EP3062184B1 - Low level central plant optimization - Google Patents

Low level central plant optimization Download PDF

Info

Publication number
EP3062184B1
EP3062184B1 EP16154940.7A EP16154940A EP3062184B1 EP 3062184 B1 EP3062184 B1 EP 3062184B1 EP 16154940 A EP16154940 A EP 16154940A EP 3062184 B1 EP3062184 B1 EP 3062184B1
Authority
EP
European Patent Office
Prior art keywords
subplant
equipment
thermal energy
feasible
central plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16154940.7A
Other languages
German (de)
French (fr)
Other versions
EP3062184A1 (en
Inventor
Matthew J. Asmus
Robert D. Turney
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Johnson Controls Technology Co
Original Assignee
Johnson Controls Technology Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=54355189&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP3062184(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Johnson Controls Technology Co filed Critical Johnson Controls Technology Co
Publication of EP3062184A1 publication Critical patent/EP3062184A1/en
Application granted granted Critical
Publication of EP3062184B1 publication Critical patent/EP3062184B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • G05B13/048Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators using a predictor
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00Machine learning
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2639Energy management, use maximum of cheap power, keep peak load low
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2642Domotique, domestic, home control, automation, smart house
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31414Calculate amount of production energy, waste and toxic release
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32021Energy management, balance and limit power to tools
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present disclosure relates generally to the operation of a central plant for serving building thermal energy loads.
  • the present disclosure relates more particularly to systems and methods for optimizing the operation of one or more subplants of a central plant.
  • a central plant may include various types of equipment configured to serve the thermal energy loads of a building or building campus (i.e., a system of buildings).
  • a central plant may include heaters, chillers, heat recovery chillers, cooling towers, or other types of equipment configured to provide heating or cooling for the building.
  • Some central plants include thermal energy storage configured to store the thermal energy produced by the central plant for later use.
  • a central plant may consume resources from a utility (e.g., electricity, water, natural gas, etc.) to heat or cool a working fluid (e.g., water, glycol, etc.) that is circulated to the building or stored for later use to provide heating or cooling for the building.
  • Fluid conduits typically deliver the heated or chilled fluid to air handlers located on the rooftop of the building or to individual floors or zones of the building. The air handlers push air past heat exchangers (e.g., heating coils or cooling coils) through which the working fluid flows to provide heating or cooling for the air. The working fluid then returns to the central plant to receive further heating or cooling and the cycle continues.
  • the central plant may cycle on or off multiple chillers, heaters, pumps, or cooling towers to provide the varying thermal energy loads of the building.
  • High efficiency equipment can help reduce the amount of energy consumed by the central plant.
  • the effectiveness of such equipment is highly dependent on the control technology that is used. It is challenging and difficult to efficiently control a central plant for a building.
  • US2013345880 (A1 ) discloses a method for controlling a chiller plant for cooling a building, including estimating an optimal combination of chiller plant equipment for meeting a chiller plant load. Estimating the optimal combination includes using binary optimization to determine at least two potential combinations of chiller plant equipment and using nonlinear optimization to determine a potential power consumption minimum for each of the at least two potential combinations.
  • US2012010757 discloses an energy management system which determines an optimal manner of using and controlling the various energy consumption, producing and storage equipment in a plant/communities.
  • the energy management system operates the various components of the plant to minimize the cost of energy over time, or at various different times, while still meeting certain constraints or requirements within the operational system.
  • US2011066258 discloses a method for optimizing operational settings for a plurality of energy devices includes representing each of the plurality of energy devices in terms of a set of decision variables and operational parameters. The decision variables and operational parameters are constrained based on operational conditions and interrelationship within the plurality of energy devices.
  • a two-tiered model of the plurality of energy devices is generated wherein a top tier of the model represents interaction of various sub-models and a bottom tier of the model includes a set of the sub-models that form the top tier, each sub-model representing detailed operation of the plurality of energy devices.
  • the two-tiered model is optimized to provide either a schedule of operation for the plurality of energy devices or real-time control for the plurality of energy devices.
  • the controller includes a processing circuit having a processor and memory.
  • the processing circuit is configured to identify a thermal energy load setpoint for a subplant of the central plant.
  • the processing circuit includes a binary optimization module configured to use binary optimization to determine one or more feasible on/off configurations for equipment of the subplant based on the identified thermal energy load setpoint, a setpoint evaluator module configured to determine optimum operating setpoints for the subplant equipment for each feasible on/off configuration, and a subplant control module configured to generate operating parameters for the subplant equipment.
  • the generated operating parameters include at least one of the feasible on/off configurations and the optimum operating setpoints.
  • the controller further includes a communications interface coupled to the processing circuit and configured to output the generated operating parameters for use in controlling the subplant equipment.
  • the controller further includes a constraints evaluator module configured to identify applicable constraints for the subplant equipment. Each feasible on/off configuration may satisfy the applicable constraints and may be estimated to result in the subplant equipment meeting the thermal energy load setpoint.
  • the binary optimization module uses a branch and bound method to determine the one or more feasible on/off configurations.
  • the setpoint evaluator module determines the optimum operating setpoints using a nonlinear optimization that minimizes an amount of power consumed by the subplant equipment.
  • the setpoint evaluator module is configured to estimate an amount of power consumed by each feasible on/off configuration of the subplant equipment at the optimum operating setpoints and to identify which of the feasible on/off configurations is estimated to result in a lowest amount of power consumed by the subplant equipment at the optimum operating setpoints.
  • Identifying the thermal energy load setpoint includes receiving the thermal energy load setpoint from a high level optimization that uses a predicted thermal energy load for the building to determine optimum thermal energy load setpoints for the plurality of subplants.
  • the processing circuit includes a low level optimization module configured to generate a resource consumption curve for the subplant.
  • the resource consumption curve may indicate a minimum amount of resource consumption by the subplant as a function of a thermal energy load on the subplant.
  • the central plant has a plurality of subplants that serve thermal energy loads of a building or building system.
  • the method includes identifying, by a processing circuit of a controller for the central plant, a thermal energy load setpoint for a subplant of the central plant and using, by a binary optimization module of the processing circuit, binary optimization to determine one or more feasible on/off configurations for equipment of the subplant based on the identified thermal energy load setpoint.
  • the method further includes determining, by a setpoint evaluator module of the processing circuit, optimum operating setpoints for the subplant equipment for each feasible on/off configuration and generating, by a subplant control module of the processing circuit, operating parameters for the subplant equipment.
  • the operating parameters include at least one of the feasible on/off configurations and the optimum operating setpoints.
  • the method further includes outputting the generated operating parameters via a communications interface coupled to the processing circuit for use in controlling the subplant equipment.
  • the method includes identifying applicable constraints for the subplant equipment.
  • Each feasible on/off configuration may satisfy the applicable constraints and is estimated to result in the subplant equipment meeting the thermal energy load setpoint.
  • determining the one or more feasible on/off configurations includes using a branch and bound method.
  • determining the optimum operating setpoints includes using a nonlinear optimization that minimizes an amount of power consumed by the subplant equipment.
  • the method includes estimating an amount of power consumed by each feasible on/off configuration of the subplant equipment at the optimum operating setpoints and identifying which of the feasible on/off configurations is estimated to result in a lowest amount of power consumed by the subplant equipment at the optimum operating setpoints.
  • Identifying the thermal energy load setpoint includes receiving the thermal energy load setpoint from a high level optimization that uses a predicted thermal energy load for the building to determine optimum thermal energy load setpoints for the plurality of subplants.
  • the method includes generating a resource consumption curve for the subplant.
  • the resource consumption curve may indicate a minimum amount of resource consumption by the subplant as a function of a thermal energy load on the subplant.
  • Another implementation of the present disclosure is a method for determining optimum operating parameters for equipment of a central plant that serves thermal energy loads of a building or building system.
  • the method may be performed by a controller for the central plant.
  • the method includes initializing a database of possible solutions and a database of feasible solutions and retrieving a branch from the database of possible solutions.
  • the retrieved branch includes a specified operating status for one or more devices of the central plant equipment.
  • the method further includes determining whether the branch satisfies applicable constraints for the central plant equipment using the specified operating status and adding the branch to the database of feasible solutions in response to a determination that the branch satisfies the applicable constraints.
  • the method further includes generating operating parameters for the central plant equipment.
  • the operating parameters include the operating status specified by the branch in the database of feasible solutions.
  • the branch includes a specified operating status for a first device of the central plant equipment and an unspecified operating status for a second device of the central plant equipment.
  • the method further includes creating a first expanded branch by specifying a first operating status for the second device.
  • the determining, adding, and generating steps may be performed for the first expanded branch.
  • the method may further include creating a second expanded branch by specifying a second operating status for the second device and adding the second expanded branch to the database of possible solutions for evaluation in a subsequent iteration of the method.
  • the method further includes, in response to a determination that the first expanded branch does not satisfy the applicable constraints, determining whether the first expanded branch can possibly satisfy the applicable constraints if an unspecified operating status in the first expanded branch is subsequently specified and adding the first expanded branch to the database of possible solutions for evaluation in a subsequent iteration of the method in response to a determination that the first expanded branch can possibly satisfy the applicable constraints.
  • the method further includes estimating an amount of power consumed by each branch in the database of possible solutions.
  • Retrieving the branch from the database of possible solutions may include retrieving the branch with the lowest estimated power consumption.
  • the method includes estimating an amount of power consumed by each branch in the database of feasible solutions.
  • the generated operating parameters may include the operating status specified by the branch in the database of feasible solutions with the lowest estimated power consumption.
  • a central plant may include a plurality of subplants, each configured to perform a particular function.
  • a central plant may include a heater subplant, a chiller subplant, a heat recovery chiller subplant, a hot thermal energy storage subplant, a cold thermal energy storage subplant, etc.
  • each subplant receives a setpoint thermal energy load to be served by the subplant (e.g., a thermal energy per unit time) and generates equipment dispatch states and/or operational setpoints for various devices of the subplant to serve the setpoint thermal energy load.
  • each subplant may include a plurality of individual devices (e.g., heaters, chillers, pumps, valves, etc.) configured to facilitate the functions of the subplant.
  • the equipment dispatch states may control which of the devices of the subplant are utilized to serve the thermal energy load (e.g., on/off states).
  • the operational setpoints may determine individual setpoints for each active device of the subplant that is capable of operating at a variable capacity (e.g., operating a chiller at 10% capacity, 60% capacity, etc.).
  • the low level central plant optimization described herein may be used in conjunction with a high level central plant optimization.
  • the high level optimization may determine an optimal distribution of thermal energy loads across multiple subplants of a central plant over a time horizon in order to minimize the cost of operating the central plant.
  • the high level optimization may determine an optimal subplant load Q ⁇ subplant for each subplant and provide the optimal subplant loads as setpoints to the various subplants.
  • the low level optimization may be performed for each subplant.
  • the low level optimization may determine which devices of the subplant to utilize (e.g., on/off states) and/or operating setpoints (e.g., temperature setpoints, flow setpoints, etc.) for individual devices of the subplant in order to minimize the amount of energy consumed by the subplant to serve the subplant load Q ⁇ subplant .
  • operating setpoints e.g., temperature setpoints, flow setpoints, etc.
  • the low level optimization is performed for several different combinations of load and weather conditions to produce multiple data points (i.e., minimum energy consumption values for various subplant loads).
  • a subplant curve can be fit to the low level optimization data for each subplant to determine the rate of utility usage (e.g., power consumption, resource consumption, etc.) as a function of the load served by the subplant.
  • the high level optimization may use the subplant curves for a plurality of subplants to determine the optimal distribution of thermal energy loads across the subplants.
  • the low level optimization may use thermal models of the subplant equipment and/or the subplant network to determine the minimum energy consumption for a given thermal energy load.
  • Equipment curves for individual devices or a combination of devices e.g., thermal load v. resource consumption
  • the equipment curves may determine optimal switching points for turning off or on individual devices.
  • the thermal network may be used to establish the feasibility of a selection of equipment and may ensure that the required thermal energy load can be met.
  • the working capacity of one device may depend on the operating setpoints of other upstream, downstream, or component devices.
  • the low level optimization may consider current operating conditions (e.g., weather conditions, environmental conditions, etc.) in determining the optimal selection of equipment and/or setpoints to serve a given thermal energy load.
  • the low level optimization uses mixed binary optimization (e.g., branch and bound) and/or nonlinear optimization (e.g., sequential quadratic programming) to minimize the energy consumption of a subplant.
  • Non-exhaustive binary optimization and the nonlinear optimization may both contribute to minimization of energy consumption.
  • Binary optimization may be used to determine the optimal combination of equipment for meeting the subplant load Q ⁇ subplant .
  • Nonlinear optimization may be used to determine optimal operating setpoints (e.g., setpoints expected to result in minimum or near-minimum power consumption for a determined combination of equipment).
  • a system or method of the present invention having mixed binary optimization and/or nonlinear optimization may advantageously result in lower central plant operating costs.
  • the mixed optimization may be advantageously suited for improving real time (i.e., near real time) optimization and automation of the central plant.
  • the mixed optimization may also be implemented in a planning tool to predict the performance of the central plant for a future time period.
  • Central plant 10 is shown to include a plurality of subplants including a heater subplant 12, a heat recovery chiller subplant 14, a chiller subplant 16, a cooling tower subplant 18, a hot thermal energy storage (TES) subplant 20, and a cold thermal energy storage (TES) subplant 22.
  • Subplants 12-22 consume resources (e.g., water, natural gas, electricity, etc.) from utilities to serve the thermal energy loads (e.g., hot water, cold water, heating, cooling, etc.) of a building or campus.
  • resources e.g., water, natural gas, electricity, etc.
  • heater subplant 12 may be configured to heat water in a hot water loop 24 that circulates the hot water between central plant 10 and a building (not shown).
  • Chiller subplant 16 may be configured to chill water in a cold water loop 26 that circulates the cold water between central plant 10 and the building.
  • Heat recovery chiller subplant 14 may be configured to transfer heat from cold water loop 26 to hot water loop 24 to provide additional heating for the hot water and additional cooling for the cold water.
  • Condenser water loop 28 may absorb heat from the cold water in chiller subplant 16 and reject the absorbed heat in cooling tower subplant 18 or transfer the absorbed heat to hot water loop 24.
  • Hot TES subplant 20 and cold TES subplant 22 store hot and cold thermal energy, respectively, for subsequent use.
  • Hot water loop 24 and cold water loop 26 may deliver the heated and/or chilled water to air handlers located on the rooftop of a building or to individual floors or zones of the building.
  • the air handlers push air past heat exchangers (e.g., heating coils or cooling coils) through which the water flows to provide heating or cooling for the air.
  • the heated or cooled air may be delivered to individual zones of the building to serve the thermal energy loads of the building.
  • the water then returns to central plant 10 to receive further heating or cooling in subplants 12-22.
  • central plant 10 is shown and described as heating and cooling water for circulation to a building, it is understood that any other type of working fluid (e.g., glycol, CO2, etc.) may be used in place of or in addition to water to serve the thermal energy loads. In other embodiments, central plant 10 may provide heating and/or cooling directly to the building or campus without requiring an intermediate heat transfer fluid. Central plant 10 may be physically separate from a building served by subplants 12-22 or physically integrated with the building (e.g., located within the building).
  • any other type of working fluid e.g., glycol, CO2, etc.
  • central plant 10 may provide heating and/or cooling directly to the building or campus without requiring an intermediate heat transfer fluid.
  • Central plant 10 may be physically separate from a building served by subplants 12-22 or physically integrated with the building (e.g., located within the building).
  • Each of subplants 12-22 may include a variety of equipment configured to facilitate the functions of the subplant.
  • heater subplant 12 is shown to include a plurality of heating elements 30 (e.g., boilers, electric heaters, etc.) configured to add heat to the hot water in hot water loop 24.
  • Heater subplant 12 is also shown to include several pumps 32 and 34 configured to circulate the hot water in hot water loop 24 and to control the flow rate of the hot water through individual heating elements 30.
  • Heat recovery chiller subplant 14 is shown to include a plurality of heat recovery heat exchangers 36 (e.g., refrigeration circuits) configured to transfer heat from cold water loop 26 to hot water loop 24.
  • Heat recovery chiller subplant 14 is also shown to include several pumps 38 and 40 configured to circulate the hot water and/or cold water through heat recovery heat exchangers 36 and to control the flow rate of the water through individual heat recovery heat exchangers 36.
  • Chiller subplant 16 is shown to include a plurality of chillers 42 configured to remove heat from the cold water in cold water loop 26. Chiller subplant 16 is also shown to include several pumps 44 and 46 configured to circulate the cold water in cold water loop 26 and to control the flow rate of the cold water through individual chillers 42.
  • Cooling tower subplant 18 is shown to include a plurality of cooling towers 48 configured to remove heat from the condenser water in condenser water loop 28. Cooling tower subplant 18 is also shown to include several pumps 50 configured to circulate the condenser water in condenser water loop 28 and to control the flow rate of the condenser water through individual cooling towers 48.
  • Hot TES subplant 20 is shown to include a hot TES tank 52 configured to store the hot water for later use.
  • Hot TES subplant 20 may also include one or more pumps or valves configured to control the flow rate of the hot water into or out of hot TES tank 52.
  • Cold TES subplant 22 is shown to include cold TES tanks 54 configured to store the cold water for later use.
  • Cold TES subplant 22 may also include one or more pumps or valves configured to control the flow rate of the cold water into or out of cold TES tanks 54.
  • one or more of the pumps in central plant 10 e.g., pumps 32, 34, 38, 40, 44, 46, and/or 50
  • pipelines in central plant 10 includes an isolation valve associated therewith.
  • isolation valves may be integrated with the pumps or positioned upstream or downstream of the pumps to control the fluid flows in central plant 10.
  • more, fewer, or different types of devices may be included in central plant 10.
  • System 100 is shown to include a central plant controller 102, a building automation system 108, and a plurality of subplants 12-22.
  • Subplants 12-22 may be the same as previously described with reference to FIG. 1 .
  • subplants 12-22 are shown to include a heater subplant 12, a heat recovery chiller subplant 14, a chiller subplant 16, a hot TES subplant 20, and a cold TES subplant 22.
  • Each of subplants 12-22 is shown to include equipment 60 that can be controlled by central plant controller 102 and/or building automation system 108 to optimize the performance of central plant 10.
  • Equipment 60 may include, for example, heating devices 30, chillers 42, heat recovery heat exchangers 36, cooling towers 48, thermal energy storage devices 52-54, pumps 32, 34, 38, 44, 46, 50, valves, and/or other devices of subplants 12-22.
  • Individual devices of equipment 60 can be turned on or off to adjust the thermal energy load served by each of subplants 12-22.
  • individual devices of equipment 60 can be operated at variable capacities (e.g., operating a chiller at 10% capacity or 60% capacity) according to an operating setpoint received from central plant controller 102.
  • one or more of subplants 12-22 includes a subplant level controller configured to control the equipment 60 of the corresponding subplant.
  • central plant controller 102 may determine an on/off configuration and global operating setpoints for equipment 60.
  • the subplant controllers may turn individual devices of equipment 60 on or off, and implement specific operating setpoints (e.g., damper position, vane position, fan speed, pump speed, etc.) to reach or maintain the global operating setpoints.
  • Building automation system (BAS) 108 may be configured to monitor conditions within a controlled building.
  • BAS 108 may receive input from various sensors (e.g., temperature sensors, humidity sensors, airflow sensors, voltage sensors, etc.) distributed throughout the building and may report building conditions to central plant controller 102.
  • Building conditions may include, for example, a temperature of the building or a zone of the building, a power consumption (e.g., electric load) of the building, a state of one or more actuators configured to affect a controlled state within the building, or other types of information relating to the controlled building.
  • BAS 108 may operate subplants 12-22 to affect the monitored conditions within the building and to serve the thermal energy loads of the building.
  • BAS 108 may receive control signals from central plant controller 102 specifying on/off states and/or setpoints for equipment 60.
  • BAS 108 may control equipment 60 (e.g., via actuators, power relays, etc.) in accordance with the control signals provided by central plant controller 102.
  • BAS 108 may operate equipment 60 using closed loop control to achieve the setpoints specified by central plant controller 102.
  • BAS 108 may be combined with central plant controller 102 or may be part of a separate building management system.
  • BAS 108 is a METASYS® brand building management system, as sold by Johnson Controls, Inc.
  • Central plant controller 102 may monitor the status of the controlled building using information received from BAS 108.
  • Central plant controller 102 may be configured to predict the thermal energy loads (e.g., heating loads, cooling loads, etc.) of the building for plurality of time steps in a prediction window (e.g., using weather forecasts from a weather service).
  • Central plant controller 102 may generate on/off decisions and/or setpoints for equipment 60 to minimize the cost of energy consumed by subplants 12-22 to serve the predicted heating and/or cooling loads for the duration of the prediction window.
  • Central plant controller 102 may be configured to carry out process 500 ( FIG. 5 ), process 600 ( FIG. 6 ), process 700 ( FIG. 7 ), and other processes described herein.
  • central plant controller 102 is integrated within a single computer (e.g., one server, one housing, etc.). In various other exemplary embodiments, central plant controller 102 can be distributed across multiple servers or computers (e.g., that can exist in distributed locations). In another exemplary embodiment, central plant controller 102 may integrated with a smart building manager that manages multiple building systems and/or combined with BAS 108.
  • Central plant controller 102 is shown to include a communications interface 104 and a processing circuit 106.
  • Communications interface 104 may include wired or wireless interfaces (e.g., jacks, antennas, transmitters, receivers, transceivers, wire terminals, etc.) for conducting data communications with various systems, devices, or networks.
  • communications interface 104 may include an Ethernet card and port for sending and receiving data via an Ethernet-based communications network and/or a WiFi transceiver for communicating via a wireless communications network.
  • Communications interface 104 may be configured to communicate via local area networks or wide area networks (e.g., the Internet, a building WAN, etc.) and may use a variety of communications protocols (e.g., BACnet, IP, LON, etc.).
  • Communications interface 104 may be a network interface configured to facilitate electronic data communications between central plant controller 102 and various external systems or devices (e.g., BAS 108, subplants 12-22, etc.).
  • central plant controller 102 may receive information from BAS 108 indicating one or more measured states of the controlled building (e.g., temperature, humidity, electric loads, etc.) and one or more states of subplants 12-22 (e.g., equipment status, power consumption, equipment availability, etc.).
  • Communications interface 104 may receive inputs from BAS 108 and/or subplants 12-22 and may provide operating parameters (e.g., on/off decisions, setpoints, etc.) to subplants 12-22 via BAS 108. The operating parameters may cause subplants 12-22 to activate, deactivate, or adjust a setpoint for various devices of equipment 60.
  • processing circuit 106 is shown to include a processor 110 and memory 112.
  • Processor 110 may be a general purpose or specific purpose processor, an application specific integrated circuit (ASIC), one or more field programmable gate arrays (FPGAs), a group of processing components, or other suitable processing components.
  • ASIC application specific integrated circuit
  • FPGAs field programmable gate arrays
  • Processor 110 may be configured to execute computer code or instructions stored in memory 112 or received from other computer readable media (e.g., CDROM, network storage, a remote server, etc.).
  • Memory 112 may include one or more devices (e.g., memory units, memory devices, storage devices, etc.) for storing data and/or computer code for completing and/or facilitating the various processes described in the present disclosure.
  • Memory 112 may include random access memory (RAM), read-only memory (ROM), hard drive storage, temporary storage, non-volatile memory, flash memory, optical memory, or any other suitable memory for storing software objects and/or computer instructions.
  • RAM random access memory
  • ROM read-only memory
  • ROM read-only memory
  • Memory 112 may include database components, object code components, script components, or any other type of information structure for supporting the various activities and information structures described in the present disclosure.
  • Memory 112 may be communicably connected to processor 110 via processing circuit 106 and may include computer code for executing (e.g., by processor 106) one or more processes described herein.
  • memory 112 is shown to include a building status monitor 134.
  • Central plant controller 102 may receive data regarding the overall building or building space to be heated or cooled with central plant 10 via building status monitor 134.
  • building status monitor 134 may include a graphical user interface component configured to provide graphical user interfaces to a user for selecting building requirements (e.g., overall temperature parameters, selecting schedules for the building, selecting different temperature levels for different building zones, etc.).
  • Central plant controller 102 may determine on/off configurations and operating setpoints to satisfy the building requirements received from building status monitor 134.
  • building status monitor 134 receives, collects, stores, and/or transmits cooling load requirements, building temperature setpoints, occupancy data, weather data, energy data, schedule data, and other building parameters.
  • building status monitor 134 stores data regarding energy costs, such as pricing information available from utilities 126 (energy charge, demand charge, etc.).
  • memory 112 is shown to include a load/rate prediction module 122.
  • Load/rate prediction module 122 is shown receiving weather forecasts from a weather service 124.
  • load/rate prediction module 122 predicts the thermal energy loads l ⁇ k as a function of the weather forecasts.
  • load/rate prediction module 122 uses feedback from BAS 108 to predict loads l ⁇ k .
  • Feedback from BAS 108 may include various types of sensory inputs (e.g., temperature, flow, humidity, enthalpy, etc.) or other data relating to the controlled building (e.g., inputs from a HVAC system, a lighting control system, a security system, a water system, etc.).
  • sensory inputs e.g., temperature, flow, humidity, enthalpy, etc.
  • other data relating to the controlled building e.g., inputs from a HVAC system, a lighting control system, a security system, a water system, etc.
  • load/rate prediction module 122 uses a deterministic plus stochastic model trained from historical load data to predict loads l ⁇ k . Load/rate prediction module 122 may use any of a variety of prediction methods to predict loads l ⁇ k (e.g., linear regression for the deterministic portion and an AR model for the stochastic portion).
  • Load/rate prediction module 122 is shown receiving utility rates from utilities 126.
  • Utility rates may indicate a cost or price per unit of a resource (e.g., electricity, natural gas, water, etc.) provided by utilities 126 at each time step k in the prediction window.
  • the utility rates are time-variable rates.
  • the price of electricity may be higher at certain times of day or days of the week (e.g., during high demand periods) and lower at other times of day or days of the week (e.g., during low demand periods).
  • the utility rates may define various time periods and a cost per unit of a resource during each time period.
  • Utility rates may be actual rates received from utilities 126 or predicted utility rates estimated by load/rate prediction module 122.
  • the utility rates include demand charge rates for one or more resources provided by utilities 126.
  • a demand charge may define a separate cost imposed by utilities 126 based on the maximum usage of a particular resource (e.g., maximum energy consumption) during a demand charge period.
  • the utility rates may define various demand charge periods and one or more demand charges associated with each demand charge period. In some instances, demand charge periods may overlap partially or completely with each other and/or with the prediction window.
  • optimization module 128 may be configured to account for demand charges in the high level optimization process performed by high level optimization module 130.
  • Load/rate prediction module 122 may store the predicted loads l ⁇ k and the utility rates in memory 112 and/or provide the predicted loads l ⁇ k and the utility rates to optimization module 128. Optimization module 128 may use the predicted loads l ⁇ k and the utility rates to determine an optimal load distribution for subplants 12-22 and to generate on/off decisions and setpoints for equipment 60.
  • memory 112 is shown to include an optimization module 128.
  • Optimization module 128 may perform a cascaded optimization process to optimize the performance of central plant 10.
  • optimization module 128 is shown to include a high level optimization module 130 and a low level optimization module 132.
  • High level optimization module 130 may determine how to distribute thermal energy loads across subplants 12-22 for each time step in the prediction window in order to minimize the cost of energy consumed by subplants 12-22.
  • Low level optimization module 132 may determine how to best run each subplant at the load setpoint determined by high level optimization module 130.
  • the cascaded optimization process performed by optimization module 128 allows the optimization process to be performed in a time-efficient manner.
  • the low level optimization may use a relatively short time horizon or no time horizon at all due to the fast system dynamics compared to the time to re-optimize plant loads.
  • the high level optimization may use a relatively longer time horizon when the dynamics and capacity of the thermal energy storage allow loads to be deferred for long time periods.
  • Low level optimization module 132 may generate and provide subplant power curves to high level optimization module 130.
  • the subplant power curves may indicate the rate of utility use by each of subplants 12-22 (e.g., measured in units of power such as kW ) as a function of the load served by the subplant.
  • low level optimization module 132 generates the subplant power curves based on equipment models 120 (e.g., by combining equipment models 120 for individual devices into an aggregate power curve for the subplant).
  • Low level optimization module 132 may generate the subplant power curves by running the low level optimization process (described in greater detail with reference to FIGS. 5-7 ) for several different loads and weather conditions to generate multiple data points ( Q ⁇ subplant , kW ).
  • Low level optimization module 132 may fit a curve to the data points to generate the subplant power curves.
  • High level optimization module 130 may receive the load and rate predictions from load/rate prediction module 122 and the subplant power curves from low level optimization module 132. High level optimization module 130 may determine the optimal load distribution for subplants 12-22 (e.g., Q ⁇ subplant for each subplant) over the prediction window and provide the optimal load distribution to low level optimization module 132. In some embodiments, high level optimization module 130 determines the optimal load distribution by minimizing the total operating cost of central plant 10 over the prediction window. In other words, given a predicted load l ⁇ k and utility rate information from load/rate prediction module 122, high level optimization module 130 may distribute the predicted load l ⁇ k across subplants 12-22 to minimize cost.
  • the optimal load distribution may include using TES subplants 20 and/or 22 to store thermal energy during a first time step for use during a later time step.
  • Thermal energy storage may advantageously allow thermal energy to be produced and stored during a first time period when energy prices are relatively low and subsequently retrieved and used during a second time period when energy proves are relatively high.
  • the high level optimization may be different from the low level optimization in that the high level optimization has a longer time constant due to the thermal energy storage provided by TES subplants 20-22.
  • ⁇ HL * arg min ⁇ HL J HL ⁇ HL
  • ⁇ HL * contains the optimal high level decisions (e.g., the optimal load Q ⁇ for each of subplants 12-22) for the entire prediction period and J HL is the high level cost function.
  • high level optimization module 132 may minimize the high level cost function J HL .
  • the high level cost function J HL may be the sum of the economic costs of each utility consumed by each of subplants 12-22 for the duration of the prediction period.
  • n h is the number of time steps k in the prediction period
  • n s is the number of subplants
  • t s is the duration of a time step
  • c jk is the economic cost of utility j at a time step k of the prediction period
  • u jik is the rate of use of utility j by subplant i at time step k.
  • the cost function J HL includes an additional demand charge term such as: w d c demand max n h u elec ⁇ HL , u max , ele where w d is a weighting term, c demand is the demand cost, and the max( ) term selects the peak electricity use during the applicable demand charge period.
  • the high level optimization performed by high level optimization module 130 is the same or similar to the high level optimization process described in U.S. Patent Application No. xx/yyy,yyyy (attorney docket no. 081445-0655) titled "High Level Central Plant Optimization” and filed on the same day as the present application.
  • the entire disclosure of U.S. Patent Application No. xx/yyy,yyy is incorporated by reference herein.
  • high level optimization module 130 provides the optimal load distribution for each time step to low level optimization module 132 at the beginning of the time step.
  • the optimal load distributions for subsequent time steps may be updated by high level optimization module 130 and provided to low level optimization module 132 at the beginning of subsequent time steps.
  • Low level optimization module 132 may use the subplant loads determined by high level optimization module 130 to determine optimal low level decisions ⁇ LL * (e.g. binary on/off decisions, flow setpoints, temperature setpoints, etc.) for equipment 60.
  • the low level optimization process may be performed for each of subplants 12-22.
  • Low level optimization module 132 may be responsible for determining which devices of each subplant to use and the setpoints for such devices that will achieve the subplant load setpoint while minimizing energy consumption.
  • low level optimization module 132 may minimize the low level cost function J LL .
  • the low level cost function J LL may represent the total energy consumption for all of the devices of equipment 60 in the applicable subplant.
  • Each device may have continuous variables which can be changed to determine the lowest possible energy consumption for the overall input conditions.
  • Low level optimization module 132 may minimize the low level cost function J LL subject to inequality constraints based on the capacities of equipment 60 and equality constraints based on energy and mass balances.
  • the optimal low level decisions ⁇ LL * are constrained by switching constraints defining a short horizon for maintaining a device in an on or off state after a binary on/off switch. The switching constraints may prevent devices from being rapidly cycled on and off.
  • low level optimization module 132 performs the equipment level optimization without considering system dynamics. The optimization process may be slow enough to safely assume that the equipment control has reached its steady-state. Thus, low level optimization module 132 may determine the optimal low level decisions ⁇ LL * at an instance of time rather than over a long horizon.
  • Low level optimization module 132 may determine optimum operating statuses (e.g., on or off) for a plurality of devices of equipment 60.
  • Low level optimization module 132 may store code executable by processor 110 to execute operations as subsequently described in this application, including binary optimization operations and/or quadratic compensation operations.
  • the on/off combinations may be determined using binary optimization and quadratic compensation.
  • Binary optimization may minimize a cost function representing the power consumption of devices in the applicable subplant.
  • non-exhaustive (i.e., not all potential combinations of devices are considered) binary optimization is used.
  • Quadratic compensation may be used in considering devices whose power consumption is quadratic (and not linear).
  • Low level optimization module 132 may also determine optimum operating setpoints for equipment using nonlinear optimization. Nonlinear optimization may identify operating setpoints that further minimize the low level cost function J LL . Low level optimization module 132 is described in greater detail with reference to FIG. 3 .
  • memory 112 is shown to include a subplant control module 138.
  • Subplant control module 138 may store historical data regarding past operating statuses, past operating setpoints, and instructions for calculating and/or implementing control parameters for subplants 12-22.
  • Subplant control module 138 may also receive, store, and/or transmit data regarding the conditions of individual devices of equipment 60, such as operating efficiency, equipment degradation, a date since last service, a lifespan parameter, a condition grade, or other device-specific data.
  • Subplant control module 138 may receive data from subplants 12-22 and/or BAS 108 via communications interface 104.
  • Subplant control module 138 may also receive and store on/off statuses and operating setpoints from low level optimization module 132.
  • Monitoring and reporting applications 136 may be configured to generate real time "system health" dashboards that can be viewed and navigated by a user (e.g., a central plant engineer).
  • monitoring and reporting applications 136 may include a web-based monitoring application with several graphical user interface (GUI) elements (e.g., widgets, dashboard controls, windows, etc.) for displaying key performance indicators (KPI) or other information to users of a GUI.
  • GUI graphical user interface
  • the GUI elements may summarize relative energy use and intensity across central plants in different buildings (real or modeled), different campuses, or the like.
  • GUI elements or reports may be generated and shown based on available data that allow users to assess performance across one or more central plants from one screen.
  • the user interface or report (or underlying data engine) may be configured to aggregate and categorize operating conditions by building, building type, equipment type, and the like.
  • the GUI elements may include charts or histograms that allow the user to visually analyze the operating parameters and power consumption for the devices of a chilled water system.
  • central plant controller 102 may include one or more GUI servers, web services 114, or GUI engines 116 to support monitoring and reporting applications 136.
  • applications 136, web services 114, and GUI engine 116 may be provided as separate components outside of central plant controller 102 (e.g., as part of a smart building manager).
  • Central plant controller 102 may be configured to maintain detailed historical databases (e.g., relational databases, XML databases, etc.) of relevant data and includes computer code modules that continuously, frequently, or infrequently query, aggregate, transform, search, or otherwise process the data maintained in the detailed databases.
  • Central plant controller 102 may be configured to provide the results of any such processing to other databases, tables, XML files, or other data structures for further querying, calculation, or access by, for example, external monitoring and reporting applications.
  • Central plant controller 102 is shown to include configuration tools 118.
  • Configuration tools 118 can allow a user to define (e.g., via graphical user interfaces, via prompt-driven "wizards," etc.) how central plant controller 102 should react to changing conditions in the central plant subsystems.
  • configuration tools 118 allow a user to build and store condition-response scenarios that can cross multiple central plant devices, multiple building systems, and multiple enterprise control applications (e.g., work order management system applications, entity resource planning applications, etc.).
  • configuration tools 118 can provide the user with the ability to combine data (e.g., from subsystems, from event histories) using a variety of conditional logic.
