EP3470576A1 EP17812806.2A EP17812806A EP3470576A1 EP 3470576 A1 EP3470576 A1 EP 3470576A1 EP 17812806 A EP17812806 A EP 17812806A EP 3470576 A1 EP3470576 A1 EP 3470576A1
Authority
EP
European Patent Office
Prior art keywords
unloading
rails
rail
track
wagon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP17812806.2A
Other languages
German (de)
French (fr)
Other versions
EP3470576A4 (en
EP3470576B1 (en
EP3470576B8 (en
Inventor
Francisco Javier Miguelez Tapia
Fernando FERNANDEZ MUÑIZ
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FCC Construction SA
Contratas y Ventas SA CONVENSA
Original Assignee
FCC Construction SA
Contratas y Ventas SA CONVENSA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FCC Construction SA, Contratas y Ventas SA CONVENSA filed Critical FCC Construction SA
Priority to SI201731276T priority Critical patent/SI3470576T1/en
Priority to HRP20221460TT priority patent/HRP20221460T1/en
Publication of EP3470576A1 publication Critical patent/EP3470576A1/en
Publication of EP3470576A4 publication Critical patent/EP3470576A4/en
Publication of EP3470576B1 publication Critical patent/EP3470576B1/en
Application granted granted Critical
Publication of EP3470576B8 publication Critical patent/EP3470576B8/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • E01B29/17Lengths of rails assembled into strings, e.g. welded together
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/50Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes mounted on railway vehicles, e.g. breakdown cranes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • E01B29/20Moving rails placed on installed sleepers in the plane track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B33/00Machines or devices for shifting tracks, with or without lifting, e.g. for aligning track, for shifting excavator track

