EP3156665A1 - Compressor system, subsea production system provided therewith, and compressor cleaning method - Google Patents

Compressor system, subsea production system provided therewith, and compressor cleaning method Download PDF

Info

Publication number
EP3156665A1
EP3156665A1 EP15821658.0A EP15821658A EP3156665A1 EP 3156665 A1 EP3156665 A1 EP 3156665A1 EP 15821658 A EP15821658 A EP 15821658A EP 3156665 A1 EP3156665 A1 EP 3156665A1
Authority
EP
European Patent Office
Prior art keywords
compressor
supply
freezing agent
anti freezing
hydrate anti
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP15821658.0A
Other languages
German (de)
French (fr)
Other versions
EP3156665A4 (en
Inventor
Yuya Konno
Hideki Ito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Publication of EP3156665A1 publication Critical patent/EP3156665A1/en
Publication of EP3156665A4 publication Critical patent/EP3156665A4/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/70Suction grids; Strainers; Dust separation; Cleaning
    • F04D29/701Suction grids; Strainers; Dust separation; Cleaning especially adapted for elastic fluid pumps
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • E21B37/06Methods or apparatus for cleaning boreholes or wells using chemical means for preventing, limiting or eliminating the deposition of paraffins or like substances
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well
    • E21B43/36Underwater separating arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D17/00Radial-flow pumps, e.g. centrifugal pumps; Helico-centrifugal pumps
    • F04D17/08Centrifugal pumps
    • F04D17/10Centrifugal pumps for compressing or evacuating
    • F04D17/12Multi-stage pumps
    • F04D17/122Multi-stage pumps the individual rotor discs being, one for each stage, on a common shaft and axially spaced, e.g. conventional centrifugal multi- stage compressors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D25/00Pumping installations or systems
    • F04D25/02Units comprising pumps and their driving means
    • F04D25/06Units comprising pumps and their driving means the pump being electrically driven
    • F04D25/0686Units comprising pumps and their driving means the pump being electrically driven specially adapted for submerged use
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • F04D27/001Testing thereof; Determination or simulation of flow characteristics; Stall or surge detection, e.g. condition monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/70Suction grids; Strainers; Dust separation; Cleaning
    • F04D29/701Suction grids; Strainers; Dust separation; Cleaning especially adapted for elastic fluid pumps
    • F04D29/705Adding liquids
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D17/00Radial-flow pumps, e.g. centrifugal pumps; Helico-centrifugal pumps
    • F04D17/08Centrifugal pumps
    • F04D17/10Centrifugal pumps for compressing or evacuating
    • F04D17/12Multi-stage pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D29/00Details, component parts, or accessories
    • F04D29/40Casings; Connections of working fluid
    • F04D29/403Casings; Connections of working fluid especially adapted for elastic fluid pumps

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Control Of Positive-Displacement Air Blowers (AREA)

Abstract

A compressor system includes a compressor (50) that includes a casing, a rotation shaft supported in the casing and an impeller that rotates together with the rotation shaft and compresses a gas. The compressor system includes a compressed gas circulation unit (52) in which the gas compressed by the compressor (50) circulates, a hydrate anti freezing agent supply unit (53) configured to supply a hydrate anti freezing agent that prevents hydration of the gas to the compressed gas circulation unit (52), and an internal hydrate anti freezing agent supply unit (54) configured to supply part of the hydrate anti freezing agent to an internal flow path of the compressor (50).