  • conditional logic can range from simple logical operators between conditions (e.g., AND, OR, XOR, etc.) to pseudo-code constructs or complex programming language functions (allowing for more complex interactions, conditional statements, loops, etc.).
  • Configuration tools 118 can present user interfaces for building such conditional logic.
  • the user interfaces may allow users to define policies and responses graphically.
  • the user interfaces may allow a user to select a pre-stored or pre-constructed policy and adapt it or enable it for use with their system.
  • Low level optimization module 132 may store computer code (e.g., a set of executable computer code instructions stored in non-transitory computer-readable media) that is executable by processor 110.
  • Low level optimization module 132 may be configured to generate and output operating status commands and setpoints for equipment 60 via, e.g., communications interface 104.
  • the operating status commands (e.g., on/off) and setpoints output to the equipment 60 of a particular subplant may be estimated (e.g., by low level optimization module 132) to minimize the power consumption of the subplant.
  • Low level optimization module 132 is shown to include an operating status evaluator 154.
  • Operating status evaluator 154 may examine a plurality of potential device on/off combinations to select a combination for use by central plant 10. For example, if chiller subplant 16 has four chillers (i.e., chiller 1, chiller 2, chiller 3, and chiller 4), a potential on/off combination may be [1, 0, 0, 1] indicating that chiller 1 is on, chiller 2 is off, chiller 3 is off, and chiller 4 is on.
  • the operating status of a particular device may be unspecified (e.g., corresponding to a node that has not yet been evaluated) and may be represented with a question mark.
  • the combination [1, 0, ?, ?] may indicate that chiller 1 is on, chiller 2 is off, and chillers 3-4 have an unspecified operating status.
  • An unspecified operating status does not necessarily indicate that the operating status is unknown, but rather that the operating status for the corresponding device has not yet been evaluated and is not fixed by the combination.
  • the combination [1, 0, 0, ?] fixes the operating status of chiller 1, chiller 2, and chiller 3, but indicates that it is possible for chiller 4 to be either on or off and still satisfy the combination.
  • operating status evaluator 154 uses non-exhaustive binary optimization and quadratic compensation to determine which combination of on/off states to select for use.
  • Modules 156 and 158 (described in greater detail below) provide instructions for implementing the non-exhaustive binary optimization and quadratic compensation, respectively.
  • Low level optimization module 132 is shown to include possible solutions database 168, a feasible solution database 164, and discard database 166.
  • Possible solutions database 168 may contain on/off combinations that are estimated to be capable of satisfying the thermal energy load and the optimization constraints for the subplant.
  • a combination may be stored in possible solutions database if the combination can potentially satisfy all of the applicable constraints (e.g., subplant load constraints, device capacity constraints, etc.), considering any unspecified operating statuses as wildcards. For example, if the combination [1, 1,0, 1] satisfies the constraints but the combination [1, 1, 0, 0] does not, the combination [1, 1, 0, ?] would satisfy the constraints because the unspecified operating status can be either on (1) or off (0).
  • Possible solutions database 168 stores possible combinations (i.e., combinations that satisfy plant load requirements and system constraints) that may or may not result in the lowest power consumption.
  • Discard database 166 may contain combinations currently known or estimated to be unable to satisfy subplant load and/or system constraint requirements. Discard database 166 may store infeasible combinations of devices (i.e., combinations that cannot possibly satisfy plant load requirements and/or system constraints) regardless of the operating statuses of any devices with an unspecified operating status. For example, if both of the combinations [1, 1,0, 1] and [1, 1, 0, 0] fail to satisfy the constraints, the combination [1, 1,0, ?] would also fail to satisfy the constraints because no value of the unspecified operating status would cause the combination to satisfy the constraints.
  • Feasible solutions database 164 may contain potential combinations that are capable of satisfying the subplant load and system constraint requirements, and additionally do so with a minimum energy consumption.
  • feasible solutions database 164 stores the optimal combination of on/off statuses (i.e., the combination that results in the minimum energy consumption).
  • feasible solutions database 164 stores combinations that satisfy all applicable constraints, regardless of the value of any unspecified operating status. For example, if both of the combinations [1, 1, 0, 1] and [1, 1, 0, 0] satisfy the constraints, the combination [1, 1, 0, ?] may be stored as a feasible combination because any value of the unspecified operating status would cause the combination to satisfy the constraints.
  • Databases 164, 166, and 168 may store the potential combinations in any suitable data structure or data structures, including linked lists, trees, arrays, relational database structures, object-based structures, or other data structures.
  • Operating status evaluator 154 may receive possible combinations of on/off statuses from possible solutions database 168. Operating status evaluator 154 may evaluate the combinations in possible solutions database 168 in view of the currently applicable constraints (e.g., subplant load, device capacities, etc.) and store various combinations in possible solutions database 168, feasible solutions database 164, and/or discard database 166 based on a result of the evaluation. In some embodiments, operating status evaluator 154 periodically evaluates new combinations (e.g., those which have not recently been evaluated as a potentially optimal solution) from feasible solutions database 164 and/or discard database 166 for further evaluation. Moreover, as new devices are brought online, such new devices and new combinations including the new devices can be added to feasible solutions database 164 for consideration by operating status evaluator 154.
  • new combinations e.g., those which have not recently been evaluated as a potentially optimal solution
  • Operating status evaluator 154 may receive constraints on the low level optimization process from constraints evaluator 150.
  • Constraints may include, for example, maximum device capacities, energy or mass balance constraints, minimum device capacities, etc.
  • the constraints may establish minimum and/or maximum parameters for equipment 60.
  • the constraints are automatically generated quantities based on, e.g., historical data.
  • an operator of the central plant system may set and/or modify the constraints.
  • the constraints include, for example, that each device of the subplant system operate with a minimum load (such as 30%). This requirement may advantageously ensure that power is being consumed efficiently (i.e., the work done by the device is sufficient to justify the power required to operate the device).
  • the constraints may also include that the total power of the chiller plant be less than a maximum. This requirement may advantageously prevent the subplant from becoming overloaded.
  • Operating status evaluator 154 may use the constraints to identify feasible on/off configurations. Operating status evaluator 154 may provide a potential on/off combination to constraint evaluator 150, which may be configured to check the potential combination relative to the current constraints. If a potential combination cannot meet the current constraints, operating status evaluator 154 may move the potential combination to discard database 166 and/or remove the potential combination from feasible solutions database 164.
  • operating status evaluator 154 is shown to include a non-exhaustive binary optimization module 156 and a quadratic compensation module 158.
  • Binary optimization module 156 may include computer code instructions for optimizing (e.g., minimizing) the low level cost function J LL representing the energy consumption of a subplant.
  • binary optimization module 156 uses a branch and bound method to perform the binary optimization. The binary optimization process is described in greater detail in the discussion of FIG. 7 .
  • binary optimization module 156 executes the branch and bound method such that not all of the possible combinations of equipment 50 are considered in any given situation. This may advantageously reduce computation time required by operating status evaluator 154.
  • Quadratic compensation module 158 may include computer code instructions configured to compensate for the nonlinear nature of the system. For example, quadratic compensation module 158 may account for the power consumption of some devices of equipment 60 having a quadratic form (i.e., not a linear form). Quadratic compensation module 158 may be selectively utilized when the power consumption of the devices being considered by operating status evaluator 154 is quadratic.
  • Quadratic compensation module 158 may advantageously account for the fact that the binary optimization performed by non-exhaustive binary optimization module 156 is intended for a linear system, but the power consumption of a particular device is a quadratic function. For example, in a purely linear system, binary optimization will typically return the fewest devices required to meet plant load. If turning two devices on will meet the plant load, then other combinations may not be considered, even if the power consumption of other combinations is lower. In an exemplary embodiment, however, alternative embodiments are identified and then compared using the assistance of quadratic compensation module 158 (or another nonlinear compensation).
  • quadratic compensation may be conducted on every device having a nonlinear or quadratic power curve, advantageously checking for whether the lowest power combination of devices is achieved by adding another device.
  • binary optimization module 156 may identify a combination of devices that meets plant load (e.g., two devices on). The binary search may continue by looking ahead to a combination with the next device activated rather than deactivated. For example, even if two devices turned on would meet a plant load, the binary search may use each device's quadratic power curve to consider the expected power change with three devices turned on. The power consumption per device may decrease as additional devices are turned on because one or more of the devices may operate more efficiently at a lower capacity than a higher capacity. The net power consumption may therefore decrease as a result.
  • low level optimization module 132 is shown to include a setpoint evaluator 160.
  • Setpoint evaluator 160 may be configured to examine one or more combinations of active (e.g., "on") devices to determine optimal operating setpoints.
  • the optimal operating setpoints may be estimated to minimize power consumption while achieving the subplant load setpoint and satisfying other constraints on the low level optimization process.
  • setpoint evaluator 160 estimates the optimal temperature setpoints (e.g., hot water temperature setpoint, condenser water temperature setpoint, chilled water temperature setpoint, etc.), flow rate setpoints (e.g., flow rates through individual heating elements 30, chillers 42, heat recovery chillers 36, cooling towers 48, etc.), and/or pressure setpoints (e.g., hot water differential pressure, chilled water differential pressure, etc.) for a given combination of active devices of equipment 60. In other embodiments, more, fewer, or different setpoints may be determined.
  • optimal temperature setpoints e.g., hot water temperature setpoint, condenser water temperature setpoint, chilled water temperature setpoint, etc.
  • flow rate setpoints e.g., flow rates through individual heating elements 30, chillers 42, heat recovery chillers 36, cooling towers 48, etc.
  • pressure setpoints e.g., hot water differential pressure, chilled water differential pressure, etc.
  • Setpoint evaluator 160 may receive one or more potential on/off combinations from operating status evaluator 154 and/or possible solutions database 168. Setpoint evaluator 160 may move potential combinations to discard database 166 when the combinations are determined to be infeasible or when a potential combination is repeatedly identified as not being efficient relative to other solutions. In certain situations, setpoint evaluator 160 may also move potential combinations to feasible solutions database 164 (e.g., when a combination is estimated to minimize power consumption compared to other combinations).
  • setpoint evaluator 160 is shown to include a nonlinear optimization module 162.
  • Nonlinear optimization module 162 may include computer code for optimizing (e.g., minimizing) the low level cost function J LL for a set of active central plant devices (e.g., devices that are "on"). The operating status (e.g., on/off) of the devices may have been previously determined using operating status evaluator 154. According to various embodiments, nonlinear optimization module 162 performs a nonlinear optimization using direct or indirect search methods.
  • nonlinear optimization module 162 may use a Nelder-Mead or downhill simplex method, Generalized Reduced Gradient (GRG), Sequential Quadratic Programming (SQP), Steepest Descent (Cauchy Method), Conjugate Gradient (Fletcher-Reeves Method), or other nonlinear optimization methods.
  • GCG Generalized Reduced Gradient
  • SQL Sequential Quadratic Programming
  • SQL Steepest Descent
  • Cauchy Method Steepest Descent
  • Conjugate Gradient Fletcher-Reeves Method
  • Low level optimization module 132 is shown to include GUI services 152.
  • GUI services 152 may be configured to generate graphical user interfaces for central plant controller 102 or another server to provide to a user output device (e.g., a display, a mobile phone, a client computer, etc.). The graphical user interfaces may present or explain the active combination of devices, system efficiencies, system setpoints, system constraints, or other system information.
  • GUI services 152 may facilitate a user's (e.g., a central plant engineer's) ability to track energy usage and operating statuses of the central plant devices via, e.g., a web-based monitoring application.
  • GUI services 152 may additionally allow a user to manually set and update system constraints, available devices, certain thresholds (e.g., for moving a combination to a discard set) optimum off/on operating statuses, and optimum operating setpoints.
  • Central plant controller 102 is configured to transmit determined on/off statuses and operating setpoints to subplants 12-22 and/or the equipment 60 within each subplant. Communication between central plant controller 102 and equipment 60 may be direct (as shown in FIG. 4 ) or via one or more intermediaries (e.g., BAS 108, subplant level controllers, etc.). Central plant controller 102 and subplants 12-22 may transmit and receive data automatically, without a user's intervention. In other embodiments, a user may additionally provide manual inputs or approvals to central plant controller 102 and/or subplants 12-22.
  • equipment 60 may be coupled to a local controller that receives and implements the operating statuses and setpoints from central plant controller 102.
  • the local controller may be configured to transmit operating conditions about equipment 60 back to central plant controller 102.
  • a local controller for a particular device may report or confirm current operating status (on/off), current operating load, device energy consumption, device on/run time, device operating efficiency, failure status, or other information back to central plant controller 102 for processing or storage.
  • the performance of equipment 60 may be evaluated using a coefficient of performance (COP), a power consumption per plant load (KW/ton) value, or another value indicative of power efficiency or consumption.
  • COP coefficient of performance
  • KW/ton power consumption per plant load
  • Process 500 may be performed by central plant controller 102, as described with reference to FIGS. 2-4 .
  • process 500 is performed by processing circuit 106 of central plant controller 102 according to the instructions stored in low level optimizing module 132.
  • Process 500 may be performed for each subplant of central plant 102 to determine feasible on/off configurations for the devices of the subplant and to identify which of the feasible on/off configurations is optimal (i.e., results in the lowest energy consumption).
  • the optimal configuration may be provided to the devices of the subplant as an operating command.
  • Process 500 is shown to include identifying a thermal energy load setpoint for a subplant of a central plant (step 502).
  • step 502 includes receiving the thermal energy load setpoint from a high level optimization module or process.
  • high level optimization module 130 may be configured to perform a high level optimization process that determines a thermal energy load setpoint for each of subplants 12-22.
  • the thermal energy load setpoints may be based on a predicted thermal energy load for a building or campus and/or utility rates defining the cost of one or more resources consumed by subplants 12-22 to serve the thermal energy loads.
  • High level optimization module 130 may determine the optimal distribution of thermal energy loads across subplants 12-22, as described with reference to FIG. 2 .
  • the optimal distribution of thermal energy loads results in the minimum cost to satisfy the predicted thermal energy requirements for the building or campus over a time horizon.
  • the thermal energy load setpoint identified in step 502 may be received from high level optimization module 132, retrieved from memory, or otherwise obtained from any other data source (e.g., specified by a user, received from an external system or process via a communications network, etc.).
  • process 500 is shown to include determining one or more feasible on/off configurations for devices of the subplant using non-exhaustive binary optimization (step 504).
  • Step 504 may utilize binary optimization to determine one or more feasible combinations of devices that will satisfy the subplant load setpoint for an actual or expected set of conditions (e.g., load conditions, weather conditions, etc.). Feasible combinations may also satisfy any constraints on the system (e.g., maximum total power, minimum power per device, etc.).
  • the binary optimization performed in step 504 is accomplished using a branch and bound method.
  • the branch and bound method recursively identifies solutions that satisfy the optimization constraints on the cost function J LL (i.e., feasible solutions).
  • the cost function J LL may be subject to load constraints based on the thermal energy load setpoint received in step 502 (i.e., ensuring that the energy load setpoint is met), capacity constraints defining a minimum and/or maximum capacity for each device represented in the cost function, timeout constraints preventing a device from being activated or deactivated within a threshold period after a change in operating status, or any other optimization constraints that may be applicable to the cost function J LL .
  • the solutions (or "branches") are combinations of on/off statuses for the subplant devices.
  • step 504 includes determining upper and lower bounds for the cost function J LL given the identified solutions.
  • the optimization seeks to minimize the cost function, and branches that do not do so are discarded or pruned.
  • a first solution with a lower bound for the cost function that is greater than the upper bound of second solution's cost function may be eliminated as infeasible. This is because the first solution, at its best (i.e., lowest power consumption), is still higher than the worst or highest power consumption of the second solution.
  • Other solutions are retained and may be compared to one another to determine the optimal solution.
  • binary optimization is non-exhaustive. That is, non-exhaustive optimization does not search every possible combination of devices to find the optimal solution. This advantageously increase computational efficiency. For example, with eight chillers, there are a possible 2 8 or 256 combinations. In some embodiments, the non-exhaustive optimization finds the optimal solution in half or fewer searches.
  • the binary optimization process is described in greater detail with reference to FIG. 7 .
  • the on/off configurations determined in step 504 may be used as variables in a cost function representing the total energy consumption of the subplant.
  • the cost function J LL describes the power consumption a particular subplant as a function of the binary on/off decisions and the device setpoints.
  • Each device may have continuous variables which can be changed to determine the lowest possible energy consumption for the overall input conditions.
  • the subplant devices are chillers (e.g., for chiller subplant 16). Chiller power is typically a quadratic function of load and lift, and it is time-variant. As additional chillers are energized, the load per chiller decreases, therefore changing the energy consumption u j for each chiller in the cost function. According to an exemplary embodiment, the binary optimization may be configured to update with energy consumption values.
  • the subplant devices may include heating elements, heat exchangers, pumps, valves, cooling towers, or other equipment (e.g., equipment 60) that facilitate the functions of the subplant.
  • the energy consumption values u j for each device may be different and may vary according to different equipment models for different types of devices (e.g., linear, quadratic, time-variant or invariant, etc.).
  • Various components of low level optimization module 132 may be used in step 504 based on the different devices represented in the cost function.
  • quadratic compensation module 158 may be used when chillers are part of the cost function to account for chiller power's quadratic nature.
  • process 500 is shown to include determining optimum operating setpoints for each feasible on/off configuration using nonlinear optimization (step 506).
  • Step 506 may utilize nonlinear optimization to minimize the cost function J LL .
  • direct and/or indirect search methods e.g., downhill simplex (Nelder-Mead) method, GRG, SQP, Cauchy Method, Feltcher-Reeves Method, etc.
  • the setpoints determined in step 506 may define a capacity for each active subplant device that is capable of being operated at multiple different capacities.
  • the setpoints may affect the power consumption for each feasible combination.
  • Nonlinear optimization determines one or more setpoints that will further minimize power consumption.
  • Process 500 is shown to include estimating an energy consumption resulting from each feasible configuration at the optimum operating setpoints (step 508) and identifying which of the feasible on/off configurations has a lowest energy consumption at the optimum operating setpoints (step 510).
  • more than one combination may be feasible. For example, several different on/off configurations may meet the plant load requirements and satisfy the constraints on the system. However, each feasible combination may have a different resultant energy consumption.
  • each feasible on/off configuration identified in step 504 is evaluated at the optimum operating setpoints identified in step 506 to determine an energy consumption that results from each feasible combination.
  • the optimum operating setpoints may be different for each feasible configuration. For example, the optimum operating capacity for a chiller when three chillers are active may be lower than the optimum operating capacity of the chiller when only two chillers are active to serve the same thermal energy load.
  • the on/off configuration with the lowest energy consumption at the optimal setpoints is identified.
  • the configuration and setpoints identified in step 510 may represent the optimal (i.e., lowest energy consumption) solution that satisfies all of the constraints on the cost function.
  • process 500 is shown to include issuing operating commands to the devices of the subplant in accordance with the identified on/off configuration (step 512).
  • Step 510 may include sending operating commands to a building automation system (e.g., BAS 108) configured to control the subplant devices, a subplant level controller, or an equipment level controller for the subplant devices.
  • the operating commands may specify which of the subplant devices are active, (i.e., "on"), which of the subplant devices are inactive (i.e., "off"), and, in some embodiments, setpoints for each active subplant device.
  • the on/off statuses and setpoints provided in step 512 may override any previous control decisions indicating which devices are active and/or setpoints for each active device.
  • Process 600 may be performed by central plant controller 102, as described with reference to FIGS. 2-4 , and may be a specific implementation of process 500. In some embodiments, process 600 is performed by processing circuit 106 of central plant controller 102 according to the instructions stored in low level optimizing module 132. Process 600 may be used to determine an optimal operating point for a central plant and to issue operating commands to various devices of the central plant at the optimum operating point.
  • Process 600 is shown to include receiving, from a high level optimization, subplant thermal energy load setpoints for a plurality of subplants of a central plant (step 602).
  • step 602 includes receiving the thermal energy load setpoints from a high level optimization module or process.
  • high level optimization module 130 may be configured to perform a high level optimization process that determines a thermal energy load setpoint for each of subplants 12-22.
  • the thermal energy load setpoints may be based on a predicted thermal energy load for a building or campus and/or utility rates defining the cost of one or more resources consumed by subplants 12-22.
  • High level optimization module 130 may determine the optimal distribution of thermal energy loads across subplants 12-22, as described with reference to FIG. 2 .
  • the optimal distribution of thermal energy loads across subplants 12-22 results in the minimum cost to satisfy the predicted thermal energy requirements for the building or campus over a time horizon.
  • process 600 is shown to include identifying a previous operating point for the central plant (step 604).
  • the previous operating point may include on/off statuses and/or operating setpoints for various devices of the central plant at a previous time step.
  • step 604 includes retrieving the previous operating point from subplant control module 138.
  • Subplant control module 138 may store historical data regarding past operating statuses, past operating setpoints, and instructions for calculating and/or implementing control parameters for subplants 12-22.
  • Subplant control module 138 may also receive, store, and/or transmit data regarding the conditions of individual devices of the central plant, such as operating efficiency, equipment degradation, a date since last service, a lifespan parameter, a condition grade, or other device-specific data.
  • Subplant control module 138 may also receive and store on/off statuses and operating setpoints from low level optimization module 132.
  • Step 604 may include retrieving such data from subplant control module 138 and using the retrieved data to identify the previous operating point.
  • Process 600 is shown to include using non-exhaustive binary optimization to select a feasible on/off configuration for one or more chillers and one or more cooling towers of the central plant (step 606), a feasible on/off configuration for one or more heat recovery chillers and one or more heating elements of the central plant (step 608), and a feasible on/off configuration for one or more pumps of the central plant (step 610).
  • Steps 606-610 may be the same or similar to step 504, as described with reference to FIG. 5 .
  • steps 606-610 may utilize binary optimization to determine one or more feasible combinations of devices within a particular subplant of the central plant that satisfy the thermal energy load setpoint for the subplant for an actual or expected set of conditions (e.g., load conditions, weather conditions, etc.).
  • steps 606-610 include selecting a feasible on/off configuration for the devices of each subplant that minimizes the amount of energy consumption by the subplant.
  • N is the number of devices in the subplant
  • t s is the duration of a time step
  • u j is the energy used by device j as a function of the device setpoints ⁇ LL .
  • the selected feasible combination may minimize the cost function J LL subject to the subplant load constraints and any other constraints on the optimization.
  • process 600 is shown to include determining an optimum operating point for the central plant based on the selected on/off configurations using nonlinear optimization (step 612).
  • Step 612 may be the same or similar to step 506, as described with reference to FIG. 5 .
  • step 612 may utilize nonlinear optimization to determine a setpoint vector ⁇ LL that minimizes the cost function J LL subject to the optimization constraints.
  • direct and/or indirect search methods e.g., downhill simplex (Nelder-Mead) method, GRG, SQP, Cauchy Method, Feltcher-Reeves Method, etc.
  • the setpoints determined in step 612 may define a capacity for each active device that is capable of operating at multiple different capacities and may affect the power consumption for each feasible combination.
  • the nonlinear optimization performed in step 612 determines one or more setpoints that minimize the power consumption for each feasible combination.
  • the combination of the optimum on/off configurations and the optimum device setpoints define the optimum operating point.
  • Process 600 is shown to include determining whether the percent change in the optimum operating point is less than a threshold (step 614).
  • Step 614 may include comparing the optimum operating point determined in step 612 with the previous operating point identified in step 604.
  • the comparison may include comparing on/off states and/or setpoints for various devices of the central plant.
  • the comparison may be performed for each device individually or for a grouping of devices (e.g., within each subplant, within each category identified separately in steps 606-610, within each type of device, etc.).
  • the operating point may be device specific, subplant specific, device type specific, or a general (e.g., average) operating point for all of the devices of the central plant.
  • Step 616 may include sending operating commands to a building automation system (e.g., BAS 108) configured to control the subplant devices, a subplant level controller, or an equipment level controller for the subplant devices.
  • a building automation system e.g., BAS 108
  • the operating commands may specify which of the subplant devices are active, (i.e., "on"), which of the subplant devices are inactive (i.e., "off'), and, in some embodiments, setpoints for each active subplant device.
  • the on/off statuses and setpoints provided in step 616 may override any previous control decisions indicating which devices are active and/or setpoints for each active device.
  • step 604 If the percent change between the previous operating point identified in step 604 and the optimum operating point determined in step 612 is not less than the threshold value (i.e., the result of step 614 is "no"), it may be determined that the optimization process is not converging on an optimal value or that the convergence has not stabilized sufficiency. If the percent change determined in step 614 is not less than the threshold value, process 600 may return to step 606. Steps 606-614 may be repeated until the optimum operating point converges on a particular value (i.e., the percent change determined in step 614 is less than the threshold).
  • Process 700 may be performed by central plant controller 102, as described with reference to FIGS. 2-4 , and may be used to determine one or more feasible on/off configurations of devices for a particular subplant. In some embodiments, process 700 may be used to accomplish step 504 of process 500 and/or and steps 606-610 of process 600. Process 700 may be performed by processing circuit 106 of central plant controller 102 according to the instructions stored in non-exhaustive binary optimization module 156.
  • Process 700 is shown to include initializing a database of possible solutions and a database of feasible solutions (step 702).
  • the database of possible solutions may contain on/off combinations that are estimated to be capable of satisfying the thermal energy load and the optimization constraints for the subplant.
  • Combinations may be characterized as "branches," as graphically represented as in FIGS. 8A-8D .
  • a branch corresponds to a particular combination (or some portion thereof) of on/off statuses for one or more devices.
  • Each on/off status may be described as a "bud.”
  • the "on" status of chiller 1 and the "on” status of chiller 2 are each individual buds.
  • Combinations of on/off statuses may additionally be described by strings, vectors, arrays, or other sets of the binary variable b i .
  • branch 858 of FIG. 8D may be described as [1, 1, 0, 1] (i.e., chiller 1 on, chiller 2 on, chiller 3 off, and chiller 4 on).
  • the description of a branch i.e., a combination of buds
  • “B” represents the bud or device that is presently being considered (i.e., to determine whether the device should be on or off).
  • B may be characterized as the "working bud.”
  • a,...,a represents the combination of devices that was previously considered (i.e., devices that are turned on/off before the device corresponding to the working bud).
  • c,...,c represents the combination of devices that will be considered after the working bud device has been determined to be on or off.
  • the general description [a,...,a, B, c,...,c] may represent any number and/or type of devices.
  • a,...,a can include zero or more devices
  • B can include one or more devices
  • c,...,c can include zero or more devices.
  • the a,...,a devices have lower power consumption than the working bud device and, thus, the a,...,a devices are considered before the working bud device.
  • the working bud device may have a lower power consumption than the c,...,c devices, which are considered after the working bud device.
  • combinations of subplant devices may be considered in order of increasing power consumption.
  • a combination may be stored in possible solutions database if the combination can potentially satisfy all of the applicable constraints (e.g., subplant load constraints, device capacity constraints, etc.), considering any unspecified operating statuses as wildcards. For example, if the combination [1, 1, 0, 1] satisfies the constraints but the combination [1, 1, 0, 0] does not, the combination [1, 1,0, ?] would satisfy the constraints because the unspecified operating status can be either on (1) or off(0).
  • the applicable constraints e.g., subplant load constraints, device capacity constraints, etc.
  • determining one or more optimal on/off combinations is an iterative process. For example, a portion of a combination of devices may be considered to determine whether that combination has any chance of satisfying the load requirements and/or system constraints. If there is some possibility that the combination could do so, then the combination may be returned to the possible solutions database.
  • the database of feasible solutions may contain on/off combinations that have been determined to satisfy the applicable constraints. A combination may be moved from the possible solutions database to the feasible solutions database if it is determined that the combination satisfies the applicable constraints.
  • process 700 is shown to include identifying applicable constraints (step 704).
  • the applicable constraints may define one or more requirements that must be satisfied for a combination of on/off statuses to be feasible. In other words, feasible combinations may be those that satisfy the applicable constraints.
  • Step 704 may include determining the subplant load setpoint to be met, the number and type of subplant devices, the maximum and minimum operating capacity of the devices, the operating condition and estimated power consumption of each device, etc.
  • Applicable constraints may be received at low level optimization module 132 from high level optimization module 130 (e.g., subplant load constraints), equipment models 120 (e.g., equipment capacity constraints), BAS 108 (e.g., user-defined constraints, timeout constraints, etc.), or any other data source.
  • Process 700 is shown to include retrieving a branch from the database of possible solutions (step 706) and determining whether the branch has an unspecified bud (step 708).
  • Each branch corresponds to a particular combination (or some portion thereof) of on/off statuses for one or more devices.
  • the possible solutions database stores a plurality of branches and an estimated power consumption associated with each branch. The branches in the possible solutions database may be sorted (e.g., in ascending order) by the power consumption associated with each branch.
  • step 706 includes retrieving the branch with the lowest associated power consumption. If the branch has one or more unspecified buds, the associated power consumption may be an estimated power consumption for only the devices represented by specified buds.
  • step 708 includes identifying the first unspecified bud as the working bud.
  • process 700 may proceed to generating a first expanded branch (B1) by specifying a first status for the bud and generating a second expanded branch (B2) by specifying a second status for the bud (step 710).
  • the first expanded branch specifies the status of the bud as "on” and the second expanded branch specifies the status of the bud as "off.” In other embodiments, the first expanded branch specifies the status of the bud as "off' and the second expanded branch specifies the status of the bud as "on.”
  • the first expanded branch B1 may be retained for further evaluation in steps 714-724 and the second expanded branch B2 may be returned to the database of possible solutions (step 712). If the branch retrieved in step 706 does not have an unspecified bud (i.e., the result of step 708 is "no"), process 700 may identify the branch as B1 and proceed to step 714.
  • process 700 is shown to include determining whether the branch B1 satisfies the applicable constraints (step 714).
  • the branch B1 evaluated in step 714 may be the first expanded branch generated in step 710 (e.g., if steps 710-712 are performed) or the branch retrieved from the possible solutions database in step 706 (e.g., if steps 710-712 are not performed).
  • Step 714 may include determining whether the combination of active devices specified by the branch satisfies the constraints identified in step 704.
  • step 714 may assume that any unspecified buds have a status of "off.” If the branch B1 satisfies the applicable constraints (i.e., the result of step 714 is "yes"), process 700 may proceed to add the branch B1 to the database of feasible solutions (step 716) and proceed to step 724. Adding the branch B1 to the database of feasible solutions may indicate that the devices specified as "on" in the branch B1 can be operated to satisfy the applicable constraints without requiring any additional devices.
  • process 700 may proceed determining whether the branch B1 can possibly satisfy the applicable constraints (step 718).
  • Step 718 may include determining whether the branch is capable of satisfying the applicable constraints if one or more additional devices are used.
  • the additional devices may be selected from the set of devices with an unspecified status in the branch B1. For example, if the branch B1 includes one or more unspecified buds, step 718 may include determining whether the branch could satisfy the applicable constraints if one or more of the unspecified buds are subsequently specified as "on.”
  • process 700 may proceed to discard the branch B1 (step 720) and proceed to step 724.
  • Discarding the branch may include adding the branch to a discard database (e.g., discard database 166) and/or removing the branch from further consideration as a potential solution. If the branch does not have any unspecified buds, process 700 may automatically advance from step 718 to step 720 since adding further devices is not possible. If the branch B1 can possibly satisfy the applicable constraints (i.e., the result of step 718 is "yes"), process 700 may proceed to add the branch B1 to the database of possible solutions (step 722) and proceed to step 724. Adding the branch B1 to the database of possible solutions may allow the branch to be further evaluated in a subsequent iteration of process 700.
  • process 700 is shown to include determining whether the database of possible solutions is empty (step 724).
  • the database of possible solutions may be empty once all of the branches in the database of possible solutions are either moved to the database of feasible solutions or discarded as an infeasible solution. Not every potential combination may be considered in a non-exhaustive optimization. For example, entire branches may be discarded without evaluating every individual combination based on the branch.
  • this allows the binary optimization to identify an optimal solution without processing or evaluating every possible combination. If any branches remain in the database of possible solutions, process 700 may return to step 706 and repeat steps 706-724. Otherwise, process 700 may end.
  • FIGS. 8A-8D graphical representations of combinations of the devices are shown, according to exemplary embodiments.
  • the combinations are depicted in a tree structures, with branches representing combinations of devices and buds representing the on/off status of individual devices.
  • FIGS. 8A-8D represent four chillers.
  • chiller 1 results in the least power consumption.
  • the remaining chillers result in incrementally greater power consumption, with chiller 4 resulting in the comparatively largest power consumption.
  • FIGS. 8A-8D are shown to include branches starting with the chiller 1 on.
  • the tree structures i.e., database, array, data object, etc.
  • the computations reflected in the tree structures (e.g., on/off statuses) of FIGS. 8A-8D may be completed by central plant controller 102.
  • the tree structures of FIGS. 8A-8D may be output to at least one of a memory device, a user device, or another device on the building management system.
  • the output may be a graphical user interface (e.g., on a client device, on a mobile device, generated by a web server, etc.).
  • the tree structure of FIG. 8A may be output to monitoring and reporting applications 136 via GUI engine 116 (FIG. 12).
  • the tree structure may include a portion or all of the branches and buds of data shown in FIGS. 8A-8D .
  • a user may be able, via a user interface, to choose which branches and buds should be visible.
  • a user may also be able to add branches and buds of data not shown in FIGS 8A-D including, e.g., branches with chiller 1 off.
  • the processes described herein will operate without displaying a graphical representation of a combination. While the tree structures of FIGS. 8A-8D are shown as two-dimensional figures, another information structure suitable for representing and storing the data of the chart may be used. For example, a relational database having one or more related tables may be used.
  • Bud 802 may represent the working bud of the live branch (i.e., the device being considered in a possible or feasible combination of devices).
  • Combination 852 includes chiller 1 on and chiller 2 on. The on/off status of additional devices (e.g., chiller 3 and chiller 4) may be added to combination 852 as part of determining alternate combinations of devices that will also satisfy plant load.
  • Bud 802 may be the working bud.
  • Combination 854 includes chiller 1 on, chiller 2 off, and chiller 3 on.
  • the on/off status of additional devices e.g., chiller 4
  • bud 806 may be the working bud.
  • Bud 804 may represent the working bud of the live branch.
  • Combination 856 includes chiller 1 on, chiller 2 on, and chiller 3 on.
  • the "on" status of chiller 1 is representative of previous devices in the branch.
  • the on/off status of additional devices e.g., chiller 4 may be added to combination 856 as part of determining alternate combinations of devices that will also satisfy plant load.
  • Bud 804 may be the working bud.
  • Combination 858 includes chiller 1 on, chiller 2 on, chiller 3 off, and chiller 4 on.
  • Combination 858 may represent the working bud device on, the next device off, and the following device on.
  • the "on" status of chiller 1 is representative of previous devices in the branch.
  • bud 808 may represent the last bud.
  • the present disclosure contemplates methods, systems and program products on memory or other machine-readable media for accomplishing various operations.
  • the embodiments of the present disclosure may be implemented using existing computer processors, or by a special purpose computer processor for an appropriate system, incorporated for this or another purpose, or by a hardwired system.
  • Embodiments within the scope of the present disclosure include program products or memory comprising machine-readable media for carrying or having machine-executable instructions or data structures stored thereon.
  • Such machine-readable media can be any available media that can be accessed by a general purpose or special purpose computer or other machine with a processor.
  • machine-readable media can comprise RAM, ROM, EPROM, EEPROM, CD-ROM or other optical disk storage, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to carry or store desired program code in the form of machine-executable instructions or data structures and which can be accessed by a general purpose or special purpose computer or other machine with a processor. Combinations of the above are also included within the scope of machine-readable media.
  • Machine-executable instructions include, for example, instructions and data which cause a general purpose computer, special purpose computer, or special purpose processing machines to perform a certain function or group of functions.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Quality & Reliability (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Automation & Control Theory (AREA)
  • Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Software Systems (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Computation (AREA)
  • Artificial Intelligence (AREA)
  • Medical Informatics (AREA)
  • Water Supply & Treatment (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Manufacturing & Machinery (AREA)
  • Computing Systems (AREA)
  • Mathematical Physics (AREA)
  • Data Mining & Analysis (AREA)
  • Feedback Control In General (AREA)
  • Electromagnetism (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Air Conditioning Control Device (AREA)