Definitions

  • the invention is related to the technical sector for the maintenance and construction of railway infrastructure. More precisely, it is related to a method for unloading, transporting and installing the rails from a rail-carrying train and it positioning at the place of installation.
  • the procedure historically employed to transport the rails to be laid on a railroad track was to use a provisional track, comprised of wooden sleepers and second use rails.
  • the length of this track for assembling a span of double track is 2,900 meters in spans of 12 meters to optimize its transport.
  • the rail-carrying train is the means through which the rails usually arrive to the assembly area of the railroad tracks.
  • One of the most analyzed activities within the railroad track assembly process is the unloading of the rails from the rail-carrying train.
  • a previously assembled track is required, which can be a track to be replaced or an auxiliary track.
  • the rail-carrying train remains stationary on the track, which may be the new track previously laid, and the new rail is removed, which is placed as a continuation of this previously assembled track.
  • This second working method has the advantage of not requiring an auxiliary track or a previously assembled track.
  • the present invention provides a method for transporting and transferring railway track comprising the following steps:
  • This invention achieves a performance clearly superior to that of conventional processes, thanks to the substantial increase in the number of cycles per production day and the release of material assets that are essential in all known systems, substantially reducing the cost of installing the railway tracks.
  • This method does not require pulling the rail-carrying train after each unloading cycle of continuous welded rail (CWR), rather the rail-carrying train is stationary at the end of the previously assembled track and does not need to be moved until the unloading of all CWR on the rail-carrying train is finished.
  • CWR continuous welded rail
  • the versatility of the present invention allows the unloading of rails on sleepers placed on the ballast bed, and particularly on the concrete slab of tunnels, which allows the CWR to be distributed along the tunnel for subsequent plate mounting.
  • Another type of advantages of this invention are the environmental ones, since it diminishes the environmental impact on air quality, since it reduces the pollution load, through the reduction of exhaust gas emissions. Proportionally, the environmental impact on the consumption of energy resources is also reduced.
  • this new method ostensibly improves the sanitary conditions of the operators of the assembly process, especially when it comes to carrying out the unloading of rails in the form of CWR for the installation of slab track inside tunnels or other confined spaces.
  • the disappearance of exhaust gas emitted by the traction locomotives of the rail-carrying train translates into a substantial improvement in air quality and a clear reduction in the need for ventilation.
  • the method described below supports a railway track transport and transfer system, consisting of a puller machine for the unloading and placement of railway tracks, a wagon for unloading said railway tracks and elements for the transport and transfer of the rails to the point of installation.
  • the puller machine (1100) makes it possible to unload and lay the railway tracks, which arrive on a rail-carrying train, quickly, safely and precisely.
  • the machine (1100) is comprised of several parts that differ based on the function to be performed:
  • the machine (1100) has a first part formed by a frame (110) widened to a distance that allows the circulation of the driving elements (120) bordering the sleepers placed along the track, and the driving elements (120) that will be used to move the machine (1100) when the needs of adhesion and fraction are high and it is necessary to drag a pair of rails in the configuration of continuous welded rail (CWR) with a length of up to 270m.
  • CWR continuous welded rail
  • the energy required for the movement of the machine (1100) is provided by a diesel engine (150) which drives hydraulic pumps that transform mechanical energy to hydraulic energy that is transmitted to the motors joined to the driving elements (120) that will transform the hydraulic energy received into mechanical energy by driving the rotation of said driving elements (120).
  • said driving elements (120) are of the caterpillar type, mainly for outdoor and irregular terrain, whereas in another embodiment, said driving elements (120) are made of rubber, mainly when the deployment of railway track is carried out in tunnels with a concrete base.
  • It also has a second part formed by a cross member (130) perpendicular to the direction of travel of the machine (1100), located at the rear of the machine, which has been equipped with tying elements (140) the rail pull flanges, separated from each other at a distance equal to the width of the track to be mounted; this distance can be adapted to any track width.
  • the tying elements (140) for the rail, lugs, flanges and shackles are commercial and foreign to this invention.
  • This cross member (130) can be adjusted in height by means of hydraulic bottles attached to the frame (110) of the machine (1100), and serves to bridge the longitudinal levelling irregularities on the platform or ballast bed. Actuating them upwards in such a way that the end of the rails is higher than the sliding rollers, such that part of the weight of these rail ends will rest on the traction elements, thus improving their adherence if the traction effort to be carried out requires it.
  • the device By means of an articulated arm (160) with a rail clamp (170) at the end, as a lifting crane, the device carries out the operation of lifting the rail for the recovery of the rail sliding elements placed on the sleepers, the rollers, and the placement of the rail on the sleeper, once the roller has been removed.
  • the machine (1100) In order to speed up the movement of the machine and the transport of the sliding elements, the machine (1100) has been equipped with four railway wheels (180), with the possibility of adapting to the different track widths, which are hydraulically driven, allowing the machine (1100) to swiftly move along the already assembled track when the traction needs are not so demanding, i.e., throughout the whole process except when dragging the track pairs.
  • These four wheels (180) move vertically with respect to the frame (110) of the machine (1100), so that once resting on the upper surface of the rails, the caterpillars (120) or rubber wheels (120) used to split the rail remain in the air, and the movement of the machine (1100) is carried out by these railway wheels (180).
  • It consists of a wagon (2100) or platform suitable for travelling on railway tracks, equipped with railway mounted axles (210), suitable for circulation on railway tracks of different widths, which is coupled to the rail-carrying train at the unloading end of the rails.
  • this unloading wagon (2100) or platform is to avoid deflections of the railcar during the unloading, which can produce permanent deformations therein.
  • variable height (220) openings installed on its upper surface, which serve as a guide to lead the rails from the platform of the rail-carrying train to the transport elements.
  • the wagon (2100) therefore, facilitates the unloading of the rails in pairs of predetermined length (e.g., 270 meters in length), through the openings (220) that serve as a guide to lead the bars in a parallel way on the fastenings which receive them and direct them to the transport elements.
  • predetermined length e.g., 270 meters in length
  • the openings (220) can be regulated in height, which makes it easier to adapt the rail from its variable position on the rail-carrying train, and they have vertical and horizontal rolls (290) which facilitate the job of the traction element or puller machine (1100) for moving the rail forward minimizing the friction between the rail and the opening (220).
  • the wagon (2100) or unloading platform has a crane (230) to easily move the slings of twisted wire used to transmit the traction effort to the rail in the first phase of unloading.
  • said crane (230) is ready to fold and deploy and, in its maximum deployment phase, it is ready to reach the opening (220) that is the furthest from this wagon (2100).
  • the unloading wagon (2100) can be used to transport materials by using the crane (230) of the slings as a tool for loading and unloading materials and to facilitate in the same way the unloading of small dimensions and other consumables.
  • the wagon (2100) also functions as a storage hangar for the translation tanks (310) of the rail.
  • the tanks (310) are set aside on a cased track (240) or additional track on the platform of the wagon itself (2100), which has a ramp (280) made up of two longitudinally collapsible rail coupons, cut in wedges to allow the tanks (310) to pass from the wagon to the assembly track, i.e., the wagon (2100) has said cased track (240) on its upper portion, in which said translation tanks (310) are stored.
  • the wagon (2100) allows driving the rail from its location on the rail-carrying train to the transport elements and, in addition, doing it without allowing it to flex, which can cause the permanent deformations; this element serves as a guide for the rails.
  • Driving is achieved as the traction element or puller machine (1100) pulls the rail for unloading it from the rail-carrying train, through openings (220) which are adjustable in height, through which the end of the rail is passed.
  • the energy necessary for moving the crane is given by a power-pack or connected power unit (260) and a generating set powered by a diesel engine.
  • This connected power unit (260) and generating set can also power a lighting tower (270) that allows these tasks to be carried out in low visibility conditions, whether they are carried out at night or inside tunnels.
