EP3097623A1 - Windpark mit vorsteuerung im leistungsregler - Google Patents
Windpark mit vorsteuerung im leistungsreglerInfo
- Publication number
- EP3097623A1 EP3097623A1 EP15700386.4A EP15700386A EP3097623A1 EP 3097623 A1 EP3097623 A1 EP 3097623A1 EP 15700386 A EP15700386 A EP 15700386A EP 3097623 A1 EP3097623 A1 EP 3097623A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- power
- wind
- output
- wind farm
- farm according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/381—Dispersed generators
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D7/04—Automatic control; Regulation
- F03D7/042—Automatic control; Regulation by means of an electrical or electronic controller
- F03D7/048—Automatic control; Regulation by means of an electrical or electronic controller controlling wind farms
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D9/00—Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
- F03D9/20—Wind motors characterised by the driven apparatus
- F03D9/25—Wind motors characterised by the driven apparatus the apparatus being an electrical generator
- F03D9/255—Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor
- F03D9/257—Wind motors characterised by the driven apparatus the apparatus being an electrical generator connected to electrical distribution networks; Arrangements therefor the wind motor being part of a wind farm
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/46—Controlling the sharing of generated power between the generators, sources or networks
- H02J3/466—Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand
- H02J3/472—Scheduling or selectively controlling the operation of the generators or sources, e.g. connecting or disconnecting generators to meet a demand for selectively connecting the AC sources in a particular order, e.g. sequential, alternating or subsets of sources
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2101/00—Supply or distribution of decentralised, dispersed or local electric power generation
- H02J2101/20—Dispersed power generation using renewable energy sources
- H02J2101/28—Wind energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Definitions
- Wind farm with feedforward control in soupregier relates to a wind park with at least two wind turbines, which generate electric power by means of a wind rotor and a generator and release of a collecting ⁇ web, and a parking master, which is formed for guiding the wind turbines, wherein the ParkMaster a power controller comprises, at its input, a target power signal is created and output to the output Leis ⁇ processing control signals for the wind turbines
- wind farms are therefore required that wind farms also be actively involved in regulating the grid. This includes the provision of reactive power but also measures to control the delivered active power.
- wind farms differ from conventional power plants in one essential point, namely that their power output can not be freely determined, but that it depends on the wind speed in general and the wind conditions at the wind farm's individual wind turbines in particular.
- wind farms can follow if necessary under certain conditions, depending on wind conditions with an increase in Leis ⁇ processing requirement. However, they can always react when the demand for power drops, namely by throttling the wind energy plant of the wind farm and thus not fully exploiting the existing wind.
- that is setpoint adjustments for the power down wind farms are in principle so fully applicable to the Netz-Rege ⁇ ment. This is used by applying a setpoint for a power to be delivered to the parkmaster.
- the park master controls the wind power installation so that a entspre ⁇ sponding power is generated and outputted to the network so far ⁇ which allow the wind conditions. Not let them there, so much the set point is not reached, the wind park ⁇ feeds as much power as is currently one possible.
- the network operator is now demanding a reduction in the power output, the nominal value of the park master is ent lowered ⁇ speaking. This is usually done to avoid over- or undershoots in the power delivery not abruptly, but gradually as a ramp.
- the RAM penförmige reducing the setpoint also takes account of the fact that corresponding throttle signals to the spread in the wind park are arranged WEA have to be transmitted and that their rotor blades must be adjusted with respect to the angle of incidence in each case in order to perform the desired Leis ⁇ tung reduction.
- the invention has for its object to provide an improved wind farm, which avoids these disadvantages.
- the invention provides that the power controller has a pilot module, which is a measure of the desired power via a multiplier on the Output of the power controller switches to ⁇ .
