EP3006648A1 - Guard rail - Google Patents
Guard rail Download PDFInfo
- Publication number
- EP3006648A1 EP3006648A1 EP15189071.2A EP15189071A EP3006648A1 EP 3006648 A1 EP3006648 A1 EP 3006648A1 EP 15189071 A EP15189071 A EP 15189071A EP 3006648 A1 EP3006648 A1 EP 3006648A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- guard rail
- rail
- vertical
- locking device
- attached
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 2
- 230000009286 beneficial effect Effects 0.000 description 8
- 206010016173 Fall Diseases 0.000 description 7
- 229910052751 metal Inorganic materials 0.000 description 4
- 239000002184 metal Substances 0.000 description 4
- 229910001335 Galvanized steel Inorganic materials 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000004411 aluminium Substances 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000009408 flooring Methods 0.000 description 2
- 239000008397 galvanized steel Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000004677 Nylon Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 229920001778 nylon Polymers 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 230000002459 sustained effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/147—Railings specially adapted for mounting prior to the mounting of the platform
Definitions
- the present invention relates to a guard rail for scaffolding.
- the present invention more particularly relates to an improved detachable guard rail that takes up less space during storage and transport and allows for fast and secure scaffolding assembly.
- EP2527563A discloses a guard rail for scaffolding.
- the guard rail is basically T-shaped and comprises a set of vertical rail parts permanently attached to horizontal parts mutually connected by a vertical member to form a one-piece body rail element.
- this guard rail takes up a lot of space during storage and transport. Accordingly, the applicability of the guard rail is restricted by the space that the guard rail takes up during storage and transport.
- the guard rail according to the invention is a guard rail configured to be attached to a scaffolding, wherein the guard rail comprises a rail, adapted to cordon off a work area in one or more horizontal directions, wherein the guard rail comprises a vertical member and a rail extending basically perpendicular to the vertical member, wherein the rail is formed as a one-piece body that is configured to be detachably attached to the vertical member.
- guard rail that takes up less space during storage and transport, since the rail can be detached from the vertical member so that two separate units (the vertical member and the rail) can be transported in a manner in which less space is required. Furthermore, the guard rail is fast and easy to assemble and disassemble, since the rail can be detachably attached to the vertical member.
- the guard rail is capable of preventing scaffolders from falling down from the scaffolding.
- the guard rail is configured to be attached to a scaffolding by any suitable means including suspending brackets shaped as hook bodies.
- the guard rail comprises a rail, adapted to cordon off a work area in one or more horizontal directions. Accordingly, the rail provides a safe working area on a scaffold platform when no transverse members have yet been mounted.
- the working referred to may be a scaffold platform.
- the guard rail can prevent scaffolders from falling down as they approach the periphery of the scaffolding (the periphery of the scaffold platform).
- the guard rail comprises a vertical member and a rail extending basically perpendicular to the vertical member. It may be an advantage that the guard rail is essentially T-shaped.
- the rail is formed as a one-piece body that is configured to be detachably attached to the vertical member by means of any suitable attachment means.
- the vertical member comprises means for detachable attachment to the scaffolding.
- the vertical member and thus the guard rail can be detachably attached to the scaffolding. It is preferred that the means for detachable attachment to the scaffolding provide an easy and fast attachment and detachment of the guard rail.
- the vertical member may comprise a grate structure comprising a plurality of rods extending perpendicular to each other.
- a grate structure comprising a plurality of rods extending perpendicular to each other.
- the longitudinal axis of the rail and the longitudinal axis of the vertical member extend perpendicular to each other. If the longitudinal axis of the rail of the guard rail extends horizontally, the longitudinal axis of the vertical member preferably extends vertically.
- the vertical member extends basically perpendicular to the rail and comprises means for detachable attachment to a scaffolding.
- the vertical member comprises two essentially parallel longitudinal vertical structures, wherein a number of transverse frame members extend between the vertical structures.
- the vertical member comprises a first vertical structure and a second vertical structure extending parallel to the first vertical structure, wherein a plurality of transverse structures extend between the first vertical structure and the second vertical structure.
- the vertical structures may be equipped with means for attaching the vertical member and thus the guard rail to the scaffolding.
- the vertical structures may be provided with means for attaching the rail to the vertical member.
- the rail overlaps the vertical member.
- the rail overlaps the top portion of the vertical member.
- the rail of the guard rail can be provided in the largest distance from the bottom portion of the guard rail. Accordingly, the height of the vertical member can be minimised.
- the rail comprises two longitudinal frame members and one or more frame members extending between the two longitudinal frame members.
- the rail comprises two longitudinal frame members and two, three or more frame members extending between the two longitudinal frame members.
- the rail comprises two longitudinal frame members and four frame members extending between the two longitudinal frame members.
- the rail comprises one or more frame members that are offset relative to the vertical structures of the vertical member.
- the vertical frame members that are offset relative to the vertical structures of the vertical member can prevent the motion of the rail along the longitudinal axis of the rail, because the suspending brackets will abut the vertical frame members when the rail is moved along its longitudinal axis. Since the vertical frame members extend between the horizontal frame members, suspending brackets will prevent the vertical frame members and thus the rail from being moved further along (one direction of) the longitudinal axis of the rail when the suspending brackets abut the vertical frame members.
- the rail comprises a first frame member and a second frame member that are offset relative to the vertical structures of the vertical member.
- the first frame member can restrict the motion of the rail in a first direction (along its longitudinal axis), whereas the second frame member can restrict the motion of the rail in the opposite direction (along its longitudinal axis).
- the distance between the first frame member and a second (adjacent) frame member is larger than the width of the vertical member.
- first frame member and the second adjacent frame member can be used to restrict displacement of the rail along its longitudinal axis.
- the guard rail comprises a locking device configured to be brought into engagement with a scaffold platform, wherein the locking device comprises a handle and is configured to be positioned in a locked position and in an unlocked position, wherein the locking device comprises means for maintaining the locking device fixed in the positions, wherein the locking device comprises means for bringing the locking device from a locked position to an unlocked position and for bringing the locking device from an unlocked position to a locked position solely by rotation and/or displacement of the handle.
