EP3150780A1 - A temporary edge protection system - Google Patents

A temporary edge protection system Download PDF

Info

Publication number
EP3150780A1
EP3150780A1 EP15187437.7A EP15187437A EP3150780A1 EP 3150780 A1 EP3150780 A1 EP 3150780A1 EP 15187437 A EP15187437 A EP 15187437A EP 3150780 A1 EP3150780 A1 EP 3150780A1
Authority
EP
European Patent Office
Prior art keywords
barrier panel
locking
protection system
edge protection
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP15187437.7A
Other languages
German (de)
French (fr)
Other versions
EP3150780B1 (en
Inventor
Joakim Svedberg
Helena Nilsson
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Safety Solutions Jonsereds AB
Original Assignee
Safety Solutions Jonsereds AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Safety Solutions Jonsereds AB filed Critical Safety Solutions Jonsereds AB
Priority to DK15187437.7T priority Critical patent/DK3150780T3/en
Priority to PL15187437T priority patent/PL3150780T3/en
Priority to LTEP15187437.7T priority patent/LT3150780T/en
Priority to EP15187437.7A priority patent/EP3150780B1/en
Publication of EP3150780A1 publication Critical patent/EP3150780A1/en
Application granted granted Critical
Publication of EP3150780B1 publication Critical patent/EP3150780B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3223Means supported by building floors or flat roofs, e.g. safety railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3219Means supported by the building wall, e.g. security consoles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/062Consoles; Brackets specially adapted for attachment to building walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Definitions

