EP3384095B1 - Perforated structure mountable onto a seabed - Google Patents

Perforated structure mountable onto a seabed Download PDF

Info

Publication number
EP3384095B1
EP3384095B1 EP16870131.6A EP16870131A EP3384095B1 EP 3384095 B1 EP3384095 B1 EP 3384095B1 EP 16870131 A EP16870131 A EP 16870131A EP 3384095 B1 EP3384095 B1 EP 3384095B1
Authority
EP
European Patent Office
Prior art keywords
concrete
perforated
cavity
connector
corner portions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16870131.6A
Other languages
German (de)
French (fr)
Other versions
EP3384095A1 (en
EP3384095A4 (en
Inventor
Kobi Birnhack
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ocean Brick System OBS Ltd
Original Assignee
Ocean Brick System OBS Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US14/957,639 external-priority patent/US9683346B2/en
Application filed by Ocean Brick System OBS Ltd filed Critical Ocean Brick System OBS Ltd
Publication of EP3384095A1 publication Critical patent/EP3384095A1/en
Publication of EP3384095A4 publication Critical patent/EP3384095A4/en
Application granted granted Critical
Publication of EP3384095B1 publication Critical patent/EP3384095B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/18Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article
    • B28B7/183Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article for building blocks or similar block-shaped objects
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/20Equipment for shipping on coasts, in harbours or on other fixed marine structures, e.g. bollards
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/166Connectors or means for connecting parts for reinforcements the reinforcements running in different directions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/025Reinforced concrete structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/129Polyhedrons, tetrapods or similar bodies, whether or not threaded on strings