Description

    CROSS-REFERENCE TO RELATED PATENT APPLICATIONS
  • This application claims the benefit of and priority to U.S. Patent Application No. 14/634,615 filed February 27, 2015 , which claims the benefit of and priority to U.S. Provisional Patent Application No. 61/987,361 filed May 1, 2014 . Both U.S. Patent Application No. 14/634,615 and U.S. Provisional Patent Application No. 61/987,361 are incorporated by reference herein in their entireties.
  • BACKGROUND
  • The present disclosure relates generally to the operation of a central plant for serving building thermal energy loads. The present disclosure relates more particularly to systems and methods for optimizing the operation of one or more subplants of a central plant.
  • A central plant may include various types of equipment configured to serve the thermal energy loads of a building or building campus (i.e., a system of buildings). For example, a central plant may include heaters, chillers, heat recovery chillers, cooling towers, or other types of equipment configured to provide heating or cooling for the building. Some central plants include thermal energy storage configured to store the thermal energy produced by the central plant for later use.
  • A central plant may consume resources from a utility (e.g., electricity, water, natural gas, etc.) to heat or cool a working fluid (e.g., water, glycol, etc.) that is circulated to the building or stored for later use to provide heating or cooling for the building. Fluid conduits typically deliver the heated or chilled fluid to air handlers located on the rooftop of the building or to individual floors or zones of the building. The air handlers push air past heat exchangers (e.g., heating coils or cooling coils) through which the working fluid flows to provide heating or cooling for the air. The working fluid then returns to the central plant to receive further heating or cooling and the cycle continues.
  • As variables such as temperature and humidity vary, the central plant may cycle on or off multiple chillers, heaters, pumps, or cooling towers to provide the varying thermal energy loads of the building. High efficiency equipment can help reduce the amount of energy consumed by the central plant. However, the effectiveness of such equipment is highly dependent on the control technology that is used. It is challenging and difficult to efficiently control a central plant for a building.
  • US2013345880 (A1 ) discloses a method for controlling a chiller plant for cooling a building, including estimating an optimal combination of chiller plant equipment for meeting a chiller plant load. Estimating the optimal combination includes using binary optimization to determine at least two potential combinations of chiller plant equipment and using nonlinear optimization to determine a potential power consumption minimum for each of the at least two potential combinations.
  • US2012010757 (A1 ) discloses an energy management system which determines an optimal manner of using and controlling the various energy consumption, producing and storage equipment in a plant/communities. The energy management system operates the various components of the plant to minimize the cost of energy over time, or at various different times, while still meeting certain constraints or requirements within the operational system.
  • US2011066258 (A1 ) discloses a method for optimizing operational settings for a plurality of energy devices includes representing each of the plurality of energy devices in terms of a set of decision variables and operational parameters. The decision variables and operational parameters are constrained based on operational conditions and interrelationship within the plurality of energy devices. A two-tiered model of the plurality of energy devices is generated wherein a top tier of the model represents interaction of various sub-models and a bottom tier of the model includes a set of the sub-models that form the top tier, each sub-model representing detailed operation of the plurality of energy devices. The two-tiered model is optimized to provide either a schedule of operation for the plurality of energy devices or real-time control for the plurality of energy devices.
  • SUMMARY
  • One implementation of the present disclosure is a controller for a central plant according to claim 1. The central plant has a plurality of subplants that serve thermal energy loads of a building or building system. The controller includes a processing circuit having a processor and memory. The processing circuit is configured to identify a thermal energy load setpoint for a subplant of the central plant. The processing circuit includes a binary optimization module configured to use binary optimization to determine one or more feasible on/off configurations for equipment of the subplant based on the identified thermal energy load setpoint, a setpoint evaluator module configured to determine optimum operating setpoints for the subplant equipment for each feasible on/off configuration, and a subplant control module configured to generate operating parameters for the subplant equipment. The generated operating parameters include at least one of the feasible on/off configurations and the optimum operating setpoints. The controller further includes a communications interface coupled to the processing circuit and configured to output the generated operating parameters for use in controlling the subplant equipment.
  • In some embodiments, the controller further includes a constraints evaluator module configured to identify applicable constraints for the subplant equipment. Each feasible on/off configuration may satisfy the applicable constraints and may be estimated to result in the subplant equipment meeting the thermal energy load setpoint.
  • In some embodiments, the binary optimization module uses a branch and bound method to determine the one or more feasible on/off configurations.
  • In some embodiments, the setpoint evaluator module determines the optimum operating setpoints using a nonlinear optimization that minimizes an amount of power consumed by the subplant equipment.
  • In some embodiments, the setpoint evaluator module is configured to estimate an amount of power consumed by each feasible on/off configuration of the subplant equipment at the optimum operating setpoints and to identify which of the feasible on/off configurations is estimated to result in a lowest amount of power consumed by the subplant equipment at the optimum operating setpoints.
  • Identifying the thermal energy load setpoint includes receiving the thermal energy load setpoint from a high level optimization that uses a predicted thermal energy load for the building to determine optimum thermal energy load setpoints for the plurality of subplants.
  • The processing circuit includes a low level optimization module configured to generate a resource consumption curve for the subplant. The resource consumption curve may indicate a minimum amount of resource consumption by the subplant as a function of a thermal energy load on the subplant.
  • Another implementation of the present disclosure is a method for controlling a central plant. The central plant has a plurality of subplants that serve thermal energy loads of a building or building system. The method includes identifying, by a processing circuit of a controller for the central plant, a thermal energy load setpoint for a subplant of the central plant and using, by a binary optimization module of the processing circuit, binary optimization to determine one or more feasible on/off configurations for equipment of the subplant based on the identified thermal energy load setpoint. The method further includes determining, by a setpoint evaluator module of the processing circuit, optimum operating setpoints for the subplant equipment for each feasible on/off configuration and generating, by a subplant control module of the processing circuit, operating parameters for the subplant equipment. The operating parameters include at least one of the feasible on/off configurations and the optimum operating setpoints. The method
    further includes outputting the generated operating parameters via a communications interface coupled to the processing circuit for use in controlling the subplant equipment.
  • In some embodiments, the method includes identifying applicable constraints for the subplant equipment. Each feasible on/off configuration may satisfy the applicable constraints and is estimated to result in the subplant equipment meeting the thermal energy load setpoint.
  • In some embodiments, determining the one or more feasible on/off configurations includes using a branch and bound method.
  • In some embodiments, determining the optimum operating setpoints includes using a nonlinear optimization that minimizes an amount of power consumed by the subplant equipment.
  • In some embodiments, the method includes estimating an amount of power consumed by each feasible on/off configuration of the subplant equipment at the optimum operating setpoints and identifying which of the feasible on/off configurations is estimated to result in a lowest amount of power consumed by the subplant equipment at the optimum operating setpoints.
  • Identifying the thermal energy load setpoint includes receiving the thermal energy load setpoint from a high level optimization that uses a predicted thermal energy load for the building to determine optimum thermal energy load setpoints for the plurality of subplants.
  • In some embodiments, the method includes generating a resource consumption curve for the subplant. The resource consumption curve may indicate a minimum amount of resource consumption by the subplant as a function of a thermal energy load on the subplant.
  • Another implementation of the present disclosure is a method for determining optimum operating parameters for equipment of a central plant that serves thermal energy loads of a building or building system. The method may be performed by a controller for the central plant. The method includes initializing a database of possible solutions and a database of feasible solutions and retrieving a branch from the database of possible solutions. The retrieved branch includes a specified operating status for one or more devices of the central plant equipment. The
    method further includes determining whether the branch satisfies applicable constraints for the central plant equipment using the specified operating status and adding the branch to the database of feasible solutions in response to a determination that the branch satisfies the applicable constraints. The method further includes generating operating parameters for the central plant equipment. The operating parameters include the operating status specified by the branch in the database of feasible solutions.
  • In some embodiments, the branch includes a specified operating status for a first device of the central plant equipment and an unspecified operating status for a second device of the central plant equipment.
  • In some embodiments, the method further includes creating a first expanded branch by specifying a first operating status for the second device. The determining, adding, and generating steps may be performed for the first expanded branch. The method may further include creating a second expanded branch by specifying a second operating status for the second device and adding the second expanded branch to the database of possible solutions for evaluation in a subsequent iteration of the method.
  • In some embodiments, the method further includes, in response to a determination that the first expanded branch does not satisfy the applicable constraints, determining whether the first expanded branch can possibly satisfy the applicable constraints if an unspecified operating status in the first expanded branch is subsequently specified and adding the first expanded branch to the database of possible solutions for evaluation in a subsequent iteration of the method in response to a determination that the first expanded branch can possibly satisfy the applicable constraints.
  • In some embodiments, the method further includes estimating an amount of power consumed by each branch in the database of possible solutions. Retrieving the branch from the database of possible solutions may include retrieving the branch with the lowest estimated power consumption.
  • In some embodiments, the method includes estimating an amount of power consumed by each branch in the database of feasible solutions. The generated operating parameters may include the operating status specified by the branch in the database of feasible solutions with the lowest estimated power consumption.
  • Those skilled in the art will appreciate that the summary is illustrative only and is not intended to be in any way limiting. Other aspects, inventive features, and advantages of the devices and/or processes described herein, as defined solely by the claims, will become apparent in the detailed description set forth herein and taken in conjunction with the accompanying drawings.
  • BRIEF DESCRIPTION OF THE DRAWINGS
    • FIG. 1 is a diagram of a central plant including a plurality of subplants operable to serve the thermal energy loads of a building or building system, according to an exemplary embodiment.
    • FIG. 2 is a block diagram of a central plant system including a central plant controller configured to generate on/off decisions and operating setpoints for equipment the central plant of FIG. 1, according to an exemplary embodiment.
    • FIG. 3 is a block diagram illustrating a low level optimization module of the central plant controller of FIG. 2 in greater detail, according to an exemplary embodiment.
    • FIG. 4 is a block diagram illustrating the central plant controller of FIG. 2 receiving operating conditions from the plurality of subplants of FIG. 1 and providing generated on/off statuses and operating setpoints as operating commands for the central plant equipment, according to an exemplary embodiment.
    • FIG. 5 is a flowchart of a low level optimization process that may be performed by the central plant controller of FIG. 2 to determine feasible on/off configurations for the central plant equipment and operating setpoints that optimize the amount of energy consumed by the plurality of subplants, according to an exemplary embodiment.
    • FIG. 6 is a flowchart of another low level optimization process that may be performed by the central plant controller of FIG. 2 as a specific implementation of the process of FIG. 5 to determine feasible on/off configurations and operating setpoints for the central plant equipment, according to an exemplary embodiment.
    • FIG. 7 is a flowchart of a binary optimization process that may be performed by the central plant controller of FIG. 2 to determine feasible on/off configurations for the central plant equipment, according to an exemplary embodiment.
    • FIGS. 8A-8D are branch and bound diagrams illustrating several potential branches (i.e., combinations of on/off statuses for the central plant equipment) that may be considered as possible solutions in the binary optimization process of FIG. 7, according to an exemplary embodiment.
    DETAILED DESCRIPTION
  • Referring generally to the FIGURES, systems and methods for low level central plant optimization and are shown, according to various exemplary embodiments. The systems and methods described herein may be used to control the equipment of a central plant that provides heating and/or cooling for a building or building campus (i.e., a system of buildings). A central plant may include a plurality of subplants, each configured to perform a particular function. For example, a central plant may include a heater subplant, a chiller subplant, a heat recovery chiller subplant, a hot thermal energy storage subplant, a cold thermal energy storage subplant, etc.
  • According to an exemplary embodiment, each subplant receives a setpoint thermal energy load to be served by the subplant (e.g., a thermal energy per unit time) and generates equipment dispatch states and/or operational setpoints for various devices of the subplant to serve the setpoint thermal energy load. For example, each subplant may include a plurality of individual devices (e.g., heaters, chillers, pumps, valves, etc.) configured to facilitate the functions of the subplant. The equipment dispatch states may control which of the devices of the subplant are utilized to serve the thermal energy load (e.g., on/off states). The operational setpoints may determine individual setpoints for each active device of the subplant that is capable of operating at a variable capacity (e.g., operating a chiller at 10% capacity, 60% capacity, etc.).
  • The low level central plant optimization described herein may be used in conjunction with a high level central plant optimization. The high level optimization may determine an optimal distribution of thermal energy loads across multiple subplants of a central plant over a time horizon in order to minimize the cost of operating the central plant. For example, the high level optimization may determine an optimal subplant load subplant for each subplant and provide the optimal subplant loads as setpoints to the various subplants. The low level optimization may be performed for each subplant. The low level optimization may determine which devices of the subplant to utilize (e.g., on/off states) and/or operating setpoints (e.g., temperature setpoints, flow setpoints, etc.) for individual devices of the subplant in order to minimize the amount of energy consumed by the subplant to serve the subplant load subplant .
  • In some embodiments, the low level optimization is performed for several different combinations of load and weather conditions to produce multiple data points (i.e., minimum energy consumption values for various subplant loads). A subplant curve can be fit to the low level optimization data for each subplant to determine the rate of utility usage (e.g., power consumption, resource consumption, etc.) as a function of the load served by the subplant. The high level optimization may use the subplant curves for a plurality of subplants to determine the optimal distribution of thermal energy loads across the subplants.
  • The low level optimization may use thermal models of the subplant equipment and/or the subplant network to determine the minimum energy consumption for a given thermal energy load. Equipment curves for individual devices or a combination of devices (e.g., thermal load v. resource consumption) may be used to determine an optimal selection of devices for a given load condition. For example, operating two chillers at 50% capacity may consume less energy than operating a single chiller at 100% capacity while producing the same thermal energy load. The equipment curves may determine optimal switching points for turning off or on individual devices. The thermal network may be used to establish the feasibility of a selection of equipment and may ensure that the required thermal energy load can be met. For example, the working capacity of one device may depend on the operating setpoints of other upstream, downstream, or component devices. The low level optimization may consider current operating conditions (e.g., weather conditions, environmental conditions, etc.) in determining the optimal selection of equipment and/or setpoints to serve a given thermal energy load.
  • In some embodiments, the low level optimization uses mixed binary optimization (e.g., branch and bound) and/or nonlinear optimization (e.g., sequential quadratic programming) to minimize the energy consumption of a subplant. Non-exhaustive binary optimization and the nonlinear optimization may both contribute to minimization of energy consumption. Binary optimization may be used to determine the optimal combination of equipment for meeting the subplant load subplant . Nonlinear optimization may be used to determine optimal operating setpoints (e.g., setpoints expected to result in minimum or near-minimum power consumption for a determined combination of equipment). A system or method of the present invention having mixed binary optimization and/or nonlinear optimization may advantageously result in lower central plant operating costs. In some embodiments, the mixed optimization may be advantageously suited for improving real time (i.e., near real time) optimization and automation of the central plant. The mixed optimization may also be implemented in a planning tool to predict the performance of the central plant for a future time period.
  • Referring now to FIG. 1, a diagram of a central plant 10 is shown, according to an exemplary embodiment. Central plant 10 is shown to include a plurality of subplants including a heater subplant 12, a heat recovery chiller subplant 14, a chiller subplant 16, a cooling tower subplant 18, a hot thermal energy storage (TES) subplant 20, and a cold thermal energy storage (TES) subplant 22. Subplants 12-22 consume resources (e.g., water, natural gas, electricity, etc.) from utilities to serve the thermal energy loads (e.g., hot water, cold water, heating, cooling, etc.) of a building or campus. For example, heater subplant 12 may be configured to heat water in a hot water loop 24 that circulates the hot water between central plant 10 and a building (not shown). Chiller subplant 16 may be configured to chill water in a cold water loop 26 that circulates the cold water between central plant 10 and the building. Heat recovery chiller subplant 14 may be configured to transfer heat from cold water loop 26 to hot water loop 24 to provide additional heating for the hot water and additional cooling for the cold water. Condenser water loop 28 may absorb heat from the cold water in chiller subplant 16 and reject the absorbed heat in cooling tower subplant 18 or transfer the absorbed heat to hot water loop 24. Hot TES subplant 20 and cold TES subplant 22 store hot and cold thermal energy, respectively, for subsequent use.
  • Hot water loop 24 and cold water loop 26 may deliver the heated and/or chilled water to air handlers located on the rooftop of a building or to individual floors or zones of the building. The air handlers push air past heat exchangers (e.g., heating coils or cooling coils) through which the water flows to provide heating or cooling for the air. The heated or cooled air may be delivered to individual zones of the building to serve the thermal energy loads of the building. The water then returns to central plant 10 to receive further heating or cooling in subplants 12-22.
  • Although central plant 10 is shown and described as heating and cooling water for circulation to a building, it is understood that any other type of working fluid (e.g., glycol, CO2, etc.) may be used in place of or in addition to water to serve the thermal energy loads. In other embodiments, central plant 10 may provide heating and/or cooling directly to the building or campus without requiring an intermediate heat transfer fluid. Central plant 10 may be physically separate from a building served by subplants 12-22 or physically integrated with the building (e.g., located within the building).
  • Each of subplants 12-22 may include a variety of equipment configured to facilitate the functions of the subplant. For example, heater subplant 12 is shown to include a plurality of heating elements 30 (e.g., boilers, electric heaters, etc.) configured to add heat to the hot water in hot water loop 24. Heater subplant 12 is also shown to include several pumps 32 and 34 configured to circulate the hot water in hot water loop 24 and to control the flow rate of the hot water through individual heating elements 30. Heat recovery chiller subplant 14 is shown to include a plurality of heat recovery heat exchangers 36 (e.g., refrigeration circuits) configured to transfer heat from cold water loop 26 to hot water loop 24. Heat recovery chiller subplant 14 is also shown to include several pumps 38 and 40 configured to circulate the hot water and/or cold water through heat recovery heat exchangers 36 and to control the flow rate of the water through individual heat recovery heat exchangers 36.
  • Chiller subplant 16 is shown to include a plurality of chillers 42 configured to remove heat from the cold water in cold water loop 26. Chiller subplant 16 is also shown to include several pumps 44 and 46 configured to circulate the cold water in cold water loop 26 and to control the flow rate of the cold water through individual chillers 42. Cooling tower subplant 18 is shown to include a plurality of cooling towers 48 configured to remove heat from the condenser water in condenser water loop 28. Cooling tower subplant 18 is also shown to include several pumps 50 configured to circulate the condenser water in condenser water loop 28 and to control the flow rate of the condenser water through individual cooling towers 48.
  • Hot TES subplant 20 is shown to include a hot TES tank 52 configured to store the hot water for later use. Hot TES subplant 20 may also include one or more pumps or valves configured to control the flow rate of the hot water into or out of hot TES tank 52. Cold TES subplant 22 is shown to include cold TES tanks 54 configured to store the cold water for later use. Cold TES subplant 22 may also include one or more pumps or valves configured to control the flow rate of the cold water into or out of cold TES tanks 54. In some embodiments, one or more of the pumps in central plant 10 (e.g., pumps 32, 34, 38, 40, 44, 46, and/or 50) or pipelines in central plant 10 includes an isolation valve associated therewith. In various embodiments, isolation valves may be integrated with the pumps or positioned upstream or downstream of the pumps to control the fluid flows in central plant 10. In other embodiments, more, fewer, or different types of devices may be included in central plant 10.
  • Referring now to FIG. 2, a block diagram illustrating a central plant system 100 is shown, according to an exemplary embodiment. System 100 is shown to include a central plant controller 102, a building automation system 108, and a plurality of subplants 12-22. Subplants 12-22 may be the same as previously described with reference to FIG. 1. For example, subplants 12-22 are shown to include a heater subplant 12, a heat recovery chiller subplant 14, a chiller subplant 16, a hot TES subplant 20, and a cold TES subplant 22.
  • Each of subplants 12-22 is shown to include equipment 60 that can be controlled by central plant controller 102 and/or building automation system 108 to optimize the performance of central plant 10. Equipment 60 may include, for example, heating devices 30, chillers 42, heat recovery heat exchangers 36, cooling towers 48, thermal energy storage devices 52-54, pumps 32, 34, 38, 44, 46, 50, valves, and/or other devices of subplants 12-22. Individual devices of equipment 60 can be turned on or off to adjust the thermal energy load served by each of subplants 12-22. In some embodiments, individual devices of equipment 60 can be operated at variable capacities (e.g., operating a chiller at 10% capacity or 60% capacity) according to an operating setpoint received from central plant controller 102.
  • In some embodiments, one or more of subplants 12-22 includes a subplant level controller configured to control the equipment 60 of the corresponding subplant. For example, central plant controller 102 may determine an on/off configuration and global operating setpoints for equipment 60. In response to the on/off configuration and received global operating setpoints, the subplant controllers may turn individual devices of equipment 60 on or off, and implement specific operating setpoints (e.g., damper position, vane position, fan speed, pump speed, etc.) to reach or maintain the global operating setpoints.
  • Building automation system (BAS) 108 may be configured to monitor conditions within a controlled building. For example, BAS 108 may receive input from various sensors (e.g., temperature sensors, humidity sensors, airflow sensors, voltage sensors, etc.) distributed throughout the building and may report building conditions to central plant controller 102. Building conditions may include, for example, a temperature of the building or a zone of the building, a power consumption (e.g., electric load) of the building, a state of one or more actuators configured to affect a controlled state within the building, or other types of information relating to the controlled building. BAS 108 may operate subplants 12-22 to affect the monitored conditions within the building and to serve the thermal energy loads of the building.
  • BAS 108 may receive control signals from central plant controller 102 specifying on/off states and/or setpoints for equipment 60. BAS 108 may control equipment 60 (e.g., via actuators, power relays, etc.) in accordance with the control signals provided by central plant controller 102. For example, BAS 108 may operate equipment 60 using closed loop control to achieve the setpoints specified by central plant controller 102. In various embodiments, BAS 108 may be combined with central plant controller 102 or may be part of a separate building management system. According to an exemplary embodiment, BAS 108 is a METASYS® brand building management system, as sold by Johnson Controls, Inc.
  • Central plant controller 102 may monitor the status of the controlled building using information received from BAS 108. Central plant controller 102 may be configured to predict the thermal energy loads (e.g., heating loads, cooling loads, etc.) of the building for plurality of time steps in a prediction window (e.g., using weather forecasts from a weather service). Central plant controller 102 may generate on/off decisions and/or setpoints for equipment 60 to minimize the cost of energy consumed by subplants 12-22 to serve the predicted heating and/or cooling loads for the duration of the prediction window. Central plant controller 102 may be configured to carry out process 500 (FIG. 5), process 600 (FIG. 6), process 700 (FIG. 7), and other processes described herein. According to an exemplary embodiment, central plant controller 102 is integrated within a single computer (e.g., one server, one housing, etc.). In various other exemplary embodiments, central plant controller 102 can be distributed across multiple servers or computers (e.g., that can exist in distributed locations). In another exemplary embodiment, central plant controller 102 may integrated with a smart building manager that manages multiple building systems and/or combined with BAS 108.
  • Central plant controller 102 is shown to include a communications interface 104 and a processing circuit 106. Communications interface 104 may include wired or wireless interfaces (e.g., jacks, antennas, transmitters, receivers, transceivers, wire terminals, etc.) for conducting data communications with various systems, devices, or networks. For example, communications interface 104 may include an Ethernet card and port for sending and receiving data via an Ethernet-based communications network and/or a WiFi transceiver for communicating via a wireless communications network. Communications interface 104 may be configured to communicate via local area networks or wide area networks (e.g., the Internet, a building WAN, etc.) and may use a variety of communications protocols (e.g., BACnet, IP, LON, etc.).
  • Communications interface 104 may be a network interface configured to facilitate electronic data communications between central plant controller 102 and various external systems or devices (e.g., BAS 108, subplants 12-22, etc.). For example, central plant controller 102 may receive information from BAS 108 indicating one or more measured states of the controlled building (e.g., temperature, humidity, electric loads, etc.) and one or more states of subplants 12-22 (e.g., equipment status, power consumption, equipment availability, etc.). Communications interface 104 may receive inputs from BAS 108 and/or subplants 12-22 and may provide operating parameters (e.g., on/off decisions, setpoints, etc.) to subplants 12-22 via BAS 108. The operating parameters may cause subplants 12-22 to activate, deactivate, or adjust a setpoint for various devices of equipment 60.
  • Still referring to FIG. 2, processing circuit 106 is shown to include a processor 110 and memory 112. Processor 110 may be a general purpose or specific purpose processor, an application specific integrated circuit (ASIC), one or more field programmable gate arrays (FPGAs), a group of processing components, or other suitable processing components. Processor 110 may be configured to execute computer code or instructions stored in memory 112 or received from other computer readable media (e.g., CDROM, network storage, a remote server, etc.).
  • Memory 112 may include one or more devices (e.g., memory units, memory devices, storage devices, etc.) for storing data and/or computer code for completing and/or facilitating the various processes described in the present disclosure. Memory 112 may include random access memory (RAM), read-only memory (ROM), hard drive storage, temporary storage, non-volatile memory, flash memory, optical memory, or any other suitable memory for storing software objects and/or computer instructions. Memory 112 may include database components, object code components, script components, or any other type of information structure for supporting the various activities and information structures described in the present disclosure. Memory 112 may be communicably connected to processor 110 via processing circuit 106 and may include computer code for executing (e.g., by processor 106) one or more processes described herein.
  • Still referring to FIG. 2, memory 112 is shown to include a building status monitor 134. Central plant controller 102 may receive data regarding the overall building or building space to be heated or cooled with central plant 10 via building status monitor 134. In an exemplary embodiment, building status monitor 134 may include a graphical user interface component configured to provide graphical user interfaces to a user for selecting building requirements (e.g., overall temperature parameters, selecting schedules for the building, selecting different temperature levels for different building zones, etc.).
  • Central plant controller 102 may determine on/off configurations and operating setpoints to satisfy the building requirements received from building status monitor 134. In some embodiments, building status monitor 134 receives, collects, stores, and/or transmits cooling load requirements, building temperature setpoints, occupancy data, weather data, energy data, schedule data, and other building parameters. In some embodiments, building status monitor 134 stores data regarding energy costs, such as pricing information available from utilities 126 (energy charge, demand charge, etc.).