- the guard rail can be fixed to the scaffolding in a fast and user-friendly manner without using screws that have to be fastened by means of tools. Moreover, the guard rail can be detached from the scaffolding in an easy and fast manner.
- the locking device is rotatably attached to the vertical structures of the vertical member.
- the locking device may be brought from a locked position to an unlocked position and from an unlocked position to a locked position solely by rotation of the handle. Accordingly, the locking device can be operated by the scaffolder in a fast and easy manner.
- the guard rail comprises a positioning member configured to maintain the locking device in a locked position and in an unlocked position, wherein the positioning member comprises a cavity configured to bear against an abutting structure of the guard rail in such a manner that the locking device is fixed to the abutting structure.
- the positioning member can be maintained fixed to the abutting structure in an easy manner.
- the guard rail comprises a spring or another resilient member arranged to provide a force keeping the positioning member in engagement with the abutting structure.
- the spring or another resilient member secures that the locking device can be maintained in a locked position or in an unlocked position as long as desired. Moreover, the use of a spring or another resilient member allows for an easy change of the position of the locking device.
- the guard rail comprises a locking device comprising locking arms configured to engage with a portion of the scaffolding, preferably a scaffold platform, e.g. a plane plate-shaped structure extending perpendicular to a horizontal direction.
- the guard rail may be attached to the scaffold platform independent of the geometry and type of the scaffolding as long as the locking device fits the scaffold platform.
- the guard rail comprises a locking device comprising locking arms configured to engage with a portion of the scaffolding, preferably a scaffold platform.
- the guard rail comprises a plurality of suspension brackets configured to be attached to a transverse member of the scaffolding.
- the guard rail can easily be attached to the transverse member of the scaffolding so that the scaffolders, required to step onto the scaffold platform which has just been laid as the uppermost walk surface, can be prevented from falling down.
- the guard rail according to the invention is easy and fast to use because no tools are needed to fasten screws.
- the guard rail comprises hook bodies for attachment to a first transverse structure and a second parallel transverse structure of the scaffolding.
- the guard rail comprises a locking device comprising a handler that allows for fast and easy positioning of the locking device into a locked position and an unlocked position, respectively.
- guard rail can be attached to a scaffolding without screws and scaffolding split pins because the montage time can be reduced.
- the guard rail comprises first suspending brackets configured to be received by the top portion of horizontally oriented transverse members of a scaffolding, wherein the guard rail furthermore comprises other suspending brackets configured to receive at least the bottom portion of horizontally oriented frame members of the rail. It may be beneficial that the first suspending brackets are attached at a one side of the vertical member and that the other suspending brackets are arranged at the other side of the vertical member.
- a guard rail 2 of the present invention is illustrated in Fig. 1 .
- Fig. 1 is a schematic side view of a guard rail 2 according to the invention.
- a coordinate system showing a first axis X and a second axis Y is provided below the guard rail 2.
- the guard rail 2 comprises a rail 4 (a frame-shaped grate structure) having two parallel longitudinal frame members 10, 10'.
- a rail 4 a frame-shaped grate structure
- Four parallel transversal frame members 12, 12', 12", 12"' extend between the frame members 10, 10'.
- the longitudinal frame members 10, 10' extend parallel to the axis X, whereas the parallel transversal frame members 12, 12', 12", 12'" extend parallel to the axis Y.
- the rail 4 may be produced in metal, e.g. a light metal such as aluminium or in steel (e.g. galvanized steel).
- the longitudinal frame members 10, 10' and the transversal frame members 12, 12', 12", 12'" are hollow in order to reduce the weight of the rail 4. It may be beneficial that the longitudinal frame members 10, 10' and the transversal frame members 12, 12', 12", 12'” are cylindrical with a circular, rectangular or triangular cross-section.
- the longitudinal frame members 10, 10' and the transversal frame members 12, 12', 12", 12'” may be welded together by separate pipes. Alternatively, it is possible to attach the transversal frame members 12, 12', 12", 12"' to the longitudinal frame members 10, 10' by means of screws (e.g. corresponding bolts and nuts).
- the guard rail 2 furthermore comprises a vertical member 6 comprising two longitudinal vertical structures 14, 14' and three transverse structures 16, 16', 16" extending there between.
- the longitudinal vertical structures 14, 14' extend parallel to the axis Y, whereas the three transverse structures 16, 16', 16" extend parallel to the axis X.
- the longitudinal vertical structures 14, 14' and the transverse structures 16, 16', 16" may be shaped as hollow pipes in order to reduce the weight of the vertical member 6. It may be an advantage that the vertical structures 14, 14' and the transverse structures 16, 16', 16" are shaped as cylindrical pipes having a circular, rectangular of triangular cross-section.
- the vertical structures 14, 14' and the transverse structures 16, 16', 16" may beneficially be joint by means of welding or mechanically by means of screws (e.g. corresponding bolts and nuts).
- suspending brackets 18, 18', 20, 20', 22, 22', 24, 24' are pair wisely attached at four vertical positions on the vertical structures 14, 14'.
- the suspending brackets 18, 20, 22, 24 are attached to the first vertical structure 14, whereas the suspending brackets 18', 20', 22', 24' are attached to the second vertical structure 14'.
- the suspending brackets 18, 18', 20, 20' are configured to engage with horizontal pipe structures on a scaffolding, whereas the suspending brackets 22, 22', 24, 24' are configured for mounting and keep the rail 4 fixed to a scaffolding.
- the guard rail 2 furthermore comprises a locking device 8 rotatably attached to the vertical member 6.
- the locking device 8 comprises a handle 26 shaped as a pipe structure that is a little shorter than the transverse structures 16, 16', 16".
- the handle 26 extends parallel to the axis X.
- the locking device 8 moreover comprises two parallel arms 28, 28' shaped as plate-shaped structures attached to the end structures of the handle (on each end of the handle) 26.
- the two parallel arms 28, 28' extend parallel to the axis Y.
- the two parallel arms 28, 28' are rotatably attached to the first longitudinal vertical structure 14 and the second longitudinal vertical structure 14', respectively.