Description

    [Technical Field]
  • The present invention relates to a compressor system, a subsea production system provided therewith, and a compressor cleaning method.
  • [Background Art]
  • In subsea production systems configured to extract submarine resources, production fluids mixed with crude oils and natural gases are drawn from production wells drilled to a depth of several thousand meters in the seabed. In the subsea production systems, the drawn production fluids are separated into gases such as natural gases and liquids such as crude oils by a separator such as a scrubber and are then sent to a ship on the sea surface through flow lines that extend under the sea. In this case, in order to send gases such as natural gases to a ship on the sea surface, a compressor installed in the seabed is used.
  • In the compressor installed in the seabed in this manner, according to continuous operations, sediments accumulate in internal flow paths through which natural gases circulate. As a result, a flow rate of natural gases that can circulate in the internal flow paths decreases and efficiency of the compressor decreases.
  • For such a compressor, for example, a cleaning method in which some condensates that are hydrocarbons contained in liquids separated out in the separator are supplied to the compressor for cleaning is disclosed in Patent Literature 1. In the compressor cleaning method, the condensates decompose and remove sediments, and internal flow paths of the compressor are cleaned.
  • [Citation List] [Patent Literature]
  • [Patent Literature 1] PCT International Publication No. WO 2013/185801
  • [Summary of Invention] [Technical Problem]
  • However, in the above-described cleaning method, condensates harvested from production wells are used. Therefore, in the cleaning method, there is a risk of a necessary amount of condensates not being reliably harvested from production wells. As a result, it is difficult to reliably clean the compressor.
  • The present invention provides a compressor system capable of reliably cleaning a compressor, a subsea production system provided therewith, and a compressor cleaning method.
  • [Solution to Problem]
  • In order to address the above problems, the present invention proposes the following solutions. A compressor system according to a first aspect of the present invention includes a compressor including a casing, a rotation shaft supported in the casing, and an impeller that rotates together with the rotation shaft and compresses a gas; a compressed gas circulation unit in which the gas compressed by the compressor circulates; a hydrate anti freezing agent supply unit configured to supply a hydrate anti freezing agent that prevents hydration of the gas to the compressed gas circulation unit; and an internal hydrate anti freezing agent supply unit configured to supply part of the hydrate anti freezing agent supplied from the hydrate anti freezing agent supply unit to an internal flow path formed of the impeller and the casing.
  • In such a configuration, part of the hydrate anti freezing agent supplied from the hydrate anti freezing agent supply unit to the compressed gas circulation unit for preventing hydration of the gas compressed by the compressor is supplied to the internal flow path. Therefore, the hydrate anti freezing agent flows in the internal flow path together with the gas, and thus sediments accumulated in the internal flow path can be removed. When the hydrate anti freezing agent is directly supplied to the internal flow path, the hydrate anti freezing agent is prevented from being diluted by the gas before reaching the internal flow path, and it is possible to clean the inside of the compressor by effectively using the hydrate anti freezing agent. When part of the hydrate anti freezing agent supplied from the hydrate anti freezing agent supply unit to the compressed gas circulation unit is used, it is possible to reliably supply a necessary amount of the hydrate anti freezing agent to the internal flow path.
  • The compressor system may include a control unit configured to perform supply control such that, when predetermined conditions are satisfied, the internal hydrate anti freezing agent supply unit starts supply of the hydrate anti freezing agent to the internal flow path.
  • In such a configuration, when supply control of the hydrate anti freezing agent is performed by the control unit, it is possible to limit supply of the hydrate anti freezing agent to the compressor that is in a state in which cleaning is necessary. Therefore, the hydrate anti freezing agent supplied from the internal hydrate anti freezing agent supply unit can be efficiently used for cleaning the compressor and it is possible to minimize a supply amount of the hydrate anti freezing agent.
  • In the compressor system, the control unit may include a first reference determination unit configured to determine whether a difference between characteristic values of the gas on an inlet side of the compressor and an outlet side of the compressor satisfies a predetermined first reference and a supply start instruction unit configured to send an instruction to the internal hydrate anti freezing agent supply unit to start supply of the hydrate anti freezing agent to the internal flow path when the first reference determination unit determines that the first reference is satisfied.
  • In such a configuration, when a difference between characteristic values of the gas on the inlet side and the outlet side of the compressor is calculated, the calculated difference is compared with a predetermined first reference and determination is performed in the first reference determination unit, it is possible to easily determine whether the internal flow path is in a state in which cleaning is necessary. When the supply start instruction unit starts supply of the hydrate anti freezing agent to the internal flow path based on the determination result, it is possible to perform cleaning of the internal flow path. Therefore, it is possible to determine whether the compressor is in a state in which cleaning is necessary with high accuracy and it is possible to further limit supply of the hydrate anti freezing agent. Therefore, for the internal flow path for which cleaning is necessary, the hydrate anti freezing agent supplied from the internal hydrate anti freezing agent supply unit can be used for cleaning the compressor more efficiently and a supply amount of the hydrate anti freezing agent can be further minimized.
  • The compressor system may include a heating unit configured to heat the hydrate anti freezing agent, and the internal hydrate anti freezing agent supply unit may supply the hydrate anti freezing agent heated by the heating unit to the internal flow path.
  • In such a configuration, when the heating unit is provided, a high temperature hydrate anti freezing agent can be supplied to the internal flow path. It is thus possible to improve solubility of sediments due to the hydrate anti freezing agent that is heated to a high temperature. Therefore, it is possible to increase a dissolution rate of sediments accumulated in the internal flow path and effectively clean the internal flow path.
  • The compressor system may include a heating unit configured to heat the hydrate anti freezing agent, and the control unit may include a second reference determination unit configured to determine whether a difference between characteristic values of the gas on the inlet side of the compressor and the outlet side of the compressor satisfies a predetermined second reference after supply of the hydrate anti freezing agent to the internal flow path starts; and a heat supply instruction unit configured to send an instruction to the internal hydrate anti freezing agent supply unit to supply the hydrate anti freezing agent heated by the heating unit to the internal flow path when the second reference determination unit determines that the second reference is satisfied.
  • In such a configuration, when a difference between characteristic values of the gas on the inlet side and the outlet side of the compressor is calculated, the calculated difference is compared with a second reference and determination is performed in the second reference determination unit, it is possible to easily determine again whether the internal flow path is in a state in which cleaning is necessary. Therefore, for example, it is possible to easily determine a state of the internal flow path that is different from the state determined using the first reference. Based on the determination result, when the heat supply instruction unit sends an instruction to supply the hydrate anti freezing agent heated by the heating unit to the internal flow path, it is possible to perform cleaning of the internal flow path more effectively using the hydrate anti freezing agent that is heated to a high temperature. Therefore, it is possible to perform greater cleaning on the compressor as necessary. Therefore, when the internal flow path is in a state in which greater cleaning is necessary, it is possible to efficiently supply the heated hydrate anti freezing agent and clean the compressor more efficiently.
  • According to a second aspect of the present invention, there is provided a subsea production system that includes the compressor system and a separator configured to separate a production fluid drawn from a production well into a gas and a liquid and supply the result to the compressor.
  • In such a configuration, it is also possible to reliably and efficiently clean the compressor that is installed at a position at which maintenance is difficult, for example, in the seabed. Therefore, it is possible to prevent clogging due to sediments and it is possible to reliably send the gas through the compressor.
  • According to a third aspect according to the present invention, there is provided a compressor cleaning method in which a compressor including a casing, a rotation shaft supported in the casing and an impeller that rotates together with the rotation shaft and compresses a gas is cleaned, the method including: a first reference determining process of determining whether a difference between characteristic values of the gas on an inlet side of the compressor and an outlet side of the compressor satisfies a predetermined first reference; and a supply start process in which, when it is determined that the first reference is satisfied in the first reference determining process, supply of a hydrate anti freezing agent that prevents hydration of the gas compressed by the compressor to an internal flow path formed of the impeller and the casing starts.
  • In such a configuration, when a difference between characteristic values of the gas on the inlet side and the outlet side of the compressor is calculated, the calculated difference is compared with a first reference and determination is performed in the first reference determining process, it is possible to easily determine whether the internal flow path is in a state in which cleaning is necessary. When supply of the hydrate anti freezing agent to the internal flow path starts in the supply start process based on the determination result, it is possible to perform cleaning of the internal flow path. Therefore, it is possible to determine whether the compressor is in a state in which cleaning is necessary with high accuracy and it is possible to further limit supply of the hydrate anti freezing agent. Therefore, for the internal flow path for which cleaning is necessary, the hydrate anti freezing agent supplied from the internal hydrate anti freezing agent supply unit can be used for cleaning the compressor more efficiently and a supply amount of the hydrate anti freezing agent can be further minimized.
  • The compressor cleaning method may include a second reference determining process in which, after supply of the hydrate anti freezing agent to the internal flow path starts, it is determined whether a difference between characteristic values of the gas on an inlet side of the compressor and an outlet side of the compressor satisfies a predetermined second reference; and a heat supply process in which, when it is determined that the second reference is satisfied in the second reference determining process, the heated hydrate anti freezing agent is supplied to the internal flow path.
  • In such a configuration, when a difference between characteristic values of the gas on the inlet side and the outlet side of the compressor is calculated, the calculated difference is compared with the second reference and determination is performed in the second reference determining process, it is possible to easily determine again whether the internal flow path is in a state in which cleaning is necessary. For example, it is possible to easily determine whether the internal flow path is in a state different from the state determined using the first reference (for example, whether greater cleaning is necessary for the internal flow path). Based on the determination result temperature, in the heat supply process, when the hydrate anti freezing agent heated to a high temperature is supplied from a hydrate anti freezing agent spraying unit to the internal flow path, it is possible to perform cleaning of the internal flow path more effectively. Therefore, it is possible to perform greater cleaning on the compressor as necessary. Therefore, when the internal flow path is in a state in which greater cleaning is necessary, it is possible to efficiently supply the heated hydrate anti freezing agent and clean the compressor more efficiently.
  • [Advantageous Effects of Invention]
  • According to the present invention, it is possible to efficiently clean the compressor by supplying the hydrate anti freezing agent to the internal flow path.
  • [Brief Description of Drawings]