  • Still referring to FIG. 2, memory 112 is shown to include a load/rate prediction module 122. Load/rate prediction module 122 may be configured to predict the thermal energy loads (ℓ̂ k ) of the building or campus for each time step k (e.g., k = 1 ... n) of a prediction period. Load/rate prediction module 122 is shown receiving weather forecasts from a weather service 124. In some embodiments, load/rate prediction module 122 predicts the thermal energy loads ℓ̂ k as a function of the weather forecasts. In some embodiments, load/rate prediction module 122 uses feedback from BAS 108 to predict loads ℓ̂ k . Feedback from BAS 108 may include various types of sensory inputs (e.g., temperature, flow, humidity, enthalpy, etc.) or other data relating to the controlled building (e.g., inputs from a HVAC system, a lighting control system, a security system, a water system, etc.).
  • In some embodiments, load/rate prediction module 122 receives a measured electric load and/or previous measured load data from BAS 108 (e.g., via building status monitor 134). Load/rate prediction module 122 may predict loads ℓ̂ k as a function of a given weather forecast (φ̂w ), a day type (day), the time of day (t), and previous measured load data (Y k-1). Such a relationship is expressed in the following equation: l ^ k = f φ ^ w , day , t | Y k 1
    Figure imgb0001
    In some embodiments, load/rate prediction module 122 uses a deterministic plus stochastic model trained from historical load data to predict loads ℓ̂ k . Load/rate prediction module 122 may use any of a variety of prediction methods to predict loads ℓ̂ k (e.g., linear regression for the deterministic portion and an AR model for the stochastic portion).
  • Load/rate prediction module 122 is shown receiving utility rates from utilities 126. Utility rates may indicate a cost or price per unit of a resource (e.g., electricity, natural gas, water, etc.) provided by utilities 126 at each time step k in the prediction window. In some embodiments, the utility rates are time-variable rates. For example, the price of electricity may be higher at certain times of day or days of the week (e.g., during high demand periods) and lower at other times of day or days of the week (e.g., during low demand periods). The utility rates may define various time periods and a cost per unit of a resource during each time period. Utility rates may be actual rates received from utilities 126 or predicted utility rates estimated by load/rate prediction module 122.
  • In some embodiments, the utility rates include demand charge rates for one or more resources provided by utilities 126. A demand charge may define a separate cost imposed by utilities 126 based on the maximum usage of a particular resource (e.g., maximum energy consumption) during a demand charge period. The utility rates may define various demand charge periods and one or more demand charges associated with each demand charge period. In some instances, demand charge periods may overlap partially or completely with each other and/or with the prediction window. Advantageously, optimization module 128 may be configured to account for demand charges in the high level optimization process performed by high level optimization module 130.
  • Load/rate prediction module 122 may store the predicted loads ℓ̂ k and the utility rates in memory 112 and/or provide the predicted loads ℓ̂ k and the utility rates to optimization module 128. Optimization module 128 may use the predicted loads ℓ̂ k and the utility rates to determine an optimal load distribution for subplants 12-22 and to generate on/off decisions and setpoints for equipment 60.
  • Still referring to FIG. 2, memory 112 is shown to include an optimization module 128. Optimization module 128 may perform a cascaded optimization process to optimize the performance of central plant 10. For example, optimization module 128 is shown to include a high level optimization module 130 and a low level optimization module 132. High level optimization module 130 may determine how to distribute thermal energy loads across subplants 12-22 for each time step in the prediction window in order to minimize the cost of energy consumed by subplants 12-22. Low level optimization module 132 may determine how to best run each subplant at the load setpoint determined by high level optimization module 130.
  • Advantageously, the cascaded optimization process performed by optimization module 128 allows the optimization process to be performed in a time-efficient manner. The low level optimization may use a relatively short time horizon or no time horizon at all due to the fast system dynamics compared to the time to re-optimize plant loads. The high level optimization may use a relatively longer time horizon when the dynamics and capacity of the thermal energy storage allow loads to be deferred for long time periods.
  • Low level optimization module 132 may generate and provide subplant power curves to high level optimization module 130. The subplant power curves may indicate the rate of utility use by each of subplants 12-22 (e.g., measured in units of power such as kW) as a function of the load served by the subplant. In some embodiments, low level optimization module 132 generates the subplant power curves based on equipment models 120 (e.g., by combining equipment models 120 for individual devices into an aggregate power curve for the subplant). Low level optimization module 132 may generate the subplant power curves by running the low level optimization process (described in greater detail with reference to FIGS. 5-7) for several different loads and weather conditions to generate multiple data points (subplant , kW). Low level optimization module 132 may fit a curve to the data points to generate the subplant power curves.
  • High level optimization module 130 may receive the load and rate predictions from load/rate prediction module 122 and the subplant power curves from low level optimization module 132. High level optimization module 130 may determine the optimal load distribution for subplants 12-22 (e.g., subplant for each subplant) over the prediction window and provide the optimal load distribution to low level optimization module 132. In some embodiments, high level optimization module 130 determines the optimal load distribution by minimizing the total operating cost of central plant 10 over the prediction window. In other words, given a predicted load ℓ̂ k and utility rate information from load/rate prediction module 122, high level optimization module 130 may distribute the predicted load ℓ̂ k across subplants 12-22 to minimize cost.
  • In some instances, the optimal load distribution may include using TES subplants 20 and/or 22 to store thermal energy during a first time step for use during a later time step. Thermal energy storage may advantageously allow thermal energy to be produced and stored during a first time period when energy prices are relatively low and subsequently retrieved and used during a second time period when energy proves are relatively high. The high level optimization may be different from the low level optimization in that the high level optimization has a longer time constant due to the thermal energy storage provided by TES subplants 20-22. The high level optimization may be described by the following equation: θ HL * = arg min θ HL J HL θ HL
    Figure imgb0002
    where θ HL *
    Figure imgb0003
    contains the optimal high level decisions (e.g., the optimal load for each of subplants 12-22) for the entire prediction period and JHL is the high level cost function.
  • To find the optimal high level decisions θ HL * ,
    Figure imgb0004
    high level optimization module 132 may minimize the high level cost function JHL . The high level cost function JHL may be the sum of the economic costs of each utility consumed by each of subplants 12-22 for the duration of the prediction period. For example, the high level cost function JHL may be described using the following equation: J HL θ HL = k = 1 n h i = 1 n s j = 1 n u t s c jk u jik θ HL
    Figure imgb0005
    where nh is the number of time steps k in the prediction period, ns is the number of subplants, ts is the duration of a time step, cjk is the economic cost of utility j at a time step k of the prediction period, and ujik is the rate of use of utility j by subplant i at time step k. In some embodiments, the cost function JHL includes an additional demand charge term such as: w d c demand max n h u elec θ HL , u max , ele
    Figure imgb0006
    where wd is a weighting term, cdemand is the demand cost, and the max( ) term selects the peak electricity use during the applicable demand charge period.
  • In some embodiments, the high level optimization performed by high level optimization module 130 is the same or similar to the high level optimization process described in U.S. Patent Application No. xx/yyy,yyy (attorney docket no. 081445-0655) titled "High Level Central Plant Optimization" and filed on the same day as the present application. The entire disclosure of U.S. Patent Application No. xx/yyy,yyy is incorporated by reference herein.
  • In some embodiments, high level optimization module 130 provides the optimal load distribution for each time step to low level optimization module 132 at the beginning of the time step. The optimal load distributions for subsequent time steps may be updated by high level optimization module 130 and provided to low level optimization module 132 at the beginning of subsequent time steps.
  • Low level optimization module 132 may use the subplant loads determined by high level optimization module 130 to determine optimal low level decisions θ LL *
    Figure imgb0007
    (e.g. binary on/off decisions, flow setpoints, temperature setpoints, etc.) for equipment 60. The low level optimization process may be performed for each of subplants 12-22. Low level optimization module 132 may be responsible for determining which devices of each subplant to use and the setpoints for such devices that will achieve the subplant load setpoint while minimizing energy consumption. The low level optimization may be described using the following equation: θ LL * = arg min θ LL J LL θ LL
    Figure imgb0008
    where θ LL *
    Figure imgb0009
    contains the optimal low level decisions and JLL is the low level cost function.
  • To find the optimal low level decisions θ LL * ,
    Figure imgb0010
    low level optimization module 132 may minimize the low level cost function JLL . The low level cost function JLL may represent the total energy consumption for all of the devices of equipment 60 in the applicable subplant. The lower level cost function JLL may be described using the following equation: J LL θ LL = j = 1 N t s b j u j θ LL
    Figure imgb0011
    where N is the number of devices of equipment 60 in the subplant, ts is the duration of a time step, bj is a binary on/off decision (e.g., 0=off, 1=on), and uj is the energy used by device j as a function of the setpoint θ LL . Each device may have continuous variables which can be changed to determine the lowest possible energy consumption for the overall input conditions.
  • Low level optimization module 132 may minimize the low level cost function JLL subject to inequality constraints based on the capacities of equipment 60 and equality constraints based on energy and mass balances. In some embodiments, the optimal low level decisions θ LL *
    Figure imgb0012
    are constrained by switching constraints defining a short horizon for maintaining a device in an on or off state after a binary on/off switch. The switching constraints may prevent devices from being rapidly cycled on and off. In some embodiments, low level optimization module 132 performs the equipment level optimization without considering system dynamics. The optimization process may be slow enough to safely assume that the equipment control has reached its steady-state. Thus, low level optimization module 132 may determine the optimal low level decisions θ LL *
    Figure imgb0013
    at an instance of time rather than over a long horizon.
  • Low level optimization module 132 may determine optimum operating statuses (e.g., on or off) for a plurality of devices of equipment 60. Low level optimization module 132 may store code executable by processor 110 to execute operations as subsequently described in this application, including binary optimization operations and/or quadratic compensation operations. According to an exemplary embodiment, the on/off combinations may be determined using binary optimization and quadratic compensation. Binary optimization may minimize a cost function representing the power consumption of devices in the applicable subplant. In some embodiments, non-exhaustive (i.e., not all potential combinations of devices are considered) binary optimization is used. Quadratic compensation may be used in considering devices whose power consumption is quadratic (and not linear). Low level optimization module 132 may also determine optimum operating setpoints for equipment using nonlinear optimization. Nonlinear optimization may identify operating setpoints that further minimize the low level cost function JLL . Low level optimization module 132 is described in greater detail with reference to FIG. 3.
  • Still referring to FIG. 2, memory 112 is shown to include a subplant control module 138. Subplant control module 138 may store historical data regarding past operating statuses, past operating setpoints, and instructions for calculating and/or implementing control parameters for subplants 12-22. Subplant control module 138 may also receive, store, and/or transmit data regarding the conditions of individual devices of equipment 60, such as operating efficiency, equipment degradation, a date since last service, a lifespan parameter, a condition grade, or other device-specific data. Subplant control module 138 may receive data from subplants 12-22 and/or BAS 108 via communications interface 104. Subplant control module 138 may also receive and store on/off statuses and operating setpoints from low level optimization module 132.
  • Data and processing results from optimization module 128, subplant control module 138, or other modules of central plant controller 102 may be accessed by (or pushed to) monitoring and reporting applications 136. Monitoring and reporting applications 136 may be configured to generate real time "system health" dashboards that can be viewed and navigated by a user (e.g., a central plant engineer). For example, monitoring and reporting applications 136 may include a web-based monitoring application with several graphical user interface (GUI) elements (e.g., widgets, dashboard controls, windows, etc.) for displaying key performance indicators (KPI) or other information to users of a GUI. In addition, the GUI elements may summarize relative energy use and intensity across central plants in different buildings (real or modeled), different campuses, or the like. Other GUI elements or reports may be generated and shown based on available data that allow users to assess performance across one or more central plants from one screen. The user interface or report (or underlying data engine) may be configured to aggregate and categorize operating conditions by building, building type, equipment type, and the like. The GUI elements may include charts or histograms that allow the user to visually analyze the operating parameters and power consumption for the devices of a chilled water system.
  • Still referring to FIG. 2, central plant controller 102 may include one or more GUI servers, web services 114, or GUI engines 116 to support monitoring and reporting applications 136. In various embodiments, applications 136, web services 114, and GUI engine 116 may be provided as separate components outside of central plant controller 102 (e.g., as part of a smart building manager). Central plant controller 102 may be configured to maintain detailed historical databases (e.g., relational databases, XML databases, etc.) of relevant data and includes computer code modules that continuously, frequently, or infrequently query, aggregate, transform, search, or otherwise process the data maintained in the detailed databases. Central plant controller 102 may be configured to provide the results of any such processing to other databases, tables, XML files, or other data structures for further querying, calculation, or access by, for example, external monitoring and reporting applications.
  • Central plant controller 102 is shown to include configuration tools 118. Configuration tools 118 can allow a user to define (e.g., via graphical user interfaces, via prompt-driven "wizards," etc.) how central plant controller 102 should react to changing conditions in the central plant subsystems. In an exemplary embodiment, configuration tools 118 allow a user to build and store condition-response scenarios that can cross multiple central plant devices, multiple building systems, and multiple enterprise control applications (e.g., work order management system applications, entity resource planning applications, etc.). For example, configuration tools 118 can provide the user with the ability to combine data (e.g., from subsystems, from event histories) using a variety of conditional logic. In varying exemplary embodiments, the conditional logic can range from simple logical operators between conditions (e.g., AND, OR, XOR, etc.) to pseudo-code constructs or complex programming language functions (allowing for more complex interactions, conditional statements, loops, etc.). Configuration tools 118 can present user interfaces for building such conditional logic. The user interfaces may allow users to define policies and responses graphically. In some embodiments, the user interfaces may allow a user to select a pre-stored or pre-constructed policy and adapt it or enable it for use with their system.
  • Referring now to FIG. 3, a block diagram illustrating low level optimization module 132 in greater detail is shown, according to an exemplary embodiment. Low level optimization module 132 may store computer code (e.g., a set of executable computer code instructions stored in non-transitory computer-readable media) that is executable by processor 110. Low level optimization module 132 may be configured to generate and output operating status commands and setpoints for equipment 60 via, e.g., communications interface 104. The operating status commands (e.g., on/off) and setpoints output to the equipment 60 of a particular subplant may be estimated (e.g., by low level optimization module 132) to minimize the power consumption of the subplant.
  • Low level optimization module 132 is shown to include an operating status evaluator 154. Operating status evaluator 154 may examine a plurality of potential device on/off combinations to select a combination for use by central plant 10. For example, if chiller subplant 16 has four chillers (i.e., chiller 1, chiller 2, chiller 3, and chiller 4), a potential on/off combination may be [1, 0, 0, 1] indicating that chiller 1 is on, chiller 2 is off, chiller 3 is off, and chiller 4 is on. In some instances, the operating status of a particular device may be unspecified (e.g., corresponding to a node that has not yet been evaluated) and may be represented with a question mark. For example, the combination [1, 0, ?, ?] may indicate that chiller 1 is on, chiller 2 is off, and chillers 3-4 have an unspecified operating status. An unspecified operating status does not necessarily indicate that the operating status is unknown, but rather that the operating status for the corresponding device has not yet been evaluated and is not fixed by the combination. For example, the combination [1, 0, 0, ?] fixes the operating status of chiller 1, chiller 2, and chiller 3, but indicates that it is possible for chiller 4 to be either on or off and still satisfy the combination. In an exemplary embodiment, operating status evaluator 154 uses non-exhaustive binary optimization and quadratic compensation to determine which combination of on/off states to select for use. Modules 156 and 158 (described in greater detail below) provide instructions for implementing the non-exhaustive binary optimization and quadratic compensation, respectively.
  • Low level optimization module 132 is shown to include possible solutions database 168, a feasible solution database 164, and discard database 166. Possible solutions database 168 may contain on/off combinations that are estimated to be capable of satisfying the thermal energy load and the optimization constraints for the subplant. A combination may be stored in possible solutions database if the combination can potentially satisfy all of the applicable constraints (e.g., subplant load constraints, device capacity constraints, etc.), considering any unspecified operating statuses as wildcards. For example, if the combination [1, 1,0, 1] satisfies the constraints but the combination [1, 1, 0, 0] does not, the combination [1, 1, 0, ?] would satisfy the constraints because the unspecified operating status can be either on (1) or off (0). Possible solutions database 168 stores possible combinations (i.e., combinations that satisfy plant load requirements and system constraints) that may or may not result in the lowest power consumption.
  • Discard database 166 may contain combinations currently known or estimated to be unable to satisfy subplant load and/or system constraint requirements. Discard database 166 may store infeasible combinations of devices (i.e., combinations that cannot possibly satisfy plant load requirements and/or system constraints) regardless of the operating statuses of any devices with an unspecified operating status. For example, if both of the combinations [1, 1,0, 1] and [1, 1, 0, 0] fail to satisfy the constraints, the combination [1, 1,0, ?] would also fail to satisfy the constraints because no value of the unspecified operating status would cause the combination to satisfy the constraints.
  • Feasible solutions database 164 may contain potential combinations that are capable of satisfying the subplant load and system constraint requirements, and additionally do so with a minimum energy consumption. In some embodiments, feasible solutions database 164 stores the optimal combination of on/off statuses (i.e., the combination that results in the minimum energy consumption). In some embodiments, feasible solutions database 164 stores combinations that satisfy all applicable constraints, regardless of the value of any unspecified operating status. For example, if both of the combinations [1, 1, 0, 1] and [1, 1, 0, 0] satisfy the constraints, the combination [1, 1, 0, ?] may be stored as a feasible combination because any value of the unspecified operating status would cause the combination to satisfy the constraints. Databases 164, 166, and 168 may store the potential combinations in any suitable data structure or data structures, including linked lists, trees, arrays, relational database structures, object-based structures, or other data structures.
  • Operating status evaluator 154 may receive possible combinations of on/off statuses from possible solutions database 168. Operating status evaluator 154 may evaluate the combinations in possible solutions database 168 in view of the currently applicable constraints (e.g., subplant load, device capacities, etc.) and store various combinations in possible solutions database 168, feasible solutions database 164, and/or discard database 166 based on a result of the evaluation. In some embodiments, operating status evaluator 154 periodically evaluates new combinations (e.g., those which have not recently been evaluated as a potentially optimal solution) from feasible solutions database 164 and/or discard database 166 for further evaluation. Moreover, as new devices are brought online, such new devices and new combinations including the new devices can be added to feasible solutions database 164 for consideration by operating status evaluator 154.
  • Operating status evaluator 154 may receive constraints on the low level optimization process from constraints evaluator 150. Constraints may include, for example, maximum device capacities, energy or mass balance constraints, minimum device capacities, etc. The constraints may establish minimum and/or maximum parameters for equipment 60. In some embodiments, the constraints are automatically generated quantities based on, e.g., historical data. In other embodiments, an operator of the central plant system may set and/or modify the constraints. The constraints include, for example, that each device of the subplant system operate with a minimum load (such as 30%). This requirement may advantageously ensure that power is being consumed efficiently (i.e., the work done by the device is sufficient to justify the power required to operate the device). The constraints may also include that the total power of the chiller plant be less than a maximum. This requirement may advantageously prevent the subplant from becoming overloaded.
  • Operating status evaluator 154 may use the constraints to identify feasible on/off configurations. Operating status evaluator 154 may provide a potential on/off combination to constraint evaluator 150, which may be configured to check the potential combination relative to the current constraints. If a potential combination cannot meet the current constraints, operating status evaluator 154 may move the potential combination to discard database 166 and/or remove the potential combination from feasible solutions database 164.
  • Still referring to FIG. 3, operating status evaluator 154 is shown to include a non-exhaustive binary optimization module 156 and a quadratic compensation module 158. Binary optimization module 156 may include computer code instructions for optimizing (e.g., minimizing) the low level cost function JLL representing the energy consumption of a subplant. According to an exemplary embodiment, binary optimization module 156 uses a branch and bound method to perform the binary optimization. The binary optimization process is described in greater detail in the discussion of FIG. 7. In some embodiments, binary optimization module 156 executes the branch and bound method such that not all of the possible combinations of equipment 50 are considered in any given situation. This may advantageously reduce computation time required by operating status evaluator 154.
  • Quadratic compensation module 158 may include computer code instructions configured to compensate for the nonlinear nature of the system. For example, quadratic compensation module 158 may account for the power consumption of some devices of equipment 60 having a quadratic form (i.e., not a linear form). Quadratic compensation module 158 may be selectively utilized when the power consumption of the devices being considered by operating status evaluator 154 is quadratic.
  • Quadratic compensation module 158 may advantageously account for the fact that the binary optimization performed by non-exhaustive binary optimization module 156 is intended for a linear system, but the power consumption of a particular device is a quadratic function. For example, in a purely linear system, binary optimization will typically return the fewest devices required to meet plant load. If turning two devices on will meet the plant load, then other combinations may not be considered, even if the power consumption of other combinations is lower. In an exemplary embodiment, however, alternative embodiments are identified and then compared using the assistance of quadratic compensation module 158 (or another nonlinear compensation).
  • Because chiller power is not linear, quadratic compensation may be conducted on every device having a nonlinear or quadratic power curve, advantageously checking for whether the lowest power combination of devices is achieved by adding another device. For example, binary optimization module 156 may identify a combination of devices that meets plant load (e.g., two devices on). The binary search may continue by looking ahead to a combination with the next device activated rather than deactivated. For example, even if two devices turned on would meet a plant load, the binary search may use each device's quadratic power curve to consider the expected power change with three devices turned on. The power consumption per device may decrease as additional devices are turned on because one or more of the devices may operate more efficiently at a lower capacity than a higher capacity. The net power consumption may therefore decrease as a result. If three devices on results in lower power, then it is a more optimal solution than two devices on. On the other hand, despite efficiencies gained in the original "on" devices by turning another device on, the overhead energy consumption added by turning on the additional device may result in a determination that the additional device should not be turned on.
  • Still referring to FIG. 3, low level optimization module 132 is shown to include a setpoint evaluator 160. Setpoint evaluator 160 may be configured to examine one or more combinations of active (e.g., "on") devices to determine optimal operating setpoints. The optimal operating setpoints may be estimated to minimize power consumption while achieving the subplant load setpoint and satisfying other constraints on the low level optimization process. According to an exemplary embodiment, setpoint evaluator 160 estimates the optimal temperature setpoints (e.g., hot water temperature setpoint, condenser water temperature setpoint, chilled water temperature setpoint, etc.), flow rate setpoints (e.g., flow rates through individual heating elements 30, chillers 42, heat recovery chillers 36, cooling towers 48, etc.), and/or pressure setpoints (e.g., hot water differential pressure, chilled water differential pressure, etc.) for a given combination of active devices of equipment 60. In other embodiments, more, fewer, or different setpoints may be determined.
  • Setpoint evaluator 160 may receive one or more potential on/off combinations from operating status evaluator 154 and/or possible solutions database 168. Setpoint evaluator 160 may move potential combinations to discard database 166 when the combinations are determined to be infeasible or when a potential combination is repeatedly identified as not being efficient relative to other solutions. In certain situations, setpoint evaluator 160 may also move potential combinations to feasible solutions database 164 (e.g., when a combination is estimated to minimize power consumption compared to other combinations).
  • Still referring to FIG. 3, setpoint evaluator 160 is shown to include a nonlinear optimization module 162. Nonlinear optimization module 162 may include computer code for optimizing (e.g., minimizing) the low level cost function JLL for a set of active central plant devices (e.g., devices that are "on"). The operating status (e.g., on/off) of the devices may have been previously determined using operating status evaluator 154. According to various embodiments, nonlinear optimization module 162 performs a nonlinear optimization using direct or indirect search methods. For example, nonlinear optimization module 162 may use a Nelder-Mead or downhill simplex method, Generalized Reduced Gradient (GRG), Sequential Quadratic Programming (SQP), Steepest Descent (Cauchy Method), Conjugate Gradient (Fletcher-Reeves Method), or other nonlinear optimization methods.
  • Low level optimization module 132 is shown to include GUI services 152. GUI services 152 may be configured to generate graphical user interfaces for central plant controller 102 or another server to provide to a user output device (e.g., a display, a mobile phone, a client computer, etc.). The graphical user interfaces may present or explain the active combination of devices, system efficiencies, system setpoints, system constraints, or other system information. GUI services 152 may facilitate a user's (e.g., a central plant engineer's) ability to track energy usage and operating statuses of the central plant devices via, e.g., a web-based monitoring application. GUI services 152 may additionally allow a user to manually set and update system constraints, available devices, certain thresholds (e.g., for moving a combination to a discard set) optimum off/on operating statuses, and optimum operating setpoints.
  • Referring now to FIG. 4, a block diagram illustrating central plant controller 102 and subplants 12-22 is shown, according to an exemplary embodiment. Central plant controller 102 is configured to transmit determined on/off statuses and operating setpoints to subplants 12-22 and/or the equipment 60 within each subplant. Communication between central plant controller 102 and equipment 60 may be direct (as shown in FIG. 4) or via one or more intermediaries (e.g., BAS 108, subplant level controllers, etc.). Central plant controller 102 and subplants 12-22 may transmit and receive data automatically, without a user's intervention. In other embodiments, a user may additionally provide manual inputs or approvals to central plant controller 102 and/or subplants 12-22.
  • The number of active devices of equipment 60 within each subplant may depend on the load on the subplant. In some embodiments, equipment 60 may be coupled to a local controller that receives and implements the operating statuses and setpoints from central plant controller 102. The local controller may be configured to transmit operating conditions about equipment 60 back to central plant controller 102. For example, a local controller for a particular device may report or confirm current operating status (on/off), current operating load, device energy consumption, device on/run time, device operating efficiency, failure status, or other information back to central plant controller 102 for processing or storage. The performance of equipment 60 may be evaluated using a coefficient of performance (COP), a power consumption per plant load (KW/ton) value, or another value indicative of power efficiency or consumption.
  • Referring now to FIG. 5, a flowchart of a process 500 for low level central plant optimization is shown, according to an exemplary embodiment. Process 500 may be performed by central plant controller 102, as described with reference to FIGS. 2-4. In some embodiments, process 500 is performed by processing circuit 106 of central plant controller 102 according to the instructions stored in low level optimizing module 132. Process 500 may be performed for each subplant of central plant 102 to determine feasible on/off configurations for the devices of the subplant and to identify which of the feasible on/off configurations is optimal (i.e., results in the lowest energy consumption). The optimal configuration may be provided to the devices of the subplant as an operating command.