  • the present invention relates to a barrier panel for a temporary edge protection system, and to a temporary edge protection system comprising such a barrier panel.
  • the temporary edge protection system comprises several post arrangements, which are fastened at a floor, a wall, a beam, or the like, of the building, and several barrier panels carried by the post arrangements. At some buildings only widely spaced columns are available for fastening the post arrangements. To bridge the distance between two columns at least two barrier panels need to be interconnected with no post support at the interconnection position. Since typically the temporary edge protection system is to be mounted at a high height, a sky lift or the like has to be used for parts of the mounting operation. With the current temporary edge protection systems this is a rather complicated and time consuming operation, requiring the sky lift to be moved several times back and forth between the columns and the interconnection position.
  • a barrier panel for a temporary edge protection system wherein the barrier panel is arranged for quick-coupling with another barrier panel.
  • the barrier panel comprises a horizontal lower frame element having opposite first and second ends, wherein the lower frame element comprises a male connector at the first end thereof and a female connector at the second end thereof.
  • the male and female connectors are arranged to be quick coupled to respective female and male connectors of other barrier panels by receiving the male connector into the female connector.
  • the barrier panel comprises a horizontal upper frame element with opposite first and second ends, wherein the upper frame element comprises a first connection part at the first end thereof, and a second connection part at the second end thereof.
  • the first and second connection parts are arranged to be quick coupled with respective second and first connection parts of other barrier panels.
  • the quick coupling arrangements simplify the mounting operation when interconnecting two barrier panels.
  • the male connector comprises a protrusion, which protrudes horizontally from the first end of the lower frame element, and wherein the female connector comprises a cavity extending inside of the lower frame element from the second end towards the first end.
  • the female connector comprises a plastic sleeve, which defines the cavity. This embodiment provides for a lower friction that for instance metal against metal which is advantageous for connection as well as disconnection of the barrier panels.
  • the female connector comprises a locking device, which is vertically movable between a locked state where the locking device, when the female connector is interconnected with a male connector, is engaged with the male connector, and an unlocked state, where the locking device is disengaged with the male connector.
  • the locking device improves safety.
  • the locking device is spring biased towards the locked state and arranged for a click-in engagement with the protrusion of the male connector in conjunction with a quick-coupling operation, and wherein the male connector comprises a rest portion, upon which a protruding portion of the locking device can be temporarily rested when the locking device has been moved to the unlocked state, and thereby held in the unlocked state, to enable uncoupling of the male and female connectors.
  • the male connector comprises a rest portion, upon which a protruding portion of the locking device can be temporarily rested when the locking device has been moved to the unlocked state, and thereby held in the unlocked state, to enable uncoupling of the male and female connectors.
  • the protrusion is generally V-shaped, with the tip of the V-shape constituting the outer end of the protrusion.
  • This embodiment is advantageous in that the interconnection of two barrier panels is facilitated.
  • the width of the protrusion can be arranged to decrease from the first end of the lower frame element towards the tip of the V-shape.
  • a temporary edge protection system comprising a barrier panel, as described above, and a post arrangement.
  • the post arrangement comprises a structure attachment, a post device, adapted to be mounted at the structure attachment at a lower portion of the post device, and a barrier panel holder, connectable with the post device at an upper portion thereof.
  • This temporary edge protection system provides the same simplification as the barrier panel as such.
  • the structure attachment has post holding hooks, wherein the post device comprises, at a lower end thereof, a beam structure having hook receivers, which are arranged to engage with the hooks.
  • the beam structure comprises a locking device for preventing unintentional removal of the beam structure from the hooks.
  • the beam structure has a horizontal tubular first beam, which comprises one of the hook receivers, which hook receiver constitutes an end portion of the first beam, at a first end thereof, which is an open end, wherein the first beam further comprises the locking device, which comprises a locking pin extending internally of the first beam along the length thereof, wherein the locking pin is arranged to interact with the hook receiver and to prevent release of the hook from the hook receiver when the locking device is in a locked state.
  • the locking device is advantageously simple to handle.
  • the locking pin is spring biased towards the first end of the first beam
  • the locking device further comprises a rotatable catch element, which is connected with the locking pin at a second end of the first beam, and which is arranged at an outer surface of the beam structure, wherein the catch element is arranged to be moved between an active state where it holds the locking pin in a retracted position, in the unlocked state of the locking device, and an idle state, where the locking device is in the locked state, wherein the movement between the idle state and the active state involves moving the catch element away from the first end of the beam and rotating it.
  • the beam structure comprises a horizontal tubular second beam, which comprises another one of the hook receivers, which hook receiver constitutes an end portion of the second beam, at a first end thereof, which is an open end, wherein the second beam is arranged vertically parallel with the first beam, such that the hook receivers of the first and second beams are positioned above each other.
  • the post device comprises a vertical post beam, wherein the barrier panel holder is horizontally movably connected with the vertical post beam.
  • This embodiment has an advantageous adjustment of the horizontal position of the barrier panel.
  • the barrier panel holder comprises a horizontal holder beam, horizontally movably connected with the vertical post beam, and a vertical holder beam, which comprises barrier panel supports, and which is vertically adjustably connected with the horizontal holder beam.
  • An embodiment of the temporary edge protection system 1 comprises at least one barrier panel 2, 3, and at least one post arrangement 4. However, typically the system 1 comprises several barrier panels 2, 3 as well as several post arrangements 4 in order to enable the system to provide a safety barrier along one or more sides of a large building.
  • the temporary edge protection system 1 is arranged to be mounted at a building, and more particularly at a structure 5, such as a wall, a column, etc., of a building.
  • the temporary edge protection system is constructed to facilitate mounting of the system across large spans.
  • the barrier panels 2, 3 are provided with lower and upper quick couplings 6, 7 for coupling the barrier panels 2, 3 together. More particularly, as best shown in Fig. 3 , referring to a first barrier panel 2 of the shown barrier panels 2, 3, each barrier panel 2 has a frame with lower and upper frame elements 9, 10, and side frame elements 11, 12. A mesh 8 is typically mounted within the frame, covering at least a part of the frame area. Referring to a mounted state, the lower and upper frame elements 9, 10 are horizontal, and the side frame elements 11, 12 are vertical. This geometrical orientation is used throughout the application.
  • the lower frame element 9 comprises a male connector 13 at a first end thereof, and a female connector 14 at a second, opposite end thereof.
  • the male connector 13 of one barrier panel 2, and the female connector 14 of another barrier panel 3 together form the lower quick coupling 6.
  • the upper frame element 10 comprises a first connection part 15 at a first end thereof, at the same side of the barrier panel 2 as the male connector 13, and a second connection part 16 at a second end thereof, at the same side of the barrier panel 2 as the female connector 14.
  • the first connection part 15 of one barrier panel 2, and the second connection part 16 of another barrier panel 3 form the upper quick coupling 7. Consequently, the male and female connectors 13, 14 are arranged to be quick coupled with each other, and so are the first and second connection parts 15, 16 as well.
  • the lower frame element 9 is tubular, and the male connector 13 comprises a protrusion 17, which protrudes horizontally from the opening of the first end of the lower frame element 9, and a base portion 18, which extends a distance into the lower frame element 9 and is attached to the lower frame element 9.
  • the female connector 14 comprises a sleeve 19, which extends into the lower frame element 9 at its second end, thereby forming a cavity for receiving the protrusion 17 of the male connector 13 of another barrier panel, such as a second barrier panel 3 as shown.
  • the male connector 13 is preferably made of a metal, such as steel, to provide enough strength, while the female connector 14 preferably is made of plastic in order to reduce the friction between the male and female connectors 13, 14.
  • the female connector 14 further comprises a locking device 23, which has a locking element 24 that is vertically movable between a locked state, as for instance shown in Fig. 5d , and an unlocked state, as for instance shown in Fig. 5c .
  • a locked state the locking element 24 is engaged with a locking seat 25 of the male connector 13.
  • the locking element 24 is constituted of a locking pin, and the locking seat 25 is constituted by a hole.
  • the unlocked state the locking element 24 is disengaged from the locking seat 25.
  • the locking device 23 further comprises a spring 26, which is arranged to spring bias the locking element 24 towards the locked state and for a clickin engagement with the protrusion 17 of the male connector 13 in conjunction with a quick-coupling operation.