- An essential aspect of the invention is that the pilot module is not added to the output of the output ⁇ controller additive, but multiplicatively. Thus, a significantly accelerated response can be achieved in particular at setpoint reduction. It is the merit of the invention to have recognized that a con- ventional pilot control is not sufficient to ensure that the desired arrives ver ⁇ improved behavior, but on a different kind of intrusion, namely by multiplying member. It not only offers the advantage of more rapid An Anlagenverhal ⁇ least, but in addition also robust to the operating state of the wind farm, ie whether much or little Leis ⁇ processing is generated. By multiplication with the power signal output by the power controller, an automatic adjustment of the pilot module to the respective power level is achieved. This can not be achieved with a merely additive link. The invention thus combines strikingly simple and elegant way out ⁇ advantages clearly more rapid response with robustness be ⁇ technische.
- the precontrol acts, so to speak, in parallel with the power controller.
- more convenient locations gate is this an accurate stationary element vorgese ⁇ hen to einregeln a desired power value better.
- Such stationary precise members in particular in the form of an I-member, are known in the art, but not in combination with a multiplicatively connected pilot module.
- the power controller is relieved in that regard. During its parameterization, priority is no longer to be paid to fast response.
- the invention makes use of this by preferably providing a double parameter set for the power regulator.
- one of the parameter sets is used to parameterize the power controller. Conveniently, this criterion is based on the sign of a control difference formed on the power controller, thus therefore positive for increases and negative for reductions.
- one of the two parameter sets is then used for the power controller. Switching between the parameter sets can be done at any time, ie dynamically.
- a Konfigu ⁇ ration has been found in which the parameter set for the reduction has a shorter time constant than the parameter set for the increase, and indeed by about one sizing order ⁇ .
- an order of magnitude a factor of about 8 to 14 is considered, preferably about 10. This provides a particularly good adaptation to the conditions ge ⁇ rade of wind turbines is achieved. This can only very slowly or not increase the power output, down ⁇ but they are able to quickly surrender the power to reduce. This intrinsic behavior of the wind turbine is proposed by such worn Reglerkonfigu ⁇ ration bill.
- the precontrol module has a correction limiter.
- the correction limiter is designed asymmetrically.
- a maximum finder is expediently provided for generating the upper limit, and is designed to determine from the various wind turbines of the wind farm that wind energy plant which generates the maximum electric power and feeds it to the network.
- This maximum output specifically the associated end to the nominal power of the wind turbine normalized Leis ⁇ tung grad (z. B. 0.75 for a 75% underutilized wind ⁇ power plant), in the formation of the upper limit of the Korrekturbeskyrs underlying, so there ss the risk of unwanted throttling wind and thus high-performance wind turbines is avoided.
- the addition of a fixed value ensures that the upper limit is always greater than the lower limit
- a dynamic locking member is preferably seen ⁇ before, which is connected to the output of the multiplier (ie in the signal path behind the pilot control to detect their influence).
- the dynamic lock member is configured to monitor the rate of change at that output and to block the power regulator when a limit is exceeded. A further increase in the values at the output, which could lead to an excessive demand of the wind turbine, is thus prevented. Preference ⁇ way, this is done in such a way that the power controller in the blocked state retains the previous value. In order to its condition remains and it can be re-used softly when the dynamic lock member releases the blockage.
- a preferably simplified model of the wind turbine is implemented in the dynamic locking member. It can be more accurately matched to the behavior of the wind turbine, especially when changes in the requested performance.
- the model needs to be be ⁇ Sonder consuming not mandatory. For reasons of faster calculation, a simple model is even an advantage. Be ⁇ Sonder is appropriate if the simplified model bimo ⁇ dal in the sense that it provides different Zeitkonstan ⁇ th for power reduction and power increase.
- a wind power plant can quickly follow a power reduction, while a power increase results in a delay time due to the adjustment of the wind rotor required for this purpose.
- a particularly simple and functional modeling therefore provides for the Leis ⁇ tung increase a delay element before, one of the first order is sufficient. Thus, a much better dynamic behavior, especially at high rates of change, achieved without much effort.