- the first arm 28 is rotatably attached to the first longitudinal vertical structure 14 by means of a bolt 32 and a nut 34 attached thereto. Between the first longitudinal vertical structure 14 and the first arm 28, a positioning member 40 is provided. It may be an advantage that the positioning member 40 is made in a softer material than the first longitudinal vertical structure 14. It may be an advantage that the positioning member 40 is made in nylon, wood or in a plastic material.
- the other arm 28' is rotatably attached to the second longitudinal vertical structure 14' by means of a bolt 32' and a nut 34' attached thereto.
- a spring 36 is provided between the second longitudinal vertical structure 14' and the other arm 28'. The spring 36 provides a sustained force against the locking device 8 along the axis X in the direction from the second longitudinal vertical structure 14' towards the first longitudinal vertical structure 14.
- a locking arm 30 is attached to the distal end of the first arm 28, whereas a corresponding locking arm 30' is attached to the distal end of the second arm 28'.
- the locking arms 30, 30' may be shaped as angle structures comprising two rectangular plate structures attached to each other.
- the locking arms 30, 30' are configured to engage with a portion of a scaffold platform (see Fig. 4 or Fig. 5 ).
- the distance W 2 between the first frame member 12' and the second frame member 12" is larger than the width W 1 of the vertical member 6.
- the guard rail 2 can be disassembled.
- a guard rail 4 formed as a frame-shaped grate structure comprising two parallel longitudinal frame members 10, 10' and four frame members 12, 12', 12", 12"' extending there between.
- the longitudinal frame members 10, 10' extend parallel to the axis X
- the frame members 12, 12', 12", 12'" extend parallel with the axis Y, wherein the axes X, Y are shown in a coordinate system above the rail 4.
- Fig. 2 b illustrates the vertical member 6 of a guard rail 2 according to the invention.
- a coordinate system is arranged below the vertical member 6.
- the vertical member 6 comprises two longitudinal vertical structures 14, 14' extending parallel to the axis Y.
- Four hook bodies 18, 20, 22, 24 are provided in the first vertical member 14, whereas four corresponding hook bodies 18', 20', 22', 24' are provided in the second vertical member 14'.
- bores 44, 44' are provided for attachment of attachment means (e.g. scaffolding split pins).
- the locking device 8 comprises a rod-shaped handle 26 extending parallel to the axis X.
- the locking device 8, furthermore, comprises a first arm 28 attached to one of the free ends of the handle 26 and a second arm 28' attached to the other free end of the handle 26. Both arms 28, 28' extend parallel to the axis Y.
- a positioning member 40 is provided between the first arm 28 and the first vertical structure 14.
- the positioning member 40 is formed to fit the outer periphery of the first vertical structure 14 that abuts the positioning member 40.
- the positioning member 40 is configured to maintain the locking device 8 fixed in a first position and in a second position relative to the vertical member 6.
- a spring 36 is provided between the second arm 28' and the second vertical structure 14'. The spring 36 pushes the locking device 8 to the left against the first vertical structure 14 in such a manner that the first vertical structure 14 abuts the positioning member 40.
- the locking device 8 By moving the locking device 8 to the right towards the second vertical structure 14', it is possible to bring the locking device 8 out of engagement with the positioning member 40, whereby it is possible to change the position of the locking device 8 as shown in Fig. 2 d) .
- the locking device 8 is automatically brought in engagement with the positioning member 40 when the spring presses the locking device 8 to the left against the first vertical structure 14.
- the locking device 8 comprises two L-shaped locking arms 30, 30' attached to the first arm 28 and the second arm 28', respectively.
- Fig. 2 c) illustrates a close-up view of the positioning member 40 shown in Fig. 2 b) . It can be seen that the positioning member 40 is rotatably attached to the first vertical structure 14 by means of a bolt 32 extending through a bore extending through the first vertical structure 14 and further through the positioning member 40 and the arm 28. A nut 34 is attached to the free end of the bolt 32.
- Fig. 2 d) illustrates a side view of the vertical member 6 shown in Fig. 3 b) .
- a three-dimensional Cartesian coordinate system having three perpendicular axes X, Y, Z is provided below the vertical member 6.
- the vertical member 6 comprises a straight vertical structure 14 extending parallel to the axis Y.
- a first suspending bracket 18' and a second suspending bracket 20' having L-shaped profiles extending downwards are attached to the vertical structure 14.
- a third suspending bracket 22' and a fourth suspending bracket 24' having L-shaped profiles extending upwards are attached to the vertical structure 14.
- the three transverse structures 16, 16', 16" are indicated with dotted circles.
- the vertical member 6 comprises a locking device 8 that is rotatably attached to the longitudinal vertical structure 14.
- the axis of rotation ⁇ is shown in Fig. 2 d) and it can be seen that the locking device 8 can be arranged in two different configurations (positions).
- the arm 28' In the "unlocked position” A, the arm 28' extends parallel to the longitudinal vertical structure 14 and thus parallel to the axis Y.
- the arm 28' In the "locked position” B, the arm 28' extends perpendicular to the longitudinal vertical structure 14 and thus parallel to the axis Z.
- the distal portion of the L-shaped locking arm 30' extends horizontally parallel to the axis Z.
- the distal portion of the L-shaped locking arm 30' extends vertically, which enables it to engage with a portion of a scaffold platform.
- Fig. 3 a illustrates a front view of a locking device 8 according to the invention.
- the locking device 8 comprises a rod-shaped handle 26 extending between and being attached to two parallel arms 28, 28'.
- a first locking arm 30 and a second locking arm 30' are attached to the distal end of the first arm 28 and the second arm 28, respectively.
- a positioning member 40 is provided on the first arm 28.
- Fig. 3 b illustrates a front view of the locking device 8 shown in Fig. 3 a) .
- the locking device 8 comprises a rod-shaped, pipe-shaped handle 26 having a circular cross-section (indicated with a dotted circular line).
- a first L-shaped locking arm 30 is attached to the distal end of the first arm 28.
- a positioning member 40 having a through-going bore 44 is provided on the first arm 28. The bore 44 is configured to receive a through-going bolt for attachment of the positioning member 40 to the first arm 28.
- Fig. 3 c) illustrates a close-up view of the positioning member 40 shown in Fig. 3 a) .
