EP3147408A1 - Marine foundation and construction method thereof - Google Patents

Marine foundation and construction method thereof Download PDF

Info

Publication number
EP3147408A1
EP3147408A1 EP16175964.2A EP16175964A EP3147408A1 EP 3147408 A1 EP3147408 A1 EP 3147408A1 EP 16175964 A EP16175964 A EP 16175964A EP 3147408 A1 EP3147408 A1 EP 3147408A1
Authority
EP
European Patent Office
Prior art keywords
unit
self
weight control
control tank
tank unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP16175964.2A
Other languages
German (de)
French (fr)
Other versions
EP3147408B1 (en
Inventor
Seok Tae Kim
Keum Seok Kang
Moo Sung Ryu
Joon Young Park
Jae Kyoung Lee
Min Uk Jung
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Korea Electric Power Corp
Original Assignee
Korea Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Korea Electric Power Corp filed Critical Korea Electric Power Corp
Publication of EP3147408A1 publication Critical patent/EP3147408A1/en
Application granted granted Critical
Publication of EP3147408B1 publication Critical patent/EP3147408B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/027Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0065Monopile structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0073Details of sea bottom engaging footing
    • E02B2017/0078Suction piles, suction cans
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0091Offshore structures for wind turbines

Definitions

  • the present invention relates to a marine foundation and a construction method thereof, and more specifically, to a marine foundation capable of being easily moved in the sea and submerged and installed at a correct installation position, and a construction method thereof.
  • a marine structure such as a wind turbine
  • a marine structure foundation is mounted on the ocean floor to support the marine structure.
  • the marine structure foundation is loaded on a barge ship or a ship and is then moved to an installation position.
  • the marine structure foundation of the barge ship or the ship is moved to sea level using a crane or the like and is submerged.
  • the marine structure foundation is mounted on the ocean floor, and then the marine structure is installed on the marine structure foundation.
  • a conventional marine structure foundation is loaded on a barge or a ship and is moved to an installation position, and thus several tugs are used to move the marine structure foundation to the installation position.
  • the installation position of the marine structure foundation may be changed due to a tide or wave.
  • the present invention is directed to a marine foundation capable of being easily moved and installed at an accurate installation position, and a construction method thereof.
  • a marine foundation including a self-weight control tank unit configured to move while floating at sea level and submerged and installed on an ocean floor by receiving seawater, a monopod unit installed in the self-weight control tank unit to be lowered and connected to a marine structure, a guide bucket unit installed under the monopod unit and mounted on the ocean floor by discharging seawater, and a leg unit installed under the self-weight control tank unit.
  • the marine foundation may further include a thrust device installed in the self-weight control tank unit and configured to control a submerged installation position of the self-weight control tank unit by applying a thrust to the self-weight control tank unit.
  • the thrust device may include a belt unit coupled to the self-weight control tank unit, and a propeller unit installed on the belt unit and applying the thrust to the self-weight control tank unit.
  • the belt unit may include a plurality of band units arranged to surround the self-weight control tank unit, and a belt unfastening unit coupling and separating adjacent ends of the plurality of band units.
  • the self-weight control tank unit may include a guide unit formed so that the monopod unit is movably inserted therein, a seawater chamber formed so that the seawater is supplied thereto, and a hose connection unit formed so that pumping hoses are connected thereto.
  • the marine foundation may further include an opening and closing valve installed in the self-weight control tank unit to supply the seawater to the self-weight control tank unit and block the seawater from being supplied to the self-weight control tank unit.
  • the guide unit may be formed to vertically pass through the center of the self-weight control tank unit.
  • the leg unit may include a leg bucket unit disposed along a lower circumference of the self-weight control tank unit and mounted on the ocean floor by discharging seawater.
  • the leg bucket unit may have an open lower side, and the leg bucket unit may have a hose coupling unit so that pumping hoses are connected thereto.
  • a method of constructing a marine foundation including moving a self-weight control tank unit to an installation position while the self-weight control tank unit floats at sea level by buoyancy, lowering a guide bucket unit installed in the self-weight control tank unit and mounting the guide bucket unit on an ocean floor, submerging and installing the self-weight control tank unit on the ocean floor by supplying seawater to a seawater chamber of the self-weight control tank unit, and lowering a leg unit coupled to the self-weight control tank unit along with the self-weight control tank unit and mounting the leg unit on the ocean floor.
  • the submerging and installing of the self-weight control tank unit on the ocean floor may include operating a thrust device coupled to the self-weight control tank unit to control a submerged installation position of the self-weight control tank unit.
  • the method may further include unfastening the self-weight control tank unit from the thrust device and collecting the thrust device after the lowering of the leg unit coupled to the self-weight control tank unit along with the self-weight control tank unit and the mounting of the leg unit on the ocean floor.
  • the lowering of the leg unit coupled to the self-weight control tank unit along with the self-weight control tank unit to mount the leg unit on the ocean floor may include discharging seawater in the leg unit to an outside of the leg unit to generate suction pressures in the leg unit.
  • FIG. 1 is a perspective view illustrating a marine foundation according to one embodiment of the present invention
  • FIG. 2 is a front view illustrating the marine foundation according to one embodiment of the present invention
  • FIG. 3 is a cross-sectional view illustrating the marine foundation according to one embodiment of the present invention
  • FIG. 4 is a perspective view illustrating a thrust device in the marine foundation according to one embodiment of the present invention.
  • the marine foundation includes a self-weight control tank unit 110, a monopod unit 120, a guide bucket unit 130, and leg units 140.
  • the self-weight control tank unit 110 moves while floating at sea level, and is submerged and installed on the ocean floor when seawater is supplied thereto.
  • the self-weight control tank unit 110 moves while floating at sea level, and thus a marine foundation may be moved to an installation position using one tug. Therefore, a barge ship and a ship may be disused to mount the self-weight control tank unit 110, and thus delivery costs of the marine foundation may be reduced.
  • the self-weight control tank unit 110 has a conical upper side.
  • a circular ring-shaped skirt unit 115 is formed along a circumference of the self-weight control tank unit 110.
  • the self-weight control tank unit 110 includes a guide unit 111 formed so that the monopod unit 120 is movably inserted therein, a seawater chamber 112 formed so that seawater is supplied thereto, and a hose connection unit 113 formed so that pumping hoses are connected thereto.
  • the guide unit 111 is formed in a cylindrical pipe shape.
