EP3152399A2 - Device for connecting the structural elements of ribs and reticular structures - Google Patents
Device for connecting the structural elements of ribs and reticular structuresInfo
- Publication number
- EP3152399A2 EP3152399A2 EP15732416.1A EP15732416A EP3152399A2 EP 3152399 A2 EP3152399 A2 EP 3152399A2 EP 15732416 A EP15732416 A EP 15732416A EP 3152399 A2 EP3152399 A2 EP 3152399A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- rib
- structural element
- housing
- cavity
- structural
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000003780 insertion Methods 0.000 claims abstract description 37
- 230000037431 insertion Effects 0.000 claims abstract description 37
- 238000009412 basement excavation Methods 0.000 claims description 18
- 238000000034 method Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 description 13
- ORQBXQOJMQIAOY-UHFFFAOYSA-N nobelium Chemical group [No] ORQBXQOJMQIAOY-UHFFFAOYSA-N 0.000 description 13
- CNQCVBJFEGMYDW-UHFFFAOYSA-N lawrencium atom Chemical group [Lr] CNQCVBJFEGMYDW-UHFFFAOYSA-N 0.000 description 8
- 238000003466 welding Methods 0.000 description 7
- 239000004567 concrete Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000011378 shotcrete Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 238000005555 metalworking Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
- E21D11/24—Knuckle joints or links between arch members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
- E21D11/22—Clamps or other yieldable means for interconnecting adjacent arch members either rigidly, or allowing arch member parts to slide when subjected to excessive pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2451—Connections between closed section profiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2457—Beam to beam connections
Definitions
- the present invention concerns a device for connecting the structural elements, in particular elements of ribs, reticular structures and similar.
- the present invention also concerns a rib for supporting and consolidating an excavation comprising means for connecting the said structural elements and a method for installing a supporting rib inside an excavation .
- structural elements that are connected to each other in order to create the final form of the said supporting structure.
- These structural elements may have an open cross-section, for example C or double T, or a closed cross-section.
- the structural elements are tubular and may have cross-sections of any form, for example circular, square, rectangular or triangular.
- a rib For the support of excavations, such as motorway or railway tunnels, it is known to use reinforcing arches called “ribs".
- a rib usually comprises a plurality of shaped steel elements mutually connected in a “vault” configuration. These elements are formed by “open” profiles with H, INP, C or double T cross-section, and are made integral with one another by a connection element known as a tie plate. In the majority of cases, the profiles are mutually connected at the level of the excavation to be reinforced, after having been shaped by metalworking . After being assembled, each rib is connected to the adjacent ribs through connection chains whose ends are connected to supports welded along the body of the rib profiles.
- each first joining plate has portions that are welded to a relative structural element at a terminal section.
- Each joining plate usually rectangular in shape, comprises two series of holes for the connection of bolts that fix the plates to each other, making the connection between the structural elements so that the structural elements form a continuous structure that develops over the entire extension of the structure.
- the structural elements In order to make the connection, the structural elements must be precisely positioned with respect to each other so as to line up the holes of the plates into which the bolts are to be inserted. This is difficult, particularly in the case of rather extensive structures, especially those extending vertically, or structures that must assume a particular final configuration, such as ribs in a "vault" configuration.
- connection cannot be made automatically, since the mutual positioning of the plates and the insertion of the bolts can only be done manually. This connection process therefore requires a substantial investment of time.
- This connection may also be unstable if, for example, the bolts are not fixed correctly.
- the instability of the connection may increase over time if the tightness of the bolts is not checked periodically.
- the aim of the present invention is to provide a rapid and secure connection between structural elements.
- a further aim of the present invention is to make an automatic connection that does not require manual intervention .
- a device for connecting the structural elements comprising at least one housing having a cavity and capable of being associated with a first structural element, at least one connection body having at least one insertion portion for insertion in the said cavity of the said first housing and capable of being associated with a second structural element, and means for locking the said insertion portion of the said connection body inside the said cavity.
- the locking means comprise at least one pin cooperating with elastic means and capable of being inserted into a hole made in a side wall of the said cavity of the said first housing, the said pin and the said elastic means being arranged on the said insertion portion of the said connection body.