Definitions

  • This invention relates to offshore structures and methods for their construction and more particularly to modular constructions useful for deep-water ports and artificial islands.
  • a second obstacle is the lack of sufficiently deep water near the coast and the massive expense that additional dredging and construction of retaining walls entails. For example, between 2000 and 2005, the Kill van Kull channel (New York/New Jersey) was deepened from 35 feet to 45 feet at a cost of $360 million, and the project currently underway to dredge the channel to the 50 foot depth required for 7000 - 8000 TEU capacity ships will add more than $900 million to the overall cost.
  • U.S. Pat. No. 6,234,714 discloses a pier with a nominally integrated breakwater.
  • the breakwater and pier are in fact independent structures, in which the breakwater comprises a mound of sand, gravel, rocks, and/or rubble piled up against the seaward side of the pier, upon which a plurality of caisson-like structures are placed.
  • this design also suffers from the problems that the breakwater cannot be constructed without extensive dredging operations and that the breakwater and the pier are not a single modular structure.
  • the present invention provides a solution to the problems described above and an answer to the need for a new way of thinking about port design. It is one object of the present invention, as defined by claim 1, to provide perforated structure mountable onto a seabed for establishing a deep-water port or an artificial island.
  • the aforesaid structure comprises: (a) a plurality of prefabricated perforated modules integratable into said structure; (b) at least one connector interconnecting corner portions of said prefabricated perforated modules.
  • each prefabricated perforated module has a corner portion comprising a concave surface such that said corner portions being integrated together into said structure form a cavity to be filled with a concrete.
  • the connector comprises a crosspiece having three arms orthogonal to each other; each arm has a cross-like cross section.
  • the crosspiece has reinforcing members distributed within said concrete.
  • the aforesaid method comprises the steps of (a) providing a plurality of prefabricated perforated modules integratable into said structure; each prefabricated perforated module has a corner portion comprising a concave surface such that said corner portions being integrated together into said structure form a cavity to be filled with a concrete; (b) providing at least one connector; (c) positioning corner portions of said prefabricated perforated modules such that a cavity surrounding said corner portions is formed; (d) mounting said connector comprising crosspiece having three arms orthogonal to each other within formed cavity; each arm has a cross-like cross section; said crosspiece has reinforcing members; and (e) filling said cavity with concrete such that said reinforcing members distributed within said concrete.
  • a perforated modular marine structure unit 10 is shown with a shape constituting a rectangular parallelepiped 12 defined by six planar faces with lower base vertices ABCD and upper base vertices EFGH.
  • the parallelepiped is a geometrical cube with sides about 10 m long.
  • Four non-adjacent corners of the cube, in this case, B, D, E, and G, are cut out, leaving surfaces S B , S D (not seen in the view illustrated in FIG. 1 ), S E , and S G .
  • FIG. 1 In the particular embodiment shown in FIG.
  • S B , S D , S E , and S G have the shape of part of the surface of a sphere centered at the nearest corner, but they can have any shape bulging toward the cube's center (e.g. an ellipsoid or a more complex shape).
  • Four tunnels T B , T D , T E , and T G are formed and converge in the cube's center to form a tetrapod-like passage interconnecting the cut-out surfaces.
  • the tunnels are shown as having a cylindrical cross-section, but they may be of other shapes.
  • the six planar surfaces left from the faces of the original cube e.g. surface 14, remaining from side EFGH) are base planes by which the perforated modular marine structure contacts other modules. These surfaces must be large enough to ensure stable positioning of the module on a substantially horizontal foundation during the assembly process.
  • the perforated modular marine structures are formed with reinforcing diagonal beams (RDBs) 30 extending along the six diagonals on the planar surfaces remaining from the faces of the original cube.
  • the RDBs may comprise reinforcing elements, for example, steel rods 32, and material embedding the reinforcing elements, e.g. concrete.
  • Recesses 42 are formed on the cube's surface at the corners of the module. When two to eight modular marine structure units 10 are arranged about a common corner, these recesses form cavities that serve as a mold for casting concrete or injecting grout to create corner joints. Similar recesses 52 may be formed along the diagonals, as shown in FIG. 1 .
  • FIG. 1 shows one example of the design of a perforated modular marine unit, but the construction of the underdeck 2 is not restricted to this specific design for the modular units 10.
  • FIGS. 2-4 various stages in the construction of the underdeck 2 and integrated port 100 are shown.
  • FIG. 5 a detail of a section of the completed underdeck 2 is shown.
  • the means by which the individual perforated modular marine units are interconnected, described above, is shown graphically in the figure.
  • an integrated deepwater offshore port 100 which comprises an upper pier deck 1 and an under-deck 2.