  • the hose connection unit 113 is connected to the upper side of the self-weight control tank unit 110.
  • the seawater chamber 112 is formed in the self-weight control tank unit 110, and thus, when the marine foundation is transferred to the installation position, air is accommodated in the seawater chamber 112 to apply buoyancy to the self-weight control tank unit 110.
  • seawater is supplied to the self-weight control tank unit 110, and thus the self-weight control tank unit 110 is submerged in the sea.
  • the guide unit 111 is formed to vertically pass through the center of the self-weight control tank unit 110. Since the guide unit 111 is formed to pass through the center of the self-weight control tank unit 110, the monopod unit 120 is movably installed in the center of the self-weight control tank unit 110. Therefore, the monopod unit 120 may be stably supported by the self-weight control tank unit 110.
  • the marine foundation further includes an opening and closing valve 117 installed in the self-weight control tank unit 110 to supply seawater to the self-weight control tank unit 110 or block the seawater from being supplied to the self-weight control tank unit 110.
  • an opening and closing valve 117 installed in the self-weight control tank unit 110 to supply seawater to the self-weight control tank unit 110 or block the seawater from being supplied to the self-weight control tank unit 110.
  • the self-weight of the self-weight control tank unit 110 may be controlled depending on the amount of supplied water, and thus the self-weight of the self-weight control tank unit 110 may be controlled depending on the strength of the ground.
  • the self-weight of the self-weight control tank unit 110 may be reduced when the strength of ground is relatively weak, and the self-weight of the self-weight control tank unit 110 may be increased when the strength of ground is relatively strong.
  • the self-weight of the self-weight control tank unit 110 is controlled depending on the strength of ground, and thus the monopod unit 120 may be vertically positioned according to a parallel mounting of the self-weight control tank unit 110 on the ground.
  • the monopod unit 120 is installed in the self-weight control tank unit 110 to be lowered therefrom.
  • a marine structure 10, such as a wind turbine, is connected to an upper side of the monopod unit 120.
  • the monopod unit 120 is formed in a cylindrical pipe shape.
  • the guide bucket unit 130 is installed under the monopod unit 120 and is mounted on the ocean floor by discharging seawater.
  • the guide bucket unit 130 is formed in a cylindrical shape with an open lower side.
  • the guide bucket unit 130 is mounted on the ocean floor, and then the self-weight control tank unit 110 is lowered to the ocean floor. Therefore, when the self-weight control tank unit 110 is lowered, the self-weight control tank unit 110 can be prevented from leaving the installation position due to a tide or wave.
  • the guide bucket unit 130 is formed in a cylindrical shape with the open lower side.
  • the inside of the guide bucket unit 130 communicates with the inside of the monopod unit 120.
  • the pumping hoses approach the guide bucket unit 130 through the monopod unit 120, and thus seabed sediment in the guide bucket unit 130 is discharged to the outside through the pumping hoses. Therefore, the guide bucket unit 130 is lowered into seabed sediment to be mounted on the ground of the ocean floor.
  • Leg units 140 are installed under the self-weight control tank unit 110 to support the self-weight control tank unit 110.
  • the leg units 140 are disposed around a lower circumference of the self-weight control tank unit 110 and include a plurality of leg bucket units 141 that are mounted on the ocean floor by discharging seawater.
  • the leg bucket units 141 are lowered into seabed sediment by discharging seawater and are stably mounted on the ground of the ocean floor.
  • the leg bucket units 141 When the leg bucket units 141 are lowered into the seabed sediment, the self-weight control tank unit 110 is also lowered along with the leg bucket units 141, and thus the monopod unit 120 is moved relative to the upper side of the self-weight control tank unit 110. Therefore, the leg bucket units 141, the self-weight control tank unit 110, and the guide bucket unit 130 may be stably mounted on the ground.
  • the leg bucket units 141 are formed in a cylindrical shape with an open lower side.
  • the leg bucket units 141 include hose coupling units 143 to be connected to the pumping hoses.
  • the hose coupling units 143 are disposed on upper sides of the leg bucket units 141.
  • the pumping hoses are inserted into the hose coupling units 143 to suction seabed sediment in the leg bucket units 141, and thus the leg bucket units 141 are lowered into the seabed sediment.
  • the marine foundation further includes a thrust device 150 installed in the self-weight control tank unit 110 and preventing a submerged installation position of the self-weight control tank unit 110 from being changed by applying a thrust to the self-weight control tank unit 110.
  • the thrust device 150 generates a thrust at the self-weight control tank unit 110 when the self-weight control tank unit 110 is lowered, thereby preventing the self-weight control tank unit 110 from leaving the installation position due to a tide or wave.
  • GPS global positioning system
  • the thrust device 150 when the position of the marine foundation is measured by a global positioning system (GPS) and the self-weight control tank unit 110 slightly leaves the installation position, the thrust device 150 generates a thrust so that the self-weight control tank unit 110 is moved to the installation position. Therefore, the marine foundation may be mounted at the correct installation position.
  • GPS global positioning system
  • the thrust device 150 includes a belt unit 151 coupled to the self-weight control tank unit 110, and a plurality of propeller units 155 generating a thrust at the self-weight control tank unit 110.
  • the plurality of propeller units 155 are disposed along the circumference of the self-weight control tank unit 110 at regular gaps. In this case, when the self-weight control tank unit 110 is swept to one side by a tide or wave, the propeller units 155 positioned on one side of the self-weight control tank unit 110 are operated to prevent the self-weight control tank unit 110 from leaving the installation position.
  • the belt unit 151 includes a plurality of band units 152 disposed to surround the self-weight control tank unit 110, and a belt unfastening unit 153 coupling to or separated from adjacent ends of the plurality of band units 152.
  • the belt unfastening unit 153 separates the adjacent ends of the band units 152 from each other to separate the thrust device 150 from the self-weight control tank unit 110 and collect the thrust device 150.
  • FIG. 5 is a front view illustrating movement of the marine foundation according to one embodiment of the present invention while floating at sea level
  • FIG. 6 is a front view illustrating a state in which a guide bucket unit in the marine foundation according to one embodiment of the present invention is lowered and positioned on the ocean floor
  • FIG. 7 is a front view illustrating a state in which the guide bucket unit in the marine foundation according to one embodiment of the present invention is lowered and mounted on the ocean floor
  • FIG. 8 is a front view illustrating a state in which leg bucket units in the marine foundation according to one embodiment of the present invention are lowered to the ocean floor
  • FIG. 8 is a front view illustrating movement of the marine foundation according to one embodiment of the present invention while floating at sea level
  • FIG. 6 is a front view illustrating a state in which a guide bucket unit in the marine foundation according to one embodiment of the present invention is lowered and positioned on the ocean floor