  • Process 500 is shown to include identifying a thermal energy load setpoint for a subplant of a central plant (step 502). In some embodiments, step 502 includes receiving the thermal energy load setpoint from a high level optimization module or process. For example, high level optimization module 130 may be configured to perform a high level optimization process that determines a thermal energy load setpoint for each of subplants 12-22. The thermal energy load setpoints may be based on a predicted thermal energy load for a building or campus and/or utility rates defining the cost of one or more resources consumed by subplants 12-22 to serve the thermal energy loads. High level optimization module 130 may determine the optimal distribution of thermal energy loads across subplants 12-22, as described with reference to FIG. 2. In some embodiments, the optimal distribution of thermal energy loads results in the minimum cost to satisfy the predicted thermal energy requirements for the building or campus over a time horizon. In various embodiments, the thermal energy load setpoint identified in step 502 may be received from high level optimization module 132, retrieved from memory, or otherwise obtained from any other data source (e.g., specified by a user, received from an external system or process via a communications network, etc.).
  • Still referring to FIG. 5, process 500 is shown to include determining one or more feasible on/off configurations for devices of the subplant using non-exhaustive binary optimization (step 504). Step 504 may utilize binary optimization to determine one or more feasible combinations of devices that will satisfy the subplant load setpoint for an actual or expected set of conditions (e.g., load conditions, weather conditions, etc.). Feasible combinations may also satisfy any constraints on the system (e.g., maximum total power, minimum power per device, etc.).
  • According to an exemplary embodiment, the binary optimization performed in step 504 is accomplished using a branch and bound method. The branch and bound method recursively identifies solutions that satisfy the optimization constraints on the cost function JLL (i.e., feasible solutions). For example, the cost function JLL may be subject to load constraints based on the thermal energy load setpoint received in step 502 (i.e., ensuring that the energy load setpoint is met), capacity constraints defining a minimum and/or maximum capacity for each device represented in the cost function, timeout constraints preventing a device from being activated or deactivated within a threshold period after a change in operating status, or any other optimization constraints that may be applicable to the cost function JLL . The solutions (or "branches") are combinations of on/off statuses for the subplant devices.
  • In some embodiments, step 504 includes determining upper and lower bounds for the cost function JLL given the identified solutions. The optimization seeks to minimize the cost function, and branches that do not do so are discarded or pruned. A first solution with a lower bound for the cost function that is greater than the upper bound of second solution's cost function may be eliminated as infeasible. This is because the first solution, at its best (i.e., lowest power consumption), is still higher than the worst or highest power consumption of the second solution. Other solutions are retained and may be compared to one another to determine the optimal solution.
  • According to an exemplary embodiment, binary optimization is non-exhaustive. That is, non-exhaustive optimization does not search every possible combination of devices to find the optimal solution. This advantageously increase computational efficiency. For example, with eight chillers, there are a possible 28 or 256 combinations. In some embodiments, the non-exhaustive optimization finds the optimal solution in half or fewer searches. The binary optimization process is described in greater detail with reference to FIG. 7.
  • The on/off configurations determined in step 504 may be used as variables in a cost function representing the total energy consumption of the subplant. The cost function JLL describes the power consumption a particular subplant as a function of the binary on/off decisions and the device setpoints. The cost function may be of the form: J LL θ LL = j = 1 N t s b j u j θ LL
    Figure imgb0014
    where N is the number of devices in the subplant, ts is the duration of a time step, bj is a binary on/off decision (e.g., 0=off, 1=on), and uj is the energy used by device j as a function of the device setpoints θLL . Each device may have continuous variables which can be changed to determine the lowest possible energy consumption for the overall input conditions.
  • In some instances, the subplant devices are chillers (e.g., for chiller subplant 16). Chiller power is typically a quadratic function of load and lift, and it is time-variant. As additional chillers are energized, the load per chiller decreases, therefore changing the energy consumption uj for each chiller in the cost function. According to an exemplary embodiment, the binary optimization may be configured to update with energy consumption values. In other instances, the subplant devices may include heating elements, heat exchangers, pumps, valves, cooling towers, or other equipment (e.g., equipment 60) that facilitate the functions of the subplant. The energy consumption values uj for each device may be different and may vary according to different equipment models for different types of devices (e.g., linear, quadratic, time-variant or invariant, etc.). Various components of low level optimization module 132 (FIG. 3) may be used in step 504 based on the different devices represented in the cost function. For example, quadratic compensation module 158 may be used when chillers are part of the cost function to account for chiller power's quadratic nature.
  • Still referring to FIG. 5, process 500 is shown to include determining optimum operating setpoints for each feasible on/off configuration using nonlinear optimization (step 506). Step 506 may utilize nonlinear optimization to minimize the cost function JLL . According to various embodiments, direct and/or indirect search methods (e.g., downhill simplex (Nelder-Mead) method, GRG, SQP, Cauchy Method, Feltcher-Reeves Method, etc.), are used to perform nonlinear optimization. The setpoints determined in step 506 may define a capacity for each active subplant device that is capable of being operated at multiple different capacities. The setpoints may affect the power consumption for each feasible combination. Nonlinear optimization determines one or more setpoints that will further minimize power consumption.
  • Process 500 is shown to include estimating an energy consumption resulting from each feasible configuration at the optimum operating setpoints (step 508) and identifying which of the feasible on/off configurations has a lowest energy consumption at the optimum operating setpoints (step 510). In some embodiments, more than one combination may be feasible. For example, several different on/off configurations may meet the plant load requirements and satisfy the constraints on the system. However, each feasible combination may have a different resultant energy consumption.
  • In step 508, each feasible on/off configuration identified in step 504 is evaluated at the optimum operating setpoints identified in step 506 to determine an energy consumption that results from each feasible combination. The optimum operating setpoints may be different for each feasible configuration. For example, the optimum operating capacity for a chiller when three chillers are active may be lower than the optimum operating capacity of the chiller when only two chillers are active to serve the same thermal energy load. In step 510, the on/off configuration with the lowest energy consumption at the optimal setpoints is identified. The configuration and setpoints identified in step 510 may represent the optimal (i.e., lowest energy consumption) solution that satisfies all of the constraints on the cost function.
  • Still referring to FIG. 5, process 500 is shown to include issuing operating commands to the devices of the subplant in accordance with the identified on/off configuration (step 512). Step 510 may include sending operating commands to a building automation system (e.g., BAS 108) configured to control the subplant devices, a subplant level controller, or an equipment level controller for the subplant devices. The operating commands may specify which of the subplant devices are active, (i.e., "on"), which of the subplant devices are inactive (i.e., "off"), and, in some embodiments, setpoints for each active subplant device. The on/off statuses and setpoints provided in step 512 may override any previous control decisions indicating which devices are active and/or setpoints for each active device.
  • Referring now to FIG. 6, a flowchart of a process 600 for low level central plant optimization is shown, according to an exemplary embodiment. Process 600 may be performed by central plant controller 102, as described with reference to FIGS. 2-4, and may be a specific implementation of process 500. In some embodiments, process 600 is performed by processing circuit 106 of central plant controller 102 according to the instructions stored in low level optimizing module 132. Process 600 may be used to determine an optimal operating point for a central plant and to issue operating commands to various devices of the central plant at the optimum operating point.
  • Process 600 is shown to include receiving, from a high level optimization, subplant thermal energy load setpoints for a plurality of subplants of a central plant (step 602). In some embodiments, step 602 includes receiving the thermal energy load setpoints from a high level optimization module or process. For example, high level optimization module 130 may be configured to perform a high level optimization process that determines a thermal energy load setpoint for each of subplants 12-22. The thermal energy load setpoints may be based on a predicted thermal energy load for a building or campus and/or utility rates defining the cost of one or more resources consumed by subplants 12-22. High level optimization module 130 may determine the optimal distribution of thermal energy loads across subplants 12-22, as described with reference to FIG. 2. In some embodiments, the optimal distribution of thermal energy loads across subplants 12-22 results in the minimum cost to satisfy the predicted thermal energy requirements for the building or campus over a time horizon.
  • Still referring to FIG. 6, process 600 is shown to include identifying a previous operating point for the central plant (step 604). The previous operating point may include on/off statuses and/or operating setpoints for various devices of the central plant at a previous time step. In some embodiments, step 604 includes retrieving the previous operating point from subplant control module 138. Subplant control module 138 may store historical data regarding past operating statuses, past operating setpoints, and instructions for calculating and/or implementing control parameters for subplants 12-22. Subplant control module 138 may also receive, store, and/or transmit data regarding the conditions of individual devices of the central plant, such as operating efficiency, equipment degradation, a date since last service, a lifespan parameter, a condition grade, or other device-specific data. Subplant control module 138 may also receive and store on/off statuses and operating setpoints from low level optimization module 132. Step 604 may include retrieving such data from subplant control module 138 and using the retrieved data to identify the previous operating point.
  • Process 600 is shown to include using non-exhaustive binary optimization to select a feasible on/off configuration for one or more chillers and one or more cooling towers of the central plant (step 606), a feasible on/off configuration for one or more heat recovery chillers and one or more heating elements of the central plant (step 608), and a feasible on/off configuration for one or more pumps of the central plant (step 610). Steps 606-610 may be the same or similar to step 504, as described with reference to FIG. 5. For example, steps 606-610 may utilize binary optimization to determine one or more feasible combinations of devices within a particular subplant of the central plant that satisfy the thermal energy load setpoint for the subplant for an actual or expected set of conditions (e.g., load conditions, weather conditions, etc.). Feasible combinations may also satisfy any constraints on the system (e.g., maximum total power, minimum power per device, etc.).
    In some embodiments, steps 606-610 include selecting a feasible on/off configuration for the devices of each subplant that minimizes the amount of energy consumption by the subplant. The energy consumption of a subplant may be represented with the cost function: J LL θ LL = j = 1 N t s b j u j θ LL
    Figure imgb0015
  • where N is the number of devices in the subplant, ts is the duration of a time step, bj is a binary on/off decision (e.g., 0=off, 1=on), and uj is the energy used by device j as a function of the device setpoints θLL . The selected feasible combination may minimize the cost function JLL subject to the subplant load constraints and any other constraints on the optimization.
  • Still referring to FIG. 6, process 600 is shown to include determining an optimum operating point for the central plant based on the selected on/off configurations using nonlinear optimization (step 612). Step 612 may be the same or similar to step 506, as described with reference to FIG. 5. For example, step 612 may utilize nonlinear optimization to determine a setpoint vector θLL that minimizes the cost function JLL subject to the optimization constraints. According to various embodiments, direct and/or indirect search methods (e.g., downhill simplex (Nelder-Mead) method, GRG, SQP, Cauchy Method, Feltcher-Reeves Method, etc.), are used to perform nonlinear optimization.
  • The setpoints determined in step 612 may define a capacity for each active device that is capable of operating at multiple different capacities and may affect the power consumption for each feasible combination. The nonlinear optimization performed in step 612 determines one or more setpoints that minimize the power consumption for each feasible combination. In some embodiments, the combination of the optimum on/off configurations and the optimum device setpoints define the optimum operating point.
  • Process 600 is shown to include determining whether the percent change in the optimum operating point is less than a threshold (step 614). Step 614 may include comparing the optimum operating point determined in step 612 with the previous operating point identified in step 604. The comparison may include comparing on/off states and/or setpoints for various devices of the central plant. In various embodiments, the comparison may be performed for each device individually or for a grouping of devices (e.g., within each subplant, within each category identified separately in steps 606-610, within each type of device, etc.). For example, the operating point may be device specific, subplant specific, device type specific, or a general (e.g., average) operating point for all of the devices of the central plant.
  • If the percent change between the previous operating point identified in step 604 and the optimum operating point determined in step 612 is less than a threshold value (i.e., the result of step 614 is "yes"), it may be determined that the optimization process is converging on an optimal value. If the percent change determined in step 614 is less than the threshold value, process 600 may proceed to issuing operating commands at the optimum operating point (step 616). Step 616 may include sending operating commands to a building automation system (e.g., BAS 108) configured to control the subplant devices, a subplant level controller, or an equipment level controller for the subplant devices. The operating commands may specify which of the subplant devices are active, (i.e., "on"), which of the subplant devices are inactive (i.e., "off'), and, in some embodiments, setpoints for each active subplant device. The on/off statuses and setpoints provided in step 616 may override any previous control decisions indicating which devices are active and/or setpoints for each active device.
  • If the percent change between the previous operating point identified in step 604 and the optimum operating point determined in step 612 is not less than the threshold value (i.e., the result of step 614 is "no"), it may be determined that the optimization process is not converging on an optimal value or that the convergence has not stabilized sufficiency. If the percent change determined in step 614 is not less than the threshold value, process 600 may return to step 606. Steps 606-614 may be repeated until the optimum operating point converges on a particular value (i.e., the percent change determined in step 614 is less than the threshold).
  • Referring now to FIG. 7, a flowchart of a non-exhaustive binary optimization process 700 is shown, according to an exemplary embodiment. Process 700 may be performed by central plant controller 102, as described with reference to FIGS. 2-4, and may be used to determine one or more feasible on/off configurations of devices for a particular subplant. In some embodiments, process 700 may be used to accomplish step 504 of process 500 and/or and steps 606-610 of process 600. Process 700 may be performed by processing circuit 106 of central plant controller 102 according to the instructions stored in non-exhaustive binary optimization module 156.
  • Process 700 is shown to include initializing a database of possible solutions and a database of feasible solutions (step 702). The database of possible solutions may contain on/off combinations that are estimated to be capable of satisfying the thermal energy load and the optimization constraints for the subplant. Combinations may be characterized as "branches," as graphically represented as in FIGS. 8A-8D. A branch corresponds to a particular combination (or some portion thereof) of on/off statuses for one or more devices. Each on/off status may be described as a "bud." For example, in branch 852 of FIG. 8A, the "on" status of chiller 1 and the "on" status of chiller 2 are each individual buds.
  • Combinations of on/off statuses may additionally be described by strings, vectors, arrays, or other sets of the binary variable bi . For example, branch 858 of FIG. 8D may be described as [1, 1, 0, 1] (i.e., chiller 1 on, chiller 2 on, chiller 3 off, and chiller 4 on). In general, the description of a branch (i.e., a combination of buds) is of the form [a,...,a, B, c,...,c]. "B" represents the bud or device that is presently being considered (i.e., to determine whether the device should be on or off). B may be characterized as the "working bud." a,...,a represents the combination of devices that was previously considered (i.e., devices that are turned on/off before the device corresponding to the working bud). Each device in the set a,...,a may have a specified on/off status (e.g., a=0 or a=1). c,...,c represents the combination of devices that will be considered after the working bud device has been determined to be on or off. Each device in the set c,...,c may have an unspecified on/off status (e.g., c=?).
  • The general description [a,...,a, B, c,...,c] may represent any number and/or type of devices. For example, a,...,a can include zero or more devices, B can include one or more devices, and c,...,c can include zero or more devices. According to an exemplary embodiment, the a,...,a devices have lower power consumption than the working bud device and, thus, the a,...,a devices are considered before the working bud device. Similarly, the working bud device may have a lower power consumption than the c,...,c devices, which are considered after the working bud device. In other words, combinations of subplant devices may be considered in order of increasing power consumption.
  • A combination may be stored in possible solutions database if the combination can potentially satisfy all of the applicable constraints (e.g., subplant load constraints, device capacity constraints, etc.), considering any unspecified operating statuses as wildcards. For example, if the combination [1, 1, 0, 1] satisfies the constraints but the combination [1, 1, 0, 0] does not, the combination [1, 1,0, ?] would satisfy the constraints because the unspecified operating status can be either on (1) or off(0).
  • According to an exemplary embodiment, determining one or more optimal on/off combinations is an iterative process. For example, a portion of a combination of devices may be considered to determine whether that combination has any chance of satisfying the load requirements and/or system constraints. If there is some possibility that the combination could do so, then the combination may be returned to the possible solutions database. The database of feasible solutions may contain on/off combinations that have been determined to satisfy the applicable constraints. A combination may be moved from the possible solutions database to the feasible solutions database if it is determined that the combination satisfies the applicable constraints.
  • Still referring to FIG. 7, process 700 is shown to include identifying applicable constraints (step 704). The applicable constraints may define one or more requirements that must be satisfied for a combination of on/off statuses to be feasible. In other words, feasible combinations may be those that satisfy the applicable constraints. Step 704 may include determining the subplant load setpoint to be met, the number and type of subplant devices, the maximum and minimum operating capacity of the devices, the operating condition and estimated power consumption of each device, etc. Applicable constraints may be received at low level optimization module 132 from high level optimization module 130 (e.g., subplant load constraints), equipment models 120 (e.g., equipment capacity constraints), BAS 108 (e.g., user-defined constraints, timeout constraints, etc.), or any other data source.
  • Process 700 is shown to include retrieving a branch from the database of possible solutions (step 706) and determining whether the branch has an unspecified bud (step 708). Each branch corresponds to a particular combination (or some portion thereof) of on/off statuses for one or more devices. In some embodiments, the possible solutions database stores a plurality of branches and an estimated power consumption associated with each branch. The branches in the possible solutions database may be sorted (e.g., in ascending order) by the power consumption associated with each branch. In some embodiments, step 706 includes retrieving the branch with the lowest associated power consumption. If the branch has one or more unspecified buds, the associated power consumption may be an estimated power consumption for only the devices represented by specified buds. In some embodiments, step 708 includes identifying the first unspecified bud as the working bud.
  • If the branch has an unspecified bud (i.e., the result of step 708 is "yes"), process 700 may proceed to generating a first expanded branch (B1) by specifying a first status for the bud and generating a second expanded branch (B2) by specifying a second status for the bud (step 710). The status of the unspecified bud may be specified as "on" or "off," which may be represented by a variety of binary indicators (e.g., 0=off, 1=on, etc.). In some embodiments, the first expanded branch specifies the status of the bud as "on" and the second expanded branch specifies the status of the bud as "off." In other embodiments, the first expanded branch specifies the status of the bud as "off' and the second expanded branch specifies the status of the bud as "on." The first expanded branch B1 may be retained for further evaluation in steps 714-724 and the second expanded branch B2 may be returned to the database of possible solutions (step 712). If the branch retrieved in step 706 does not have an unspecified bud (i.e., the result of step 708 is "no"), process 700 may identify the branch as B1 and proceed to step 714.
  • Still referring to FIG. 7, process 700 is shown to include determining whether the branch B1 satisfies the applicable constraints (step 714). The branch B1 evaluated in step 714 may be the first expanded branch generated in step 710 (e.g., if steps 710-712 are performed) or the branch retrieved from the possible solutions database in step 706 (e.g., if steps 710-712 are not performed). Step 714 may include determining whether the combination of active devices specified by the branch satisfies the constraints identified in step 704. If the branch B1 includes one or more unspecified buds, the determination in step 714 may assume that any unspecified buds have a status of "off." If the branch B1 satisfies the applicable constraints (i.e., the result of step 714 is "yes"), process 700 may proceed to add the branch B1 to the database of feasible solutions (step 716) and proceed to step 724. Adding the branch B1 to the database of feasible solutions may indicate that the devices specified as "on" in the branch B1 can be operated to satisfy the applicable constraints without requiring any additional devices.
  • If the branch B1 does not satisfy the applicable constraints (i.e., the result of step 714 is "no"), process 700 may proceed determining whether the branch B1 can possibly satisfy the applicable constraints (step 718). Step 718 may include determining whether the branch is capable of satisfying the applicable constraints if one or more additional devices are used. The additional devices may be selected from the set of devices with an unspecified status in the branch B1. For example, if the branch B1 includes one or more unspecified buds, step 718 may include determining whether the branch could satisfy the applicable constraints if one or more of the unspecified buds are subsequently specified as "on."
  • If the branch B1 cannot possibly satisfy the applicable constraints (i.e., the result of step 718 is "no"), process 700 may proceed to discard the branch B1 (step 720) and proceed to step 724. Discarding the branch may include adding the branch to a discard database (e.g., discard database 166) and/or removing the branch from further consideration as a potential solution. If the branch does not have any unspecified buds, process 700 may automatically advance from step 718 to step 720 since adding further devices is not possible. If the branch B1 can possibly satisfy the applicable constraints (i.e., the result of step 718 is "yes"), process 700 may proceed to add the branch B1 to the database of possible solutions (step 722) and proceed to step 724. Adding the branch B1 to the database of possible solutions may allow the branch to be further evaluated in a subsequent iteration of process 700.
  • Still referring to FIG. 7, process 700 is shown to include determining whether the database of possible solutions is empty (step 724). The database of possible solutions may be empty once all of the branches in the database of possible solutions are either moved to the database of feasible solutions or discarded as an infeasible solution. Not every potential combination may be considered in a non-exhaustive optimization. For example, entire branches may be discarded without evaluating every individual combination based on the branch. Advantageously, this allows the binary optimization to identify an optimal solution without processing or evaluating every possible combination. If any branches remain in the database of possible solutions, process 700 may return to step 706 and repeat steps 706-724. Otherwise, process 700 may end.
  • Referring now to FIGS. 8A-8D, graphical representations of combinations of the devices are shown, according to exemplary embodiments. The combinations are depicted in a tree structures, with branches representing combinations of devices and buds representing the on/off status of individual devices. FIGS. 8A-8D represent four chillers. According to an exemplary embodiment, chiller 1 results in the least power consumption. The remaining chillers result in incrementally greater power consumption, with chiller 4 resulting in the comparatively largest power consumption. FIGS. 8A-8D are shown to include branches starting with the chiller 1 on. The tree structures (i.e., database, array, data object, etc.) may be created, maintained, updated, processed, and/or stored in possible solutions database 168, feasible solutions database 164, and/or discard database 166. The computations reflected in the tree structures (e.g., on/off statuses) of FIGS. 8A-8D may be completed by central plant controller 102.
  • The tree structures of FIGS. 8A-8D may be output to at least one of a memory device, a user device, or another device on the building management system. The output may be a graphical user interface (e.g., on a client device, on a mobile device, generated by a web server, etc.). For example, the tree structure of FIG. 8A may be output to monitoring and reporting applications 136 via GUI engine 116 (FIG. 12). Depending on the embodiment, the tree structure may include a portion or all of the branches and buds of data shown in FIGS. 8A-8D. In some embodiments, a user may be able, via a user interface, to choose which branches and buds should be visible. A user may also be able to add branches and buds of data not shown in FIGS 8A-D including, e.g., branches with chiller 1 off. In other embodiments, the processes described herein will operate without displaying a graphical representation of a combination. While the tree structures of FIGS. 8A-8D are shown as two-dimensional figures, another information structure suitable for representing and storing the data of the chart may be used. For example, a relational database having one or more related tables may be used.
  • Referring to FIG. 8A, a graphical representation of a combination of devices is shown, according to an exemplary embodiment. Bud 802 may represent the working bud of the live branch (i.e., the device being considered in a possible or feasible combination of devices). Combination 852 includes chiller 1 on and chiller 2 on. The on/off status of additional devices (e.g., chiller 3 and chiller 4) may be added to combination 852 as part of determining alternate combinations of devices that will also satisfy plant load.
  • Referring to FIG. 8B, a graphical representation of another combination of devices is shown, according to an exemplary embodiment. Bud 802 may be the working bud. Combination 854 includes chiller 1 on, chiller 2 off, and chiller 3 on. The on/off status of additional devices (e.g., chiller 4) may be added to combination 854 as part of determining alternate combinations of devices that will satisfy plant load. In another embodiment, bud 806 may be the working bud.
  • Referring to FIG. 8C, a graphical representation of another combination of devices is shown, according to an exemplary embodiment. Bud 804 may represent the working bud of the live branch. Combination 856 includes chiller 1 on, chiller 2 on, and chiller 3 on. The "on" status of chiller 1 is representative of previous devices in the branch. The on/off status of additional devices (e.g., chiller 4) may be added to combination 856 as part of determining alternate combinations of devices that will also satisfy plant load.
  • Referring to FIG. 8D, a graphical representation of yet another combination of devices is shown, according to an exemplary embodiment. Bud 804 may be the working bud. Combination 858 includes chiller 1 on, chiller 2 on, chiller 3 off, and chiller 4 on. Combination 858 may represent the working bud device on, the next device off, and the following device on. The "on" status of chiller 1 is representative of previous devices in the branch. In an embodiment with a chiller plant of four devices, bud 808 may represent the last bud.
  • The construction and arrangement of the systems and methods as shown in the various exemplary embodiments are illustrative only. Although only a few embodiments have been described in detail in this disclosure, many modifications are possible (e.g., variations in sizes, dimensions, structures, shapes and proportions of the various elements, values of parameters, mounting arrangements, use of materials, orientations, etc.). For example, the position of elements may be reversed or otherwise varied and the nature or number of discrete elements or positions may be altered or varied. Accordingly, all such modifications are intended to be included within the scope of the present disclosure. The order or sequence of any process or method steps may be varied or re-sequenced according to alternative embodiments. Other substitutions, modifications, changes, and omissions may be made in the design, operating conditions and arrangement of the exemplary embodiments without departing from the scope of the present disclosure.
  • The present disclosure contemplates methods, systems and program products on memory or other machine-readable media for accomplishing various operations. The embodiments of the present disclosure may be implemented using existing computer processors, or by a special purpose computer processor for an appropriate system, incorporated for this or another purpose, or by a hardwired system. Embodiments within the scope of the present disclosure include program products or memory comprising machine-readable media for carrying or having machine-executable instructions or data structures stored thereon. Such machine-readable media can be any available media that can be accessed by a general purpose or special purpose computer or other machine with a processor. By way of example, such machine-readable media can comprise RAM, ROM, EPROM, EEPROM, CD-ROM or other optical disk storage, magnetic disk storage or other magnetic storage devices, or any other medium which can be used to carry or store desired program code in the form of machine-executable instructions or data structures and which can be accessed by a general purpose or special purpose computer or other machine with a processor. Combinations of the above are also included within the scope of machine-readable media. Machine-executable instructions include, for example, instructions and data which cause a general purpose computer, special purpose computer, or special purpose processing machines to perform a certain function or group of functions.
  • Although the figures may show a specific order of method steps, the order of the steps may differ from what is depicted. Also two or more steps may be performed concurrently or with partial concurrence. Such variation will depend on the software and hardware systems chosen and on designer choice. All such variations are within the scope of the disclosure. Likewise, software implementations could be accomplished with standard programming techniques with rule based logic and other logic to accomplish the various connection steps, processing steps, comparison steps and decision steps.
  • It will be appreciated that the features of the dependent claims below can be used in any number, and in any combination, with the features of the independent claims. We hereby disclose the combination of any number of dependent claims with any of the independent claims. For example, we disclose the combination of claims 1 and 3; or 2 and 3; or 1 and 4 or 2 and 4; or 3 and 4, or 2, 3 and 4, or 1, 2 and 4, or 1, 3 and 4 etc. We disclose the combination of claims as if the dependent claims depended from any preceding claim.

