EP3420141A1 - Barrages gonflables - Google Patents

Barrages gonflables

Info

Publication number
EP3420141A1
EP3420141A1 EP17711734.8A EP17711734A EP3420141A1 EP 3420141 A1 EP3420141 A1 EP 3420141A1 EP 17711734 A EP17711734 A EP 17711734A EP 3420141 A1 EP3420141 A1 EP 3420141A1
Authority
EP
European Patent Office
Prior art keywords
boom
air
airflow
air blower
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP17711734.8A
Other languages
German (de)
English (en)
Other versions
EP3420141B1 (fr
Inventor
Mark HOWES
Leon BOWRING
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vikoma International Ltd
Original Assignee
Vikoma International Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vikoma International Ltd filed Critical Vikoma International Ltd
Publication of EP3420141A1 publication Critical patent/EP3420141A1/fr
Application granted granted Critical
Publication of EP3420141B1 publication Critical patent/EP3420141B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/08Devices for reducing the polluted area with or without additional devices for removing the material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/08Devices for reducing the polluted area with or without additional devices for removing the material
    • E02B15/0814Devices for reducing the polluted area with or without additional devices for removing the material with underwater curtains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/08Devices for reducing the polluted area with or without additional devices for removing the material
    • E02B15/0857Buoyancy material
    • E02B15/0864Air