  • FIG. 7 is a front view illustrating a state in which the guide bucket unit in the marine foundation according to
  • FIG. 9 is a front view illustrating a state in which the leg bucket units in the marine foundation according to one embodiment of the present invention are submerged and installed on the ocean floor
  • FIG. 10 is a flowchart illustrating a method of constructing a marine foundation according to one embodiment of the present invention.
  • the self-weight control tank unit 110 is moved to an installation position while floating at sea level by buoyancy (S11).
  • the self-weight control tank unit 110 floats at sea level, and the self-weight control tank unit 110 may be easily moved in the sea even in shallow water.
  • the self-weight control tank unit 110 moves to the installation position while floating at sea level, and thus a marine foundation may be moved using one tug. Therefore, a barge ship or a ship is disused to mount the marine foundation, and thus costs for installing the marine structure 10 may be reduced.
  • Pumping hoses are connected to the hose connection unit 113 of the self-weight control tank unit 110 and the hose coupling units 143 of the leg bucket units 141, respectively. Also, the pumping hoses are inserted into the guide bucket unit 130 through the monopod unit 120. In this case, a diver may connect the pumping hoses to the hose connection unit 113, the hose coupling units 143, and the guide bucket unit 130.
  • the pumping hoses are connected to a pump installed in the tug, a platform, or the like. Strainers may be installed at lower ends of the pumping hoses to prevent seabed sediment, such as gravel, from being suctioned into the pumping hoses.
  • the guide bucket unit 130 is lowered to be mounted on the ocean floor (S12).
  • the guide bucket unit 130 is lowered along with the guide unit 111.
  • the guide bucket unit 130 is lowered by a weight of the guide bucket unit 130.
  • the lowering of the guide bucket unit 130 is stopped.
  • seabed sediment in the guide bucket unit 130 is suctioned into the pump hoses.
  • the guide bucket unit 130 is lowered into the seabed sediment. Therefore, the guide bucket unit 130 is mounted on the ocean floor.
  • Seawater is supplied to the self-weight control tank unit 110 (S13).
  • the opening and closing valve 117 installed at a lower side of the self-weight control tank unit 110 is opened, the seawater is supplied to the seawater chamber 112 of the self-weight control tank unit 110.
  • the seawater chamber 112 of the self-weight control tank unit 110 is filled with the seawater, and the self-weight control tank unit 110 is lowered in the sea (S14).
  • the guide bucket unit 130 is mounted on the ocean floor and the monopod unit 120 supports the self-weight control tank unit 110, thereby preventing the self-weight control tank unit 110 from leaving the installation position when the self-weight control tank unit 110 is lowered.
  • the thrust device 150 is operated to compensate for the installation position of the self-weight control tank unit 110 (S15). That is, when self-weight control tank unit 110 is lowered, the thrust device 150 applies a thrust to the self-weight control tank unit 110 to prevent the self-weight control tank unit 110 from being swept by a tide or wave. For example, when the self-weight control tank unit 110 is swept to the left, the thrust device 150 applies a thrust to the left of the self-weight control tank unit 110 to prevent movement of the self-weight control tank unit 110. Therefore, the self-weight control tank unit 110 may be prevented from leaving the installation position due to a tide or wave.
  • the leg units 140 When the self-weight control tank unit 110 is submerged and installed on the ocean floor, the leg units 140 are mounted on the ocean floor along with the self-weight control tank unit 110 (S16). In this case, seabed sediment in the leg bucket units 141 is suctioned through the pumping hoses, and thus suction pressures in the leg bucket units 141 are generated. As the seabed sediment is suctioned from the leg bucket units 141, the leg bucket units 141 may be lowered into the seabed sediment. In this case, when the self-weight control tank unit 110 is lowered, the monopod unit 120 is lifted along with the guide unit 111.
  • the belt unfastening unit 153 unfastens the locking of the belt unit 151 (S17).
  • the band units 152 are separated from the self-weight control tank unit 110 along with the propeller units 155, and thus the thrust device 150 may be collected from the self-weight control tank unit 110 (S18).
  • the belt unfastening unit 153 is operated through wireless communication, or a diver may directly separate the belt unfastening unit 153 from the belt unit 151. Also, when the diver ties the thrust device 150 or the band units 152 with a rope, the tug pulls the rope to collect the thrust device 150. Therefore, the thrust device 150 may be reinstalled in another marine foundation.
  • the self-weight control tank unit 110 moves while floating at sea level, and thus the self-weight control tank unit 110 may be easily moved in the sea even in shallow water. Also, the marine foundation may be moved using one tug, and thus the installation costs of the marine structure can be reduced.
  • the monopod unit 120 is movably installed in the center of the self-weight control tank unit 110, and thus the monopod unit 120 may be stably supported by the self-weight control tank unit 110.
  • the self-weight of the self-weight control tank unit 110 is controlled depending on the amount of supplied water, and thus the self-weight of the self-weight control tank unit 110 can be controlled depending on the strength of the ground.
  • the guide bucket unit 130 is mounted on the ocean floor, and then the self-weight control tank unit 110 is lowered to the ocean floor, and thus the self-weight control tank unit 110 may be prevented from leaving the installation position due to a tide or wave when the self-weight control tank unit 110 is lowered.
  • the thrust device 150 generates a thrust at the self-weight control tank unit 110 when the self-weight control tank unit 110 is lowered, thereby preventing the self-weight control tank unit 110 from leaving the installation position due to a tide or wave.
  • the self-weight control tank unit as the self-weight control tank unit is moved to an installation position while floating at sea level, the self-weight control tank unit can be easily moved even in shallow water. Also, the marine foundation can be moved using one tug, and thus the installation costs of the marine structure can be reduced.
  • the monopod unit as the monopod unit is movably installed in the center of the self-weight control tank unit, the monopod unit can be stably supported by the self-weight control tank unit.
  • seawater is supplied to the self-weight control tank unit when the opening and closing valve is opened and seawater is blocked from being supplied to the self-weight control tank unit when the opening and closing valve is closed. Therefore, the self-weight of the self-weight control tank unit can be controlled depending on the amount of supplied seawater, and thus the self-weight of the self-weight control tank unit can be controlled depending on the strength of the ground.
  • the guide bucket unit is mounted on the ocean floor and then the self-weight control tank unit is lowered to the ocean floor, and thus the self-weight control tank unit can be prevented from leaving the installation position due to a tide or wave when the self-weight control tank unit is lowered.
  • the thrust device generates a thrust at the self-weight control tank unit when the self-weight control tank unit is lowered, and thus the self-weight control tank unit can be prevented from leaving the installation position due to a tide or wave.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