  • the translation of the track rails to their final position in the installation is carried out in several stages, for each of which different but related and coordinated means of transport are used.
  • the rails are carried from the rail-carrying train and the unloading wagon by transport elements (310) or tanks moving on existing track.
  • transport elements 310) or tanks moving on existing track.
  • this track ends and, therefore, the point is reached where there are sleepers on which to place the new rails, there are sliding elements (330) placed on the sleepers themselves on which the rails are to slide.
  • This rail transport is from the rear or end point of the unloading wagon next to the parked rail-carrying train to the transfer element (320). To this end, the rail is loaded on said tanks (310) and these are the ones that transport the rail on the assembled track, where the force necessary for movement is exerted by the traction device (1100).
  • the rails are directed towards a pivoting beam (313) installed in the tanks (310) at the end of which a there is a guide (314) on which the rails of the track are placed for transport.
  • the distance between tanks (310) and, therefore, the number of tanks (310) required to support the weight of the section supported may vary.
  • Each of these elements for the transport (310) of rail or tanks consists of a pivoting beam (313) designed to receive the pair of rails on its upper surface, where this beam (313) is prepared to accommodate and stabilize the rails supported during their transfer.
  • the beam (313) pivots on a vertical central axis (315) which is fixed to the frame (311) of the tank or transport element (310), where this pivoting movement facilitates circulation, allowing it to adapt to different curvatures.
  • the frame (311) is rigid and is equipped with four railway wheels (312) which allow it to roll on the rail, while these wheels (312) have a "double tab".
  • the contact of these tabs with the side faces of the rail head guides the tanks (310) on the existing track when they are dragged by the supported rail that rests on them.
  • these tanks (310) makes them suitable for circulation on different track widths, and in particular on the three track widths used in Spain.
  • the frame (311) in its center zone, is disposed so as to increase or decrease in size.
  • the system has sliding elements (330) with rollers previously placed on the sleepers without track at a mounting distance on the basalt bed. These elements with rollers (330) allow the rail to slide with little friction without the need to have a mobile element moving in the area of trackless sleepers.
  • the transfer of the rail from the tanks (310) to these sliding elements is carried out by means of a continuous transfer element (320), which, taking advantage of the pulling force of the traction element (1100), said horizontal pull is transformed by the transfer element (320) into a force with a vertical component which causes the rail to be raised in such a way that it no longer rests on the pivoting beam (313) of the tank or transport element (310).
  • This device or continuous transfer element (320) is placed at the end of the assembled track, on a frame (324) including railroad wheels (325). It is equipped with a mechanical system of connecting rods and actuations. This system of connecting rods (321) and actuations (322), in its initial end position, is folded on the horizontal plane, and allows transit over the traction element (1100) that is making the pulling effort during the transport of the rails on the tanks (310).
  • the actuation (322) may be a hydraulic system supported by a diesel engine (323).
  • the connecting rod (321) which rotates on an axis fixed to the frame (324), starts to move, which causes the sliding element (330) on its end to contact the lower face of the conveyed rail or rail skid.
  • the connecting rod (321) continues to rotate, its end begins to exert a vertical component force that causes the rail to raise, separating it from the transport element (310), thus stopping said element (310) from being dragged along the rail and stopping against a stop installed at the edge of the transfer element (320).
  • the rail When the actuation (322) and the connecting rod (321) reach their final position, the rail will be suspended between the end of the connecting rod (321) of the transfer device (320) and the support of the dragged tank (310), where the rail describes, due to its own weight, a catenary curve.
  • the elevation of the connecting rod (321) is such that the vertical projection of this catenary on the rolling plane of the tanks or transport elements (310) has a length of at least the sum of the lengths of all the tanks (310) that transport the CWR, so that they stop in the span of track assembled prior to the transfer element (320).
  • the sliding elements (330) of rail are arranged on the sleepers with rollers. Each of these sliding elements (330) is extended to form a bridge between two consecutive sleepers, spaced by a previously defined spacing.
  • Each of these sliding elements (330) consists of a steel plate or metal profile of such length that it can be extended between sleepers and fixed to two consecutive sleepers as a bridge. This profile is fixed to a roller that is responsible for enabling the movement of a rail, supported on it, during its longitudinal movement in the direction of installation.
  • the sliding elements (330) with these rollers are arranged on both sides of the sleeper, for each rail, successively keeping a certain equidistance.
  • tractor element (1100) Since the tractor element (1100) is equipped with crane means, the rail lifting operation is carried out supported on them, for the recovery of the rollers or sliding elements.
  • the traction device (1100) also has side trays which, like saddlebags on the machine chassis, allow the storage and transport of other components, such as, for example, the sliding elements (330) for the rails.
  • the method for transporting and transferring railway track comprises the following steps:
  • the traction element (1110) begins to move longitudinally away from the unloading wagon (2100), dragging the rails; as the rail advances, the tanks (310) are rolled one by one from the unloading wagon (2100) to the track assembled by the ramps (280) placed at the end of the wagon (2100), and they are inserted under the rails, supporting their weight and enabling, with their wheels (312), their transport.
  • the tanks (310) are placed equidistant, at a distance such that the rail, depending on its own weight, does not flex excessively due to the action of gravity.
  • spacers will be fitted between rails to strengthen the pair of rails and to prevent the rail from tipping over.
  • the traction element (1100) will continue to move away until the rails exit the unloading wagon (2100) completely and are only supported on tanks (310).
  • the tanks (310) then roll along the assembled track, pulled by the traction element or pulling machine (1100) to the transfer element (320).
  • the tanks (310) can no longer transport the CWR on the existing track; then, the track will cease to be transported by the tanks (310) and will be dragged using elements that make it easier to slide.
  • These sliding elements (330) incorporate rollers and have previously been placed on the sleepers that have been previously placed and at a mounting distance on the ballast bed.
  • Transfer element (320) Continuous transfer from the rail transport system (310) to the rail sliding element (330) is carried out via transfer element (320), which, taking advantage of the pulling force of the traction element (1100), is transformed by the transfer element (320) into a force with a vertical component which causes the rail to be raised in such a way that it no longer rests on the pivoting beam (313) of the tank (310).
  • the rail sliding elements (330) are arranged on top of them, with their rollers, each of them extended to form a bridge between two consecutive sleepers as mentioned above, and spaced by a previously defined spacing.
  • the pair of rails is transferred from the tanks (310) to the sliding rollers, the rails being directed and guided towards their support on the rollers or sliding elements (330) that were previously placed on the sleepers of the track.
  • a cutting, squaring and flanging operation is carried out, i.e., an operation to join the ends of the rails immediately adjacent to each other.
  • This operation is carried out with the lifting equipment or crane (160) incorporated in the traction device (1100), and it consists of lifting the rail, held at one end, the free end, to allow for the recovery of the aforementioned sliding elements (330), which are then loaded into the traction device (1100) itself, as mentioned above, for transport to the new working position.
  • one sleeper every certain number of units for example, one sleeper every 7 units.
  • the traction device or puller machine (1100) traces back its steps to the unloading wagon (2100) moving on the assembled track using the railway wheels (180) of variable track width available and finishes nailing, all components and devices being ready for the beginning of a new cycle.
  • the transfer element (320) When it reaches the transfer element (320), it must change its sliding mode to the caterpillars (120) or rubber wheels (120) and pass the transfer element (320) that is folded. Once passed, it rests on its railway wheels (180) and returns to the unloading wagon (2100), pushing the tanks (310), which have previously been tied to each other, to prevent them from rolling out of control in the event of a favorable slope.
  • the tanks (310) Once the tanks (310) reach the unloading wagon, they begin to ascend to it platform by means of the ramps (280) prepared for this purpose. As the traction element (1100) approaches the unloading wagon (2100), the tanks (310) are coupled to the platform, until the traction element (1100) is in position to begin the cycle and all tanks (310) are on the platform of the unloading wagon (2100).

