EP3304683A1 - Optimisation of photovoltaic solar energy recovery - Google Patents

Optimisation of photovoltaic solar energy recovery

Info

Publication number
EP3304683A1
EP3304683A1 EP16726843.2A EP16726843A EP3304683A1 EP 3304683 A1 EP3304683 A1 EP 3304683A1 EP 16726843 A EP16726843 A EP 16726843A EP 3304683 A1 EP3304683 A1 EP 3304683A1
Authority
EP
European Patent Office
Prior art keywords
load
voltage
photovoltaic generator
terminals
primary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP16726843.2A
Other languages
German (de)
French (fr)
Inventor
Georges KANAAN
Jean-Marie Klein
Henri Zara
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Commissariat a lEnergie Atomique et aux Energies Alternatives CEA
Original Assignee
Commissariat a lEnergie Atomique CEA
Commissariat a lEnergie Atomique et aux Energies Alternatives CEA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Commissariat a lEnergie Atomique CEA, Commissariat a lEnergie Atomique et aux Energies Alternatives CEA filed Critical Commissariat a lEnergie Atomique CEA
Publication of EP3304683A1 publication Critical patent/EP3304683A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Definitions

  • the present invention relates to an optimized operating method of an autonomous system comprising a photovoltaic generator.
  • photovoltaic solar energy is an inexhaustible source of energy, it is however weakened by screens, such as clouds, lying on the path of photons emitted by the sun to the solar modules.
  • screens such as clouds
  • MPPT Maximum Power Point Tracker
  • an autonomous system comprising a source of photovoltaic energy generally comprises an energy storage means such as a battery.
  • an energy storage means such as a battery.
  • a DC / DC converter that reduces the voltage and raises the current, can be integrated in the autonomous system to adapt the characteristics of the photovoltaic panel to the characteristics of the battery.
  • a BMS (Battery Management System) device can be associated in addition to the system. The device makes it possible to limit the current, thus leading to a loss of power. The use of a BMS device in combination with a DC / DC converter is then counterproductive, from an optimization point of view of the energy produced by the photovoltaic generator.
  • patent application US 2010/0066309 discloses a mode of management of the charge of a battery by an intermittent source, through a super-capacitor. This mode of charge management aims primarily to limit the charging current, and does not optimize the solar energy not stored in the battery.
  • the patent application US 2010/0231162 discloses a device for charging and discharging a battery comprising a plurality of cells. The cells are connected in series during the discharge. When the temperature of one of the cells reaches a maximum allowable temperature, it is disconnected from the battery.
  • EP 2282392 discloses a device comprising a battery, a charge controller of said battery and a photovoltaic generator, connected in series. The charge controller has a bypass circuit controlled by a control circuit.
  • EP 2200152 discloses a photovoltaic system comprising a photovoltaic generator and a backup voltage generator. The system includes a switch for either connecting the voltage generator in series with the photovoltaic generator or disconnecting it.
  • a first switch system arranged to disconnect the secondary load from the main load
  • the method further comprises the following steps:
  • the measurement step including the measurement of the voltage at empty at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator;
  • the measuring step comprises measuring the output current intensity of the photovoltaic generator, and the first threshold value comprises a predetermined threshold current intensity.
  • the first switch system is in a first state so that the photovoltaic generator supplies the primary load and then the secondary load in series when the result of the comparison shows that the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator is greater than the first threshold voltage.
  • the first switch system is in a second state, opposite to the first state, so as to disconnect the secondary load from the main load when the result of the comparison step shows that the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator is lower than the first threshold voltage.
  • the primary charge comprises a first battery
  • the secondary charge comprises a thermal device configured to heat or cool the first battery and / or the photovoltaic generator.
  • the measurement step may comprise measuring the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator, and the threshold voltage corresponds to the sum of the minimum voltage of the photovoltaic generator.
  • the threshold voltage corresponds to the sum of the minimum voltage of the photovoltaic generator.
  • a second switch system is arranged to disconnect the primary load from the main load. The first switch system and the second switch system can be operated according to the result of the comparison step.
  • the measuring step comprises measuring the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator, and the first threshold value comprises a threshold voltage corresponding to the voltage minimum operation of the primary load.
  • the measured electrical quantity is compared with a second threshold voltage corresponding to the minimum operating voltage of the secondary load (30).
  • the first and second switch systems are operated so as to disconnect the primary load from the main load, so that the photovoltaic generator supplies only the secondary load when the result of the comparison step shows that the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator is between the second and first threshold voltages.
  • FIG. 1 - Figures 1, 3 and 4 show, schematically, an autonomous system according to one embodiment of the invention
  • - Figures 2a and 2b show, schematically, a switch system included in the autonomous system according to another embodiment of the invention.
  • the aim is to optimize the use of the power produced by a photovoltaic generator of an autonomous system, by providing an operating method taking advantage of the excess power available beyond the supply of a primary primary load, in order to feed a secondary load.
  • the autonomous system 10 comprises at least one photovoltaic generator 1 1 arranged to feed a main load 12.
  • autonomous system is meant a system capable of providing independent of its administration and its energy supply.
  • the photovoltaic generator 1 1 preferably comprises at least one panel provided with photovoltaic solar cells.
  • the autonomous system 10 comprises two essential elements, the main load 12 and the photovoltaic generator 11.
  • the main load 12 is connected to the photovoltaic generator 1 1 by its output terminals B and D.
  • the current flows inside the load 12 from a first terminal (B or D) to a second terminal (D or B).
  • Each of its two elements (1 1 and 12) may include one or more devices.
  • the photovoltaic generator 1 1, upstream of the output terminals B and D, may comprise an MPPT device, a DC / DC converter, etc.
  • the photovoltaic generator 1 1 is devoid of DC / DC converters.
  • the main load 12 includes a primary load 20 connected in series with a secondary load 30.
  • the primary load 20 is connected between the terminals B and C and the secondary load 30 is connected between the terminals C and D.
  • Each of the loads, primary 20 and secondary 30, is configured to include one or more electrical devices.
  • the primary 20 and secondary 30 charges are distinct elements and can not be assimilated to cells belonging to a battery.
  • electrical device is meant any device requiring a supply of electrical energy to perform a specific function.
  • the electrical device may be a floor lamp, a roller shutter, a parking meter, a battery, a fan, etc.
  • the primary load 20 comprises the main device or devices of the autonomous system 10.
  • the autonomous system 10 gives priority to the supply of the primary load 20 and its electrical devices, with respect to the secondary load 30 and its electrical devices.
  • the autonomous system advantageously comprises a management device 40 comprising a first switch system 31, controlled by the management device 40 via integrated control means (not shown ).
  • the first switch system 31 is arranged to disconnect or connect the secondary load 30 of the main load 12.
  • the switch system 31 may have at least first E1 0 and second E1 cc states.
  • the first switch 31 is configured to be in the first state E1 0 so as to leave the secondary load 30 connected in series with the primary load 20 within the main load 12.
  • the first switch 31 is in the first state E1 0 so that the photovoltaic generator 1 1 supplies the primary load 20 and the secondary load 30 in series.
  • the first switch system 31 is also configured to be in the second state E1 cc so as to disconnect the secondary feed 30 of the main charge 12, in other words, the PV generator 1 1 does feeds between its output terminals B and D, that the main load 20.
  • the switch system 31 comprises a first switch 31 connected in parallel with the secondary load 30.
  • the first switch 31 bypasses the secondary load 30
  • the current generated by the generator 1 1 travels only the main charge 20.
  • the secondary charge 30 remains connected in series with the primary charge 20.
  • the photovoltaic generator 1 1 can supply, and the primary charge 20 and secondary charge 30.
  • the switch system may advantageously include several switches so as to disconnect the secondary load 30 while avoiding short-circuiting.
  • the switch system 31 may comprise a second switch 31b, mounted between the secondary load 30 and one of the terminals C and D.
  • the first switch 31a is mounted between the terminals C and D, in parallel with the branch comprising the secondary load 30 and the second switch 31 b.
  • the first switch system 31 is in the first state E1 0 , when the first switch 31a is open and the second switch 31b is closed.
  • the first switch system 31 has the second state E1 cc, when the first switch 31a is closed and the second switch 31b is opened.
  • the two switches 31a and 31b are advantageously in opposite states.
  • the switch system 31 may comprise an electronic switch, for example a transistor, or a mechanical switch for example an electromechanical microsystem (MEMS).
  • an electronic switch for example a transistor
  • a mechanical switch for example an electromechanical microsystem (MEMS).
  • MEMS electromechanical microsystem
  • first switch system 31 Here we have given two examples of execution of the first switch system 31. However, those skilled in the art may also use other configurations depending on the devices included in the secondary load 30, so as to have two states of the switch system 31: a first state in which the generator 1 1 feeds both the primary charge 20 and the secondary charge 30, and a second state in which the secondary charge 30 is disconnected from the main charge 12 so that the generator 1 1 feeds only the primary charge 20.
  • the operating method of the autonomous system 10 comprises at least one step of measuring an electrical quantity A m .
  • the measuring step is performed by a measuring device 42, preferably integrated in the management device 40.
  • the measuring device 42 is configured to measure at least one electrical quantity, for example a voltage or a current intensity.
  • the measurement device 42 may comprise one or more conventional systems, such as a digital voltmeter, for measuring the voltage at the terminals of an element of the autonomous system 10, or such as a digital ammeter, a shunt, or a current transformer for measuring the intensity of current flowing in an element of the autonomous system 10.
  • the measuring device 42 comprises one or more sensors for measuring voltage and / or intensity continuously and / or periodically.
  • the choice of the conventional measurement system or systems is determined by the skilled person according to the elements included in the autonomous system 10, and the measurement accuracy envisaged.
  • the measured electrical quantity A m is chosen from the following electrical quantities:
  • a voltage A at the terminals of the photovoltaic generator 1 1, in other words a voltage between the terminals B and D;
  • the method further comprises a step of comparing the latter. Indeed, the measured quantity A m is compared with a first threshold value A s i.
  • the first threshold value A s i is chosen as a function of the measured quantity A m , so that the comparison result can provide information on the capacity of the photovoltaic generator 1 1 to be fed, the primary load only, or the primary charge 20 and the secondary charge 30 at the same time.
  • the comparison step may be performed by a conventional computer integrated in the control means 41 of the management device 40.