- the said insertion portion of the said connection body has at least one cavity and at least one hole made in a side wall of the said cavity, the said pin being inserted into the said hole and the said elastic means being arranged inside the said cavity.
- a compact structure is created that makes it possible to automatically and rapidly lock the connection body inside the cavity of the housing .
- the insertion portion is countershaped with respect to the said first cavity of the said first housing, which preferably has an essentially truncated cone shape. This structure makes it easier to insert the connection body into the cavity of the housing.
- the device comprises at least a second housing having at least one cavity and capable of being associated with the said second structural element, the said connection body comprising a fixing portion capable of being arranged and fixed inside the said cavity of the said second housing.
- the cavity of the said first housing and the cavity of the said second housing have essentially the same form.
- the said insertion portion and the said fixing portion of the said connection body have essentially the same form. In this way, a single type of hollow housing can be provided for associating with each structural element, successively fixing the connection body inside one of the housings .
- the said first housing and/or the said second housing is/are arranged in a cup-shaped element, the said cup element having a side wall for fixing to a respective structural element.
- the cup element allows the device to be easily fixed to structural elements of different shapes and cross-sections, both open and closed.
- a rib for supporting and consolidating an excavation comprising at least a first rib structural element and at least a second rib structural element, the said first rib structural element and the said second rib structural element being connected by connecting means, in which the said connection means comprise at least one engaging connection element associated with the said first rib structural element and cooperating with elastic means, the said engaging connection element being movable between a first unlocking position and a second locking position with respect to the said second rib structural element.
- the said first rib structural element and the said second rib structural element are connected rotatably to each other, so as to move from a first position in which the said rib structural elements are essentially folded one on the other to a second position in which they are arranged so as to form at least one essentially continuous portion of rib.
- FIG. 1 shows a longitudinal cross-section of a first form of implementation of the connecting device according to the present invention
- FIG. 2 shows an initial phase of the connection of two structural elements by means of the device of Figure 1 ;
- FIG. 3 shows a successive phase of the connection by means of the device of Figure 1 ;
- FIG. 4 shows a final phase of the connection by means of the device of Figure 1 ;
- FIG. 5 shows a longitudinal cross-section of a second form of implementation of the connecting device according to the present invention
- FIG. 9 shows a longitudinal cross-section of a cup-shaped element of the connecting device of Figure 5 associated with a structural element with an open cross-section;
- - Figure 10 shows a second cross-section along the line X-X of the connecting device of Figure 9;
- FIG. 11 shows longitudinal cross-section of a further form of implementation of the connecting device according to the present invention.
- Figure 12 shows a perspective view from below of the connecting device of Figure 11;
- Figure 13 shows a perspective view from above of the connecting device of Figure 11;
- Figure 17 shows a front view of a preferred form of implementation of a rib according to the present invention in the installation configuration
- FIG. 18 shows a longitudinal cross-section of a form of implementation of means for connecting two structural elements of the rib of Figure 17;
- Figure 19 shows a front view of a preferred form of implementation of the rib of Figure 17 in a pre-installation configuration
- FIG. 20 shows a first phase of installation of the rib of Figure 17, in which the rib is transported into the excavation;
- FIG. 21 shows a successive phase of installation of the rib in which the rib is raised in order to initiate the opening of the structural elements from a folded configuration
- - Figure 22 shows a successive phase of installation of the rib in which the structural elements are moved into an opening configuration
- - Figure 23 shows a further successive phase of installation of the rib, in which the supporting elements are moved into the installation configuration.
- Figure 1 illustrates a first form of implementation of a connecting device 1 of structural elements according to the present invention, in particular of a first structural element 2 and a second structural element 3.
- the device 1 comprises a housing 4 defining a cavity 14, preferably of truncated cone shape, associated with a plate 6 that is fixed, for example by welding, to a first structural element
- the structural element 2 is tubular and has a circular, square or rectangular transverse cross-section.
- the plate 6 is fixed to the tubular structural element 2 in such a way that the housing 4 extends inside the said tubular element 2.
- a hinge portion 6a is also associated with the plate 6.
- the side wall 10 of the housing 4 has one or more holes 12, preferably four.