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention relates to a method for unloading, transporting and installing a railway track, which does not require the rail-carrying train to be brought closer after each cycle of unloading continuous welded rail (CWR), the train remaining parked at the end of the track already laid until all the CWR has been completely unloaded. According to the invention, the method consists of: fastening two rails to a crane of an unloading wagon and moving same through windows along the wagon, facilitating the descent thereof to the track; transferring the rails to a machine for pulling and positioning which moves along, leaving the rails supported on transport elements that move along the track already laid; transferring the rails from the track already laid to a section of sleepers; and moving the rails to their final position, using sliding elements placed on the sleepers.

Description

    Field of invention
  • The invention is related to the technical sector for the maintenance and construction of railway infrastructure. More precisely, it is related to a method for unloading, transporting and installing the rails from a rail-carrying train and it positioning at the place of installation.
  • Background of the invention
  • The procedure historically employed to transport the rails to be laid on a railroad track was to use a provisional track, comprised of wooden sleepers and second use rails. The length of this track for assembling a span of double track is 2,900 meters in spans of 12 meters to optimize its transport.
  • Recently, several companies have developed systems and procedures that allow the elimination of this auxiliary track.
  • The rail-carrying train is the means through which the rails usually arrive to the assembly area of the railroad tracks. One of the most analyzed activities within the railroad track assembly process is the unloading of the rails from the rail-carrying train.
  • There are basically two methods to perform the unloading of the rails, which differ in that, in one of them, the rail-carrying train moves on track that was already laid while the rail remains tied to a fixed point by one of its ends and, in the other method, the rail-carrying train remains stationary while the rail is being removed following the track alignment.
  • If the first method is employed, a previously assembled track is required, which can be a track to be replaced or an auxiliary track.
  • With the second method, the rail-carrying train remains stationary on the track, which may be the new track previously laid, and the new rail is removed, which is placed as a continuation of this previously assembled track. This second working method has the advantage of not requiring an auxiliary track or a previously assembled track.
  • Currently, when it comes to the construction of new railway tracks, the most relevant method is the second one, and it is the one usually used for the purposes of achieving a greater productivity, since it avoids assembling an auxiliary track.
  • It is unknown in the market the existence of any machine to perform the tasks of unloading and placing railway tracks.
  • There are some proposals for machines for laying rails, but none of them (with the exception of the specified on the Spanish Patent with Application No. P-200901480 issued to the owner of this patent) perform the functions of dragging, rail hoisting and transporting auxiliary sliding elements.
  • Disclosure of the invention
  • It is necessary to offer an alternative to the state of the art which closes the gaps found therein.
  • To this end, the present invention provides a method for transporting and transferring railway track comprising the following steps:
    1. a) tying by the slings two rails located in a rail-carrying train to the crane of a wagon for unloading and laying the railway tracks,
    2. b) pulling, said unloading wagon, from said rails, to move them on each of the openings of said unloading wagon until the most advanced end of the rails reaches the opening furthest away from the rail-carrying train,
    3. c) changing the rail ties from the crane of said unloading wagon to a puller machine for unloading and placing railway tracks,
    4. d) pulling, said puller machine, from said rails, while said machine travels and moves away from the unloading wagon, where, as said machine moves forward, transport elements move from said unloading wagon on the already laid track, and thus said rails are supported on said transport elements while they move along the track,
    5. e) once the assembled track is finished, said rails go through a transfer element located at the end of said assembled track to sliding elements located along the sleepers where the unloaded rails will be placed, and
    6. f) recovering the sliding elements on which the rails are supported with the help of a crane of said machine and leave said rails resting on the sleepers in their final position.
  • Embodiments of the system of the invention are described according to the attached claims, and in a later section.
  • This invention achieves a performance clearly superior to that of conventional processes, thanks to the substantial increase in the number of cycles per production day and the release of material assets that are essential in all known systems, substantially reducing the cost of installing the railway tracks.
  • This method does not require pulling the rail-carrying train after each unloading cycle of continuous welded rail (CWR), rather the rail-carrying train is stationary at the end of the previously assembled track and does not need to be moved until the unloading of all CWR on the rail-carrying train is finished. Thus, the locomotives that perform a traction service in these transports between unloading cycles are expendable, because the rail-carrying train is stationary.
  • This allows them to be used during the time of unloading in other tasks within the assembly process, such as the distribution and application of ballast, or the transport of rail detours, thus optimizing resources and reducing the costs of track installation.
  • In addition, the versatility of the present invention allows the unloading of rails on sleepers placed on the ballast bed, and particularly on the concrete slab of tunnels, which allows the CWR to be distributed along the tunnel for subsequent plate mounting.
  • Another type of advantages of this invention are the environmental ones, since it diminishes the environmental impact on air quality, since it reduces the pollution load, through the reduction of exhaust gas emissions. Proportionally, the environmental impact on the consumption of energy resources is also reduced.
  • It also has advantages regarding ergonomic and occupational hygiene aspects: in the field of Occupational Risk Prevention, this new method ostensibly improves the sanitary conditions of the operators of the assembly process, especially when it comes to carrying out the unloading of rails in the form of CWR for the installation of slab track inside tunnels or other confined spaces. The disappearance of exhaust gas emitted by the traction locomotives of the rail-carrying train translates into a substantial improvement in air quality and a clear reduction in the need for ventilation.
  • These and other advantages are evident in the light of the detailed description of the invention.
  • Brief Description of the Drawings
  • The foregoing and other advantages and characteristics shall be more completely understood from the following detailed description of the embodiments, with reference to the attached drawings, which are to be considered in an illustrative rather than a limitative manner, in which:
    • FIG. 1 shows a front view of the puller machine where the railway wheels are seen resting on the rails, while the driving elements of the frame are in the air.
    • FIG. 2 shows a side view of the puller machine where the railway wheels are seen resting on the rails, while the driving elements of the frame are in the air, and where the cross member for tying and pulling and the hinged arm with the clamp for rails is seen.
    • FIG. 2A shows, with reference to the previous Figure, an enlargement of the tying element.
    • FIG. 3 shows a front view of the puller machine where the railway wheels are seen in the air, not resting on the rails, while the driving elements of the frame are on the ground.
    • FIG. 4 shows a side view of the puller machine where the railway wheels are seen in the air, not resting on the rails, while the driving elements of the frame remain resting on the ground, and where the cross member for tying and pulling and the hinged arm with the clamp for rails is seen.
    • FIG. 5 shows a plan view of the unloading wagon.
    • FIG. 6A shows an elevation view of the unloading wagon, where the crane can be seen at one end, while FIG. 6B shows the other end of the unloading with the puller machine supporting said unloading.
    • FIG. 6C shows an enlarged detail with respect to FIG. 6A where the openings appear next to other elements, while FIG. 6D shows the lighting tower in greater detail, also in relation to FIG. 6A.
    • FIG. 7 shows a front view of an example opening of greater height, which could be located at the beginning of the rail unloading point. Likewise, the Figure shows the lighting tower which can be incorporated to the wagon.
    • FIG. 8 shows a front view of an example opening of medium height, related to the one above.
    • FIG. 9 shows a front view of an example opening of lesser height, which could be located at the end of the unloading point on the wagon.
    • FIG. 10A shows a front view of a transport element of the railway track transport and transfer system. In this example, the element is arranged for a narrow track width.
    • FIG. 10B shows a front view of the same transport element of the previous Figure arranged for a track width that is wider than the one above.
    • FIG. 11A shows the top view of the transport element of the railway track transport and transfer system, in which the pivoting beam remains perpendicular to the direction of the track.
    • FIG. 11B shows the top view of the transport element of the railway track transport and transfer system, in which the pivoting beam is rotated to adapt to the curvature of the rail and the track when it is moving along the existing track.
    • FIG. 12A shows a top view of the transfer element of the railway track transport and transfer system.
    • FIG. 12B shows a front view of the transfer element of the railway track transport and transfer system.
    • FIG. 12C shows a side view of the transfer element of the railway track transport and transfer system where the system of connecting rods and drive is observed in an elevated position with respect to the horizontal.
    • FIG. 13 shows a side view of a section of the deployment of the railway track transport and transfer system; specifically, the rail that is transported by the transport elements and is already elevated above the transfer element.
    • FIG. 14 shows a side view of another section of the deployment of the railway track transport and transfer system; specifically, the rail that is elevated above the transfer element and slid over the sliding elements by pulling with a traction element.
    • FIG. 15 shows a side view of another section of the deployment of the railway track transport and transfer system; specifically, the rail that is elevated above the transfer element and slid over the sliding elements by pulling with the traction element, but that, once the rail has reached its final position, it is observed how said traction element elevates the rail by the crane which is incorporated to remove the sliding elements and leave the rail resting on the sleepers.
    • FIG. 15A shows an enlargement with the detail of the above figure of the sliding elements.
    • FIGS. 16A and 16B show elevation views of the transfer element in two different moments: when pulling the rail, FIG. 16B, and when lifting the assembled rail to recover the translation tanks, FIG. 16B.
    • FIG. 17 shows the recovery of the tanks once the operation of unloading and installing the rail is finished.
    Detailed Description of the Invention