  • the male connector 13 comprises a shelf element 27, upon which a protruding portion 28, which is an upper end portion, of the locking element 24, can be temporarily rested when the locking element 24 has been moved to the unlocked state. Thereby the locking element 24 is held in the unlocked state while in the beginning of the uncoupling of the male and female connectors 13, 14, preventing the locking element 24 from reengaging with the locking seat 25.
  • the shelf element 27 is arranged at the side frame element 11 above the end portion of the lower horizontal frame element 9, and the shelf element 27 protrudes from the side frame element 11 in the same direction as the protrusion 17 of the male connector 13.
  • the shelf element 27 is constituted by a bent plate which has been attached to the side frame element 11.
  • the locking element 24 Since the locking element 24 is spring biased towards the locked state, and the shelf element 27 is comprised in the male connector 13, the locking element 24 will always be in the locked state when two barrier panels 2, 3 are to be coupled together.
  • the protrusion 17 of the male connector 13 is generally V-shaped, in the vertical direction, constituting the height of the male connector 13, with the tip of the V-shape constituting the outer end of the protrusion 17.
  • the width of the protrusion 17 decreases in direction from the support portion 18 towards the tip of the V-shape, i.e. the front end of the male connector 13, as shown in Fig. 6 .
  • the first connection part 15 comprises a hook portion 20 protruding from the end of the upper frame element 10, and having a hook shaped outer end, as shown in Fig. 7 . More particularly, at least the hook portion 20, and in this embodiment the whole first connection part 15, is U-shaped in cross-section, having an inner width slightly wider than the width of the upper frame element 10, and having opposite notches 21 at side walls of the hook portion 20.
  • the second connection part 16 comprises a hook engagement element 22, which in this embodiment simply is a bolt extending laterally through the upper frame element 10 and protruding at both sides thereof. Due to the U-shape of the connection portion 15, the upper frame elements 10 of the barrier panels 2, 3, and thus the barrier panels 2, 3, are aligned with each other when coupled together. The notches 21 are arranged to receive the hook engagement element 22 when the first and second connection part 15, 16 are coupled together.
  • Each post arrangement 4 comprises a structure attachment 30, a post device 31, mounted at the structure attachment 30 at a lower portion of the post device 31, and a barrier panel holder 32, connectable with the post device 31 at an upper portion thereof.
  • the post device 31 comprises a vertical post beam 33
  • the barrier panel holder 32 is horizontally movably connected with the vertical post beam 33 at its top.
  • the structure attachment 30, which when the temporary edge protection system 4 is mounted at the structure 5 is attached by means of bolts 36, or the like, to the structure 5, comprise post holding hooks 34.
  • the post device 31 comprises, at a lower end thereof, a beam structure 35 having hook receivers 37, which are engaged with the post holding hooks 34.
  • the beam structure 35 has a horizontal tubular first beam 38, which comprises one of the hook receivers 37, which hook receiver constitutes an end portion of the first beam 38, at a first end 45 thereof, which is an open end.
  • the hook receiver 37 includes a hole 42 at an top wall 43 thereof, through which hole 42 an end portion of the post holding hook 34 protrudes.
  • the beam structure 35 further comprises a horizontal tubular second beam 39, which comprises another one of the hook receivers 37, which hook receiver 37 constitutes an end portion of the second beam 39, at a first end 45 thereof, which is an open end.
  • the second beam 39 is arranged vertically parallel with the first beam 38, such that the hook receivers 37 of the first and second beams 38, 39 are positioned above each other.
  • the horizontal tubular first and second beams 38, 39 are attached to the vertical post beam 33 at respective second ends 47 thereof.
  • the beam structure 35 comprises a beam locking device 40 for preventing unintentional removal of the beam structure 35 from the hooks 34.
  • the first beam 38 comprises the beam locking device 40, which comprises a beam locking pin 41 extending internally of the first beam 38 along the length thereof, wherein the beam locking pin 41 is arranged to interact with the hook receiver 37 and to prevent release of the hook 34 from the hook receiver 37 when the beam locking device 40 is in a locked state. More particularly, there is a space between the underside of the hook 34 and the bottom wall 48 of the first beam 38, into which the beam locking pin 41 extends in the locked state. Thereby, there is not enough play to permit the protruding end of the hook 34 to disengage with the hole 42 in the top wall 43 of the first beam 38.
  • the beam locking pin 41 is spring biased, by means of a biasing spring 44, towards the first end 45 of the first beam 38, wherein the beam locking device 40 further comprises a rotatable catch element 46, which is connected with the beam locking pin 41 at the second end 47 of the first beam, and which is arranged at an outer surface of the beam structure 35. More particularly, the beam locking pin 41 extends through the vertical post beam 33, transverse thereof, and the catch element 46 is constituted by a bracket that encompasses the vertical post beam 33. The catch element 46 is arranged to be moved between an active state where it holds the beam locking pin 41 in a retracted position, in the unlocked state of the beam locking device 40, and an idle state, where the beam locking device 40 is in the locked state.
  • the movement between the idle state and the active state involves pulling the catch element 46 away from the second end 47 of the first beam 38 and rotating it 90 degrees.
  • the beam locking device 40 can be arranged at the second beam 39 instead of at the first beam 38.
  • the barrier panel holder 32 comprises a horizontal holder beam 49, horizontally movably connected with the vertical post beam 33, and a vertical holder beam 50, which comprises lower and upper barrier panel supports 51, 52, and which is vertically movably connected with the horizontal holder beam 49.
  • the horizontal holder beam 49 extends through a first clamping device 53 arranged at the top of the vertical post beam 33, so by releasing the clamping device 53 the position of the horizontal holder beam 49 relative to the vertical post beam 33 is adjustable.
  • the horizontal holder beam 49 is provide with a stop element 54 at its free end 55.
  • a second clamping device 56 is arranged at barrier panel end 57 of the horizontal holder beam 49, opposite to the free end 55. By releasing the second clamping device 56 the position of the vertical holder beam 50 relative to the horizontal holder beam 49, and thus the height of the barrier panel 2, can be adjusted.
  • First one structure attachment 30 is fastened at each pillar. Typically, the whole structure attachment 30 is pre-mounted, or fastenings for it are prepared already at the manufacture of the pillar.
  • a beam structure 35 is mounted at the structure attachment 30, by receiving the hooks 34 in the hook receivers 37.
  • the beam locking device 40 If the beam locking device 40 is in its locked state, a spring force has to be overcome during a part of the mounting operation since the beam locking pin 41 has to be pushed against the force of the biasing spring a bit before there is room for the beam locking pin 41 to return to the locking state. If the beam locking device 40 is in the unlocked state, as shown in Fig. 10b , it has to be locked when the beam structure has been mounted on the structure attachment 30. Then a barrier panel holder 32 is mounted at the beam structure 35, wherein the stop element 54 is temporarily removed from the horizontal holder beam 49 when it is introduced into the clamping device 53 at the top of the vertical post beam 33.
  • the horizontal holder beam 49 is adjusted to correctly position the vertical holder beam 50 relative to the building structure 5, and the clamping device 53 is tightened.
  • the barrier panels 2, 3 are to be mounted, starting from one barrier panel holder 32 and proceeding towards an adjacent barrier panel holder 32.
  • the upper barrier panel support 52 which comprises a clamping means, such as e.g. disclosed in EP 2 871 302 , is tightened to clamp the upper frame element 10.
  • a barrier panel 3 here called a second barrier panel 3
  • an already mounted barrier panel 2 here called a first barrier panel 2
  • first the upper quick coupling 7 is coupled, i.e.
  • the first connection part 15 of the second barrier panel 3 is engaged with the second connection part 16 of the first barrier panel 2, while the second barrier panel 3 is slightly angled to the first barrier panel 2, i.e. an end of the second barrier panel is lifted. Then the end of the second barrier panel 3 is lowered so that the male connector 13 enters the female connector 14 until the second barrier panel 3 is aligned with the first barrier panel 2, and the locking element 24 engages, by clicking-in, with the locking seat 25. Due to the smooth couplings/connections between the different parts of the temporary edge protection system 1, the mounting is quicker and easier to do than it was with the previously known temporary edge protection systems.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a barrier panel for a temporary edge protection system, wherein the barrier panel (2) is arranged for quick-coupling with another barrier panel (3), wherein the barrier panel comprises a horizontal lower frame element (9) having opposite first and second ends, wherein the lower frame element comprises a male connector (13) at the first end thereof and a female connector (14) at the second end thereof, which male and female connectors are arranged to be quick coupled to respective female and male connectors of other barrier panels by receiving the male connector into the female connector, and wherein the barrier panel comprises a horizontal upper frame element (10) with opposite first and second ends, wherein the upper frame element comprises a first connection part (15) at the first end thereof, and a second connection part (16) at the second end thereof, which first and second connection parts are arranged to be quick coupled with respective second and first connection parts of other barrier panels.
The invention further relates to a temporary edge protection system including the barrier panel.