- the connecting device 1 of Figure 1 also comprises a connection body 5, which has an insertion portion 119, preferably of truncated cone shape and defining a cavity 19.
- the connection body 5 is associated with a plate 7 that is fixed, for example by welding, to a second structural element
- the side wall 9 of the connection body 5 has one or more holes 11, preferably in a number the same as that of the side wall 10 of the housing.
- a pin 13 In each hole 11 of the connection body 5 is inserted a pin 13 with a head 15 of larger diameter capable of forming a stop to the translatory motion of the pin 13 in the said hole 11.
- an elastic element 17 With the head 15 is associated an elastic element 17 that extends inside the cavity 19 of the hollow connection body 5 and is fixed to the plate 7.
- With the plate 7 is associated another hinge portion 7a, which with the hinge portion 6a forms a hinge 8 in order to create a rotatable connection between the structural elements 2, 3.
- the pins 13 and the corresponding elastic elements 17 are arranged on the housing 4 associated with the first structural element 2.
- connection body 5 is rotated so as to be inserted into the cavity 14 of the housing 4.
- a first pin 13 sliding on the side wall 10 of the housing 4, advantageously inclined due to the truncated cone shape, is pushed out of the respective hole 11 against the force exerted by the elastic element 17.
- the other pins 13 are also pushed out of the respective holes 11.
- the connection body 5 is fully inserted into the cavity 14 of the housing 4, so that the position of the pins 13 corresponds to that of the holes 12 made in the side wall 10 of the housing 4. In this way, the pins 13 are pushed by the elastic element 17 into the holes 12 as far as the stop formed by the head 15
- Figure 5 illustrates a second form of implementation of a connecting device 110 according to the present invention.
- the device 110 comprises a first cup-shaped element 40 capable of being associated with a first structural element 20 and a second cup-shaped element 50 capable of being associated with a second structural element 30.
- the first cup element 40 comprises a side wall 41 and a base 42.
- the side wall 41 is capable of being fixed to a surface 21 of the relative structural element 20 at one of its ends 22.
- the base 42 of the cup element 40 has a recess 43 that forms a housing 44 defining a cavity 414, having a portion 45 preferably with a truncated cone shape.
- the truncated cone portion 45 is linked to the base 42 by means of an inclined section 46.
- the side wall 41 of the housing 44 has one or more holes 47, preferably four .
- the second cup element 50 comprises a side wall 51 and a base 52.
- the side wall 51 is capable of being fixed to a surface 31 of the relative structural element 30 at one of its ends 32.
- the base 52 has a recess 53 that forms a housing 54 defining a cavity 514, preferably with a truncated cone shape .
- the side wall 51 of the housing 54 has one or more holes 67, preferably four.
- connection body 56 Within the cavity 514 of the housing 54 of the second cup element 50 is fixed a connection body 56 by means of bolts 55 inserted into the holes 67.
- the connection body 56 has a fixing portion 57, preferably hollow and countershaped with respect to the cavity 514 in the housing 54.
- the fixing portion 57 has a truncated cone shape.
- An insertion portion 58 with a cavity 581 is associated with the fixing portion 57.
- the insertion portion 58 preferably with a truncated cone shape, is arranged symmetrically with respect to the larger base 59 of the truncated cone fixing portion 57, and capable of being inserted into the cavity 414 of the housing 44 of the first cup element 40 of the first structural element 20.
- the side wall 582 of the insertion portion 58 of the connection body 56 has preferably four holes 60.
- a pin 61 with a head 62 of larger diameter capable of forming a stop to the translatory motion of the pin 61 in the said hole 60.
- the head 62 is associated an elastic element 63 that extends and is fixed inside the connection body 56.
- each cup element 40, 50 is fixed on to a respective tubular structural element 20, 30.
- the cup element 40, 50 has a transverse cross-section passing through the fixing wall 41, 51 of corresponding shape.
- the cup element 40, 50 may be fixed to the respective structural element 20, 30 by welding of the fixing wall 41, 51 to the said structural element 20, 30 or by means of bolts inserted in suitable holes 74, 75 made on the fixing wall 41, 51 and on the structural element 20, 30.