Definitions

  • This invention relates to inflatable booms for use as floating barriers, for example in marine spill response operations.
  • Buoyant inflatable booms are used in marine spill response operations as barriers to limit the spread of pollutants, such as liquid hydrocarbons, that may be left floating on a body of water following a spill.
  • pollutants such as liquid hydrocarbons
  • one or more such booms floating at the surface may be used for the containment of floating pollutants or for gathering and concentrating the pollutants into a confined area. Once concentrated in this way, floating pollutants can be separated efficiently from the water and recovered using skimmers or other separating devices.
  • An inflatable boom is a hollow elongate structure that is deflated and collapsed into a compact state for storage and transportation. Most commonly, a deflated boom is stored and transported on a reel that may be carried by a dedicated spill response vessel or by a 'vessel of opportunity', which is a non-dedicated vessel that is normally engaged in activities other than spill response. Thus, when deflated, the boom is flexible enough to allow reeling or spooling but when inflated after unreeling or unspooling, the boom becomes relatively rigid to assume and maintain its desired shape. The inflated boom then forms a long, generally sausage-shaped buoyancy tube with closed ends that floats on and extends across the water surface.
  • ballast weights hanging under the buoyancy tube hold the inflated boom in a desired orientation at the water surface, partially submerged to mitigate any escape of pollutants under the boom.
  • the ballast weights may act on a web or skirt that hangs underwater from the buoyancy tube and that extends the cross- section of the boom downwardly.
  • an inflatable boom is constructed of several panels of a substantially impermeable flexible layered sheet material such as PVC or neoprene. The panels are welded together or bonded together and are shaped to determine the desired inflated shape of the boom. The panels also define one or more internal chambers of the buoyancy tube that are filled with air at elevated pressure when the boom is inflated for use.
  • the pressurised air in the chambers provides buoyancy and maintains the inflated shape of the boom. After use of the boom, the air is vented from the chambers so that the boom can be collapsed again for transport and storage, which most conveniently involves winding the deflated boom back onto the reel of a vessel that deployed the boom.
  • booms As flexible sheet materials may be vulnerable to damage, it is common for longer booms to be constructed of multiple individual sections joined in series so that if any one section is damaged beyond repair, it can be replaced without having to replace the remainder of the boom.
  • a boom that is 300m long may typically comprise six 50m sections in series. The use of multiple shorter sections also makes it easier to manufacture a long boom.
  • a boom comprising multiple chambers can substantially maintain its integrity in terms of its shape, rigidity and buoyancy in the event that a panel defining any one chamber is punctured in use. Otherwise, a punctured boom could lose the shape, rigidity and buoyancy that are necessary for the boom to do its job effectively; indeed, some parts of the boom could even sink, allowing floating pollutants to breach the barrier that the boom is intended to create.
  • each chamber has to be inflated and deflated individually during deployment and recovery using valves that are dedicated to each chamber.
  • an inflatable boom is commonly deployed from a reel on a vessel as noted above.
  • the boom is pulled off the reel by a separate towing vessel.
  • a primary vessel carries the boom on a reel and a secondary vessel is used to tow the free end of the boom away from the primary vessel.
  • the masters of the primary and secondary vessels must coordinate their actions with each other and with the operators on the primary vessel who control rotation of the reel and inflation of the boom. Such coordination may be challenging even in a training scenario performed in daylight on calm water; it is all the more difficult in an actual spill response operation that may take place in far from ideal conditions.
  • Unreeling and launching simple inflatable booms known in the prior art is a stepwise, intermittent process because each chamber must be inflated fully before being launched into the water. To do so, operators standing on the deck of the primary vessel inflate the individual chambers via their respective valves. To save time in what may be a time-critical emergency situation, it is common for multiple operators to work simultaneously on inflating the boom. This requires multiple operators to be available on standby in case deployment is needed and to coordinate their actions precisely during deployment, which requires frequent and expensive training. The operators must share limited deck space and in an actual spill response operation they may have to work in bad weather, potentially at night, as the vessel rolls and pitches in a choppy sea. Consequently, the boom deployment process is slow and may expose the operators to heightened safety risks.
  • the inflated portions of the boom are usually launched over the stern of the primary vessel.
  • the reel must be located a considerable distance forward of the stern to leave enough deck space for the operators to stand aft of the reel beside the boom as the boom is inflated and deployed. This disadvantageously constrains the deck layout of the primary vessel.
  • booms are known that can be inflated from a single point despite having multiple separate chambers to ensure high integrity. Such a boom is shown in Figures 1 and 2 of the accompanying drawings.
  • Figure 1 is a top plan view that shows an inflatable boom 10 being deployed from a reel 12 on a primary spill response vessel 14, using a secondary towing vessel 16 to pull the free end of the boom 10 off the reel 12.
  • the deployment direction of the boom 10 is from left to right as illustrated.
  • Figure 2 is a side view of successive sections 18 of the boom 10, with each section 18 being shown shortened in length for ease of illustration. Again, the deployment direction of the boom 10 is from left to right as illustrated. Conversely, the recovery direction will be from right to left as illustrated when the boom 10 is wound back onto the reel 12 after deployment.
  • Each section 18 of the boom 10 comprises an inflatable buoyancy tube 20 and a skirt 22.
  • the skirt 22 hangs beneath the buoyancy tube 20 by virtue of the weight of ballast, such as a chain or wire, held in a ballast pocket 24 extending along the lower free edge of the skirt 22.
  • the successive sections 18 abut each other at, and are joined by, section connectors 26.
  • conical flexible internal bulkheads 28 subdivide the buoyancy tube 20 of each section 18 into multiple independent chambers 30.
  • the boom 10 is inflated from a single inflation point 32 on the towed, free end of the boom 10 as opposed to the reel end of the boom 10.
  • the towing vessel 16 carries a high-volume inflator 34 that blows a high volume of air at low (but above ambient) pressure into a large-diameter flexible hose 36 leading to the inflation point 32.
  • the flexible hose 36 is connected to an inflation cuff 38 that serves as an air duct running the full length of each section 18 of the boom 10.
  • Connecting pipes 40 as shown in Figure 2 connect the inflation cuffs 38 of successive sections 18 to each other in series to form a continuous air duct.
  • the pipes 40 may, for example, be defined by fabric tubes that serve as interconnecting conduits.
  • Individual non-return filling valves 42 communicate between the inflation cuffs 38 and the interior of each chamber 30.
  • the filling valves 42 open in response to overpressure in the inflation cuffs 38 to allow air from the inflation cuffs 38 to enter the multiple individual chambers 30.
  • the non-return characteristic of the filling valves 42 ensures that the air stays in the chambers 30 once introduced from the inflation cuffs 38.