Disclosed are a marine foundation and a construction method thereof. The marine foundation of the present invention includes a self-weight control tank unit moving while floating at sea level and submerged and installed on the ocean floor when seawater is supplied thereto, a monopod unit installed on the self-weight control tank unit to be lowered and connected to a marine structure, a guide bucket unit installed under the monopod unit and mounted on the ocean floor by discharging seawater, and a leg unit installed under the self-weight control tank unit.

Description

    CROSS-REFERENCE TO RELATED APPLICATION
  • This application claims priority to and the benefit of Korean Patent Application No. 2015-0134167, filed on September, 22, 2015 , the disclosure of which is incorporated herein by reference in its entirety.
  • BACKGROUND 1. Field of the Invention
  • The present invention relates to a marine foundation and a construction method thereof, and more specifically, to a marine foundation capable of being easily moved in the sea and submerged and installed at a correct installation position, and a construction method thereof.
  • 2. Discussion of Related Art
  • Generally, a marine structure, such as a wind turbine, is installed in the sea. A marine structure foundation is mounted on the ocean floor to support the marine structure. The marine structure foundation is loaded on a barge ship or a ship and is then moved to an installation position. The marine structure foundation of the barge ship or the ship is moved to sea level using a crane or the like and is submerged. The marine structure foundation is mounted on the ocean floor, and then the marine structure is installed on the marine structure foundation.
  • However, a conventional marine structure foundation is loaded on a barge or a ship and is moved to an installation position, and thus several tugs are used to move the marine structure foundation to the installation position.
  • Also, when the marine structure foundation is submerged at the installation position, the installation position of the marine structure foundation may be changed due to a tide or wave.
  • Therefore, improvement for the above-described problems is necessary.
  • The background of the present invention is disclosed in Korean Laid-open Patent Application No. 2004-0037263 (Published on 2004. 05. 04, Title: Method for Establishing a Foundation in Particular for a Tower of a Wind Energy Plant).
  • SUMMARY OF THE INVENTION
  • The present invention is directed to a marine foundation capable of being easily moved and installed at an accurate installation position, and a construction method thereof.
  • According to an aspect of the present invention, there is provided a marine foundation including a self-weight control tank unit configured to move while floating at sea level and submerged and installed on an ocean floor by receiving seawater, a monopod unit installed in the self-weight control tank unit to be lowered and connected to a marine structure, a guide bucket unit installed under the monopod unit and mounted on the ocean floor by discharging seawater, and a leg unit installed under the self-weight control tank unit.
  • The marine foundation may further include a thrust device installed in the self-weight control tank unit and configured to control a submerged installation position of the self-weight control tank unit by applying a thrust to the self-weight control tank unit.
  • The thrust device may include a belt unit coupled to the self-weight control tank unit, and a propeller unit installed on the belt unit and applying the thrust to the self-weight control tank unit.
  • The belt unit may include a plurality of band units arranged to surround the self-weight control tank unit, and a belt unfastening unit coupling and separating adjacent ends of the plurality of band units.
  • The self-weight control tank unit may include a guide unit formed so that the monopod unit is movably inserted therein, a seawater chamber formed so that the seawater is supplied thereto, and a hose connection unit formed so that pumping hoses are connected thereto.
  • The marine foundation may further include an opening and closing valve installed in the self-weight control tank unit to supply the seawater to the self-weight control tank unit and block the seawater from being supplied to the self-weight control tank unit.
  • The guide unit may be formed to vertically pass through the center of the self-weight control tank unit.
  • The leg unit may include a leg bucket unit disposed along a lower circumference of the self-weight control tank unit and mounted on the ocean floor by discharging seawater.
  • The leg bucket unit may have an open lower side, and the leg bucket unit may have a hose coupling unit so that pumping hoses are connected thereto.
  • According to another aspect of the present invention, there is provided a method of constructing a marine foundation, the method including moving a self-weight control tank unit to an installation position while the self-weight control tank unit floats at sea level by buoyancy, lowering a guide bucket unit installed in the self-weight control tank unit and mounting the guide bucket unit on an ocean floor, submerging and installing the self-weight control tank unit on the ocean floor by supplying seawater to a seawater chamber of the self-weight control tank unit, and lowering a leg unit coupled to the self-weight control tank unit along with the self-weight control tank unit and mounting the leg unit on the ocean floor.
  • The submerging and installing of the self-weight control tank unit on the ocean floor may include operating a thrust device coupled to the self-weight control tank unit to control a submerged installation position of the self-weight control tank unit.
  • The method may further include unfastening the self-weight control tank unit from the thrust device and collecting the thrust device after the lowering of the leg unit coupled to the self-weight control tank unit along with the self-weight control tank unit and the mounting of the leg unit on the ocean floor.
  • The lowering of the leg unit coupled to the self-weight control tank unit along with the self-weight control tank unit to mount the leg unit on the ocean floor may include discharging seawater in the leg unit to an outside of the leg unit to generate suction pressures in the leg unit.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The above and other objects, features and advantages of the present invention will become more apparent to those of ordinary skill in the art by describing exemplary embodiments thereof in detail with reference to the accompanying drawings, in which:
    • FIG. 1 is a perspective view illustrating a marine foundation according to one embodiment of the present invention;
    • FIG. 2 is a front view illustrating the marine foundation according to one embodiment of the present invention;
    • FIG. 3 is a cross-sectional view illustrating the marine foundation according to one embodiment of the present invention;
    • FIG. 4 is a perspective view illustrating a thrust device in the marine foundation according to one embodiment of the present invention;
    • FIG. 5 is a front view illustrating movement of the marine foundation according to one embodiment of the present invention while floating at sea level;
    • FIG. 6 is a front view illustrating a state in which a guide bucket unit in the marine foundation according to one embodiment of the present invention is lowered and positioned on the ocean floor;
    • FIG. 7 is a front view illustrating a state in which the guide bucket unit in the marine foundation according to one embodiment of the present invention is lowered and mounted on the ocean floor;
    • FIG. 8 is a front view illustrating a state in which leg bucket units in the marine foundation according to one embodiment of the present invention are lowered to the ocean floor;
    • FIG. 9 is a front view illustrating a state in which the leg bucket units in the marine foundation according to one embodiment of the present invention are submerged and installed on the ocean floor; and
    • FIG. 10 is a flowchart illustrating a method of constructing a marine foundation according to one embodiment of the present invention.
    DETAILED DESCRIPTION OF EXEMPLARY EMBODIMENTS
  • Hereinafter, embodiments of a marine foundation according to the present invention and a method of constructing a marine foundation will be described with reference to the accompanying drawings. In the process of describing the marine foundation and the method of constructing a marine structure, the thickness of lines, the size of components, or the like shown in the drawings may be exaggerated for convenience and clearness of explanation. Some terms described below are defined by considering functions in the invention and meanings may vary depending on, for example, a user or operator's intentions or customs. Therefore, the meanings of terms should be interpreted based on the scope throughout this specification.