- the positioning member 40 comprises a basically circular profile (seen from a side perspective).
- the positioning member 40 comprises a cavity 42 shaped as a section of a sphere with a radius r (a circle with radius r is indicated with a dotted line). Therefore, the positioning member 40 is configured to abut and engage a pipe structure having a circular cross-section (see Fig. 1 , Fig. 2 b) and Fig. 2 c) ).
- a through-going bore 44 extends through the positioning member 40 and the first arm 28.
- the through-going bore 44 is indicated with dotted lines.
- a spring 36 is provided between the nut 34 and the first arm 28. Hereby, it is possible to displace the positioning member 40 perpendicular to (in a direction away from) the first arm 28, whereby the positioning member 40 can rotate about the bore 44.
- Fig. 3 d illustrates a schematic illustration of a vertical structure 14 according to the invention.
- a first suspending bracket 18 is moveably attached to the vertical structure 14 by means of a bracket 48, onto which the suspending bracket 18 is attached.
- a through-going bore configured to receive a bolt for attaching the suspending bracket 18 to the vertical structure 14 extends through the bracket 48.
- Three through-going bores 46, 46', 46" for attachment of the suspending bracket 18 are provided in the vertical structure 14.
- the suspending bracket 18 By displacing the suspending bracket 18 from the second bore 46' to the third bore 46", the suspending bracket 18 is displaced a length d as indicated on Fig. 3 d) .
- Fig. 4 illustrates a scaffolding 56 provided with a first guard rail 2 and a second guard rail 2' according to the invention.
- the scaffolding 56 is placed on a support 50 provided with tiles and cobblestones by means of a plurality of feet 52.
- the scaffolding 56 comprises a scaffold platform 58 to which the first guard rail 2 is detachably attached.
- the first guard rail 2 comprises a vertical member 6 that is attached to one of the transverse members 60 of the scaffolding 56 by means of four suspending brackets 18, 18', 20, 20'.
- the suspending brackets 18, 18', 20, 20' rest on the transverse members 60 that prevent the guard rail 2 from being moved downwards.
- the means for detachable attachment comprise a locking device 8 that engages the scaffold platform 58 and thus is fixed to it. This fixation prevents the guard rail 2 from being moved perpendicular to the longitudinal axis of the scaffold platform 58.
- a rail 4 comprising a first longitudinal frame member 10 and a second frame member 10' extending parallel to the first frame member 10 is attached to the vertical member 6.
- the rail 4 is attached to four suspending brackets 22, 22', 24, 24' provided in the top portion of the vertical member 6.
- the first longitudinal frame member 10 is attached to the two second uppermost suspending brackets 22, 22', whereas the second longitudinal frame member 10' is attached to the vertical member 6 by means of the uppermost suspending brackets 24, 24'.
- Locking members 54 formed as scaffolding split pins are attached to the uppermost suspending brackets 24, 24' in order to prevent the rail 4 from being detached from the vertical member 6.
- the guard rail 2 is light and easy to use and that the first guard rail 2 prevents the scaffolders from falling down from the scaffolding 56, when they step onto the scaffold platform 58 which has just been laid as the uppermost walk surface (where no transverse members 60, 60', 60" have been mounted).
- the guard rail 2 is very easy to assemble, because it can be mounted by means of the suspending brackets 18, 18' and the locking device 8. Further hook bodies may, however, be used.
- a second guard rail 2' is mounted on the end wall of the scaffolding 56.
- the end wall of the scaffolding 56 is shorter than the long side of the scaffolding 56.
- the second guard rail 2' comprises a vertical member 6'.
- a first pair of suspending brackets 18, 18' is attached to the vertical member 6'.
- the first suspending brackets 18, 18' engage a first transverse member 60'.
- a second pair of suspending brackets 20, 20' is attached to the vertical member 6'.
- the second suspending brackets 20, 20' engage a second transverse member 60".
- the vertical member 6' is mechanically attached to the scaffold platform 58 by means of a first fastening member 62 connecting the first vertical structure 14 and the scaffold platform 58 and by means of a second fastening member 62' connecting the second vertical structure 14' and the scaffold platform 58.
- the fastening members 62, 62' can comprise a wire connected to a scaffolding split pin, suspending brackets or other suitable mechanical attachment means.
- the rail 4' attached to the second vertical structure 6' is shorter than the first rail 4 attached to the first guard rail 2.
- the second rail 4' comprises a first longitudinal frame member 10 and a second longitudinal frame member 10', extending parallel to each other.
- the second rail 4' is attached to four suspending brackets 22, 22', 24, 24' provided in the top portion of the vertical structure 6'.
- the first longitudinal frame member 10 is attached to the two second uppermost suspending brackets 22, 22', whereas the second frame member 10' is attached to the two uppermost suspending brackets 24, 24'.
- Scaffolding split pins 54 are attached to the uppermost suspending brackets 24, 24' in order to prevent the rail 4' from detaching from the vertical structure 6'.
- Fig. 5 illustrates two guard rails 2, 2' according to the invention attached to a scaffolding 56.
- the scaffolding 56 is arranged on a support 50 up against a building (a block of flats) 64.
- the support 50 is a pavement upon which the feet 53 of the scaffolding 56 rest.
- the first guard rail 2 comprises a vertical structure 6 attached to a transverse member 60 by means of two suspending brackets 18, 18' that engage the transverse member 60 and rest upon it.
- the vertical structure 6 comprises a locking device 8 attached to the scaffold platform 58.
- the first guard rail 2 furthermore comprises a rail 4 attached to the two upper most pairs of suspending brackets 22, 22', 24, 24' of the vertical structure 6. Scaffolding split pins 54 are attached to the uppermost suspending brackets 24, 24' in order to fix the rail 4 to the uppermost pair of suspending brackets 24, 24'.
- the second guard rail 2' comprises a vertical structure 6' attached to a first transverse member 60' by means of two suspending brackets 18, 18' and to a second transverse member 60" by means of two suspending brackets 20, 20'.
- the vertical structure 6' comprises a locking device 8' attached to the scaffold platform 58.
- the second guard rail 2' comprises a rail 4' attached to the two uppermost pairs of suspending brackets 22, 22', 24, 24' of the vertical structure 6.
