EP3317936B1 - Energieübertragungsanordnung und verfahren zum betrieb einer energieübertragungsanordnung - Google Patents

Energieübertragungsanordnung und verfahren zum betrieb einer energieübertragungsanordnung Download PDF

Info

Publication number
EP3317936B1
EP3317936B1 EP15732273.6A EP15732273A EP3317936B1 EP 3317936 B1 EP3317936 B1 EP 3317936B1 EP 15732273 A EP15732273 A EP 15732273A EP 3317936 B1 EP3317936 B1 EP 3317936B1
Authority
EP
European Patent Office
Prior art keywords
power
converter station
converter
power transmission
transmission line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP15732273.6A
Other languages
English (en)
French (fr)
Other versions
EP3317936A1 (de
Inventor
Göran BRORSSON
Hongbo Jiang
Marcin Szewczyk
Mats Hyttinen
Michal LAZARCZYK
Pawel Dawidowski
Radoslaw Jez
Wojciech Piasecki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Schweiz AG
Original Assignee
ABB Schweiz AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Schweiz AG filed Critical ABB Schweiz AG
Publication of EP3317936A1 publication Critical patent/EP3317936A1/de
Application granted granted Critical
Publication of EP3317936B1 publication Critical patent/EP3317936B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/36Arrangements for transfer of electric power between ac networks via a high-tension dc link
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02MAPPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
    • H02M5/00Conversion of ac power input into ac power output, e.g. for change of voltage, for change of frequency, for change of number of phases
    • H02M5/40Conversion of ac power input into ac power output, e.g. for change of voltage, for change of frequency, for change of number of phases with intermediate conversion into dc
    • H02M5/42Conversion of ac power input into ac power output, e.g. for change of voltage, for change of frequency, for change of number of phases with intermediate conversion into dc by static converters
    • H02M5/44Conversion of ac power input into ac power output, e.g. for change of voltage, for change of frequency, for change of number of phases with intermediate conversion into dc by static converters using discharge tubes or semiconductor devices to convert the intermediate dc into ac
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/60Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]