  • the computer 41 is configured, either to directly compare the magnitude measured A m with the first threshold value A s i, or to compare values representative of these quantities (A m , A s i).
  • the management device 40 will operate the first switch system 31.
  • the management device 40 will actuate the first switch system 31 so that the secondary load 30 remains connected in series with the primary load 20.
  • the photovoltaic generator 1 1 by feeding the main load 12, will supply at the same time the primary charge 20 and the secondary charge 30.
  • the management device 40 when the comparison result shows that the power of the photovoltaic generator 1 1 is insufficient to supply the primary load 20 and the secondary load 30 at the same time, the management device 40 will actuate the first switch system 31 so that to disconnect the secondary charge 30 from the main charge 12. As a result, the photovoltaic generator 1 1 by supplying the main charge 12, will supply only the primary charge 20.
  • the measuring step comprises measuring the output current intensity lu of the photovoltaic generator 1 1.
  • the read intensity measured can be, for example, the short-circuit current of the photovoltaic generator 1 1.
  • the first threshold value A s i comprises a predetermined threshold current intensity Is. This threshold current intensity is predetermined according to the components included in the primary load 20, or depending on the components of the primary load 20 and the secondary charge 30. Moreover, in certain applications and / or certain configurations of the autonomous system 10, it is easier and more useful to measure a voltage and compare it to a threshold than to measure and compare a current intensity.
  • the measuring step thus comprises the measurement of the open- circuit voltage U 0C v at the terminals of the photovoltaic generator 1 1, in other words, between the terminals B and D.
  • the measured electrical quantity (A m , A) then corresponds to the open- circuit voltage U 0C v which is characteristic of the generator 1 1 and also depends on the sunlight conditions.
  • the measuring step can also comprise the measurement of the voltage of the maximum output power UMPP at the terminals of the photovoltaic generator 1 1, otherwise said, between terminals B and D. This voltage of the maximum power UMPP is determined by the MPPT device.
  • the step of comparing the measured quantity (U 0C v or UMPP) with the first threshold value A s i advantageously makes it possible to provide an indication of the capacity of the photovoltaic generator 1 1 to supply, in addition to the primary load 20, the secondary charge 30.
  • the first switch system 31 is in the first state E1 0 when the result of the comparison shows that the voltage at the terminals of the photovoltaic generator (Un, U ocv ) or the voltage of the maximum power produced at the terminals of the photovoltaic generator (One, UMPP) is greater than the first threshold voltage A s i.
  • the first electronic switch system 31 is in the second state E cc when the result of the comparison step shows that the no- load voltage at the terminals of the photovoltaic generator (Un, U ocv ) or the voltage of the maximum power produced at the terminals of the photovoltaic generator (Un, UMPP) is lower than the first threshold voltage A s i.
  • the first threshold value A s i may comprise a threshold voltage corresponding to the minimum operating voltage U pr im of the primary load 20.
  • This voltage U pr im is predetermined depending on the components included in the primary charge 20.
  • the step of comparing U 0C v or UMPP with U pr im advantageously provides information if, after the supply of the priority devices of the main load 20, the energy produced by the generator 1 1 has a surplus of energy available.
  • the latter can then be used to feed the secondary load 30.
  • the secondary charge 30 may comprise an electronic device operating at low electrical energy, such as a device based on light-emitting diodes, for example a lamp, or an information display, etc.
  • the secondary charge 30 may also include an electronic device operating in proportion to the amount of energy it receives, such as linear actuators, for example, an electromechanical actuator.
  • the primary load 20 comprises a first battery 22 and the secondary load comprises a thermal device 32 configured to heat or cool the first battery 22 and / or the photovoltaic generator 1 1 (see Figure 3).
  • the battery 22 is an electric accumulator, that is, an electrochemical system configured to store electrical energy. The system restores chemical energy into electrical energy, using electrochemical reactions.
  • the battery 22 comprises a reversible electrochemical system, it can thus be rechargeable.
  • the battery 22 is configured to be charged when connected to the photovoltaic generator 1 1.
  • the battery 22 may be a lead-acid battery, an alkaline battery, or a lithium-based battery.
  • the battery 22 is a lithium-ion type battery.
  • the thermal device 32 comprises a fan 33 configured to cool the battery 22 and / or the photovoltaic generator 11.
  • the power dissipated by the thermal device 32 is equivalent to or substantially equivalent to the power supplied by the photovoltaic generator 1 1.
  • the combination of this type of fan 33 with a battery 22 makes it possible to take advantage of the surplus electrical power generated, especially when the solar panels receive a strong solar irradiation. More irradiation is important plus the rise in the temperature of the battery 22 and the temperature of the solar panels of the generator 1 1 is important.
  • This configuration ensures efficient operation of the fan 33 with a faster and faster speed depending on the solar irradiation.
  • the fan 33 advantageously makes it possible to lower the ambient temperature around the battery and / or the solar panels of the generator 1 1 by forced convection.
  • the lowering of the temperature of the battery 22 allows an improvement in the charging operation, and the increase in its lifetime.
  • the lowering of the temperature of the photovoltaic panels of the generator 1 1 by self-consumption ventilation allows advantageously an improvement in the energy recovery of the photovoltaic generator during strong solar irradiation.
  • the combination of this type of fan 33 with a battery 22 allows a beneficial use of the surplus power produced during strong solar irradiation, improving the performance and reliability of the battery 22 and the photovoltaic generator 1 1, in other words of the autonomous system 10.
  • the secondary charge 30, according to this embodiment may also include heating sheets 33 'configured to be associated with the battery 22.
  • the carrier mobility decreases and the internal impedance increases within a battery, in particular a lithium-ion battery.
  • the high current capacity of the battery 22 is limited.
  • battery manufacturers generally prohibit recharging the battery if its temperature is below a preset temperature (at low temperatures), since charging the battery in these conditions may damage it.
  • at low temperatures are meant temperatures below 0 ° C, and preferably below -10 ° C.
  • the management device 40 or the thermal device 32 may comprise a measurement system (not shown in the figures) of the temperature of the battery 22.
  • the measurement system is configured to provide information on the temperature of the battery 22. It can comprise a plurality of temperature sensors distributed in the battery 22, for example distributed over the surface of the battery 22.
  • the temperature sensors may comprise a thermometer, a thermocouple, a thermistor, or any system making it possible to provide a measurement of the temperature.
  • the management device 40 according to the result of the comparison and the measurement of the temperature of the battery 22, will operate either the fan 33 or the heating sheets 33 '.
  • the threshold voltage A s i corresponds to the sum of the minimum operating voltage U pr im of the primary charge 20 and the minimum operating voltage U c of the secondary load 30
  • the method is advantageously usable when the secondary charge 30 also comprises one or more electrical devices requiring a minimum supply of electrical energy to fulfill a certain function.
  • the surplus power must be sufficient to operate the second load 30 for the management device actuates the first switch system 21, so that the photovoltaic generator 1 1 feeds both the primary load 20 and the secondary charge 30 connected in series with the latter.
  • the autonomous system 10 comprises a second switch system 21 arranged to disconnect the primary load 20 from the main load 12.
  • the operation of the second switch system 21 with the primary load 20 is similar to the operation of the first switch system 31 with the secondary load 30.
  • the first switch system 31 and the second switch system 21 are controlled by the management device 40, and are operated according to the result of the comparison step.
  • this configuration offers the management device 40 more possibilities for managing the electrical energy produced by the photovoltaic generator 1 1. It is advantageously possible to disconnect the primary load while leaving the secondary load connected.
  • the primary and secondary loads 30 may both include a battery.
  • the use of two switch systems 21 and 31 associated with the loads 20 and 30 makes it possible to charge the battery of the primary load 20 as a priority.
  • the management device 40 can, if the power delivered is sufficient, charge in addition the battery of the secondary charge 30. If after the comparison step, it turns out that the power delivered by the photovoltaic generator 1 1 can only charge the battery of the primary charge 20, then the management device 40 will disconnect the secondary load 30.
  • the management device 40 may advantageously switch to another state in which the primary charge 20 is disconnected, and the secondary charge 30 is connected to the main load 12, to recharge the battery of the secondary charge 30.
  • the measuring step comprises measuring the no-load voltage at the terminals of the photovoltaic generator (Un, Uocv) or the voltage of the maximum power produced at the terminals of the photovoltaic generator (Un, UMPP).
  • the first threshold value A s i comprises a threshold voltage corresponding to the minimum operating voltage U pr im of the primary load 20.
  • the measured electrical quantity A m is compared with both the first threshold value A s i and at a second threshold value A S 2, corresponding to the minimum operating voltage U sec of the secondary load 30.
  • the first 31 and second 21 switch systems are actuated so as to disconnect the primary load 20, so that the photovoltaic generator 1 1 feeds the secondary load 30 when the result of the comparison step shows that the no- load voltage at the terminals of the photovoltaic generator (Un, U ocv ) or the voltage of the maximum power produced At the terminals of the photovoltaic generator (A, UMPP) is between the second A S 2 and the first A s i th threshold voltages.
  • the power delivered by the photovoltaic generator 1 1 is not sufficient for the normal operation of the primary load 20
  • this embodiment advantageously makes it possible to take advantage of the power of the generator 1 1 to supply the secondary load 30 and to operate the electrical device or devices included in the secondary charge 30.
  • the secondary load 30 may include a backup battery that can be connected to the devices of the primary charge 20.
  • the backup battery When the backup battery is charged, it can be associated with the photovoltaic generator 1 1 to provide power of the primary charge, in the case where the generator 1 1 alone can not operate the devices of the primary charge 20 (for example in conditions of low sunlight).
  • the current flowing in the main load 12 flows through the primary load 20 only, through the secondary load 30 only or through the primary and secondary loads 20 and 30 mounted in the main load. series.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)

Abstract

The method of operation of an autonomous system (10) comprising a photovoltaic generator (11) arranged so as to supply a main load (12) tends to optimize the photovoltaic solar energy recovery. The main load comprises, a primary load (20) arranged in series with a secondary load (30); a first interrupter system (31) arranged in such a way as to disconnect the secondary load (30) from the main load (12). The method comprises the following steps: - measuring at least one electrical quantity (Am) chosen from among: an output current intensity (I11) of the photovoltaic generator (11), a voltage across the terminals (U11) of the photovoltaic generator (11), and a voltage across the terminal (U20) of the primary load (20); − comparing the measured electrical quantity (Am) with a first threshold value (As1); − actuating the first interrupter system (31) as a function of the result of the comparison.

