EP3103756A1 - A method for attaching a lifting element to a concrete body - Google Patents
A method for attaching a lifting element to a concrete body Download PDFInfo
- Publication number
- EP3103756A1 EP3103756A1 EP15170964.9A EP15170964A EP3103756A1 EP 3103756 A1 EP3103756 A1 EP 3103756A1 EP 15170964 A EP15170964 A EP 15170964A EP 3103756 A1 EP3103756 A1 EP 3103756A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- lifting
- lifting element
- concrete body
- hole
- slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 34
- 238000010079 rubber tapping Methods 0.000 claims abstract description 12
- 238000001125 extrusion Methods 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 description 7
- 238000005553 drilling Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/62—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled
- B66C1/66—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled for engaging holes, recesses, or abutments on articles specially provided for facilitating handling thereof
- B66C1/666—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means comprising article-engaging members of a shape complementary to that of the articles to be handled for engaging holes, recesses, or abutments on articles specially provided for facilitating handling thereof for connection to anchor inserts embedded in concrete structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
- E04G21/145—Means in or on the elements for connecting same to handling apparatus specific for hollow plates
Definitions
- the present invention relates to a method for attaching a lifting element to a concrete body.
- a known method for attaching a lifting element to a concrete body is installing a lifting loop in a fresh concrete body when the concrete is not cured yet.
- lifting systems which comprise mechanical clamps which support the slab.
- the clamps fit in recesses at opposite side walls of a hollow-core slab.
- a hollow-core slab comprises an upper layer and a lower layer, whereas vertical webs connect the upper layer and the lower layer.
- the vertical webs form walls between open channels or cores which extend in longitudinal direction of the slab.
- the recesses at opposite side walls for receiving a pair of clamps are mostly located just below the level of the upper layer. It may be clear that the clamping force must be limited in order to avoid damaging the slab upon clamping; on the other hand, the clamping force must provide sufficient hold to the concrete slab. Since this forms a safety risk during hoisting upon transporting and installing hollow-core slabs, safety measures are required in practice.
- Another disadvantage of the mechanical clamps is their relatively heavy weight and bulky shape.
- lifting loops in fresh concrete bodies is known.
- a part of the fresh slab is broken away at a hollow core and the lifting loop is installed such that it bears against pre-stressing strands of the slab.
- the present invention aims to provide a method which simplifies the process of manufacturing and handling concrete bodies.
- a hole is drilled into the concrete body when it is in a cured phase, after which a fixation part of the lifting element is fixed into said hole, wherein the fixation part of the lifting element comprises a self-tapping screw which is screwed into said hole.
- Drilling a hole in a cured body provides a relatively small and well-defined amount of removed concrete, contrary to removal of a relatively large amount of concrete in case of breaking away parts of fresh concrete. This means that after installing the concrete body it is only a drilled hole that has to be filled with concrete afterwards, if the fixation part of the lifting element is to be removed. It is also possible to cover the hole by means of a cap or to leave it open or to leave the lifting element in the concrete body. Another advantage of the method according to the invention is that the moment of installing the lifting element can be chosen arbitrarily, for example directly after hardening the concrete body in a factory or after transport to a site where the body must be installed.
- the fixation part of the lifting element comprises a self-tapping screw which is screwed into the hole
- the lifting element can be fixed to the concrete body very quickly.
- a splitting force onto the surrounding walls of the hole is limited or negligible, hence minimizing a force onto the concrete in radial direction of the self-tapping screw.
- the lifting element may comprise a ring-shaped portion for receiving a hook of a hoisting device, but alternative shapes are conceivable.
- the concrete body is manufactured by means of a slip form process or an extrusion process.
- the lifting element to the body afterwards in order to minimize disturbances of the manufacturing process.
- the centreline of the hole may be angled with respect to an upper face of the concrete body.
- a hoisting cable may be engaged to the lifting element such that the hoisting cable extends vertically above the body, but the lifting element exerts a lateral force on the wall of the hole. This means that it becomes more difficult to pull the lifting element out of the hole, which may be advantageous if the fixation part comprises a self-tapping screw, for example.
- the hole may at least partly be drilled into a web between two adjacent hollow cores of the slab.
- the hole and the lifting element may be adapted such that the lifting element is located below an upper surface of the concrete body adjacent to the lifting element.
- the lifting element does not project from the concrete body and may be left in the concrete body after installation thereof.
- a hole is drilled into the concrete body when it is in a cured phase, after which a fixation part of the lifting element is fixed into said hole, wherein the concrete body comprises a hollow-core slab, which is manufactured by means of a slip form process or an extrusion process.