Definitions

  • the present invention generally relates to the field of power transmission systems, e.g. High Voltage Direct Current (HVDC) power transmission systems.
  • HVDC High Voltage Direct Current
  • the present invention relates to a power transmission arrangement configured to electrically couple a first power system with a second power system, each of the first power system and the second power system for example comprising an alternating current (AC) and/or a direct current (DC) power system, by means of a power transmission line, e.g. comprising a DC transmission line.
  • HVDC High Voltage Direct Current
  • HVDC power transmission has become increasingly important due to increasing need for power supply or delivery and interconnected power transmission and distribution systems.
  • a HVDC converter station which is a type of station configured to convert high voltage DC to AC, or vice versa.
  • a HVDC converter station may comprise a plurality of elements such as the converter itself (or a plurality of converters connected in series or in parallel), one or more transformers, capacitors, filters, and/or other auxiliary elements.
  • Converters may comprise a plurality of solid-state based devices such as semiconductor devices and may be categorized as line-commutated converters (LCCs) or voltage source converters (VSCs), e.g. depending on the type of switches (or switching devices) which are employed in the converter.
  • LCCs line-commutated converters
  • VSCs voltage source converters
  • a plurality of solid-state semiconductor devices such as IGBTs may be connected together, for instance in series, to form a building block, or cell, of a HVDC converter.
  • HVDC Light is a technology developed by ABB and that is based on VSC technology and is designed to transmit power for example underground and underwater, and also over relatively long distances.
  • HVDC Light based power systems may be capable of black start operation, i.e. they may have a capability of starting transferring power from an operating power system or grid to another power system or grid that suffered a blackout, or to an 'islanded' or isolated power system.
  • a HVDC converter station is often equipped with auxiliary systems or elements such as systems which may provide or facilitate cooling, water purification, communications and/or control of operation of the HVDC converter station. It is often desired or even required that some or even all of such auxiliary systems should be operational before the actual black start of the HVDC link is performed.
  • auxiliary systems Prior to the black start of the HVDC link power is usually provided to such auxiliary systems by means of a diesel generator or the like.
  • diesel generators Prior to the black start of the HVDC link power is usually provided to such auxiliary systems by means of a diesel generator or the like.
  • diesel generators Prior to the black start of the HVDC link power is usually provided to such auxiliary systems by means of a diesel generator or the like.
  • the use of diesel generators to provide its auxiliary systems with power prior to black start operation may be associated with relatively high costs relating to maintenance of the diesel generators.
  • Use of diesel generators may also have a negative environmental impact due to need for storing fuel, etc.
  • a dedicated AC transmission line for supplying auxiliary power to any auxiliary systems of the HVDC converter station may not be feasible for distances of more than a few hundred kilometers between the HVDC converter station to the shore due to relatively high reactive power consumption by the long capacitive cable that may be required for the AC transmission.
  • US 2014/9268926 A1 discloses a black start configuration that may be used with a HVDC transmission system including a HVDC conduit, which black start configuration comprises buck converters.
  • a black start flow path can be formed, bypassing a transformer at the inverter side, HVDC inverter devices, HVDC rectifier devices and a transformer at the rectifier side, and directly coupling the buck converters with the HVDC conduit.
  • US 2008/197706 A1 discloses an uninterruptable power supply with battery and converters.
  • a concern of the present invention is to provide means for facilitating or enabling carrying out a black start of a converter station of a power link, e.g. a DC link or a HVDC link, electrically connecting two power systems, e.g. two alternating current (AC) power systems.
  • a power link e.g. a DC link or a HVDC link
  • two power systems e.g. two alternating current (AC) power systems.
  • a further concern of the present invention is to provide means for facilitating or enabling carrying out a black start of a converter station of a power link electrically connecting two power systems with less or even no need of a diesel generator or the like for providing power to any auxiliary systems of the converter station prior to the black start of the power link is carried out.
  • a further concern of the present invention is to provide means for facilitating or enabling carrying out a black start of a converter station of a power link electrically connecting two power systems with less or even no need of a dedicated AC power transmission line for supplying power to any auxiliary systems of the converter station prior to the black start of the power link is carried out.
  • a power transmission arrangement configured to electrically couple a first power system with a second power system.
  • Each of the first power system and the second power system may for example comprise an alternating current (AC) and/or a direct current (DC) power system (e.g., a DC grid).
  • the first power system and the second power system are electrically connected with a first converter station and a second converter station, respectively.
  • Each of the first converter station and the second converter station is configured to convert AC power to DC power or vice versa.
  • the power transmission arrangement comprises at least one power transmission line.
  • the power transmission line may for example comprise a DC transmission line.
  • the power transmission line may be capable of conveying AC power.
  • the first power system is selectively electrically connectable to one end of the power transmission line via the first converter station.
  • the second power system is selectively electrically connectable to the other end of the power transmission line via the second converter station.
  • the first converter station is arranged at the one end of the power transmission line.
  • the second converter station is arranged at the other end of power transmission line.
  • the power transmission arrangement comprises at least one electrical energy storage element that can be selectively charged or discharged, and is selectively electrically connectable to at least a portion of one of the first converter station and the second converter station such that the at least one electrical energy storage element when discharged can convey power to the at least a portion of the one of the first converter station and the second converter station.
  • the power transmission arrangement comprises at least one auxiliary (power) converter that can be selectively electrically connected to the power transmission line and which is electrically connected to the at least one electrical energy storage element such that the at least one electrical energy storage element can be charged by power output from the at least one auxiliary converter.
  • the power transmission arrangement is arranged and/or configured to convert power (e.g., AC power or DC power) from the one of the first power system and the second power system that is at the end of the power transmission line at which the other one of the first converter station and the second converter station is arranged, to DC and/or AC power, which DC or AC power has or is at a lower voltage than the nominal operating voltage of the other one of the first converter station and the second converter station.
  • power e.g., AC power or DC power
  • the power transmission arrangement is further arranged and/or configured to, possibly at least in part by way of an electrical switching arrangement, selectively cause the DC or AC power to be conveyed to the at least one auxiliary converter via the power transmission line when the one of the first converter station and the second converter station is de-energized, so as to charge the at least one electrical energy storage element.
  • power can be conveyed to the at least a portion of the one of the first converter station and the second converter station when it is de-energized, by discharging of the at least one electrical energy storage element.
  • DC or AC power which may be lower than the nominal transmission power may be conveyed to the at least one auxiliary converter via the power transmission line.
  • the at least a portion of the one of the first converter station and the second converter station, to which power may be conveyed when it is de-energized by discharging of the at least one electrical energy storage element may for example comprise auxiliary system(s) for implementing or realizing functionality of the respective converter station which is not directly related to power transferring and/or converting operations, such as for cooling, water purification, etc.
  • the at least a portion of the one of the first converter station and the second converter station may for example comprise communications and/or control systems of (or associated with) the respective converter station.
  • a converter station being de-energized it is meant that it is disconnected from a source of electricity such that it is not able to transmit power.
  • the at least one electrical energy storage element may for example comprise at least one battery or battery unit, a capacitor and/or a flywheel electrical energy storage, etc., and/or possibly another type of uninterruptible power supply (UPS), which may be a type of UPS as known in the art.
  • UPS uninterruptible power supply
  • a power source that for example may be used prior to a black start of the one of the first converter station and the second converter station to provide power to e.g. any auxiliary system(s) thereof may be achieved.
  • a black start of the one of the first converter station and the second converter station may be facilitated, since it is often desired or even required that some or even all of such auxiliary systems should be operational before a black start of a converter station is performed.
  • the conveying of power to the at least a portion of the one of the first converter station and the second converter station when it is de-energized by discharging of the at least one electrical energy storage element may be carried out prior to carrying out a black start of the one of the first converter station and the second converter station.
  • Embodiments of the present invention are generally based on employing a power transmission line, e.g. a DC transmission line, in a HVDC link to provide auxiliary power to one of the ends of the HVDC link for facilitating a black start thereof when the HVDC link is de-energized, i.e. when at least one of the HVDC converter stations is de-energized and there is no 'transmission of power between inverter and rectifier HVDC converter stations (as it would be during 'normal' operation of the HVDC link) on each side of the HVDC link.
  • a power transmission line e.g. a DC transmission line
  • a relatively small amount of power may be conveyed towards one of the HVDC converter stations via the power transmission line so as to provide power to any auxiliary system(s) of the converter station, for example prior to a black start of the converter station being carried out.
  • the power transmission line may be used at significantly reduced voltage and current as compared to the voltage and current on the power transmission line during 'normal' operation of the HVDC link to provide power to any auxiliary system(s) of the converter station prior to a black start of the converter station being carried out.
  • black start of the converter station may be carried out with less or even no need of a diesel generator or the like, a dedicated AC power transmission line, etc., for providing power to the auxiliary system(s) of the converter station prior to the black start of the converter station being carried out.
  • auxiliary systems it is often desired or even required that some or even all of such auxiliary systems should be operational before the actual black start of the HVDC link is performed.