- the invention further extends to a corresponding method.
- Fig. 2 is a schematic view of the parkmaster with a
- FIG. 3 is a block diagram of a power regulator of the
- Fig. 5 is a detail view of a dynamic locking member; 6 shows a detailed view of an initialization module ; and
- Wind farms with and without the invention Wind farms with and without the invention.
- FIG. He An exemplary embodiment of a wind park according to the invention is shown in FIG. He includes a parkmaster
- the wind turbines 1 each have a wind rotor 11 with a driven generator 12 for generating electrical power, which in a collection network 22 of the
- Parks is fed and delivered at a connection point 29 in a transmission network 99.
- the Parkmaster 2 monitors and controls the operation of the wind turbines 1.
- the input signals are a power setpoint Pdemand, which is preferably provided by an external higher-level entity (not shown), and a value for the current power supply Pact, which is determined by a power measurement module 28 which monitors voltage and current at the connection point 28.
- the difference determined by a differential element 30 is applied to the power regulator 3 as a signal for the control difference.
- the power controller 3 determines therefrom default values for the wind power plants 1.
- it has an I-element 33, which in the illustrated embodiment is designed as a discrete integrator with a summing element 34 and a feedback delay element (1 / z) 35.
- the control difference formed at the input of the power controller 3 is not fed directly to the I-element, but is preprocessed by means of a switchable parameter set 6.
- a sign detector 40 is provided, the control difference formed by the differential element 30 to un ⁇ tersucht whether it is positive or negative. If the sign is positive, the parameter set 61 is selected and the control difference is processed with the parameters belonging to this parameter set. In the illustrated embodiment, there is only one parameter, namely the one for a P-element 62. If the sign is negative, the parameter set 61 'is selected and the control difference processed with the parameters associated with this parameter set, in the illustrated Example by means of the P-member 62 '.
- the values thus generated are combined by means of a fusion element 63 controlled by the sign detector 60 and supplied to the I-element 33.
- the values of the parameter sets are selected so that the parameter set 61 'for the negative sign (ie a change down) a shorter time constant than the positive sign parameter set 61, preferably by a factor of 10 (corresponding to an order of magnitude).
- the parking master 2 has a pre-control module 4. It is connected in parallel to the power controller 3 and at its input the signal for the power setpoint Pdemand is applied, as well as values for the actual output from the park power Pact and the performance of the individual wind turbines 1.
- the determined by the pre-control module 4 output value is over a Mul ⁇ tiéessglied switched 5 to the output signal of the power ⁇ regulator 3, and transmits the obtained product therefrom in sequence via a park internal signal network 21 to the wind turbines. 1
- the pilot control module 4 and its interaction with the power regulator 3 will be explained in more detail below.
- the signal for the power reference value P DEMAND is applied as input ⁇ signal to the feedforward control module 4 and to the difference ⁇ member 30 at the input of the power controller. 3 To the differential element 30, detected by the power measurement module 28 ⁇ actual current power Pact is still further applied.
- the pre-control module 4 comprises a fast forward channel 40, via which the signal applied to its input for the desired power Pdemand is output directly and applied to the multiplication element 5. For a ge ⁇ wished quick response is achieved to setpoint changes, which automatically scales thanks multiplicative intrusion to the actual output power level. It is thus achieved a fast and robust response.
- the pilot module on additional channels 41 and 42 with which it acts on the power ⁇ regulator.
- the passage 41 acts on a Korrekturbe ⁇ limiter 7 and obtains values for the turbines by the individual wind power output 1 ⁇ ⁇ , P n and P in. These values are queried by the parkmaster 2 via the signal network 21 from the individual wind turbines 1.