Claims (13)

  1. A controller (102) for a central plant (10) having a plurality of subplants (12-22) that serve thermal energy loads of a building or building system, the controller comprising:
    a processing circuit (106) comprising a processor and memory, wherein the processing circuit (106) comprises:
    a high level optimization module (130) configured to generate a thermal energy load setpoint for a subplant (12-22) of the central plant (10), by performing a high level optimization that determines optimum thermal energy load setpoints for each of the plurality of subplants (12-22) by optimally distributing a predicted thermal energy load for the building across the plurality of subplants (12-22);
    a low level optimization module (132) comprising a binary optimization module (156) configured to use binary optimization to determine one or more feasible on/off configurations for equipment (60) of the subplant (12-22) to achieve the thermal energy load setpoint generated by the high level optimization;
    the low level optimization module (132) comprising a setpoint evaluator module configured to determine optimum operating setpoints for the subplant equipment (60) for each feasible on/off configuration;
    wherein the low level optimization module (132) is configured to generate a resource consumption curve for the subplant (12-22) by optimizing an amount of resource consumption by the subplant (12-22) for several different combinations of thermal energy load and weather conditions, the resource consumption curve indicating a minimum amount of resource consumption by the subplant (12-22) as a function of a thermal energy load on the subplant (12-22) and wherein the high level optimization module is configured to receive the resource consumption curve for the subplant (12-22) from the low level optimization module (132); and
    a subplant control module (138) configured to generate operating parameters for the subplant equipment (60), the operating parameters comprising at least one of the feasible on/off configurations and the optimum operating setpoints; and
    a communications interface (104) coupled to the processing circuit (106) and configured to output the generated operating parameters for use in controlling the subplant equipment (60).
  2. The controller of Claim 1, further comprising a constraints evaluator module (146) configured to identify applicable constraints for the subplant equipment (60);
    wherein each feasible on/off configuration satisfies the applicable constraints and is estimated to result in the subplant equipment (60) meeting the thermal energy load setpoint.
  3. The controller of Claim 1, wherein the binary optimization module uses a branch and bound method to determine the one or more feasible on/off configurations.
  4. The controller of Claim 1, wherein the setpoint evaluator module determines the optimum operating setpoints using a nonlinear optimization that minimizes an amount of power consumed by the subplant equipment (60).
  5. The controller of Claim 1, wherein the setpoint evaluator module is configured to:
    estimate an amount of power consumed by each feasible on/off configuration of the subplant equipment (60) at the optimum operating setpoints; and
    identify which of the feasible on/off configurations is estimated to result in a lowest amount of power consumed by the subplant equipment (60) at the optimum operating setpoints.
  6. The controller of Claim 1, wherein the low level optimization module (132) generates the resource consumption curve by:
    optimizing the amount of resource consumption by the subplant (12-22) for several different combinations of thermal energy load and weather conditions to produce multiple data points, comprising minimum energy consumption values for various subplant loads; and
    fitting the resource consumption curve to the multiple data points.
  7. A method for controlling a central plant (10) having a plurality of subplants (12-22) that serve thermal energy loads of a building or building system, the method comprising:
    generating, by a processing circuit (106) of a controller for the central plant (10), a thermal energy load setpoint for a subplant (12-22) of the central plant (10), wherein the thermal energy load setpoint is generated by a high level optimization module (130) of the processing circuit (106) by performing a high level optimization that determines optimum thermal energy load setpoints for each of the plurality of subplants (12-22) by optimally distributing a predicted thermal energy load for the building across the plurality of subplants (12-22);
    using, by a binary optimization module of a low level optimization module (132) of the processing circuit (106), binary optimization to determine one or more feasible on/off configurations for equipment (60) of the subplant (12-22) to achieve the thermal energy load setpoint generated by the high level optimization;
    determining, by a setpoint evaluator module(160) of the low level optimization module (132) of the processing circuit (106), optimum operating setpoints for the subplant equipment (60) for each feasible on/off configuration;
    generating, by the low level optimization module (132) of the processing circuit (106), a resource consumption curve for the subplant (12-22) for several different combinations of thermal energy load and weather conditions, the resource consumption curve indicating a minimum amount of resource consumption by the subplant (12-22) as a function of a thermal energy load on the subplant (12-22) and wherein the high level optimization module is configured to receive the resource consumption curve for the subplant (12-22) from the low level optimization module (132);
    generating, by a subplant control module (138) of the processing circuit (106), operating parameters for the subplant equipment (60), the operating parameters comprising at least one of the feasible on/off configurations and the optimum operating setpoints; and
    outputting the generated operating parameters via a communications interface (104) coupled to the processing circuit (106) for use in controlling the subplant equipment (60).
  8. The method of Claim 7, further comprising:
    identifying applicable constraints for the subplant equipment (60);
    wherein each feasible on/off configuration satisfies the applicable constraints and is estimated to result in the subplant equipment (60) meeting the thermal energy load setpoint.
  9. The method of Claim 7, wherein determining the one or more feasible on/off configurations comprises using a branch and bound method.
  10. The method of Claim 7, wherein determining the optimum operating setpoints comprises using a nonlinear optimization that minimizes an amount of power consumed by the subplant equipment (60).
  11. The method of Claim 7, further comprising:
    estimating an amount of power consumed by each feasible on/off configuration of the subplant equipment (60) at the optimum operating setpoints; and
    identifying which of the feasible on/off configurations is estimated to result in a lowest amount of power consumed by the subplant equipment (60) at the optimum operating setpoints.
  12. The method of Claim 7, wherein generating the resource consumption curve comprises:
    optimizing the amount of resource consumption by the subplant (12-22) for several different combinations of thermal energy load and weather conditions to produce multiple data points, comprising minimum energy consumption values for various subplant loads; and
    fitting the resource consumption curve to the multiple data points.
  13. The method of Claim 7, further comprising:
    providing a database of possible solutions and a database of feasible solutions;
    retrieving, by the controller, a branch from the database of possible solutions, the branch comprising a specified operating status for one or more devices of the central plant equipment;
    determining, by the controller, whether the branch satisfies applicable constraints for the central plant equipment using the specified operating status;
    adding, by the controller, the branch to the database of feasible solutions in response to a determination that the branch satisfies the applicable constraints; and
    generating, by the controller, operating parameters for the central plant equipment, the operating parameters comprising the operating status specified by the branch in the database of feasible solutions.
EP16154940.7A 2014-05-01 2016-02-09 Low level central plant optimization Active EP3062184B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201461987361P 2014-05-01 2014-05-01
US14/634,615 US10101731B2 (en) 2014-05-01 2015-02-27 Low level central plant optimization

Publications (2)

Publication Number Publication Date
EP3062184A1 EP3062184A1 (en) 2016-08-31
EP3062184B1 true EP3062184B1 (en) 2019-05-29

Family

ID=54355189

Family Applications (4)

Application Number Title Priority Date Filing Date
EP16154938.1A Active EP3062183B1 (en) 2014-05-01 2016-02-09 System and method for central plant optimization
EP19214769.2A Active EP3640756B1 (en) 2014-05-01 2016-02-09 Central plant optimization
EP16154940.7A Active EP3062184B1 (en) 2014-05-01 2016-02-09 Low level central plant optimization
EP22192523.3A Active EP4116786B1 (en) 2014-05-01 2016-02-09 Method and system for central plant optimization

Family Applications Before (2)

Application Number Title Priority Date Filing Date
EP16154938.1A Active EP3062183B1 (en) 2014-05-01 2016-02-09 System and method for central plant optimization
EP19214769.2A Active EP3640756B1 (en) 2014-05-01 2016-02-09 Central plant optimization

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP22192523.3A Active EP4116786B1 (en) 2014-05-01 2016-02-09 Method and system for central plant optimization

Country Status (2)

Country Link
US (9) US10386820B2 (en)
EP (4) EP3062183B1 (en)