- the two guard rails 2, 2' are easy and fast to apply and they are capable of preventing scaffolders from falling down when the scaffolders step on the scaffold platform 58 when no side structures yet are mounted.
- the guard rail 2 is fast to assemble and fix to the scaffolding, since it is only attached by means of the suspending brackets 18, 18', 20, 20' and the locking device 8.
- the two guard rails 2, 2' almost bear against each other. A small gap is, however, provided between the two guard rails 2, 2' in order to mount the guard rails 2, 2'.
- Fig, 6 a illustrates a schematic top view of a positioning member 40 brought into engagement with a longitudinal vertical structure 14.
- the longitudinal vertical structure 14 has a circular profile that fits the cavity 42 of the positioning member 40.
- the positioning member 40 is attached to the arm 28.
- a bore 44 extends through the positioning member 40 and the arm 28.
- a bolt extends through the bore 44, and a nut 34 is attached to the free end of the bolt.
- a spring 36 that presses the nut 34 away from the arm 28 is provided between the nut 34 and the arm 28.
- FIG. 6 a A three-dimensional Cartesian coordinate system having a vertical axis Y and two horizontal axes X, Z corresponding to the one shown in Fig. 1 and Fig. 2 is illustrated in Fig. 6 a) .
- Fig. 6 b) illustrates a schematic top view of a positioning member 40 brought into engagement with a longitudinal vertical structure 14.
- the arm 28 and the positioning member 40 attached to the arm 28 are rotated 90 degrees compared to Fig. 6 a) .
- a three-dimensional Cartesian coordinate system having a vertical axis Y and two horizontal axes X, Z corresponding to the one shown in Fig. 1 and Fig. 2 is illustrated in Fig. 6 b) .
- Fig. 6 c) illustrates a schematic top view of a positioning member 40 brought into engagement with a longitudinal vertical structure 14.
- the arm 28 and the positioning member 40 attached to the arm 28 are arranged in the same manner relative to each other as in Fig. 6 b) .
- Fig. 7 illustrates a front view of a guard rail 2 according to an embodiment of the invention.
- the guard rail 2 comprises a rail 4 having a frame-shaped grate structure.
- the rail 4 comprises two parallel longitudinal frame members 10, 10'.
- Four parallel transversal frame members 12, 12', 12", 12"' extend between the frame members 10, 10'.
- the rail 4 may be produced in metal, e.g. a light metal such as aluminium or in steel (e.g. galvanized steel).
- the two central frame members 12', 12" are arranged closer to each other that the other adjacent frame members.
- the guard rail 2 comprises a vertical member 6 comprising two longitudinal vertical structures 14, 14' and three transverse structures 16, 16', 16" extending there between.
- suspending brackets 18, 18', 20, 20', 22, 22', 24, 24' are attached to the vertical structures 14, 14'.
- the suspending brackets 18, 20, 22, 24 are attached to the first vertical structure 14, whereas the suspending brackets 18', 20', 22', 24' are attached to the second vertical structure 14'.
- the suspending brackets 18, 18', 20, 20' are adapted to be brought into engagement with horizontal pipe structures on a scaffolding, whereas the suspending brackets 22, 22', 24, 24' are configured for mounting and keep the rail 4 fixed to a scaffolding.
- the guard rail 2 comprises a locking device 8 rotatably attached to the vertical member 6.
- the locking device 8 comprises a handle 26 shaped as a pipe structure that is a little shorter than the transverse structures 16, 16', 16".
- the locking device 8 moreover comprises two parallel arms shaped as plate-shaped structures attached to the end structures of the handle (on each end of the handle) 26.
- the two parallel arms are rotatably attached to the first longitudinal vertical structure 14 and the second longitudinal vertical structure 14', respectively.
- the vertical member 6 is attached to first frame member 10 and the second frame member 10' of the rail 4 between the frame members 12 and 12'. Accordingly, the rail 4 protrudes to the right side of the vertical member 6 to a much greater extent than to the left side of the vertical member. By changing the position of the rail 4 on which the vertical member 6 is attached, it is possible to arrange the rail 4 according to space specific requirements.
- the distance W 2 between the first frame member 12' and the second frame member 12" is larger than the width W 1 of the vertical member 6.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
Description
- The present invention relates to a guard rail for scaffolding. The present invention more particularly relates to an improved detachable guard rail that takes up less space during storage and transport and allows for fast and secure scaffolding assembly.
- During scaffolding construction, vertical scaffolding elements designed as so-called adjusting frames are fitted onto one another by means of pipe connectors as the structure is built upwards. In each tier, the adjusting frames are erected first and these are subsequently connected by flooring or planking elements. Accordingly, each time a scaffolding is built upwards, a scaffolder is required to step onto the flooring or planking element, which has just been laid as the uppermost walk surface. Therefore, since the scaffolder stands freely on the walk surface without any back protection, this work is especially dangerous.
- Therefore, it is an object of the invention is to provide means whereby this danger may be obviated.
- Due to the potential risk of falling down, the authorities have enforced new regulations that require the scaffolders to wear safety belts during assembling of scaffolding. This procedure is, however, time consuming and a nuisance to the scaffolders.
- Several attempts have been made to provide a guard rail for scaffolding with the purpose of preventing scaffolders from falling down.
EP2527563A discloses a guard rail for scaffolding. The guard rail is basically T-shaped and comprises a set of vertical rail parts permanently attached to horizontal parts mutually connected by a vertical member to form a one-piece body rail element. Thus, this guard rail takes up a lot of space during storage and transport. Accordingly, the applicability of the guard rail is restricted by the space that the guard rail takes up during storage and transport. - Accordingly, it is an object of the present invention to provide a guard rail that takes up less space during storage and transport. It is also an object of the present invention to provide a guard rail that is fast and easy to assemble and disassemble.
- The object of the present invention can be achieved by a guard rail as defined in claim 1. Preferred embodiments are defined in the dependent sub claims, explained in the following description and illustrated in the accompanying drawings.