- a maximum detector 73 which determines the highest of these power values and outputs them to a summer 74 as a normalized power signal. Furthermore, a signal for a basic value offset is applied to the summing element 74. The sum signal formed therefrom is applied to a limiting member 75, which performs loading ⁇ limitation on 1 corresponding to the rated power. This signal thus obtained is applied to a divide ⁇ member 76, which performs a division by the same normalized value for the desired power Pdemand. The thus he ⁇ preserved signal is a second limiting member 77 supplied ⁇ leads, it is limited downwards to 1 and then applied to an upper limit of input 72 Korrekturbe dictionaryrs.
- a fixed normalized power value of 0.5 is applied to a lower-limit input 71, which may optionally also be replaced by a higher value.
- the channel 42 acts on an initializer 9, which is designed as part of the precontrol 4 to initialize the horeg ⁇ ler 3 in certain situations by means of a ramp function. To recognize these particular situations, the initializer 9 has an input stage consisting of two comparison modules 93, 94. At the first
- Comparison module 93 signals for the desired power P mandand and the current power P act are applied. It checks if the requested nominal power is less than the power currently delivered by the wind farm. If this is the case, a logic signal is output as a release. Is equal to the second Ver ⁇ module 94 also the signal for current performance-P act applied and further a difference signal which it is evidence ⁇ as an output signal of the Korrekturbegrenzers 7 with a rate tolerance value T comparative difference element 95th If the current power is smaller, if an enable logic signal is output even if ⁇ ; if it is not, this means that the current power is close enough to the new setpoint that it can be reached directly and initialization of the ramp is not required.
- a predictor 98 can be connected to the initializer 9. This is designed to generate an estimated value for the target power specification for the wind energy plants in the event of a setpoint step up. In the case of such a setpoint jump to this estimated value a better transitional behavior can be achieved.
- the predictor 98 is the subject of another, simultaneously filed application of the Applicant.
- a dynamic locking member 8 is provided. At him is the signal generated by the multiplication element 5 is ⁇ closed. He monitors it by means of a simplified ma ⁇ thematic model 82 of the wind turbine 1 and acts in case of too rapid changes to blocking elements 81, which act on the parameter sets 61, 61 '. Thus, a so-called. Anti-windup for the power controller 3 is realized.
- the model 82 is preferably constructed so that it as the input stage comprises an upper path 84 with a 1st order delay element 86, and a Be ⁇ limiter 88 and a lower path 85 to an integrator 83 which are merged at a difference block 89, which in turn outputs the output signal for the activation of the blocking elements 81.
- an increase in power so ensures that of deceleration member 86 that occurring at the actual wind power installation ⁇ slow processes, such as pitch adjustment will be considered of the rotor blades in the model. This ensures correct control of the controller even in this case.
- the interaction of the components described above is shown in FIG.
- FIG. 7 shows performance diagrams for wind farms with (FIG. 7a) and without (FIG. 7b) the pilot control module 4 according to the invention.
- the wind conditions are rather weak but quite turbulent so that the wind turbine fluctuates around 70% of its rated output.