- the invention is also related to a method for lifting a concrete body comprising a lifting element which is attached thereto by a method as described hereinbefore, wherein a hoisting cable is connected to the lifting element.
- At least two lifting elements may be attached to the concrete body, wherein said lifting elements are located at a horizontal distance from each other and wherein hoisting cables are connected to the lifting elements such that resultant upward forces on the lifting elements are angled with respect to the respective centrelines of the holes.
- Fig. 1 shows a concrete body in the form of a hollow-core concrete slab 1 which is manufactured by means of a slip form process.
- Figs. 4 and 5 show that the slab 1 comprises an upper layer 2 and a lower layer 3.
- the upper layer 2 and the lower layer 3 are connected to each other via vertical webs 4 which extend in longitudinal direction, hence forming elongate cavities between the webs 4.
- the slab 1 comprises pre-stressing strands 5, which extend in longitudinal direction of the slab 1.
- Fig. 1 shows that the slab 1 is lifted at four lifting elements 6, but a higher number of lifting elements 6 per slab 1 is conceivable.
- the lifting elements 6 are connected to a central hoisting cable 7 through four intermediate hoisting cables 8.
- the cables 7, 8 may be ropes, steel cables, chains or the like.
- Fig. 4 shows more than two lifting elements 6 at a cross-section of the slab 1, but this is only for illustrative reasons.
- the lifting elements 6 have different dimensions and shapes and different orientations with respect to the slab 1.
- three of the five lifting elements have a lifting ring 9 and a self-tapping screw 10, which forms a fixation part of the lifting element 6.
- the lifting ring 9 and self-tapping screw 10 may be made of one piece, but alternatively they may be separate parts.
- the other two lifting elements 6 as shown in Fig. 4 have respective lifting heads 9', instead of lifting rings.
- the lifting elements 6 including lifting heads 9' are not entirely screwed into the slab 1 in order to leave room between the lifting heads 9' and the upper surface of the slab 1 in order to allow to receive a hoisting hook between the respective lifting heads 9' and the upper surface of the slab 1.
- One of the lifting heads 9' is received in a recess in the upper surface of the slab 1; this is also conceivable in case of a lifting ring 9.
- the lifting element 6 can be left in the slab 1 and possibly covered by a cap.
- the left lifting element 6 has a lifting ring 9 and the right lifting element 6 has a planar lifting head 9'.
- Figs. 4 and 5 show holes 11 at the locations of the respective lifting elements 6. The holes 11 are drilled into the slab 1 when it is in a cured phase. This means that the concrete of the slab 1 is already hardened such that the moment of drilling the holes 11 can be selected after the slip form process whenever it suits.
- the lifting elements 6 are mounted to the slab 1 by screwing their self-tapping screws 10 into the respective holes 11.
- the self-tapping screws 10 tap cooperating threads into the cured concrete of the slab 1.
- Fig. 5 shows that in this case the centrelines of the holes 11 are substantially perpendicular to the plane of the slab 1, i.e. substantially vertical in case of considering the plane of the slab 1 horizontally.
- the intermediate hoisting cables 8 are angled with respect to the plane of the slab 1, which means that the resultant forces on the respective lifting elements 6 are angled with respect to the centrelines of the respective holes 11.
- the lifting elements 6 also exert lateral forces onto the slab 1, which provides increased resistance against pulling out the lifting elements 6 from the slab 1.
- the intermediate hoisting cables 8 extend vertically from the lifting rings 9 of the lifting elements 6, but the self-tapping screws 10 and the corresponding holes 11 are angled with respect to the plane of the slab 1, for example as shown by the second lifting element 6 from the left in Fig. 4 .
- Figs. 2 and 3 shows an alternative concrete body 12 which has the same outer shape and dimensions as the hollow-core slab 1 as shown in Figs. 1 , 4 and 5 .
- the concrete body 12 is not provided with elongate hollow cores.
- the lifting elements 6 may have similar dimensions and shapes and orientations with respect to the concrete body 12 as in case of the hollow-core slab 1.
- fixation part of the lifting element is in the form of an alternative clamping system rather than a self-tapping screw.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
- The present invention relates to a method for attaching a lifting element to a concrete body.
- A known method for attaching a lifting element to a concrete body is installing a lifting loop in a fresh concrete body when the concrete is not cured yet.