  • By possibly being able to perform a black start of the HVDC link without need of diesel generators or the like it may become easier or even be enabled to start up converter stations in remote, inaccessible locations (e.g., at subsea locations such as on the ocean floor).
  • costs may be reduced, since there may be no need for a diesel generator, and hence also no need for storing e.g. fuel for the diesel generator or for maintenance of the diesel generator.
  • Another way to generally describe embodiments of the present invention is to use the power transmission line of a HVDC link for conveying power to a relatively small converter (in the context of the present application meaning having e.g. relatively low voltage and power ratings) at the HVDC inverter side of the HVDC link in order to provide power to an electrical energy storage element such as an UPS and any auxiliary system(s) of the HVDC inverter.
  • a relatively small converter in the context of the present application meaning having e.g. relatively low voltage and power ratings
  • a HVDC power transmission system is to derive relatively low voltage from the rectifier side of the HVDC link, for example by means of a relatively small auxiliary converter at the rectifier side of the HVDC link bypassing the HVDC rectifier, or from output of the HVDC rectifier in case it includes a multi-level converter, and transfer that voltage by means of the power transmission line of the HVDC link to charge an electrical energy storage element (e.g., an UPS) at the inverter side of the HVDC link.
  • an electrical energy storage element e.g., an UPS
  • Relatively low voltage it is meant voltage that is low in comparison with voltage on the HVDC link during nominal (normal) operation thereof. Power stored in the electrical energy storage element can then fed to the HVDC inverter auxiliary system(s) for facilitating a black start of the HVDC inverter.
  • the at least one electrical energy storage element may be at least in part pre-charged before carrying out a black start of the one of the first converter station and the second converter station. That is to say, prior to initiating a black start operation for black starting the one of the first converter station and the second converter station, DC or AC power may be conveyed to the at least one auxiliary converter via the power transmission line when the one of the first converter station and the second converter station is de-energized, so as to charge the at least one electrical energy storage element.
  • power may be conveyed to the at least a portion of the one of the first converter station and the second converter station when it is de-energized, by discharging of the at least one electrical energy storage element.
  • HVDC power transmission system Although embodiments of the present invention may be described herein in the context of a HVDC power transmission system, it is to be understood that the present invention is not limited to HVDC power transmission systems, but is applicable to all power transmission systems where power is transmitted between two power systems by way of a power transmission line.
  • DC or AC power power which has as a source the first power system or the second power system, respectively, and which may be directly or indirectly provided (e.g., by means of at least one transformer) from the first power system or the second power system, is converted to DC or AC power.
  • DC or AC power having a lower voltage than the nominal operating voltage of the first converter station or the second converter station, it is meant that the DC or AC power has a voltage that is lower (possibly significantly) than a voltage at which the converter station is designed and/or desired or even required to operate.
  • the DC or AC power may be at a voltage that corresponds to a fraction of the 'full' (or nominal) voltage on the power transmission line during 'normal' power transmission between the first and second converter stations via the power transmission line.
  • DC or AC power having a lower voltage than the nominal operating voltage of the first converter station or the second converter station may for example be obtained by way of an auxiliary converter that bypasses the second converter station or the first converter station, respectively, and/or by way of the second converter station or the first converter station, respectively, comprising a modular multi-level converter (MMC) e.g. having or exhibiting a full-bridge or half-bridge configuration, and allowing for or facilitating outputting a fraction of its nominal operating voltage.
  • MMC modular multi-level converter
  • the voltage of the DC or AC power conveyed to the at least one auxiliary converter via the power transmission line may in general depend for example on the length of the at least one power transmission line, or the distance over which the DC or AC power must be conveyed in order to reach the at least one auxiliary converter, and/or the voltage of the second power system or the first power system. The longer the distance the lower the voltage rating of the at least one auxiliary converter may be. According to one or more embodiments of the present invention the voltage rating of the at least one auxiliary converter may be approximately 20-30% of the nominal voltage rating of the at least one power transmission line. This may be the case for example when the nominal voltage rating of the at least one power transmission line is between about 1 kV and 10 kV.
  • the voltage rating of the at least one auxiliary converter may only be a few percent of the nominal voltage rating of the at least one power transmission line.
  • the electrical switching arrangement may comprise a plurality of switching elements or devices for example such as known in the art, e.g. comprising thyristors and/or transistors.
  • the power transmission arrangement may comprise a plurality of power transmission lines.
  • the at least one power transmission line may for example comprise a HVDC transmission line, or several DC or HVDC transmission lines for example arranged in a grid.
  • a HVDC transmission line may be arranged in configurations such as bi-pole, symmetric monopole, or monopole configuration.
  • a bipolar HVDC transmission line comprises a positive pole line, a negative pole line, and a metallic return line connected to ground.
  • One or more embodiments of the present invention may for example be implemented in the positive pole line, the negative pole line, and/or in the metallic return line of a bipolar HVDC transmission line.
  • the at least one power transmission line may comprise a plurality of power transmission lines or conductors, which plurality of power transmission lines or conductors may include a ground return, or a return line connected to ground.
  • the at least one power transmission line comprises or is constituted by a bipolar HVDC transmission line
  • the current of the 'healthy' pole may be taken over by the ground return (or metallic return if available), and the faulty pole may be isolated.
  • the DC or AC power may then be conveyed to the at least one auxiliary converter via the 'healthy' pole.
  • the at least one power transmission line may comprise an overhead line (OHL) or a cable.
  • the at least one power transmission line may comprise at least one OHL portion and at least one cable portion.
  • the first converter station and/or the second converter station may for example include or be constituted by a HVDC converter station.
  • the first converter station and/or the second converter station may be based on VSC technology or LCC technology.
  • power output from the at least one electrical storage element when discharged can be used to provide AC voltage to the AC side of the first converter station and/or the second converter station, respectively (possibly via a step-up transformer) for facilitating or enabling commutation of the (switching element(s)) of the first converter station and/or the second converter station, respectively, and thereby in turn facilitating or enabling black start of the first converter station and/or the second converter station, respectively.
  • the at least one auxiliary converter may be configured to convert DC power to AC power, or vice versa.
  • the at least one electrical energy storage element may possibly be charged by AC power output from the at least one auxiliary converter.
  • the at least one auxiliary converter may be configured to convert DC power to DC power, in case the at least a portion of the one of the first converter station and the second converter station is configured such that is capable of being fed or supplied with DC power.
  • the at least one auxiliary converter may be configured to convert AC power to AC power, in case the power transmission line is capable of conveying AC power.
  • the voltage of the DC or AC power conveyed to the at least one auxiliary converter via the power transmission line may be smaller the longer the distance over which the DC or AC power must be conveyed in order to reach the at least one auxiliary converter or the higher the voltage of the second power system or the first power system.
  • the power transmission arrangement may be configured to convert power (e.g., DC power or AC power) from the one of the first power system and the second power system that is at the end of the power transmission line at which the other one of the first converter station and the second converter station is arranged, to DC or AC power at a selected voltage.
  • power e.g., DC power or AC power
  • the DC or AC power conveyed to the at least one auxiliary converter via the power transmission line when the one of the first converter station and the second converter station is de-energized may be controllable at least with respect to voltage level or magnitude.
  • the power transmission arrangement can selectively cause the DC or AC power to be conveyed to the at least one auxiliary converter via the power transmission line when the one of the first converter station and the second converter station is de-energized, so as to charge the at least one electrical energy storage element.
  • the power transmission arrangement may comprise at least two auxiliary converters.
  • One of the auxiliary converters may be selectively electrically connected to the power transmission line so as to selectively electrically bypass the first converter station (or second converter station).
  • Another one of the auxiliary converters may be electrically connected to the at least one electrical energy storage element such that power output by the latter auxiliary converter can charge the at least one electrical energy storage element.
  • the one of the auxiliary converters may be selectively electrically connected to the power transmission line such that power output from the one of the auxiliary converters can be conveyed to the other one of the auxiliary converters via the power transmission line, when the other one of the auxiliary converters is electrically connected to the power transmission line.
  • the power transmission arrangement may be arranged and/or configured to convert power from the second power system to DC or AC power at a selected voltage that is lower than the nominal operating voltage of the second converter station, and to selectively cause the DC or AC power to be conveyed to the at least one auxiliary converter via the power transmission line when the first converter station is de-energized, so as to charge the at least one electrical energy storage element. Power may thereby be conveyed to the at least a portion of the first converter station when it is de-energized, by discharging of the at least one electrical energy storage element.
  • the one of the auxiliary converters may for example be electrically connected to the second power system via a dedicated transformer, and/or via a winding of a transformer electrically connected between the second converter station and the second power system.
  • the dedicated transformer and/or the transformer which may be electrically connected between the second converter station and the second power system may down-convert voltage from the second power system.