Description

    FIELD OF THE INVENTION
  • The present invention relates to a barrier panel for a temporary edge protection system, and to a temporary edge protection system comprising such a barrier panel.
  • BACKGROUND OF THE INVENTION
  • When raising or maintaining a building temporary edge protection systems are used to safeguard the workers. Typically the temporary edge protection system comprises several post arrangements, which are fastened at a floor, a wall, a beam, or the like, of the building, and several barrier panels carried by the post arrangements. At some buildings only widely spaced columns are available for fastening the post arrangements. To bridge the distance between two columns at least two barrier panels need to be interconnected with no post support at the interconnection position. Since typically the temporary edge protection system is to be mounted at a high height, a sky lift or the like has to be used for parts of the mounting operation. With the current temporary edge protection systems this is a rather complicated and time consuming operation, requiring the sky lift to be moved several times back and forth between the columns and the interconnection position.
  • SUMMARY OF THE INVENTION
  • It would be advantageous to provide a solution which facilitates the mounting of the temporary edge protection system in the situation described above.
  • To better address this concern, in a first aspect of the invention there is presented a barrier panel for a temporary edge protection system, wherein the barrier panel is arranged for quick-coupling with another barrier panel. The barrier panel comprises a horizontal lower frame element having opposite first and second ends, wherein the lower frame element comprises a male connector at the first end thereof and a female connector at the second end thereof. The male and female connectors are arranged to be quick coupled to respective female and male connectors of other barrier panels by receiving the male connector into the female connector. Further, the barrier panel comprises a horizontal upper frame element with opposite first and second ends, wherein the upper frame element comprises a first connection part at the first end thereof, and a second connection part at the second end thereof. The first and second connection parts are arranged to be quick coupled with respective second and first connection parts of other barrier panels. The quick coupling arrangements simplify the mounting operation when interconnecting two barrier panels.
  • In accordance with an embodiment of the barrier panel, the male connector comprises a protrusion, which protrudes horizontally from the first end of the lower frame element, and wherein the female connector comprises a cavity extending inside of the lower frame element from the second end towards the first end. Thereby the interconnection of the female and the male connector is facilitated.
  • In accordance with an embodiment of the barrier panel, the female connector comprises a plastic sleeve, which defines the cavity. This embodiment provides for a lower friction that for instance metal against metal which is advantageous for connection as well as disconnection of the barrier panels.
  • In accordance with an embodiment of the barrier panel, the female connector comprises a locking device, which is vertically movable between a locked state where the locking device, when the female connector is interconnected with a male connector, is engaged with the male connector, and an unlocked state, where the locking device is disengaged with the male connector. The locking device improves safety.
  • In accordance with an embodiment of the barrier panel, the locking device is spring biased towards the locked state and arranged for a click-in engagement with the protrusion of the male connector in conjunction with a quick-coupling operation, and wherein the male connector comprises a rest portion, upon which a protruding portion of the locking device can be temporarily rested when the locking device has been moved to the unlocked state, and thereby held in the unlocked state, to enable uncoupling of the male and female connectors. Thereby safety as well as simplicity of mounting and demounting is enhanced.
  • In accordance with an embodiment of the barrier panel, the protrusion is generally V-shaped, with the tip of the V-shape constituting the outer end of the protrusion. This embodiment is advantageous in that the interconnection of two barrier panels is facilitated. As an additional feature contributing to the same advantage, the width of the protrusion can be arranged to decrease from the first end of the lower frame element towards the tip of the V-shape.
  • According to another aspect of the present invention, there is provided a temporary edge protection system comprising a barrier panel, as described above, and a post arrangement. The post arrangement comprises a structure attachment, a post device, adapted to be mounted at the structure attachment at a lower portion of the post device, and a barrier panel holder, connectable with the post device at an upper portion thereof. This temporary edge protection system provides the same simplification as the barrier panel as such.
  • In accordance with an embodiment of the temporary edge protection system, the structure attachment has post holding hooks, wherein the post device comprises, at a lower end thereof, a beam structure having hook receivers, which are arranged to engage with the hooks. Thereby it is simple to first mount the structure attachment at a structure, and then engage the post device with the hooks.
  • In accordance with an embodiment of the temporary edge protection system, the beam structure comprises a locking device for preventing unintentional removal of the beam structure from the hooks.
  • In accordance with an embodiment of the temporary edge protection system, the beam structure has a horizontal tubular first beam, which comprises one of the hook receivers, which hook receiver constitutes an end portion of the first beam, at a first end thereof, which is an open end, wherein the first beam further comprises the locking device, which comprises a locking pin extending internally of the first beam along the length thereof, wherein the locking pin is arranged to interact with the hook receiver and to prevent release of the hook from the hook receiver when the locking device is in a locked state. In this embodiment the locking device is advantageously simple to handle.
  • In accordance with an embodiment of the temporary edge protection system, the locking pin is spring biased towards the first end of the first beam, wherein the locking device further comprises a rotatable catch element, which is connected with the locking pin at a second end of the first beam, and which is arranged at an outer surface of the beam structure, wherein the catch element is arranged to be moved between an active state where it holds the locking pin in a retracted position, in the unlocked state of the locking device, and an idle state, where the locking device is in the locked state, wherein the movement between the idle state and the active state involves moving the catch element away from the first end of the beam and rotating it. Thereby the demounting of the post arrangement is facilitated.
  • In accordance with an embodiment of the temporary edge protection system, the beam structure comprises a horizontal tubular second beam, which comprises another one of the hook receivers, which hook receiver constitutes an end portion of the second beam, at a first end thereof, which is an open end, wherein the second beam is arranged vertically parallel with the first beam, such that the hook receivers of the first and second beams are positioned above each other. This embodiment provides for stability of the system.
  • In accordance with an embodiment of the temporary edge protection system, the post device comprises a vertical post beam, wherein the barrier panel holder is horizontally movably connected with the vertical post beam. This embodiment has an advantageous adjustment of the horizontal position of the barrier panel.