- Furthermore, several methods of lifting a concrete body are known. For example, for hoisting conventional hollow-core slabs there are lifting systems which comprise mechanical clamps which support the slab. The clamps fit in recesses at opposite side walls of a hollow-core slab. A hollow-core slab comprises an upper layer and a lower layer, whereas vertical webs connect the upper layer and the lower layer. The vertical webs form walls between open channels or cores which extend in longitudinal direction of the slab. The recesses at opposite side walls for receiving a pair of clamps are mostly located just below the level of the upper layer. It may be clear that the clamping force must be limited in order to avoid damaging the slab upon clamping; on the other hand, the clamping force must provide sufficient hold to the concrete slab. Since this forms a safety risk during hoisting upon transporting and installing hollow-core slabs, safety measures are required in practice. Another disadvantage of the mechanical clamps is their relatively heavy weight and bulky shape.
- As described above, installing lifting loops in fresh concrete bodies is known. For example, in case of a hollow-core slab a part of the fresh slab is broken away at a hollow core and the lifting loop is installed such that it bears against pre-stressing strands of the slab. Particularly, in case of manufacturing a slab by means of a slip form process, it is difficult to incorporate the lifting loops during the manufacturing process and removing fresh concrete appears to be more efficient. It is, however, still undesired that the entire manufacturing process is decelerated by an intermediate step of installing the lifting loops before curing or hardening the concrete slab.
- Furthermore, in case of integrating a lifting element in a concrete body during the manufacturing process before curing the concrete body, it is not possible or at least difficult to check whether the lifting element is secured appropriately in the concrete body.
- The present invention aims to provide a method which simplifies the process of manufacturing and handling concrete bodies.
- For this purpose, a hole is drilled into the concrete body when it is in a cured phase, after which a fixation part of the lifting element is fixed into said hole, wherein the fixation part of the lifting element comprises a self-tapping screw which is screwed into said hole.
- Drilling a hole in a cured body provides a relatively small and well-defined amount of removed concrete, contrary to removal of a relatively large amount of concrete in case of breaking away parts of fresh concrete. This means that after installing the concrete body it is only a drilled hole that has to be filled with concrete afterwards, if the fixation part of the lifting element is to be removed. It is also possible to cover the hole by means of a cap or to leave it open or to leave the lifting element in the concrete body. Another advantage of the method according to the invention is that the moment of installing the lifting element can be chosen arbitrarily, for example directly after hardening the concrete body in a factory or after transport to a site where the body must be installed. Since the fixation part of the lifting element comprises a self-tapping screw which is screwed into the hole, the lifting element can be fixed to the concrete body very quickly. Besides, a splitting force onto the surrounding walls of the hole is limited or negligible, hence minimizing a force onto the concrete in radial direction of the self-tapping screw.
- The lifting element may comprise a ring-shaped portion for receiving a hook of a hoisting device, but alternative shapes are conceivable.
- In a practical embodiment the concrete body is manufactured by means of a slip form process or an extrusion process. In particular for this type of manufacturing concrete bodies it is advantageous to fix the lifting element to the body afterwards in order to minimize disturbances of the manufacturing process.
- The centreline of the hole may be angled with respect to an upper face of the concrete body. In that case a hoisting cable may be engaged to the lifting element such that the hoisting cable extends vertically above the body, but the lifting element exerts a lateral force on the wall of the hole. This means that it becomes more difficult to pull the lifting element out of the hole, which may be advantageous if the fixation part comprises a self-tapping screw, for example.
- In case of a hollow-core slab the hole may at least partly be drilled into a web between two adjacent hollow cores of the slab.
- The hole and the lifting element may be adapted such that the lifting element is located below an upper surface of the concrete body adjacent to the lifting element. In this case the lifting element does not project from the concrete body and may be left in the concrete body after installation thereof.
- In an alternative embodiment a hole is drilled into the concrete body when it is in a cured phase, after which a fixation part of the lifting element is fixed into said hole, wherein the concrete body comprises a hollow-core slab, which is manufactured by means of a slip form process or an extrusion process.
- The invention is also related to a method for lifting a concrete body comprising a lifting element which is attached thereto by a method as described hereinbefore, wherein a hoisting cable is connected to the lifting element.
- Alternatively, at least two lifting elements may be attached to the concrete body, wherein said lifting elements are located at a horizontal distance from each other and wherein hoisting cables are connected to the lifting elements such that resultant upward forces on the lifting elements are angled with respect to the respective centrelines of the holes.
- In case of vertical holes in a planar concrete body the resultant lifting forces extend obliquely with respect to the plane of the body.