- each cup element 40, 50 is fixed to the relative structural element 20, 30 by welding of the fixing wall 41, 51 on to the surface 21, 31, preferably external, of the said structural element 20, 30.
- the fixing portion 57 of the connection element 56 is fixed to the housing 54 arranged on the respective structural element 30 by means of bolts 55.
- a first structural element 20 for example the structural element provided with the single housing 44, is rotated so as to bring it towards the connection body 56 associated with the second structural element 30 ( Figure 6) .
- a first pin 61 of the connection body 56 sliding on the side wall 45 of the housing 44, is pushed out of the respective hole 60 against the force exerted by the elastic element 63.
- the other pins 61 are also pushed out of the respective holes 60.
- the insertion portion 58 of the connection body 56 is fully inserted into the cavity 414 of the housing 44, so that the position of the pins 61 corresponds to that of the holes 47 made in the side wall 41 of the housing 44. In this way, the pins 61 are pushed by the elastic element 63 into the holes 47 as far as the stop formed by the head 62 of the pins 61, connecting the two structural elements 20, 30 to each other .
- a cup element as illustrated in Figure 5 may be associated with a first structural element and be connected to a connection body with a plate as illustrated in Figure 1, associated with a second structural element.
- a housing as illustrated in Figure 1 may be associated with a first structural element and be connected to a connection body inserted into a cup element as illustrated in Figure 5, associated with a second structural element .
- Figures 9 and 10 illustrate a structural element 200 of open cross-section, in particular a double T cross-section, on to which is fixed a cup element 400 of the device according to the form of implementation of Figure 5.
- the cup element 400 in this case with a square or rectangular transverse cross-section, is arranged at an end 201 of the respective structural element 200 and fixed by means of bolts 402 on to an external wall 202 of the structural element 200, so that the housing 403 of the cup element 400 is in proximity to the end 201 of the structural element 200.
- the cup element may be welded on to an external wall of the structural element.
- the reticular structure consists of a lattice, for example of triangular cross-section, and the cup element is fitted on to an end of the structural element of the lattice and welded to the struts of the said lattice.
- the device 111 comprises a housing 411 defining a cavity 144, essentially with a truncated cone shape.
- the housing 411 is capable of being associated with a first tubular structural element 121 with a circular cross-section ( Figure 14) .
- the external wall 411A of the housing 411 has a truncated cone shape, so as to be inserted into an end of the tubular structural element 121, to which it is fixed for example by welding.
- the internal wall 411B of the housing 411 has a circumferential groove 621, capable of receiving an engaging connection element, preferably an elastic ring 653, for making the connection with the second structural element 131 ( Figure 14) .
- the connecting device 111 also comprises a connection body 511, which has a supporting and fixing portion 590 and an insertion portion 591.
- the supporting and fixing portion 590 has an essentially flat first surface 590A capable of coming into contact with a base 411C of the housing 411, and a second surface 590B, opposite the first, capable of being fixed to the second structural element 131, for example by welding.
- With the supporting and fixing portion 590 is also preferably associated a hinge portion 60b.
- the insertion portion 591 preferably has an essentially truncated cone shape.
- the insertion portion 591 is hollow so as to connect the inside of the first structural element 121 and the inside of the second structural element 131 to each other.
- the internal wall 592 of the insertion portion 591 has a first inclined section 592A essentially parallel to the truncated cone external wall 411A of the housing 411 and a second section 592B with an opposite inclination.
- the insertion portion 591 has an essentially flat annular base 595 on which are preferably made incisions 597.
- On the external wall 593 of the insertion portion 591 is provided a groove 623 for the insertion of the elastic ring 653.
- the elastic ring 653 may be prefitted on to the internal wall 411B of the housing 411 and inserted into the groove 623 of the insertion portion 591 during the connection phase.
- the elastic ring 653 may be prefitted into the groove 623 of the insertion portion 591 and inserted into the groove 621 made on the internal wall 411B of the housing 411 during the connection phase.
- Figures 14, 15 and 16 illustrate the phases of the connection between the two structural elements 121, 131, in the making of which the elastic ring 653 is prefitted inside the groove 623 of the insertion portion 591 extending radially outwards from the same.
- connection body 511 is rotated so as to be inserted into the cavity 144 of the housing 411.