  • In accordance with an embodiment of the temporary edge protection system, the barrier panel holder comprises a horizontal holder beam, horizontally movably connected with the vertical post beam, and a vertical holder beam, which comprises barrier panel supports, and which is vertically adjustably connected with the horizontal holder beam. This embodiment provides for an advantageous vertical adjustment of the barrier panel.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The invention will now be described in more detail and with reference to the appended drawings in which:
    • Figs. 1 and 2 are schematic perspective views of an embodiment of the temporary edge protection system according to the present invention;
    • Fig. 3 is a perspective view of two barrier panels of the embodiment;
    • Fig. 4 is a side view of a quick coupling of the embodiment;
    • Figs. 5a-5d and 6 are cross-sectional views of the quick coupling of Fig. 4;
    • Fig. 7 is a side view of another quick coupling of the embodiment;
    • Fig. 8 is a perspective view of an upper part of the embodiment;
    • Fig. 9 is a side view of a lower part of the embodiment; and
    • Figs. 10a-10b are cross-sectional views of the lower part of Fig. 9.
    DESCRIPTION OF EMBODIMENTS
  • An embodiment of the temporary edge protection system 1 comprises at least one barrier panel 2, 3, and at least one post arrangement 4. However, typically the system 1 comprises several barrier panels 2, 3 as well as several post arrangements 4 in order to enable the system to provide a safety barrier along one or more sides of a large building. The temporary edge protection system 1 is arranged to be mounted at a building, and more particularly at a structure 5, such as a wall, a column, etc., of a building.
  • The temporary edge protection system is constructed to facilitate mounting of the system across large spans. For instance, the barrier panels 2, 3 are provided with lower and upper quick couplings 6, 7 for coupling the barrier panels 2, 3 together. More particularly, as best shown in Fig. 3, referring to a first barrier panel 2 of the shown barrier panels 2, 3, each barrier panel 2 has a frame with lower and upper frame elements 9, 10, and side frame elements 11, 12. A mesh 8 is typically mounted within the frame, covering at least a part of the frame area. Referring to a mounted state, the lower and upper frame elements 9, 10 are horizontal, and the side frame elements 11, 12 are vertical. This geometrical orientation is used throughout the application. The lower frame element 9 comprises a male connector 13 at a first end thereof, and a female connector 14 at a second, opposite end thereof. The male connector 13 of one barrier panel 2, and the female connector 14 of another barrier panel 3 together form the lower quick coupling 6. The upper frame element 10 comprises a first connection part 15 at a first end thereof, at the same side of the barrier panel 2 as the male connector 13, and a second connection part 16 at a second end thereof, at the same side of the barrier panel 2 as the female connector 14. Similarly to the first quick coupling, the first connection part 15 of one barrier panel 2, and the second connection part 16 of another barrier panel 3, form the upper quick coupling 7. Consequently, the male and female connectors 13, 14 are arranged to be quick coupled with each other, and so are the first and second connection parts 15, 16 as well.
  • Referring now to figs. 4 and 5a-5d, the lower frame element 9 is tubular, and the male connector 13 comprises a protrusion 17, which protrudes horizontally from the opening of the first end of the lower frame element 9, and a base portion 18, which extends a distance into the lower frame element 9 and is attached to the lower frame element 9. The female connector 14 comprises a sleeve 19, which extends into the lower frame element 9 at its second end, thereby forming a cavity for receiving the protrusion 17 of the male connector 13 of another barrier panel, such as a second barrier panel 3 as shown. The male connector 13 is preferably made of a metal, such as steel, to provide enough strength, while the female connector 14 preferably is made of plastic in order to reduce the friction between the male and female connectors 13, 14.
  • The female connector 14 further comprises a locking device 23, which has a locking element 24 that is vertically movable between a locked state, as for instance shown in Fig. 5d, and an unlocked state, as for instance shown in Fig. 5c. In the locked state the locking element 24 is engaged with a locking seat 25 of the male connector 13. In this embodiment, the locking element 24 is constituted of a locking pin, and the locking seat 25 is constituted by a hole. In the unlocked state, the locking element 24 is disengaged from the locking seat 25.
  • The locking device 23 further comprises a spring 26, which is arranged to spring bias the locking element 24 towards the locked state and for a clickin engagement with the protrusion 17 of the male connector 13 in conjunction with a quick-coupling operation. The male connector 13 comprises a shelf element 27, upon which a protruding portion 28, which is an upper end portion, of the locking element 24, can be temporarily rested when the locking element 24 has been moved to the unlocked state. Thereby the locking element 24 is held in the unlocked state while in the beginning of the uncoupling of the male and female connectors 13, 14, preventing the locking element 24 from reengaging with the locking seat 25. The shelf element 27 is arranged at the side frame element 11 above the end portion of the lower horizontal frame element 9, and the shelf element 27 protrudes from the side frame element 11 in the same direction as the protrusion 17 of the male connector 13. In this embodiment, the shelf element 27 is constituted by a bent plate which has been attached to the side frame element 11.
  • Since the locking element 24 is spring biased towards the locked state, and the shelf element 27 is comprised in the male connector 13, the locking element 24 will always be in the locked state when two barrier panels 2, 3 are to be coupled together.
  • The protrusion 17 of the male connector 13 is generally V-shaped, in the vertical direction, constituting the height of the male connector 13, with the tip of the V-shape constituting the outer end of the protrusion 17. The width of the protrusion 17 decreases in direction from the support portion 18 towards the tip of the V-shape, i.e. the front end of the male connector 13, as shown in Fig. 6.
  • The first connection part 15 comprises a hook portion 20 protruding from the end of the upper frame element 10, and having a hook shaped outer end, as shown in Fig. 7. More particularly, at least the hook portion 20, and in this embodiment the whole first connection part 15, is U-shaped in cross-section, having an inner width slightly wider than the width of the upper frame element 10, and having opposite notches 21 at side walls of the hook portion 20. The second connection part 16 comprises a hook engagement element 22, which in this embodiment simply is a bolt extending laterally through the upper frame element 10 and protruding at both sides thereof. Due to the U-shape of the connection portion 15, the upper frame elements 10 of the barrier panels 2, 3, and thus the barrier panels 2, 3, are aligned with each other when coupled together. The notches 21 are arranged to receive the hook engagement element 22 when the first and second connection part 15, 16 are coupled together.
  • Each post arrangement 4 comprises a structure attachment 30, a post device 31, mounted at the structure attachment 30 at a lower portion of the post device 31, and a barrier panel holder 32, connectable with the post device 31 at an upper portion thereof. More particularly, the post device 31 comprises a vertical post beam 33, and the barrier panel holder 32 is horizontally movably connected with the vertical post beam 33 at its top.