Description

Optimisation de la récupération énergétique solaire photovoltaïque  Optimization of solar photovoltaic energy recovery
Domaine technique de l'invention Technical field of the invention
La présente invention est relative à un procédé de fonctionnement optimisé d'un système autonome comportant un générateur photovoltaïque. The present invention relates to an optimized operating method of an autonomous system comprising a photovoltaic generator.
État de la technique State of the art
La démocratisation et l'évolution incessantes des sources d'énergie solaire, notamment, les sources d'énergie photovoltaïque, nécessitent le développement de nouveaux procédés d'utilisation de systèmes autonomes comportant de telles sources d'énergie. En effet, bien que l'énergie solaire photovoltaïque soit une source d'énergie inépuisable, elle est cependant affaiblie par des écrans, tels que les nuages, se trouvant sur la trajectoire des photons émis par le soleil à destination des modules solaires. Ainsi, la production électrique d'un système photovoltaïque n'est pas constante, même en journée. The ongoing democratization and evolution of solar energy sources, including photovoltaic power sources, requires the development of new processes for using autonomous systems with such sources of energy. Indeed, although photovoltaic solar energy is an inexhaustible source of energy, it is however weakened by screens, such as clouds, lying on the path of photons emitted by the sun to the solar modules. Thus, the electricity production of a photovoltaic system is not constant, even during the day.
Il est assez répandu d'intégrer un dispositif MPPT (MPPT pour l'acronyme anglais de « Maximum Power Point Tracker ») dans un système photovoltaïque afin de rechercher le point de puissance maximale et de maximiser ainsi la puissance produite en sortie du panneau photovoltaïque. It is quite common to integrate a MPPT (Maximum Power Point Tracker) into a photovoltaic system in order to find the maximum power point and thus maximize the output power of the photovoltaic panel.
Par ailleurs, un système autonome comportant une source d'énergie photovoltaïque comporte généralement un moyen de stockage énergétique tel qu'une batterie. Dans ce cas, pour tirer profit au maximum de la batterie, un convertisseur DC/DC qui réduit la tension et élève le courant, peut être intégré dans le système autonome pour adapter les caractéristiques du panneau photovoltaïque aux caractéristiques de la batterie. Furthermore, an autonomous system comprising a source of photovoltaic energy generally comprises an energy storage means such as a battery. In this case, to take full advantage of the battery, a DC / DC converter that reduces the voltage and raises the current, can be integrated in the autonomous system to adapt the characteristics of the photovoltaic panel to the characteristics of the battery.
L'élévation du courant imposée par le convertisseur DC/DC peut avoir un effet néfaste sur le vieillissement de la batterie causé notamment par les courants élevés et un réchauffement de la batterie. Pour remédier à ce problème un dispositif BMS (BMS pour l'acronyme anglais de « Battery Management System ») peut être associé, en outre, au système. Le dispositif permet de limiter le courant, conduisant de la sorte à une perte de puissance. L'utilisation d'un dispositif BMS en association avec un convertisseur DC/DC est alors contreproductive, d'un point de vue optimisation de l'énergie produite par le générateur photovoltaïque. The rise in current imposed by the DC / DC converter can have a detrimental effect on the aging of the battery caused by high currents and a warming of the battery. To remedy this problem, a BMS (Battery Management System) device can be associated in addition to the system. The device makes it possible to limit the current, thus leading to a loss of power. The use of a BMS device in combination with a DC / DC converter is then counterproductive, from an optimization point of view of the energy produced by the photovoltaic generator.
D'autres dispositifs connus de l'état de la technique, peuvent être associés à un système autonome comportant une source d'énergie photovoltaïque. A titre d'exemple, la demande de brevet US 2010/0066309 divulgue un mode de gestion de la charge d'une batterie par une source intermittente, par l'intermédiaire d'une super-capacité. Ce mode de gestion de la charge vise principalement à limiter le courant de charge, et ne permet pas l'optimisation de l'énergie solaire non stockée dans la batterie. Other devices known from the state of the art can be associated with an autonomous system comprising a source of photovoltaic energy. For example, patent application US 2010/0066309 discloses a mode of management of the charge of a battery by an intermittent source, through a super-capacitor. This mode of charge management aims primarily to limit the charging current, and does not optimize the solar energy not stored in the battery.
Par ailleurs, la demande de brevet US 2010/0231 162 divulgue un dispositif de charge et de décharge d'une batterie comportant plusieurs cellules. Les cellules sont connectées en série pendant la décharge. Lorsque la température d'une des cellules atteint une température maximale admissible, elle est déconnectée de la batterie. Le document EP 2282392 divulgue un dispositif comprenant une batterie, un contrôleur de charge de ladite batterie et un générateur photovoltaïque, connectés en série. Le contrôleur de charge comporte un circuit de dérivation contrôlé par un circuit de commande. Le document EP 2200152 divulgue un système photovoltaïque comportant un générateur photovoltaïque et un générateur de tension d'appoint. Le système comporte un commutateur permettant soit de connecter le générateur de tension en série avec le générateur photovoltaïque, soit de le déconnecter. Furthermore, the patent application US 2010/0231162 discloses a device for charging and discharging a battery comprising a plurality of cells. The cells are connected in series during the discharge. When the temperature of one of the cells reaches a maximum allowable temperature, it is disconnected from the battery. EP 2282392 discloses a device comprising a battery, a charge controller of said battery and a photovoltaic generator, connected in series. The charge controller has a bypass circuit controlled by a control circuit. EP 2200152 discloses a photovoltaic system comprising a photovoltaic generator and a backup voltage generator. The system includes a switch for either connecting the voltage generator in series with the photovoltaic generator or disconnecting it.
Objet de l'invention Object of the invention
Il existe un besoin de prévoir un système autonome comportant un générateur photovoltaïque dont la puissance générée est exploitée de manière optimisée. La solution devrait avantageusement être facilement réalisable, et adaptée aux dispositifs électriques compris dans le système autonome. There is a need to provide an autonomous system comprising a photovoltaic generator whose generated power is exploited in an optimized manner. The solution should advantageously be easily achievable, and adapted to the electrical devices included in the autonomous system.
On tend à satisfaire ce besoin et à pallier les inconvénients cités ci-dessus en prévoyant un procédé de fonctionnement d'un système autonome comportant un générateur photovoltaïque agencé pour alimenter une charge principale comprenant : This need is tending to be satisfied and the drawbacks cited above are overcome by providing a method of operating an autonomous system comprising a photovoltaic generator arranged to feed a main load comprising:
- une charge primaire montée en série avec une charge secondaire ; - a primary load connected in series with a secondary load;
- un premier système interrupteur agencé de manière à déconnecter la charge secondaire de la charge principale ; a first switch system arranged to disconnect the secondary load from the main load;
Le procédé comporte en outre, les étapes suivantes : The method further comprises the following steps:
- mesurer au moins une grandeur électrique choisie parmi : une intensité de courant de sortie du générateur photovoltaïque, une tension aux bornes du générateur photovoltaïque, et une tension aux bornes de la charge primaire, l'étape de mesure comportant la mesure de la tension à vide aux bornes du générateur photovoltaïque ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque ;  measuring at least one electrical variable chosen from: an output current of the photovoltaic generator, a voltage at the terminals of the photovoltaic generator, and a voltage at the terminals of the primary charge, the measurement step including the measurement of the voltage at empty at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator;
- comparer la grandeur électrique mesurée à une première valeur seuil comprenant une tension de seuil correspondant à la tension minimale de fonctionnement de la charge primaire ; - actionner le premier système interrupteur en fonction du résultat de la comparaison. comparing the measured electrical quantity with a first threshold value comprising a threshold voltage corresponding to the minimum operating voltage of the primary load; - operate the first switch system according to the result of the comparison.
Selon un mode de réalisation, l'étape de mesure comporte la mesure de l'intensité de courant de sortie du générateur photovoltaïque, et la première valeur seuil comprend une intensité de courant seuil prédéterminé. According to one embodiment, the measuring step comprises measuring the output current intensity of the photovoltaic generator, and the first threshold value comprises a predetermined threshold current intensity.
De manière préférentielle, le premier système interrupteur est dans un premier état de sorte que le générateur photovoltaïque alimente en série la charge primaire puis la charge secondaire lorsque le résultat de la comparaison montre que la tension à vide aux bornes du générateur photovoltaïque ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque est supérieure à la première tension seuil. En outre, le premier système interrupteur est dans un deuxième état, opposé au premier état, de sorte à déconnecter la charge secondaire de la charge principale lorsque le résultat de l'étape de comparaison montre que la tension à vide aux bornes du générateur photovoltaïque ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque est inférieure à la première tension seuil. Préférentiellement, la charge primaire comporte une première batterie, et la charge secondaire comporte un dispositif thermique configuré pour chauffer ou refroidir la première batterie et/ou le générateur photovoltaïque. Preferably, the first switch system is in a first state so that the photovoltaic generator supplies the primary load and then the secondary load in series when the result of the comparison shows that the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator is greater than the first threshold voltage. In addition, the first switch system is in a second state, opposite to the first state, so as to disconnect the secondary load from the main load when the result of the comparison step shows that the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator is lower than the first threshold voltage. Preferably, the primary charge comprises a first battery, and the secondary charge comprises a thermal device configured to heat or cool the first battery and / or the photovoltaic generator.