Families Citing this family (232)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9927190B2 (en) * 2012-01-12 2018-03-27 Lacon Systems Ltd. Method of controlling a chiller
US11816465B2 (en) 2013-03-15 2023-11-14 Ei Electronics Llc Devices, systems and methods for tracking and upgrading firmware in intelligent electronic devices
US10001792B1 (en) * 2013-06-12 2018-06-19 Opower, Inc. System and method for determining occupancy schedule for controlling a thermostat
US10386820B2 (en) 2014-05-01 2019-08-20 Johnson Controls Technology Company Incorporating a demand charge in central plant optimization
US9756511B1 (en) 2014-05-13 2017-09-05 Senseware, Inc. System, method and apparatus for wireless sensor network configuration
US9876653B1 (en) 2014-05-13 2018-01-23 Senseware, Inc. System, method and apparatus for augmenting a building control system domain
US10149141B1 (en) 2014-05-13 2018-12-04 Senseware, Inc. System, method and apparatus for building operations management
US10687231B1 (en) * 2014-05-13 2020-06-16 Senseware, Inc. System, method and apparatus for presentation of sensor information to a building control system
US11734396B2 (en) 2014-06-17 2023-08-22 El Electronics Llc Security through layers in an intelligent electronic device
US10031494B2 (en) 2014-08-15 2018-07-24 Honeywell International Inc. Dashboard and button/tile system for an interface
JP6385446B2 (en) * 2014-09-01 2018-09-05 三菱電機株式会社 Air conditioning system control apparatus and air conditioning system control method
US10719578B1 (en) * 2014-10-27 2020-07-21 University Of South Florida Local lagged adapted generalized method of moments dynamic process
US11953865B2 (en) 2015-04-23 2024-04-09 Johnson Controls Tyco IP Holdings LLP HVAC controller with predictive cost optimization
US11216020B2 (en) 2015-05-04 2022-01-04 Johnson Controls Tyco IP Holdings LLP Mountable touch thermostat using transparent screen technology
US9890971B2 (en) 2015-05-04 2018-02-13 Johnson Controls Technology Company User control device with hinged mounting plate
US10677484B2 (en) 2015-05-04 2020-06-09 Johnson Controls Technology Company User control device and multi-function home control system
US20170053361A1 (en) * 2015-08-20 2017-02-23 Sinogreenergy Consultant Co. Ltd. Power output calculating method of a solar power plant
US10760809B2 (en) 2015-09-11 2020-09-01 Johnson Controls Technology Company Thermostat with mode settings for multiple zones
US20170074536A1 (en) 2015-09-11 2017-03-16 Johnson Controls Technology Company Thermostat with near field communication features
DE102015218472A1 (en) * 2015-09-25 2017-03-30 Siemens Aktiengesellschaft Method and device for operating a technical system
US20170089601A1 (en) * 2015-09-30 2017-03-30 Nec Laboratories America, Inc. Mixed integer optimization based sequencing of a system of chillers
US10190789B2 (en) 2015-09-30 2019-01-29 Johnson Controls Technology Company Central plant with coordinated HVAC equipment staging across multiple subplants
US10509374B2 (en) 2015-10-07 2019-12-17 University Of Utah Research Foundation Systems and methods for managing power generation and storage resources
US10296030B2 (en) * 2015-10-07 2019-05-21 University Of Utah Research Foundation Systems and methods for power system management
US10282687B2 (en) * 2015-10-07 2019-05-07 University Of Utah Research Foundation Systems and methods for managing power generation resources
US10936600B2 (en) * 2015-10-23 2021-03-02 Oracle International Corporation Sensor time series data: functional segmentation for effective machine learning
US10310477B2 (en) 2015-10-28 2019-06-04 Johnson Controls Technology Company Multi-function thermostat with occupant tracking features
US11277893B2 (en) 2015-10-28 2022-03-15 Johnson Controls Technology Company Thermostat with area light system and occupancy sensor
US10655881B2 (en) 2015-10-28 2020-05-19 Johnson Controls Technology Company Thermostat with halo light system and emergency directions
US10546472B2 (en) 2015-10-28 2020-01-28 Johnson Controls Technology Company Thermostat with direction handoff features
US10318266B2 (en) 2015-11-25 2019-06-11 Johnson Controls Technology Company Modular multi-function thermostat
US10452034B2 (en) 2015-12-16 2019-10-22 Johnson Controls Technology Company Central plant control system with building energy load estimation
US10958435B2 (en) 2015-12-21 2021-03-23 Electro Industries/ Gauge Tech Providing security in an intelligent electronic device
US10042340B2 (en) 2016-01-06 2018-08-07 Johnson Controls Technology Company Systems and methods for extending the battery life of a wireless sensor in a building control system
US11181875B2 (en) 2016-01-22 2021-11-23 Johnson Controls Tyco IP Holdings LLP Systems and methods for monitoring and controlling a central plant
FR3049097B1 (en) * 2016-03-21 2021-12-03 Muller Et Cie PROCESS FOR MANAGING THE ENERGY CONSUMPTION OF A THERMAL INSTALLATION INCLUDING AT LEAST ONE HEAT STORAGE DEVICE
DE102016205036B4 (en) * 2016-03-24 2018-12-13 Viessmann Werke Gmbh & Co Kg Method for controlling a power supply system
DE102016205035A1 (en) * 2016-03-24 2017-09-28 Viessmann Werke Gmbh & Co Kg Method for controlling a multivalent power supply system
US10281363B2 (en) 2016-03-24 2019-05-07 Johnson Controls Technology Company Systems and methods for fault detection and handling by assessing building equipment performance
DE102016205028A1 (en) * 2016-03-24 2017-09-28 Viessmann Werke Gmbh & Co Kg Method for controlling a multivalent power supply system
WO2017191253A1 (en) * 2016-05-04 2017-11-09 Abb Schweiz Ag Alarm handling system and method in plant process automation
KR102071266B1 (en) 2016-06-21 2020-01-30 한국전자통신연구원 Device and method for scent emission by multiple sensors
JP7406918B2 (en) 2016-06-30 2023-12-28 ジョンソン コントロールズ テクノロジー カンパニー Variable refrigerant flow system with predictive control and how to operate it
JP6976976B2 (en) 2016-06-30 2021-12-08 ジョンソン コントロールズ テクノロジー カンパニーJohnson Controls Technology Company Multilevel model predictive control system and method
US11067955B2 (en) 2016-06-30 2021-07-20 Johnson Controls Technology Company HVAC system using model predictive control with distributed low-level airside optimization
US20180004171A1 (en) 2016-06-30 2018-01-04 Johnson Controls Technology Company Hvac system using model predictive control with distributed low-level airside optimization and airside power consumption model
US11789415B2 (en) 2016-06-30 2023-10-17 Johnson Controls Tyco IP Holdings LLP Building HVAC system with multi-level model predictive control
US20180012164A1 (en) * 2016-07-08 2018-01-11 Conduent Business Services, Llc Method of planning for deployment of facilities and apparatus associated therewith
US10941951B2 (en) 2016-07-27 2021-03-09 Johnson Controls Technology Company Systems and methods for temperature and humidity control
US10436851B2 (en) 2016-07-29 2019-10-08 Con Edison Battery Storage, Llc Electrical energy storage system with battery resistance estimation
US10305309B2 (en) 2016-07-29 2019-05-28 Con Edison Battery Storage, Llc Electrical energy storage system with battery state-of-charge estimation
US20180032964A1 (en) * 2016-08-01 2018-02-01 Nec Europe Ltd. Transportation system and method for allocating frequencies of transit services therein
AT518964A3 (en) * 2016-08-09 2022-05-15 Siemens Ag Oesterreich Process and system for energy and/or cost-optimized operation of buildings
JP2018025962A (en) * 2016-08-10 2018-02-15 東京瓦斯株式会社 Operation plan planning method, operation plan planning device, and program
US10527295B2 (en) * 2016-08-24 2020-01-07 Iot Cloud Technologies Inc. Hydronic boiler control system with weather anticipation
US10605838B2 (en) * 2016-10-10 2020-03-31 Johnson Controls Technology Company System and method for submetering of a heating, ventilation, and/or air conditioning (HVAC) system
US10372146B2 (en) 2016-10-21 2019-08-06 Johnson Controls Technology Company Systems and methods for creating and using combined predictive models to control HVAC equipment
CN108009938B (en) * 2016-11-02 2021-12-03 中国电力科学研究院 System load clustering and load period pattern recognition method based on shape
CN107065520B (en) * 2016-12-09 2019-11-05 聊城大学 A kind of air-cooler parameter configuration optimization method
US11061424B2 (en) 2017-01-12 2021-07-13 Johnson Controls Technology Company Building energy storage system with peak load contribution and stochastic cost optimization
US10359748B2 (en) 2017-02-07 2019-07-23 Johnson Controls Technology Company Building energy cost optimization system with asset sizing
US11010846B2 (en) 2017-01-12 2021-05-18 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
US11238547B2 (en) * 2017-01-12 2022-02-01 Johnson Controls Tyco IP Holdings LLP Building energy cost optimization system with asset sizing
US10282796B2 (en) 2017-01-12 2019-05-07 Johnson Controls Technology Company Building energy storage system with multiple demand charge cost optimization
US10949777B2 (en) 2017-06-07 2021-03-16 Johnson Controls Technology Company Building energy optimization system with economic load demand response (ELDR) optimization
US10324483B2 (en) 2017-01-12 2019-06-18 Johnson Controls Technology Company Building energy storage system with peak load contribution cost optimization
US10480804B2 (en) * 2017-01-18 2019-11-19 Johnson Controls Technology Company Building management system with distributed data storage and processing
US11847617B2 (en) 2017-02-07 2023-12-19 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with financial analysis functionality
US11900287B2 (en) 2017-05-25 2024-02-13 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with budgetary constraints
CA3090944A1 (en) * 2017-02-08 2018-08-16 Upstream Data Inc. Blockchain mine at oil or gas facility
US10169486B2 (en) 2017-02-10 2019-01-01 Johnson Controls Technology Company Building management system with timeseries processing
US10515098B2 (en) 2017-02-10 2019-12-24 Johnson Controls Technology Company Building management smart entity creation and maintenance using time series data
US10423138B2 (en) 2017-03-06 2019-09-24 Con Edison Battery Storage, Llc Building energy storage system with planning tool
US10767885B2 (en) 2017-03-09 2020-09-08 Johnson Controls Technology Company Building automation system with an energy optimization builder and generic data model designer
US11042924B2 (en) 2017-03-10 2021-06-22 Johnson Controls Technology Company Building controller for optimizing equipment upgrades with design of experiments
US10706375B2 (en) 2017-03-29 2020-07-07 Johnson Controls Technology Company Central plant with asset allocator
US10458669B2 (en) 2017-03-29 2019-10-29 Johnson Controls Technology Company Thermostat with interactive installation features
CZ2017200A3 (en) * 2017-04-10 2018-04-04 Česká energeticko-auditorská společnost, s. r. o. A device for optimizing the production, consumption and storage of electricity
US11162698B2 (en) 2017-04-14 2021-11-02 Johnson Controls Tyco IP Holdings LLP Thermostat with exhaust fan control for air quality and humidity control
US10712038B2 (en) 2017-04-14 2020-07-14 Johnson Controls Technology Company Multi-function thermostat with air quality display
US10868857B2 (en) 2017-04-21 2020-12-15 Johnson Controls Technology Company Building management system with distributed data collection and gateway services
US11371739B2 (en) 2017-04-25 2022-06-28 Johnson Controls Technology Company Predictive building control system with neural network based comfort prediction
US11675322B2 (en) 2017-04-25 2023-06-13 Johnson Controls Technology Company Predictive building control system with discomfort threshold adjustment
CN110753886B (en) 2017-04-25 2023-05-05 江森自控科技公司 Predictive building control system with neural network-based constraint generation
WO2018200861A1 (en) 2017-04-27 2018-11-01 Johnson Controls Technology Company Building energy system with stochastic model predictive control
US10816235B2 (en) 2017-04-27 2020-10-27 Johnson Controls Technology Company Building energy system with predictive control of battery and green energy resources
US11274849B2 (en) 2017-04-28 2022-03-15 Johnson Controls Tyco IP Holdings LLP Smart thermostat with model predictive control and demand response integration
US10146237B2 (en) 2017-04-28 2018-12-04 Johnson Controls Technology Company Smart thermostat with model predictive control
US10724756B2 (en) * 2017-04-28 2020-07-28 Johnson Controls Technology Company Building network device for generating communication models for connecting building devices to a network
US11416955B2 (en) 2017-05-25 2022-08-16 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with integrated measurement and verification functionality
WO2018217251A1 (en) 2017-05-25 2018-11-29 Johnson Controls Technology Company Model predictive maintenance system for building equipment
US11636429B2 (en) 2017-05-25 2023-04-25 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance systems and methods with automatic parts resupply
US11120411B2 (en) 2017-05-25 2021-09-14 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with incentive incorporation
US11409274B2 (en) 2017-05-25 2022-08-09 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system for performing maintenance as soon as economically viable
US11747800B2 (en) 2017-05-25 2023-09-05 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with automatic service work order generation
WO2018217398A1 (en) 2017-05-26 2018-11-29 Johnson Controls Technology Company Air handling unit and rooftop unit with predictive control
US10732584B2 (en) 2017-06-07 2020-08-04 Johnson Controls Technology Company Building energy optimization system with automated and dynamic economic load demand response (ELDR) optimization
US11022947B2 (en) 2017-06-07 2021-06-01 Johnson Controls Technology Company Building energy optimization system with economic load demand response (ELDR) optimization and ELDR user interfaces
US11271769B2 (en) 2019-11-14 2022-03-08 Johnson Controls Tyco IP Holdings LLP Central plant control system with asset allocation override
US10739028B2 (en) * 2017-06-09 2020-08-11 Johnson Controls Technology Company Thermostat with efficient wireless data transmission
US10333810B2 (en) * 2017-06-09 2019-06-25 Johnson Controls Technology Company Control system with asynchronous wireless data transmission
WO2018237340A1 (en) * 2017-06-23 2018-12-27 Johnson Controls Technology Company Building equipment with predictive control
US10969775B2 (en) * 2017-06-23 2021-04-06 Johnson Controls Technology Company Predictive diagnostics system with fault detector for preventative maintenance of connected equipment
EP3617607B1 (en) * 2017-07-05 2024-01-03 Mitsubishi Electric Corporation Operation control device, air conditioning system, operation control method, and operation control program
US10514178B2 (en) 2017-07-07 2019-12-24 Johnson Controls Technology Company Central plant control system with computation reduction based on graph theory
US11616367B2 (en) 2017-07-17 2023-03-28 Johnson Controls Technology Company Energy storage system with virtual device manager
US10558178B2 (en) * 2017-07-27 2020-02-11 Johnson Controls Technology Company Central plant control system with linear solver for computation reduction
US10969135B2 (en) 2017-07-27 2021-04-06 Johnson Controls Technology Company Central plant control system with computation reduction based on sensitivity analysis
US20190032945A1 (en) * 2017-07-27 2019-01-31 Johnson Controls Technology Company Central plant control system with setpoints modification based on physical constraints
US11092352B2 (en) 2017-07-27 2021-08-17 Johnson Controls Tyco IP Holdings LLP Central plant control system with computation reduction based on stranded node analysis
US11867419B2 (en) * 2017-07-27 2024-01-09 Johnson Controls Technology Company Systems and methods to automatically link availability of series devices in a plant
US10900686B2 (en) * 2017-07-28 2021-01-26 Johnson Controls Technology Company Central plant control system with time dependent deferred load
US10876754B2 (en) * 2017-07-28 2020-12-29 Johnson Controls Technology Company Dynamic central plant control based on load prediction
US10824125B2 (en) 2017-07-28 2020-11-03 Johnson Controls Technology Company Central plant control system based on load prediction through mass storage model
US10523506B2 (en) * 2017-08-02 2019-12-31 Nanning Fugui Precision Industrial Co., Ltd. Network configuration method and network device
US10935940B2 (en) 2017-08-03 2021-03-02 Johnson Controls Technology Company Building management system with augmented deep learning using combined regression and artificial neural network modeling
US11237576B2 (en) 2017-08-03 2022-02-01 Johnson Controls Tyco IP Holdings LLP HVAC system with data driven user interfaces for equipment commissioning and operation
JP6788555B2 (en) * 2017-08-07 2020-11-25 株式会社東芝 Information processing system, information processing device, and information processing method
EP3447258B1 (en) 2017-08-25 2023-05-17 Johnson Controls Tyco IP Holdings LLP Central plant control system with equipment maintenance evaluation
EP3673213A1 (en) 2017-08-25 2020-07-01 Johnson Controls Technology Company Temperature control valve
US10809705B2 (en) 2017-09-01 2020-10-20 Johnson Controls Technology Company Central plant control system with automatic optimization formulation
US10418811B2 (en) * 2017-09-12 2019-09-17 Sas Institute Inc. Electric power grid supply and load prediction using cleansed time series data
EP3457513A1 (en) * 2017-09-13 2019-03-20 Johnson Controls Technology Company Building energy system with load balancing
US10681667B2 (en) 2017-09-18 2020-06-09 Johnson Controls Fire Protection LP Method and system for service verification using WiFi signal strength mapping
US11687048B2 (en) 2017-09-18 2023-06-27 Johnson Controls Tyco IP Holdings LLP Method and apparatus for evaluation of temperature sensors
US20190086877A1 (en) * 2017-09-18 2019-03-21 Tyco Fire & Security Gmbh Method and Apparatus for Cloud Based Predictive Service Scheduling and Evaluation
US10735418B2 (en) 2017-09-18 2020-08-04 Johnson Controls Fire Protection LP Method and system for service verification using access control system
US10755555B2 (en) 2017-09-18 2020-08-25 Johnson Controls Fire Protection LP Method and apparatus for verifying service of installed devices using RFID
US10559181B2 (en) 2017-09-27 2020-02-11 Johnson Controls Technology Company Building risk analysis system with risk combination for multiple threats
WO2019067627A1 (en) 2017-09-27 2019-04-04 Johnson Controls Technology Company Systems and methods for risk analysis
US10962945B2 (en) 2017-09-27 2021-03-30 Johnson Controls Technology Company Building management system with integration of data into smart entities
CN109695976A (en) * 2017-10-23 2019-04-30 深圳市爱能森科技有限公司 A kind of method, system and the terminal device of powering device management
JP7059583B2 (en) * 2017-11-20 2022-04-26 株式会社Ihi Energy management system, power supply and demand plan optimization method, and power supply and demand plan optimization program
US10838441B2 (en) 2017-11-28 2020-11-17 Johnson Controls Technology Company Multistage HVAC system with modulating device demand control
US10838440B2 (en) 2017-11-28 2020-11-17 Johnson Controls Technology Company Multistage HVAC system with discrete device selection prioritization
US20190188611A1 (en) * 2017-12-14 2019-06-20 Business Objects Software Limited Multi-step time series forecasting with residual learning
US11209184B2 (en) 2018-01-12 2021-12-28 Johnson Controls Tyco IP Holdings LLP Control system for central energy facility with distributed energy storage
US11754997B2 (en) * 2018-02-17 2023-09-12 Ei Electronics Llc Devices, systems and methods for predicting future consumption values of load(s) in power distribution systems
US11686594B2 (en) 2018-02-17 2023-06-27 Ei Electronics Llc Devices, systems and methods for a cloud-based meter management system
US11734704B2 (en) 2018-02-17 2023-08-22 Ei Electronics Llc Devices, systems and methods for the collection of meter data in a common, globally accessible, group of servers, to provide simpler configuration, collection, viewing, and analysis of the meter data
US10767886B2 (en) 2018-02-20 2020-09-08 Johnson Controls Technology Company Building management system with saturation detection and removal for system identification
US11131474B2 (en) 2018-03-09 2021-09-28 Johnson Controls Tyco IP Holdings LLP Thermostat with user interface features
US10678227B2 (en) 2018-03-15 2020-06-09 Johnson Controls Technology Company Central plant control system with plug and play EMPC
US11599071B2 (en) 2018-03-29 2023-03-07 Johnson Controls Tyco IP Holdings LLP Systems and methods for adaptively tuning thresholds for fault detection in buildings
US11182714B2 (en) 2018-03-29 2021-11-23 Johnson Controls Tyco IP Holdings LLP Building energy optimization system with capacity market program (CMP) planning
US11360451B2 (en) 2018-03-31 2022-06-14 Johnson Controls Tyco IP Holdings LLP Central plant optimization planning tool with advanced user interface
EP3553615A1 (en) * 2018-04-10 2019-10-16 Siemens Aktiengesellschaft Method and system for managing a technical installation
CN108515868B (en) * 2018-04-23 2020-06-09 国网福建省电力有限公司厦门供电公司 Orderly charging control system for electric automobile in residential district
US11221156B2 (en) 2018-04-24 2022-01-11 Johnson Controls Tyco IP Holdings LLP Central plant control system with decaying capacity adjustment
US10948884B2 (en) 2018-04-25 2021-03-16 Johnson Controls Technology Company Building control based on uneven load distribution
JP6835905B2 (en) 2018-05-07 2021-02-24 ジョンソン コントロールズ テクノロジー カンパニーJohnson Controls Technology Company Cost-targeted optimized systems, methods and non-transitory computer-readable media
US11009252B2 (en) 2018-05-07 2021-05-18 Johnson Controls Technology Company HVAC control system with cost target optimization
US11002457B2 (en) 2018-05-07 2021-05-11 Johnson Controls Technology Company Variable refrigerant flow, room air conditioner, and packaged air conditioner control systems with cost target optimization
EP3576029A1 (en) * 2018-05-31 2019-12-04 IMEC vzw Method and device for determining energy system operating scenarios
EP3578808A1 (en) * 2018-06-08 2019-12-11 Siemens Gamesa Renewable Energy A/S Controlling wind turbines in presence of wake interactions
CN108427318B (en) * 2018-06-11 2021-04-13 黄河科技学院 Intelligent home monitoring system based on Internet of things
US11474485B2 (en) 2018-06-15 2022-10-18 Johnson Controls Tyco IP Holdings LLP Adaptive training and deployment of single chiller and clustered chiller fault detection models for connected chillers
US11859846B2 (en) 2018-06-15 2024-01-02 Johnson Controls Tyco IP Holdings LLP Cost savings from fault prediction and diagnosis
US11549709B2 (en) * 2018-06-29 2023-01-10 Johnson Controls Tyco IP Holdings LLP Quantitative monthly visual indicator to determine data availability for utility rates
US11703815B2 (en) * 2018-07-12 2023-07-18 Johnson Controls Tyco IP Holdings LLP Building control system with predictive maintenance based on time series analysis
JP7014299B2 (en) * 2018-07-27 2022-02-01 日本電信電話株式会社 Behavioral optimizers, methods and programs
US11579588B2 (en) * 2018-07-30 2023-02-14 Sap Se Multivariate nonlinear autoregression for outlier detection
US11159022B2 (en) 2018-08-28 2021-10-26 Johnson Controls Tyco IP Holdings LLP Building energy optimization system with a dynamically trained load prediction model
US11163271B2 (en) 2018-08-28 2021-11-02 Johnson Controls Technology Company Cloud based building energy optimization system with a dynamically trained load prediction model
CN109143860B (en) * 2018-09-06 2023-05-23 广州大学 Active earthquake-resistant control method for building
US11497144B2 (en) 2018-09-21 2022-11-08 Johnson Controls Tyco IP Holdings LLP Optimized thermal control of data center
US10797511B2 (en) 2018-09-28 2020-10-06 Johnson Controls Technology Company Photovoltaic energy system with stationary energy storage control and power factor correction
US10673380B2 (en) 2018-09-28 2020-06-02 Johnson Controls Technology Company Photovoltaic energy system with stationary energy storage control
US11276125B2 (en) 2018-10-18 2022-03-15 Johnson Controls Tyco IP Holdings LLP Systems and methods for assessing economic feasibility of an energy plant
US11960261B2 (en) 2019-07-12 2024-04-16 Johnson Controls Tyco IP Holdings LLP HVAC system with sustainability and emissions controls
US10928784B2 (en) 2018-11-01 2021-02-23 Johnson Controls Technology Company Central plant optimization system with streamlined data linkage of design and operational data
US20220004475A1 (en) * 2018-11-28 2022-01-06 3M Innovative Properties Company Data center infrastructure optimization method based on causal learning
US11288754B2 (en) 2018-12-18 2022-03-29 Johnson Controls Tyco IP Holdings LLP Cost optimization of a central energy facility with block-and-index rate structure
US11164126B2 (en) 2018-12-18 2021-11-02 Johnson Controls Tyco IP Holdings LLP Cost optimization of a central energy facility with block-and-index rate structure
US11107390B2 (en) 2018-12-21 2021-08-31 Johnson Controls Technology Company Display device with halo
US10884398B2 (en) 2019-01-04 2021-01-05 Johnson Controls Technology Company Systems and methods for prediction model update scheduling for building equipment
US11544724B1 (en) * 2019-01-09 2023-01-03 Blue Yonder Group, Inc. System and method of cyclic boosting for explainable supervised machine learning
US11519620B2 (en) * 2020-09-22 2022-12-06 Johnson Controls Tyco IP Holdings LLP Stability index for connected equipment
US11092954B2 (en) 2019-01-10 2021-08-17 Johnson Controls Technology Company Time varying performance indication system for connected equipment
US10978199B2 (en) 2019-01-11 2021-04-13 Honeywell International Inc. Methods and systems for improving infection control in a building
US11408626B2 (en) 2019-01-11 2022-08-09 Johnson Controls Tyco IP Holdings LLP Central plant control system with dynamic computation reduction
US11873998B2 (en) * 2019-01-28 2024-01-16 Johnson Controls Tyco IP Holdings LLP Central plant with secondary strong prevention
US11761660B2 (en) 2019-01-30 2023-09-19 Johnson Controls Tyco IP Holdings LLP Building control system with feedback and feedforward total energy flow compensation
US11592792B2 (en) 2019-01-30 2023-02-28 Johnson Controls Tyco IP Holdings LLP Energy control system with energy provider level demand optimization
DE102019202440A1 (en) * 2019-02-22 2020-08-27 Siemens Aktiengesellschaft Method for determining thermal consumption of an energy system, energy management system and energy system
CN111692721B (en) 2019-03-15 2023-09-22 开利公司 Control method for air conditioning system
CN111795481B (en) 2019-04-08 2023-05-23 开利公司 Air conditioning system and control method therefor
US11256219B2 (en) 2019-04-25 2022-02-22 Johnson Controls Tyco IP Holdings LLP Central plant control system with rank-based asset allocator
US11907029B2 (en) 2019-05-15 2024-02-20 Upstream Data Inc. Portable blockchain mining system and methods of use
US10955800B2 (en) 2019-05-17 2021-03-23 Johnson Controls Technology Company Central plant control system, method, and controller with multi-level granular and non-granular asset allocation
US11454940B2 (en) 2019-05-21 2022-09-27 Johnson Controls Tyco IP Holdings LLP Building control system with heat load estimation using deterministic and stochastic models
US11215375B2 (en) 2019-05-21 2022-01-04 Johnson Controls Tyco IP Holdings LLP Building control system with heat disturbance estimation and prediction
US11281198B2 (en) 2019-05-31 2022-03-22 Johnson Controls Tyco IP Holdings LLP Central plant optimization with optimization modification
US11392095B2 (en) 2019-05-31 2022-07-19 Johnson Controls Tyco IP Holdings LLP Building control system with central plant model generation
US11863589B2 (en) 2019-06-07 2024-01-02 Ei Electronics Llc Enterprise security in meters
WO2020261317A1 (en) * 2019-06-24 2020-12-30 三菱電機株式会社 Air conditioner and air conditioning system
US11474869B2 (en) 2019-06-26 2022-10-18 Johnson Controls Tyco IP Holdings LLP Central plant control system with subplant rank generator
US11226600B2 (en) 2019-08-29 2022-01-18 Johnson Controls Tyco IP Holdings LLP Building control system with load curtailment optimization
US11274842B2 (en) 2019-07-12 2022-03-15 Johnson Controls Tyco IP Holdings LLP Systems and methods for optimizing ventilation, filtration, and conditioning schemes for buildings
US11714393B2 (en) 2019-07-12 2023-08-01 Johnson Controls Tyco IP Holdings LLP Building control system with load curtailment optimization
CN114364926B (en) 2019-07-12 2024-04-05 江森自控泰科知识产权控股有限责任合伙公司 HVAC system with design and operation tools for building infection control
US11774122B2 (en) 2019-07-16 2023-10-03 Johnson Controls Tyco IP Holdings LLP Building control system with adaptive online system identification
US11098921B2 (en) * 2019-07-18 2021-08-24 Johnson Controls Tyco IP Holdings LLP Building management system with automatic comfort constraint adjustment
US11085663B2 (en) 2019-07-19 2021-08-10 Johnson Controls Tyco IP Holdings LLP Building management system with triggered feedback set-point signal for persistent excitation
US11199336B2 (en) 2019-07-26 2021-12-14 Johnson Controls Tyco IP Holdings LLP HVAC system with on-off control
US11480360B2 (en) 2019-08-06 2022-10-25 Johnson Controls Tyco IP Holdings LLP Building HVAC system with modular cascaded model
US11099530B2 (en) 2019-08-23 2021-08-24 Johnson Controls Technology Company Central plant control system with device geometric modeling and control
US11144020B2 (en) 2019-08-23 2021-10-12 Johnson Controls Tyco IP Holdings LLP Central plant control system with geometric modeling of operational sequences
US11635751B2 (en) 2019-09-10 2023-04-25 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with short-term scheduling
US11188039B2 (en) 2019-10-18 2021-11-30 Johnson Controls Tyco IP Holdings LLP Building management system with dynamic energy prediction model updates
US11385605B2 (en) 2019-11-12 2022-07-12 Johnson Controls Tyco IP Holdings LLP Building control system with features for operating under intermittent connectivity to a cloud computation system
US11662113B2 (en) 2019-11-18 2023-05-30 Johnson Controls Tyco IP Holdings LLP Building cooling systems with energy optimization and model predictive control
US11953871B2 (en) 2019-11-19 2024-04-09 Johnson Controls Tyco IP Holdings LLP Building control system with automatic control problem formulation using building information model
US11644814B2 (en) 2019-11-20 2023-05-09 Abb Schweiz Ag Method and apparatus for coordinating the utilization of operational zones to achieve production goals
US11445024B2 (en) 2019-11-26 2022-09-13 Johnson Controls Tyco IP Holdings LLP Building control system with smart edge devices having embedded model predictive control
US11281173B2 (en) 2019-12-04 2022-03-22 Johnson Controls Tyco IP Holdings LLP Systems and methods for maintaining occupant comfort for various environmental conditions
US11530833B2 (en) 2019-12-18 2022-12-20 Johnson Controls Tyco IP Holdings LLP Systems and methods for controlling and predicting heat load disturbances
CN111476675B (en) * 2020-03-16 2023-11-03 昆明电力交易中心有限责任公司 Comprehensive energy system distributed equilibrium interactive control method based on demand response
US11416796B2 (en) 2020-04-28 2022-08-16 Johnson Controls Tyco IP Holdings LLP Control system for generating and distributing energy resources and operating building equipment accounting for resource provider contraints
CN111476441A (en) * 2020-05-29 2020-07-31 南方电网科学研究院有限责任公司 Load prediction method for electric vehicle charging equipment and related device
US11913659B2 (en) 2020-06-15 2024-02-27 Honeywell International Inc. Systems and methods for monitoring operation of an HVAC system
US11823295B2 (en) 2020-06-19 2023-11-21 Honeywell International, Inc. Systems and methods for reducing risk of pathogen exposure within a space
EP4214450A1 (en) 2020-09-16 2023-07-26 Johnson Controls Tyco IP Holdings LLP Systems and methods to mitigate infection risk using air purification
US11894145B2 (en) 2020-09-30 2024-02-06 Honeywell International Inc. Dashboard for tracking healthy building performance
US11747037B2 (en) 2020-10-09 2023-09-05 Johnson Controls Tyco IP Holdings LLP Building system with an in-zone plume control system
US11894679B2 (en) 2020-10-19 2024-02-06 Eaton Intelligent Power Limited Methods, devices, and systems for distributed monitoring based adaptive diagnosis of power anomalies in a power network
US11372383B1 (en) 2021-02-26 2022-06-28 Honeywell International Inc. Healthy building dashboard facilitated by hierarchical model of building control assets
US11689020B2 (en) 2021-05-19 2023-06-27 International Business Machines Corporation Computer modeling to analyze electrical usage in an electrical grid for facilitating management of electrical transmission
US11526139B1 (en) 2021-07-09 2022-12-13 Johnson Controls Tyco IP Holdings LLP Central plant optimization system with equipment model adaptation
CN116488219B (en) * 2023-04-13 2023-11-10 江苏果下科技有限公司 Distributed energy storage acquisition strategy control method based on multi-level architecture
CN116777064B (en) * 2023-06-20 2024-03-01 广东工业大学 Two-dimensional boxing method based on non-primary cut constraint and branch pricing algorithm
CN117649062A (en) * 2024-01-30 2024-03-05 中国建筑西北设计研究院有限公司 Engineering configuration method and device for multi-heat source combined operation energy station system capacity