  • The structure attachment 30, which when the temporary edge protection system 4 is mounted at the structure 5 is attached by means of bolts 36, or the like, to the structure 5, comprise post holding hooks 34. The post device 31 comprises, at a lower end thereof, a beam structure 35 having hook receivers 37, which are engaged with the post holding hooks 34.
  • The beam structure 35 has a horizontal tubular first beam 38, which comprises one of the hook receivers 37, which hook receiver constitutes an end portion of the first beam 38, at a first end 45 thereof, which is an open end. The hook receiver 37 includes a hole 42 at an top wall 43 thereof, through which hole 42 an end portion of the post holding hook 34 protrudes. The beam structure 35 further comprises a horizontal tubular second beam 39, which comprises another one of the hook receivers 37, which hook receiver 37 constitutes an end portion of the second beam 39, at a first end 45 thereof, which is an open end. The second beam 39 is arranged vertically parallel with the first beam 38, such that the hook receivers 37 of the first and second beams 38, 39 are positioned above each other. The horizontal tubular first and second beams 38, 39 are attached to the vertical post beam 33 at respective second ends 47 thereof.
  • The beam structure 35 comprises a beam locking device 40 for preventing unintentional removal of the beam structure 35 from the hooks 34. More particularly, the first beam 38 comprises the beam locking device 40, which comprises a beam locking pin 41 extending internally of the first beam 38 along the length thereof, wherein the beam locking pin 41 is arranged to interact with the hook receiver 37 and to prevent release of the hook 34 from the hook receiver 37 when the beam locking device 40 is in a locked state. More particularly, there is a space between the underside of the hook 34 and the bottom wall 48 of the first beam 38, into which the beam locking pin 41 extends in the locked state. Thereby, there is not enough play to permit the protruding end of the hook 34 to disengage with the hole 42 in the top wall 43 of the first beam 38.
  • The beam locking pin 41 is spring biased, by means of a biasing spring 44, towards the first end 45 of the first beam 38, wherein the beam locking device 40 further comprises a rotatable catch element 46, which is connected with the beam locking pin 41 at the second end 47 of the first beam, and which is arranged at an outer surface of the beam structure 35. More particularly, the beam locking pin 41 extends through the vertical post beam 33, transverse thereof, and the catch element 46 is constituted by a bracket that encompasses the vertical post beam 33. The catch element 46 is arranged to be moved between an active state where it holds the beam locking pin 41 in a retracted position, in the unlocked state of the beam locking device 40, and an idle state, where the beam locking device 40 is in the locked state. The movement between the idle state and the active state involves pulling the catch element 46 away from the second end 47 of the first beam 38 and rotating it 90 degrees. As is understood by the person skilled in the art, the beam locking device 40 can be arranged at the second beam 39 instead of at the first beam 38.
  • The barrier panel holder 32 comprises a horizontal holder beam 49, horizontally movably connected with the vertical post beam 33, and a vertical holder beam 50, which comprises lower and upper barrier panel supports 51, 52, and which is vertically movably connected with the horizontal holder beam 49. In other words, the horizontal holder beam 49 extends through a first clamping device 53 arranged at the top of the vertical post beam 33, so by releasing the clamping device 53 the position of the horizontal holder beam 49 relative to the vertical post beam 33 is adjustable. In order to prevent a user from pulling the horizontal holder beam 49 out of the first clamping device 53, the horizontal holder beam 49 is provide with a stop element 54 at its free end 55. Similarly, a second clamping device 56 is arranged at barrier panel end 57 of the horizontal holder beam 49, opposite to the free end 55. By releasing the second clamping device 56 the position of the vertical holder beam 50 relative to the horizontal holder beam 49, and thus the height of the barrier panel 2, can be adjusted.
  • In order to exemplify how some parts of the edge protection system 1 are mounted, in order to show the simplicity of the system, it is assumed that only the pillars of the building structure 5 can be used to anchor the edge protection system 1, and that the distance between two adjacent pillars is too long to bridge it with two barrier panels 2, 3, one at each pillar. First one structure attachment 30 is fastened at each pillar. Typically, the whole structure attachment 30 is pre-mounted, or fastenings for it are prepared already at the manufacture of the pillar. A beam structure 35 is mounted at the structure attachment 30, by receiving the hooks 34 in the hook receivers 37. If the beam locking device 40 is in its locked state, a spring force has to be overcome during a part of the mounting operation since the beam locking pin 41 has to be pushed against the force of the biasing spring a bit before there is room for the beam locking pin 41 to return to the locking state. If the beam locking device 40 is in the unlocked state, as shown in Fig. 10b, it has to be locked when the beam structure has been mounted on the structure attachment 30. Then a barrier panel holder 32 is mounted at the beam structure 35, wherein the stop element 54 is temporarily removed from the horizontal holder beam 49 when it is introduced into the clamping device 53 at the top of the vertical post beam 33.
  • Next, the horizontal holder beam 49 is adjusted to correctly position the vertical holder beam 50 relative to the building structure 5, and the clamping device 53 is tightened. Now the barrier panels 2, 3 are to be mounted, starting from one barrier panel holder 32 and proceeding towards an adjacent barrier panel holder 32. When a barrier panel 2, 3 is mounted at the barrier panel supports 51, 52, the upper barrier panel support 52, which comprises a clamping means, such as e.g. disclosed in EP 2 871 302 , is tightened to clamp the upper frame element 10. When a barrier panel 3, here called a second barrier panel 3, is interconnected with an already mounted barrier panel 2, here called a first barrier panel 2, first the upper quick coupling 7 is coupled, i.e. the first connection part 15 of the second barrier panel 3 is engaged with the second connection part 16 of the first barrier panel 2, while the second barrier panel 3 is slightly angled to the first barrier panel 2, i.e. an end of the second barrier panel is lifted. Then the end of the second barrier panel 3 is lowered so that the male connector 13 enters the female connector 14 until the second barrier panel 3 is aligned with the first barrier panel 2, and the locking element 24 engages, by clicking-in, with the locking seat 25. Due to the smooth couplings/connections between the different parts of the temporary edge protection system 1, the mounting is quicker and easier to do than it was with the previously known temporary edge protection systems.
  • While the invention has been illustrated and described in detail in the drawings and foregoing description, such illustration and description are to be considered illustrative or exemplary and not restrictive; the invention is not limited to the disclosed embodiments.
  • Other variations to the disclosed embodiments can be understood and effected by those skilled in the art in practicing the claimed invention, from a study of the drawings, the disclosure, and the appended claims. In the claims, the word "comprising" does not exclude other elements or steps, and the indefinite article "a" or "an" does not exclude a plurality. A single unit may fulfill the functions of several items recited in the claims. The mere fact that certain measures are recited in mutually different dependent claims does not indicate that a combination of these measured cannot be used to advantage. Any reference signs in the claims should not be construed as limiting the scope.