Par ailleurs, l'étape de mesure peut comporter la mesure de la tension à vide aux bornes du générateur photovoltaïque ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque, et la tension de seuil correspond à la somme de la tension minimale de fonctionnement de la charge primaire et de la tension minimale de fonctionnement de la charge secondaire. Selon un mode d'exécution, un deuxième système interrupteur est agencé de manière à déconnecter la charge primaire de la charge principale. Le premier système interrupteur et le deuxième système interrupteur peuvent être actionnés en fonction du résultat de l'étape de comparaison. Furthermore, the measurement step may comprise measuring the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator, and the threshold voltage corresponds to the sum of the minimum voltage of the photovoltaic generator. operation of the primary load and the minimum operating voltage of the secondary load. According to one embodiment, a second switch system is arranged to disconnect the primary load from the main load. The first switch system and the second switch system can be operated according to the result of the comparison step.
Selon une alternative, l'étape de mesure comporte la mesure de la tension à vide aux bornes du générateur photovoltaïque ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque, et la première valeur seuil comprend une tension de seuil correspondant à la tension minimale de fonctionnement de la charge primaire. En outre, la grandeur électrique mesurée est comparée, à une seconde tension seuil correspondant à la tension minimale de fonctionnement de la charge secondaire (30). According to an alternative, the measuring step comprises measuring the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator, and the first threshold value comprises a threshold voltage corresponding to the voltage minimum operation of the primary load. In addition, the measured electrical quantity is compared with a second threshold voltage corresponding to the minimum operating voltage of the secondary load (30).
Selon cette alternative, les premier et deuxième systèmes interrupteurs sont actionnés de sorte à déconnecter la charge primaire de la charge principale, de sorte que le générateur photovoltaïque alimente uniquement la charge secondaire lorsque le résultat de l'étape de comparaison montre que la tension à vide aux bornes du générateur photovoltaïque ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque est comprise entre les deuxième et première tensions de seuil. According to this alternative, the first and second switch systems are operated so as to disconnect the primary load from the main load, so that the photovoltaic generator supplies only the secondary load when the result of the comparison step shows that the no-load voltage at the terminals of the photovoltaic generator or the voltage of the maximum power produced at the terminals of the photovoltaic generator is between the second and first threshold voltages.
Description sommaire des dessins Brief description of the drawings
D'autres avantages et caractéristiques ressortiront plus clairement de la description qui va suivre de modes particuliers de réalisation de l'invention donnés à titre d'exemples non limitatifs et représentés aux dessins annexés, dans lesquels : Other advantages and features will emerge more clearly from the following description of particular embodiments of the invention given by way of non-limiting example and represented in the accompanying drawings, in which:
- les figures 1 , 3 et 4 représentent, de manière schématique, un système autonome selon un mode de réalisation de l'invention ; - les figures 2a et 2b représentent, de manière schématique, un système interrupteur compris dans le système autonome selon un autre mode de réalisation de l'invention. - Figures 1, 3 and 4 show, schematically, an autonomous system according to one embodiment of the invention; - Figures 2a and 2b show, schematically, a switch system included in the autonomous system according to another embodiment of the invention.
Description de modes de réalisation préférentiels de l'invention DESCRIPTION OF PREFERRED EMBODIMENTS OF THE INVENTION
On tend à optimiser l'utilisation de la puissance produite par un générateur photovoltaïque d'un système autonome, en prévoyant un procédé de fonctionnement tirant profit du surplus de puissance disponible au delà de l'alimentation d'une charge primaire prioritaire, afin d'alimenter une charge secondaire. The aim is to optimize the use of the power produced by a photovoltaic generator of an autonomous system, by providing an operating method taking advantage of the excess power available beyond the supply of a primary primary load, in order to feed a secondary load.
Comme illustré à la figure 1 , le système autonome 10 prévu selon un mode de réalisation de l'invention, comporte au moins un générateur photovoltaïque 1 1 agencé pour alimenter une charge principale 12. Par système autonome, on entend un système pouvant assurer de manière indépendante son administration et son alimentation en énergie. Le générateur photovoltaïque 1 1 comporte préférentiellement au moins un panneau muni de cellules solaires photovoltaïques. As illustrated in FIG. 1, the autonomous system 10 provided according to one embodiment of the invention comprises at least one photovoltaic generator 1 1 arranged to feed a main load 12. By autonomous system, is meant a system capable of providing independent of its administration and its energy supply. The photovoltaic generator 1 1 preferably comprises at least one panel provided with photovoltaic solar cells.
Le système autonome 10 comporte deux éléments essentiels, la charge principale 12 et le générateur photovoltaïque 1 1 . La charge principale 12 est connectée au générateur photovoltaïque 1 1 par ses bornes de sortie B et D. Le courant circule à l'intérieur de la charge 12 depuis une première borne (B ou D) vers une seconde borne (D ou B). Chacun de ses deux éléments (1 1 et 12) peut comporter un ou plusieurs dispositifs. Le générateur photovoltaïque 1 1 , en amont des bornes de sortie B et D, peut comporter un dispositif MPPT, un convertisseur DC/DC, etc. Préférentiellement, le générateur photovoltaïque 1 1 est dépourvue de convertisseurs DC/DC. La charge principale 12 comporte une charge primaire 20 montée en série avec une charge secondaire 30. La charge primaire 20 est montée entre les bornes B et C et la charge secondaire 30 est montée entre les bornes C et D. Chacune des charges, primaire 20 et secondaire 30, est configurée de sorte à comporter un ou plusieurs dispositifs électriques. Par ailleurs, les charges primaire 20 et secondaire 30 sont des éléments distincts et ne peuvent pas être assimilés à des cellules appartenant à une batterie. Par dispositif électrique, on entend tout dispositif nécessitant une alimentation en énergie électrique pour remplir une fonction déterminée. Le dispositif électrique, peut être un lampadaire, un volet roulant, un horodateur, une batterie, un ventilateur etc. The autonomous system 10 comprises two essential elements, the main load 12 and the photovoltaic generator 11. The main load 12 is connected to the photovoltaic generator 1 1 by its output terminals B and D. The current flows inside the load 12 from a first terminal (B or D) to a second terminal (D or B). Each of its two elements (1 1 and 12) may include one or more devices. The photovoltaic generator 1 1, upstream of the output terminals B and D, may comprise an MPPT device, a DC / DC converter, etc. Preferably, the photovoltaic generator 1 1 is devoid of DC / DC converters. The main load 12 includes a primary load 20 connected in series with a secondary load 30. The primary load 20 is connected between the terminals B and C and the secondary load 30 is connected between the terminals C and D. Each of the loads, primary 20 and secondary 30, is configured to include one or more electrical devices. On the other hand, the primary 20 and secondary 30 charges are distinct elements and can not be assimilated to cells belonging to a battery. By electrical device is meant any device requiring a supply of electrical energy to perform a specific function. The electrical device may be a floor lamp, a roller shutter, a parking meter, a battery, a fan, etc.
Préférentiellement, la charge primaire 20 comporte le ou les dispositifs principaux du système autonome 10. Autrement dit, le système autonome 10 donne la priorité à l'alimentation de la charge primaire 20 et de ses dispositifs électriques, par rapport à la charge secondaire 30 et ses dispositifs électriques. Pour une meilleure gestion de l'énergie électrique produite par le générateur photovoltaïque 1 1 , le système autonome comporte avantageusement un dispositif de gestion 40 comprenant un premier système interrupteur 31 , contrôlé par le dispositif de gestion 40 via des moyens de contrôle intégrés (non représentés). Preferably, the primary load 20 comprises the main device or devices of the autonomous system 10. In other words, the autonomous system 10 gives priority to the supply of the primary load 20 and its electrical devices, with respect to the secondary load 30 and its electrical devices. For better management of the electrical energy produced by the photovoltaic generator 1 1, the autonomous system advantageously comprises a management device 40 comprising a first switch system 31, controlled by the management device 40 via integrated control means (not shown ).
Le premier système interrupteur 31 est agencé de manière à déconnecter ou à connecter la charge secondaire 30 de la charge principale 12. De manière préférentielle, le système interrupteur 31 peut avoir au moins des premier E10 et deuxième E1 cc états. Selon un exemple d'exécution, le premier interrupteur 31 est configuré de sorte à être dans le premier état E10 de manière à laisser la charge secondaire 30 connectée en série avec la charge primaire 20 au sein de la charge principale 12. Autrement dit, le premier interrupteur 31 est dans le premier état E10 de sorte que le générateur photovoltaïque 1 1 alimente en série la charge primaire 20 et la charge secondaire 30. The first switch system 31 is arranged to disconnect or connect the secondary load 30 of the main load 12. Preferably, the switch system 31 may have at least first E1 0 and second E1 cc states. According to an exemplary embodiment, the first switch 31 is configured to be in the first state E1 0 so as to leave the secondary load 30 connected in series with the primary load 20 within the main load 12. In other words, the first switch 31 is in the first state E1 0 so that the photovoltaic generator 1 1 supplies the primary load 20 and the secondary load 30 in series.
Le premier système interrupteur 31 est également configuré de sorte à être dans le deuxième état E1 cc de manière à déconnecter la charge secondaire 30 de la charge principale 12, autrement dit, le générateur photovoltaïque 1 1 n'alimente entre ses bornes de sortie B et D, que la charge principale 20. The first switch system 31 is also configured to be in the second state E1 cc so as to disconnect the secondary feed 30 of the main charge 12, in other words, the PV generator 1 1 does feeds between its output terminals B and D, that the main load 20.
Selon l'exemple d'exécution illustré à la figure 2a, le système interrupteur 31 comporte un premier interrupteur 31 a montée en parallèle de la charge secondaire 30. A l'état fermé, le premier interrupteur 31 a court-circuite la charge secondaire 30. Ainsi, le courant généré par le générateur 1 1 parcourt uniquement la charge principale 20. A l'état ouvert, la charge secondaire 30 reste connecté en série avec la charge primaire 20. Ainsi, le générateur photovoltaïque 1 1 peut alimenter, et la charge primaire 20 et la charge secondaire 30. According to the exemplary embodiment illustrated in FIG. 2a, the switch system 31 comprises a first switch 31 connected in parallel with the secondary load 30. In the closed state, the first switch 31 bypasses the secondary load 30 Thus, the current generated by the generator 1 1 travels only the main charge 20. In the open state, the secondary charge 30 remains connected in series with the primary charge 20. Thus, the photovoltaic generator 1 1 can supply, and the primary charge 20 and secondary charge 30.