    • Fig. 1 is a diagram schematically showing a subsea production system in an embodiment of the present invention.
    • Fig. 2 is a systematic diagram showing a subsea module in an embodiment of the present invention.
    • Fig. 3 is a cross-sectional view of a main part showing an internal flow path of a compressor in an embodiment of the present invention.
    • Fig. 4 is a flowchart describing a compressor cleaning method in an embodiment of the present invention.
    [Description of Embodiments]
  • Hereinafter, embodiments according to the present invention will be described with reference to Fig. 1 to Fig. 4. A subsea production system 1 according to an embodiment of the present invention is a subsea production system that is one for ocean oil and gas field development methods. As shown in Fig. 1, the subsea production system 1 includes a production well W for harvesting a production fluid PF mixed with crude oil O, natural gas G and the like extracted from an oil gas field F that is located several hundreds to thousands of meters from the seabed, a manifold M for collecting and distributing the production fluid PF harvested in the production well W, a flow line FL that is a pipe through which the production fluid PF distribute by the manifold M is conveyed, and a subsea module SM configured to separate the production fluid PF conveyed through the flow line FL into a liquid and a gas and send them to the sea surface. The subsea production system 1 includes a riser R that is a pipe through which the crude oil O and the natural gas G are conveyed to the sea surface from the subsea module SM, an umbilical line AL that is a cable through which power is supplied to the subsea module SM and the like, and a ship S to which the riser R and the umbilical line AL moored in the sea are connected and in which the crude oil O and the natural gas G are stored.
  • The manifold M is installed in the vicinity of the production well W of the oil gas field F in the seabed. The manifold M is a device configured to collect and distribute the extracted production fluid PF and convey it through a plurality of flow lines FL.
  • The flow line FL is a pipeline through which the production fluid PF is pressure-fed from the manifold M to the subsea module SM according to pressure energy of the oil gas field F.
  • The riser R extends from the subsea module SM of the seabed to the ship S on the sea surface. In the riser R of this embodiment, an oil pipeline OR through which the crude oil O sent from the subsea module SM is conveyed to a storage tank (not shown) disposed in the ship S on the sea surface and a gas pipeline GR through which the natural gas G sent from the subsea module SM is conveyed to the storage tank are separately provided. The riser R includes the gas pipeline GR through which the natural gas G is supplied such that the natural gas G is prevented from freezing due to hydration in the seabed and a pipeline for a hydrate anti freezing agent AR through which a hydrate anti freezing agent is supplied from the ship S.
  • The umbilical line AL is a composite cable including a power cable, a hydraulic cable and a signal cable for controlling the subsea module SM. The umbilical line AL sends power and signals from a generator (not shown) in the ship S to the subsea module SM and the manifold M.
  • The subsea module SM separates the production fluid PF supplied through the flow line FL into a gas and a liquid and pressure-feeds the gas and the liquid to the sea surface. As shown in Fig. 2, the subsea module SM of this embodiment includes a main heat exchanger 2 configured to cool the production fluid PF drawn from the production well W, a separator 3 configured to separate the production fluid PF cooled in the main heat exchanger 2 into a gas and a liquid, a pump system 4 configured to send the liquid separated out in the separator 3 to the riser R, and a compressor system 5 configured to send the gas separated out by the separator 3 to the riser R.
  • The main heat exchanger 2 cools the production fluid PF having a high temperature that is drawn from the production well W and sent to the flow line FL to a temperature at which the production fluid PF can be used in the separator 3. The main heat exchanger 2 of this embodiment cools the production fluid PF according to heat exchange with low temperature seawater of the seabed.
  • The separator 3 separates the production fluid PF into the natural gas G that is a gas and the crude oil O that is a liquid. The separator 3 of this embodiment is a scrubber. The separator 3 separates the natural gas G and the crude oil O containing condensates from the production fluid PF. The separator 3 sends the separated crude oil O to the pump system 4. The separator 3 sends the separated natural gas G to the compressor system 5.
  • The pump system 4 compresses the crude oil O sent from the separator 3 and sends it to the oil pipeline OR. As shown in Fig. 2, the pump system 4 includes a pump 41 configured to compress the crude oil O, a liquid circulation unit 42 configured to send the crude oil O from the separator 3 to the pump 41, and a compressed liquid circulation unit 43 in which the crude oil O compressed by the pump 41 circulates.
  • The pump 41 compresses and sends out the received crude oil O. The liquid circulation unit 42 supplies the crude oil O from the separator 3 to the pump 41. Specifically, the liquid circulation unit 42 of this embodiment is a pipe that is connected from the separator 3 to the pump 41. The crude oil O circulates inside the liquid circulation unit 42. The compressed liquid circulation unit 43 sends the crude oil O compressed by the pump 41 to the oil pipeline OR. Specifically, the compressed liquid circulation unit 43 of this embodiment is a pipe that is connected from the pump 41 to the oil pipeline OR. The compressed crude oil O circulates inside the compressed liquid circulation unit 43.
  • The compressor system 5 compresses the natural gas G sent from the separator 3 and sends it to the gas pipeline GR. As shown in Fig. 2, the compressor system 5 includes a compressor 50 configured to compress the natural gas G, a gas circulation unit 51 configured to send the natural gas G from the separator 3 to the compressor 50, a compressed gas circulation unit 52 in which the natural gas G that is compressed by the compressor 50 circulates, a hydrate anti freezing agent supply unit 53 configured to supply a hydrate anti freezing agent for preventing hydration of the natural gas G to the compressed gas circulation unit 52, an internal hydrate anti freezing agent supply unit 54 configured to supply part of the hydrate anti freezing agent supplied from the hydrate anti freezing agent supply unit 53 to the compressor 50, a heating unit 55 configured to heat the hydrate anti freezing agent, and a control unit 60 configured to perform supply control such that the internal hydrate anti freezing agent supply unit 54 starts supply of the hydrate anti freezing agent.
  • The compressor 50 is a multistage centrifugal compressor including a plurality of impellers 503. As shown in Fig. 3, the compressor 50 of this embodiment includes a casing 501 on which an internal flow path FC through which a gas flows from an upstream side to a downstream side is formed, a rotation shaft 502 that is supported in the casing 501 and rotates around an axis SL, and the impellers 503 that rotate together with the rotation shaft 502 and compress a gas.
  • The casing 501 is a stationary body and has a tubular shape. In the casing 501, the rotation shaft 502 is disposed to penetrate the center. A bearing device (not shown) is provided in the casing 501. The bearing device rotatably supports the rotation shaft 502.
  • The rotation shaft 502 is a rotating body, has a columnar shape and extends in an axis SL direction in which the shaft line SL extends. The impeller 503 is a rotating body. The plurality of impellers 503 are provided at intervals in the shaft line SL direction of the rotation shaft 502. The impellers 503 compress the natural gas G (gas) using a centrifugal force according to rotation. The impeller 503 includes a disk 503a, a blade 503b, and a cover 503c. The impeller 503 is a so-called closed type impeller 503.
  • The disk 503a is formed in a disk shape whose diameter gradually increases outward in a radial direction of the rotation shaft 502 toward a downstream side that is one side in the shaft line SL direction in the rotation shaft 502. The blade 503b is formed to protrude toward an upstream side in the shaft line SL direction which is a side opposite to a downstream side in the shaft line SL direction from the disk 503a. The plurality of blades 503b are formed in the disk 503a at predetermined intervals in a circumferential direction of the shaft line SL. The cover 503c covers the plurality of blades 503b from an upstream side in the shaft line SL direction. The cover 503c is formed in a disk shape that faces the disk 503a.
  • The internal flow path FC is formed by the impeller 503 and the casing 501 so as to connect the impellers 503 so that the natural gas G is gradually compressed. The internal flow path FC includes a compression flow path FC1 defined by the impeller 503 and a casing flow path FC2 that is formed inside the casing 501 and in which a flow of the natural gas G is adjusted.
  • The compression flow path FC1 is defined by a surface that faces an upstream side in the shaft line SL direction of the disk 503a, a surface that faces a downstream side in the shaft line SL direction of the cover 503c, and a surface that faces in a circumferential direction of the blade 503b. The casing flow path FC2 adjusts a flow of the natural gas G to flow the natural gas G through the compression flow path FC1 defined by the impeller 503.
  • The gas circulation unit 51 supplies the natural gas G from the separator 3 to the compressor 50. Specifically, the gas circulation unit 51 of this embodiment is a pipe that is connected from the separator 3 to the compressor 50 as shown in Fig. 2. The natural gas G circulates inside the gas circulation unit 51. The gas circulation unit 51 of this embodiment includes an inlet side characteristic value measuring unit 511 configured to measure a characteristic value of the natural gas G on an inlet side of the compressor 50.
  • The inlet side characteristic value measuring unit 511 measures a characteristic value of the natural gas G that flows into the compressor 50. The inlet side characteristic value measuring unit 511 is provided in the vicinity of an inlet port of the compressor 50 of the gas circulation unit 51. The inlet side characteristic value measuring unit 511 of this embodiment is a pressure sensor that measures a pressure value as a characteristic value. The inlet side characteristic value measuring unit 511 transmits the measured pressure value of the natural gas G to the control unit 60.
  • The compressed gas circulation unit 52 sends the natural gas G compressed by the compressor 50 to the riser R. Specifically, the compressed gas circulation unit 52 of this embodiment is a pipe that is connected from the compressor 50 to the gas pipeline GR. The compressed natural gas G circulates inside the compressed gas circulation unit 52. The compressed gas circulation unit 52 of this embodiment includes an outlet side characteristic value measuring unit 521 configured to measure a characteristic value of the natural gas G (gas) on an outlet side of the compressor 50.
  • The outlet side characteristic value measuring unit 521 measures a characteristic value of the natural gas G discharged from the compressor 50. The outlet side characteristic value measuring unit 521 is provided in the vicinity of an outlet port of the compressor 50 of the compressed gas circulation unit 52. Similarly to the inlet side characteristic value measuring unit 511, the outlet side characteristic value measuring unit 521 of this embodiment is a pressure sensor that measures a pressure value as a characteristic value. The outlet side characteristic value measuring unit 521 transmits the measured pressure value of the natural gas G to the control unit 60.
  • The hydrate anti freezing agent supply unit 53 circulates the hydrate anti freezing agent supplied from the ship S on the sea surface through the pipeline for a hydrate anti freezing agent AR to the compressed gas circulation unit 52. The hydrate anti freezing agent supply unit 53 of this embodiment is a pipe that is connected from the pipeline for a hydrate anti freezing agent AR to the compressed gas circulation unit 52. The hydrate anti freezing agent circulates inside the hydrate anti freezing agent supply unit 53. The hydrate anti freezing agent supply unit 53 is connected downstream from a position at which the outlet side characteristic value measuring unit 521 of the compressed gas circulation unit 52 is provided. Also, as the hydrate anti freezing agent of this embodiment, a fluid having lipophilicity and hydrophilicity is preferably used. As the hydrate anti freezing agent, for example, monoethylene glycol used for preventing hydration by preventing hydration of the natural gas G is particularly preferably used.
  • The internal hydrate anti freezing agent supply unit 54 supplies part of the hydrate anti freezing agent that flows in the hydrate anti freezing agent supply unit 53 to the internal flow path FC of the compressor 50. Specifically, the internal hydrate anti freezing agent supply unit 54 of this embodiment includes a first supply pipe 541, a first supply valve 542 configured to adjust a flow of a hydrate anti freezing agent that flows in the first supply pipe 541, a second supply pipe 543 that branches from the first supply pipe 541, and a second supply valve 544 configured to adjust a flow of a hydrate anti freezing agent that flows in the second supply pipe 543.