  • the upper pier deck is constructed of materials appropriate for use in salt water. It is designed for mooring of mega-ships, as a base for heavy cranes and other equipment used for on-loading and off-loading of cargo to and from the ships, and as a temporary location for cargo to be loaded onto the container ships or to be transferred to the container terminal.
  • the embodiment shown in FIGS. 6 and 7 shows the upper deck as having a rectangular profile, but due to the modular nature of the port's construction, the exact dimensions and shape of the upper deck will necessarily vary from embodiment to embodiment according to the specific needs of the port itself. Similarly, the exact dimensions and shape of the under-deck will be chosen in order to provide support for the upper deck, and will thus vary depending on the needs of the specific port being constructed.
  • the under-deck 2 is constructed from a plurality of perforated modular marine structure units 10.
  • the perforated modular marine structure units are prefabricated and designed such that they are capable of interconnection, and are constructed from material that is compatible with long-term immersion in salt water.
  • FIG. 1 One embodiment of said perforated modular marine structure unit is presented in FIG. 1 .
  • This embodiment illustrates the essential qualities of the unit, in particular, its modularity (i.e. construction of the under-deck 2 is done by interconnecting a plurality of identical elements as illustrated in FIG. 5 ), its interconnectability, and its ability to allow water to pass through it. In this particular embodiment, water flows through cut out portions of the structure.
  • the unit may contain passages or be itself constructed from smaller sub-units in order to allow passage of water.
  • the embodiment shown in FIG. 2 is provided to illustrate the construction of the integrated dock, and is not intended to limit its construction to use of the specific embodiment shown in the figure.
  • the under-deck sits directly on the natural sea floor and is constructed from prefabricated modular marine units 10 which are constructed on-shore, and the upper deck sits atop the mega-structure.
  • the elements are interconnected (cf. FIG. 5 ) in dry dock. After the modular marine units are interconnected, a platform of at least one level is built. It is possible to build further structures atop the platform, with the platform itself serving as a foundation for the structures. After the work is completed in dry dock, the dry dock is filled with water to float the platform and everything on top of it. The platform is then towed (afloat) to its ultimate location in deep water, at which point water is allowed to enter the cavities within the modular marine units, causing them to sink to the sea floor, thus creating the breakwater port. Alternatively, the elements may be interconnected in wet dock and the port then towed to its ultimate location.
  • the under-deck is constructed from perforated units, it acts naturally as an efficient breakwater, providing still water on its landward side, and thus enabling the upper deck to act as a pier or wharf for cargo ships without the need for construction of a separate dedicated breakwater.
  • the perforated units additionally can serve as a habitat for underwater flora and fauna, and hence, the under-deck as constructed can also serve as the basis of a man-made reef.
  • An artificial island 100 comprises integrally configured an underwater portion 20, an above-water platform 30, and accommodation facilities 40.
  • the underwater portion 20 further comprises at least one open-ended passageway and sits directly on a surface of a seabed 10.
  • the underwater portion 20 is assembled from perforated modular units 25.
  • the above-water platform 30 being mechanically fixated to the underwater portion 20 carries the accommodation facilities 40 on upper surface of the aforesaid platform 30.
  • marine fauna 60 and a scuba diver 50 are indicated in sea water.
  • the underwater portion 20 is furnished with means for forming artificial reefs.
  • the aforesaid means constitutes special metal, plastic or any other additional members mechanically connected to perforated modular units 25 to increase an area of contacting sea water to the underwater portion 20.
  • Connector 300 comprises a crosspiece having three arms 110, 120 and 130 orthogonal to each other. Each of arms 110, 120 and 130 has a cross-like cross section. Connector 300 is provided with reinforcing members 150, 160, and 170 which are in planes defined by 120-130 (X-Y), 110-130 (Y-Z) and 110-120 (X-Z). Additionally, reinforcing members exemplarily indicated as 140 and welded to arms 110, 120 and 130 are connectable to the corner portions of units 25.
  • FIGs 13a to 13f illustrating stages of establishing a structure mountable on a seabed.
  • Numeral 210 refers to the corner portions of units 25. Corner portion 210 of each unit 25 is provided with concave surface 220 such that when units 25 are assembled into a structure to be established, these concave surfaces 220 forms a cavity to be fill with concrete (described below).
  • Connector 300 is mechanically connected to corner portions 210 of units 25 by reinforcing members 140.
  • Connector 300 is mounted within cavity 230 which is filled with concrete after mounting all units 25 forming cavity 230. Filling with concrete is performed via channel 240.
  • units 25 are mounted such that surfaces 220 at corner portions 210 form cavity 230. Then, connector 300 is mounted into cavity 230. Thereat members 140 are mechanically connected to corner portions 210. Thereafter, cavity 230 is filled with concrete via channel 240.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Revetment (AREA)
  • Artificial Fish Reefs (AREA)
  • Earth Drilling (AREA)
  • Peptides Or Proteins (AREA)