Par ailleurs, pour certaines applications, et selon les dispositifs électriques compris dans la charge secondaire 30, il est déconseillé de court-circuiter la charge secondaire 30 afin d'éviter la dégradation desdits dispositifs électriques de la charge secondaire 30. Ainsi, le système interrupteur peut comporter de manière avantageuse, plusieurs interrupteurs de sorte à déconnecter la charge secondaire 30 tout en évitant de la court-circuiter. Moreover, for some applications, and according to the electrical devices included in the secondary load 30, it is disadvised to short-circuit the secondary load 30 in order to avoid the degradation of said electrical devices of the secondary load 30. Thus, the switch system may advantageously include several switches so as to disconnect the secondary load 30 while avoiding short-circuiting.
Comme illustré à la figure 2b, le système interrupteur 31 peut comporter un deuxième interrupteur 31 b, montée entre la charge secondaire 30 et une des bornes C et D. Le premier interrupteur 31 a est monté entre les bornes C et D, en parallèle de la branche comportant la charge secondaire 30 et le deuxième interrupteur 31 b. Le premier système interrupteur 31 est dans le premier état E10, lorsque le premier interrupteur 31 a est ouvert et le second interrupteur 31 b est fermé. Le premier système interrupteur 31 occupe le deuxième état E1 cc, lorsque le premier interrupteur 31 a est fermé et le second interrupteur 31 b est ouvert. Les deux interrupteurs 31 a et 31 b sont avantageusement dans des états opposés. As illustrated in FIG. 2b, the switch system 31 may comprise a second switch 31b, mounted between the secondary load 30 and one of the terminals C and D. The first switch 31a is mounted between the terminals C and D, in parallel with the branch comprising the secondary load 30 and the second switch 31 b. The first switch system 31 is in the first state E1 0 , when the first switch 31a is open and the second switch 31b is closed. The first switch system 31 has the second state E1 cc, when the first switch 31a is closed and the second switch 31b is opened. The two switches 31a and 31b are advantageously in opposite states.
Par ailleurs, le système interrupteur 31 peut comporter un interrupteur électronique, par exemple un transistor, ou un interrupteur mécanique par exemple un microsystème électromécanique (MEMS). Furthermore, the switch system 31 may comprise an electronic switch, for example a transistor, or a mechanical switch for example an electromechanical microsystem (MEMS).
Ici nous avons donné deux exemples d'exécution du premier système interrupteur 31 . Cependant, l'homme du métier pourra également utiliser d'autres configurations en fonction des dispositifs compris dans la charge secondaire 30, de sorte à avoir deux états du système interrupteur 31 : un premier état dans lequel le générateur 1 1 alimente à la fois la charge primaire 20 et la charge secondaire 30, et un deuxième état dans lequel la charge secondaire 30 est déconnectée de la charge principale 12 de sorte que le générateur 1 1 n'alimente que la charge primaire 20. Here we have given two examples of execution of the first switch system 31. However, those skilled in the art may also use other configurations depending on the devices included in the secondary load 30, so as to have two states of the switch system 31: a first state in which the generator 1 1 feeds both the primary charge 20 and the secondary charge 30, and a second state in which the secondary charge 30 is disconnected from the main charge 12 so that the generator 1 1 feeds only the primary charge 20.
Selon un mode de réalisation de l'invention, le procédé de fonctionnement du système autonome 10 comporte au moins une étape de mesure d'une grandeur électrique Am. L'étape de mesure est réalisée par un dispositif de mesure 42, préférentiellement intégré dans le dispositif de gestion 40. According to one embodiment of the invention, the operating method of the autonomous system 10 comprises at least one step of measuring an electrical quantity A m . The measuring step is performed by a measuring device 42, preferably integrated in the management device 40.
Le dispositif de mesure 42 est configurée de sorte à mesurer au moins une grandeur électrique, par exemple une tension ou une intensité de courant. Le dispositif de mesure 42 peut comporter un ou plusieurs systèmes classiques, tel qu'un voltmètre numérique, pour mesurer la tension aux bornes d'un élément du système autonome 10, ou tel qu'un ampèremètre numérique, un shunt, ou un transformateur de courant pour mesurer l'intensité de courant circulant dans un élément du système autonome 10. Préférentiellement, le dispositif de mesure 42 comporte un ou plusieurs capteurs de mesure de tension et/ou d'intensité en continu et/ou de manière périodique. The measuring device 42 is configured to measure at least one electrical quantity, for example a voltage or a current intensity. The measurement device 42 may comprise one or more conventional systems, such as a digital voltmeter, for measuring the voltage at the terminals of an element of the autonomous system 10, or such as a digital ammeter, a shunt, or a current transformer for measuring the intensity of current flowing in an element of the autonomous system 10. Preferably, the measuring device 42 comprises one or more sensors for measuring voltage and / or intensity continuously and / or periodically.
Par ailleurs, le choix du ou des systèmes classiques de mesure est déterminé par l'homme du métier en fonction des éléments compris dans le système autonome 10, et de la précision de mesure envisagée. Par ailleurs, la grandeur électrique Am mesurée, est choisie parmi les grandeurs électriques suivantes : Moreover, the choice of the conventional measurement system or systems is determined by the skilled person according to the elements included in the autonomous system 10, and the measurement accuracy envisaged. Moreover, the measured electrical quantity A m is chosen from the following electrical quantities:
- une intensité de courant de sortie lu du générateur photovoltaïque 1 1 ;  an output current intensity read from the photovoltaic generator 1 1;
- une tension Un aux bornes du générateur photovoltaïque 1 1 , autrement dit une tension entre les bornes B et D ; et  a voltage A at the terminals of the photovoltaic generator 1 1, in other words a voltage between the terminals B and D; and
- une tension U2o aux bornes de la charge primaire 20, autrement dit une tension entre les bornes B et C. a voltage U 2 o across the primary load 20, in other words a voltage between the terminals B and C.
Après l'étape de mesure de la grandeur électrique Am, le procédé comporte en outre une étape de comparaison de cette dernière. En effet, la grandeur mesurée Am est comparée à une première valeur seuil Asi. La première valeur seuil Asi est choisie en fonction de la grandeur mesurée Am, de manière à ce que le résultat de comparaison puisse fournir une information sur la capacité du générateur photovoltaïque 1 1 à alimenter, la charge primaire 20 uniquement, ou la charge primaire 20 et la charge secondaire 30 en même temps. After the step of measuring the electrical quantity A m , the method further comprises a step of comparing the latter. Indeed, the measured quantity A m is compared with a first threshold value A s i. The first threshold value A s i is chosen as a function of the measured quantity A m , so that the comparison result can provide information on the capacity of the photovoltaic generator 1 1 to be fed, the primary load only, or the primary charge 20 and the secondary charge 30 at the same time.
L'étape de comparaison peut être réalisée par un calculateur classique intégré dans les moyens de contrôle 41 du dispositif de gestion 40. Le calculateur 41 est configuré, soit pour comparer directement la grandeur mesurée Am avec la première valeur seuil Asi , soit pour comparer des valeurs représentatives de ces grandeurs (Am, Asi ). The comparison step may be performed by a conventional computer integrated in the control means 41 of the management device 40. The computer 41 is configured, either to directly compare the magnitude measured A m with the first threshold value A s i, or to compare values representative of these quantities (A m , A s i).
Ainsi, en fonction du résultat de la comparaison, le dispositif de gestion 40 actionnera le premier système interrupteur 31. Préférentiellement, lorsque le résultat de comparaison indique que le générateur photovoltaïque 1 1 est en mesure d'alimenter la charge primaire 20 et la charge secondaire 30, le dispositif de gestion 40 actionnera le premier système interrupteur 31 de sorte que la charge secondaire 30 reste connectée en série avec la charge primaire 20. De ce fait, le générateur photovoltaïque 1 1 en alimentant la charge principale 12, alimentera en même temps la charge primaire 20 et la charge secondaire 30. Thus, depending on the result of the comparison, the management device 40 will operate the first switch system 31. Preferably, when the comparison result indicates that the photovoltaic generator 1 1 is able to supply the primary load 20 and the secondary load 30, the management device 40 will actuate the first switch system 31 so that the secondary load 30 remains connected in series with the primary load 20. As a result, the photovoltaic generator 1 1 by feeding the main load 12, will supply at the same time the primary charge 20 and the secondary charge 30.
Selon cet exemple de réalisation, lorsque le résultat de comparaison montre que la puissance du générateur photovoltaïque 1 1 est insuffisante pour alimenter la charge primaire 20 et la charge secondaire 30 en même temps, le dispositif de gestion 40 actionnera le premier système interrupteur 31 de sorte à déconnecter la charge secondaire 30 de la charge principale 12. De ce fait, le générateur photovoltaïque 1 1 en alimentant la charge principale 12, alimentera uniquement la charge primaire 20. According to this exemplary embodiment, when the comparison result shows that the power of the photovoltaic generator 1 1 is insufficient to supply the primary load 20 and the secondary load 30 at the same time, the management device 40 will actuate the first switch system 31 so that to disconnect the secondary charge 30 from the main charge 12. As a result, the photovoltaic generator 1 1 by supplying the main charge 12, will supply only the primary charge 20.
Selon un mode de réalisation particulier, l'étape de mesure comporte la mesure de l'intensité de courant de sortie lu du générateur photovoltaïque 1 1 . L'intensité lu mesurée peut être par exemple le courant de court-circuit du générateur photovoltaïque 1 1 . En outre, la première valeur seuil Asi comprend une intensité de courant seuil prédéterminée Is. Cette intensité de courant seuil est prédéterminée en fonction des composants compris dans la charge primaire 20, ou encore en fonction des composants de la charge primaire 20 et de la charge secondaire 30. Par ailleurs, dans certaines applications et/ou certaines configurations du système autonome 10, il est plus aisé et plus utile de mesurer une tension et de la comparer à un seuil, que de mesurer et comparer une intensité de courant. According to a particular embodiment, the measuring step comprises measuring the output current intensity lu of the photovoltaic generator 1 1. The read intensity measured can be, for example, the short-circuit current of the photovoltaic generator 1 1. In addition, the first threshold value A s i comprises a predetermined threshold current intensity Is. This threshold current intensity is predetermined according to the components included in the primary load 20, or depending on the components of the primary load 20 and the secondary charge 30. Moreover, in certain applications and / or certain configurations of the autonomous system 10, it is easier and more useful to measure a voltage and compare it to a threshold than to measure and compare a current intensity.