- the housing 411 and the insertion portion 591 of the connection body 511 have a truncated pyramid cross-section.
- This cross- section allows the connection of tubular structural elements with a rectangular or square cross-section and of structural elements with an open cross-section.
- the connecting device according to the invention therefore allows rapid connection of the structural elements.
- the device may be associated with structural elements of various forms, with either an open or a closed cross-section, and ensures a stable connection.
- Figure 17 illustrates a possible form of implementation of a supporting and consolidating rib 100 according to the present invention.
- the rib 100 is formed by one or more structural elements 101, 102, 103, made from a metallic material such as construction steel (Fe 430 or other) .
- the rib 100 has a symmetrical "vault" configuration with respect to a plane of symmetry S. This configuration generally reflects that of the portion of the excavation intended to be reinforced by means of the said rib.
- the rib in Figure 17 comprises a first structural element 101, a second structural element 102 connected to the first structural element 101 and a third structural element 103 connected to the second structural element 102.
- first structural element 101 and the third structural element 103 are arranged in an essentially mirror-image position with respect to the plane of symmetry S of the rib 100.
- the second structural element 102 is preferably developed symmetrically between the first structural element 101 and the third structural element 103 with respect to the said plane of symmetry.
- the first structural element 101 is provided with a first end portion 151 operationally connected to a first terminal portion 181 of the second element 102 by first connecting means 161 and a second end portion 152 intended to be connected to a supporting element 190 of the rib 100.
- the third structural element 103 has a first end portion 171 intended to be connected to a second terminal portion 182 of the second structural element 102 by second connecting means 162 and a second end portion 172 intended to be connected to a second supporting element 191 of the rib 100.
- each structural element 101, 102, 103 is formed by a tubular body.
- the tubular body has a transverse cross-section that defines a respective internal cavity that develops over the entire length of the body. This internal cavity is intended to be filled with concrete following the installation of the rib 100.
- the transverse cross-section of the tubular body may be square, rectangular or circular.
- the body of the first tubular element 101 is prepared to be associated with a filling device, not illustrated in the drawing, operationally capable of being connected to means for the injection of concrete into the internal cavity of the said body .
- the third structural element 103 is also capable of being associated with a filling device associated with the tubular body of the said element.
- the connecting means 161, 162 that connect the second structural element 102 with the first structural element 101 and the third structural element 103 are configured so that the internal cavity of the second structural element 102 is in communication with those of the first structural element 101 and of the third structural element structural element 103.
- the concrete injected into the internal cavity of the first structural element 101 and of the third structural element 103 also reaches the internal cavity of the second element 102 so as to allow it to be filled.
- the rib may be formed by one or more structural element consisting of profiles with an open transverse cross- section, for example an H or a C or a double T cross-section.
- the connecting means 161, 162 for connecting the structural elements 101, 102, 103 comprise at least one engaging element associated with elastic means.
- the rib 100 comprises at least a first tubular structural element
- the connecting means 161 consist of a tubular portion 168 with a diameter smaller than the diameter of the structural elements 101, 102.
- the tubular portion tubular portion 168 is associated, for example by welding, with an end 151 of the first structural element 101.
- On the wall 163 of the tubular portion 168 are made one or more holes 164 into which are inserted the pins 165 associated with elastic means 166, which hold the respective pin 165 in a position of insertion into the hole 164.
- the second structural element 102 has, at a connecting end 181 with the first structural element 101, a number of holes
- the tubular portion 168 is inserted into the second structural element 102, pushing the pins 165 into the respective holes 16 against the force exerted by the elastic means 166 and is then fixed to the second structural element
- the tubular portion associated with one of the walls of the first structural element 101 so that it can be inserted into a corresponding locking tubular portion associated with one of the walls of the second structural element 102.
- the locking tubular portion is provided with one or more holes in which to lock the pins .
- the connecting means have a projection associated with elastic means and insertable into a corresponding locking seat provided on the second structural element.
- the structural elements 101, 102, 103 are connected to each other by a rotating connection, for example by hinges, so as to move from a first position in which the structural elements are essentially folded one on to the other to a second position in which they are arranged so as to form at least one essentially continuous portion of rib .