  • FIG. 1 is a perspective view illustrating a marine foundation according to one embodiment of the present invention, FIG. 2 is a front view illustrating the marine foundation according to one embodiment of the present invention, FIG. 3 is a cross-sectional view illustrating the marine foundation according to one embodiment of the present invention, and FIG. 4 is a perspective view illustrating a thrust device in the marine foundation according to one embodiment of the present invention.
  • Referring to FIGS. 1 to 4, the marine foundation according to the embodiment of the present invention includes a self-weight control tank unit 110, a monopod unit 120, a guide bucket unit 130, and leg units 140.
  • The self-weight control tank unit 110 moves while floating at sea level, and is submerged and installed on the ocean floor when seawater is supplied thereto. The self-weight control tank unit 110 moves while floating at sea level, and thus a marine foundation may be moved to an installation position using one tug. Therefore, a barge ship and a ship may be disused to mount the self-weight control tank unit 110, and thus delivery costs of the marine foundation may be reduced.
  • The self-weight control tank unit 110 has a conical upper side. A circular ring-shaped skirt unit 115 is formed along a circumference of the self-weight control tank unit 110.
  • The self-weight control tank unit 110 includes a guide unit 111 formed so that the monopod unit 120 is movably inserted therein, a seawater chamber 112 formed so that seawater is supplied thereto, and a hose connection unit 113 formed so that pumping hoses are connected thereto. The guide unit 111 is formed in a cylindrical pipe shape. The hose connection unit 113 is connected to the upper side of the self-weight control tank unit 110.
  • The seawater chamber 112 is formed in the self-weight control tank unit 110, and thus, when the marine foundation is transferred to the installation position, air is accommodated in the seawater chamber 112 to apply buoyancy to the self-weight control tank unit 110. When the marine foundation arrives at the installation position, seawater is supplied to the self-weight control tank unit 110, and thus the self-weight control tank unit 110 is submerged in the sea.
  • The guide unit 111 is formed to vertically pass through the center of the self-weight control tank unit 110. Since the guide unit 111 is formed to pass through the center of the self-weight control tank unit 110, the monopod unit 120 is movably installed in the center of the self-weight control tank unit 110. Therefore, the monopod unit 120 may be stably supported by the self-weight control tank unit 110.
  • The marine foundation further includes an opening and closing valve 117 installed in the self-weight control tank unit 110 to supply seawater to the self-weight control tank unit 110 or block the seawater from being supplied to the self-weight control tank unit 110. When the opening and closing valve 117 is opened, the seawater is supplied to the self-weight control tank unit 110, and when the opening and closing valve 117 is closed, the seawater is blocked from being supplied to the self-weight control tank unit 110.
  • Therefore, the self-weight of the self-weight control tank unit 110 may be controlled depending on the amount of supplied water, and thus the self-weight of the self-weight control tank unit 110 may be controlled depending on the strength of the ground. For example, the self-weight of the self-weight control tank unit 110 may be reduced when the strength of ground is relatively weak, and the self-weight of the self-weight control tank unit 110 may be increased when the strength of ground is relatively strong. The self-weight of the self-weight control tank unit 110 is controlled depending on the strength of ground, and thus the monopod unit 120 may be vertically positioned according to a parallel mounting of the self-weight control tank unit 110 on the ground.
  • The monopod unit 120 is installed in the self-weight control tank unit 110 to be lowered therefrom. A marine structure 10, such as a wind turbine, is connected to an upper side of the monopod unit 120. The monopod unit 120 is formed in a cylindrical pipe shape.
  • The guide bucket unit 130 is installed under the monopod unit 120 and is mounted on the ocean floor by discharging seawater. The guide bucket unit 130 is formed in a cylindrical shape with an open lower side. The guide bucket unit 130 is mounted on the ocean floor, and then the self-weight control tank unit 110 is lowered to the ocean floor. Therefore, when the self-weight control tank unit 110 is lowered, the self-weight control tank unit 110 can be prevented from leaving the installation position due to a tide or wave.
  • The guide bucket unit 130 is formed in a cylindrical shape with the open lower side. The inside of the guide bucket unit 130 communicates with the inside of the monopod unit 120. The pumping hoses approach the guide bucket unit 130 through the monopod unit 120, and thus seabed sediment in the guide bucket unit 130 is discharged to the outside through the pumping hoses. Therefore, the guide bucket unit 130 is lowered into seabed sediment to be mounted on the ground of the ocean floor.
  • Leg units 140 are installed under the self-weight control tank unit 110 to support the self-weight control tank unit 110. The leg units 140 are disposed around a lower circumference of the self-weight control tank unit 110 and include a plurality of leg bucket units 141 that are mounted on the ocean floor by discharging seawater. The leg bucket units 141 are lowered into seabed sediment by discharging seawater and are stably mounted on the ground of the ocean floor. When the leg bucket units 141 are lowered into the seabed sediment, the self-weight control tank unit 110 is also lowered along with the leg bucket units 141, and thus the monopod unit 120 is moved relative to the upper side of the self-weight control tank unit 110. Therefore, the leg bucket units 141, the self-weight control tank unit 110, and the guide bucket unit 130 may be stably mounted on the ground.
  • The leg bucket units 141 are formed in a cylindrical shape with an open lower side. The leg bucket units 141 include hose coupling units 143 to be connected to the pumping hoses. The hose coupling units 143 are disposed on upper sides of the leg bucket units 141. The pumping hoses are inserted into the hose coupling units 143 to suction seabed sediment in the leg bucket units 141, and thus the leg bucket units 141 are lowered into the seabed sediment.
  • The marine foundation further includes a thrust device 150 installed in the self-weight control tank unit 110 and preventing a submerged installation position of the self-weight control tank unit 110 from being changed by applying a thrust to the self-weight control tank unit 110. The thrust device 150 generates a thrust at the self-weight control tank unit 110 when the self-weight control tank unit 110 is lowered, thereby preventing the self-weight control tank unit 110 from leaving the installation position due to a tide or wave. For example, when the position of the marine foundation is measured by a global positioning system (GPS) and the self-weight control tank unit 110 slightly leaves the installation position, the thrust device 150 generates a thrust so that the self-weight control tank unit 110 is moved to the installation position. Therefore, the marine foundation may be mounted at the correct installation position.
  • The thrust device 150 includes a belt unit 151 coupled to the self-weight control tank unit 110, and a plurality of propeller units 155 generating a thrust at the self-weight control tank unit 110. The plurality of propeller units 155 are disposed along the circumference of the self-weight control tank unit 110 at regular gaps. In this case, when the self-weight control tank unit 110 is swept to one side by a tide or wave, the propeller units 155 positioned on one side of the self-weight control tank unit 110 are operated to prevent the self-weight control tank unit 110 from leaving the installation position.
  • The belt unit 151 includes a plurality of band units 152 disposed to surround the self-weight control tank unit 110, and a belt unfastening unit 153 coupling to or separated from adjacent ends of the plurality of band units 152. When the marine foundation is completely mounted on the ocean floor, the belt unfastening unit 153 separates the adjacent ends of the band units 152 from each other to separate the thrust device 150 from the self-weight control tank unit 110 and collect the thrust device 150.
  • A method of constructing the marine foundation according to the embodiment of the present invention configured as described above will be described below.
  • FIG. 5 is a front view illustrating movement of the marine foundation according to one embodiment of the present invention while floating at sea level, FIG. 6 is a front view illustrating a state in which a guide bucket unit in the marine foundation according to one embodiment of the present invention is lowered and positioned on the ocean floor, FIG. 7 is a front view illustrating a state in which the guide bucket unit in the marine foundation according to one embodiment of the present invention is lowered and mounted on the ocean floor, FIG. 8 is a front view illustrating a state in which leg bucket units in the marine foundation according to one embodiment of the present invention are lowered to the ocean floor, FIG. 9 is a front view illustrating a state in which the leg bucket units in the marine foundation according to one embodiment of the present invention are submerged and installed on the ocean floor, and FIG. 10 is a flowchart illustrating a method of constructing a marine foundation according to one embodiment of the present invention.