  • the inflator 34 on the towing vessel 16 is run at a rate of air delivery chosen to ensure the chambers 30 fill with air as they are deployed from the reel 12 and have sufficient buoyancy to keep the boom 10 afloat on being launched into the water.
  • the chambers 30 have respective deflation valves 44 to allow air to escape the chambers 30 when the boom 10 is deflated for recovery on being wound back onto the reel 12.
  • a deflation valve 44 is positioned toward the aft end of each chamber 30 with respect to the recovery direction, which is from right to left as illustrated.
  • the system shown in Figures 1 and 2 has the advantage over earlier prior art that during deployment, minimal effort is required by the crew of the primary spill response vessel 14 that carries the reel 12.
  • a single operator on the primary spill response vessel 14 controls the speed of deployment of the boom 10 by controlling the rotational speed of the reel 12, whose rotation is suitably powered. Inflation of the boom 10 is under the control of an operator on the secondary towing vessel 16. Consequently, the system works well: fewer operators and less deck space are needed on the primary spill response vessel 14, yet a boom of 300m in length can typically be deployed offshore within fifteen minutes. It will be appreciated that speed and ease of deployment is important to ensure that the boom 10 is available for duty in containing a marine spill as quickly as possible.
  • the system shown in Figures 1 and 2 still has challenges.
  • the masters of the primary and secondary vessels 14, 16 must coordinate their actions with each other, with the operator on the primary vessel 14 who controls rotation of the reel 12 and with the operator on the secondary vessel 16 who controls inflation of the boom 10.
  • the inflator 34 on the secondary vessel 16 requires careful control. If the inflator 34 is run too slowly, the boom 10 can sink and could become entangled; conversely, if the inflator 34 is run too quickly, the boom 10 may become inflated all the way back to the reel 12, which can itself cause problems.
  • Particular challenges arise when the boom 10 is being recovered by being wound back on to the reel 12, when it is necessary to evacuate the air from each individual chamber 30 of the boom 10 in turn.
  • each deflation valve 44 is opened as soon as it becomes accessible to an operator leaning out from the stern of the spill response vessel 14. This maximises the opportunity for the air to be evacuated from the associated chamber 30 before the chamber 30 is wound on to the reel 12. Finally, each deflation valve 44 must be reset into a closed state.
  • This manipulation involves turning part of the mechanism of the deflation valve 44 to lock the deflation valve 44 temporarily into an open state.
  • a further operator working forward of the reel 12 then has to re-set the deflation valves 44 to close them and to replace their caps 46 so that the boom 10 is ready for the next deployment.
  • the deflation valves 44 have to be reset and their caps 46 have to be replaced before further rotation of the reel 12 will render them inaccessible. Failure to complete these operations may hinder the next deployment.
  • US 2011/0318109, EP 2927375, WO 92/09750, WO 2013/156998 and US 9512585 disclose other examples of containment systems comprising booms.
  • WO 2011/019873 discloses a tidal barrier.
  • GB 1284418 discloses an air blower for inflating structures such as booms.
  • the invention has two aspects.
  • the first aspect of the invention involves an inflatable boom that comprises a series of chambers and an air duct extending along the boom to communicate with the chambers.
  • a power line such as a high-pressure air line extends along the boom to an air blower such as an airflow amplifier that draws in atmospheric air and exhausts that air into the air duct to inflate the chambers.
  • the chambers are inflated by supplying power along the boom in one direction to drive an air blower, which exhausts air to flow in the opposite direction along the boom to inflate the chambers.
  • the second aspect of the invention involves a method of deflating an inflatable boom, which comprises applying an airflow intake of an air blower such as an airflow amplifier to a deflation valve and, by virtue of suction, opening the valve and drawing air from the boom through the opened valve and the air blower.
  • the deflation valve has an element that is movable by engagement of the airflow intake to open the valve.
  • the invention provides an elongate inflatable boom, comprising: a longitudinal series of chambers; an air duct extending along the boom to communicate with the chambers; and a power line extending along the boom to an air blower.
  • the air blower has: an airflow intake for drawing in atmospheric air when power is provided to the air blower along the power line in use; and an airflow outlet communicating with the air duct to exhaust the drawn-in air into the air duct to inflate the chambers.
  • the air blower is an airflow amplifier and the power line is a high-pressure air line extending along the boom to a high-pressure air inlet of the airflow amplifier, such that atmospheric air is drawn in to the airflow intake of the airflow amplifier when high-pressure air is supplied through the high-pressure air line to the high-pressure air inlet in use.
  • an airflow amplifier is preferred over other air blowers for its compactness, lightness, simplicity and effectiveness.
  • the power line it would be possible for the power line to be an electrical or hydraulic power line for supplying electrical or hydraulic power to an electrical or hydraulic motor that drives an impeller of an air blower.
  • pneumatic power it would also be possible for pneumatic power to be supplied in the form of high-pressure air to a rotary expander or other pneumatic motor that drives such an impeller.
  • the air blower is advantageously located adjacent to a first end of the boom and the air duct and the power line extend substantially along a full length of the boom.
  • the power line may extend from the air blower to a coupling adjacent to a second end of the boom, opposed to the first end, for connection to a source of power such as a high-pressure air source.
  • a sea anchor or drogue is conveniently attached to the boom adjacent to the first end to pull the boom into water without requiring a separate towing vessel.
  • the air blower is supported by a buoyant body attached to the boom. In that case, the buoyant body is suitably arranged to hold the airflow intake of the air blower above water in which the buoyant body floats in use.
  • power conveniently flows in the power line in a first direction along the boom and the drawn-in air flows in the air duct in a second direction along the boom, opposed to the first direction.
  • the inventive concept embraces a combination of the boom of the invention and a reel around which the boom is wound.
  • the air blower is located adjacent to a free end of the boom remote from the reel.
  • the reel preferably comprises a rotary power coupling between a source of power and the power line of the boom.
  • the reel may comprise a rotary airflow coupling between a high-pressure air source and a high-pressure air line extending along the boom.
  • the reel may further comprise a power connection such as an air duct extending between the rotary power coupling and the source of power.
  • the inventive concept extends to a vessel carrying the boom of the invention or the combination of a boom and reel of the invention.
  • That vessel preferably comprises a source of power for supply to the power line of the boom, such as a high-pressure air source connected to a high-pressure air line extending along the boom.
  • the invention may also be expressed as a corresponding method of inflating a longitudinal series of chambers in an elongate boom.
  • the method comprises: supplying power along the boom in a first direction to drive an air blower that draws in