- the rib 100 consists of three structural elements 101, 102, 103 and two supporting elements 190, 191.
- the supporting elements 190, 191 are also rotatably connected to respective structural elements 101, 103 and may be fixed to these by the connecting means described .
- Figure 19 shows the rib of Figure 17 in a configuration prior to final installation.
- the structural elements of the rib are connected by hinges so that they are folded one on to the other in order to be easily transported to the site of the excavation.
- Figures 20-23 show the phases of installation of the rib of Figure 19.
- the rib is transported to the site of the excavation in the configuration in which the structural elements and the supporting elements are folded one on to the other ( Figure 20) .
- Transportation is therefore effected easily, and the elements that comprise the rib are already prepared for correct positioning in the final configuration.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Joining Of Building Structures In Genera (AREA)
- Connection Of Plates (AREA)
- Lining And Supports For Tunnels (AREA)
- Wind Motors (AREA)
- Prostheses (AREA)
- Toys (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ITBO20140324 | 2014-06-04 | ||
PCT/IB2015/054023 WO2015186029A2 (en) | 2014-06-04 | 2015-05-28 | Device for connecting the structural elements of ribs and reticular structures |
Publications (1)
Publication Number | Publication Date |
---|---|
EP3152399A2 true EP3152399A2 (en) | 2017-04-12 |
Family
ID=51628199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15732416.1A Pending EP3152399A2 (en) | 2014-06-04 | 2015-05-28 | Device for connecting the structural elements of ribs and reticular structures |
Country Status (10)
Country | Link |
---|---|
US (1) | US20170096895A1 (en) |
EP (1) | EP3152399A2 (en) |
CN (1) | CN106795766B (en) |
AU (1) | AU2015270177A1 (en) |
BR (1) | BR112016028327B1 (en) |
CA (1) | CA2949446A1 (en) |
CL (1) | CL2016003125A1 (en) |
PE (1) | PE20170596A1 (en) |
SG (1) | SG11201609645YA (en) |
WO (1) | WO2015186029A2 (en) |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3037608A1 (en) * | 2014-12-24 | 2016-06-29 | Rv Lizenz AG | Installation system for modular industrial installations |
JP2017106272A (en) * | 2015-12-11 | 2017-06-15 | 大成建設株式会社 | Tunnel support and method of constructing the same |
GB201718744D0 (en) * | 2017-11-13 | 2017-12-27 | Univ College Dublin Nat Univ Ireland Dublin | Structural member |
EP3502368B1 (en) * | 2017-12-21 | 2023-12-06 | Tomba Enterprises Pty Ltd | Structural connector |
JP7021420B2 (en) * | 2018-01-19 | 2022-02-17 | 前田建設工業株式会社 | Connection structure and connection method of invert steel support |
CN108643923B (en) * | 2018-04-23 | 2020-08-25 | 山东大学 | Fabricated supporting structure and construction method using same |
CN108775246A (en) * | 2018-05-25 | 2018-11-09 | 北京交通大学 | A kind of connector and semi-automatic installation steel pipe arch support |
IT201800007585A1 (en) * | 2018-07-27 | 2020-01-27 | Vexa Srl | EQUIPMENT ASSEMBLY |
USD930464S1 (en) | 2019-06-14 | 2021-09-14 | Optimas Oe Solutions Llc | Coupling |
US11447947B2 (en) | 2019-06-14 | 2022-09-20 | Optimas OE Solutions, LLC | Couplings for coupling pre-cast construction segments together and pre-cast construction segments having such couplings |
CN110318785A (en) * | 2019-08-01 | 2019-10-11 | 中铁二院成都勘察设计研究院有限责任公司 | A kind of steelframe and its construction method based on tunnel machine full face tunneling |
CN110318784A (en) * | 2019-08-01 | 2019-10-11 | 中铁二院成都勘察设计研究院有限责任公司 | A kind of tunnel support steelframe and its construction method |
BR102020004188A2 (en) * | 2020-03-02 | 2021-09-14 | Topico Locações De Galpões E Equipamentos Para Industrias S.A. | TRUSS, ARCH AND SHED STRUCTURE |