  • Referring to FIGS. 5 to 10, the self-weight control tank unit 110 is moved to an installation position while floating at sea level by buoyancy (S11). The self-weight control tank unit 110 floats at sea level, and the self-weight control tank unit 110 may be easily moved in the sea even in shallow water. Also, the self-weight control tank unit 110 moves to the installation position while floating at sea level, and thus a marine foundation may be moved using one tug. Therefore, a barge ship or a ship is disused to mount the marine foundation, and thus costs for installing the marine structure 10 may be reduced.
  • Pumping hoses are connected to the hose connection unit 113 of the self-weight control tank unit 110 and the hose coupling units 143 of the leg bucket units 141, respectively. Also, the pumping hoses are inserted into the guide bucket unit 130 through the monopod unit 120. In this case, a diver may connect the pumping hoses to the hose connection unit 113, the hose coupling units 143, and the guide bucket unit 130. The pumping hoses are connected to a pump installed in the tug, a platform, or the like. Strainers may be installed at lower ends of the pumping hoses to prevent seabed sediment, such as gravel, from being suctioned into the pumping hoses.
  • The guide bucket unit 130 is lowered to be mounted on the ocean floor (S12). In this case, when a worker or a diver unfastens a hook unit from the monopod unit 120 and pressurizes the monopod unit 120 downward, the guide bucket unit 130 is lowered along with the guide unit 111. When the guide bucket unit 130 is lowered, the guide bucket unit 130 is lowered by a weight of the guide bucket unit 130. When the guide bucket unit 130 reaches seabed sediment, the lowering of the guide bucket unit 130 is stopped. In this case, as the pump installed in the tug or the platform is operated, seabed sediment in the guide bucket unit 130 is suctioned into the pump hoses. In this case, as a suction pressure is generated in the guide bucket unit 130, the guide bucket unit 130 is lowered into the seabed sediment. Therefore, the guide bucket unit 130 is mounted on the ocean floor.
  • Seawater is supplied to the self-weight control tank unit 110 (S13). In this case, when the opening and closing valve 117 installed at a lower side of the self-weight control tank unit 110 is opened, the seawater is supplied to the seawater chamber 112 of the self-weight control tank unit 110. The seawater chamber 112 of the self-weight control tank unit 110 is filled with the seawater, and the self-weight control tank unit 110 is lowered in the sea (S14).
  • In this case, the guide bucket unit 130 is mounted on the ocean floor and the monopod unit 120 supports the self-weight control tank unit 110, thereby preventing the self-weight control tank unit 110 from leaving the installation position when the self-weight control tank unit 110 is lowered.
  • Also, when the self-weight control tank unit 110 is lowered, the thrust device 150 is operated to compensate for the installation position of the self-weight control tank unit 110 (S15). That is, when self-weight control tank unit 110 is lowered, the thrust device 150 applies a thrust to the self-weight control tank unit 110 to prevent the self-weight control tank unit 110 from being swept by a tide or wave. For example, when the self-weight control tank unit 110 is swept to the left, the thrust device 150 applies a thrust to the left of the self-weight control tank unit 110 to prevent movement of the self-weight control tank unit 110. Therefore, the self-weight control tank unit 110 may be prevented from leaving the installation position due to a tide or wave.
  • When the self-weight control tank unit 110 is submerged and installed on the ocean floor, the leg units 140 are mounted on the ocean floor along with the self-weight control tank unit 110 (S16). In this case, seabed sediment in the leg bucket units 141 is suctioned through the pumping hoses, and thus suction pressures in the leg bucket units 141 are generated. As the seabed sediment is suctioned from the leg bucket units 141, the leg bucket units 141 may be lowered into the seabed sediment. In this case, when the self-weight control tank unit 110 is lowered, the monopod unit 120 is lifted along with the guide unit 111.
  • When the self-weight control tank unit 110 is completely submerged and installed on the ocean floor, the belt unfastening unit 153 unfastens the locking of the belt unit 151 (S17). In this case, the band units 152 are separated from the self-weight control tank unit 110 along with the propeller units 155, and thus the thrust device 150 may be collected from the self-weight control tank unit 110 (S18). The belt unfastening unit 153 is operated through wireless communication, or a diver may directly separate the belt unfastening unit 153 from the belt unit 151. Also, when the diver ties the thrust device 150 or the band units 152 with a rope, the tug pulls the rope to collect the thrust device 150. Therefore, the thrust device 150 may be reinstalled in another marine foundation.
  • As described above, the self-weight control tank unit 110 moves while floating at sea level, and thus the self-weight control tank unit 110 may be easily moved in the sea even in shallow water. Also, the marine foundation may be moved using one tug, and thus the installation costs of the marine structure can be reduced.
  • Also, the monopod unit 120 is movably installed in the center of the self-weight control tank unit 110, and thus the monopod unit 120 may be stably supported by the self-weight control tank unit 110.
  • Also, when the opening and closing valve 117 is opened, seawater is supplied to the self-weight control tank unit 110, and when the opening and closing valve 117 is closed, the seawater is blocked from being supplied to the self-weight control tank unit 110. Therefore, the self-weight of the self-weight control tank unit 110 is controlled depending on the amount of supplied water, and thus the self-weight of the self-weight control tank unit 110 can be controlled depending on the strength of the ground.
  • The guide bucket unit 130 is mounted on the ocean floor, and then the self-weight control tank unit 110 is lowered to the ocean floor, and thus the self-weight control tank unit 110 may be prevented from leaving the installation position due to a tide or wave when the self-weight control tank unit 110 is lowered.
  • The thrust device 150 generates a thrust at the self-weight control tank unit 110 when the self-weight control tank unit 110 is lowered, thereby preventing the self-weight control tank unit 110 from leaving the installation position due to a tide or wave.
  • According to the present invention, as the self-weight control tank unit is moved to an installation position while floating at sea level, the self-weight control tank unit can be easily moved even in shallow water. Also, the marine foundation can be moved using one tug, and thus the installation costs of the marine structure can be reduced.
  • Also, according to the present invention, as the monopod unit is movably installed in the center of the self-weight control tank unit, the monopod unit can be stably supported by the self-weight control tank unit.
  • Also, according to the present invention, seawater is supplied to the self-weight control tank unit when the opening and closing valve is opened and seawater is blocked from being supplied to the self-weight control tank unit when the opening and closing valve is closed. Therefore, the self-weight of the self-weight control tank unit can be controlled depending on the amount of supplied seawater, and thus the self-weight of the self-weight control tank unit can be controlled depending on the strength of the ground.
  • Also, according to the present invention, the guide bucket unit is mounted on the ocean floor and then the self-weight control tank unit is lowered to the ocean floor, and thus the self-weight control tank unit can be prevented from leaving the installation position due to a tide or wave when the self-weight control tank unit is lowered.
  • Also, according to the present invention, the thrust device generates a thrust at the self-weight control tank unit when the self-weight control tank unit is lowered, and thus the self-weight control tank unit can be prevented from leaving the installation position due to a tide or wave.
  • The present invention has been described with reference to the examples illustrated in the drawings, but these are only examples. It should be understood by those skilled in the art that various modifications and equivalent other examples may be made.
  • Therefore, the scope of the present invention is defined by the appended claims.