  • the method comprises launching the boom into a body of water in the first direction, conveniently while also inflating the chambers.
  • the boom is apt to be launched from a reel carried by a vessel floating on the body of water, in which case power may conveniently be supplied to the boom from a source carried by the vessel and may be supplied to the boom through the reel.
  • the boom may be pulled in the first direction by virtue of drag force arising from relative movement between the boom and the body of water.
  • the air blower may be floated on the body of water.
  • power is supplied as a flow of high-pressure air to a high-pressure air inlet of an airflow amplifier, such that atmospheric air is drawn in to the airflow intake of the airflow amplifier when high-pressure air is supplied to the high-pressure air inlet in use.
  • the invention extends to a method of deflating an inflatable boom. That method comprises: supplying power to generate suction in an airflow intake of an air blower; applying the airflow intake to a deflation valve of the boom; and, by virtue of said suction, opening the deflation valve and drawing air from the boom through the opened valve to be exhausted to the atmosphere through the air blower.
  • the airflow intake may be extended or displaced by an extension piece attached to the air blower, which extension piece is suitably a rigid tubular structure that may be fixed to the air blower or may be removable from the air blower.
  • the deflation valve may be opened by using said suction to drive movement of the air blower toward the boom and by virtue of that movement, depressing a movable valve element of the deflation valve to open the valve.
  • valve element is biased to move into a closed position and to move the air blower away from the boom when the supply of power is stopped.
  • the air blower is suitably supported at a distal end of an elongate rigid supporting structure or handle held by an operator while the operator controls the supply of power at a proximal end of the structure or handle.
  • the operator may use the structure or handle to apply the airflow intake of the air blower to a deflation valve before the deflation valve comes on board the vessel with the boom.
  • Ergonomic considerations may lead to the air blower being sited at alternative locations.
  • a location nearer the proximal end of an elongate supporting structure for example, reduces overhung weight and so makes holding the air blower easier on an operator's wrist.
  • the air blower suitably remains in a convenient wand-like structure, for example being sited proximally in a structure from which a hollow extension piece extends distally toward an airflow intake at a distal end.
  • the air blower is preferably an airflow amplifier to which power is supplied as a flow of high-pressure air to a high-pressure air inlet, such that air from the boom is drawn in to the airflow intake of the airflow amplifier when high-pressure air is supplied to the high-pressure air inlet in use.
  • the hose trailing from the wand remains a compact airline carrying high-pressure compressed air, as opposed to a large hose for movement of bulk air from a remote blower.
  • the invention resides in a boom deflation system that comprises an air blower such as an airflow amplifier cooperable with a deflation valve of an inflatable boom.
  • the air blower comprises an airflow intake that is engageable with the deflation valve and the deflation valve has a valve element that is movable by said engagement of the airflow intake to open the deflation valve.
  • the airflow intake is shaped to define a peripheral surface to lie against a skin of the boom around the deflation valve.
  • a plunger formation of the air blower may protrude beyond the peripheral surface of the airflow intake to be received in a well of the deflation valve and to depress the valve element in that well.
  • Figure 1 is a top plan view of an inflatable boom being deployed from a reel on a spill response vessel in a system known in the prior art
  • Figure 2 is a side view of successive sections of the boom shown in Figure 1 ;
  • Figure 3 is a side view of the spill response vessel of Figure 1 recovering the boom of the prior art after deployment;
  • Figure 4 is an enlarged detail view of an operator on board the spill response vessel of Figure 3 manipulating a deflation valve of the boom during recovery of the boom onto the reel.
  • Figure 5 is a top plan view of an inflatable boom being deployed from a reel on a spill response vessel in a system according to the invention
  • Figure 6 is a schematic enlarged detail top view of the reel and the reel end of the boom shown in Figure 5, during deployment;
  • Figure 7 is a schematic enlarged detail side view of the free end of the boom shown in Figure 5, showing details of an inflation post at that end;
  • Figure 8 is a longitudinal sectional view showing the general features of an airflow amplifier that may be used in the inflation post shown in Figure 7;
  • Figure 9 is an enlarged detail view of an operator on board the spill response vessel of Figure 5 engaging the head of a deflation wand with a deflation valve during recovery of the boom, in accordance with the invention
  • Figure 10 is a sectional side view of a head of the deflation wand approaching the deflation valve of Figure 9;
  • Figure 11 corresponds to Figure 10 but shows the head of the deflation wand engaged with the deflation valve.
  • a powered reel 12 on a spill response vessel 14 carries an inflatable boom 50 in accordance with the invention.
  • the boom 50 has internal conical bulkheads 28 defining multiple chambers 30 for redundancy and hence high integrity.
  • the boom 50 may also comprise a series of individually-replaceable sections like the sections 18 of the boom 10 shown in Figures 1 to 4; however, the boom 50 is shown in Figures 5 to 7 as a single length for simplicity.
  • the boom 50 again provides for single-point inflation of the chambers 30 via respective non-return filling valves 42 communicating with a common inflation cuff 38 extending along the boom 50, but in a different way to inflation of the prior art boom 10 as will be explained.
  • the invention provides for easier, safer and more rapid deflation of the chambers 30 when the boom 50 is being recovered after deployment.
  • a notable difference, and advantage, of the boom 50 over the prior art boom 10 is that only one vessel 14 is required to deploy the boom 50. Consequently, it is not necessary to use the towing vessel 16 of the prior art shown in Figure 1 to pull the boom 50 off the reel 12. This greatly simplifies the deployment operation by removing the complication of co-ordinating the movements of two vessels 14, 16 as in the prior art. As a result, the speed and safety of deployment are improved because there are fewer operations to go wrong.
  • the boom 50 of the invention is deployed by launching a sea anchor 52 at the free end of the boom 50 into the water, either as the vessel 14 moves forward through the water or as the vessel 14 is moored at a stationary position in a current of water.
  • the sea anchor 52 acts as a drogue to create drag upon movement relative to the water and so applies tension to the boom 50.
  • This tension pulls the boom 50 aft to deploy into the water, with increasing separation between the vessel 14 and the sea anchor 52, as the boom 50 is inflated while the reel 12 turns.
  • an operator begins to rotate the reel 12 at a slow speed and the force exerted on the free end of the boom 50 by the sea anchor 52 begins to pull the boom 50 off the reel 12.
  • the same operator can then begin to inflate the boom 50 by turning on a supply of compressed air, as will be explained.
  • deployment of the boom 50 may be initiated and may proceed even while the vessel 14 is travelling at speed to the scene of a spill.
  • the vessel 14 then tows the partially- or fully-deployed boom 50 directly to where it will be needed.
  • the boom 50 can be in the water ready to do its job as quickly as possible on arrival of the vessel 14 at the scene.