- the dashed line shows the setpoint output by the parkmaster 2 to the wind turbines 1 as a dashed line
- the solid line shows the actual output power of the park as a whole.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Eletrric Generators (AREA)
- Wind Motors (AREA)
Abstract
Description
Claims
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL15700386T PL3097623T3 (pl) | 2014-01-22 | 2015-01-14 | Farma wiatrowa ze sprzężeniem w przód w regulatorze mocy |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102014000784.7A DE102014000784A1 (de) | 2014-01-22 | 2014-01-22 | Windpark mit Vorsteuerung im Leistungsregler |
| PCT/EP2015/050608 WO2015110335A1 (de) | 2014-01-22 | 2015-01-14 | Windpark mit vorsteuerung im leistungsregler |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP3097623A1 true EP3097623A1 (de) | 2016-11-30 |
| EP3097623B1 EP3097623B1 (de) | 2018-06-27 |
Family
ID=52350121
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP15700386.4A Not-in-force EP3097623B1 (de) | 2014-01-22 | 2015-01-14 | Windpark mit vorsteuerung im leistungsregler |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US10330084B2 (de) |
| EP (1) | EP3097623B1 (de) |
| CN (1) | CN105917545B (de) |
| DE (1) | DE102014000784A1 (de) |
| DK (1) | DK3097623T3 (de) |
| ES (1) | ES2687043T3 (de) |
| PL (1) | PL3097623T3 (de) |
| WO (1) | WO2015110335A1 (de) |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3156646B1 (de) * | 2015-10-16 | 2018-05-16 | Nordex Energy GmbH | Windenergieanlage mit einem drehzahl- und einem generatorregler |
| DE102016108394A1 (de) * | 2016-05-06 | 2017-11-09 | Wobben Properties Gmbh | Verfahren zur Kompensation von einzuspeisenden Strömen eines Windparks |
| DK3376026T3 (da) | 2017-03-13 | 2022-02-28 | Nordex Energy Se & Co Kg | Fremgangsmåde til regulering af aktiv-effekt fra en vindmøllepark, og tilsvarende vindmøllepark |
| EP3376626B1 (de) | 2017-03-13 | 2022-02-09 | Nordex Energy SE & Co. KG | Verfahren zur regelung der wirkleistungsabgabe eines windparks sowie ein solcher windpark |
| ES2774695T3 (es) | 2017-07-10 | 2020-07-22 | Nordex Energy Gmbh | Procedimiento para la regulación de la emisión de potencia efectiva de un parque eólico así como un parque eólico correspondiente |
| ES2854706T3 (es) * | 2017-08-18 | 2021-09-22 | Nordex Energy Se & Co Kg | Procedimiento para el control de una instalación de energía eólica |
| DK3444938T3 (da) * | 2017-08-18 | 2021-02-22 | Nordex Energy Se & Co Kg | Fremgangsmåde til styring af en vindturbine |
| CN109659982B (zh) * | 2019-02-02 | 2022-05-10 | 河海大学 | 一种新能源电力系统时滞依赖稳定性的判定方法 |
| DE102019115943A1 (de) * | 2019-06-12 | 2020-12-17 | Wobben Properties Gmbh | Verfahren zum Steuern einer Windenergieanlage |
| CN110206686A (zh) * | 2019-07-17 | 2019-09-06 | 星际(重庆)智能装备技术研究院有限公司 | 一种用于风力发电机组的自适应最大功率跟踪控制方法 |
| CN119452163A (zh) * | 2022-04-12 | 2025-02-14 | 马克·丹尼尔·法博 | 用于操作流体涡轮机集群的系统和方法 |
Family Cites Families (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6058322A (en) * | 1997-07-25 | 2000-05-02 | Arch Development Corporation | Methods for improving the accuracy in differential diagnosis on radiologic examinations |
| EP1107260B1 (de) * | 1999-11-30 | 2008-10-15 | Philips Intellectual Property & Standards GmbH | Gitter zur Absorption von Röntgenstrahlen |
| US6975925B1 (en) * | 2002-03-19 | 2005-12-13 | Windlynx Systems, B.V. | Forecasting an energy output of a wind farm |
| NL1021109C2 (nl) * | 2002-07-18 | 2004-01-20 | Den Ameele Award B V Van | Fitting voor een lamp. |
| EP1665494B2 (de) * | 2003-09-03 | 2023-06-28 | Siemens Gamesa Renewable Energy Service GmbH | Verfahren zum betrieb bzw. regelung einer windenergieanlage sowie verfahren zur bereitstellung von primärregelleistung mit windenergieanlagen |
| JPWO2006019056A1 (ja) * | 2004-08-19 | 2008-05-08 | 株式会社国際電気セミコンダクターサービス | 供給電力調節装置、半導体製造装置、ヒータへの電力制御方法、及び半導体装置の製造方法 |
| DE102004048341A1 (de) * | 2004-10-01 | 2006-04-13 | Repower Systems Ag | Windpark mit robuster Blindleistungsregelung und Verfahren zum Betrieb |
| JP4803997B2 (ja) * | 2004-12-03 | 2011-10-26 | ルネサスエレクトロニクス株式会社 | 半導体集積装置、その設計方法、設計装置、およびプログラム |