  • The elements defined in this detailed description are provided to aid in the general understanding of the invention. Consequently, one of ordinary skill in the art shall recognize that variations and modifications to the embodiments described in this document may be made without departing from the scope and spirit of the invention. In addition, the detailed description of the functions and elements sufficiently known is omitted for clarity and conciseness.
  • The method described below supports a railway track transport and transfer system, consisting of a puller machine for the unloading and placement of railway tracks, a wagon for unloading said railway tracks and elements for the transport and transfer of the rails to the point of installation.
  • The characteristics of each of these elements are as follows:
  • Puller machine for unloading and placement of railway tracks
  • The puller machine (1100) makes it possible to unload and lay the railway tracks, which arrive on a rail-carrying train, quickly, safely and precisely.
  • The machine (1100) is comprised of several parts that differ based on the function to be performed:
  • • Rail traction function.
  • For this function, the machine (1100) has a first part formed by a frame (110) widened to a distance that allows the circulation of the driving elements (120) bordering the sleepers placed along the track, and the driving elements (120) that will be used to move the machine (1100) when the needs of adhesion and fraction are high and it is necessary to drag a pair of rails in the configuration of continuous welded rail (CWR) with a length of up to 270m.
  • The energy required for the movement of the machine (1100) is provided by a diesel engine (150) which drives hydraulic pumps that transform mechanical energy to hydraulic energy that is transmitted to the motors joined to the driving elements (120) that will transform the hydraulic energy received into mechanical energy by driving the rotation of said driving elements (120).
  • In a preferred embodiment, said driving elements (120) are of the caterpillar type, mainly for outdoor and irregular terrain, whereas in another embodiment, said driving elements (120) are made of rubber, mainly when the deployment of railway track is carried out in tunnels with a concrete base.
  • It also has a second part formed by a cross member (130) perpendicular to the direction of travel of the machine (1100), located at the rear of the machine, which has been equipped with tying elements (140) the rail pull flanges, separated from each other at a distance equal to the width of the track to be mounted; this distance can be adapted to any track width.
  • The tying elements (140) for the rail, lugs, flanges and shackles are commercial and foreign to this invention.
  • This cross member (130) can be adjusted in height by means of hydraulic bottles attached to the frame (110) of the machine (1100), and serves to bridge the longitudinal levelling irregularities on the platform or ballast bed. Actuating them upwards in such a way that the end of the rails is higher than the sliding rollers, such that part of the weight of these rail ends will rest on the traction elements, thus improving their adherence if the traction effort to be carried out requires it.
  • • Function of recovery of sliding elements and rail positioning.
  • By means of an articulated arm (160) with a rail clamp (170) at the end, as a lifting crane, the device carries out the operation of lifting the rail for the recovery of the rail sliding elements placed on the sleepers, the rollers, and the placement of the rail on the sleeper, once the roller has been removed.
  • • Function of moving and transporting the sliding elements
  • In order to speed up the movement of the machine and the transport of the sliding elements, the machine (1100) has been equipped with four railway wheels (180), with the possibility of adapting to the different track widths, which are hydraulically driven, allowing the machine (1100) to swiftly move along the already assembled track when the traction needs are not so demanding, i.e., throughout the whole process except when dragging the track pairs.
  • These four wheels (180) move vertically with respect to the frame (110) of the machine (1100), so that once resting on the upper surface of the rails, the caterpillars (120) or rubber wheels (120) used to split the rail remain in the air, and the movement of the machine (1100) is carried out by these railway wheels (180).
  • Wagon for unloading railway tracks
  • It consists of a wagon (2100) or platform suitable for travelling on railway tracks, equipped with railway mounted axles (210), suitable for circulation on railway tracks of different widths, which is coupled to the rail-carrying train at the unloading end of the rails.
  • The purpose of this unloading wagon (2100) or platform is to avoid deflections of the railcar during the unloading, which can produce permanent deformations therein.
  • To this end, it has variable height (220) openings installed on its upper surface, which serve as a guide to lead the rails from the platform of the rail-carrying train to the transport elements.
  • The wagon (2100), therefore, facilitates the unloading of the rails in pairs of predetermined length (e.g., 270 meters in length), through the openings (220) that serve as a guide to lead the bars in a parallel way on the fastenings which receive them and direct them to the transport elements.
  • The width of these openings (220) or windows, the space remaining for the passage of the rail, is gradually reduced, so that after the passage through the last of them, the position both in the vertical plane and in the horizontal plane of the rail head is adequate to come down on the translation tanks (310).
  • The openings (220) can be regulated in height, which makes it easier to adapt the rail from its variable position on the rail-carrying train, and they have vertical and horizontal rolls (290) which facilitate the job of the traction element or puller machine (1100) for moving the rail forward minimizing the friction between the rail and the opening (220).
  • The wagon (2100) or unloading platform has a crane (230) to easily move the slings of twisted wire used to transmit the traction effort to the rail in the first phase of unloading. said crane (230) is ready to fold and deploy and, in its maximum deployment phase, it is ready to reach the opening (220) that is the furthest from this wagon (2100).
  • In addition, the unloading wagon (2100) can be used to transport materials by using the crane (230) of the slings as a tool for loading and unloading materials and to facilitate in the same way the unloading of small dimensions and other consumables.
  • The wagon (2100) also functions as a storage hangar for the translation tanks (310) of the rail. The tanks (310) are set aside on a cased track (240) or additional track on the platform of the wagon itself (2100), which has a ramp (280) made up of two longitudinally collapsible rail coupons, cut in wedges to allow the tanks (310) to pass from the wagon to the assembly track, i.e., the wagon (2100) has said cased track (240) on its upper portion, in which said translation tanks (310) are stored. In order to pass the tanks (310) from the platform of the wagon (2100) to the track in the assembly phase, it is provided with two rail coupons or pieces of short rail, which are collapsible and cut in bevel, such that, once collapsed, act as a ramp (280).
  • The wagon (2100) allows driving the rail from its location on the rail-carrying train to the transport elements and, in addition, doing it without allowing it to flex, which can cause the permanent deformations; this element serves as a guide for the rails.
  • Driving is achieved as the traction element or puller machine (1100) pulls the rail for unloading it from the rail-carrying train, through openings (220) which are adjustable in height, through which the end of the rail is passed.
  • In order to position the rail head where it can be tied to the cross beam of the traction element (1100), it is necessary to use, as mentioned above, a flexible sling. Due to the traction efforts that the traction element (1100) has to make to pull the rail, a sling of braided steel wire of great dimensions is necessary, which is difficult to manually handle; therefore, for handling this sling and the rail, the unloading wagon (2100) has been equipped with a hydraulic crane (230) to perform these tasks.
  • The energy necessary for moving the crane is given by a power-pack or connected power unit (260) and a generating set powered by a diesel engine.
  • This connected power unit (260) and generating set can also power a lighting tower (270) that allows these tasks to be carried out in low visibility conditions, whether they are carried out at night or inside tunnels.
  • Transport and transfer elements of the railway track
  • The translation of the track rails to their final position in the installation is carried out in several stages, for each of which different but related and coordinated means of transport are used.
  • In a first stage, the rails are carried from the rail-carrying train and the unloading wagon by transport elements (310) or tanks moving on existing track. When this track ends and, therefore, the point is reached where there are sleepers on which to place the new rails, there are sliding elements (330) placed on the sleepers themselves on which the rails are to slide.
  • And in between, at the intermediate point, in this transit of the rails from the transport elements (310) to the sliding elements (330), there is a continuous transfer element (320) which allows the transfer of the continuous welded rail (CWR), which, supported on the transport elements (310) or tanks, are moved along the already assembled track in a longitudinal direction, to slide on sliding elements (330) installed on the sleepers placed on the ballast bed. This transfer is performed in a continuous manner, with no need to lift the rail, using the pulling effort of the traction element (1100).
  • This rail transport is from the rear or end point of the unloading wagon next to the parked rail-carrying train to the transfer element (320). To this end, the rail is loaded on said tanks (310) and these are the ones that transport the rail on the assembled track, where the force necessary for movement is exerted by the traction device (1100).
  • Once the tip of the rail exits from the wagons of the rail-carrying train, and with the help of the unloading wagon and its built-in guiding means, the rails are directed towards a pivoting beam (313) installed in the tanks (310) at the end of which a there is a guide (314) on which the rails of the track are placed for transport.
  • When the rails are resting on the pivoting beam (313) and the weight of the rail section falls on the tank or transport element (310), it begins to move longitudinally in the direction of the installation, dragged by the rail it supports, by the action of a pulling force of the traction element or puller machine (1100). As the rails moves forward, new tanks (310) are incorporated to support the rail section removed from the rail-carrying train, thus gradually incorporating more tanks (310) that support the weight of the removed sections of the continuous welded rail.
  • Depending on the type of rail and its length, the distance between tanks (310) and, therefore, the number of tanks (310) required to support the weight of the section supported may vary.
  • Each of these elements for the transport (310) of rail or tanks consists of a pivoting beam (313) designed to receive the pair of rails on its upper surface, where this beam (313) is prepared to accommodate and stabilize the rails supported during their transfer.
  • The beam (313) pivots on a vertical central axis (315) which is fixed to the frame (311) of the tank or transport element (310), where this pivoting movement facilitates circulation, allowing it to adapt to different curvatures.
  • The frame (311) is rigid and is equipped with four railway wheels (312) which allow it to roll on the rail, while these wheels (312) have a "double tab". The contact of these tabs with the side faces of the rail head guides the tanks (310) on the existing track when they are dragged by the supported rail that rests on them.