  • inflation of the boom 50 may be controlled by the operator who also controls the reel 12, in principle this allows a single operator to deploy the boom 50.
  • Air to inflate the boom 50 is supplied from a compressed air source 54 on board the vessel 14, such as an air compressor and/or a bank of high-pressure air cylinders.
  • the compressed air source 54 supplies air at high pressure to a rotary swivel coupling 56 on the reel 12 so that the high-pressure air is available continuously to the boom 50 as the reel 12 rotates.
  • the reel 12 contains a duct 58 to receive the high- pressure air from the rotary swivel coupling 56 and to deliver that air into a high- pressure air line 60 that extends along substantially the full length of the boom 50, from the reel end to the free end of the boom 50.
  • the high-pressure air line 60 can be uncoupled from the duct 58 to remove the boom 50 from the reel 12 on completion of deployment.
  • the high-pressure air line 60 is notably narrower than the inflation cuff 38, which conveys a much larger volume of air at lower pressure than in the air line 60.
  • the high-pressure air line 60 is shown in Figures 6 and 7 attached externally to the inflation cuff 38 of the boom 50 for ease of illustration. However, the high-pressure air line 60 can be attached to or incorporated in any part of the boom 50, either externally or internally.
  • the high-pressure air line 60 communicates with a buoyant inflation post 62 at the free end of the boom 50.
  • the inflation post 62 with the attached free end of the boom 50 is deployed over the stern of the vessel 14 immediately after the sea anchor 52.
  • the inflation post 62 has a buoyant upper end 64, for example of solid foamed plastics, and a ballasted lower end 66, for example containing an iron weight. This is to ensure that the inflation post 62 floats substantially upright in the water with the upper end 64 protruding well above the water surface.
  • a generally-tubular airflow amplifier 68 positioned in the upper end of the inflation post 62 receives high-pressure air from the high-pressure air line 60.
  • the high-pressure air enters the airflow amplifier 68 through a high-pressure air inlet 70 positioned between an airflow intake 72 and an airflow outlet 74 of the airflow amplifier 68.
  • the airflow intake 72 draws in atmospheric air from above the water surface.
  • the airflow outlet 74 exhausts that air, plus air entering through the high-pressure air inlet 70, as a high volume, high-velocity flow that enters the inflation cuff 38 to inflate the chambers 30 via the filling valves 42.
  • the airflow amplifier 68 (known variously in the art of pneumatics as a vacuum pump, an air accelerator or an air amplifier) works by directing the incoming high-pressure air from the high-pressure air inlet 70 around an internal annular chamber 76. The high-pressure air in the annular chamber 76 is then throttled through a ring nozzle 78 to form an annular high-velocity primary airstream within the airflow amplifier 68.
  • the primary air stream adheres to an annular outwardly- tapering venturi-shaped coanda profile 80 on the radially inner side of the airflow amplifier 68, which directs the primary airstream toward the airflow outlet 74.
  • a low-pressure region is created at the centre of the annular primary air stream, which region extends between the airflow intake 72 and the ring nozzle 78.
  • the low pressure in the airflow intake 72 draws in a high-volume flow of surrounding atmospheric air, which is entrained into the primary air stream.
  • the primary function of that high-pressure air supply is to provide pneumatic power to drive the airflow amplifier 68, causing the airflow amplifier 68 to draw in substantially more air through the airflow intake 72. This is fundamentally different to simply providing a supply of air as the sole source of inflation.
  • airflow amplifiers or air accelerators within the inventive concept, such as those that utilise an annular array of discrete nozzles. Such nozzles are arranged to produce an annular high-velocity air stream. The effect is similar to the ring-nozzle type described above.
  • the key benefit of the airflow amplifier 68 is that a comparatively low-volume air flow at high pressure generates a pressure difference that moves a much larger volume of air to inflate the chambers 30.
  • the volume of air leaving the airflow amplifier 68 in the exhaust flow through the airflow outlet 74 is far in excess of the volume of compressed air supplied into the high-pressure air inlet 70.
  • the majority of the air in the exhaust flow does not come from the high-pressure air line 60 but instead is atmospheric air that enters the airflow intake 72. In this way, a high volume of atmospheric air is used for inflation of the boom 50 even though a much smaller volume of high-pressure air is supplied from the spill response vessel 14.
  • compressed air from the high-pressure air line 60 is expanded in the airflow amplifier 68 to draw a much larger volume of air into the airflow intake 72.
  • the expanded air combines with the larger volume of drawn-in air to direct a high-volume, relatively low pressure (but still above ambient pressure) flow of air from the airflow outlet 74 into the inflation cuff 38 and from there into the chambers 30 through the respective filling valves 42.
  • compressed air in the high-pressure air line 60 may be at a gauge pressure of about 6 to 10 bar.
  • Air exhausting from the airflow outlet 74 of the airflow amplifier 68 used for inflation of the boom 50 may be at a gauge pressure of up to about 103m bar (1.5psi) with a typical flow rate of about 6m 3 /hr, representing airflow multiplication of 4x to 5x.
  • the airflow amplifier 68 shown in Figure 8 has the optional feature of an internally- threaded tubular body 82 engaged with an externally threaded tubular insert 84 that defines the outwardly-tapering venturi-shaped coanda profile 80.
  • the annular opening of the ring nozzle 78 can be adjusted, if required, by turning the insert 84 within the body 82 as shown to move the insert 84 axially with respect to the body 82. This allows the airflow characteristics of the airflow amplifier 68 to be adjusted if needs be.
  • the buoyancy of the inflation post 62 prevents the free end of the boom 50 sinking in the water in the event of incomplete inflation and so keeps the airflow intake 72 of the airflow amplifier 68 clear of the water to draw in atmospheric air. Nevertheless, provision may be made to trap and to drain away any water that may inadvertently enter the airflow intake 72, preferably before that water can enter the inflation cuff 38.
  • the inflation post 62 Being at the free end of the boom 50, the inflation post 62 provides a convenient fixing point for the sea anchor 52, which is attached to the inflation post 62 by a bridle and rope 86.
  • the inflation post 62 is attached, in turn, to the free end of the boom 50 by a boom connector plate 88.
  • a blow-off valve 90 automatically limits the maximum air pressure that can be supplied by the airflow amplifier 68.
  • the blow-off valve 90 is conveniently situated in the airflow channel between the airflow outlet 74 of the airflow amplifier 68 and the inflation cuff 38.
  • each chamber 30 may be fitted with a respective blow-off valve, or for deflation valves 92 of each chamber 30 to have blow-off functionality.
  • a deflation valve 92 is positioned toward the aft end of each chamber 30 with respect to the recovery direction, which is from right to left as illustrated. Thus, when the boom 50 is being wound onto the reel 12, the end of the chamber 30 with the deflation valve 92 is wound on last.
  • FIGS 9 to 11 of the drawings show how modified deflation valves 92 associated with the chambers 30 can also interact beneficially with an airflow amplifier 94 when recovering the boom 50 back onto the reel 12 after deployment.
  • the airflow amplifier 94 shown in Figures 9 to 11 has the same features as the airflow amplifier 68 used in the inflation post 62, but is inverted in function so that its airflow intake 96 draws air from within a chamber 30 and its airflow outlet 98 exhausts that air to the atmosphere. This deflates the chamber 30 as rapidly and completely as possible, accelerating the boom recovery process and minimising the bulk of the deflated boom 50 on the reel 12.