| US7289341B2 (en) * | 2004-12-14 | 2007-10-30 | Advanced Energy Industries, Inc. | Power supply adaptive feedforward control circuit |
| DE102004060943A1 (de) * | 2004-12-17 | 2006-07-06 | Repower Systems Ag | Windparkleistungsregelung und -verfahren |
| DE102005032693A1 (de) * | 2005-07-13 | 2007-02-01 | Repower Systems Ag | Leistungsregelung eines Windparks |
| US7983799B2 (en) * | 2006-12-15 | 2011-07-19 | General Electric Company | System and method for controlling microgrid |
| EP1993184B2 (de) * | 2007-05-14 | 2024-04-24 | Siemens Gamesa Renewable Energy A/S | Verfahren zum Starten mindestens eines Teils einer Windkraftanlage, Windkraftanlage und Verwendung der Windkraftanlage |
| US7999406B2 (en) * | 2008-02-29 | 2011-08-16 | General Electric Company | Wind turbine plant high wind derating control |
| DE102009017939A1 (de) * | 2009-04-17 | 2010-11-11 | Nordex Energy Gmbh | Windpark mit mehreren Windenergieanlagen sowie Verfahren zur Regelung der Einspeisung von einem Windpark |
| US7890217B2 (en) * | 2009-10-26 | 2011-02-15 | General Electric Company | Integrated real-time power and solar farm control system |
| ES2547637T3 (es) * | 2011-04-28 | 2015-10-07 | Vestas Wind Systems A/S | Turbina eólica variable con unidad de disipación de potencia; método para hacer funcionar una unidad de disipación de potencia en una turbina eólica |
| DE102011112025A1 (de) * | 2011-08-31 | 2013-02-28 | Repower Systems Se | Schnelle Spannungsregelung |
| CN103107553B (zh) * | 2011-11-11 | 2015-07-29 | 北京能高自动化技术股份有限公司 | 基于离散非线性逆系统电压前馈的风电机组并网控制策略 |
| US8853877B1 (en) * | 2013-05-29 | 2014-10-07 | General Electric Company | System and method for controlling a wind farm |
-
2014
- 2014-01-22 DE DE102014000784.7A patent/DE102014000784A1/de not_active Withdrawn
-
2015
- 2015-01-14 EP EP15700386.4A patent/EP3097623B1/de not_active Not-in-force
- 2015-01-14 US US15/113,177 patent/US10330084B2/en not_active Expired - Fee Related
- 2015-01-14 WO PCT/EP2015/050608 patent/WO2015110335A1/de not_active Ceased
- 2015-01-14 DK DK15700386.4T patent/DK3097623T3/en active
- 2015-01-14 PL PL15700386T patent/PL3097623T3/pl unknown
- 2015-01-14 ES ES15700386.4T patent/ES2687043T3/es active Active
- 2015-01-14 CN CN201580004230.8A patent/CN105917545B/zh not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN105917545B (zh) | 2018-11-30 |
| DE102014000784A1 (de) | 2015-07-23 |
| PL3097623T3 (pl) | 2019-02-28 |
| CN105917545A (zh) | 2016-08-31 |
| US10330084B2 (en) | 2019-06-25 |
| US20170009740A1 (en) | 2017-01-12 |
| WO2015110335A1 (de) | 2015-07-30 |
| ES2687043T3 (es) | 2018-10-23 |
| EP3097623B1 (de) | 2018-06-27 |
| DK3097623T3 (en) | 2018-10-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3097623B1 (de) | Windpark mit vorsteuerung im leistungsregler | |
| EP2093419B1 (de) | Verfahren zum Betreiben einer Windenergieanlage und Windenergieanlage | |
| EP2556247B1 (de) | Dynamische trägheitsregelung | |
| EP2841766B1 (de) | Windpark mit schneller lokaler blindleistungsregelung | |
| DE102005029000B4 (de) | Verfahren und System zur Regelung der Drehzahl eines Rotors einer Windenergieanlage | |
| DE102009037239B4 (de) | Windenergieanlage mit einstellbarer Leistungsreserve | |
| EP2191551A2 (de) | Windpark mit spannungsregelung der windenergieanlagen und betriebsverfahren | |
| EP3749851B1 (de) | Verfahren zum steuern einer windenergieanlage und entsprechende windenergieanlage | |
| EP2751422A1 (de) | Verfahren zum betreiben einer windenergieanlage | |
| DE102016007098A1 (de) | Windpark mit schneller Reaktion auf Netzparameteränderungen und Verfahren hierfür | |
| EP3489507B1 (de) | Verfahren und vorrichtung zum betreiben einer windenergieanlage | |
| EP3438447B1 (de) | Bereitstellen von regelleistung beim betrieb einer regenerativen stromerzeugungseinheit, insbesondere windenergieanlage | |
| EP3884153A1 (de) | Reglerstruktur und regelverfahren für eine windenergieanlage | |
| DE102006051352A1 (de) | Verfahren zum Betreiben einer Windenergieanlage | |
| EP3176430B1 (de) | Verfahren zum überwachen einer windenergieanlage | |