  • The first supply pipe 541 branches from the hydrate anti freezing agent supply unit 53 and is connected to the casing 501 of the compressor 50. Specifically, the first supply pipe 541 of this embodiment is connected to pass through the inside of the casing 501 of the compressor 50. The first supply pipe 541 branches at the inside of the casing 501. At a distal portion of the first supply pipe 541, a hydrate anti freezing agent spraying unit 541 a configured to spray a hydrate anti freezing agent toward the casing flow path FC2 is provided.
  • The first supply valve 542 adjusts supply of a hydrate anti freezing agent into the first supply pipe 541. Specifically, when the first supply valve 542 of this embodiment is closed, supply of a hydrate anti freezing agent into the first supply pipe 541 stops and when the first supply valve 542 of this embodiment is opened, supply of a hydrate anti freezing agent into the first supply pipe 541 starts. The first supply valve 542 is a solenoid valve in which opening and closing operations are controlled by the control unit 60.
  • The second supply pipe 543 branches from the first supply pipe 541 and supplies a hydrate anti freezing agent to the compressor 50. The second supply pipe 543 of this embodiment branches from the first supply pipe 541 on an upstream side relative to a position at which the first supply valve 542 is provided and is connected to the first supply pipe 541 again at a downstream side relative to a position at which the first supply valve 542 is provided.
  • The second supply valve 544 adjusts supply of a hydrate anti freezing agent into the second supply pipe 543. Specifically, when the second supply valve 544 of this embodiment is closed, supply of a hydrate anti freezing agent into the second supply pipe 543 stops and when the second supply valve 544 of this embodiment is opened, supply of a hydrate anti freezing agent into the second supply pipe 543 starts. The second supply valve 544 is a solenoid valve whose opening and closing operations are controlled by the control unit 60.
  • The heating unit 55 is provided in the internal hydrate anti freezing agent supply unit 54 and heats a hydrate anti freezing agent. The heating unit 55 of this embodiment is provided at a position that is on a downstream side relative to the second supply valve 544 of the second supply pipe 543 and at which the second supply pipe 543 and the liquid circulation unit 42 cross. The heating unit 55 heats a hydrate anti freezing agent by using heat of the crude oil O that flows in the pump system 4. Specifically, the heating unit 55 heats monoethylene glycol which is a hydrate anti freezing agent that flows in the second supply pipe 543 at an ambient temperature of, for example, about 20 °C to 50 °C, to a high temperature of 110 °C or more.
  • When predetermined conditions are satisfied, the control unit 60 performs supply control such that the internal hydrate anti freezing agent supply unit 54 starts supply of a hydrate anti freezing agent into the internal flow path FC of the compressor 50. When predetermined conditions are satisfied, the control unit 60 of this embodiment controls opening and closing operations of the first supply valve 542 and the second supply valve 544, and thus supply of a hydrate anti freezing agent into the internal flow path FC is controlled.
  • Specifically, the control unit 60 of this embodiment includes a first input unit 61 configured to receive a characteristic value measured by the inlet side characteristic value measuring unit 511, a second input unit 62 configured to receive a characteristic value measured by the outlet side characteristic value measuring unit 521, and a difference calculation unit 63 configured to calculate a difference between the characteristic value received by the first input unit 61 and the characteristic value received by the second input unit 62. The control unit 60 of this embodiment includes a first reference determination unit 64 configured to determine whether the difference calculated by the difference calculation unit 63 satisfies a predetermined first reference and a supply start instruction unit 65 configured to send an instruction to start supply of a hydrate anti freezing agent to the internal flow path FC based on the determination result of the first reference determination unit 64. The control unit 60 of this embodiment includes a second reference determination unit 66 configured to determine whether the difference calculated by the difference calculation unit 63 satisfies a predetermined second reference, a heat supply instruction unit 67 configured to send an instruction to supply the hydrate anti freezing agent heated by the heating unit 55 to the internal flow path FC based on the determination result of the second reference determination unit 66, and a cleaning termination instruction unit 70 configured to send an instruction to terminate supply of the hydrate anti freezing agent to the internal flow path FC based on the determination result of the second reference determination unit 66. The control unit 60 of this embodiment includes a first supply valve instruction unit 68 configured to open or close the first supply valve 542 based on an input signal and a second supply valve instruction unit 69 configured to open or close the second supply valve 544 based on an input signal.
  • The first input unit 61 receives a pressure value of the natural gas G measured by the inlet side characteristic value measuring unit 511. The first input unit 61 outputs information about the input pressure value to the difference calculation unit 63. The second input unit 62 receives a pressure value of the natural gas G measured by the outlet side characteristic value measuring unit 521. The second input unit 62 outputs information about the input pressure value to the difference calculation unit 63.
  • The difference calculation unit 63 calculates a difference by subtracting a pressure value on an inlet side of a compressor input by the first input unit 61 from a pressure value on an outlet side of a compressor input by the second input unit 62. The difference calculation unit 63 outputs the calculated difference to the first reference determination unit 64. After the calculated difference is output to the first reference determination unit 64, when information is input again from the first input unit 61 and the second input unit 62, the difference calculation unit 63 outputs the calculated difference to the second reference determination unit 66.
  • The first reference determination unit 64 compares information about the difference input from the difference calculation unit 63 with a first reference. Here, the first reference is a value indicating a state in which cleaning is necessary since sediments have precipitated and the internal flow path FC of the compressor 50 is narrowed. The first reference of this embodiment is set to a value smaller than a value of a rise a pressure of the natural gas G that is compressed while circulating in the compression flow path FC1 in a normal state in which cleaning is not necessary. That is, the first reference of this embodiment is a value of a difference between pressures on an inlet side and an outlet side of the compressor 50 while the internal flow path FC is narrowed due to sediments and the natural gas G is hardly compressed.
  • The first reference determination unit 64 of this embodiment determines whether the input difference value is less than the first reference. When it is determined that the calculated difference is less than the first reference and satisfies the first reference, the first reference determination unit 64 sends a signal to the supply start instruction unit 65.
  • When the first reference determination unit 64 determines that the first reference is satisfied, the supply start instruction unit 65 sends an instruction to the internal hydrate anti freezing agent supply unit 54 to start supply of a hydrate anti freezing agent to the internal flow path FC. When the signal is input from the first reference determination unit 64, the supply start instruction unit 65 of this embodiment sends a signal to the first supply valve instruction unit 68 and sends an instruction to the first supply valve 542.
  • The second reference determination unit 66 compares information about the difference input from the difference calculation unit 63 with the second reference. Here, the second reference is a value indicating a state in which sediments of the internal flow path FC of the compressor 50 are not sufficiently removed and greater cleaning is necessary. The second reference of this embodiment is set to a value smaller than a value of a rise of a pressure of the natural gas G that is compressed while circulating in the compression flow path FC1 in a normal state and is greater than the first reference. That is, the second reference of this embodiment is a value of a difference between pressures on the inlet side and the outlet side of the compressor 50 in a state in which cleaning has been performed once, but the result is that this is not enough to satisfy the first reference, sediments remain in the internal flow path FC, and the natural gas G is not sufficiently compressed.
  • The second reference determination unit 66 of this embodiment determines whether the input difference value is less than the second reference. When it is determined that the calculated difference is less than the second reference and satisfies the second reference, the second reference determination unit 66 sends a signal to the heat supply instruction unit 67. When it is determined that the calculated difference is greater than the second reference and does not satisfy the second reference, the second reference determination unit 66 sends a signal to the cleaning termination instruction unit 70.
  • When the second reference determination unit 66 determines that the second reference is satisfied, the heat supply instruction unit 67 sends an instruction to the internal hydrate anti freezing agent supply unit 54 to supply the hydrate anti freezing agent heated by the heating unit 55 to the internal flow path FC. The heat supply instruction unit 67 of this embodiment receives the signal from the second reference determination unit 66. As a result, the heat supply instruction unit 67 sends a signal to the first supply valve instruction unit 68 and the second supply valve instruction unit 69 after the signal is sent from the supply start instruction unit 65, and sends an instruction to the first supply valve 542 and the second supply valve 544.
  • When the second reference determination unit 66 determines that the second reference is not satisfied, the cleaning termination instruction unit 70 sends an instruction to the internal hydrate anti freezing agent supply unit 54 to terminate supply of a hydrate anti freezing agent to the internal flow path FC. The cleaning termination instruction unit 70 of this embodiment receives a signal from the second reference determination unit 66. As a result, the cleaning termination instruction unit 70 sends a signal to the first supply valve instruction unit 68 and the second supply valve instruction unit 69 and sends an instruction to the first supply valve 542 and the second supply valve 544.
  • When the signal is input from the supply start instruction unit 65, the first supply valve instruction unit 68 sends an instruction to open the first supply valve 542. When a signal is input from the heat supply instruction unit 67, the first supply valve instruction unit 68 sends an instruction to close the first supply valve 542. When a signal is input from the cleaning termination instruction unit 70, the first supply valve instruction unit 68 sends an instruction to close the first supply valve 542.
  • When a signal is input from the heat supply instruction unit 67, the second supply valve instruction unit 69 sends an instruction to open the second supply valve 544. When a signal is input from the cleaning termination instruction unit 70, the second supply valve instruction unit 69 sends an instruction to close the second supply valve 544.
  • Next, operations of the subsea production system 1 of the above-described embodiment will be described. The subsea production system 1 of this embodiment collects the production fluid PF that is harvested from the oil gas field F through the production well W in the manifold M, conveys the collected production fluid PF into the flow line FL according to pressure energy generated when the production fluid PF is extracted from the oil gas field F, and supplies the production fluid PF to the subsea module SM.
  • In the subsea module SM, power is supplied to devices from a generator (not shown) in the ship S by the umbilical line AL. The production fluid PF supplied to the subsea module SM is cooled by the main heat exchanger 2 and flows into the separator 3. The production fluid PF flowed into the separator 3 is separated into the crude oil O that is a liquid and the natural gas G that is a gas. Note that the crude oil O separated out in the separator 3 includes condensates and the like.
  • The crude oil O separated out in the separator 3 circulates inside the liquid circulation unit 42 and is sent to the pump 41. The pump 41 compresses the crude oil O, sends it to the oil pipeline OR through the compressed liquid circulation unit 43 and supplies it to a crude oil O storage tank (not shown) in the ship S.
  • The natural gas G separated out by the separator 3 circulates inside the liquid circulation unit 42 and is sent to the compressor 50. In the compressor 50, when the natural gas G circulates in the internal flow path FC, the impeller 503 rotates together with the rotation shaft 502 so that the natural gas G is compressed in the compression flow path FC1 and sent to the compressed gas circulation unit 52. A hydrate anti freezing agent is supplied from the hydrate anti freezing agent supply unit 53 to the compressed gas circulation unit 52. The hydrate anti freezing agent is sent to the gas pipeline GR together with the compressed natural gas G. In the compressed gas circulation unit 52, while preventing hydration using the supplied the hydrate anti freezing agent, the natural gas G is supplied to a natural gas G storage tank (not shown) in the ship S.