Selon un mode d'exécution préférentiel, l'étape de mesure comporte ainsi la mesure de la tension à vide U0Cv aux bornes du générateur photovoltaïque 1 1 , autrement dit, entre les bornes B et D. La grandeur électrique mesurée (Am, Un) correspond alors à la tension à vide U0Cv qui est caractéristique du générateur 1 1 et dépend également des conditions d'ensoleillement. According to a preferred embodiment, the measuring step thus comprises the measurement of the open- circuit voltage U 0C v at the terminals of the photovoltaic generator 1 1, in other words, between the terminals B and D. The measured electrical quantity (A m , A) then corresponds to the open- circuit voltage U 0C v which is characteristic of the generator 1 1 and also depends on the sunlight conditions.
Par ailleurs, si le générateur photovoltaïque 1 1 comporte un dispositif MPPT en amont des bornes B et D, l'étape de mesure peut comporter également, la mesure de la tension de la puissance maximale produite UMPP aux bornes du générateur photovoltaïque 1 1 , autrement dit, entre les bornes B et D. Cette tension de la puissance maximale UMPP est déterminée par le dispositif MPPT. Furthermore, if the photovoltaic generator 1 1 comprises a MPPT device upstream of the terminals B and D, the measuring step can also comprise the measurement of the voltage of the maximum output power UMPP at the terminals of the photovoltaic generator 1 1, otherwise said, between terminals B and D. This voltage of the maximum power UMPP is determined by the MPPT device.
L'étape de comparaison de la grandeur mesurée (U0Cv ou UMPP) avec la première valeur seuil Asi , permet avantageusement de fournir une indication sur la capacité du générateur photovoltaïque 1 1 à alimenter, en plus de la charge primaire 20, la charge secondaire 30. The step of comparing the measured quantity (U 0C v or UMPP) with the first threshold value A s i, advantageously makes it possible to provide an indication of the capacity of the photovoltaic generator 1 1 to supply, in addition to the primary load 20, the secondary charge 30.
Préférentiellement, le premier système interrupteur 31 est dans le premier état E10 lorsque le résultat de la comparaison montre que la tension à vide aux bornes du générateur photovoltaïque (Un , Uocv) ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque (Un , UMPP) est supérieure à la première tension seuil Asi . Preferably, the first switch system 31 is in the first state E1 0 when the result of the comparison shows that the voltage at the terminals of the photovoltaic generator (Un, U ocv ) or the voltage of the maximum power produced at the terminals of the photovoltaic generator (One, UMPP) is greater than the first threshold voltage A s i.
Par ailleurs, le premier système interrupteur électronique 31 est dans le deuxième état E cc lorsque le résultat de l'étape de comparaison montre que la tension à vide aux bornes du générateur photovoltaïque (Un , Uocv) ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque (Un, UMPP) est inférieure à la première tension seuil Asi. Moreover, the first electronic switch system 31 is in the second state E cc when the result of the comparison step shows that the no- load voltage at the terminals of the photovoltaic generator (Un, U ocv ) or the voltage of the maximum power produced at the terminals of the photovoltaic generator (Un, UMPP) is lower than the first threshold voltage A s i.
Selon un mode d'exécution préférentiel, la première valeur seuil Asi peut comprendre une tension de seuil correspondant à la tension minimale de fonctionnement Uprim de la charge primaire 20. Cette tension Uprim est prédéterminée en fonction des composants compris dans la charge primaire 20. L'étape de comparaison de U0Cv ou de UMPP avec Uprim, permet avantageusement de renseigner si, après l'alimentation des dispositifs prioritaires de la charge principale 20, l'énergie produite par le générateur 1 1 dispose d'un excédent d'énergie disponible. Avantageusement, ce dernier peut être alors mis à profit pour alimenter la charge secondaire 30. According to a preferred embodiment, the first threshold value A s i may comprise a threshold voltage corresponding to the minimum operating voltage U pr im of the primary load 20. This voltage U pr im is predetermined depending on the components included in the primary charge 20. The step of comparing U 0C v or UMPP with U pr im, advantageously provides information if, after the supply of the priority devices of the main load 20, the energy produced by the generator 1 1 has a surplus of energy available. Advantageously, the latter can then be used to feed the secondary load 30.
Selon cet exemple d'exécution, la charge secondaire 30 peut comporter un dispositif électronique fonctionnant à faible énergie électrique, tel qu'un dispositif à base de diodes électroluminescentes, par exemple une lampe, ou un afficheur d'informations, etc. La charge secondaire 30 peut également comporter un dispositif électronique fonctionnant proportionnellement à la quantité d'énergie qu'il reçoit, tel que des actionneurs linéaires, par exemple, un actionneur électromécanique. According to this exemplary embodiment, the secondary charge 30 may comprise an electronic device operating at low electrical energy, such as a device based on light-emitting diodes, for example a lamp, or an information display, etc. The secondary charge 30 may also include an electronic device operating in proportion to the amount of energy it receives, such as linear actuators, for example, an electromechanical actuator.
Préférentiellement, la charge primaire 20 comporte une première batterie 22 et la charge secondaire comporte un dispositif thermique 32 configuré pour chauffer ou refroidir la première batterie 22 et/ou le générateur photovoltaïque 1 1 (cf. figure 3). La batterie 22 est un accumulateur électrique, autrement dit, un système électrochimique configuré pour stocker de l'énergie électrique. Le système restitue une énergie chimique en une énergie électrique, à l'aide de réactions électrochimiques. La batterie 22 comporte un système électrochimique réversible, elle peut être ainsi rechargeable. La batterie 22 est configurée pour être chargée, lorsqu'elle est connectée au générateur photovoltaïque 1 1 . Preferably, the primary load 20 comprises a first battery 22 and the secondary load comprises a thermal device 32 configured to heat or cool the first battery 22 and / or the photovoltaic generator 1 1 (see Figure 3). The battery 22 is an electric accumulator, that is, an electrochemical system configured to store electrical energy. The system restores chemical energy into electrical energy, using electrochemical reactions. The battery 22 comprises a reversible electrochemical system, it can thus be rechargeable. The battery 22 is configured to be charged when connected to the photovoltaic generator 1 1.
Par exemple, la batterie 22 peut être un accumulateur au plomb, un accumulateur alcalin, ou encore un accumulateur à base de lithium. Préférentiellement, la batterie 22 est une batterie de type lithium-ion. For example, the battery 22 may be a lead-acid battery, an alkaline battery, or a lithium-based battery. Preferably, the battery 22 is a lithium-ion type battery.
De manière préférentielle, le dispositif thermique 32 comporte un ventilateur 33 configuré pour refroidir la batterie 22 et/ou le générateur photovoltaïque 1 1 . Le puissance dissipée par le dispositif thermique 32 est équivalente ou sensiblement équivalente à la puissance fournie par le générateur photovoltaïque 1 1 . L'association de ce type de ventilateur 33 avec une batterie 22, permet de tirer profit du surplus de puissance électrique générée, notamment lorsque les panneaux solaires reçoivent une forte irradiation solaire. Plus l'irradiation est importante plus l'élévation de la température de la batterie 22 et la température des panneaux solaires du générateur 1 1 est importante. Preferably, the thermal device 32 comprises a fan 33 configured to cool the battery 22 and / or the photovoltaic generator 11. The power dissipated by the thermal device 32 is equivalent to or substantially equivalent to the power supplied by the photovoltaic generator 1 1. The combination of this type of fan 33 with a battery 22 makes it possible to take advantage of the surplus electrical power generated, especially when the solar panels receive a strong solar irradiation. More irradiation is important plus the rise in the temperature of the battery 22 and the temperature of the solar panels of the generator 1 1 is important.
Par ailleurs, plus l'irradiation solaire est élevée plus la gamme de tension utile est large et l'intensité de courant débité par le générateur 1 1 est élevée, et le surplus de puissance électrique généré est important. Cette configuration assure un fonctionnement performant du ventilateur 33 avec une vitesse de plus en plus rapide en fonction de l'irradiation solaire. Le ventilateur 33 permet avantageusement, d'abaisser la température ambiante aux environs de la batterie et/ou des panneaux solaires du générateur 1 1 par convection forcée. Moreover, the higher the solar irradiation the greater the range of useful voltage is wide and the current intensity delivered by the generator 1 1 is high, and the surplus electrical power generated is important. This configuration ensures efficient operation of the fan 33 with a faster and faster speed depending on the solar irradiation. The fan 33 advantageously makes it possible to lower the ambient temperature around the battery and / or the solar panels of the generator 1 1 by forced convection.
L'abaissement de la température de la batterie 22, permet une amélioration de l'opération de charge, et l'augmentation de sa durée de vie. En outre, l'abaissement de la température des panneaux photovoltaïques du générateur 1 1 par une ventilation par autoconsommation, permet avantageusement une amélioration de la récupération énergétique du générateur photovoltaïque lors de forte irradiation solaire. The lowering of the temperature of the battery 22 allows an improvement in the charging operation, and the increase in its lifetime. In addition, the lowering of the temperature of the photovoltaic panels of the generator 1 1 by self-consumption ventilation allows advantageously an improvement in the energy recovery of the photovoltaic generator during strong solar irradiation.
Avantageusement, l'association de ce type de ventilateur 33 avec une batterie 22 permet une utilisation bénéfique du surplus de puissance produite lors de forte irradiations solaires, en améliorant les performances et la fiabilité de la batterie 22 et du générateur photovoltaïque 1 1 , autrement dit, du système autonome 10. La charge secondaire 30, selon ce mode d'exécution, peut également comporter des feuilles chauffantes 33' configurés de sorte à être associés à la batterie 22. En effet, à basses températures, la mobilité des porteurs diminue et l'impédance interne augmente au sein d'une batterie, notamment une batterie lithium-ion. Ainsi, la capacité à courant élevé de la batterie 22 est limitée. En outre, les fabricants de batteries interdisent généralement la recharge de la batterie si sa température est inférieure à une température prédéfinie (à basses températures), puisque la charge de la batterie dans ces conditions peut l'endommager. Ici, par basses températures on entend des températures inférieures à 0 °C, et préférentiellement inférieures à - 10 °C. Advantageously, the combination of this type of fan 33 with a battery 22 allows a beneficial use of the surplus power produced during strong solar irradiation, improving the performance and reliability of the battery 22 and the photovoltaic generator 1 1, in other words of the autonomous system 10. The secondary charge 30, according to this embodiment, may also include heating sheets 33 'configured to be associated with the battery 22. In fact, at low temperatures, the carrier mobility decreases and the internal impedance increases within a battery, in particular a lithium-ion battery. Thus, the high current capacity of the battery 22 is limited. In addition, battery manufacturers generally prohibit recharging the battery if its temperature is below a preset temperature (at low temperatures), since charging the battery in these conditions may damage it. Here, at low temperatures are meant temperatures below 0 ° C, and preferably below -10 ° C.