  • the power transmission arrangement may be arranged and/or configured to convert power from the first power system to DC or AC power at a selected voltage that is lower than the nominal operating voltage of the first converter station, and to selectively cause the DC or AC power to be conveyed to the at least one auxiliary converter via the power transmission line when the second converter station is de-energized, so as to charge the at least one electrical energy storage element. Power may thereby be conveyed to the at least a portion of the second converter station when it is de-energized, by discharging of the at least one electrical energy storage element.
  • the one of the auxiliary converters may for example be electrically connected to the first power system via a dedicated transformer, and/or via a winding of a transformer electrically connected between the first converter station and the first power system.
  • the dedicated transformer and/or the transformer which may be electrically connected between the first converter station and the first power system may down-convert voltage from the first power system.
  • one or both of the first converter station and the second converter station may comprise at least one modular multi-level converter (MMC) comprising a plurality of converter cells.
  • MMC modular multi-level converter
  • One or both of the first converter station and the second converter station may thus be comprised in the power transmission arrangement.
  • the at least one MMC may be configured to control its output voltage so as to output DC or AC power at a lower voltage than the nominal operating voltage of the other one of the first converter station and the second converter station, and input the DC or AC power into the power transmission line for conveyance of the DC or AC power to the at least one auxiliary converter via the power transmission line.
  • the at least one MMC may for example comprise at least one half-bridge cell or a full-bridge cell.
  • the at least one MMC may comprise at least one converter cell that can be selectively bypassed.
  • At least one transformer may be electrically connected between the first converter station and the first power system and/or between the second converter station and the second power system, respectively.
  • the at least one transformer may be configured to adjust voltage such that the at least one transformer outputs a selected fraction of the voltage of the first power system and/or the second power system, respectively.
  • the transformer may for example be equipped with a tap changer mechanism such that by controllable selection of or switching between different transformer taps, the transformer's output voltage may be controlled or adjusted.
  • the at least one auxiliary converter may be electrically connected to the first power system or the second power system for example via a winding of the transformer, e.g. a tertiary winding thereof, or via another transformer which possibly may be dedicated to the at least one auxiliary converter.
  • a transformer may have an additional winding in addition to a primary winding and a secondary winding.
  • the additional winding may be referred to as a tertiary winding.
  • the power transmission arrangement may comprise a plurality of electrical energy storage elements.
  • the power transmission arrangement may comprise at least one first electrical energy storage element.
  • the at least one first electrical energy storage element may be configured or arranged such that it can be selectively charged or discharged, and such that it can be selectively electrically connected to at least a portion of the first converter station such that the at least one first electrical energy storage element when discharged can convey power to the at least a portion of the first converter station.
  • the power transmission arrangement may comprise at least one second electrical energy storage element.
  • the at least one second electrical energy storage element may be configured or arranged such that it can be selectively charged or discharged and such that it can be selectively electrically connected to at least a portion of the second converter station such that the at least one second electrical energy storage element when discharged can convey power to the at least a portion of the second converter station.
  • the power transmission arrangement may comprise a plurality of auxiliary converters.
  • the power transmission arrangement may comprise at least one first auxiliary converter.
  • the at least one first auxiliary converter may be selectively electrically connectable to the power transmission line, and may be electrically connected to the at least one first electrical energy storage element such that the at least one first electrical energy storage element can be charged by power output from the at least one first auxiliary converter.
  • the power transmission arrangement may comprise at least one second auxiliary converter.
  • the at least one second auxiliary converter may be selectively electrically connectable to the power transmission line, and may be electrically connected to the at least one second electrical energy storage element such that the at least one second electrical energy storage element can be charged by power output from the at least one second auxiliary converter.
  • the power transmission arrangement may be configured to as to facilitate or enable black start of either one of the first converter station and the second converter station. That is to say, the black start operation may be 'bidirectional'.
  • the power transmission arrangement may be configured to convert power from the second power system (e.g., DC or AC power) to DC or AC power at a lower voltage than the nominal operating voltage of the second converter station, and selectively cause the DC or AC power to be conveyed to the at least one first auxiliary converter via the power transmission line when the first converter station is de-energized so as to charge the at least one first electrical energy storage element, whereby power can be conveyed to the at least a portion of the first converter station when it is de-energized by discharging of the at least one first electrical energy storage element.
  • the second power system e.g., DC or AC power
  • the power transmission arrangement may be further configured to convert power from the first power system (e.g., DC or AC power) to DC or AC power at a lower voltage than the nominal operating voltage of the first converter station, and selectively cause the DC or AC power to be conveyed to the at least one second auxiliary converter via the power transmission line when the second converter station is de-energized so as to charge the at least one second electrical energy storage element, whereby power can be conveyed to the at least a portion of the second converter station when it is de-energized by discharging of the at least one second electrical energy storage element.
  • the first power system e.g., DC or AC power
  • a power transmission system which comprises a first power system, a second power system and a power transmission arrangement according to the first aspect configured to electrically couple the first power system with the second power system.
  • Each of the first power system and the second power system may comprise an AC and/or a DC power system (e.g., a DC grid).
  • a method for operating a power transmission arrangement which is configured to electrically couple a first power system with a second power system.
  • Each of the first power system and the second power system may for example comprise an AC and/or a DC power system (e.g., a DC grid).
  • the first power system is electrically connected with a first converter station configured to convert AC power to DC power, or vice versa.
  • the second power system is electrically connected with a second converter station configured to convert DC power to AC power, or vice versa.
  • the power transmission arrangement comprises at least one power transmission line.
  • the first power system is selectively electrically connectable to one end of the power transmission line via the first converter station.
  • the second power system is selectively electrically connectable to the other end of the power transmission line via the second converter station.
  • the first converter station is arranged at the one end of the power transmission line.
  • the second converter station is arranged at the other end of power transmission line.
  • the power transmission arrangement comprises at least one electrical energy storage element that can be selectively charged or discharged, and is selectively electrically connectable to at least a portion of one of the first converter station and the second converter station such that the at least one electrical energy storage element when discharged can convey power to the at least a portion of the one of the first converter station and the second converter station.
  • the power transmission arrangement comprises at least one auxiliary (power) converter that can be selectively electrically connected to the power transmission line and which is electrically connected to the at least one electrical energy storage element such that the at least one electrical energy storage element can be charged by power output from the at least one auxiliary converter.
  • power e.g., AC power or DC power
  • DC power from the one of the first power system and the second power system that is at the end of the power transmission line at which the other one of the first converter station and the second converter station is arranged, is converted to DC and/or AC power at a lower voltage than the nominal operating voltage of the other one of the first converter station and the second converter station.
  • the DC or AC power is conveyed to the at least one auxiliary converter via the power transmission line when the one of the first converter station and the second converter station is de-energized so as to charge the at least one electrical energy storage element, whereby power can be conveyed to the at least a portion of the one of the first converter station and the second converter station when it is de-energized by discharging of the at least one electrical energy storage element.
  • power e.g., DC power or AC power
  • DC power or AC power which may be lower than the nominal transmission power may be conveyed to the at least one auxiliary converter via the power transmission line.
  • the method may comprise conveying power to the at least a portion of the one of the first converter station and the second converter station when it is de-energized by discharging of the at least one electrical energy storage element.
  • the conveying of power to the at least a portion of the one of the first converter station and the second converter station when it is de-energized by discharging of the at least one electrical energy storage element may be carried out prior to carrying out a black start of the one of the first converter station and the second converter station. Thereby, the at least a portion of the one of the first converter station and the second converter station can be provided with power prior to black start of the converter station.
  • the at least one electrical energy storage element may be at least in part pre-charged with respect to carrying out a black start of the one of the first converter station and the second converter station.
  • the at least a portion of the one of the first converter station and the second converter station may for example comprise auxiliary system(s) for example for implementing or realizing functionality of the converter station not directly related to power transferring and/or converting operations, such as for cooling, water purification, etc., and/or systems for controlling the converter station and/or for communications between the converter station and other entities in the power transmission arrangement or in the first or second power systems or another converter station.
  • At least the one of the first converter station and the second converter station may be line-commutated. Power output from the at least one electrical storage element when it is discharged may be used to provide AC voltage to the AC side of the first converter station or the second converter station, respectively, for commutation thereof.
  • the at least a portion of the one of the first converter station and the second converter station may be powered (possibly solely) by means of power from the one of the first power system and the second power system that is at the end of the power transmission line at which the one of the first converter station and the second converter station is arranged.