  • Next, a cleaning method of the compressor 50 of the above-described embodiment will be described. In the compressor 50 configured to compress the natural gas G and supply it to the ship S as described above, when an operation continues, sediments are precipitated and accumulate in the internal flow path FC in which the natural gas G circulates. By the cleaning method of the compressor 50, cleaning is performed on the compressor 50 in which such sediments accumulate. The cleaning method of the compressor 50 of this embodiment will be described with reference to Fig. 2 to Fig. 4.
  • In the cleaning method of the compressor 50 of this embodiment, as shown in Fig. 4, for a characteristic value of the natural gas G which is a gas separated out by the separator 3 on the inlet side and the outlet side of the compressor 50, a pressure value is measured and acquired, and a state of the compressor 50 is measured (a characteristic value acquiring process S100). Specifically, in the characteristic value acquiring process S100, the inlet side characteristic value measuring unit 511 measures a pressure value of the natural gas G that circulates in the gas circulation unit 51 and acquires a pressure value of the natural gas G on the inlet side of the compressor 50. The outlet side characteristic value measuring unit 521 measures a pressure value of the natural gas G that circulates in the compressed gas circulation unit 52 and acquires a pressure value of the natural gas G on the outlet side of the compressor 50.
  • Next, in the cleaning method of the compressor 50 of this embodiment, a difference between the acquired pressure value on the inlet side of the compressor 50 and the acquired pressure value on the outlet side thereof is calculated (a difference calculating process S200). Specifically, in the difference calculating process S200, information about the pressure value measured by the inlet side characteristic value measuring unit 511 is input to the first input unit 61 of the control unit 60. In the difference calculating process S200, information about the pressure value measured by the outlet side characteristic value measuring unit 521 is input to the second input unit 62 of the control unit 60. In the control unit 60, information input to the first input unit 61 and the second input unit 62 is input to the difference calculation unit 63. In the difference calculation unit 63, a difference between the pressure value on the outlet side of the compressor 50 and the pressure value on the inlet side thereof is calculated by subtracting information input from the first input unit 61 from information input from the second input unit 62.
  • Next, in the cleaning method of the compressor 50 of this embodiment, it is determined whether a hydrate anti freezing agent has been supplied to the internal flow path FC of the compressor 50 (a hydrate anti freezing agent supply determining process S300). Specifically, in the hydrate anti freezing agent supply determining process S300, the difference calculation unit 63 determines whether a hydrate anti freezing agent has already been supplied to the internal flow path FC. In the difference calculation unit 63, when it is determined that information has been input once from the first input unit 61 and the second input unit 62, it is determined that a hydrate anti freezing agent has already been supplied to the internal flow path FC and information about the difference is output to the second reference determination unit 66. On the other hand, in the difference calculation unit 63, when it is determined that information has not been input from the first input unit 61 and the second input unit 62, it is determined that a hydrate anti freezing agent has not been supplied to the internal flow path FC, and information about the difference is output to the first reference determination unit 64.
  • When it is determined that a hydrate anti freezing agent has not been supplied to the internal flow path FC, it is determined whether the calculated difference satisfies a predetermined first reference (a first reference determining process S400). Specifically, in the first reference determining process S400, in the control unit 60, the calculated difference is input from the difference calculation unit 63 to the first reference determination unit 64. The first reference determination unit 64 determines whether the input difference value is less than the first reference. When it is determined that the calculated difference is less than the first reference, the first reference determination unit 64 sends a signal to the supply start instruction unit 65. On the other hand, when it is determined that the calculated difference is greater than the first reference, the first reference determination unit 64 terminates cleaning of the compressor 50 without sending a signal.
  • When the first reference determination unit 64 determines that the difference is less than the first reference and satisfies the first reference, supply of a hydrate anti freezing agent to be supplied to a gas compressed by the compressor 50 to the internal flow path FC starts (a supply start process S500). Specifically, in the supply start process S500, in the control unit 60, a signal is sent from the first reference determination unit 64 to the supply start instruction unit 65, and a signal is sent from the supply start instruction unit 65 to the first supply valve instruction unit 68. When a signal is sent from the supply start instruction unit 65, the first supply valve instruction unit 68 sends an instruction to open to the first supply valve 542. When the first supply valve 542 that has received the instruction is opened, part of the hydrate anti freezing agent that circulates in the hydrate anti freezing agent supply unit 53 flows into the first supply pipe 541. The hydrate anti freezing agent flowed into the first supply pipe 541 is sprayed from the hydrate anti freezing agent spraying unit 541a provided inside the casing 501 toward the casing flow path FC2 and is supplied to the internal flow path FC. The hydrate anti freezing agent supplied into the internal flow path FC circulates in the internal flow path FC together with the natural gas G, flows into the compressed gas circulation unit 52, and is discharged from the inside of the internal flow path FC.
  • Then, pressure values of the natural gas G are measured and acquired again on the inlet side and the outlet side of the compressor 50, and a state of the compressor 50 is measured (the characteristic value acquiring process S100). Then, a difference between the acquired pressure value on the inlet side of the compressor 50 and the acquired pressure value on the outlet side thereof is calculated (the difference calculating process S200). Next, it is determined whether a hydrate anti freezing agent has been supplied to the internal flow path FC of the compressor 50 (the hydrate anti freezing agent supply determining process S300). In this case, information has been already input once from the first input unit 61 and the second input unit 62. Therefore, in the hydrate anti freezing agent supply determining process S300, the difference calculation unit 63 determines that a hydrate anti freezing agent is supplied to the internal flow path FC and outputs information about the difference to the second reference determination unit 66.
  • When it is determined that a hydrate anti freezing agent is supplied to the internal flow path FC, it is determined that the calculated difference satisfies a predetermined second reference (a second reference determining process S600). Specifically, in the second reference determining process S600, in the control unit 60, the calculated difference is input from the difference calculation unit 63 to the second reference determination unit 66. The second reference determination unit 66 determines whether the input difference value is less than the second reference. When it is determined that the calculated difference is less than the second reference, the second reference determination unit 66 sends a signal to the heat supply instruction unit 67. On the other hand, when it is determined that the calculated difference is greater than the second reference, the second reference determination unit 66 sends a signal to the cleaning termination instruction unit 70, closes the first supply valve 542 and the second supply valve 544 and terminates cleaning of the compressor 50.
  • When the second reference determination unit 66 determines that the difference is less than the second reference and satisfies the second reference, the heated hydrate anti freezing agent is supplied to the internal flow path FC (a heat supply process S700). Specifically, in the heat supply process S700, in the control unit 60, a signal is sent from the second reference determination unit 66 to the heat supply instruction unit 67 and a signal is sent from the heat supply instruction unit 67 to the first supply valve instruction unit 68 and the second supply valve instruction unit 69. When the signal is sent from the heat supply instruction unit 67, the first supply valve instruction unit 68 sends an instruction to close to the first supply valve 542. When the signal is sent from the heat supply instruction unit 67, the second supply valve instruction unit 69 sends an instruction to open to the second supply valve 544. When the first supply valve 542 that has received the instruction is closed, the hydrate anti freezing agent flowing into the first supply pipe 541 is stopped. When the second supply valve 544 that has received the instruction is opened, flowing of the hydrate anti freezing agent into the second supply pipe 543 starts. The hydrate anti freezing agent flowed into the second supply pipe 543 passes through the heating unit 55 and is thus heated through heat exchange with the crude oil O that flows in the liquid circulation unit 42. The hydrate anti freezing agent heated to a high temperature flows into the first supply pipe 541 from a downstream side relative to the first supply valve 542. The high temperature hydrate anti freezing agent flowed into the first supply pipe 541 is sprayed from the hydrate anti freezing agent spraying unit 541a inside the casing 501 toward the casing flow path FC2 and is supplied to the internal flow path FC. The high temperature hydrate anti freezing agent supplied into the internal flow path FC circulates in the internal flow path FC together with the natural gas G, flows into the compressed gas circulation unit 52, and is discharged from the inside of the internal flow path FC.
  • According to the compressor system 5 described above, part of the hydrate anti freezing agent that is supplied from the hydrate anti freezing agent supply unit 53 to the compressed gas circulation unit 52 for preventing hydration of the natural gas G compressed by the compressor 50 is sprayed to the casing flow path FC2 through the first supply pipe 541 when the first supply valve 542 is opened. The hydrate anti freezing agent not only prevents freezing of the natural gas G and prevents hydration but also has lipophilicity and hydrophilicity. Therefore, it is possible to remove oil contamination and aqueous contamination by the hydrate anti freezing agent. Therefore, when the hydrate anti freezing agent sprayed to the casing flow path FC2 flows in the internal flow path FC together with the natural gas G, it is possible to effectively remove sediments that are precipitated on a wall surface of the internal flow path FC. When the hydrate anti freezing agent is directly supplied to the casing flow path FC2, the hydrate anti freezing agent is prevented from being diluted by the natural gas G before reaching the internal flow path FC, and it is possible to clean the inside of the compressor 50 by effectively using the hydrate anti freezing agent. When part of the hydrate anti freezing agent supplied from the hydrate anti freezing agent supply unit 53 to the compressed gas circulation unit 52 is used, it is possible to reliably supply a necessary amount of the hydrate anti freezing agent to the internal flow path FC. Accordingly, the compressor 50 can be reliably and effectively cleaned.
  • When the control unit 60 satisfies predetermined conditions as in the first reference determination unit 64 and the second reference determination unit 66, the hydrate anti freezing agent flows into the first supply pipe 541 and the second supply pipe 543 from the hydrate anti freezing agent supply unit 53. As a result, the hydrate anti freezing agent is ejected into the casing flow path FC2 by the hydrate anti freezing agent spraying unit 541 a. That is, when supply of the hydrate anti freezing agent to the internal flow path FC is controlled by the first reference determination unit 64 and the second reference determination unit 66, the hydrate anti freezing agent can be limit supply to the compressor 50 that is in a state in which cleaning is necessary. Therefore, it is possible to efficiently use the hydrate anti freezing agent supplied from the first supply pipe 541 and the second supply pipe 543 for cleaning the compressor 50 and minimize a supply amount of the hydrate anti freezing agent.