Description

    FIELD OF THE INVENTION
  • This invention relates to offshore structures and methods for their construction and more particularly to modular constructions useful for deep-water ports and artificial islands.
  • BACKGROUND OF THE INVENTION
  • The increasing globalization of the world economy has led to increased demands for international shipping. As a result of this increased demand, more and more cargo companies are placing orders for "jumbo" container ships with capacities of over 14,800 TEU (1 TEU or "Twenty-Foot Equivalent Unit" = 1445 ft3 = the volume equal to that occupied by a 20' × 8½' × 8½' container) (J. Svendsen and J. Tiedemann, "The Big Ships Are Coming," web site article dated July 17, 2007: http://containerinfo.co.ohost.de). While these large ships can improve the efficiency by which goods are transported, only some 20 ports worldwide can handle them, leading to additional transportation costs and loss of time due to the ensuing necessity of transshipment from a "hub port" to the cargo's ultimate destination.
  • Several obstacles hinder the development of additional ports capable of handling tomorrow's jumbo cargo ships. One is the lack of available coastal land for ports. Not only is the amount of coastal land suitable for port development inherently limited, but coastal land in general is valuable and desirable for development for other purposes (e.g. residential). A second obstacle is the lack of sufficiently deep water near the coast and the massive expense that additional dredging and construction of retaining walls entails. For example, between 2000 and 2005, the Kill van Kull channel (New York/New Jersey) was deepened from 35 feet to 45 feet at a cost of $360 million, and the project currently underway to dredge the channel to the 50 foot depth required for 7000 - 8000 TEU capacity ships will add more than $900 million to the overall cost.
  • There is a further fundamental obstacle to the development of new deep-water ports accessible to jumbo container ships, namely, the way in which ports are normally engineered. The basic design of seaports has remained essentially unchanged since the time of the Roman Empire: a breakwater is constructed to provide a harbor (i.e. area of calm water), and the port constructed within that harbor. While this design has been useful for literally two millennia, it suffers from three weaknesses that limit its usefulness to contemporary port design: (1) construction of the breakwater adds significantly to the cost of the seaport (one-third of the total) - and the cost of the breakwater increases as the square of its depth; (2) the need for constant dredging on the landward side of the breakwater adds additional expense to the maintenance of the port; (3) the wide slope of the breakwater prevents mooring of ships in close proximity to it, wasting the deepest and hence most useful part of the harbor.
  • In the face of these obstacles, it is of vital importance that new ways of thinking about seaport design be found. Such new approaches are still lacking, however. In U.S. Pat. Nos. 5,803,659 and 6,017,167 , Chattey disclosed a method of using modular caissons for seaport construction or expansion. While this invention has the cost advantages brought about by the modularity and portability of the caissons used, the port itself remains tied to land, and hence does not remove the need for the expensive dredging operations described above in cases where the water is not sufficiently deep.
  • Others have disclosed various means of constructing modular underwater breakwaters (e.g. the inventions disclosed in U.S. Pat Nos. 1,816,095 ; 3,844,125 ; 4,502,816 ; 4,978,247 ; and 5,393,169 ), but these breakwaters are generally designed for prevention of beach erosion rather than for use in a port. Even those modular units intended for use in construction of harbor breakwaters (e.g. those disclosed in U.S. Pat. Nos. 3,614,866 ; 4,347,017 ; and 5,620,280 ), while reducing costs of harbor construction, envision construction of a breakwater and the piers as separate entities.
  • U.S. Pat. No. 6,234,714 discloses a pier with a nominally integrated breakwater. As with the above-referenced patents, however, the breakwater and pier are in fact independent structures, in which the breakwater comprises a mound of sand, gravel, rocks, and/or rubble piled up against the seaward side of the pier, upon which a plurality of caisson-like structures are placed. Thus, this design also suffers from the problems that the breakwater cannot be constructed without extensive dredging operations and that the breakwater and the pier are not a single modular structure.
  • Thus, there remains a need for a new paradigm for deep-water port design and construction. In order to solve the problems discussed above, what is needed is a deep-water port or an artificial island in which the breakwater is integrated into the structure itself, eliminating the costs of a dedicated breakwater construction and maintenance; in which the structure itself can be constructed in deep water without the need for additional dredging; and in which the port can be built as an independent structure not needing any direct connection to dry land, eliminating the need for free coastal land as a prerequisite for port construction or expansion. The present invention is designed to meet these long-felt needs.
  • SUMMARY OF THE INVENTION
  • The present invention provides a solution to the problems described above and an answer to the need for a new way of thinking about port design. It is one object of the present invention, as defined by claim 1, to provide perforated structure mountable onto a seabed for establishing a deep-water port or an artificial island. The aforesaid structure comprises: (a) a plurality of prefabricated perforated modules integratable into said structure; (b) at least one connector interconnecting corner portions of said prefabricated perforated modules.
  • It is a core purpose of the present invention to each prefabricated perforated module has a corner portion comprising a concave surface such that said corner portions being integrated together into said structure form a cavity to be filled with a concrete. The connector comprises a crosspiece having three arms orthogonal to each other; each arm has a cross-like cross section. The crosspiece has reinforcing members distributed within said concrete.