  • the airflow amplifier 94 conveniently forms the head of a hand-held, portable deflation wand 100.
  • the airflow amplifier 94 is at the distal end of a rigid tubular handle 102.
  • the handle 102 supplies high-pressure air to the high-pressure air inlet 104 of the airflow amplifier 94.
  • the handle 102 extends transversely, in this example orthogonally, with respect to the central axis of the airflow amplifier 94 shared by the airflow intake 96 and the airflow outlet 98.
  • the handle 102 of the deflation wand 100 extends the reach of an operator 48 so that the operator 48 can place the airflow amplifier 94 onto a deflation valve 92 very easily and safely, without having to stretch awkwardly across the boom 50 or to manipulate the deflation valve 92 with cold slippery fingers.
  • the operator 48 need not even touch the boom 50 because the deflation valves 92 have no caps and do not need to be manipulated. Instead, placing the airflow intake 96 of the airflow amplifier 94 onto a deflation valve 92 and supplying high-pressure air to the high- pressure air inlet 104 of the airflow amplifier 94 opens the deflation valve 92 and evacuates air from within the chamber 30 associated with the deflation valve 92.
  • the deflation wand 100 allows operators 48 to use less deck space on the spill response vessel 14 or allows the use of a smaller vessel 14.
  • the extended reach of the handle 102 enables the operator 48 to access and operate a deflation valve 92 at a distance more easily. Potentially, the operator 48 can even access and operate a deflation valve 92 before it has come onboard the vessel 14 with the boom 50 during recovery.
  • Figures 10 and 11 show that a standard high-pressure air coupling 106 at the proximal end of the handle 102 allows the deflation wand 100 to be connected releasably to a flexible high-pressure air hose.
  • a trigger 108 adjacent to the coupling 106 allows an operator 48 holding the proximal end of the handle 102 to control the flow of high-pressure air along the handle 102 to the high-pressure air inlet 104.
  • Figures 10 and 11 also show that the airflow intake 96 of the airflow amplifier 94 is defined by the mouth of an elastomeric frusto-conical skirt or inverted cup that splays radially outwardly to an integral surrounding flange 1 10.
  • the flange 110 has a substantially planar annular underside that extends radially and substantially orthogonally with respect to the central axis of the airflow amplifier 94.
  • the flange 110 is arranged to encircle the deflation valve 92 and to lie against a flexible skin 1 12 of the chamber 30 surrounding the deflation valve 92.
  • the deflation wand 100 further comprises a spigot 1 14 disposed centrally within the frusto-conical skirt that defines the airflow intake 96.
  • the spigot 1 14 protrudes slightly beyond the planar underside of the flange 110.
  • the deflation valve 92 stands slightly proud of the surrounding skin 1 12 so that an outwardly-protruding annular part of the deflation valve 92 can be received within the mouth of the frusto-conical skirt that defines the airflow intake 96.
  • the resulting engagement helps the operator 48 to align the airflow amplifier 94 with the deflation valve 92 and supports the airflow amplifier 94 when thus engaged.
  • the outwardly-protruding part of the deflation valve 92 surrounds a tubular well 116 that accommodates an axially-movable poppet valve element 1 18 in concentric relation.
  • the valve element 118 is spring-biased outwardly into sealing contact with a valve seat on the inner end of the tubular well 1 16 to close the deflation valve 92.
  • the airflow intake 96 of the airflow amplifier 94 is engaged with the deflation valve 92
  • the protruding spigot 1 14 of the deflation wand 100 bears against the valve element 1 18 with a plunger action. This moves the valve element 1 18 inwardly against the bias to lift away from the valve seat and hence to open the deflation valve 92.
  • the operator 48 aligns the airflow intake 98 of the airflow amplifier 94 with the deflation valve 92 as shown in Figure 9. Then, the operator 48 depresses the trigger 108 to admit high-pressure air into the high- pressure air inlet 104 of the airflow amplifier 94. The resulting pressure drop in the airflow intake 96 sucks the flange 1 10 against the skin 1 12 surrounding the deflation valve 92 as shown in Figure 10. This movement automatically locks the airflow amplifier 94 onto the deflation valve 92 and simultaneously opens the deflation valve 92.
  • the suction arising from the pressure drop in the airflow intake 96 holds the airflow amplifier 94 in engagement with the deflation valve 92 and presses the spigot 1 14 against the valve element 118 to open the deflation valve 92.
  • This opens an airflow path from the interior of the chamber 30 through the airflow amplifier 94 to the surrounding atmosphere via the airflow outlet 98, and greatly accelerates airflow out of the chamber 30 along that path.
  • the suction also effects a rudimentary seal between the resilient flange 110 and the skin 112 to evacuate the chamber 30 more effectively, with minimal entrainment of atmospheric air under the flange 110.
  • the deflation valves 92 of the boom 50 are robust enough to withstand the forces they may experience when the boom 50 is wound onto the reel 12.
  • the deflation valves 92 also have an external profile that is low or shallow and rounded or chamfered so that they will not easily snag ropes or the like or become snagged by other structures.
  • the deflation valves 92 are easy to keep clean, in particular by having minimal external cavities or recesses so as to minimise the accumulation of pollutants, debris or other contaminants. This also makes the deflation valves 92 easy to wipe clean in the event that they become fouled.
  • the internal parts of the deflation valves 92 are designed to facilitate rapid deflation of the chambers 30, with only a small pressure drop as air flows through the deflation valves 92.
  • the internal side of each deflation valve 92 is designed not to become blocked if it is pulled down against an opposed internal surface of the boom 50.
  • Assisted deflation of a boom is known in the spill response industry, but is generally achieved by sucking the air out of a boom via a large-diameter hose. The bulk and awkwardness of that hose impedes an operator.
  • the deflation wand 100 of the invention exhausts air directly to atmosphere from an air blower such as the airflow amplifier 94 whose airflow outlet is adjacent to, and in direct communication with, the deflation valve through a rigid body without an intermediate hose.
  • the power source in this example is compressed air, which is fed to the deflation wand 100 by a comparatively small-diameter compressed air line. This smaller and lighter air line is easier and safer for an operator to handle.
  • the invention has various advantages in addition to those mentioned above. For example, multiple boom systems can be deployed from multiple reels on the same vessel, all without requiring a separate towing vessel. Also, deployment over the port or starboard side of the vessel is more easily undertaken, and safety is increased, due to not having to delegate inflation of the boom to a secondary vessel.
  • the system of the invention is particularly suitable for operation in hazardous environments, in particular to contain and recover flammable pollutants. This is because the system may use hydraulic and pneumatic, and hence non-electrical, auxiliary power systems of the deploying vessel.
  • the system of the invention lends itself to being retrofitted to existing inflatable booms, which may be adapted by the addition of an inflation post at the free end of the boom to feed atmospheric air into the inflation cuff, and a high-pressure air line extending along the boom to supply the inflation post.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jet Pumps And Other Pumps (AREA)