  • FIG 1 is a schematic circuit diagram of a power transmission system 100 according to an embodiment of the present invention.
  • the power transmission system 100 comprises a first power system 110 and a second power system 120, which first power system 110 and second power system 120 both are AC power systems.
  • at least one of the first power system 110 and the second power system 120 illustrated in Figures 1-3 may comprise a DC power system, e.g. a DC grid.
  • the first power system 110 and the second power system 120 may be referred to as a first AC power system 110 and a second AC power system 120, respectively.
  • the power transmission system 100 comprises a power transmission arrangement 130 according to an embodiment of the present invention.
  • the power transmission arrangement 130 is configured to electrically couple the first AC power system 110 with the second AC power system 120.
  • the first AC power system 110 and the second AC power system 120 are electrically connected with the first converter station 140 and the second converter station 150, respectively, for example by way of AC buses or terminals 112 and 122, respectively.
  • Each of the first converter station 140 and the second converter station 150 is configured to convert AC power to DC power or vice versa.
  • the power transmission arrangement 130 comprises a power transmission line in the form of a DC transmission line 160 (or several DC transmission lines).
  • the power transmission line being a DC transmission line is according to an embodiment of the present invention, and that according to one or more embodiments of present invention, the power transmission line may be configured so as to be capable of conveying DC power and/or AC power.
  • the DC transmission line 160 may comprise an OHL or a cable, or it may comprise at least one OHL portion and at least one cable portion.
  • the first AC power system 110 is selectively electrically connectable (for example by way of a switching element or device 111 as illustrated in Figure 1 ) to one end of the DC transmission line 160 via the first converter station 140
  • the second AC power system 120 is selectively electrically connectable (for example by way of a switching element or device 121 as illustrated in Figure 1 ) to the other end of the DC transmission line 160 via the second converter station 150.
  • the first converter station 140 is arranged at one end of the DC transmission line 160
  • the second converter station 150 is arranged at the other end of the DC transmission line 160.
  • the second converter station 150 may be selectively electrically connected to the DC transmission line 160 for example by way of a switching element or device 117.
  • the first converter station 140 and the second converter station 150 include or are constituted by HVDC converter stations, and the DC transmission line 160 is a HVDC transmission line.
  • the present invention is not limited to HVDC applications or HVDC power transmission systems, and that the present invention is applicable to power transmission systems in general where power is transmitted between two AC power systems by way of a DC transmission line.
  • the first converter station 140 comprises a first portion 141 configured to convert AC power to DC power or vice versa, and a second portion 142.
  • the second portion 142 of the first converter station 140 may for example comprise auxiliary system(s) for implementing or realizing functionality of the first converter station 140 not directly related to power transferring and/or converting operations, such as for cooling, water purification, etc.
  • the portion 142 of the first converter station 140 may for example comprise communications and/or control systems of (or associated with) the first converter station 140.
  • the second converter station 150 may similarly to the first converter station 140 comprise a first portion and a second portion. However, only the portion of the second converter station 150 that is configured to convert AC power to DC power, or vice versa, is illustrated in Figure 1 .
  • the power transmission arrangement 130 comprises an electrical energy storage element 170 (or several electrical energy storage elements) that can be selectively charged or discharged.
  • the electrical energy storage element 170 may for example comprise at least one battery or battery unit, a capacitor and/or a flywheel electrical energy storage, etc., and/or possibly another type of UPS, which may be a type of UPS as known in the art.
  • the electrical energy storage element 170 is selectively electrically connectable to at least the portion 142 of the first converter station 140 such that the at least one electrical energy storage element 170 when discharged can convey power to (at least) the portion 142 of the first converter station 140.
  • the power transmission arrangement 130 comprises an auxiliary converter 180 (or several auxiliary converters).
  • the auxiliary converter 180 can be selectively electrically connected to the DC transmission line 160 (for example by way of a switching element or device 115 as illustrated in Figure 1 ).
  • the auxiliary converter 180 is electrically connected to the electrical energy storage element 170 such that the electrical energy storage element 170 can be charged by power output from the auxiliary converter 180.
  • the electrical energy storage element 170 may for example be selectively electrically connectable to the at least the portion 142 of the first converter station 140 by way of a switching element or device 115 (and further by way of the auxiliary converter 180).
  • the power transmission arrangement 130 is configured to convert AC power from the second AC power system 120 to DC power at a lower voltage than the nominal operating voltage of the second converter station 150, and selectively cause the DC power to be conveyed to the auxiliary converter 180 via the DC transmission line 160 when the first converter station 140 is de-energized so as to charge the electrical energy storage element 170, whereby power can be conveyed to (at least) the portion 142 of the first converter station 140 when it is de-energized by discharging of the electrical energy storage element 170.
  • a black start of the first converter station 140 may be facilitated.
  • it may, as indicated in the foregoing, be desired or even required that some or even all of any auxiliary systems of the (portion 142 of the) first converter station 140 should be operational before a black start of the first converter station 140 is performed.
  • Such a configuration of the power transmission arrangement 130 may be achieved in a number of different ways, such as described in the foregoing, and some of which will be further described in the following. It is however to be understood that other configurations of the power transmission arrangement 130 so that it can convert AC power from the second AC power system 120 to DC power at a lower voltage than the nominal operating voltage of the second converter station 150, and selectively cause the DC power to be conveyed to the auxiliary converter 180 via the DC transmission line 160 when the first converter station 140 is de-energized so as to charge the electrical energy storage element 170, are possible and within the scope of the present invention. According to one or more embodiments of the present invention, any controllability of voltage that may be exhibited by the second converter station 150 may be employed.
  • the second converter station 150 may comprise at least one MMC comprising a plurality of converter cells (not shown in Figure 1 ).
  • MMCs may be controllable with respect to output voltage.
  • the at least one MMC may be configured to control its output voltage so as to output DC power at a lower voltage than the nominal operating voltage of the second converter station 150, and input the DC power into the DC transmission line 160 for conveyance of the DC power to the auxiliary converter 180 via the DC transmission line 160.
  • the at least one MMC may for example comprise at least one half-bridge cell or a full-bridge cell.
  • the at least one MMC may comprise at least one converter cell that can be selectively bypassed.
  • the second converter station 150 may hence be comprised in the power transmission arrangement 130.
  • the power which may be conveyed to the auxiliary converter 180 via the power transmission line 160 when the first converter station 140 is de-energized so as to charge the electrical energy storage element 170 is DC power.
  • the power transmission line 160 may be configured so as to be capable of conveying DC power and/or AC power, and that if the power transmission line 160 is capable of carrying AC power, the (auxiliary) power, which is conveyed to the auxiliary converter 180 via the power transmission line 160 when the first converter station 140 is de-energized so as to charge the electrical energy storage element 170, may be AC power.
  • a transformer 131 may be electrically connected between the first converter station 140 and the first AC power system 110.
  • a transformer 132 may be electrically connected between the second converter station 150 and the second AC power system 120.
  • a transformer 143 may be electrically connected between the portion 142 of the first converter station 140 and the first AC power system 110.
  • Each of the switching elements or devices 111, 115, 117, 121 may comprise a controllable switching element or device capable of controllably being switched on or off, or into an electrically conducting state or electrically non-conducting state (or substantially non-conducting state, where no or possibly only a relatively small current is allowed to flow via the respective switching element or device), respectively.
  • Each of the switching elements or devices 111, 115, 117, 121 may for example comprise a mechanical contact system and/or a thyristor and/or a transistor.
  • FIG 2 is a schematic circuit diagram of a power transmission system 200 according to another embodiment of the present invention.
  • the power transmission system 200 is similar to the power transmission system 100 illustrated in Figure 1 , and the same reference numerals in Figures 1 and 2 denote the same or similar components, and with the same or similar function, unless otherwise specified.
  • the power transmission system 200 illustrated in Figure 2 comprises two auxiliary converters 180, 190.
  • the auxiliary converter 180 can be selectively electrically connected to the DC transmission line 160 (for example by way of a switching element or device 115 as illustrated in Figure 2 ).
  • the auxiliary converter 180 is electrically connected to the electrical energy storage element 170 such that the electrical energy storage element 170 can be charged by power output from the auxiliary converter 180.
  • the auxiliary converter 190 can be selectively electrically connected to the DC transmission line 160 (for example by way of a switching element or device 116 as illustrated in Figure 2 ) so as to selectively electrically bypass the second converter station 150.
  • the auxiliary converter 190 is configured to output DC power based on AC power that has been derived from a fraction of the voltage of the second AC power system 120.
  • the auxiliary converter 190 can be selectively electrically connected to the DC transmission line 160 such that power output from the auxiliary converter 190 can be conveyed to the auxiliary converter 180 via the DC transmission line 160 when the auxiliary converter 190 is electrically connected to the DC transmission line 160.
  • the switching element or device 116 may comprise a controllable switching element or device capable of controllably being switched on or off, or into an electrically conducting state or electrically non-conducting state (or substantially non-conducting state, where no or possibly only a relatively small current is allowed to flow via the respective switching element or device), respectively.
  • the switching element or device 116 may for example comprise a mechanical contact system and/or a thyristor and/or a transistor.
  • the transformer 132 may be configured to adjust voltage from the second power system 120 such that transformer 132 outputs a selected fraction of the voltage of the second AC power system 120.
  • the transformer 132 may for example be equipped with a tap changer mechanism such that by controllable selection of or switching between different transformer taps, the transformer's 132 output voltage may be controlled or adjusted.