  • In the control unit 60, a pressure value of the natural gas G on the inlet side of the compressor 50 measured by the inlet side characteristic value measuring unit 511 of the gas circulation unit 51 is input to the first input unit 61. In addition, in the control unit 60, a pressure value of the natural gas G on the outlet side of the compressor 50 measured by the outlet side characteristic value measuring unit 521 of the compressed gas circulation unit 52 is input to the second input unit 62. Accordingly, it is possible to acquire pressure values of the natural gas G on the inlet side and the outlet side of the compressor 50. When the difference calculation unit 63 calculates a difference between the acquired pressure values of the natural gas G on the inlet side and the outlet side of the compressor 50 and the first reference determination unit 64 compares the calculated difference with the first reference and performs determination, it is possible to easily determine whether the internal flow path FC is in a state in which cleaning is necessary. Based on the determination result, when a signal is sent from the first reference determination unit 64 to the supply start instruction unit 65 and the first supply valve 542 is opened through the first supply valve instruction unit 68, it is possible to start supply of the hydrate anti freezing agent to the first supply pipe 541. As a result, it is possible to start spraying of the hydrate anti freezing agent from the hydrate anti freezing agent spraying unit 541 a to the internal flow path FC and it is possible to perform cleaning of the internal flow path FC. Therefore, it is possible to determine whether the compressor 50 is in a state in which cleaning is necessary with high accuracy and it is possible to further limit supply of the hydrate anti freezing agent. Therefore, for the internal flow path FC for which cleaning is necessary, the hydrate anti freezing agent supplied from the first supply pipe 541 and the second supply pipe 543 can be more efficiently used for cleaning the compressor 50 and it is possible to further minimize a supply amount of the hydrate anti freezing agent.
  • The heating unit 55 configured to heat a hydrate anti freezing agent is provided in the second supply pipe 543. Therefore, it is possible to supply a high temperature hydrate anti freezing agent to the internal flow path FC. It is possible to improve solubility of sediments due to the hydrate anti freezing agent that is heated to a high temperature. Therefore, it is possible to increase a dissolution rate of sediments accumulated in the internal flow path FC and effectively clean the internal flow path FC.
  • When the difference calculation unit 63 calculates a difference between the acquired pressure values of the natural gas G on the inlet side and the outlet side of the compressor 50, and the second reference determination unit 66 compares the calculated difference with the second reference that is set to a value greater than the first reference and performs determination, it is possible to easily determine again whether the internal flow path FC is in a state in which cleaning is necessary. Therefore, for example, it is possible to easily determine whether the internal flow path FC is in a state that is different from the state determined using the first reference (for example, whether greater cleaning is necessary for the internal flow path FC). Based on the determination result, a signal is sent from the second reference determination unit 66 to the heat supply instruction unit 67, the first supply valve 542 is closed through the first supply valve instruction unit 68, and the second supply valve 544 is opened through the second supply valve instruction unit 69. Therefore, it is possible to start supply of the hydrate anti freezing agent to the second supply pipe 543 in which the heating unit 55 is provided. As a result, it is possible to spray the hydrate anti freezing agent heated to a high temperature from the hydrate anti freezing agent spraying unit 541 a to the internal flow path FC, and it is possible to perform cleaning of the internal flow path FC more effectively. Therefore, it is possible to determine whether the compressor 50 is in a state that is different from the state in which the first reference is used for determination and cleaning is performed with high accuracy and it is possible to perform greater cleaning on the compressor 50 as necessary. Therefore, when the internal flow path FC is in a state in which greater cleaning is necessary, it is possible to efficiently supply the heated hydrate anti freezing agent and clean the compressor 50 more efficiently.
  • When monoethylene glycol whose hydrocarbon part has lipophilicity and whose hydroxyl groups and ether group have hydrophilicity is used as the hydrate anti freezing agent, it is possible to effectively clean both oil contamination and aquatic contamination in the internal flow path FC.
  • When part of the hydrate anti freezing agent supplied from the hydrate anti freezing agent supply unit 53 to the compressed gas circulation unit 52 flows in the internal flow path FC of the compressor 50 for cleaning, there is no need to stop an operation of the compressor 50 in order to clean the compressor 50. Therefore, it is possible to efficiently clean the compressor 50 without causing a cleaning downtime.
  • According to the subsea production system 1 described above, it is also possible to reliably and efficiently clean the compressor 50 that is installed at a position at which maintenance is difficult, for example, in the seabed. Therefore, it is possible to prevent clogging due to sediments and it is possible to reliably send the natural gas G to the ship S through the compressor 50.
  • According to the cleaning method of the compressor 50 described above, a difference between the pressure values of the natural gas G on the inlet side and the outlet side of the compressor 50 acquired in the characteristic value acquiring process S 100 is calculated in the difference calculating process S200 and it is determined whether a hydrate anti freezing agent has been supplied to the internal flow path FC in the hydrate anti freezing agent supply determining process S300. Then, in the first reference determining process S400, the calculated difference is compared with the first reference and determination is performed. Therefore, it is possible to easily determine whether the internal flow path FC is in a state in which cleaning is necessary. Based on the determination result, the first supply valve 542 is opened in the supply start process S500. Therefore, it is possible to start supply of the hydrate anti freezing agent to the first supply pipe 541. As a result, it is possible to start spraying of the hydrate anti freezing agent from the hydrate anti freezing agent spraying unit 541 a to the internal flow path FC and it is possible to perform cleaning of the internal flow path FC. Therefore, it is possible to determine whether the compressor 50 is in a state in which cleaning is necessary with high accuracy and it is possible to further limit supply of the hydrate anti freezing agent. Therefore, for the internal flow path FC for which cleaning is necessary, the hydrate anti freezing agent supplied from the first supply pipe 541 and the second supply pipe 543 can be more efficiently used for cleaning the compressor 50 and it is possible to further minimize a supply amount of the hydrate anti freezing agent.
  • After it is determined whether a hydrate anti freezing agent has been supplied to the internal flow path FC in the hydrate anti freezing agent supply determining process S300, when the second reference determining process S600 is performed in the first reference determining process S400 based on the determination result, it is possible to determine a cleaning state of the compressor 50. Therefore, it is possible to more efficiently clean the compressor 50 according to the cleaning state of the compressor 50.
  • A difference between the pressure values of the natural gas G on the inlet side and the outlet side of the compressor 50 acquired in the characteristic value acquiring process S 100 is calculated in the difference calculating process S200 and the calculated difference is compared with the second reference that is set to a value greater than the first reference and determination is performed in the second reference determining process S600. Accordingly, it is possible to easily determine again whether the internal flow path FC is in a state in which cleaning is necessary. Therefore, for example, it is possible to easily determine whether the internal flow path FC is in a state that is different from the state determined using the first reference (for example, whether greater cleaning is necessary for the internal flow path FC). Based on the determination result, in the heat supply process S700, the first supply valve 542 is closed and the second supply valve 544 is opened. Therefore, it is possible to start supply of the hydrate anti freezing agent to the second supply pipe 543 in which the heating unit 55 is provided. As a result, it is possible to spray the hydrate anti freezing agent heated to a high temperature from the hydrate anti freezing agent spraying unit 541a to the internal flow path FC, and it is possible to perform cleaning of the internal flow path FC more effectively. Therefore, it is possible to determine whether the compressor 50 is in a state that is different from the state in which the first reference is used for determination and cleaning is performed with high accuracy and it is possible to perform greater cleaning on the compressor 50 as necessary. Therefore, when the internal flow path FC is in a state in which greater cleaning is necessary, it is possible to efficiently supply the heated hydrate anti freezing agent and clean the compressor 50 more efficiently.
  • The embodiments of the present invention have been described in detail above with reference to the drawings, but configurations and combinations thereof in the embodiments are only examples, and additions, omissions, substitutions and other modifications of the configurations can be made without departing from the scope of the present invention. In addition, the present invention is not limited to the embodiments and is only limited by the scope of the appended claims.
  • A characteristic value of a gas is not limited to a pressure value of the gas as in this embodiment, and may be a value at which there is a difference in a state before and after the gas is compressed by the compressor. For example, the characteristic value of the gas may be a value obtained by measuring a temperature of the gas, a value obtained by measuring a flow rate of the gas, and a value obtained by calculating an efficiency of the compressor 50.
  • The internal hydrate anti freezing agent supply unit 54 of this embodiment has a configuration in which there is branching into the first supply pipe 541 and the second supply pipe 543, is not limited to such a structure and may have any structure as long as the hydrate anti freezing agent can be supplied to the internal flow path FC of the compressor 50. For example, the internal hydrate anti freezing agent supply unit 54 may have a structure that includes only either the first supply pipe 541 or the second supply pipe 543.
  • When it is determined whether the first reference or the second reference is satisfied, determination of whether to supply the hydrate anti freezing agent may not be based on a single determination result as in this embodiment, but based on a plurality of determinations of whether the first reference or the second reference is satisfied. In such a configuration, it is possible to determine a contamination condition of the internal flow path FC with higher accuracy.
  • [Industrial Applicability]
  • According to the above-described compressor system, it is possible to efficiently clean the compressor by supplying the hydrate anti freezing agent to the internal flow path.
  • [Reference Signs List]
  • 1
    Subsea production system
    S
    Ship
    F
    Oil gas field
    W
    Production well
    PF
    Production fluid
    M
    Manifold
    FL
    Flow line
    R
    Riser
    GR
    Gas pipeline
    OR
    Oil pipeline
    AR
    Pipeline for a hydrate anti freezing agent
    AL
    Umbilical line
    SM
    Subsea module
    2
    Main heat exchanger
    3
    Separator
    4
    Pump system
    41
    Pump
    42
    Liquid circulation unit
    43
    Compressed liquid circulation unit
    5
    Compressor system
    50
    Compressor
    SL
    Shaft line
    501
    Casing
    502
    Rotation shaft
    503
    Impeller
    503a
    Disk
    503b
    Blade
    503c
    Cover
    FC
    Internal flow path
    FC1
    Compression flow path
    FC2
    Casing flow path
    51
    Gas circulation unit
    511
    Inlet side characteristic value measuring unit
    52
    Compressed gas circulation unit
    521
    Outlet side characteristic value measuring unit
    53
    Hydrate anti freezing agent supply unit
    54
    Internal hydrate anti freezing agent supply unit
    541
    First supply pipe
    541a
    Hydrate anti freezing agent spraying unit
    42
    First supply valve
    543
    Second supply pipe
    544
    Second supply valve
    55
    Heating unit
    60
    Control unit
    61
    First input unit
    62
    Second input unit
    63
    Difference calculation unit
    64
    First reference determination unit
    65
    Supply start instruction unit
    66
    Second reference determination unit
    67
    Heat supply instruction unit
    68
    First supply valve instruction unit
    69
    Second supply valve instruction unit
    70
    Cleaning termination instruction unit
    S100
    Characteristic value acquiring process
    S200
    Difference calculating process
    S300
    Hydrate anti freezing agent supply determining process
    S400
    First reference determining process
    S500
    Supply start process
    S600
    Second reference determining process
    S700
    Heat supply process