- The guard rail according to the invention is a guard rail configured to be attached to a scaffolding, wherein the guard rail comprises a rail, adapted to cordon off a work area in one or more horizontal directions, wherein the guard rail comprises a vertical member and a rail extending basically perpendicular to the vertical member, wherein the rail is formed as a one-piece body that is configured to be detachably attached to the vertical member.
- Hereby, it is possible to provide a guard rail that takes up less space during storage and transport, since the rail can be detached from the vertical member so that two separate units (the vertical member and the rail) can be transported in a manner in which less space is required. Furthermore, the guard rail is fast and easy to assemble and disassemble, since the rail can be detachably attached to the vertical member.
- The guard rail is capable of preventing scaffolders from falling down from the scaffolding.
- The guard rail is configured to be attached to a scaffolding by any suitable means including suspending brackets shaped as hook bodies.
- The guard rail comprises a rail, adapted to cordon off a work area in one or more horizontal directions. Accordingly, the rail provides a safe working area on a scaffold platform when no transverse members have yet been mounted. The working referred to may be a scaffold platform. The guard rail can prevent scaffolders from falling down as they approach the periphery of the scaffolding (the periphery of the scaffold platform).
- The guard rail comprises a vertical member and a rail extending basically perpendicular to the vertical member. It may be an advantage that the guard rail is essentially T-shaped.
- The rail is formed as a one-piece body that is configured to be detachably attached to the vertical member by means of any suitable attachment means.
- It may be an advantage that the vertical member comprises means for detachable attachment to the scaffolding.
- Hereby, the vertical member and thus the guard rail can be detachably attached to the scaffolding. It is preferred that the means for detachable attachment to the scaffolding provide an easy and fast attachment and detachment of the guard rail.
- The vertical member may comprise a grate structure comprising a plurality of rods extending perpendicular to each other. Hereby is meant that the longitudinal axis of the rail and the longitudinal axis of the vertical member extend perpendicular to each other. If the longitudinal axis of the rail of the guard rail extends horizontally, the longitudinal axis of the vertical member preferably extends vertically.
- In a preferred embodiment, the vertical member extends basically perpendicular to the rail and comprises means for detachable attachment to a scaffolding.
- It may be an advantage that the vertical member comprises two essentially parallel longitudinal vertical structures, wherein a number of transverse frame members extend between the vertical structures.
- It may be advantageous that the vertical member comprises a first vertical structure and a second vertical structure extending parallel to the first vertical structure, wherein a plurality of transverse structures extend between the first vertical structure and the second vertical structure.
- Hereby, a strong and reliable vertical member suitable for fast and easy montage can be provided. Furthermore, the vertical structures may be equipped with means for attaching the vertical member and thus the guard rail to the scaffolding. Moreover, the vertical structures may be provided with means for attaching the rail to the vertical member.
- It may be beneficial that the rail overlaps the vertical member.
- Hereby, it is possible to provide a strong guard rail that is resistant toward impact. Two layers (one rail layer and one vertical member layer) will be present. Accordingly, a strong and reliable attachment of the rail to the vertical member can be achieved.
- It may be advantageous that the rail overlaps the top portion of the vertical member.
- Hereby, the rail of the guard rail can be provided in the largest distance from the bottom portion of the guard rail. Accordingly, the height of the vertical member can be minimised.
- It may be advantageous that the rail comprises two longitudinal frame members and one or more frame members extending between the two longitudinal frame members.
- Hereby, a strong construction can be achieved.
- In one preferred embodiment according to the invention, the rail comprises two longitudinal frame members and two, three or more frame members extending between the two longitudinal frame members.
- In a particular preferred embodiment according to the invention, the rail comprises two longitudinal frame members and four frame members extending between the two longitudinal frame members.
- It may be beneficial that the rail comprises one or more frame members that are offset relative to the vertical structures of the vertical member.
- Hereby, it is possible to apply the frame members that are offset relative to the vertical structures of the vertical member to prevent the motion of the rail along the longitudinal axis of the rail.
- If the rail is attached to the vertical member by means of suspending brackets attached to horizontal frame members, the vertical frame members that are offset relative to the vertical structures of the vertical member can prevent the motion of the rail along the longitudinal axis of the rail, because the suspending brackets will abut the vertical frame members when the rail is moved along its longitudinal axis. Since the vertical frame members extend between the horizontal frame members, suspending brackets will prevent the vertical frame members and thus the rail from being moved further along (one direction of) the longitudinal axis of the rail when the suspending brackets abut the vertical frame members.
- It may be beneficial that the rail comprises a first frame member and a second frame member that are offset relative to the vertical structures of the vertical member.
- Hereby, the first frame member can restrict the motion of the rail in a first direction (along its longitudinal axis), whereas the second frame member can restrict the motion of the rail in the opposite direction (along its longitudinal axis).
- It may be advantageous that the distance between the first frame member and a second (adjacent) frame member is larger than the width of the vertical member.
- Hereby, it is possible to attach the vertical member between the first frame member and the second adjacent frame member. Furthermore, the first frame member and the second adjacent frame member can be used to restrict displacement of the rail along its longitudinal axis.
- It may be an advantage that the guard rail comprises a locking device configured to be brought into engagement with a scaffold platform, wherein the locking device comprises a handle and is configured to be positioned in a locked position and in an unlocked position, wherein the locking device comprises means for maintaining the locking device fixed in the positions, wherein the locking device comprises means for bringing the locking device from a locked position to an unlocked position and for bringing the locking device from an unlocked position to a locked position solely by rotation and/or displacement of the handle.
- Hereby, the guard rail can be fixed to the scaffolding in a fast and user-friendly manner without using screws that have to be fastened by means of tools. Moreover, the guard rail can be detached from the scaffolding in an easy and fast manner.
- It may be advantageous that the locking device is rotatably attached to the vertical structures of the vertical member.
- Hereby, the locking device may be brought from a locked position to an unlocked position and from an unlocked position to a locked position solely by rotation of the handle. Accordingly, the locking device can be operated by the scaffolder in a fast and easy manner.
- It may be beneficial that the guard rail comprises a positioning member configured to maintain the locking device in a locked position and in an unlocked position, wherein the positioning member comprises a cavity configured to bear against an abutting structure of the guard rail in such a manner that the locking device is fixed to the abutting structure.