JP2021175859A (en) * | 2020-05-01 | 2021-11-04 | 株式会社安藤・間 | Guide steel support and steel support erecting method |
USD997308S1 (en) * | 2020-10-27 | 2023-08-29 | Optimas Oe Solutions Llc | Coupling |
USD976693S1 (en) * | 2020-12-16 | 2023-01-31 | Optimas Oe Solutions Llc | Coupling |
KR102512683B1 (en) * | 2021-02-24 | 2023-03-22 | 군산대학교산학협력단 | Tunnel support module and construction method of tunnel using the same |
KR102523187B1 (en) * | 2021-05-27 | 2023-04-18 | 군산대학교산학협력단 | Construction method of tunnel using Tunnel support module |
IT202100014225A1 (en) | 2021-05-31 | 2022-12-01 | Officine Maccaferri Italia S R L | Rib for supporting and consolidating an excavation, and method for installing such a rib within an excavation |
EP4348006A2 (en) * | 2021-05-31 | 2024-04-10 | Officine Maccaferri Italia S.r.l. | Centring for supporting and consolidating an excavation, and method for installing such a centring inside an excavation |
IT202200001559A1 (en) | 2022-01-31 | 2023-07-31 | Officine Maccaferri Italia S R L | Support rib for an excavation, with control of the thrust exerted by the walls of the excavation |
IT202200009266A1 (en) | 2022-05-05 | 2023-11-05 | Officine Maccaferri Italia S R L | Device for compensating the length of a rib |
IT202100028355A1 (en) | 2021-11-02 | 2023-05-02 | Officine Maccaferri Italia S R L | Improved rib for supporting and consolidating an excavation, and method of installing such a rib within an excavation |
GB2610429A (en) * | 2021-09-06 | 2023-03-08 | Stelling Modular Ltd | Metal-construction-beam connector system, construction module using said system, and a method of construction |
IT202200015058A1 (en) | 2022-07-18 | 2024-01-18 | Maccaferri Tunneling S R L | METHOD AND MACHINE FOR BUILDING NATURAL TUNNELS. |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2474771Y (en) * | 2000-09-26 | 2002-01-30 | 周维纲 | Pipe material sleeving jointing mechanism |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE713805C (en) * | 1938-12-21 | 1941-11-15 | F W Moll Soehne Maschinenfabri | Iron polygon or arch construction |
DE975603C (en) * | 1946-05-28 | 1962-02-15 | Elke Lorenz | Iron polygon or arch construction |
NL81672C (en) * | 1948-04-23 | 1956-06-15 | ||
BE488659A (en) * | 1949-04-23 | 1949-10-24 | Friedrich Wilhelm Moll | |
DE957744C (en) * | 1955-01-29 | 1957-02-07 | C Deilmann Bergbau GmbH, Bentheim (Bez Osnabrück) | CONSTRUCTION FOR BLIND SHAFT AND ROUTES AND CONNECTION ELEMENT FOR SHAFT FITTING |
GB1147157A (en) * | 1966-07-21 | 1969-04-02 | Frederick Colin Swallow | Improvements in or relating to supports or linings of tunnels and shafts |
FR2446376A1 (en) * | 1979-01-15 | 1980-08-08 | Pont A Mousson | METHOD AND APPARATUS FOR ASSEMBLING TUNNEL COVERS |
DE19923572A1 (en) * | 1998-08-20 | 2000-11-23 | Werner Berwald | Friction lock for open profile connection of slide arc structure comprises rolled channel profiles with clamping bulges and hollow cavities |
CN2714869Y (en) * | 2003-11-17 | 2005-08-03 | 江门市婴宝婴儿用品有限公司 | Pipe fitting connector |
CN101592174B (en) * | 2009-06-30 | 2010-08-18 | 航天东方红卫星有限公司 | Automatic locked folding rod piece connector |
PL2354447T3 (en) * | 2010-01-29 | 2017-09-29 | Officine Maccaferri Italia S.R.L. | Method for supporting and reinforcing an excavation with a rib |
CN201853055U (en) * | 2010-06-30 | 2011-06-01 | 深圳市世纪星视听器材有限公司 | Connecting device for projection screen bracket |
CN202659250U (en) * | 2012-07-10 | 2013-01-09 | 山东大学 | Novel insert type prestress grouting steel pipe concrete node |
-
2015
- 2015-05-28 BR BR112016028327-9A patent/BR112016028327B1/en active IP Right Grant