  • The constructive form chosen for these tanks (310) makes them suitable for circulation on different track widths, and in particular on the three track widths used in Spain. Specifically, the frame (311), in its center zone, is disposed so as to increase or decrease in size.
  • When the tanks (310) with the rail loaded on them reach the end of the assembled track and can no longer transport the CWR on the existing track, the system has sliding elements (330) with rollers previously placed on the sleepers without track at a mounting distance on the basalt bed. These elements with rollers (330) allow the rail to slide with little friction without the need to have a mobile element moving in the area of trackless sleepers.
  • The transfer of the rail from the tanks (310) to these sliding elements is carried out by means of a continuous transfer element (320), which, taking advantage of the pulling force of the traction element (1100), said horizontal pull is transformed by the transfer element (320) into a force with a vertical component which causes the rail to be raised in such a way that it no longer rests on the pivoting beam (313) of the tank or transport element (310).
  • Thus, the tank (310) is no longer being dragged and it stops. This mechanical system of continuous transfer (320) is equipped with rail guiding and sliding devices (326), which lead it to the sliding elements (330).
  • This device or continuous transfer element (320) is placed at the end of the assembled track, on a frame (324) including railroad wheels (325). It is equipped with a mechanical system of connecting rods and actuations. This system of connecting rods (321) and actuations (322), in its initial end position, is folded on the horizontal plane, and allows transit over the traction element (1100) that is making the pulling effort during the transport of the rails on the tanks (310).
  • Once the tractor element (1100) and the tip of the transported rails have passed said transfer element, by means of a mechanical actuation (322), it begins to unfold. The actuation (322) may be a hydraulic system supported by a diesel engine (323).
  • The connecting rod (321), which rotates on an axis fixed to the frame (324), starts to move, which causes the sliding element (330) on its end to contact the lower face of the conveyed rail or rail skid. As the connecting rod (321) continues to rotate, its end begins to exert a vertical component force that causes the rail to raise, separating it from the transport element (310), thus stopping said element (310) from being dragged along the rail and stopping against a stop installed at the edge of the transfer element (320).
  • When the actuation (322) and the connecting rod (321) reach their final position, the rail will be suspended between the end of the connecting rod (321) of the transfer device (320) and the support of the dragged tank (310), where the rail describes, due to its own weight, a catenary curve.
  • The elevation of the connecting rod (321) is such that the vertical projection of this catenary on the rolling plane of the tanks or transport elements (310) has a length of at least the sum of the lengths of all the tanks (310) that transport the CWR, so that they stop in the span of track assembled prior to the transfer element (320).
  • Once the rail has been raised and in a continuous manner, without having to stop the longitudinal movement of the rail, it is led to the sliding elements (30) that allow the CWR to move on the sleepers placed on the ballast bed.
  • With the sleepers in place, as mentioned above, the sliding elements (330) of rail are arranged on the sleepers with rollers. Each of these sliding elements (330) is extended to form a bridge between two consecutive sleepers, spaced by a previously defined spacing.
  • Each of these sliding elements (330) consists of a steel plate or metal profile of such length that it can be extended between sleepers and fixed to two consecutive sleepers as a bridge. This profile is fixed to a roller that is responsible for enabling the movement of a rail, supported on it, during its longitudinal movement in the direction of installation. The sliding elements (330) with these rollers are arranged on both sides of the sleeper, for each rail, successively keeping a certain equidistance.
  • Once the tail of the CWR has surpassed the transfer element (320) completely, it is necessary to remove the sliding elements (330), so that the underside of the rail rests on the sleepers placed on the ballast bed.
  • Since the tractor element (1100) is equipped with crane means, the rail lifting operation is carried out supported on them, for the recovery of the rollers or sliding elements.
  • By means of an articulated arm with a rail clamp at the end, as a lifting crane, the operation of lifting the rail is performed, which releases the weight of the rail and enables the recovery of the rail sliding elements (330) placed on the sleepers, and the placement of the rail on the sleeper, once the roller has been removed. The traction device (1100) also has side trays which, like saddlebags on the machine chassis, allow the storage and transport of other components, such as, for example, the sliding elements (330) for the rails.
  • From these system elements, the method for transporting and transferring railway track comprises the following steps:
  • Rail tie and unloading to translation tanks
  • With the help of the crane (230) of the unloading wagon (2100), steel slings are thrown through the openings (220) of the unloading wagon (2100), which are used for pulling. A flanging operation of a pair of rails is then carried out on the last wagon of the rail-carrying train, with the means used to split and move the rails in the unloading direction with the help of the traction element or puller machine (1100). By means of the traction element (1100), the rails are dragged through the openings (220) until their heads pass through the last opening (220).
  • At this point, the slings of the rail are released and the traction element or puller machine (1100) approaches the head of the rail and the pulling flange is directly attached to the cross beam (130) of the element, traction device or puller machine (1100).
  • Loading on translation tanks and transport of rail to transfer element.
  • After the pair of rails is tied directly to the traction element (1100), traction is exerted on them by the traction device (1100), until the complete exit of the rails is achieved, from the rail-carrying train wagons, an operation which, as mentioned above, is enabled by the guiding means (290) incorporated in the openings (220) on the unloading wagon (2100), and the rails being directed and guided towards their support on the tanks (310).
  • The traction element (1110) begins to move longitudinally away from the unloading wagon (2100), dragging the rails; as the rail advances, the tanks (310) are rolled one by one from the unloading wagon (2100) to the track assembled by the ramps (280) placed at the end of the wagon (2100), and they are inserted under the rails, supporting their weight and enabling, with their wheels (312), their transport.
  • The tanks (310) are placed equidistant, at a distance such that the rail, depending on its own weight, does not flex excessively due to the action of gravity. In addition, spacers will be fitted between rails to strengthen the pair of rails and to prevent the rail from tipping over. The traction element (1100) will continue to move away until the rails exit the unloading wagon (2100) completely and are only supported on tanks (310).
  • The tanks (310) then roll along the assembled track, pulled by the traction element or pulling machine (1100) to the transfer element (320).
  • Transfer of the rail from the transfer elements to the sliding elements.
  • Once the tip of the CWR surpasses the transfer device (320), placed at the end of the assembled track, the tanks (310) can no longer transport the CWR on the existing track; then, the track will cease to be transported by the tanks (310) and will be dragged using elements that make it easier to slide. These sliding elements (330) incorporate rollers and have previously been placed on the sleepers that have been previously placed and at a mounting distance on the ballast bed.
  • Continuous transfer from the rail transport system (310) to the rail sliding element (330) is carried out via transfer element (320), which, taking advantage of the pulling force of the traction element (1100), is transformed by the transfer element (320) into a force with a vertical component which causes the rail to be raised in such a way that it no longer rests on the pivoting beam (313) of the tank (310).
  • Thus, the tank (310) is no longer being dragged and it stops. This mechanical system of continuous transfer is equipped with rail guiding and sliding devices, which lead it to the sliding elements.
  • Rail sliding to its final position.
  • With the sleepers in place, the rail sliding elements (330) are arranged on top of them, with their rollers, each of them extended to form a bridge between two consecutive sleepers as mentioned above, and spaced by a previously defined spacing.
  • As the pair of rails is transferred from the tanks (310) to the sliding rollers, the rails being directed and guided towards their support on the rollers or sliding elements (330) that were previously placed on the sleepers of the track.
  • With the sleepers in place, while the tractor element (1100) moves, some operators distribute the sliding elements (330) of the rail that are housed in the saddlebags of the traction element or pulling machine (1100), and are transported by it, placing each one of them extended, forming a bridge between two consecutive sleepers as mentioned above, and separated by a previously defined spacing. 17
  • When the entire rail has been transferred to the sliding elements (330), a cutting, squaring and flanging operation is carried out, i.e., an operation to join the ends of the rails immediately adjacent to each other.
  • Positioning of rail in its final location and recovery of sliding rollers.
  • At the end of the previous operation, the rail on each side is lifted to recover the rollers or sliding elements (330) that allowed the longitudinal movement of each rail.
  • This operation is carried out with the lifting equipment or crane (160) incorporated in the traction device (1100), and it consists of lifting the rail, held at one end, the free end, to allow for the recovery of the aforementioned sliding elements (330), which are then loaded into the traction device (1100) itself, as mentioned above, for transport to the new working position.
  • Once the previous stage has been completed, to the partial nailing of the track is performed, one sleeper every certain number of units, for example, one sleeper every 7 units.
  • Returning the translation elements to the unloading wagon.
  • Finally, the traction device or puller machine (1100) traces back its steps to the unloading wagon (2100) moving on the assembled track using the railway wheels (180) of variable track width available and finishes nailing, all components and devices being ready for the beginning of a new cycle.
  • When it reaches the transfer element (320), it must change its sliding mode to the caterpillars (120) or rubber wheels (120) and pass the transfer element (320) that is folded. Once passed, it rests on its railway wheels (180) and returns to the unloading wagon (2100), pushing the tanks (310), which have previously been tied to each other, to prevent them from rolling out of control in the event of a favorable slope.
  • Once the tanks (310) reach the unloading wagon, they begin to ascend to it platform by means of the ramps (280) prepared for this purpose. As the traction element (1100) approaches the unloading wagon (2100), the tanks (310) are coupled to the platform, until the traction element (1100) is in position to begin the cycle and all tanks (310) are on the platform of the unloading wagon (2100).
  • From here on, the cycle is repeated for other rails.