Claims (15)

  1. A barrier panel for a temporary edge protection system, wherein the barrier panel (2) is arranged for quick-coupling with another barrier panel (3), wherein the barrier panel comprises a horizontal lower frame element (9) having opposite first and second ends, wherein the lower frame element comprises a male connector (13) at the first end thereof and a female connector (14) at the second end thereof, which male and female connectors are arranged to be quick coupled to respective female and male connectors of other barrier panels by receiving the male connector into the female connector, and wherein the barrier panel comprises a horizontal upper frame element (10) with opposite first and second ends, wherein the upper frame element comprises a first connection part (15) at the first end thereof, and a second connection part (16) at the second end thereof, which first and second connection parts are arranged to be quick coupled with respective second and first connection parts of other barrier panels.
  2. The barrier panel according to claim 1, wherein the male connector (13) comprises a protrusion (17), which protrudes horizontally from the first end of the lower frame element (9), and wherein the female connector (14) comprises a cavity extending inside of the lower frame element from the second end towards the first end.
  3. The barrier panel according to claim 2, wherein the female connector (14) comprises a plastic sleeve (19), which defines the cavity.
  4. The barrier panel according to claim 2 or 3, wherein the female connector (14) comprises a locking device (23), which has a locking element (24) that is vertically movable between a locked state where the locking element, when the female connector is interconnected with a male connector (13), is engaged with a locking seat (25) of the male connector, and an unlocked state, where the locking element is disengaged from the locking seat.
  5. The barrier panel according to claim 4, wherein the locking device (23) further comprises a spring (26), which is arranged to spring bias the locking element (24) towards the locked state and for a click-in engagement with the protrusion (17) of the male connector (13) in conjunction with a quick-coupling operation, and wherein the male connector comprises a shelf element (27), upon which a protruding portion (28) of the locking element can be temporarily rested when the locking element has been moved to the unlocked state, and thereby held in the unlocked state, to facilitate uncoupling of the male and female connectors (13, 14).
  6. The barrier panel according to any one of claims 2-5, wherein the protrusion (17) is generally V-shaped, with the tip of the V-shape constituting the outer end of the protrusion.
  7. The barrier panel according to claim 6, wherein the width of the protrusion (17) decreases from the first end of the lower frame element (9) towards the tip of the V-shape.
  8. A temporary edge protection system comprising a barrier panel according to any one of the previous claims, and a post arrangement (4), wherein the post arrangement comprises a structure attachment (30), a post device (31), adapted to be mounted at the structure attachment at a lower portion of the post device, and a barrier panel holder (32), connectable with the post device at an upper portion thereof.
  9. The temporary edge protection system according to claim 8, wherein the structure attachment (30) has post holding hooks (34), wherein the post device (31) comprises, at a lower end thereof, a beam structure (35) having hook receivers (37), which are arranged to engage with the hooks.
  10. The temporary edge protection system according to claim 8, wherein the beam structure (35) comprises a beam locking device (40) for preventing unintentional removal of the beam structure from the hooks (34).
  11. The temporary edge protection system according to claim 10, wherein the beam structure (35) has a horizontal tubular first beam (38), which comprises one of the hook receivers (37), which hook receiver constitutes an end portion of the first beam, at a first end thereof, which is an open end, wherein the first beam further comprises the beam locking device (40), which comprises a beam locking pin (41) extending internally of the first beam (38) along the length thereof, wherein the beam locking pin is arranged to interact with the hook receiver (37) and to prevent release of the hook (34) from the hook receiver when the beam locking device is in a locked state.
  12. The temporary edge protection system according to claim 11, wherein the beam locking pin (41) is spring biased towards the first end of the first beam, wherein the locking device further comprises a rotatable catch element (46), which is connected with the beam locking pin at a second end of the first beam (38), and which is arranged at an outer surface of the beam structure (35), wherein the catch element is arranged to be moved between an active state where it holds the beam locking pin in a retracted position, in the unlocked state of the beam locking device (40), and an idle state, where the beam locking device is in the locked state, wherein the movement between the idle state and the active state involves moving the catch element away from the first end of the first beam and rotating it.
  13. The temporary edge protection system according to claim 11 or 12, wherein the beam structure (35) comprises a horizontal tubular second beam (39), which comprises another one of the hook receivers (37), which hook receiver constitutes an end portion of the second beam, at a first end thereof, which is an open end, wherein the second beam is arranged vertically parallel with the first beam (38), such that the hook receivers of the first and second beams are positioned above each other.
  14. The temporary edge protection system according to any one of claims 8-13, wherein the post device (31) comprises a vertical post beam (33), wherein the barrier panel holder (32) is horizontally movably connected with the vertical post beam.
  15. The temporary edge protection system according to claim 14, wherein the barrier panel holder (32) comprises a horizontal holder beam (49), horizontally movably connected with the vertical post beam (33), and a vertical holder beam (50), which comprises barrier panel supports (51, 52), and which is vertically movably connected with the horizontal holder beam.
EP15187437.7A 2015-09-29 2015-09-29 A temporary edge protection system Active EP3150780B1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DK15187437.7T DK3150780T3 (en) 2015-09-29 2015-09-29 Temporary corner protection system.
PL15187437T PL3150780T3 (en) 2015-09-29 2015-09-29 A temporary edge protection system
LTEP15187437.7T LT3150780T (en) 2015-09-29 2015-09-29 A temporary edge protection system
EP15187437.7A EP3150780B1 (en) 2015-09-29 2015-09-29 A temporary edge protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP15187437.7A EP3150780B1 (en) 2015-09-29 2015-09-29 A temporary edge protection system