- The invention will hereafter be elucidated with reference to the schematic drawings showing embodiments of the invention by way of example.
-
Fig. 1 is a perspective view of a hollow-core concrete slab in which lifting elements are attached by means of an embodiment of a method according to the invention. -
Fig. 2 is a similar view asFig. 1 , but showing a different concrete body. -
Fig. 3 is an enlarged cross-sectional view of the concrete body according toFig. 2 , showing a number of possible lifting elements. -
Figs 4 and 5 are similar views asFig. 3 , but related to the embodiment ofFig. 1 . -
Fig. 1 shows a concrete body in the form of a hollow-core concrete slab 1 which is manufactured by means of a slip form process.Figs. 4 and 5 show that the slab 1 comprises an upper layer 2 and alower layer 3. The upper layer 2 and thelower layer 3 are connected to each other viavertical webs 4 which extend in longitudinal direction, hence forming elongate cavities between thewebs 4. Furthermore, the slab 1 comprises pre-stressingstrands 5, which extend in longitudinal direction of the slab 1. -
Fig. 1 shows that the slab 1 is lifted at fourlifting elements 6, but a higher number oflifting elements 6 per slab 1 is conceivable. Thelifting elements 6 are connected to acentral hoisting cable 7 through fourintermediate hoisting cables 8. Thecables -
Fig. 4 shows more than twolifting elements 6 at a cross-section of the slab 1, but this is only for illustrative reasons. Thelifting elements 6 have different dimensions and shapes and different orientations with respect to the slab 1. InFig. 4 three of the five lifting elements have alifting ring 9 and a self-tappingscrew 10, which forms a fixation part of thelifting element 6. Thelifting ring 9 and self-tappingscrew 10 may be made of one piece, but alternatively they may be separate parts. The other twolifting elements 6 as shown inFig. 4 have respective lifting heads 9', instead of lifting rings. Thelifting elements 6 including lifting heads 9' are not entirely screwed into the slab 1 in order to leave room between the lifting heads 9' and the upper surface of the slab 1 in order to allow to receive a hoisting hook between the respective lifting heads 9' and the upper surface of the slab 1. One of the lifting heads 9' is received in a recess in the upper surface of the slab 1; this is also conceivable in case of alifting ring 9. - After installing the slab 1 the
lifting element 6 can be left in the slab 1 and possibly covered by a cap. InFig. 5 theleft lifting element 6 has alifting ring 9 and theright lifting element 6 has a planar lifting head 9'.Figs. 4 and 5 show holes 11 at the locations of therespective lifting elements 6. Theholes 11 are drilled into the slab 1 when it is in a cured phase. This means that the concrete of the slab 1 is already hardened such that the moment of drilling theholes 11 can be selected after the slip form process whenever it suits. - After drilling the
holes 11 thelifting elements 6 are mounted to the slab 1 by screwing their self-tappingscrews 10 into therespective holes 11. The self-tappingscrews 10 tap cooperating threads into the cured concrete of the slab 1. -
Fig. 5 shows that in this case the centrelines of theholes 11 are substantially perpendicular to the plane of the slab 1, i.e. substantially vertical in case of considering the plane of the slab 1 horizontally. As illustrated inFig. 1 theintermediate hoisting cables 8 are angled with respect to the plane of the slab 1, which means that the resultant forces on therespective lifting elements 6 are angled with respect to the centrelines of therespective holes 11. As a consequence, thelifting elements 6 also exert lateral forces onto the slab 1, which provides increased resistance against pulling out thelifting elements 6 from the slab 1. Alternatively, it is possible that theintermediate hoisting cables 8 extend vertically from the lifting rings 9 of thelifting elements 6, but the self-tappingscrews 10 and the correspondingholes 11 are angled with respect to the plane of the slab 1, for example as shown by thesecond lifting element 6 from the left inFig. 4 . -
Figs. 2 and3 shows an alternativeconcrete body 12 which has the same outer shape and dimensions as the hollow-core slab 1 as shown inFigs. 1 ,4 and 5 . Theconcrete body 12 is not provided with elongate hollow cores. Thelifting elements 6 may have similar dimensions and shapes and orientations with respect to theconcrete body 12 as in case of the hollow-core slab 1. - The invention is not limited to the embodiments as shown in the drawings and described hereinbefore, which may be varied in different manners within the scope of the claims and their technical equivalents. It is conceivable that the fixation part of the lifting element is in the form of an alternative clamping system rather than a self-tapping screw.