- 2015-05-28 EP EP15732416.1A patent/EP3152399A2/en active Pending
- 2015-05-28 SG SG11201609645YA patent/SG11201609645YA/en unknown
- 2015-05-28 AU AU2015270177A patent/AU2015270177A1/en not_active Abandoned
- 2015-05-28 PE PE2016002395A patent/PE20170596A1/en unknown
- 2015-05-28 US US15/313,289 patent/US20170096895A1/en not_active Abandoned
- 2015-05-28 CN CN201580029347.1A patent/CN106795766B/en active Active
- 2015-05-28 WO PCT/IB2015/054023 patent/WO2015186029A2/en active Application Filing
- 2015-05-28 CA CA2949446A patent/CA2949446A1/en not_active Abandoned
-
2016
- 2016-12-02 CL CL2016003125A patent/CL2016003125A1/en unknown
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2474771Y (en) * | 2000-09-26 | 2002-01-30 | 周维纲 | Pipe material sleeving jointing mechanism |
Also Published As
Publication number | Publication date |
---|---|
CA2949446A1 (en) | 2015-12-10 |
US20170096895A1 (en) | 2017-04-06 |
WO2015186029A2 (en) | 2015-12-10 |
SG11201609645YA (en) | 2016-12-29 |
CL2016003125A1 (en) | 2017-10-20 |
BR112016028327A2 (en) | 2017-08-22 |
CN106795766B (en) | 2020-01-14 |
BR112016028327B1 (en) | 2022-06-07 |
WO2015186029A3 (en) | 2016-09-15 |
AU2015270177A1 (en) | 2017-01-12 |
PE20170596A1 (en) | 2017-05-28 |
CN106795766A (en) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2015186029A2 (en) | Device for connecting the structural elements of ribs and reticular structures | |
EP3152400B1 (en) | Rib for supporting and consolidating an excavation and method for installing a structure to support and consolidate an excavation | |
US6668503B2 (en) | Concrete wall form and connectors therefor | |
US7404691B2 (en) | Dowel bar assembly with snap fit side frames | |
EP2169133A2 (en) | Permanent plastic formwork system | |
JP6243147B2 (en) | Method for connecting curved precast members and connecting structure thereof | |
US8898964B1 (en) | Lift anchor assembly for precast portland cement concrete shapes | |
CN107227748B (en) | Earth-retaining synthesizes inner supporting structure object with L-type steel | |
CN111194374B (en) | Building element | |
AU2015242987B2 (en) | Trenching Panels, Panel Assembly, System and Method | |
US20140096459A1 (en) | Lifting and bracing system for a wall panel | |
WO2011092331A2 (en) | Rib for supporting and reinforcing an excavation | |
KR101520853B1 (en) | Dowel-bar assembly | |
CA2390614C (en) | Mine stopping, permanent stopping form and method of installing same | |
US10781968B2 (en) | Anchors and methods for anchoring an underground storage tank | |
KR20200001115A (en) | Device for reinforcing head of steel pipe pile | |
KR101556674B1 (en) | Steel pipe assembly and construction method of steel pipe structure using the same | |
JP7079166B2 (en) | Tunnel internal structure and its construction method | |
JP2000204888A (en) | Pit mouth tunnel and its construction method | |
JP3883372B2 (en) | Construction steel pipe member and construction method of construction steel pipe member | |
KR101869262B1 (en) | Steel pipe strut with connection member | |
KR102212307B1 (en) | Air injection type stake form for vertically or horizontally separate placement of concrete, and its installation method | |
KR100952206B1 (en) | Concrete box culvert having eye bolts connection using eyebolts and steel bars, and constructing method thereof | |
GB2348914A (en) | Cage former with a helical frame and integral spacers | |
WO2016068805A1 (en) | Bar-pods for reinforced concrete formwork and scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20161216 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: OFFICINE MACCAFERRI ITALIA S.R.L. |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20171109 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230607 |