| DE102006040970A1 (de) | Verfahren zum Betrieb einer Windenergieanlage | |
| EP4421313B1 (de) | Verfahren zum steuern einer windenergieanlage | |
| EP3430244B1 (de) | Synchronisierung einer turbine mit einem wechselstromnetz gemäss einer solltrajektorie für den solldifferenzwinkel | |
| DE102014103027A1 (de) | Nachführregler für eine U/f-gesteuerte Asynchronmaschine | |
| EP3887676B1 (de) | Verfahren zum betrieb einer windenergieanlage | |
| EP3382196B1 (de) | Windenergieanlage mit kurzschlussstromverbessertem anlagentransformator | |
| EP3511564A1 (de) | Verfahren und system zum steuern einer windenergieanlage | |
| DE102018116299A1 (de) | Verfahren zum Einspeisen elektrischer Leistung in ein elektrisches Versorgungsnetz |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20160609 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: BLUHM, ROMAN Inventor name: SCHROETER, THOMAS Inventor name: GEISLER, JENS Inventor name: OTT, THOMAS |
|
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: F03D 9/25 20160101ALI20180116BHEP Ipc: F03D 7/04 20060101ALI20180116BHEP Ipc: H02J 3/38 20060101AFI20180116BHEP Ipc: H02J 3/46 20060101ALI20180116BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20180216 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1013147 Country of ref document: AT Kind code of ref document: T Effective date: 20180715 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502015004822 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20181001 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2687043 Country of ref document: ES Kind code of ref document: T3 Effective date: 20181023 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180927 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180927 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180928 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181027 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502015004822 Country of ref document: DE |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20190328 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190114 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190131 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190114 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181029 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1013147 Country of ref document: AT Kind code of ref document: T Effective date: 20200114 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20210120 Year of fee payment: 7 Ref country code: NL Payment date: 20210120 Year of fee payment: 7 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200114 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20210120 Year of fee payment: 7 Ref country code: DE Payment date: 20210120 Year of fee payment: 7 Ref country code: PL Payment date: 20210104 Year of fee payment: 7 Ref country code: GB Payment date: 20210122 Year of fee payment: 7 Ref country code: ES Payment date: 20210217 Year of fee payment: 7 Ref country code: BE Payment date: 20210120 Year of fee payment: 7 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20150114 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180627 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502015004822 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP Effective date: 20220131 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20220201 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20220114 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20220131 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220201 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220114 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220802 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220131 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220131 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220131 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20230307 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220115 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220114 |