Claims (8)

  1. A compressor system comprising:
    a compressor including a casing, a rotation shaft supported in the casing, and an impeller that rotates together with the rotation shaft and compresses a gas;
    a compressed gas circulation unit in which the gas compressed by the compressor circulates;
    a hydrate anti freezing agent supply unit configured to supply a hydrate anti freezing agent that prevents hydration of the gas to the compressed gas circulation unit; and
    an internal hydrate anti freezing agent supply unit configured to supply part of the hydrate anti freezing agent supplied from the hydrate anti freezing agent supply unit to an internal flow path formed of the impeller and the casing.
  2. The compressor system according to claim 1, comprising
    a control unit configured to perform supply control such that, when predetermined conditions are satisfied, the internal hydrate anti freezing agent supply unit starts supply of the hydrate anti freezing agent to the internal flow path.
  3. The compressor system according to claim 2,
    wherein the control unit includes
    a first reference determination unit configured to determine whether a difference between characteristic values of the gas on an inlet side of the compressor and an outlet side of the compressor satisfies a predetermined first reference; and
    a supply start instruction unit configured to send an instruction to the internal hydrate anti freezing agent supply unit to start supply of the hydrate anti freezing agent to the internal flow path when the first reference determination unit determines that the first reference is satisfied.
  4. The compressor system according to any one of claims 1 to 3, comprising
    a heating unit configured to heat the hydrate anti freezing agent,
    wherein the internal hydrate anti freezing agent supply unit supplies the hydrate anti freezing agent heated by the heating unit to the internal flow path.
  5. The compressor system according to claim 3, comprising
    a heating unit configured to heat the hydrate anti freezing agent,
    wherein the control unit includes
    a second reference determination unit configured to determine whether a difference between characteristic values of the gas on the inlet side of the compressor and the outlet side of the compressor satisfies a predetermined second reference after supply of the hydrate anti freezing agent to the internal flow path starts; and
    a heat supply instruction unit configured to send an instruction to the internal hydrate anti freezing agent supply unit to supply the hydrate anti freezing agent heated by the heating unit to the internal flow path when the second reference determination unit determines that the second reference is satisfied.
  6. A subsea production system comprising:
    the compressor system according to any one of claims 1 to 5; and
    a separator configured to separate a production fluid drawn from a production well into the gas and a liquid and supply the result to the compressor.
  7. A compressor cleaning method in which a compressor including a casing, a rotation shaft supported in the casing and an impeller that rotates together with the rotation shaft and compresses a gas is cleaned, the method comprising:
    a first reference determining process of determining whether a difference between characteristic values of the gas on an inlet side of the compressor and an outlet side of the compressor satisfies a predetermined first reference; and
    a supply start process in which, when it is determined that the first reference is satisfied in the first reference determining process, supply of a hydrate anti freezing agent that prevents hydration of the gas compressed by the compressor to an internal flow path formed of the impeller and the casing starts.
  8. The compressor cleaning method according to claim 7, comprising
    a second reference determining process in which, after supply of the hydrate anti freezing agent to the internal flow path starts, it is determined whether a difference between characteristic values of the gas on an inlet side of the compressor and an outlet side of the compressor satisfies a predetermined second reference; and
    a heat supply process in which, when it is determined that the second reference is satisfied in the second reference determining process, the heated hydrate anti freezing agent is supplied to the internal flow path.
EP15821658.0A 2014-07-18 2015-01-21 Compressor system, subsea production system provided therewith, and compressor cleaning method Withdrawn EP3156665A4 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014147603A JP2016023578A (en) 2014-07-18 2014-07-18 Compressor system, undersea production system with compressor system, and compressor system washing method
PCT/JP2015/051529 WO2016009658A1 (en) 2014-07-18 2015-01-21 Compressor system, subsea production system provided therewith, and compressor cleaning method