  • It is another object of the invention to provide a method, as defined by claim 2, of establishing a deep-water port or an artificial island. The aforesaid method comprises the steps of (a) providing a plurality of prefabricated perforated modules integratable into said structure; each prefabricated perforated module has a corner portion comprising a concave surface such that said corner portions being integrated together into said structure form a cavity to be filled with a concrete; (b) providing at least one connector; (c) positioning corner portions of said prefabricated perforated modules such that a cavity surrounding said corner portions is formed; (d) mounting said connector comprising crosspiece having three arms orthogonal to each other within formed cavity; each arm has a cross-like cross section; said crosspiece has reinforcing members; and (e) filling said cavity with concrete such that said reinforcing members distributed within said concrete.
  • BRIEF DESCRIPTION OF THE DRAWINGS
    • FIG. 1 shows one embodiment of a modular marine structure unit 10 (prior art, U.S. Pat. No. 7,226,245 assigned to Kent and Alkon) used to construct the breakwater underdeck 2. This document discloses the features of the preambles of claims 1 and 2;
    • FIG. 2 shows how the transport of a prefabricated modular unit 10 (or of an assembly comprising a plurality of interconnected units) to the site of the port;
    • FIGS. 3 and 4 show top views of the assembled port with a cutaway view showing the placement of a modular unit 10, said modular unit being shown in one embodiment;
    • FIG. 5 shows a cutaway assembly diagram illustrating how modular structure units 10 are connected to form the breakwater underdeck 2;
    • FIG. 6 shows a view of the fully-constructed port 100 showing the upper pier deck 1 and breakwater underdeck 2, illustrating how the fully-constructed port sits in the water;
    • FIG. 7 shows a cutaway view of the port 100 illustrating the construction of the breakwater deck 2 from modular units 10 and the positions of the upper deck 1 and of the underdeck 2 relative to each other and to the water;
    • FIG. 8 shows a view of a harbor that includes an integrated deep water port 100;
    • FIG. 9 is a schematic view of an environmentally friendly artificial island;
    • FIG. 10 is another schematic three-dimensional view of the environmentally friendly artificial island according to yet another design and embodiment;
    • FIG. 11 is still another schematic three-dimensional view of the environmentally friendly artificial island according to yet another design and embodiment of the invention;
    • FIG. 12 is an isometric view of a connector for interconnecting prefabricated units;
    • FIGs 13a to 13f illustrates stages of establishing a structure mountable on a seabed; and
    • FIG. 14 is an isometric view of a connector for mounted within a structure mountable on a seabed.
    DETAILED DESCRIPTION OF THE INVENTION
  • It will be apparent to one skilled in the art that there are several embodiments of the invention that differ in details of construction, without affecting the essential nature thereof, and therefore the invention is not limited by that which is illustrated in the figures and described in the specification, but only as indicated in the accompanying claims, with the proper scope determined only by the broadest interpretation of said claims.
  • We define the following terms to describe the invention:
    • Breakwater: a barrier designed to protect a harbor or shore from the impact of waves.
    • Perforated modular marine structure unit: a structural module for underwater construction, which has cut-outs or passages such that when immersed in a body of water, the water may pass through it.
  • With reference to FIG. 1 , one embodiment of a perforated modular marine structure unit 10 is shown with a shape constituting a rectangular parallelepiped 12 defined by six planar faces with lower base vertices ABCD and upper base vertices EFGH. In the example shown, it is assumed without any limitations that the parallelepiped is a geometrical cube with sides about 10 m long. Four non-adjacent corners of the cube, in this case, B, D, E, and G, are cut out, leaving surfaces S B , S D (not seen in the view illustrated in FIG. 1 ), S E , and S G . In the particular embodiment shown in FIG. 1 , S B , S D , S E , and S G have the shape of part of the surface of a sphere centered at the nearest corner, but they can have any shape bulging toward the cube's center (e.g. an ellipsoid or a more complex shape). Four tunnels T B , T D , T E , and T G are formed and converge in the cube's center to form a tetrapod-like passage interconnecting the cut-out surfaces. The tunnels are shown as having a cylindrical cross-section, but they may be of other shapes. The six planar surfaces left from the faces of the original cube (e.g. surface 14, remaining from side EFGH) are base planes by which the perforated modular marine structure contacts other modules. These surfaces must be large enough to ensure stable positioning of the module on a substantially horizontal foundation during the assembly process.
  • In the particular embodiment shown in FIG. 1, the perforated modular marine structures are formed with reinforcing diagonal beams (RDBs) 30 extending along the six diagonals on the planar surfaces remaining from the faces of the original cube. The RDBs may comprise reinforcing elements, for example, steel rods 32, and material embedding the reinforcing elements, e.g. concrete. Recesses 42 are formed on the cube's surface at the corners of the module. When two to eight modular marine structure units 10 are arranged about a common corner, these recesses form cavities that serve as a mold for casting concrete or injecting grout to create corner joints. Similar recesses 52 may be formed along the diagonals, as shown in FIG. 1 .
  • FIG. 1 shows one example of the design of a perforated modular marine unit, but the construction of the underdeck 2 is not restricted to this specific design for the modular units 10.
  • With reference to FIGS. 2-4 , various stages in the construction of the underdeck 2 and integrated port 100 are shown.
  • With reference to FIG. 5 , a detail of a section of the completed underdeck 2 is shown. The means by which the individual perforated modular marine units are interconnected, described above, is shown graphically in the figure.