Claims (13)

  1. A marine foundation comprising:
    a self-weight control tank unit configured to move while floating at seal level and submerged and installed on an ocean floor by receiving seawater;
    a monopod unit installed in the self-weight control tank unit to be lowered and connected to a marine structure;
    a guide bucket unit installed under the monopod unit and mounted on the ocean floor by discharging seawater; and
    a leg unit installed under the self-weight control tank unit.
  2. The marine foundation of claim 1, further comprising a thrust device installed in the self-weight control tank unit and configured to control a submerged installation position of the self-weight control tank unit by applying a thrust to the self-weight control tank unit.
  3. The marine foundation of claim 2, wherein the thrust device includes:
    a belt unit coupled to the self-weight control tank unit; and
    a propeller unit installed on the belt unit and applying the thrust to the self-weight control tank unit.
  4. The marine foundation of claim 3, wherein the belt unit includes:
    a plurality of band units arranged to surround the self-weight control tank unit; and
    a belt unfastening unit coupling and separating adjacent ends of the plurality of band units.
  5. The marine foundation of claim 1, wherein the self-weight control tank unit includes a guide unit formed so that the monopod unit is movably inserted therein, a seawater chamber formed so that the seawater is supplied therein, and a hose connection unit formed so that a pumping hose is connected thereto.
  6. The marine foundation of claim 5, further comprising an opening and closing valve installed in the self-weight control tank unit to supply the seawater to the self-weight control tank unit and block the seawater from being supplied to the self-weight control tank unit.
  7. The marine foundation of claim 5, wherein the guide unit is formed to vertically pass through the center of the self-weight control tank unit.
  8. The marine foundation of claim 1, wherein the leg unit includes a leg bucket unit disposed along a lower circumference of the self-weight control tank unit and mounted on the ocean floor by discharging seawater.
  9. The marine foundation of claim 8, wherein the leg bucket unit has an open lower side, and the leg bucket unit has a hose coupling unit so that a pumping hose is connected thereto.
  10. A method of constructing a marine foundation, the method comprising:
    moving a self-weight control tank unit to an installation position while the self-weight control tank unit floats at sea level by buoyancy;
    lowering a guide bucket unit installed in the self-weight control tank unit and mounting the guide bucket unit on an ocean floor;
    submerging and installing the self-weight control tank unit on the ocean floor by supplying seawater to a seawater chamber of the self-weight control tank unit; and
    lowering a leg unit coupled to the self-weight control tank unit along with the self-weight control tank unit to mount the leg unit on the ocean floor.
  11. The method of claim 10, wherein, the submerging and installing of the self-weight control tank unit on the ocean floor includes operating a thrust device coupled to the self-weight control tank unit to control a submerged installation position of the self-weight control tank unit.
  12. The method of claim 11, further comprising unfastening the self-weight control tank unit from the thrust device and collecting the thrust device after the lowering of the leg unit coupled to the self-weight control tank unit along with the self-weight control tank unit to mount the leg unit on the ocean floor.
  13. The method of claim 10, wherein, the lowering of the leg unit coupled to the self-weight control tank unit along with the self-weight control tank unit to mount the leg unit on the ocean floor includes discharging seawater in the leg unit to an outside of the leg unit to generate suction pressure in the leg unit.
EP16175964.2A 2015-09-22 2016-06-23 Marine foundation and construction method thereof Active EP3147408B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020150134167A KR101723987B1 (en) 2015-09-22 2015-09-22 Marine foundation and construction method thereof