  • the auxiliary converter 190 may be electrically connected to the second AC power system 120 for example via a transformer 133, which possibly may be dedicated to the auxiliary converter 190.
  • the auxiliary converter 190 may be electrically connected to the second AC power system 120 via an additional winding of the transformer 132, which the transformer 132 may have in addition to a primary winding and a secondary winding.
  • the additional winding of the transformer 132 may hence be a tertiary winding.
  • Figure 3 is a schematic circuit diagram of a power transmission system 300 according to another embodiment of the present invention.
  • the power transmission system 300 is similar to the power transmission system 200 illustrated in Figure 2 , and the same reference numerals in Figures 2 and 3 denote the same or similar components, and with the same or similar function.
  • the power transmission system 300 illustrated in Figure 3 comprises a transformer 134 electrically connected between the second converter station 150 and the second AC power system 120.
  • the transformer 134 may be configured to adjust voltage from the second power system 120 such that transformer 134 outputs a selected fraction of the voltage of the second AC power system 120.
  • the transformer 134 may for example be equipped with a tap changer mechanism such that by controllable selection of or switching between different transformer taps, the transformer's 134 output voltage may be controlled or adjusted.
  • the auxiliary converter 190 may be electrically connected to the second AC power system 120 via an additional winding of the transformer 134, which the transformer 134 may have in addition to a primary winding and a secondary winding.
  • the power transmission arrangement 130 so as to be able to convey power to (at least) the portion 142 of the first converter station 140 when it is de-energized, by discharging of the electrical energy storage element 170, a black start of the first converter station 140 may be facilitated.
  • the conveying of power to the portion 142 of the first converter station 140 when it is de-energized may be carried out prior to carrying out a black start of the first converter station 140.
  • the switching elements or devices 111 and 121 may be switched on so that each of them enters an electrically conducting state at all times or substantially at all times.
  • the first converter station 140 is de-energized.
  • the switching element or device 117 may be switched off so that it is in an electrically non-conducting state.
  • the second converter station 150 is energized, but is not transmitting power to the first converter station 140.
  • the switching elements or devices 115 and 116 are switched on so that each of them is in an electrically conducting state. Power from the second power system 120 then flows by way of transformers 133 and 132 and the auxiliary converter 190 into the DC transmission line 160, and via the auxiliary converter 190 to the electrical energy storage element 170, thereby charging it.
  • power may be conveyed to the portion 142 of the first converter station 140, by discharging of the electrical energy storage element 170.
  • the switching elements or devices 115 and 116 are switched off so that each of them is in an electrically non-conducting state. At this stage, no power may flow via the DC transmission line 160.
  • the portion 142 of the first converter station 140 may now be energized and ready for operation. In alternative, the portion 142 of the first converter station 140 may be energized during the second stage, in which case the required capacity (or 'size') of the electrical energy storage element 170 may be less than if the portion 142 of the first converter station 140 is energized during the third stage. Both of the first and second auxiliary converters 180, 190 may be shut down.
  • the first converter station 140 may transmit a signal or message to the second converter station 150 indicating that the portion 142 of the first converter station 140 has been charged.
  • the transmission of the signal or message may for example be carried out by way of a communication module (not shown in Figure 2 ), which may be comprised in the power transmission arrangement 130.
  • the communication module may be based on wired and/or wireless communication technique(s) as known in the art.
  • the switching of the switching elements or devices 115 and 116 into electrically non-conducting states, and possibly also the shutting down of the first and second auxiliary converters 180, 190, may in turn be carried out responsive to the switching elements or devices 115 and 116 and possibly the first and second auxiliary converters 180, 190 receiving a signal or message from the second converter station 150, which signal or message may be transmitted once the second converter station 150 is ready to transmit power.
  • Power to the portion 142 of the first converter station 140 is provided from the electrical energy storage element 170. Any initialization of the first converter station 140 before energizing it may, if required, be carried out. In addition to any power from the electrical energy storage element 170 by discharging thereof, power may be conveyed to the portion 142 of the first converter station 140 also from the first AC power system 110 by way of transformer 143.
  • the second converter station 150 may initiate power transmission from the second converter station 150 to the first converter station 140 via the DC transmission line 160 at the nominal operating voltage on the DC transmission line during 'normal' power transmission.
  • the switching element or device 117 is switched on so that it is in an electrically conducting state, thus energizing the first converter station 140.
  • power may be conveyed to the portion 142 of the first converter station 140 from the first AC power system 110 by way of transformer 143, as well as from the electrical energy storage element 170 by discharging thereof.
  • the switching element or device 115 and/or 116 (or another one of the switching elements or devices illustrated in Figures 1 to 3 ) can be deemed or confirmed to be switched off for example after a predefined period of time has elapsed since the signal or message from the second converter station 150 to the switching element or device 115 and/or 116 was transmitted.
  • the first converter station 140 is energized and is transmitting power to the second converter station 150.
  • the portion 142 of the first converter station 140 may optionally be powered for example by means of first AC power system 110 by way of transformer 143, possibly with no power being conveyed to the portion 142 of the first converter station 140 from the electrical energy storage element 170. This may be useful for example in case of a black start of a HVDC link of an off-shore wind power plant from an on-shore converter station
  • any one of the power transmission arrangements 130 described in the foregoing may be configured to as to facilitate or enable black start of either one of the first converter station 140 and the second converter station 150. That is to say, the black start operation may be 'bidirectional'.
  • the power transmission arrangement 130 may as described in the foregoing comprise a plurality of electrical energy storage elements (not shown in Figures 1-3 , each of which depicts the exemplifying case where there is one electrical energy storage element 170).
  • Each of the first and second converter stations 140, 150 may be associated with at least one electrical energy storage element, similarly or the same as to how the electrical energy storage element 170 is associated with the first converter station 140. Black start operation in either direction (i.e.
  • black start of either the first converter station 140 or the second converter station 150 may for example be carried out in the same or similar manner as described above with reference to Figure 2 .
  • a switching element or device (not shown in the figures) may be provided for selectively electrically connecting the first converter station 140 to the DC transmission line 160, similarly to the switching element or device 117, by way of which switching element or device 117 the second converter station 150 can be selectively electrically connected to the DC transmission line 160.
  • the switching element or devices may be controlled for example by way of a message, signaling, etc., transmitted from the first or second converter station 140, 150 at the other end of the DC transmission line 160 - that is to say, from the one of the first and second converter station 140, 150 that acts as 'transmitting' converter station during the black start operation.
  • the power transmission line 160 may be configured so as to be capable of conveying DC power and/or AC power. If the power transmission line 160 is capable of conveying AC power, the (auxiliary) power, which is conveyed to the auxiliary converter 180 via the power transmission line 160 when the first converter station 140 is de-energized so as to charge the electrical energy storage element 170, may be AC power.
  • the auxiliary converter 180 may be an AC/AC converter, instead of an AC/DC converter or possibly DC/DC converter.
  • the auxiliary converter 190 may in that case be an AC/AC converter instead of an AC/DC converter.
  • FIG. 4 is a schematic flowchart illustrating a method 400 for operating a power transmission arrangement according to an embodiment of the present invention.
  • the power transmission arrangement is configured to electrically couple a first power system with a second power system.
  • the first power system may comprise an AC power system and/or a DC power system.
  • the second power system may comprise an AC power system and/or a DC power system.
  • the first power system is electrically connected with a first converter station configured to convert AC power to DC power, or vice versa.
  • the second power system is electrically connected with a second converter station configured to convert DC power to AC power, or vice versa.
  • the power transmission arrangement comprises at least one power transmission line.
  • the first power system is selectively electrically connectable to one end of the power transmission line via the first converter station.
  • the second power system is selectively electrically connectable to the other end of the power transmission line via the second converter station.
  • the first converter station is arranged at the one end of the power transmission line.
  • the second converter station is arranged at the other end of power transmission line.
  • the power transmission arrangement comprises at least one electrical energy storage element that can be selectively charged or discharged, and is selectively electrically connectable to at least a portion of one of the first converter station and the second converter station such that the at least one electrical energy storage element when discharged can convey power to the at least a portion of the one of the first converter station and the second converter station.
  • the power transmission arrangement comprises at least one auxiliary (power) converter that can be selectively electrically connected to the power transmission line and which is electrically connected to the at least one electrical energy storage element such that the at least one electrical energy storage element can be charged by power output from the at least one auxiliary converter.
  • the method 400 comprises converting power (e.g., AC power or DC power) from the one of the first power system and the second power system that is at the end of the power transmission line at which the other one of the first converter station and the second converter station is arranged, to DC or AC power, 410, which DC or AC power is at a lower voltage than the nominal operating voltage of the other one of the first converter station and the second converter station.
  • power e.g., AC power or DC power
  • the DC or AC power is conveyed to the at least one auxiliary converter via the power transmission line when the one of the first converter station and the second converter station is de-energized, so as to charge the at least one electrical energy storage element, 420.
  • power can be conveyed to the at least a portion of the one of the first converter station and the second converter station when it is de-energized by discharging of the at least one electrical energy storage element.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Claims (15)