Claims (8)

  1. Method for unloading, transporting and installing a railway track, characterized in that it comprises the following steps:
    a) tying by the slings two rails located in a rail-carrying train to the crane (230) of a wagon for unloading and laying the railway tracks (2100),
    b) pulling, by the crane (230), said unloading wagon (2100), from said rails, to move them on each of the openings (220) of said unloading wagon (2100) until the most advanced end of the rails reaches the opening (220) furthest away from the rail-carrying train,
    c) changing the rail ties from the crane (230) of said unloading wagon (2100) to the puller machine for unloading and placing railway tracks (1100),
    d) pulling, said puller machine (1100), from said rails, while said machine (1100) travels and moves away from the unloading wagon (2100), where, as said machine (1100) moves forward, transport elements (310) move from said unloading wagon (2100) on the already laid track, and thus said rails are supported on said transport elements (310) while they move along the track,
    e) once the assembly is finished, said rails go through a transfer element (320) located at the end of said assembled track to sliding elements (330) located along the sleepers where the unloaded rails will be placed,
    f) recovering the sliding elements (330) on which the rails are supported with the help of a crane (160) of said machine (1100) and leave said rails resting on the sleepers in their final position, and
    g) returning, said puller machine (1100), to the unloading wagon (2100), where, after passing the transfer element (320), it pushes the transport elements (310) to said wagon (2100) where the steps can be repeated with a next pair of rails.
  2. Method for unloading, transporting and installing a railway track according to claim 1, characterized in that said puller machine (1100) slides with rail wheels (180) where there is assembled track, between the unloading wagon (2100) and the transfer element (320), while it uses drive elements (120), preferably caterpillar type or rubber wheels, when there is no track assembled to slide on.
  3. Method for unloading, transporting and installing a railway track according to claim 1, characterized in that said transfer element (320) remains folded when said puller machine (1100) passes over said transfer element (320).
  4. Method for unloading, transporting and installing a railway track according to claim 1, characterized in that said transfer element (320) transforms the horizontal pulling force exerted by this puller machine (1100) into a vertical component force which causes these rails to be lifted as they pass by and frees up these transport elements (310), in such a way that said transport elements (310) stop moving forward.
  5. Method for unloading, transporting and installing a railway track according to claim 1, characterized in that the tie c) of the rails to the puller machine (1100) is carried out on a transverse beam (130) of said machine (1100).
  6. Method for unloading, transporting and installing a railway track according to claim 1, characterized in that said transport elements (310) pass from the unloading wagon (2100) to the already assembled track d) through a cased track or additional track (240) located over the top portion of the wagon and a ramp (280) located at the end of said wagon.
  7. Method for unloading, transporting and installing a railway track according to claim 1, characterized in that each of said transport elements (310) is positioned at an approximately equidistant distance and sufficiently close to each other so that the rails do not flex excessively.
  8. Method for unloading, transporting and installing a railway track according to claim 1, characterized in that each of said sliding elements (330) is placed between each pair of consecutive sleepers.
EP17812806.2A 2016-06-14 2017-06-05 Method for unloading, transporting and installing a railway track Active EP3470576B8 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SI201731276T SI3470576T1 (en) 2016-06-14 2017-06-05 Method for unloading, transporting and installing a railway track
HRP20221460TT HRP20221460T1 (en) 2016-06-14 2017-06-05 Method for unloading, transporting and installing a railway track

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ES201630810A ES2646752B1 (en) 2016-06-14 2016-06-14 Method for unloading, transporting and installing railroad track lanes
PCT/ES2017/070407 WO2017216405A1 (en) 2016-06-14 2017-06-05 Method for unloading, transporting and installing a railway track

Publications (4)

Publication Number Publication Date
EP3470576A1 true EP3470576A1 (en) 2019-04-17
EP3470576A4 EP3470576A4 (en) 2019-06-12
EP3470576B1 EP3470576B1 (en) 2022-09-07
EP3470576B8 EP3470576B8 (en) 2022-12-28

Family

ID=60664015

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17812806.2A Active EP3470576B8 (en) 2016-06-14 2017-06-05 Method for unloading, transporting and installing a railway track

Country Status (13)

Country Link
US (1) US11299858B2 (en)
EP (1) EP3470576B8 (en)
CA (1) CA3034174A1 (en)
CL (1) CL2018003618A1 (en)
CO (1) CO2019000352A2 (en)
DK (1) DK3470576T3 (en)
ES (2) ES2646752B1 (en)
HR (1) HRP20221460T1 (en)
LT (1) LT3470576T (en)
PE (1) PE20190548A1 (en)
PT (1) PT3470576T (en)
SI (1) SI3470576T1 (en)
WO (1) WO2017216405A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108468256A (en) * 2018-02-06 2018-08-31 中车工业研究院有限公司 A kind of railway intelligence fastener installation mechanical arm and its fastener installation method
CN113897823A (en) * 2021-09-18 2022-01-07 中国铁建高新装备股份有限公司 Rail changing system and using method