Le dispositif de gestion 40 ou le dispositif thermique 32 peuvent comporter un système de mesure (non représenté aux figures) de la température de la batterie 22. Le système de mesure est configuré pour fournir une information sur la température de la batterie 22. Il peut comporter plusieurs capteurs de température distribués dans la batterie 22, par exemple répartis sur la surface de la batterie 22. Les capteurs de température peuvent comporter un thermomètre, un thermocouple, une thermistance, ou n'importe quel système permettant de fournir une mesure de la température. Ainsi, le dispositif de gestion 40 en fonction du résultat de la comparaison et de la mesure de la température de la batterie 22, actionnera soit le ventilateur 33 soit les feuilles chauffantes 33'. Selon une alternative du mode d'exécution préférentiel, la tension de seuil Asi correspond à la somme de la tension minimale de fonctionnement Uprim de la charge primaire 20 et de la tension minimale de fonctionnement Usec de la charge secondaire 30. Le procédé est avantageusement utilisable lorsque la charge secondaire 30 comporte également un ou plusieurs dispositifs électriques nécessitant une alimentation minimale en énergie électrique pour remplir une fonction déterminée. Ainsi, selon cette alternative, le surplus de puissance doit être suffisant pour faire fonctionner la seconde charge 30 pour que le dispositif de gestion actionne le premier système interrupteur 21 , de sorte que le générateur photovoltaïque 1 1 alimente à la fois la charge primaire 20 et la charge secondaire 30 montée en série avec cette dernière. The management device 40 or the thermal device 32 may comprise a measurement system (not shown in the figures) of the temperature of the battery 22. The measurement system is configured to provide information on the temperature of the battery 22. It can comprise a plurality of temperature sensors distributed in the battery 22, for example distributed over the surface of the battery 22. The temperature sensors may comprise a thermometer, a thermocouple, a thermistor, or any system making it possible to provide a measurement of the temperature. Thus, the management device 40 according to the result of the comparison and the measurement of the temperature of the battery 22, will operate either the fan 33 or the heating sheets 33 '. According to an alternative of the preferred embodiment, the threshold voltage A s i corresponds to the sum of the minimum operating voltage U pr im of the primary charge 20 and the minimum operating voltage U c of the secondary load 30 The method is advantageously usable when the secondary charge 30 also comprises one or more electrical devices requiring a minimum supply of electrical energy to fulfill a certain function. Thus, according to this alternative, the surplus power must be sufficient to operate the second load 30 for the management device actuates the first switch system 21, so that the photovoltaic generator 1 1 feeds both the primary load 20 and the secondary charge 30 connected in series with the latter.
Selon un autre mode de réalisation illustré à la figure 4, le système autonome 10 comporte un deuxième système interrupteur 21 agencé de manière à déconnecter la charge primaire 20 de la charge principale 12. Le fonctionnement du deuxième système interrupteur 21 avec la charge primaire 20 est similaire au fonctionnement du premier système interrupteur 31 avec la charge secondaire 30. Selon ce mode de réalisation, le premier système interrupteur 31 et le deuxième système interrupteur 21 sont contrôlés par le dispositif de gestion 40, et sont actionnés en fonction du résultat de l'étape de comparaison. According to another embodiment illustrated in FIG. 4, the autonomous system 10 comprises a second switch system 21 arranged to disconnect the primary load 20 from the main load 12. The operation of the second switch system 21 with the primary load 20 is similar to the operation of the first switch system 31 with the secondary load 30. According to this embodiment, the first switch system 31 and the second switch system 21 are controlled by the management device 40, and are operated according to the result of the comparison step.
Avantageusement, cette configuration offre au dispositif de gestion 40 plus de possibilités pour gérer l'énergie électrique produite par le générateur photovoltaïque 1 1 . Il est avantageusement possible de déconnecter la charge primaire 20 tout en laissant la charge secondaire 30 connectée. A titre d'exemple, les charges primaire 20 et secondaire 30 peuvent comporter toutes les deux une batterie. L'utilisation de deux systèmes interrupteurs 21 et 31 associés aux charges 20 et 30, permet de charger en priorité la batterie de la charge primaire 20. Le dispositif de gestion 40 selon ce mode de réalisation peut, si la puissance délivrée est suffisante, charger en outre la batterie de la charge secondaire 30. Si après l'étape de comparaison, il s'avère que puissance délivrée par le générateur photovoltaïque 1 1 ne peut charger, que la batterie de la charge primaire 20, alors le dispositif de gestion 40 déconnectera la charge secondaire 30. Lorsque la batterie de la charge primaire 20 est rechargée, le dispositif de gestion 40 peut avantageusement basculer dans un autre état dans lequel, la charge primaire 20 est déconnectée, et la charge secondaire 30 est connectée à la charge principale 12, pour recharger la batterie de la charge secondaire 30. Advantageously, this configuration offers the management device 40 more possibilities for managing the electrical energy produced by the photovoltaic generator 1 1. It is advantageously possible to disconnect the primary load while leaving the secondary load connected. By way of example, the primary and secondary loads 30 may both include a battery. The use of two switch systems 21 and 31 associated with the loads 20 and 30 makes it possible to charge the battery of the primary load 20 as a priority. The management device 40 according to this embodiment can, if the power delivered is sufficient, charge in addition the battery of the secondary charge 30. If after the comparison step, it turns out that the power delivered by the photovoltaic generator 1 1 can only charge the battery of the primary charge 20, then the management device 40 will disconnect the secondary load 30. When the battery of the primary charge 20 is recharged, the management device 40 may advantageously switch to another state in which the primary charge 20 is disconnected, and the secondary charge 30 is connected to the main load 12, to recharge the battery of the secondary charge 30.
Selon un exemple d'exécution préférentiel, l'étape de mesure comporte la mesure de la tension à vide aux bornes du générateur photovoltaïque (Un, Uocv) ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque (Un, UMPP). La première valeur seuil Asi comprend une tension de seuil correspondant à la tension minimale de fonctionnement Uprim de la charge primaire 20. De manière avantageuse, la grandeur électrique mesurée Am est comparée à la fois à la première valeur seuil Asi et à une deuxième valeur seuil AS2, correspondant à la tension minimale de fonctionnement Usec de la charge secondaire 30. According to an example of a preferred embodiment, the measuring step comprises measuring the no-load voltage at the terminals of the photovoltaic generator (Un, Uocv) or the voltage of the maximum power produced at the terminals of the photovoltaic generator (Un, UMPP). The first threshold value A s i comprises a threshold voltage corresponding to the minimum operating voltage U pr im of the primary load 20. Advantageously, the measured electrical quantity A m is compared with both the first threshold value A s i and at a second threshold value A S 2, corresponding to the minimum operating voltage U sec of the secondary load 30.
Après l'étape de comparaison réalisée par le dispositif de gestion 40, les premier 31 et deuxième 21 systèmes interrupteurs sont actionnés de sorte à déconnecter la charge primaire 20, de sorte que le générateur photovoltaïque 1 1 alimente la charge secondaire 30 lorsque le résultat de l'étape de comparaison montre que la tension à vide aux bornes du générateur photovoltaïque (Un, Uocv) ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque (Un , UMPP) est comprise entre les deuxième AS2 et première Asi tensions seuils. After the comparison step performed by the management device 40, the first 31 and second 21 switch systems are actuated so as to disconnect the primary load 20, so that the photovoltaic generator 1 1 feeds the secondary load 30 when the result of the comparison step shows that the no- load voltage at the terminals of the photovoltaic generator (Un, U ocv ) or the voltage of the maximum power produced At the terminals of the photovoltaic generator (A, UMPP) is between the second A S 2 and the first A s i th threshold voltages.
Bien que la puissance délivrée par le générateur photovoltaïque 1 1 , ne soit pas suffisante pour le fonctionnement normal de la charge primaire 20, ce mode d'exécution permet avantageusement de tirer profit de la puissance du générateur 1 1 pour alimenter la charge secondaire 30 et pour faire fonctionner le ou les dispositifs électriques compris dans la charge secondaire 30. Although the power delivered by the photovoltaic generator 1 1 is not sufficient for the normal operation of the primary load 20, this embodiment advantageously makes it possible to take advantage of the power of the generator 1 1 to supply the secondary load 30 and to operate the electrical device or devices included in the secondary charge 30.
Selon cet exemple d'exécution, la charge secondaire 30 peut comporter une batterie de secours pouvant être connectée aux dispositifs de la charge primaire 20. Lorsque la batterie de secours est chargée, elle peut être associée au générateur photovoltaïque 1 1 pour assurer l'alimentation de la charge primaire, dans le cas ou le générateur 1 1 seul ne peut pas faire fonctionner les dispositifs de la charge primaire 20 (par exemple dans des conditions de faible ensoleillement). According to this exemplary embodiment, the secondary load 30 may include a backup battery that can be connected to the devices of the primary charge 20. When the backup battery is charged, it can be associated with the photovoltaic generator 1 1 to provide power of the primary charge, in the case where the generator 1 1 alone can not operate the devices of the primary charge 20 (for example in conditions of low sunlight).
En fonction de l'état des systèmes interrupteurs 21 et 31 , le courant circulant dans la charge principale 12 circule à travers la charge primaire 20 uniquement, à travers la charge secondaire 30 uniquement ou à travers les charges primaire et secondaire 20 et 30 montées en série. Depending on the state of the switch systems 21 and 31, the current flowing in the main load 12 flows through the primary load 20 only, through the secondary load 30 only or through the primary and secondary loads 20 and 30 mounted in the main load. series.