  1. Energieübertragungsanordnung (130), die dazu ausgelegt ist, ein erstes Energiesystem (110) elektrisch mit einem zweiten Energiesystem (120) zu koppeln, wobei das erste Energiesystem und das zweite Energiesystem jeweils elektrisch mit einer ersten Stromrichterstation (140) und einer zweiten Stromrichterstation (150) verbunden sind, während jede der ersten Stromrichterstation und der zweiten Stromrichterstation dazu ausgelegt ist, Wechselstrom in Gleichstrom oder umgekehrt umzuwandeln, wobei die Energieübertragungsanordnung Folgendes umfasst:
    mindestens eine Energieübertragungsleitung (160), wobei das erste Energiesystem über die erste Stromrichterstation mit einem Ende der Energieübertragungsleitung gezielt elektrisch verbindbar ist, und das zweite Energiesystem über die zweite Stromrichterstation mit dem anderen Ende der Energieübertragungsleitung gezielt elektrisch verbindbar ist, wobei die erste Stromrichterstation an dem einen Ende der Energieübertragungsleitung, und die zweite Stromrichterstation an dem anderen Ende der Energieübertragungsleitung angeordnet ist;
    mindestens ein Elektroenergiespeicherelement (170), das gezielt geladen oder entladen werden kann und mit mindestens einem Teil von einer der ersten Stromrichterstation und der zweiten Stromrichterstation gezielt elektrisch verbindbar ist, so dass das mindestens eine Elektroenergiespeicherelement bei Entladung Energie zu dem mindestens einen Teil der ersten Stromrichterstation und der zweiten Stromrichterstation übermitteln kann; und
    mindestens einen Hilfsstromrichter (180; 190), der mit der Energieübertragungsleitung gezielt elektrisch verbunden werden kann, und der mit dem mindestens einen Elektroenergiespeicherelement elektrisch verbunden ist, so dass das mindestens eine Elektroenergiespeicherelement durch die von dem mindestens einen Hilfsstromrichter ausgegebene Energie geladen werden kann;
    dadurch gekennzeichnet, dass die Energieübertragungsanordnung dazu ausgelegt ist, Energie von dem einen des ersten Energiesystems und des zweiten Energiesystems, das sich an dem Ende der Energieübertragungsleitung befindet, an dem die andere der ersten Stromrichterstation und der zweiten Stromrichterstation angeordnet ist, bei einer niedrigeren Spannung als der Nennbetriebsspannung der anderen der ersten Stromrichterstation und der zweiten Stromrichterstation in Gleichstrom oder Wechselstrom umzuwandeln und gezielt zu veranlassen, den Gleichstrom oder Wechselstrom über die Energieübertragungsleitung zu dem mindestens einen Hilfsstromrichter zu übermitteln, wenn die eine der ersten Stromrichterstation und der zweiten Stromrichterstation ausgeschaltet ist, um das mindestens eine Elektroenergiespeicherelement zu laden, wodurch Energie durch Entladen des mindestens einen Elektroenergiespeicherelements zu dem mindestens einen Teil der einen der ersten Stromrichterstation und der zweiten Stromrichterstation übermittelt werden kann, wenn sie ausgeschaltet ist.
  2. Energieübertragungsanordnung gemäß Anspruch 1, wobei die Energieübertragungsanordnung dazu ausgelegt ist, Energie von dem einen des ersten Energiesystems und des zweiten Energiesystems, das sich an dem Ende der Energieübertragungsleitung befindet, an dem die andere der ersten Stromrichterstation und der zweiten Stromrichterstation angeordnet ist, in Gleichstrom oder Wechselstrom bei einer ausgewählten Spannung umzuwandeln.
  3. Energieübertragungsanordnung gemäß Anspruch 1 oder 2, die mindestens zwei Hilfsstromrichter (180, 190) umfasst;
    wobei einer (190) der Hilfsstromrichter mit der Energieübertragungsleitung gezielt elektrisch verbunden werden kann, um die andere der ersten Stromrichterstation und der zweiten Stromrichterstation gezielt elektrisch zu umgehen;
    wobei ein weiterer (180) der Hilfsstromrichter elektrisch mit dem mindestens einen Elektroenergiespeicherelement verbunden wird, so dass die von dem Hilfsstromrichter ausgegebene Energie das mindestens eine Elektroenergiespeicherelement laden kann; und
    wobei der eine der Hilfsstromrichter mit der Energieübertragungsleitung gezielt elektrisch verbunden werden kann, so dass von dem Hilfsstromrichter ausgegebene Energie über die Energieübertragungsleitung zu dem anderen der Hilfsstromrichter übermittelt werden kann, wenn der andere der Hilfsstromrichter elektrisch mit der Energieübertragungsleitung verbunden ist.
  4. Energieübertragungsanordnung gemäß Anspruch 1 oder 2, die ferner die andere der ersten Stromrichterstation und der zweiten Stromrichterstation umfasst, und wobei die andere der ersten Stromrichterstation und der zweiten Stromrichterstation mindestens einen modularen Mehrstufenwandler (MMC) umfasst, der eine Vielzahl von Wandlerzellen aufweist, und wobei der mindestens eine MMC dazu ausgelegt ist, seine Ausgangsspannung zu regeln, um Gleichstrom oder Wechselstrom bei einer niedrigeren Spannung als der Nennbetriebsspannung der anderen der ersten Stromrichterstation und der zweiten Stromrichterstation auszugeben und den Gleichstrom oder Wechselstrom in die Energieübertragungsleitung einzugeben, um den Gleichstrom oder Wechselstrom über die Energieübertragungsleitung zu dem mindestens einen Hilfsstromrichter zu übermitteln.
  5. Energieübertragungsanordnung gemäß Anspruch 4, wobei der mindestens eine MMC mindestens eine Halbbrückenzelle oder eine Vollbrückenzelle umfasst.
  6. Energieübertragungsanordnung gemäß Anspruch 4 oder 5, die ferner Folgendes umfasst:
    mindestens einen Transformator, der zwischen der anderen der ersten Stromrichterstation und der zweiten Stromrichterstation und dem ersten Energiesystem bzw. dem zweiten Energiesystem elektrisch verbunden ist, wobei der Transformator dazu ausgelegt ist, die Spannung so einzustellen, dass der mindestens eine Transformator einen ausgewählten Bruchteil der Spannung des zweiten Energiesystems bzw. des zweiten Energiesystems ausgibt.
  7. Energieübertragungsanordnung gemäß einem der Ansprüche 4-6, wobei der mindestens eine MMC mindestens eine Wandlerzelle umfasst, die gezielt umgangen werden kann.
  8. Energieübertragungsanordnung gemäß einem der Ansprüche 1-7, die Folgendes umfasst:
    mindestens ein erstes Elektroenergiespeicherelement, das gezielt geladen oder entladen werden kann, und das mit mindestens einem Teil der ersten Stromrichterstation gezielt elektrisch verbunden werden kann, so dass das mindestens eine erste Elektroenergiespeicherelement bei Entladung Energie zu dem mindestens einen Teil der ersten Stromrichterstation übermitteln kann;
    mindestens ein zweites Elektroenergiespeicherelement, das gezielt geladen oder entladen werden kann und mit mindestens einem Teil der zweiten Stromrichterstation gezielt elektrisch verbunden werden kann, so dass das mindestens eine zweite Elektroenergiespeicherelement bei Entladung Energie zu dem mindestens einen Teil der zweiten Stromrichterstation übermitteln kann; und
    mindestens einen ersten Hilfsstromrichter, der mit der Energieübertragungsleitung gezielt elektrisch verbunden werden kann, und der mit dem mindestens einen ersten Elektroenergiespeicherelement elektrisch verbunden ist, so dass das mindestens eine erste Elektroenergiespeicherelement durch die von dem mindestens einen ersten Hilfsstromrichter ausgegebene Energie geladen werden kann;
    mindestens einen zweiten Hilfsstromrichter, der mit der Energieübertragungsleitung gezielt elektrisch verbunden werden kann, und der mit dem mindestens einen zweiten Elektroenergiespeicherelement elektrisch verbunden ist, so dass das mindestens eine zweite Elektroenergiespeicherelement durch die von dem mindestens einen zweiten Hilfsstromrichter ausgegebene Energie geladen werden kann;
    wobei die Energieübertragungsanordnung dazu ausgelegt ist, Energie von dem zweiten Energiesystem bei einer niedrigeren Spannung als der Nennbetriebsspannung der zweiten Stromrichterstation in Gleichstrom oder Wechselstrom umzuwandeln, und gezielt zu veranlassen, den Gleichstrom oder Wechselstrom über die Energieübertragungsleitung zu dem mindestens einen ersten Hilfsstromrichter zu übermitteln, wenn die erste Stromrichterstation ausgeschaltet ist, um das mindestens eine erste Elektroenergiespeicherelement zu laden, wodurch Energie zu mindestens einem Teil der ersten Stromrichterstation durch Entladen des mindestens einen ersten Elektroenergiespeicherelements übermittelt werden kann, wenn sie ausgeschaltet ist; und
    wobei die Energieübertragungsanordnung dazu ausgelegt ist, Energie von dem ersten Energiesystem bei einer niedrigeren Spannung als der Nennbetriebsspannung der ersten Stromrichterstation in Gleichstrom oder Wechselstrom umzuwandeln, und gezielt zu veranlassen, den Gleichstrom oder Wechselstrom über die Energieübertragungsleitung zu dem mindestens einen zweiten Hilfsstromrichter zu übermitteln, wenn die zweite Stromrichterstation ausgeschaltet ist, um das mindestens eine zweite Elektroenergiespeicherelement zu laden, wodurch Energie zu mindestens einem Teil der zweiten Stromrichterstation durch Entladen des mindestens einen zweiten Elektroenergiespeicherelements übermittelt werden kann, wenn sie ausgeschaltet ist.
  9. Energieübertragungssystem (100; 200; 300), das Folgendes umfasst:
    ein erstes Energiesystem (110);
    ein zweites Energiesystem (120); und
    eine Energieübertragungsanordnung (130) gemäß einem der Ansprüche 1-8, die dazu ausgelegt ist, das erste Energiesystem elektrisch mit dem zweiten Energiesystem zu koppeln.
  10. Energieübertragungssystem gemäß Anspruch 9, wobei das erste Energiesystem und/oder das zweite Energiesystem ein Wechselstromsystem und/oder ein Gleichstromsystem umfasst.
  11. Verfahren (400) zum Betreiben einer Energieübertragungsanordnung (130), die dazu ausgelegt ist, ein erstes Energiesystem (110) elektrisch mit einem zweiten Energiesystem (120) zu koppeln, wobei das erste Energiesystem elektrisch mit einer ersten Stromrichterstation (140) verbunden ist, die dazu ausgelegt ist, Wechselstrom in Gleichstrom oder umgekehrt umzuwandeln, und das zweite Energiesystem elektrisch mit einer zweiten Stromrichterstation (150) verbunden ist, die dazu ausgelegt ist, Gleichstrom in Wechselstrom oder umgekehrt umzuwandeln, wobei die Energieübertragungsanordnung Folgendes umfasst:
    mindestens eine Energieübertragungsleitung (160), wobei das erste Energiesystem über die erste Stromrichterstation mit einem Ende der Energieübertragungsleitung gezielt elektrisch verbindbar ist, und das zweite Energiesystem über die zweite Stromrichterstation mit dem anderen Ende der Energieübertragungsleitung gezielt elektrisch verbindbar ist, wobei die erste Stromrichterstation an dem einen Ende der Energieübertragungsleitung, und die zweite Stromrichterstation an dem anderen Ende der Energieübertragungsleitung angeordnet ist;
    mindestens ein Elektroenergiespeicherelement (170), das gezielt geladen oder entladen werden kann und mit mindestens einem Teil von einer der ersten Stromrichterstation und der zweiten Stromrichterstation gezielt elektrisch verbindbar ist, so dass das mindestens eine Elektroenergiespeicherelement bei Entladung Energie zu dem mindestens einen Teil der ersten Stromrichterstation und der zweiten Stromrichterstation übermitteln kann; und
    mindestens einen Hilfsstromrichter (180; 190), der mit der Energieübertragungsleitung gezielt elektrisch verbunden werden kann, und der mit dem mindestens einen Elektroenergiespeicherelement elektrisch verbunden ist, so dass das mindestens eine Elektroenergiespeicherelement durch die von dem mindestens einen Hilfsstromrichter ausgegebene Energie geladen werden kann;
    wobei das Verfahren Folgendes umfasst:
    Umwandeln (410) von Energie von dem einen des ersten Energiesystems und des zweiten Energiesystems, das sich an dem Ende der Energieübertragungsleitung befindet, an dem die andere der ersten Stromrichterstation und der zweiten Stromrichterstation angeordnet ist, in Gleichstrom oder Wechselstrom bei einer niedrigeren Spannung als der Nennbetriebsspannung der anderen der ersten Stromrichterstation und der zweiten Stromrichterstation; und
    Übermitteln (420) des Gleichstroms oder Wechselstroms zu dem mindestens einen Hilfsstromrichter über die Energieübertragungsleitung, wenn die eine der ersten Stromrichterstation und der zweiten Stromrichterstation ausgeschaltet ist, um das mindestens eine Elektroenergiespeicherelement zu laden, wodurch Energie durch Entladen des mindestens einen Elektroenergiespeicherelements zu mindestens einem Teil der einen der ersten Stromrichterstation und der zweiten Stromrichterstation übermittelt werden kann, wenn sie ausgeschaltet ist.
  12. Verfahren gemäß Anspruch 11, das ferner Folgendes umfasst:
    Übermitteln von Energie zu mindestens einem Teil der einen der ersten Stromrichterstation und der zweiten Stromrichterstation, wenn sie ausgeschaltet ist, durch Entladen des mindestens einen Elektroenergiespeicherelements.
  13. Verfahren gemäß Anspruch 12, wobei das Übermitteln von Energie zu mindestens einem Teil der einen der ersten Stromrichterstation und der zweiten Stromrichterstation, wenn sie ausgeschaltet ist, durch Entladen des mindestens einen Elektroenergiespeicherelements vor dem Ausführen eines Schwarzstarts der einen der ersten Stromrichterstation und der zweiten Stromrichterstation ausgeführt wird.
  14. Verfahren gemäß einem der Ansprüche 11-13, wobei mindestens die eine der ersten Stromrichterstation und der zweiten Stromrichterstation netzgeführt ist, und wobei das Verfahren ferner Folgendes umfasst:
    Nutzen der von dem mindestens einen Elektroenergiespeicherelement beim Entladen ausgegebenen Energie, um Wechselspannung zur Kommutierung zu der Wechselstromseite der ersten Stromrichterstation bzw. der zweiten Stromrichterstation zu liefern.
  15. Verfahren gemäß einem der Ansprüche 11-14, wobei, wenn die eine der ersten Stromrichterstation und der zweiten Stromrichterstation eingeschaltet worden ist, mindestens ein Teil der einen der ersten Stromrichterstation und der zweiten Stromrichterstation mittels Energie von dem einen des ersten Energiesystems und des zweiten Energiesystems, das sich an dem Ende der Energieübertragungsleitung befindet, an dem die eine der ersten Stromrichterstation und der zweiten Stromrichterstation angeordnet ist, versorgt wird.
EP15732273.6A 2015-06-30 2015-06-30 Energieübertragungsanordnung und verfahren zum betrieb einer energieübertragungsanordnung Active EP3317936B1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/EP2015/064871 WO2017000994A1 (en) 2015-06-30 2015-06-30 Power transmission arrangement and method for operating a power transmission arrangement