Abstract

L'invention concerne un barrage gonflable comprenant une série de chambres et un conduit d'air s'étendant le long du barrage pour communiquer avec les chambres. Une gaine d'air haute pression s'étend le long du barrage vers un amplificateur de flux d'air qui aspire de l'air ambiant et expulse cet air dans le conduit d'air pour gonfler les chambres. Les chambres sont gonflées par alimentation en air haute pression le long du barrage dans une direction pour entraîner l'amplificateur de flux d'air, qui évacue l'air de façon à s'écouler dans la direction opposée le long du barrage pour gonfler les chambres. Un procédé de dégonflage du barrage comprend l'application d'une entrée de flux d'air d'un amplificateur de flux d'air à une soupape de dégonflage et, grâce à l'aspiration, l'ouverture de la soupape et l'aspiration de l'air à partir du barrage par la soupape ouverte et l'amplificateur de flux d'air. La soupape de dégonflage présente un élément qui est mobile par mise en prise de l'entrée de flux d'air pour ouvrir la soupape.
EP17711734.8A 2016-02-24 2017-02-23 Barrages gonflables Active EP3420141B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB1603213.8A GB2547667B (en) 2016-02-24 2016-02-24 Inflatable booms
PCT/GB2017/050476 WO2017144888A1 (fr) 2016-02-24 2017-02-23 Barrages gonflables