Publications (2)

Publication Number Publication Date
EP3147408A1 true EP3147408A1 (en) 2017-03-29
EP3147408B1 EP3147408B1 (en) 2017-12-13

Family

ID=56235667

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16175964.2A Active EP3147408B1 (en) 2015-09-22 2016-06-23 Marine foundation and construction method thereof

Country Status (2)

Country Link
EP (1) EP3147408B1 (en)
KR (1) KR101723987B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108331009A (en) * 2018-04-28 2018-07-27 西南交通大学 Suction type Conveyor belt constructing structure
CN111183259A (en) * 2017-10-10 2020-05-19 Spt设备有限公司 Offshore wind energy plant foundation system
EP3693515A1 (en) 2019-02-11 2020-08-12 Temporary Works Design Engineering B.V. Pile installation template
CN115627744A (en) * 2022-11-02 2023-01-20 江苏科技大学 Construction platform for steel structure in sludge ultra-soft soil water and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003004869A1 (en) * 2001-07-06 2003-01-16 Vestas Wind Systems A/S Offshore wind turbine with floating foundation
KR20040037263A (en) 2001-10-09 2004-05-04 우벤 알로이즈 Method for establishing a foundation in particular for a tower of a wind energy plant
WO2013152757A1 (en) * 2012-04-10 2013-10-17 N.Prior Energy Gmbh Method for producing a foundation for offshore wind energy plants
US20130298815A1 (en) * 2010-11-25 2013-11-14 Cobus Beheer B.V. Floating marine structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101185031B1 (en) * 2010-06-23 2012-09-21 한국건설기술연구원 Suction Anchor Pile with Propellent Device, and Installation Method of Suction Anchor Pile using the Propellent Device
KR101205797B1 (en) * 2010-12-13 2012-11-28 재단법인 포항산업과학연구원 Floating suction pile
KR101421463B1 (en) * 2013-04-23 2014-07-23 한국해양과학기술원 Upper multi-suction bucket group pile for increasing lateral resistance

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003004869A1 (en) * 2001-07-06 2003-01-16 Vestas Wind Systems A/S Offshore wind turbine with floating foundation
KR20040037263A (en) 2001-10-09 2004-05-04 우벤 알로이즈 Method for establishing a foundation in particular for a tower of a wind energy plant
US20130298815A1 (en) * 2010-11-25 2013-11-14 Cobus Beheer B.V. Floating marine structure
WO2013152757A1 (en) * 2012-04-10 2013-10-17 N.Prior Energy Gmbh Method for producing a foundation for offshore wind energy plants

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111183259A (en) * 2017-10-10 2020-05-19 Spt设备有限公司 Offshore wind energy plant foundation system
CN108331009A (en) * 2018-04-28 2018-07-27 西南交通大学 Suction type Conveyor belt constructing structure
CN108331009B (en) * 2018-04-28 2024-06-07 西南交通大学 Negative pressure formula landing stage foundation construction structure
EP3693515A1 (en) 2019-02-11 2020-08-12 Temporary Works Design Engineering B.V. Pile installation template
NL2022553B1 (en) * 2019-02-11 2020-08-19 Temporary Works Design Eng B V Pile installation template
CN115627744A (en) * 2022-11-02 2023-01-20 江苏科技大学 Construction platform for steel structure in sludge ultra-soft soil water and construction method thereof
CN115627744B (en) * 2022-11-02 2023-10-27 江苏科技大学 Construction platform and construction method for steel structure in water of silt ultra-soft soil

Also Published As

Publication number Publication date
KR20170035271A (en) 2017-03-30
KR101723987B1 (en) 2017-04-06
EP3147408B1 (en) 2017-12-13

Similar Documents

Publication Publication Date Title
EP3147408B1 (en) Marine foundation and construction method thereof
EP3147200B1 (en) Marine structure installation vessel and method of installing marine structure
EP2326552B1 (en) Method of locating a subsea structure for deployment
US8622137B2 (en) Subsea structure installation or removal
US20100150665A1 (en) Device and method for marine tower structure
JPH10159704A (en) Wave force pump activated by energy of wave
CN102322062B (en) Transportation and installation process of base barrel body of barrel type breakwater
EP2411663B1 (en) Method for installing and servicing an apparatus recovering the kinetic energy of water, and an apparatus recovering the kinetic energy of water
JP5342300B2 (en) Collection device and method for collecting bottom resources
AU2011215983B2 (en) Rigless intervention
CN106394837B (en) Submarine pipeline fortune dress ship
EP3078846B1 (en) Wind turbine parts handling method and device
CN103216678B (en) Grouting air sac method for suspending sea pipe
CN2900987Y (en) Under water dry maintenance working cabin
US9551125B2 (en) Method for installing and servicing an apparatus recovering the kinetic energy of water, and an apparatus recovering the kinetic energy of water
WO2016144158A1 (en) Water intake system and floating vessel equipped with such a system
JP2017075469A (en) Collection device for water bottom flowing methane gas and collection method for the same
CN109403422A (en) A kind of cruise-type cultivation work ship cold water mass water intake system
US20120027519A1 (en) Method and a device for sealing and/or securing a borehole
JP5643012B2 (en) Recovery method of crude oil erupted on the seabed
KR101555953B1 (en) Method of expose to submarine cables that were laid under ocean floor or water floor
JP2016075116A (en) Pollution prevention device used in dredging work
JP2012214066A (en) Method of lifting and lowering pipe string for mining, and pipe string for mining
JP2017089119A (en) Lifting unit, dredging system using the lifting unit, lifting method using the lifting unit, and dredging method using the dredging system
CA2779968A1 (en) Oil containment system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20160623

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: E02B 17/00 20060101ALI20170719BHEP

Ipc: E02B 17/02 20060101AFI20170719BHEP

Ipc: E02D 27/52 20060101ALI20170719BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20170830

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 954483

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171215

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016001074

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20171213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180313

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 954483

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180313

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180314

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180413

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016001074

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20180914

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180630

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180623

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180623

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180630

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602016001074

Country of ref document: DE

Representative=s name: 2K PATENT- UND RECHTSANWAELTE PARTNERSCHAFT MB, DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180623

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171213

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20160623

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171213

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180623

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230621

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230619

Year of fee payment: 8