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3465687A (en) * 1966-11-18 1969-09-09 New York Central Railroad Co T Rail positioning system
WO1998013551A1 (en) * 1996-09-09 1998-04-02 Karl Anders Rosenqvist A method of placing rail sections and a means therefore
US6981452B2 (en) * 2004-02-06 2006-01-03 Herzog Contracting Corp. Method and apparatus for unloading ribbon rails from rail cars
ES1057004Y (en) * 2004-03-18 2004-09-16 Tecsa Empresa Constructora Sa USEFUL FOR DISCHARGE AND POSITIONING OF RAILS IN VIAS FERREAS
ES2308954A1 (en) * 2008-07-29 2008-12-01 Tecsa Empresa Constructora, S.A Machine for the loading and unloading of rollers of trailer and positioning of roads ferreas (Machine-translation by Google Translate, not legally binding)
ES2361309B1 (en) * 2009-06-23 2012-05-16 Fcc Construccion S.A. INSTALLATION PROCEDURE OF V�? A FÉRREA, ON BASKET, WITHOUT AID TO ASSIST.
US20120145032A1 (en) * 2009-08-21 2012-06-14 Herzog Contracting Corp. Rail train
ES2384150B1 (en) * 2009-12-28 2013-10-10 Ferrovial Agromán S.A. RAIL DOWNLOAD SYSTEM.
KR20140094969A (en) * 2013-01-23 2014-07-31 (주)신승엔지니어링 Apparatus to unload rails
AU2014215585B2 (en) * 2013-02-06 2016-11-10 Herzog Rail Road Services, Inc. Rail loading and unloading machine

Also Published As

Publication number Publication date
PE20190548A1 (en) 2019-04-16
CO2019000352A2 (en) 2019-03-29
CL2018003618A1 (en) 2019-07-12
DK3470576T3 (en) 2022-12-12
US11299858B2 (en) 2022-04-12
EP3470576A4 (en) 2019-06-12
SI3470576T1 (en) 2023-04-28
PT3470576T (en) 2022-12-13
HRP20221460T1 (en) 2023-02-17
US20190330804A1 (en) 2019-10-31
ES2646752A1 (en) 2017-12-15
EP3470576B1 (en) 2022-09-07
LT3470576T (en) 2023-02-10
WO2017216405A1 (en) 2017-12-21
ES2646752B1 (en) 2018-08-09
CA3034174A1 (en) 2017-12-21
ES2932479T3 (en) 2023-01-19
EP3470576B8 (en) 2022-12-28

Similar Documents

Publication Publication Date Title
US11053101B2 (en) Bridge span replacement system
EP2094912B1 (en) Self-propelled rail unloading machine
AU2005213362B2 (en) Method and apparatus for unloading ribbon rails from rail cars
CA2812336A1 (en) Bridge span replacement method
RU2132895C1 (en) Rail car for unloading long-cut rails loaded on transportation platforms
GB2024288A (en) Machine for replacing the rails and sleepers of a railway track
EP3470576B1 (en) Method for unloading, transporting and installing a railway track
US20080072783A1 (en) Railway Rail Handling Apparatus and Method
CA1206808A (en) Train for laying a new railroad track
JPH0778321B2 (en) Machinery for picking up, laying and transporting washer
KR20150070578A (en) Construction Method
CZ273487A3 (en) Mobile device for removing or lying, as well as transport of track panels
US5243918A (en) Railroad track laying system with multiple railroad tie handling
CN111691905B (en) Method for installing fully mechanized coal mining face support
CN110318308B (en) System and method for paving magnetic levitation track panel in complex section
US4608928A (en) Track-bound carriage for an assembled track section
US20140366766A1 (en) Rail-pushing car
US4571825A (en) Railroad track removing apparatus
JP3854368B2 (en) Railway rail exchanging apparatus and rail exchanging method using the same
US2991725A (en) Railway tie spacer
US3713396A (en) Single turntable apparatus for positioning railroad ties
RU215390U1 (en) Device for directing the unloaded rail strands into the track and cleaning the upper edge of the sleepers
RU220389U1 (en) Device for loading self-propelled tracked vehicles onto a railway platform
RU196372U1 (en) Device for loading self-propelled tracked vehicles on a railway platform
CN118308920B (en) Movable turnout for dragging large-section shield tunnel along track

Legal Events

Date Code Title Description
REG Reference to a national code

Ref country code: HR

Ref legal event code: TUEP

Ref document number: P20221460T

Country of ref document: HR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20190104

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIN1 Information on inventor provided before grant (corrected)

Inventor name: MIGUELEZ TAPIA, FRANCISCO JAVIER

Inventor name: FERNANDEZ MUNIZ, FERNANDO

A4 Supplementary search report drawn up and despatched

Effective date: 20190515

RIC1 Information provided on ipc code assigned before grant

Ipc: E01B 29/17 20060101ALI20190509BHEP

Ipc: E01B 29/16 20060101AFI20190509BHEP

Ipc: E01B 33/00 20060101ALI20190509BHEP

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20200702

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20220413

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1517128

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220915

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017061581

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: PK

Free format text: BERICHTIGUNG B8

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20221208

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Ref document number: 3470576

Country of ref document: PT

Date of ref document: 20221213

Kind code of ref document: T

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20221205

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220907

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20220907

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602017061581

Country of ref document: DE

Owner name: FCC CONSTRUCCION, S.A. (FCCCO), ES

Free format text: FORMER OWNERS: CONTRATAS Y VENTAS, S.A.U. (CONVENSA), OVIEDO ASTURIAS, ES; FCC CONTRUCCION, S.A. (FCCCO), MADRID, ES

Ref country code: DE

Ref legal event code: R081

Ref document number: 602017061581

Country of ref document: DE

Owner name: CONTRATAS Y VENTAS, S.A.U. (CONVENSA), ES

Free format text: FORMER OWNERS: CONTRATAS Y VENTAS, S.A.U. (CONVENSA), OVIEDO ASTURIAS, ES; FCC CONTRUCCION, S.A. (FCCCO), MADRID, ES

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2932479

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20230119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220907

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20220402390

Country of ref document: GR

Effective date: 20230110

REG Reference to a national code

Ref country code: EE

Ref legal event code: FG4A

Ref document number: E022975

Country of ref document: EE

Effective date: 20221205

REG Reference to a national code

Ref country code: HR

Ref legal event code: T1PR

Ref document number: P20221460

Country of ref document: HR

REG Reference to a national code

Ref country code: SK

Ref legal event code: T3

Ref document number: E 41035

Country of ref document: SK

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220907

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230107

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602017061581

Country of ref document: DE

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20221460

Country of ref document: HR

Payment date: 20230601

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220907

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220907

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230530

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 1517128

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220907

26N No opposition filed

Effective date: 20230608

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20230620

Year of fee payment: 7

Ref country code: ES

Payment date: 20230703

Year of fee payment: 7

Ref country code: CH

Payment date: 20230702

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220907

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220907

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230605

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230630

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20221460

Country of ref document: HR

Payment date: 20240527

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IE

Payment date: 20240621

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240614

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LT

Payment date: 20240523

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240606

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20240614

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 20240627

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: HR

Payment date: 20240527

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20240620

Year of fee payment: 8

Ref country code: CZ

Payment date: 20240523

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SK

Payment date: 20240523

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: RO

Payment date: 20240527

Year of fee payment: 8

Ref country code: NO

Payment date: 20240624

Year of fee payment: 8

Ref country code: FR

Payment date: 20240621

Year of fee payment: 8

Ref country code: FI

Payment date: 20240622

Year of fee payment: 8

Ref country code: EE

Payment date: 20240523

Year of fee payment: 8

Ref country code: SI

Payment date: 20240530

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20240524

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20240621

Year of fee payment: 8

Ref country code: LV

Payment date: 20240523

Year of fee payment: 8