Publications (2)

Publication Number Publication Date
EP3150780A1 true EP3150780A1 (en) 2017-04-05
EP3150780B1 EP3150780B1 (en) 2018-05-09

Family

ID=54256531

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15187437.7A Active EP3150780B1 (en) 2015-09-29 2015-09-29 A temporary edge protection system

Country Status (4)

Country Link
EP (1) EP3150780B1 (en)
DK (1) DK3150780T3 (en)
LT (1) LT3150780T (en)
PL (1) PL3150780T3 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3369863A1 (en) * 2017-03-03 2018-09-05 Safety Solutions Jonsereds AB Safety barrier element

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU641036B2 (en) * 1990-08-06 1993-09-09 Tubemakers Of Australia Limited Building construction safety barrier
EP0611257A1 (en) * 1993-02-04 1994-08-17 Mägert Bautechnik AG Climbing console
FR2775712A1 (en) * 1998-03-03 1999-09-10 Dimos Fixing for scaffolding structure to construction element e.g. a wall
JP2001159244A (en) * 1999-12-03 2001-06-12 Daitou Display:Kk Connecting structure for panel of guard fence or the like
WO2004042165A1 (en) * 2002-11-07 2004-05-21 Sferco Pty. Limited Modular barrier system
JP3792336B2 (en) * 1997-02-19 2006-07-05 ジャパン スチールス インターナショナル株式会社 Temporary work unit
FR2986026A1 (en) * 2012-01-25 2013-07-26 Nord Coffrage Equipment for protecting masonry facade of building, has stringer ensuring protection of vacuum on entire surface of working structure, and lifting loops handling overall safety of equipment, where post supports stringer
EP2871302A1 (en) 2013-11-08 2015-05-13 Safety Solutions Jonsereds AB Mounting arrangement for a temporary edge protection system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU641036B2 (en) * 1990-08-06 1993-09-09 Tubemakers Of Australia Limited Building construction safety barrier
EP0611257A1 (en) * 1993-02-04 1994-08-17 Mägert Bautechnik AG Climbing console
JP3792336B2 (en) * 1997-02-19 2006-07-05 ジャパン スチールス インターナショナル株式会社 Temporary work unit
FR2775712A1 (en) * 1998-03-03 1999-09-10 Dimos Fixing for scaffolding structure to construction element e.g. a wall
JP2001159244A (en) * 1999-12-03 2001-06-12 Daitou Display:Kk Connecting structure for panel of guard fence or the like
WO2004042165A1 (en) * 2002-11-07 2004-05-21 Sferco Pty. Limited Modular barrier system
FR2986026A1 (en) * 2012-01-25 2013-07-26 Nord Coffrage Equipment for protecting masonry facade of building, has stringer ensuring protection of vacuum on entire surface of working structure, and lifting loops handling overall safety of equipment, where post supports stringer
EP2871302A1 (en) 2013-11-08 2015-05-13 Safety Solutions Jonsereds AB Mounting arrangement for a temporary edge protection system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3369863A1 (en) * 2017-03-03 2018-09-05 Safety Solutions Jonsereds AB Safety barrier element

Also Published As

Publication number Publication date
DK3150780T3 (en) 2018-07-30
EP3150780B1 (en) 2018-05-09
LT3150780T (en) 2018-06-25
PL3150780T3 (en) 2018-12-31

Similar Documents

Publication Publication Date Title
US20030047382A1 (en) Scaffolding safety apparatus and method of installation
US10561242B1 (en) Shelving bracket
US8794381B2 (en) Fittings for builders' trestles
KR100895381B1 (en) Form safety balustrade pole
EP3150780B1 (en) A temporary edge protection system
DK3160386T3 (en) ARTIFICIAL SPHINCTER.
US20190024405A1 (en) Portable type fencing system
EP4127358B1 (en) Assembly for arranging temporary preceding guardrail on a scaffolding system
EP2871302B1 (en) Mounting arrangement for a temporary edge protection system
JP6874243B1 (en) Temporary scaffolding cane
US20210095484A1 (en) Elevated walkway system and method
AU2018100485A4 (en) A Weighted Support Assembly
CN210718328U (en) Shelf supporting structure fixed by buckles
JP6159557B2 (en) Scaffolding structure
JP2020117879A (en) Joint structure of wooden horizontal member and steel horizontal member, and receiving metal fitting
JPH0622038Y2 (en) Long tile dry construction structure
JP2003097055A (en) Preceding handrail frame
KR200471957Y1 (en) Install bracket of dropping prevention net with easy construction
JP3485534B2 (en) Scaffolding protection device, scaffolding pipe device and scaffolding device
KR102181014B1 (en) Bracket and stanchion for scaffolding
JP2002276151A (en) Joint portion for steel pipe scaffolding
JP2015148098A (en) Beam frame receiving tool
CN220058473U (en) Stone curtain wall mounting structure
JP3235154U (en) Brace with handrail
AU2017245325B2 (en) A portable type fencing system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20171003

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20180124

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 997694

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180515

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015010881

Country of ref document: DE

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20180719

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: EE

Ref legal event code: FG4A

Ref document number: E015696

Country of ref document: EE

Effective date: 20180613

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 4

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20180509

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20180509

Ref country code: SK

Ref legal event code: T3

Ref document number: E 27690

Country of ref document: SK

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180810

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 997694

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015010881

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20190212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180930

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180930

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180930

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20150929

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180909

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20230817

Year of fee payment: 9

Ref country code: GB

Payment date: 20230816

Year of fee payment: 9

Ref country code: FI

Payment date: 20230816

Year of fee payment: 9

Ref country code: EE

Payment date: 20230822

Year of fee payment: 9

Ref country code: CZ

Payment date: 20230821

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SK

Payment date: 20230818

Year of fee payment: 9

Ref country code: SE

Payment date: 20230816

Year of fee payment: 9

Ref country code: PL

Payment date: 20230915

Year of fee payment: 9

Ref country code: FR

Payment date: 20230816

Year of fee payment: 9

Ref country code: DK

Payment date: 20230817

Year of fee payment: 9

Ref country code: DE

Payment date: 20230818

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LV

Payment date: 20230821

Year of fee payment: 9

Ref country code: LT

Payment date: 20230822

Year of fee payment: 9