Family Cites Families (213)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4349869A (en) 1979-10-01 1982-09-14 Shell Oil Company Dynamic matrix control method
US4616308A (en) 1983-11-15 1986-10-07 Shell Oil Company Dynamic process control
US5442544A (en) 1990-01-26 1995-08-15 Honeywell Inc. Single input single output rate optimal controller
DE69122313T2 (en) 1990-06-21 1997-03-20 Honeywell Inc Adaptive control based on a variable horizon with means for minimizing operating costs
EP0524317A4 (en) 1991-02-08 1995-02-15 Tokyo Shibaura Electric Co Model forecasting controller
US5351184A (en) 1993-01-26 1994-09-27 Honeywell Inc. Method of multivariable predictive control utilizing range control
US5408406A (en) 1993-10-07 1995-04-18 Honeywell Inc. Neural net based disturbance predictor for model predictive control
US5519605A (en) 1994-10-24 1996-05-21 Olin Corporation Model predictive control apparatus and method
US5579993A (en) * 1995-01-06 1996-12-03 Landis & Gyr Powers, Inc. HVAC distribution system identification
US5572420A (en) 1995-04-03 1996-11-05 Honeywell Inc. Method of optimal controller design for multivariable predictive control utilizing range control
US7610108B2 (en) 1996-05-06 2009-10-27 Rockwell Automation Technologies, Inc. Method and apparatus for attenuating error in dynamic and steady-state processes for prediction, control, and optimization
US6278899B1 (en) 1996-05-06 2001-08-21 Pavilion Technologies, Inc. Method for on-line optimization of a plant
US5933345A (en) 1996-05-06 1999-08-03 Pavilion Technologies, Inc. Method and apparatus for dynamic and steady state modeling over a desired path between two end points
US5778059A (en) 1996-08-30 1998-07-07 Digital Technics, Inc. Distributed predictive and event-driven processing environment
US6055483A (en) 1997-05-05 2000-04-25 Honeywell, Inc. Systems and methods using bridge models to globally optimize a process facility
US6122555A (en) 1997-05-05 2000-09-19 Honeywell International Inc. System and methods for globally optimizing a process facility
US5963458A (en) 1997-07-29 1999-10-05 Siemens Building Technologies, Inc. Digital controller for a cooling and heating plant having near-optimal global set point control strategy
US5924486A (en) * 1997-10-29 1999-07-20 Tecom, Inc. Environmental condition control and energy management system and method
US6347254B1 (en) 1998-12-31 2002-02-12 Honeywell Inc Process facility control systems using an efficient prediction form and methods of operating the same
US6459939B1 (en) 1999-06-29 2002-10-01 Alan J. Hugo Performance assessment of model predictive controllers
US6453993B1 (en) 2000-05-17 2002-09-24 Carrier Corporation Advanced starting control for multiple zone system
US7424409B2 (en) 2001-02-20 2008-09-09 Context-Based 4 Casting (C-B4) Ltd. Stochastic modeling of time distributed sequences
US20030033587A1 (en) 2001-09-05 2003-02-13 Bruce Ferguson System and method for on-line training of a non-linear model for use in electronic commerce
US7117045B2 (en) 2001-09-08 2006-10-03 Colorado State University Research Foundation Combined proportional plus integral (PI) and neural network (nN) controller
US7376472B2 (en) 2002-09-11 2008-05-20 Fisher-Rosemount Systems, Inc. Integrated model predictive control and optimization within a process control system
US7050863B2 (en) 2002-09-11 2006-05-23 Fisher-Rosemount Systems, Inc. Integrated model predictive control and optimization within a process control system
US7328074B2 (en) 2002-12-02 2008-02-05 United Technologies Corporation Real-time quadratic programming for control of dynamical systems
EP1593072A2 (en) 2003-02-07 2005-11-09 Power Measurement Ltd A method and system for calculating and distributing utility costs
US7152023B2 (en) 2003-02-14 2006-12-19 United Technologies Corporation System and method of accelerated active set search for quadratic programming in real-time model predictive control
US6983889B2 (en) 2003-03-21 2006-01-10 Home Comfort Zones, Inc. Forced-air zone climate control system for existing residential houses
US6807510B1 (en) 2003-05-05 2004-10-19 Honeywell Acsa Inc. Model predictive controller for coordinated cross direction and machine direction control
US7272454B2 (en) 2003-06-05 2007-09-18 Fisher-Rosemount Systems, Inc. Multiple-input/multiple-output control blocks with non-linear predictive capabilities
US7197485B2 (en) 2003-07-16 2007-03-27 United Technologies Corporation Square root method for computationally efficient model predictive control
US7664573B2 (en) 2003-09-26 2010-02-16 Siemens Industry, Inc. Integrated building environment data system
US7113890B2 (en) 2003-10-16 2006-09-26 Abb Inc. Method and apparatus for detecting faults in steam generator system components and other continuous processes
EP1553470B1 (en) 2004-01-09 2008-12-31 Abb Research Ltd. Process control system
WO2005077038A2 (en) 2004-02-06 2005-08-25 Wisconsin Alumni Research Foundation Siso model predictive controller
US7203554B2 (en) 2004-03-16 2007-04-10 United Technologies Corporation Model predictive controller with life extending control
US20050240427A1 (en) 2004-04-26 2005-10-27 Crichlow Henry B Energy management method and process using analytic metrics.
US20060065750A1 (en) 2004-05-21 2006-03-30 Fairless Keith W Measurement, scheduling and reporting system for energy consuming equipment
JP2005339241A (en) 2004-05-27 2005-12-08 Nissan Motor Co Ltd Model prediction controller, and vehicular recommended manipulated variable generating device
US7165399B2 (en) 2004-12-29 2007-01-23 Honeywell International Inc. Method and system for using a measure of fueling rate in the air side control of an engine
US7275374B2 (en) 2004-12-29 2007-10-02 Honeywell International Inc. Coordinated multivariable control of fuel and air in engines
US7328577B2 (en) 2004-12-29 2008-02-12 Honeywell International Inc. Multivariable control for an engine
US7591135B2 (en) 2004-12-29 2009-09-22 Honeywell International Inc. Method and system for using a measure of fueling rate in the air side control of an engine
DE102005006410A1 (en) 2005-02-11 2006-08-17 Siemens Ag Method for optimizing the operation of several compressor units and apparatus for this purpose
US7894943B2 (en) 2005-06-30 2011-02-22 Sloup Charles J Real-time global optimization of building setpoints and sequence of operation
US7389773B2 (en) 2005-08-18 2008-06-24 Honeywell International Inc. Emissions sensors for fuel control in engines
US7451004B2 (en) 2005-09-30 2008-11-11 Fisher-Rosemount Systems, Inc. On-line adaptive model predictive control in a process control system
US8818563B2 (en) 2005-10-14 2014-08-26 Siemens Aktiengesellschaft System for controlling room temperature in a building using a free energy source, an additional energy source, and predictive control
US7650195B2 (en) 2005-10-27 2010-01-19 Honeywell Asca Inc. Automated tuning of large-scale multivariable model predictive controllers for spatially-distributed processes
US7376471B2 (en) 2006-02-21 2008-05-20 United Technologies Corporation System and method for exploiting a good starting guess for binding constraints in quadratic programming with an infeasible and inconsistent starting guess for the solution
US7454253B2 (en) 2006-03-30 2008-11-18 Honeywell Asca Inc. Fast performance prediction of multivariable model predictive controller for paper machine cross-directional processes
US7496413B2 (en) 2006-05-03 2009-02-24 Honeywell Asca Inc. Apparatus and method for coordinating controllers to control a paper machine or other machine
DE102006023458B4 (en) 2006-05-18 2008-03-06 Siemens Ag Position control method for one axis
US7577483B2 (en) 2006-05-25 2009-08-18 Honeywell Asca Inc. Automatic tuning method for multivariable model predictive controllers
US8005575B2 (en) 2006-06-01 2011-08-23 General Electric Company Methods and apparatus for model predictive control in a real time controller
US8527108B2 (en) 2006-07-11 2013-09-03 Regen Energy Inc. Method and apparatus for managing an energy consuming load
US8527109B2 (en) 2006-07-11 2013-09-03 Regen Energy Inc. Method and apparatus for managing an energy consuming load
US7580775B2 (en) 2006-07-11 2009-08-25 Regen Energy Inc. Method and apparatus for implementing enablement state decision for energy consuming load based on demand and duty cycle of load
WO2008039759A2 (en) 2006-09-25 2008-04-03 Intelligent Management Systems Corporation System and method for resource management
US7844352B2 (en) 2006-10-20 2010-11-30 Lehigh University Iterative matrix processor based implementation of real-time model predictive control
US7826909B2 (en) 2006-12-11 2010-11-02 Fakhruddin T Attarwala Dynamic model predictive control
US7827813B2 (en) 2007-01-30 2010-11-09 Johnson Controls Technology Company Adaptive real-time optimization control
US8060258B2 (en) 2007-06-28 2011-11-15 Honeywell International Inc. Multivariable process controller and methodology for controlling catalyzed chemical reaction to form phthalic anhydride and other functionalized aromatics
US8032235B2 (en) 2007-06-28 2011-10-04 Rockwell Automation Technologies, Inc. Model predictive control system and method for reduction of steady state error
US7991512B2 (en) * 2007-08-28 2011-08-02 General Electric Company Hybrid robust predictive optimization method of power system dispatch
US8073659B2 (en) 2007-11-13 2011-12-06 Honeywell International Inc. Decomposition of nonlinear dynamics using multiple model approach and gap metric analysis
FR2925530B1 (en) 2007-12-21 2010-08-27 Siemens Vai Metals Tech Sas INSTALLATION AND METHOD FOR CONTINUOUS STRIPPING OF STEEL BANDS
GB2469239B (en) 2008-01-31 2012-09-26 Fisher Rosemount Systems Inc Robust adaptive model predictive controller with tuning to compensate for model mismatch
US7987145B2 (en) 2008-03-19 2011-07-26 Honeywell Internationa Target trajectory generator for predictive control of nonlinear systems using extended Kalman filter
US8126575B2 (en) 2008-03-26 2012-02-28 Fakhruddin T Attarwala Universal model predictive controller
US8078291B2 (en) 2008-04-04 2011-12-13 Honeywell International Inc. Methods and systems for the design and implementation of optimal multivariable model predictive controllers for fast-sampling constrained dynamic systems
US8036758B2 (en) 2008-04-07 2011-10-11 Honeywell International Inc. System and method for continuous supply chain control and optimization using stochastic calculus of variations approach
DK2110551T4 (en) 2008-04-15 2019-05-13 Siemens Ag Method and device for forecast-based wind turbine control
US8782234B2 (en) 2008-05-05 2014-07-15 Siemens Industry, Inc. Arrangement for managing data center operations to increase cooling efficiency
US7949416B2 (en) 2008-05-06 2011-05-24 United Technologies Corporation Multivariable control system
JP5618464B2 (en) 2008-05-22 2014-11-05 株式会社ジャパンディスプレイ Liquid crystal display device and manufacturing method thereof
US20090313083A1 (en) 2008-06-13 2009-12-17 Honeywell International Inc. Renewable energy calculator
US8600571B2 (en) 2008-06-19 2013-12-03 Honeywell International Inc. Energy optimization system
US8046089B2 (en) 2008-06-20 2011-10-25 Honeywell International Inc. Apparatus and method for model predictive control (MPC) of a nonlinear process
US8060290B2 (en) 2008-07-17 2011-11-15 Honeywell International Inc. Configurable automotive controller
US7930045B2 (en) 2008-10-07 2011-04-19 Emerson Process Management Power & Water Solutions, Inc. Two-stage model predictive control technique
CN201297253Y (en) 2008-10-23 2009-08-26 上海英格索兰压缩机有限公司 Heat recovery system of water-cooled air compressor
CN201297257Y (en) 2008-10-23 2009-08-26 上海英格索兰压缩机有限公司 Efficient heat recovery system of air compressor
JP5575784B2 (en) 2008-10-31 2014-08-20 オプティマム・エナジー,エルエルシー System and method for controlling energy consumption efficiency
US8121818B2 (en) 2008-11-10 2012-02-21 Mitek Analytics Llc Method and system for diagnostics of apparatus
US8291720B2 (en) 2009-02-02 2012-10-23 Optimum Energy, Llc Sequencing of variable speed compressors in a chilled liquid cooling system for improved energy efficiency
DE112010000813T5 (en) 2009-02-02 2012-02-09 Fisher-Rosemount Systems, Inc. Model predictive controller with tunable integral component to compensate for model mismatch
US8457796B2 (en) 2009-03-11 2013-06-04 Deepinder Singh Thind Predictive conditioning in occupancy zones
CN101900448B (en) 2009-06-01 2013-12-11 特灵空调系统(中国)有限公司 Steam jet enthalpy heat pump air-conditioning hot water unit
CN201837139U (en) 2009-06-01 2011-05-18 特灵空调系统(中国)有限公司 Jet and enthalpy increasing heat pump air conditioner hot water unit
US8145329B2 (en) 2009-06-02 2012-03-27 Honeywell International Inc. Method and system for combining feedback and feedforward in model predictive control
US8532839B2 (en) 2009-06-22 2013-09-10 Johnson Controls Technology Company Systems and methods for statistical control and fault detection in a building management system
US9104189B2 (en) 2009-07-01 2015-08-11 Mario E. Berges Gonzalez Methods and apparatuses for monitoring energy consumption and related operations
US8417392B2 (en) 2009-07-23 2013-04-09 Siemens Industry, Inc. Qualification system and method for chilled water plant operations
US8774978B2 (en) 2009-07-23 2014-07-08 Siemens Industry, Inc. Device and method for optimization of chilled water plant system operation
US8275483B2 (en) 2009-07-23 2012-09-25 Siemens Industry, Inc. Demand flow pumping
US20110016610A1 (en) 2009-07-27 2011-01-27 Steven Wieder Sweatband with absorbent bamboo inner layer and related method of use
US20170241661A1 (en) 2009-08-14 2017-08-24 Optimum Energy Llc Predictive free cooling
US8897921B2 (en) 2009-09-02 2014-11-25 Ian Dempster Environmental control for HVAC system
US8180493B1 (en) 2009-09-04 2012-05-15 Paul Ira Laskow Method and apparatus for effecting temperature difference in a respective zone
US9760067B2 (en) 2009-09-10 2017-09-12 Honeywell International Inc. System and method for predicting future disturbances in model predictive control applications
US8396572B2 (en) 2009-09-11 2013-03-12 Siemens Corporation System and method for energy plant optimization using mixed integer-linear programming
US8433450B2 (en) 2009-09-11 2013-04-30 Emerson Process Management Power & Water Solutions, Inc. Optimized control of power plants having air cooled condensers
US9475359B2 (en) 2009-10-06 2016-10-25 Johnson Controls Technology Company Systems and methods for displaying a hierarchical set of building management system information
US9159042B2 (en) 2009-10-23 2015-10-13 Viridity Energy, Inc. Facilitating revenue generation from data shifting by data centers
US8473079B2 (en) 2009-11-25 2013-06-25 Honeywell International Inc. Fast algorithm for model predictive control
BR112012014622A2 (en) 2009-12-16 2019-05-14 Commonwealth Scientific And Industrial Research Organisation heating, ventilation, and air conditioning (hvac) system control method of a building
US8340831B2 (en) 2009-12-16 2012-12-25 Robert Bosch Gmbh Non-intrusive load monitoring system and method
US8653968B2 (en) 2009-12-23 2014-02-18 Pulse Energy Inc. Systems and methods for predictive building energy monitoring
WO2011080548A1 (en) 2009-12-31 2011-07-07 Abb Research Ltd Method and control system for scheduling load of a power plant
CN102884484B (en) 2009-12-31 2016-06-01 Abb研究有限公司 Process optimization method and system for power plant
EP2372483B1 (en) 2010-03-16 2012-10-31 Siemens Aktiengesellschaft Method for regulating a room comfort quantity
US8412381B2 (en) 2010-03-24 2013-04-02 Mitsubishi Electric Research Laboratories, Inc. HVAC control system
US9223301B2 (en) 2010-04-19 2015-12-29 Honeywell International Inc. Active cloud point controller for refining applications and related method
US8504175B2 (en) 2010-06-02 2013-08-06 Honeywell International Inc. Using model predictive control to optimize variable trajectories and system control
US9335748B2 (en) 2010-07-09 2016-05-10 Emerson Process Management Power & Water Solutions, Inc. Energy management system
US8880202B2 (en) 2010-07-09 2014-11-04 Emerson Process Management Power & Water Solutions, Inc. Optimization system using an iteratively coupled expert engine
US8945094B2 (en) 2010-09-08 2015-02-03 Honeywell International Inc. Apparatus and method for medication delivery using single input-single output (SISO) model predictive control
US9342060B2 (en) 2010-09-14 2016-05-17 United Technologies Corporation Adaptive control for a gas turbine engine
US20120109620A1 (en) 2010-11-01 2012-05-03 Honeywell International Inc. Apparatus and method for model predictive control (mpc) using approximate window-based estimators
US9366451B2 (en) 2010-12-24 2016-06-14 Commonwealth Scientific And Industrial Research Organisation System and method for the detection of faults in a multi-variable system utilizing both a model for normal operation and a model for faulty operation
US8903554B2 (en) 2011-02-22 2014-12-02 The Board Of Trustees Of The Leland Stanford Junior University Energy plant design and operation
US10373082B2 (en) 2011-02-24 2019-08-06 Qcoefficient, Inc. Integration of commercial building operations with electric system operations and markets
CN103649974B (en) 2011-03-21 2019-02-22 塔雷科·莫哈梅德·莫哈梅德·赫加兹 Time Optimization System and method for
US8645076B2 (en) 2011-06-03 2014-02-04 Rockwell Automation Technologies, Inc. Microbial monitoring and prediction
US20120316914A1 (en) * 2011-06-09 2012-12-13 International Business Machines Corporation Scheduling of energy consuming activities for buildings
US20130003543A1 (en) 2011-06-30 2013-01-03 Avistar Communications Corporation NEXT-GENERATION BANDWIDTH MANAGEMENT CONTROL SYSTEMS FOR MULTIPLE-SERVICE CALLS, SESSIONS, PACKET-LEVEL PROCESSES, AND QoS PARAMETERS - PART 1: STRUCTURAL AND FUNCTIONAL ARCHITECTURES
WO2013025962A1 (en) 2011-08-18 2013-02-21 Siemens Corporation Thermo-economic modeling and optimization of a combined cooling, heating, and power plant
WO2013040539A1 (en) 2011-09-16 2013-03-21 Siemens Corporation Method and system for energy control management
US8930030B2 (en) 2011-09-30 2015-01-06 Siemens Industry, Inc. Method and system for improving energy efficiency in an HVAC system
US8843238B2 (en) 2011-09-30 2014-09-23 Johnson Controls Technology Company Systems and methods for controlling energy use in a building management system using energy budgets
US20130144451A1 (en) 2011-10-25 2013-06-06 San Diego State University Research Foundation Residential and commercial energy management system
US10415869B2 (en) 2011-11-17 2019-09-17 Optimum Energy Llc Systems and methods for reducing energy consumption of a chilled water distribution system
US20130125565A1 (en) 2011-11-17 2013-05-23 Optimum Energy,Llc Systems and methods for reducing energy consumption of a chilled water distribution system
US8417391B1 (en) 2011-12-15 2013-04-09 Restore Nv Automated demand response energy management system
WO2013095624A1 (en) 2011-12-23 2013-06-27 Hewlett-Packard Development Company, L.P. Generating a capacity schedule for a facility
US20130179373A1 (en) 2012-01-06 2013-07-11 Trane International Inc. Systems and Methods for Estimating HVAC Operation Cost
US9892472B2 (en) 2012-02-27 2018-02-13 Siemens Corporation Cost optimization for buildings with hybrid ventilation systems
JP6090904B2 (en) 2012-02-29 2017-03-08 三菱重工業株式会社 Cooling tower control device, cooling tower control method, and heat source system
JP6254953B2 (en) 2012-03-02 2017-12-27 ヴィジレント コーポレイションVigilent Corporation Multidimensional optimization to control environmental maintenance modules
US9535411B2 (en) 2012-03-05 2017-01-03 Siemens Aktiengesellschaft Cloud enabled building automation system
WO2013134455A1 (en) 2012-03-07 2013-09-12 Siemens Corporation Online heurisitc algorithm for combined cooling heating and power plant optimization
US9367053B2 (en) 2012-03-27 2016-06-14 Siemens Schweiz Ag System and method for coordination of building automation system demand and shade control
US20130262654A1 (en) 2012-03-28 2013-10-03 Sony Corporation Resource management system with resource optimization mechanism and method of operation thereof
US9002532B2 (en) 2012-06-26 2015-04-07 Johnson Controls Technology Company Systems and methods for controlling a chiller plant for a building
US20140012429A1 (en) 2012-07-06 2014-01-09 Ian Dempster Systems and methods for balancing an electrical grid with networked buildings
US20140379139A1 (en) 2012-07-06 2014-12-25 Optimum Energy, Llc Systems and methods for balancing an electrical grid with networked buildings
US20140049545A1 (en) 2012-08-16 2014-02-20 General Electric Company Method and system for optimizing utility cost
WO2014043623A1 (en) 2012-09-17 2014-03-20 Siemens Corporation Log-based predictive maintenance
US8600561B1 (en) 2012-09-30 2013-12-03 Nest Labs, Inc. Radiant heating controls and methods for an environmental control system
MX362205B (en) 2012-10-11 2019-01-08 Siemens Corp On-line optimization scheme for hvac demand response.
WO2014117013A1 (en) 2013-01-25 2014-07-31 Trane International Inc. Methods and systems for controlling a chiller system having a centrifugal compressor with a variable speed drive
US9797617B2 (en) 2013-02-07 2017-10-24 Trane International Inc. HVAC system with selective flowpath
MX343533B (en) 2013-02-11 2016-11-08 Siemens Ag Cloud enabled building automation system.
US9235657B1 (en) 2013-03-13 2016-01-12 Johnson Controls Technology Company System identification and model development
US9436179B1 (en) 2013-03-13 2016-09-06 Johnson Controls Technology Company Systems and methods for energy cost optimization in a building system
US9852481B1 (en) 2013-03-13 2017-12-26 Johnson Controls Technology Company Systems and methods for cascaded model predictive control
US20140266682A1 (en) 2013-03-15 2014-09-18 Leeo, Inc. Environmental monitoring device
US9995509B2 (en) 2013-03-15 2018-06-12 Trane International Inc. Cascading heat recovery using a cooling unit as a source
WO2014153552A1 (en) 2013-03-21 2014-09-25 Cornell University Building power management systems
US20140358508A1 (en) 2013-05-28 2014-12-04 Mitsubishi Electric Research Laboratories, Inc. Method for Optimizing HVAC Systems in Buildings Using Nonlinear Programming to Maximize Comfort for Occupants
CN203464552U (en) 2013-06-06 2014-03-05 特灵空调系统(中国)有限公司 Air-conditioning fin coil pipe heat exchanger and air-conditioning unit thereof
EP3042434A4 (en) 2013-09-06 2016-09-14 Opus One Solutions Energy Corp Systems and methods for grid operating systems in electric power systems
WO2015077754A1 (en) 2013-11-25 2015-05-28 Siemens Corporation A statistical approach to modeling and forecast of cchp energy and cooling demand and optimization cchp control setpoints
US9679248B2 (en) 2013-12-30 2017-06-13 International Business Machines Corporation Automated creation of semantically-enriched diagnosis models using time series data of temperatures collected by a network of sensors
US20150184549A1 (en) 2013-12-31 2015-07-02 General Electric Company Methods and systems for enhancing control of power plant generating units
US20150198345A1 (en) 2014-01-13 2015-07-16 Trane International Inc. Active Energy Budget Control Management
KR101548136B1 (en) 2014-03-31 2015-09-04 지멘스 주식회사 Cooling and heating air condition system, and control method thereof
CN106415145B (en) 2014-04-11 2019-08-06 特灵国际有限公司 HVAC system and control
US10386820B2 (en) 2014-05-01 2019-08-20 Johnson Controls Technology Company Incorporating a demand charge in central plant optimization
WO2015174176A1 (en) 2014-05-12 2015-11-19 三菱電機株式会社 Ventilation controller and method for controlling ventilation
CN106537429A (en) 2014-05-28 2017-03-22 西门子瑞士有限公司 System and method for providing optimization or improvement measures for one or more buildings
US10161649B2 (en) 2014-06-20 2018-12-25 Mitsubishi Electric Research Laboratories, Inc. Optimizing operations of multiple air-conditioning units
US20160004798A1 (en) 2014-07-07 2016-01-07 Ingersoll-Rand Company Determining the performance of an environmental system using a predictive model
US9746213B2 (en) 2014-08-14 2017-08-29 Siemens Industry, Inc Demand flow for air cooled chillers
US10871756B2 (en) 2014-08-26 2020-12-22 Johnson Solid State, Llc Temperature control system and methods for operating same
EP3186687B1 (en) 2014-08-26 2024-01-03 Johnson Solid State, LLC Hvac control system and methods for operating same
DE102014217929A1 (en) 2014-09-08 2016-03-10 Siemens Aktiengesellschaft An energy management system for controlling a device, computer software product and method for controlling a device
JP2016061487A (en) 2014-09-18 2016-04-25 三菱電機エンジニアリング株式会社 Optimum start-up control device for air conditioning system and optimum start-up control method for air conditioning system
US9967107B2 (en) 2014-12-24 2018-05-08 Optimum Energy Llc Intelligent equipment sequencing
CN204678489U (en) 2015-02-16 2015-09-30 特灵空调系统(中国)有限公司 Air conditioner room unit
US10386800B2 (en) 2015-02-24 2019-08-20 Siemens Industry, Inc. Variable air volume modeling for an HVAC system
US20160283844A1 (en) 2015-03-27 2016-09-29 Optimum Energy Llc Load predictor for a cooling system
WO2016182891A1 (en) 2015-05-12 2016-11-17 Siemens Industry, Inc. Method and system for adaptive control for thermostats
US9973129B2 (en) 2015-06-12 2018-05-15 Trane International Inc. HVAC components having a variable speed drive with optimized power factor correction
US10527367B2 (en) 2015-08-14 2020-01-07 Trane International Inc. Heat exchange assembly in an air to air heat exchanger
CN205332351U (en) 2015-11-16 2016-06-22 特灵空调系统(中国)有限公司 Air conditioner
US10452034B2 (en) * 2015-12-16 2019-10-22 Johnson Controls Technology Company Central plant control system with building energy load estimation
KR20180100230A (en) 2016-01-12 2018-09-07 옵티멈 에너지 엘엘씨 Predictive Freedom - Cooling
US9817383B1 (en) 2016-07-11 2017-11-14 Johnson Controls Technology Company Systems and methods for agent interaction with building management system
EP3497377B1 (en) 2016-08-09 2023-11-22 Johnson Solid State, LLC Temperature control system and methods for operating same
US10372146B2 (en) * 2016-10-21 2019-08-06 Johnson Controls Technology Company Systems and methods for creating and using combined predictive models to control HVAC equipment
CN106500274B (en) 2016-11-21 2019-07-02 特灵空调系统(中国)有限公司 The energy conserving system and method implemented in VAV system by wireless sensor network
CN106640655B (en) 2016-12-27 2017-12-22 特灵空调系统(中国)有限公司 The association's prosecutor method and fluid machinery of fluid machinery rotating speed and itself capacity adjusting mechanism
US9746199B1 (en) 2017-01-05 2017-08-29 Johnson Controls Technology Company Integrated smart actuator and valve device
EP3568646A4 (en) 2017-01-12 2020-11-04 Optimum Energy, LLC Predictive free cooling
US10409305B2 (en) 2017-01-29 2019-09-10 Trane International Inc. HVAC system configuration and zone management
CN106940075B (en) 2017-05-15 2019-05-07 特灵空调系统(中国)有限公司 Condenser of central air conditioner blower fan control system based on the autonomous optimizing of efficiency
CN107238180B (en) 2017-06-23 2020-07-07 特灵空调系统(中国)有限公司 Air quantity control method and system of air-cooled water chilling unit
JP2019049931A (en) 2017-09-12 2019-03-28 先智雲端數據股▲分▼有限公司ProphetStor Data Services, Inc. Method for optimizing use of workload-consuming resources for fixed time-series workloads
CN107525319B (en) 2017-09-18 2020-10-02 特灵空调系统(中国)有限公司 Air conditioner control system and air conditioner control method
CN108317588A (en) 2018-01-02 2018-07-24 特灵空调系统(中国)有限公司 Compound heating device, supply control method for heat and its device
US10978199B2 (en) 2019-01-11 2021-04-13 Honeywell International Inc. Methods and systems for improving infection control in a building
US11783658B2 (en) 2020-06-15 2023-10-10 Honeywell International Inc. Methods and systems for maintaining a healthy building
US20210391089A1 (en) 2020-06-15 2021-12-16 Honeywell International Inc. Methods and systems for reducing a risk of spread of an illness in a building
US11783652B2 (en) 2020-06-15 2023-10-10 Honeywell International Inc. Occupant health monitoring for buildings
US11823295B2 (en) 2020-06-19 2023-11-21 Honeywell International, Inc. Systems and methods for reducing risk of pathogen exposure within a space
US11184739B1 (en) 2020-06-19 2021-11-23 Honeywel International Inc. Using smart occupancy detection and control in buildings to reduce disease transmission
US20210398690A1 (en) 2020-06-22 2021-12-23 Honeywell International Inc. Devices, systems, and methods for assessing facility compliance with infectious disease guidance
US20210398691A1 (en) 2020-06-22 2021-12-23 Honeywell International Inc. Methods and systems for reducing a risk of spread of disease among people in a space
US20210398659A1 (en) 2020-06-22 2021-12-23 Honeywell International Inc. Methods and systems for contact tracing of occupants of a facility

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
US20190384259A1 (en) 2019-12-19
US20240061404A1 (en) 2024-02-22
US20150316946A1 (en) 2015-11-05
US20190107825A1 (en) 2019-04-11
US20150316907A1 (en) 2015-11-05
US10915094B2 (en) 2021-02-09
US10101731B2 (en) 2018-10-16
US10101730B2 (en) 2018-10-16
US10175681B2 (en) 2019-01-08
US20210132586A1 (en) 2021-05-06
EP4116786B1 (en) 2024-04-03
EP3062183B1 (en) 2019-12-11
US20150316903A1 (en) 2015-11-05
US10386820B2 (en) 2019-08-20
US20150316901A1 (en) 2015-11-05
EP3062184A1 (en) 2016-08-31
EP4116786A1 (en) 2023-01-11
EP3062183A1 (en) 2016-08-31
US11774948B2 (en) 2023-10-03
US20150316902A1 (en) 2015-11-05
EP3640756A1 (en) 2020-04-22
US11803174B2 (en) 2023-10-31
US11275355B2 (en) 2022-03-15
EP3640756B1 (en) 2022-08-31

Similar Documents

Publication Publication Date Title
EP3062184B1 (en) Low level central plant optimization
US11874638B2 (en) Control system with coordinated equipment staging
US9696054B2 (en) Systems and methods for controlling a central plant for a building
US10372146B2 (en) Systems and methods for creating and using combined predictive models to control HVAC equipment
US10761547B2 (en) HVAC controller with integrated airside and waterside cost optimization
US20230075122A1 (en) Thermal control of data center
US20240093883A1 (en) Control system for building equipment with secondary strong prevention
US11221156B2 (en) Central plant control system with decaying capacity adjustment
US20220206474A1 (en) Control systems and methods for building equipment with optimization modification
CN105929686B (en) Low level central facility optimization
US20230132477A1 (en) Building equipment selection using soft constraints

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17P Request for examination filed

Effective date: 20170228

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

17Q First examination report despatched

Effective date: 20170328

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: JOHNSON CONTROLS TECHNOLOGY COMPANY

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20181204

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016014494

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1138650

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190615

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190529

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190930

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190829

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190830

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190829

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1138650

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190529

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016014494

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

26N No opposition filed

Effective date: 20200303

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200209

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200229

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200209

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190929

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230214

Year of fee payment: 8

Ref country code: DE

Payment date: 20230227

Year of fee payment: 8