Publications (2)

Publication Number Publication Date
EP3420141A1 true EP3420141A1 (fr) 2019-01-02
EP3420141B1 EP3420141B1 (fr) 2020-04-08

Family

ID=55753127

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17711734.8A Active EP3420141B1 (fr) 2016-02-24 2017-02-23 Barrages gonflables

Country Status (4)

Country Link
EP (1) EP3420141B1 (fr)
DK (1) DK3420141T3 (fr)
GB (1) GB2547667B (fr)
WO (1) WO2017144888A1 (fr)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265687B (zh) * 2018-03-26 2023-05-26 扬州三江环安设备有限公司 一种快速收放式围油栏
CN110424348A (zh) * 2019-08-12 2019-11-08 浙江海洋大学 自动航行自动回收的电动式围油栏及其作业方法
ES2758823A1 (es) * 2020-01-20 2020-05-06 Blue And Green Env Solutions Sl Dispositivo para limpieza de agua del mar

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3631679A (en) * 1969-07-24 1972-01-04 Paul Fisch Apparatus to confine and recover oil spillage at sea
GB1284418A (en) * 1969-10-13 1972-08-09 British Petroleum Co Inflator
WO1992009750A1 (fr) * 1990-11-29 1992-06-11 Willis Richard R Systemes flottants de confinement de substances contaminantes
US5806572A (en) * 1996-03-06 1998-09-15 Voller; Ronald L. Apparatus for inflating and deflating a dunnage bag
US7610929B2 (en) * 2002-05-20 2009-11-03 Illinois Tool Works Inc. Air bag inflation/ deflation system
US7320347B2 (en) * 2003-10-14 2008-01-22 Sunrise Arkansas, Inc. Inflation and deflation apparatus
US8251612B2 (en) * 2009-08-14 2012-08-28 Skidmore, Owings & Merrill Llp Tidal responsive barrier
US9206575B2 (en) * 2010-06-25 2015-12-08 Michael T. D. Miller Onboard oil containment system
US9512585B1 (en) * 2010-10-12 2016-12-06 Michael T Miller On-board re-inflatable containment boom system and method
CA2870384C (fr) * 2012-04-15 2020-11-03 Harbo Technologies Ltd. Fleche de confinement de deversement de petrole a deplacement rapide et procede de deploiement
FR3019195B1 (fr) * 2014-04-01 2016-04-15 Musthane Barrage gonflable flottant

Also Published As

Publication number Publication date
GB201603213D0 (en) 2016-04-06
EP3420141B1 (fr) 2020-04-08
DK3420141T3 (da) 2020-07-20
WO2017144888A1 (fr) 2017-08-31
GB2547667A (en) 2017-08-30
GB2547667B (en) 2018-10-03

Similar Documents

Publication Publication Date Title
US20210087767A1 (en) Onboard oil containment system
US20050016372A1 (en) Vessel immobiliser projectile
EP3420141A1 (fr) Barrages gonflables
US4123911A (en) Oil control system
US6526901B2 (en) Retractable mast for sailboats
US9809942B2 (en) On-board re-inflatable containment boom and control system
US9415847B2 (en) Man-overboard rescue and retrieval system
US20180016762A1 (en) On-board spool-able re-useable containment boom and control system
EP3063061B1 (fr) Système de renflouage de navire mis à sec
US20110064524A1 (en) Diver operated jetting sled and method
US9975614B2 (en) Person-in-the-water rescue and retrieval system
EP0191541A2 (fr) Dispositif de sauvetage flottant
US20060048665A1 (en) Inflatable member projectile
AU2015396962B2 (en) On-board re-inflatable containment boom system and method
CN206456521U (zh) 海上救援用自动充气喷射漂浮装置
US20100300344A1 (en) Inflatable member for a protection device for a ship hull
CN214985985U (zh) 一种溺水救生装置
JPH0640384A (ja) 水中浮遊物の回収装置
KR20210116795A (ko) 팽창형 구명장구를 이용한 다수인명 구조장치
CN115447723A (zh) 一种防止空投艇着水倾覆的装置及其防倾覆方法
EP1902939A2 (fr) Procédé et appareil pour faire émerger des lignes d'amarres nautiques du fond marin
JPH05310179A (ja) 水中浮遊物の回収装置
WO2004065201A2 (fr) Dispositif support gonflable destine a une embarcation
JPS6027756Y2 (ja) 一点係留ブイの係留装置
JPH05310180A (ja) 水中浮遊物の回収装置

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180924

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190917

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1254549

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200415

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017014420

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: FI

Ref legal event code: FGE

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20200715

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20200408

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200817

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200709

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200708

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200808

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1254549

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200408

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602017014420

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

26N No opposition filed

Effective date: 20210112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602017014420

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210223

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20210228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210228

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210228

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210223

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210228

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210223

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20170223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200408

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FI

Payment date: 20240227

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20240229

Year of fee payment: 8