Claims (10)
- A method for attaching a lifting element (6) to a concrete body (1, 12), characterized in that a hole (11) is drilled into the body (1, 12) when it is in a cured phase, after which a fixation part (10) of the lifting element (6) is fixed into said hole (11), wherein the fixation part of the lifting element (6) comprises a self-tapping screw (10) which is screwed into said hole (11).
- A method according to claim 1, wherein the body (1, 12) is manufactured by means of a slip form process or extrusion process.
- A method according to claim 1 or 2, wherein the concrete body comprises a hollow-core slab (1).
- A method according to one of the preceding claims, wherein the centreline of the hole (11) is angled with respect to an upper face of the concrete body (1, 12).
- A method according to claim 3, wherein the hole (11) is at least partly drilled into a web (4) between two adjacent hollow cores of the slab (1).
- A method according to one of the preceding claims, wherein the lifting element (6) comprises a ring-shaped portion (9) for receiving a hook of a hoisting device.
- A method according to one of the preceding claims, wherein the hole (11) and the lifting element (6) are adapted such that the lifting element (6) is located below an upper surface of the concrete body (1, 12) adjacent to the lifting element (6).
- A method for attaching a lifting element (6) to a concrete body (1, 12), characterized in that a hole (11) is drilled into the body (1, 12) when it is in a cured phase, after which a fixation part (10) of the lifting element (6) is fixed into said hole (11), wherein the concrete body comprises a hollow-core slab (1) which is manufactured by means of a slip form process or an extrusion process.
- A method for lifting a concrete body (1, 12) comprising a lifting element (6) which is attached thereto by a method according to one of the preceding claims, wherein a hoisting cable (8) is connected to the lifting element (6).
- A method for lifting a concrete body (1, 12) comprising at least two lifting elements (6) which are attached thereto by a method according to one of the claims 1-8, wherein said lifting elements (9) are located at a horizontal distance from each other and wherein hoisting cables (8) are connected to the lifting elements (6) such that resultant upward forces on the lifting elements (6) are angled with respect to the respective centre lines of the holes (11).
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP15170964.9A EP3103756B1 (en) | 2015-06-08 | 2015-06-08 | A method for attaching a lifting element to a concrete body |
PL15170964.9T PL3103756T3 (en) | 2015-06-08 | 2015-06-08 | A method for attaching a lifting element to a concrete body |
ES15170964T ES2962661T3 (en) | 2015-06-08 | 2015-06-08 | Procedure for fixing a lifting element to a concrete body |
HUE15170964A HUE063855T2 (en) | 2015-06-08 | 2015-06-08 | A method for attaching a lifting element to a concrete body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP15170964.9A EP3103756B1 (en) | 2015-06-08 | 2015-06-08 | A method for attaching a lifting element to a concrete body |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3103756A1 true EP3103756A1 (en) | 2016-12-14 |
EP3103756C0 EP3103756C0 (en) | 2023-08-09 |
EP3103756B1 EP3103756B1 (en) | 2023-08-09 |
Family
ID=53365888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15170964.9A Active EP3103756B1 (en) | 2015-06-08 | 2015-06-08 | A method for attaching a lifting element to a concrete body |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3103756B1 (en) |
ES (1) | ES2962661T3 (en) |
HU (1) | HUE063855T2 (en) |
PL (1) | PL3103756T3 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3581352A1 (en) | 2018-06-11 | 2019-12-18 | HILTI Aktiengesellschaft | Reamer and method for producing countersunk bores in concrete |
WO2020260238A1 (en) | 2019-06-27 | 2020-12-30 | Hilti Aktiengesellschaft | Concrete screw with integrated washer with bulging underhead surface |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2712268A1 (en) * | 1993-11-10 | 1995-05-19 | Rector Sa | Handling method for thin or extruded concrete products |
DE10008342A1 (en) * | 2000-02-23 | 2001-08-30 | Wakai Sangyo Kk | Building material transport method, especially for ALC blocks, by securing anchor with hole for lifting device inside hole formed in top side of material |
US20120306226A1 (en) * | 2011-06-02 | 2012-12-06 | Mjt Holdings Llc | Anchor Hoist Ring Assembly |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH704717A2 (en) * | 2011-03-23 | 2012-09-28 | Adnan Fidan | Lifting. |
-
2015
- 2015-06-08 EP EP15170964.9A patent/EP3103756B1/en active Active
- 2015-06-08 HU HUE15170964A patent/HUE063855T2/en unknown
- 2015-06-08 PL PL15170964.9T patent/PL3103756T3/en unknown
- 2015-06-08 ES ES15170964T patent/ES2962661T3/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2712268A1 (en) * | 1993-11-10 | 1995-05-19 | Rector Sa | Handling method for thin or extruded concrete products |
DE10008342A1 (en) * | 2000-02-23 | 2001-08-30 | Wakai Sangyo Kk | Building material transport method, especially for ALC blocks, by securing anchor with hole for lifting device inside hole formed in top side of material |