  • With reference to FIGS. 6 to 8 , an integrated deepwater offshore port 100 is shown which comprises an upper pier deck 1 and an under-deck 2. The upper pier deck is constructed of materials appropriate for use in salt water. It is designed for mooring of mega-ships, as a base for heavy cranes and other equipment used for on-loading and off-loading of cargo to and from the ships, and as a temporary location for cargo to be loaded onto the container ships or to be transferred to the container terminal. The embodiment shown in FIGS. 6 and 7 shows the upper deck as having a rectangular profile, but due to the modular nature of the port's construction, the exact dimensions and shape of the upper deck will necessarily vary from embodiment to embodiment according to the specific needs of the port itself. Similarly, the exact dimensions and shape of the under-deck will be chosen in order to provide support for the upper deck, and will thus vary depending on the needs of the specific port being constructed.
  • The under-deck 2 is constructed from a plurality of perforated modular marine structure units 10. The perforated modular marine structure units are prefabricated and designed such that they are capable of interconnection, and are constructed from material that is compatible with long-term immersion in salt water. One embodiment of said perforated modular marine structure unit is presented in FIG. 1 . This embodiment illustrates the essential qualities of the unit, in particular, its modularity (i.e. construction of the under-deck 2 is done by interconnecting a plurality of identical elements as illustrated in FIG. 5 ), its interconnectability, and its ability to allow water to pass through it. In this particular embodiment, water flows through cut out portions of the structure. In other embodiments, the unit may contain passages or be itself constructed from smaller sub-units in order to allow passage of water. The embodiment shown in FIG. 2 is provided to illustrate the construction of the integrated dock, and is not intended to limit its construction to use of the specific embodiment shown in the figure.
  • The under-deck sits directly on the natural sea floor and is constructed from prefabricated modular marine units 10 which are constructed on-shore, and the upper deck sits atop the mega-structure. The elements are interconnected (cf. FIG. 5 ) in dry dock. After the modular marine units are interconnected, a platform of at least one level is built. It is possible to build further structures atop the platform, with the platform itself serving as a foundation for the structures. After the work is completed in dry dock, the dry dock is filled with water to float the platform and everything on top of it. The platform is then towed (afloat) to its ultimate location in deep water, at which point water is allowed to enter the cavities within the modular marine units, causing them to sink to the sea floor, thus creating the breakwater port. Alternatively, the elements may be interconnected in wet dock and the port then towed to its ultimate location.
  • Because the under-deck is constructed from perforated units, it acts naturally as an efficient breakwater, providing still water on its landward side, and thus enabling the upper deck to act as a pier or wharf for cargo ships without the need for construction of a separate dedicated breakwater. The perforated units additionally can serve as a habitat for underwater flora and fauna, and hence, the under-deck as constructed can also serve as the basis of a man-made reef.
  • Reference is now made to FIG. 9 to 11 , showing a set of preferred embodiments of the current invention, the embodiments differ in their design yet pertain t the same inventive pith and marrow. An artificial island 100 comprises integrally configured an underwater portion 20, an above-water platform 30, and accommodation facilities 40. The underwater portion 20 further comprises at least one open-ended passageway and sits directly on a surface of a seabed 10. In accordance with one embodiment of the current invention, the underwater portion 20 is assembled from perforated modular units 25. The above-water platform 30 being mechanically fixated to the underwater portion 20 carries the accommodation facilities 40 on upper surface of the aforesaid platform 30. As seen in Figures, marine fauna 60 and a scuba diver 50 are indicated in sea water.
  • In accordance with another embodiment of the current invention, the underwater portion 20 is furnished with means for forming artificial reefs. The aforesaid means constitutes special metal, plastic or any other additional members mechanically connected to perforated modular units 25 to increase an area of contacting sea water to the underwater portion 20.
  • Reference is now to FIG. 12 showing connector 300 designed for interconnecting corner portions of units 25 (not shown). Connector 300 comprises a crosspiece having three arms 110, 120 and 130 orthogonal to each other. Each of arms 110, 120 and 130 has a cross-like cross section. Connector 300 is provided with reinforcing members 150, 160, and 170 which are in planes defined by 120-130 (X-Y), 110-130 (Y-Z) and 110-120 (X-Z). Additionally, reinforcing members exemplarily indicated as 140 and welded to arms 110, 120 and 130 are connectable to the corner portions of units 25.
  • Reference is now made to FIGs 13a to 13f illustrating stages of establishing a structure mountable on a seabed. Numeral 210 refers to the corner portions of units 25. Corner portion 210 of each unit 25 is provided with concave surface 220 such that when units 25 are assembled into a structure to be established, these concave surfaces 220 forms a cavity to be fill with concrete (described below).
  • Reference is now made to FIG.14 showing connector 300 mounted into cavity 230. Connector 300 is mechanically connected to corner portions 210 of units 25 by reinforcing members 140. Connector 300 is mounted within cavity 230 which is filled with concrete after mounting all units 25 forming cavity 230. Filling with concrete is performed via channel 240.
  • Summarizing, units 25 are mounted such that surfaces 220 at corner portions 210 form cavity 230. Then, connector 300 is mounted into cavity 230. Thereat members 140 are mechanically connected to corner portions 210. Thereafter, cavity 230 is filled with concrete via channel 240.