Publications (2)

Publication Number Publication Date
EP3156665A1 true EP3156665A1 (en) 2017-04-19
EP3156665A4 EP3156665A4 (en) 2017-07-19

Family

ID=55078164

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15821658.0A Withdrawn EP3156665A4 (en) 2014-07-18 2015-01-21 Compressor system, subsea production system provided therewith, and compressor cleaning method

Country Status (5)

Country Link
US (1) US20170198724A1 (en)
EP (1) EP3156665A4 (en)
JP (1) JP2016023578A (en)
CN (1) CN106489029A (en)
WO (1) WO2016009658A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6735978B2 (en) * 2018-03-12 2020-08-05 国立研究開発法人産業技術総合研究所 Gas production system and gas production method
JP6735979B2 (en) * 2018-03-12 2020-08-05 国立研究開発法人産業技術総合研究所 Gas production system and gas production method
IT201900023883A1 (en) * 2019-12-13 2021-06-13 Nuovo Pignone Tecnologie Srl COMPRESSOR WITH A SYSTEM TO REMOVE LIQUID FROM THE COMPRESSOR
US11391289B2 (en) * 2020-04-30 2022-07-19 Trane International Inc. Interstage capacity control valve with side stream flow distribution and flow regulation for multi-stage centrifugal compressors
US11536277B2 (en) 2020-04-30 2022-12-27 Trane International Inc. Interstage capacity control valve with side stream flow distribution and flow regulation for multi-stage centrifugal compressors
US11841026B2 (en) 2021-11-03 2023-12-12 Trane International Inc. Compressor interstage throttle, and method of operating therof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO324110B1 (en) * 2005-07-05 2007-08-27 Aker Subsea As System and process for cleaning a compressor, to prevent hydrate formation and/or to increase compressor performance.
US7784288B2 (en) * 2006-03-06 2010-08-31 General Electric Company Methods and systems of variable extraction for compressor protection
WO2007110368A1 (en) * 2006-03-24 2007-10-04 Siemens Aktiengesellschaft Method for operating a compressor unit and associated compressor unit
JP5675121B2 (en) * 2010-01-27 2015-02-25 三菱重工業株式会社 Centrifugal compressor and cleaning method
MX356834B (en) * 2012-06-11 2018-06-15 Statoil Petroleum As Subsea compressor cleaning method wherein the cleaning liquid is retrieved from the multiphase process fluid.
JP2014128104A (en) * 2012-12-26 2014-07-07 Mitsubishi Heavy Ind Ltd Compression system

Also Published As

Publication number Publication date
JP2016023578A (en) 2016-02-08
US20170198724A1 (en) 2017-07-13
CN106489029A (en) 2017-03-08
WO2016009658A1 (en) 2016-01-21
EP3156665A4 (en) 2017-07-19

Similar Documents

Publication Publication Date Title
EP3156665A1 (en) Compressor system, subsea production system provided therewith, and compressor cleaning method
DK178564B1 (en) Gas compression
AU2004272938B2 (en) Subsea compression system and method
AU2009280364B2 (en) Device for separating and collecting fluid in gas from a reservoir
EP1907705B1 (en) System for cleaning a compressor
US20090200035A1 (en) All Electric Subsea Boosting System
US20220154568A1 (en) Apparatus and method for harnessing energy from a wellbore to perform multiple functions while reducing emissions
US8262365B2 (en) Method for operation of a compressor unit, and associated compressor unit
NO324577B1 (en) Pressure and leakage control in rotary compression equipment
EP3551843B1 (en) Fluid injection system
EP3156586A1 (en) Compressor system, subsea production system provided therewith, and compressor cleaning method
RU2455530C2 (en) Compression unit
WO2019045574A1 (en) Subsea arrangement and method
Korovin et al. Application of neural networks for modelling centrifugal pumping units of booster pump stations for a two-phase gas-liquid mixture
US20140299196A1 (en) Water Lifting System and Method Having Such a System
GB2532389A (en) Wellhead platform systems for use in extracting and testing multi-phase raw mixtures
CN114025892B (en) Cleaning of gas compressors
GB2433759A (en) Subsea compression system and method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20170116

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

A4 Supplementary search report drawn up and despatched

Effective date: 20170620

RIC1 Information provided on ipc code assigned before grant

Ipc: F04D 29/70 20060101AFI20170613BHEP

Ipc: F04D 27/00 20060101ALI20170613BHEP

Ipc: E21B 37/06 20060101ALI20170613BHEP

Ipc: F04D 17/12 20060101ALI20170613BHEP

Ipc: F04D 25/06 20060101ALI20170613BHEP

DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20180118