US20120306226A1 (en) * | 2011-06-02 | 2012-12-06 | Mjt Holdings Llc | Anchor Hoist Ring Assembly |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3581352A1 (en) | 2018-06-11 | 2019-12-18 | HILTI Aktiengesellschaft | Reamer and method for producing countersunk bores in concrete |
WO2020260238A1 (en) | 2019-06-27 | 2020-12-30 | Hilti Aktiengesellschaft | Concrete screw with integrated washer with bulging underhead surface |
EP3757316A1 (en) | 2019-06-27 | 2020-12-30 | Hilti Aktiengesellschaft | Concrete screw with integrated washer with bulging underhead surface |
Also Published As
Publication number | Publication date |
---|---|
ES2962661T3 (en) | 2024-03-20 |
PL3103756T3 (en) | 2024-01-22 |
EP3103756C0 (en) | 2023-08-09 |
HUE063855T2 (en) | 2024-02-28 |
EP3103756B1 (en) | 2023-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2347067B1 (en) | A lifting device and method for concrete elements | |
US9180323B2 (en) | Fall protection tie-off anchor point and method | |
CN109537476B (en) | Pin lug type double-temporary-rope self-balancing pulling type suspension bridge sling replacement underpinning device | |
EP3103756A1 (en) | A method for attaching a lifting element to a concrete body | |
CN215287701U (en) | Special lifting appliance for prefabricated wall | |
CN111409192B (en) | Production process of PC (polycarbonate) member and hoisting device for PC member | |
KR200291531Y1 (en) | fixde pin for pipe support | |
KR100862275B1 (en) | Guided clinbing system for skyscraper construction | |
CN102808508B (en) | Method for pouring reinforced concrete structure provided with deformation joint and deformation joint steel fly die template | |
WO2014032115A1 (en) | A reusable inwardly collapsible void former | |
KR101916016B1 (en) | Continuous gangform falling prevention system | |
KR101066023B1 (en) | Device for constructing pier in the water and pier constructing method using the same | |
CN102116084A (en) | Hanging formwork device replacing supporting formwork for pouring concrete floor slab in multilayer building | |
WO2005111310A1 (en) | A method and modules for establishing road regulations | |
US20070164575A1 (en) | Concrete lifting eye-recessed lifting box | |
KR200410995Y1 (en) | gangform fasten means | |
JP4211537B2 (en) | Concrete block manufacturing method and manufacturing jig | |
KR20120050043A (en) | Semi-auto shackle | |
KR20090105907A (en) | Lifting unit mounting apparatus for auto climbing system | |
KR200485889Y1 (en) | A rope fixed device for cleanning a building | |
KR100484583B1 (en) | The lifting cable structure salvage of heavy weight concrete cube structure | |
KR200284928Y1 (en) | The lifting cable structure salvage of heavy weight concrete cube structure | |
JP2620693B2 (en) | Removal method of formwork support material under slab | |
WO2023099001A1 (en) | Fastening insert, use of a fastening insert and method of installing a guide rail of an elevator | |
KR200379649Y1 (en) | Link fixed on the wall for Rope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20170614 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20180222 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20220630 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
INTC | Intention to grant announced (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20230314 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602015085004 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
U01 | Request for unitary effect filed |
Effective date: 20230831 |
|
U07 | Unitary effect registered |
Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI Effective date: 20230907 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20230809 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231110 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230809 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231209 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230809 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231110 |
|
REG | Reference to a national code |
Ref country code: HU Ref legal event code: AG4A Ref document number: E063855 Country of ref document: HU |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2962661 Country of ref document: ES Kind code of ref document: T3 Effective date: 20240320 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230809 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230809 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230809 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602015085004 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20240627 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240627 Year of fee payment: 10 |
|
26N | No opposition filed |
Effective date: 20240513 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: RO Payment date: 20240528 Year of fee payment: 10 Ref country code: NO Payment date: 20240627 Year of fee payment: 10 |
|
U20 | Renewal fee paid [unitary effect] |
Year of fee payment: 10 Effective date: 20240627 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20240521 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: HU Payment date: 20240528 Year of fee payment: 10 |