Claims (2)

  1. A perforated structure mountable onto a seabed for establishing a deep-water port or an artificial island; said structure comprising:
    a plurality of prefabricated perforated modules (25) integratable into said structure;
    wherein each prefabricated perforated module has a corner portion (210) comprising a concave surface (220) such that said corner portions being integrated together into said structure form a cavity (230) to be filled with a concrete;
    characterised in that said structure comprises at least one connector (300) interconnecting corner portions of said prefabricated perforated modules; and wherein said connector comprises a crosspiece having three arms (110, 120, 130) orthogonal to each other; each arm has a cross-like cross section;
    wherein said crosspiece has reinforcing members (150, 160, 170) distributed within said concrete.
  2. A method of establishing a deep-water port or an artificial island; said method comprising the steps of
    a. providing a plurality of prefabricated perforated modules (25) integratable into said structure; each prefabricated perforated module has a corner portion (210) comprising a concave surface (220) such that said corner portions being integrated together into said structure form a cavity (230) to be filled with a concrete;
    characterised by
    b. providing at least one connector (300);
    c. positioning corner portions of said prefabricated perforated modules such that a cavity surrounding said corner portions is formed;
    d. mounting said connector comprising crosspiece having three arms (110, 120, 130) orthogonal to each other within formed cavity; each arm has a cross-like cross section; said crosspiece has reinforcing members (150, 160, 170); and
    e. filling said cavity with concrete such that said reinforcing members distributed within said concrete.
EP16870131.6A 2015-12-03 2016-12-01 Perforated structure mountable onto a seabed Active EP3384095B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US14/957,639 US9683346B2 (en) 2009-01-15 2015-12-03 Perforated structure mountable onto a seabed
PCT/IL2016/051289 WO2017094013A1 (en) 2015-12-03 2016-12-01 Perforated structure mountable onto a seabed

Publications (3)

Publication Number Publication Date
EP3384095A1 EP3384095A1 (en) 2018-10-10
EP3384095A4 EP3384095A4 (en) 2019-07-17
EP3384095B1 true EP3384095B1 (en) 2020-07-29

Family

ID=58796470

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16870131.6A Active EP3384095B1 (en) 2015-12-03 2016-12-01 Perforated structure mountable onto a seabed

Country Status (9)

Country Link
EP (1) EP3384095B1 (en)
JP (1) JP6778759B2 (en)
BR (1) BR112018011257A2 (en)
DK (1) DK3384095T3 (en)
ES (1) ES2830323T3 (en)
IL (1) IL259757B (en)
PT (1) PT3384095T (en)
SG (1) SG11201804634RA (en)
WO (1) WO2017094013A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463571A (en) * 2021-07-31 2021-10-01 周张宁 Reinforced concrete stop block with water flow hole

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2942745B2 (en) * 1997-07-17 1999-08-30 株式会社リタ総合企画 Block joint and block structure using the same
JP2001182171A (en) * 1999-12-22 2001-07-03 Taiyo Gijutsu Kaihatsu Kk Coupling method of concrete structure
DK1404927T3 (en) * 2001-06-28 2007-07-30 Tamnor Man & Consulting Ltd Modular marine structures

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
WO2017094013A1 (en) 2017-06-08
EP3384095A1 (en) 2018-10-10
DK3384095T3 (en) 2020-11-02
PT3384095T (en) 2020-11-20
EP3384095A4 (en) 2019-07-17
BR112018011257A2 (en) 2018-11-21
IL259757A (en) 2018-07-31
ES2830323T3 (en) 2021-06-03
IL259757B (en) 2021-12-01
JP6778759B2 (en) 2020-11-04
SG11201804634RA (en) 2018-06-28
JP2018536787A (en) 2018-12-13