- Hereby, the positioning member can be maintained fixed to the abutting structure in an easy manner.
- It may be advantageous that the guard rail comprises a spring or another resilient member arranged to provide a force keeping the positioning member in engagement with the abutting structure.
- Hereby, the spring or another resilient member secures that the locking device can be maintained in a locked position or in an unlocked position as long as desired. Moreover, the use of a spring or another resilient member allows for an easy change of the position of the locking device.
- It may be beneficial that the guard rail comprises a locking device comprising locking arms configured to engage with a portion of the scaffolding, preferably a scaffold platform, e.g. a plane plate-shaped structure extending perpendicular to a horizontal direction.
- Hereby, a safe, strong and user-friendly attachment of the guard rail can be provided. Moreover, the guard rail may be attached to the scaffold platform independent of the geometry and type of the scaffolding as long as the locking device fits the scaffold platform.
- It may be an advantage that the guard rail comprises a locking device comprising locking arms configured to engage with a portion of the scaffolding, preferably a scaffold platform.
- It may be an advantage that the guard rail comprises a plurality of suspension brackets configured to be attached to a transverse member of the scaffolding.
- Hereby, the guard rail can easily be attached to the transverse member of the scaffolding so that the scaffolders, required to step onto the scaffold platform which has just been laid as the uppermost walk surface, can be prevented from falling down.
- The guard rail according to the invention is easy and fast to use because no tools are needed to fasten screws. In a preferred embodiment of the invention, the guard rail comprises hook bodies for attachment to a first transverse structure and a second parallel transverse structure of the scaffolding. In a preferred embodiment of the invention, the guard rail comprises a locking device comprising a handler that allows for fast and easy positioning of the locking device into a locked position and an unlocked position, respectively.
- It is beneficial that the guard rail can be attached to a scaffolding without screws and scaffolding split pins because the montage time can be reduced.
- It may be an advantage that the guard rail comprises first suspending brackets configured to be received by the top portion of horizontally oriented transverse members of a scaffolding, wherein the guard rail furthermore comprises other suspending brackets configured to receive at least the bottom portion of horizontally oriented frame members of the rail. It may be beneficial that the first suspending brackets are attached at a one side of the vertical member and that the other suspending brackets are arranged at the other side of the vertical member.
- The invention will become more fully understood from the detailed description given herein below. The accompanying drawings are given by way of illustration only, and thus, they are not limitative of the present invention. In the accompanying drawings:
- Fig. 1
- shows a schematic side view of a guard rail according to the invention;
- Fig. 2 a)
- shows a schematic illustration of a first portion (the rail) of a guard rail according to the invention;
- Fig. 2 b)
- shows a schematic front view of a second portion (the vertical member) and a third portion (locking device) of a guard rail according to the invention;
- Fig. 2 c)
- shows a close-up view of the locking device shown in
Fig. 2 b) ; - Fig. 2 d)
- shows a schematic front view of the second portion (the vertical member) and the third portion (locking device) shown in
Fig. 2 b) ; - Fig. 3 a)
- shows a schematic front view of a locking device according to the invention;
- Fig. 3 b)
- shows a side view of the locking device shown in
Fig. 3 a) ; - Fig. 3 c)
- shows a close-up view of a positioning member of the locking device shown in
Fig. 3a ); - Fig. 3 d)
- shows a schematic view of a longitudinal vertical member according to the invention and a suspending bracket detachably mounted therein;
- Fig. 4
- shows a scaffolding comprising a first guard rail and a second guard rail according to the invention attached to the scaffolding;
- Fig. 5
- shows a scaffolding comprising two guard rails according to the invention;
- Fig. 6 a)
- shows a top view of a first positioning device according to the invention;
- Fig. 6 b)
- shows a top view of a second positioning device according to the invention;
- Fig. 6 c)
- shows a top view of a third positioning device according to the invention and
- Fig. 7
- shows a front view of a guard rail according to the invention.
- Referring now in detail to the drawings for the purpose of illustrating preferred embodiments of the present invention, a
guard rail 2 of the present invention is illustrated inFig. 1 . -
Fig. 1 is a schematic side view of aguard rail 2 according to the invention. A coordinate system showing a first axis X and a second axis Y is provided below theguard rail 2. - The
guard rail 2 comprises a rail 4 (a frame-shaped grate structure) having two parallellongitudinal frame members 10, 10'. Four paralleltransversal frame members frame members 10, 10'. Thelongitudinal frame members 10, 10' extend parallel to the axis X, whereas the paralleltransversal frame members rail 4 may be produced in metal, e.g. a light metal such as aluminium or in steel (e.g. galvanized steel). - It may be an advantage that the
longitudinal frame members 10, 10' and thetransversal frame members rail 4. It may be beneficial that thelongitudinal frame members 10, 10' and thetransversal frame members longitudinal frame members 10, 10' and thetransversal frame members transversal frame members longitudinal frame members 10, 10' by means of screws (e.g. corresponding bolts and nuts). - The
guard rail 2 furthermore comprises avertical member 6 comprising two longitudinalvertical structures 14, 14' and threetransverse structures vertical structures 14, 14' extend parallel to the axis Y, whereas the threetransverse structures - The longitudinal
vertical structures 14, 14' and thetransverse structures vertical member 6. It may be an advantage that thevertical structures 14, 14' and thetransverse structures vertical structures 14, 14' and thetransverse structures - Four pairs of suspending
brackets vertical structures 14, 14'. The suspendingbrackets vertical structure 14, whereas the suspending brackets 18', 20', 22', 24' are attached to the second vertical structure 14'. - The suspending
brackets brackets rail 4 fixed to a scaffolding. - The
guard rail 2 furthermore comprises alocking device 8 rotatably attached to thevertical member 6. Thelocking device 8 comprises ahandle 26 shaped as a pipe structure that is a little shorter than thetransverse structures handle 26 extends parallel to the axis X. - The