Claims

Revendications claims
1. Procédé de fonctionnement d'un système autonome (10) comportant un générateur photovoltaïque (1 1 ) agencé pour alimenter une charge principale (12) comprenant : A method of operating an autonomous system (10) comprising a photovoltaic generator (1 1) arranged to power a main load (12) comprising:
- une charge primaire (20) montée en série avec une charge secondaire (30) ;  a primary load (20) connected in series with a secondary load (30);
- un premier système interrupteur (31 ) agencé de manière à déconnecter la charge secondaire (30) de la charge principale (12) ; le procédé comportant les étapes suivantes :  a first switch system (31) arranged to disconnect the secondary load (30) from the main load (12); the process comprising the following steps:
- mesurer au moins une grandeur électrique (Am) choisie parmi : une intensité de courant de sortie (lu) du générateur photovoltaïque (1 1 ), une tension aux bornes (Un) du générateur photovoltaïque (1 1 ), et une tension aux bornes (U2o) de la charge primaire (20), l'étape de mesure comportant la mesure de la tension à vide aux bornes du générateur photovoltaïque (Un , Uocv) ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque (Un , UMPP) ; measuring at least one electrical variable (A m ) chosen from: an output current intensity (lu) of the photovoltaic generator (1 1), a terminal voltage (Un) of the photovoltaic generator (1 1), and a voltage at terminals (U 2 o) of the primary load (20), the measuring step comprising the measurement of the no-load voltage at the terminals of the photovoltaic generator (Un, U ocv ) or the voltage of the maximum power produced at the terminals of the generator photovoltaic (A, UMPP);
- comparer la grandeur électrique mesurée (Am) à une première valeur seuil (Asi) comprenant une tension de seuil correspondant à la tension minimale de fonctionnement (Uprim) de la charge primaire (20) ; comparing the measured electrical quantity (A m ) with a first threshold value (A s i) comprising a threshold voltage corresponding to the minimum operating voltage (U pr im) of the primary load (20);
- actionner le premier système interrupteur (31 ) en fonction du résultat de la comparaison pour connecter ou déconnecter la charge secondaire (30) de la charge principale (12).  - Operate the first switch system (31) according to the result of the comparison to connect or disconnect the secondary load (30) of the main load (12).
2. Procédé selon la revendication 1 , dans lequel l'étape de mesure comporte la mesure de l'intensité de courant de sortie (In) du générateur photovoltaïque (1 1 ), et dans lequel la première valeur seuil (Asi) comprend une intensité de courant seuil (ls) prédéterminé. 2. Method according to claim 1, wherein the measuring step comprises measuring the output current intensity (In) of the photovoltaic generator (1 1), and wherein the first threshold value (A s i) comprises a predetermined threshold current intensity (l s ).
3. Procédé selon la revendication 1 , dans lequel : The method of claim 1, wherein:
- le premier système interrupteur (31 ) est dans un premier état (E10) de sorte que le générateur photovoltaïque (1 1 ) alimente en série la charge primaire (20) puis la charge secondaire (30) lorsque le résultat de la comparaison montre que la tension à vide aux bornes du générateur photovoltaïque (Un, U0Cv) ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque (Un, UMPP) est supérieure à la première tension seuil the first switch system (31) is in a first state (E1 0 ) so that the photovoltaic generator (1 1) supplies the primary load (20) and then the secondary load (30) in series when the result of the comparison shows the voltage at the terminals of the photovoltaic generator (Un, U 0C v) or the voltage of the maximum power produced at the terminals of the photovoltaic generator (Un, UMPP) is greater than the first threshold voltage
- le premier système interrupteur (31 ) est dans un deuxième état (E cc) opposé au premier état (E0) de sorte à déconnecter la charge secondaire (30) de la charge principale (12) lorsque le résultat de l'étape de comparaison montre que la tension à vide aux bornes du générateur photovoltaïque (Un, Uocv) ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque (Un,the first switch system (31) is in a second state (E cc ) opposite to the first state (E 0 ) so as to disconnect the secondary load (30) from the main load (12) when the result of the step of comparison shows that the voltage at the terminals of the photovoltaic generator (Un, U ocv ) or the voltage of the maximum power produced at the terminals of the photovoltaic generator (Un,
UMPP) est inférieure à la première tension seuil (Asi). UMPP) is lower than the first threshold voltage (A s i).
4. Procédé selon l'une des revendications 1 et 3, dans lequel la charge primaire (20) comporte une première batterie (22), et la charge secondaire (30) comporte un dispositif thermique (32) configuré pour chauffer ou refroidir la première batterie (22) et/ou le générateur photovoltaïque (1 1 ). 4. Method according to one of claims 1 and 3, wherein the primary charge (20) comprises a first battery (22), and the secondary charge (30) comprises a thermal device (32) configured to heat or cool the first battery (22) and / or the photovoltaic generator (1 1).
5. Procédé selon l'une des revendications 1 et 3, dans lequel l'étape de mesure comporte la mesure de la tension à vide aux bornes du générateur photovoltaïque (Un, Uocv) ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque (Un, UMPP), et dans lequel la tension de seuil (Asi) correspond à la somme de la tension minimale de fonctionnement (Uprim) de la charge primaire (20) et de la tension minimale de fonctionnement (Usec) de la charge secondaire (30). Procédé selon la revendication 1 , dans lequel un deuxième système interrupteur (21 ) est agencé de manière à déconnecter la charge primaire (20) de la charge principale (12), et dans lequel le premier système interrupteur (31 ) et le deuxième système interrupteur (21 ) sont actionnés en fonction du résultat de l'étape de comparaison. 5. Method according to one of claims 1 and 3, wherein the measuring step comprises the measurement of the no- load voltage at the terminals of the photovoltaic generator (Un, U ocv ) or the voltage of the maximum power produced across the terminals of the photovoltaic generator (Un, UMPP), and in which the threshold voltage (A s i) corresponds to the sum of the minimum operating voltage (U pr im) of the primary load (20) and the minimum operating voltage ( U se c) of the secondary charge (30). The method of claim 1, wherein a second switch system (21) is arranged to disconnect the primary load (20) from the main load (12), and wherein the first switch system (31) and the second switch system. (21) are actuated according to the result of the comparison step.
Procédé selon les revendications 1 et 6, dans lequel la grandeur électrique mesurée (Am) est comparée, en outre, à une seconde tension seuil (AS2) correspondant à la tension minimale de fonctionnement (Usec) de la charge secondaire (30), et dans lequel : Method according to claims 1 and 6, wherein the measured electrical magnitude (A m ) is further compared to a second threshold voltage (A S 2) corresponding to the minimum operating voltage (U se c) of the secondary load (30), and wherein:
- les premier (31 ) et deuxième (21 ) systèmes interrupteurs sont actionnés de sorte à déconnecter la charge primaire (20) de la charge principale (12), de sorte que le générateur photovoltaïque (1 1 ) alimente uniquement la charge secondaire (30) lorsque le résultat de l'étape de comparaison montre que la tension à vide aux bornes du générateur photovoltaïque (Un, U0Cv) ou la tension de la puissance maximale produite aux bornes du générateur photovoltaïque (Un, UMPP) est comprise entre les deuxième (AS2) et première (Asi) tensions de seuil. the first (31) and second (21) switch systems are actuated so as to disconnect the primary load (20) from the main load (12), so that the photovoltaic generator (1 1) supplies only the secondary load (30); ) when the result of the comparison step shows that the no-load voltage at the terminals of the photovoltaic generator (Un, U 0C v) or the voltage of the maximum power produced at the terminals of the photovoltaic generator (Un, UMPP) is between second (A S 2) and first (A s i) threshold voltages.
EP16726843.2A 2015-05-25 2016-05-25 Optimisation of photovoltaic solar energy recovery Withdrawn EP3304683A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1554670A FR3036866B1 (en) 2015-05-25 2015-05-25 OPTIMIZATION OF SOLAR PHOTOVOLTAIC ENERGY RECOVERY
PCT/EP2016/061808 WO2016189035A1 (en) 2015-05-25 2016-05-25 Optimisation of photovoltaic solar energy recovery

Publications (1)

Publication Number Publication Date
EP3304683A1 true EP3304683A1 (en) 2018-04-11

Family

ID=54066011

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16726843.2A Withdrawn EP3304683A1 (en) 2015-05-25 2016-05-25 Optimisation of photovoltaic solar energy recovery

Country Status (3)

Country Link
EP (1) EP3304683A1 (en)
FR (1) FR3036866B1 (en)
WO (1) WO2016189035A1 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2936110B1 (en) 2008-09-16 2010-10-01 Commissariat Energie Atomique AUTONOMOUS SYSTEM COMPRISING A BATTERY AND A SUPERCAPACITY AND A CHARGING METHOD.
ES2381227T3 (en) * 2008-12-19 2012-05-24 Abb Research Ltd. A photovoltaic system
US20100231162A1 (en) * 2009-03-16 2010-09-16 Gm Global Technology Operations, Inc. Solar powered battery charging methods and devices for lithium-ion battery systems
EP2282392A1 (en) * 2009-07-31 2011-02-09 Nxp B.V. A battery charger for a photovoltaic system, a controller therefor and a method of controlling the same

Also Published As

Publication number Publication date
WO2016189035A1 (en) 2016-12-01
FR3036866A1 (en) 2016-12-02
FR3036866B1 (en) 2018-09-07

Similar Documents

Publication Publication Date Title
FR2916099A1 (en) METHOD FOR CHARGING A BATTERY OF AN AUTONOMOUS SYSTEM
WO2013064407A1 (en) Device for balancing the charge of the elements of an electrical power battery
EP3729553B1 (en) Method of management of the state of charge of a battery left at rest
EP2904687B1 (en) Circuit for managing the charge of a battery
EP1990891B1 (en) Method for charging a storage element of a standalone system
US8633671B2 (en) Photo-voltaic charging of high voltage traction batteries
EP2532068B1 (en) Charge equalization system for batteries
WO2006067350A1 (en) Method and system for stand-alone electrical supply by means of renewable energy
WO2006003287A1 (en) Method for managing a rechargeable battery storage
EP2393193A1 (en) Converter circuit and electronic system comprising such a circuit
FR2963709A1 (en) BALANCING METHOD FOR ELECTRIC BATTERY AND BATTERY MANAGEMENT SYSTEM USING SUCH A METHOD
EP2684274A1 (en) Charge balancing system for batteries
FR3005535A1 (en) SECURITY SYSTEM FOR BATTERY MODULE OF ACCUMULATORS AND METHOD OF BALANCING A CORRESPONDING BATTERY MODULE
EP2532070A2 (en) Equalization system for accumulator batteries
EP3036818A2 (en) Device for balancing the charge of the elements of a power battery
EP1825557B1 (en) Method for controlling a rechargeable battery and rechargeable battery for carrying out said method
EP2237387B1 (en) Stromversorgungssystem und Ladungssteuerungsverfahren für elektrochemische Generatoren
EP2722963B1 (en) Electrical power supply system with modular capacity
FR2496352A1 (en) METHOD AND DEVICE FOR CHARGING A BATTERY OF ELECTRIC BATTERIES USING SOLAR CELLS
FR2945684A1 (en) CONVERTER CIRCUIT AND ELECTRONIC SYSTEM COMPRISING SUCH A CIRCUIT
EP3304683A1 (en) Optimisation of photovoltaic solar energy recovery
FR3059167A1 (en) ANALOGIALLY LOCAL BALANCING SYSTEM FOR A SET OF CAPACITIVE ELECTRIC ENERGY STORAGE DEVICES, RECHARGEABLE STORAGE MODULE, ELECTRIC VEHICLE AND INSTALLATION COMPRISING SUCH A SYSTEM.
FR3052928B1 (en) METHOD AND SYSTEM FOR INTELLIGENT MANAGEMENT OF ELECTROCHEMICAL BATTERIES OF AN ELECTRICAL POWER SUPPLY
FR2943473A1 (en) BATTERY RECHARGING SYSTEM
EP2936423A1 (en) Management of high-temperature batteries

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20171128

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20190625

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20191106