Similar Documents

Publication Publication Date Title
US4511288A (en) Modular island drilling system
KR101448092B1 (en) Prefabricated caisson blocks and breakwater, seawall using it
WO2018074977A1 (en) System and method for reconfiguring a mobile docking apparatus for transporting, removal, installation, housing and transferring assets
US20080112759A1 (en) Artificial reef anchor structure
KR101037222B1 (en) Bidding Shipment System of Coastal Pier Using Transfer Pants
US6082931A (en) Modular maritime dock design
US9683346B2 (en) Perforated structure mountable onto a seabed
EP3384095B1 (en) Perforated structure mountable onto a seabed
US20120051845A1 (en) Deep water port
KR101666626B1 (en) Shore bank using frame and geotextile, and method for constructing this same
US20150010364A1 (en) Deep-water port
KR101806855B1 (en) Modular revetment structureand construction method
KR20070075118A (en) Rabbet joint block and structure using thereof
US11787514B2 (en) Marine construction and a method for constructing the same
JP4539989B2 (en) Artificial seabed with upwelling flow and its construction method
JP5234415B2 (en) Sea area control structure
KR100708599B1 (en) Multipurpose concrete block for river facilities
JP3212514B2 (en) Environmentally friendly floating structure and method of manufacturing the same
KR101326773B1 (en) Harbor Structures Easily respond to Differential Settlement
JP3294118B2 (en) How to build an environmentally friendly submerged levee
KR100374177B1 (en) The structure of breakwater in deep sea
CN115573297A (en) Coastal pontoon bridge
Flores Ganuza et al. Development of a Modular, Adaptable and Scalable Gravity Anchor System for Various Floating Foundations
WO2024054163A1 (en) Floating foundation system
WO2022165315A1 (en) Barrier systems and methods

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180625

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RIN1 Information on inventor provided before grant (corrected)

Inventor name: BIRNHACK, KOBI

A4 Supplementary search report drawn up and despatched

Effective date: 20190619

RIC1 Information provided on ipc code assigned before grant

Ipc: E02B 3/06 20060101ALI20190613BHEP

Ipc: E02D 29/16 20060101ALI20190613BHEP

Ipc: E02B 3/12 20060101ALN20190613BHEP

Ipc: E02B 17/00 20060101ALI20190613BHEP

Ipc: B63B 5/18 20060101ALN20190613BHEP

Ipc: E04C 5/16 20060101ALI20190613BHEP

Ipc: E04B 1/19 20060101ALN20190613BHEP

Ipc: E02B 17/02 20060101AFI20190613BHEP

Ipc: E02B 3/20 20060101ALI20190613BHEP

Ipc: B28B 7/00 20060101ALI20190613BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20200207

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 29/16 20060101ALI20200127BHEP

Ipc: E02B 3/06 20060101ALI20200127BHEP

Ipc: E04B 1/19 20060101ALN20200127BHEP

Ipc: B28B 7/00 20060101ALI20200127BHEP

Ipc: E02B 3/20 20060101ALI20200127BHEP

Ipc: E02B 3/12 20060101ALN20200127BHEP

Ipc: E02B 17/02 20060101AFI20200127BHEP

Ipc: E02B 17/00 20060101ALI20200127BHEP

Ipc: E04C 5/16 20060101ALI20200127BHEP

Ipc: B28B 23/02 20060101ALI20200127BHEP

Ipc: B63B 5/18 20060101ALN20200127BHEP

Ipc: B28B 7/18 20060101ALI20200127BHEP

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1295935

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200815

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016041067

Country of ref document: DE

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20201030

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Ref document number: 3384095

Country of ref document: PT

Date of ref document: 20201120

Kind code of ref document: T

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20201112

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1295935

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200729

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201030

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201029

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201029

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20201221

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201129

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016041067

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2830323

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20210603

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

26N No opposition filed

Effective date: 20210430

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200729

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220601

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211231

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20220629

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230630

Year of fee payment: 8

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20221231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221231

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231207

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: MC

Payment date: 20231207

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20231227

Year of fee payment: 8

Ref country code: IE

Payment date: 20231207

Year of fee payment: 8

Ref country code: DK

Payment date: 20231207

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20240103

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20231221

Year of fee payment: 8