Publications (2)

Publication Number Publication Date
EP3317936A1 EP3317936A1 (de) 2018-05-09
EP3317936B1 true EP3317936B1 (de) 2018-12-12

Family

ID=53491540

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15732273.6A Active EP3317936B1 (de) 2015-06-30 2015-06-30 Energieübertragungsanordnung und verfahren zum betrieb einer energieübertragungsanordnung

Country Status (4)

Country Link
US (1) US10097002B2 (de)
EP (1) EP3317936B1 (de)
CN (1) CN108141041B (de)
WO (1) WO2017000994A1 (de)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105514957B (zh) * 2016-01-28 2017-12-22 南京南瑞继保电气有限公司 一种混合背靠背直流输电系统及潮流反转控制方法
CN109742809B (zh) * 2019-03-15 2023-12-26 中国电力工程顾问集团西北电力设计院有限公司 一种多源互补储能型发电厂保安电源系统及其控制方法
EP3723229A1 (de) * 2019-04-11 2020-10-14 Ørsted Wind Power A/S Verfahren zum schwarzstarten eines stromnetzes
FR3098037B1 (fr) * 2019-06-26 2021-06-18 Inst Supergrid Procédé de commande d’un réseau de transmission électrique
CN114567012B (zh) * 2022-03-17 2023-10-13 南京南瑞继保电气有限公司 风电直流送出系统及其控制方法

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE463953B (sv) * 1989-06-19 1991-02-11 Asea Brown Boveri Anlaeggning foer avtappning av elektrisk kraft fraan en hoegspaend likstroemstransmissionslinje
SE504522C2 (sv) * 1995-07-06 1997-02-24 Asea Brown Boveri Kraftöverföring med högspänd likström innefattande fler än två strömriktarstationer
SE506199C2 (sv) * 1996-03-26 1997-11-17 Asea Brown Boveri Förfarande och anordning för bestämning av kortslutningseffekten i ett elektriskt växelströmskraftnät som är anslutet till en högspänd likströmsöverföring
SE520658C2 (sv) * 1997-03-24 2003-08-05 Abb Ab Anläggning för överföring av elektrisk effekt mellan likspänningsnät och växelspänningsnät
CN100563086C (zh) * 2006-10-16 2009-11-25 盈正豫顺电子股份有限公司 有源双向电力调节器
US7688048B2 (en) * 2007-02-21 2010-03-30 American Power Conversion Corporation 3-phase high power UPS
CN101252277B (zh) 2007-12-21 2011-05-11 华北电力大学 一种空载长线路的启动方法
US8559197B2 (en) * 2008-10-13 2013-10-15 Infinia Corporation Electrical control circuits for an energy converting apparatus
EP2325970A3 (de) * 2009-11-19 2015-01-21 Samsung SDI Co., Ltd. Energieverwaltungssystem und netzgebundenes Energiespeichersystem mit dem Energieverwaltungssystem
US20130170255A1 (en) * 2010-09-21 2013-07-04 Abb Technology Ag Apparatus for controlling the electric power transmission in a hvdc power transmission system
EP2622705B1 (de) * 2010-09-30 2015-11-04 ABB Research Ltd. Koordinierte steuerung von hvdc-systemen mit mehreren endgeräten
US20130313906A1 (en) 2012-05-23 2013-11-28 General Electric Company Remote load bypass system
CN102983568B (zh) 2012-11-12 2015-04-22 华北电力大学 一种用于电网黑启动的mmc-hvdc换流站启动方法
US9099936B2 (en) 2013-03-14 2015-08-04 General Electric Company High voltage direct current (HVDC) converter system and method of operating the same
CN103595064B (zh) * 2013-10-23 2015-07-15 浙江大学 一种扩展式双极直流输电系统
EP2869419B1 (de) * 2013-10-29 2019-10-02 General Electric Technology GmbH Leistungsübertragungsnetzwerk
CN203839972U (zh) * 2014-05-14 2014-09-17 国网上海市电力公司 一种并联式三极直流输电电路

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
CN108141041B (zh) 2020-03-06
EP3317936A1 (de) 2018-05-09
CN108141041A (zh) 2018-06-08
US10097002B2 (en) 2018-10-09
WO2017000994A1 (en) 2017-01-05
US20180175622A1 (en) 2018-06-21

Similar Documents

Publication Publication Date Title
KR102534729B1 (ko) 전기 충전 시스템 및 방법
EP3317936B1 (de) Energieübertragungsanordnung und verfahren zum betrieb einer energieübertragungsanordnung
KR101147206B1 (ko) 계통 연계형 전력 저장 시스템 및 이를 위한 통합 제어기
CN103299503B (zh) 将电力馈送到中间电压电力供应网中的光伏设备的操作方法
US11205902B2 (en) Energy storage system
JP2014146589A (ja) バッテリ温度制御システムおよびその制御方法
US20110266876A1 (en) Power supply system and photovoltaic device therefor
JP2017135889A (ja) 電力変換装置、及び電力変換システム
US10284115B2 (en) Inverter system
CN105391289A (zh) 对于功率转换器的增强操作和保护的系统和方法
CN105281355A (zh) 多级功率转换器
CN101304180B (zh) 复合式节能不断电系统及双向转换器模块与电力转换方法
JP6454540B2 (ja) 電力変換装置
KR20210094630A (ko) 연성 접속 변전소 및 제어 방법
EP3391498B1 (de) Stromversorgungsvorrichtung
EP3915824A1 (de) Verfahren und system zum fahrzeug-zu-fahrzeug-laden von elektrofahrzeugen
US11456618B2 (en) Micro-grid system with un-interruptible power supply
JP2013013174A (ja) 電力供給システム
CN207124475U (zh) 储能系统
WO2018070037A1 (ja) 電力変換システム、電力供給システムおよび電力変換装置
US20180083453A1 (en) Power converting module, power generating system, and control method thereof
KR20150007138A (ko) 계통 연계형 태양광 발전 시스템의 배터리 충전 장치
KR20080001239U (ko) 직류 에너지원을 이용한 전원공급 시스템
CN109617476B (zh) 多功能开关磁阻发电机高压直流系统
JP2018033226A (ja) 太陽光発電システム

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180130

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20180705

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1077257

Country of ref document: AT

Kind code of ref document: T

Effective date: 20181215

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015021304

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20181212

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190312

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190312

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1077257

Country of ref document: AT

Kind code of ref document: T

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190313

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190412

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190412

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015021304

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

26N No opposition filed

Effective date: 20190913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20190630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602015021304

Country of ref document: DE

Owner name: HITACHI ENERGY SWITZERLAND AG, CH

Free format text: FORMER OWNER: ABB SCHWEIZ AG, BADEN, CH

Ref country code: DE

Ref legal event code: R081

Ref document number: 602015021304

Country of ref document: DE

Owner name: HITACHI ENERGY LTD, CH

Free format text: FORMER OWNER: ABB SCHWEIZ AG, BADEN, CH

Ref country code: DE

Ref legal event code: R081

Ref document number: 602015021304

Country of ref document: DE

Owner name: ABB POWER GRIDS SWITZERLAND AG, CH

Free format text: FORMER OWNER: ABB SCHWEIZ AG, BADEN, CH

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20150630

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20211104 AND 20211110

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602015021304

Country of ref document: DE

Owner name: HITACHI ENERGY SWITZERLAND AG, CH

Free format text: FORMER OWNER: ABB POWER GRIDS SWITZERLAND AG, BADEN, CH

Ref country code: DE

Ref legal event code: R081

Ref document number: 602015021304

Country of ref document: DE

Owner name: HITACHI ENERGY LTD, CH

Free format text: FORMER OWNER: ABB POWER GRIDS SWITZERLAND AG, BADEN, CH

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20181212

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230527

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602015021304

Country of ref document: DE

Representative=s name: DENNEMEYER & ASSOCIATES S.A., DE

Ref country code: DE

Ref legal event code: R081

Ref document number: 602015021304

Country of ref document: DE

Owner name: HITACHI ENERGY LTD, CH

Free format text: FORMER OWNER: HITACHI ENERGY SWITZERLAND AG, BADEN, CH

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240621

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240619

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20240628

Year of fee payment: 10

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20240718 AND 20240724