locking device 8 moreover comprises twoparallel arms 28, 28' shaped as plate-shaped structures attached to the end structures of the handle (on each end of the handle) 26. The twoparallel arms 28, 28' extend parallel to the axis Y. The twoparallel arms 28, 28' are rotatably attached to the first longitudinalvertical structure 14 and the second longitudinal vertical structure 14', respectively. - The
first arm 28 is rotatably attached to the first longitudinalvertical structure 14 by means of abolt 32 and anut 34 attached thereto. Between the first longitudinalvertical structure 14 and thefirst arm 28, a positioningmember 40 is provided. It may be an advantage that the positioningmember 40 is made in a softer material than the first longitudinalvertical structure 14. It may be an advantage that the positioningmember 40 is made in nylon, wood or in a plastic material. - The other arm 28' is rotatably attached to the second longitudinal vertical structure 14' by means of a bolt 32' and a nut 34' attached thereto. A
spring 36 is provided between the second longitudinal vertical structure 14' and the other arm 28'. Thespring 36 provides a sustained force against thelocking device 8 along the axis X in the direction from the second longitudinal vertical structure 14' towards the first longitudinalvertical structure 14. - A locking
arm 30 is attached to the distal end of thefirst arm 28, whereas a corresponding locking arm 30' is attached to the distal end of the second arm 28'. The lockingarms 30, 30' may be shaped as angle structures comprising two rectangular plate structures attached to each other. The lockingarms 30, 30' are configured to engage with a portion of a scaffold platform (seeFig. 4 orFig. 5 ). - The distance W2 between the first frame member 12' and the
second frame member 12" is larger than the width W1 of thevertical member 6. - As it can be seen from
Fig. 2 , theguard rail 2 can be disassembled. OnFig. 2 a) one can see aguard rail 4 formed as a frame-shaped grate structure comprising two parallellongitudinal frame members 10, 10' and fourframe members longitudinal frame members 10, 10' extend parallel to the axis X, whereas theframe members rail 4. -
Fig. 2 b) illustrates thevertical member 6 of aguard rail 2 according to the invention. A coordinate system is arranged below thevertical member 6. Thevertical member 6 comprises two longitudinalvertical structures 14, 14' extending parallel to the axis Y.Four hook bodies vertical member 14, whereas four corresponding hook bodies 18', 20', 22', 24' are provided in the second vertical member 14'. In theuppermost hook bodies 24, 24', bores 44, 44' are provided for attachment of attachment means (e.g. scaffolding split pins). - Three
transverse structures device 8 extend between the two longitudinalvertical structures 14, 14'. Thelocking device 8 comprises a rod-shapedhandle 26 extending parallel to the axis X. Thelocking device 8, furthermore, comprises afirst arm 28 attached to one of the free ends of thehandle 26 and a second arm 28' attached to the other free end of thehandle 26. Botharms 28, 28' extend parallel to the axis Y. - A positioning
member 40 is provided between thefirst arm 28 and the firstvertical structure 14. The positioningmember 40 is formed to fit the outer periphery of the firstvertical structure 14 that abuts the positioningmember 40. The positioningmember 40 is configured to maintain thelocking device 8 fixed in a first position and in a second position relative to thevertical member 6. Aspring 36 is provided between the second arm 28' and the second vertical structure 14'. Thespring 36 pushes thelocking device 8 to the left against the firstvertical structure 14 in such a manner that the firstvertical structure 14 abuts the positioningmember 40. - By moving the
locking device 8 to the right towards the second vertical structure 14', it is possible to bring thelocking device 8 out of engagement with the positioningmember 40, whereby it is possible to change the position of thelocking device 8 as shown inFig. 2 d) . Thelocking device 8 is automatically brought in engagement with the positioningmember 40 when the spring presses thelocking device 8 to the left against the firstvertical structure 14. - The
locking device 8 comprises two L-shaped lockingarms 30, 30' attached to thefirst arm 28 and the second arm 28', respectively. -
Fig. 2 c) illustrates a close-up view of the positioningmember 40 shown inFig. 2 b) . It can be seen that the positioningmember 40 is rotatably attached to the firstvertical structure 14 by means of abolt 32 extending through a bore extending through the firstvertical structure 14 and further through the positioningmember 40 and thearm 28. Anut 34 is attached to the free end of thebolt 32. -
Fig. 2 d) illustrates a side view of thevertical member 6 shown inFig. 3 b) . A three-dimensional Cartesian coordinate system having three perpendicular axes X, Y, Z is provided below thevertical member 6. Thevertical member 6 comprises a straightvertical structure 14 extending parallel to the axis Y. A first suspending bracket 18' and a second suspending bracket 20' having L-shaped profiles extending downwards are attached to thevertical structure 14. A third suspending bracket 22' and a fourth suspending bracket 24' having L-shaped profiles extending upwards are attached to thevertical structure 14. - The three
transverse structures - It can be seen that the
vertical member 6 comprises alocking device 8 that is rotatably attached to the longitudinalvertical structure 14. The axis of rotation α is shown inFig. 2 d) and it can be seen that thelocking device 8 can be arranged in two different configurations (positions). In the "unlocked position" A, the arm 28' extends parallel to the longitudinalvertical structure 14 and thus parallel to the axis Y. In the "locked position" B, the arm 28' extends perpendicular to the longitudinalvertical structure 14 and thus parallel to the axis Z. - In the unlocked position A, the distal portion of the L-shaped locking arm 30' extends horizontally parallel to the axis Z. In the locked position B, the distal portion of the L-shaped locking arm 30' extends vertically, which enables it to engage with a portion of a scaffold platform.
-
Fig. 3 a) illustrates a front view of alocking device 8 according to the invention. Thelocking device 8 comprises a rod-shapedhandle 26 extending between and being attached to twoparallel arms 28, 28'. Afirst locking arm 30 and a second locking arm 30' are attached to the distal end of thefirst arm 28 and thesecond arm 28, respectively. A positioningmember 40 is provided on thefirst arm 28. -
Fig. 3 b) illustrates a front view of thelocking device 8 shown inFig. 3 a) . It can be seen that thelocking device 8 comprises a rod-shaped, pipe-shapedhandle 26 having a circular cross-section (indicated with a dotted circular line). A first L-shapedlocking arm 30 is attached to the distal end of thefirst arm 28. A positioningmember 40 having a through-goingbore 44 is provided on thefirst arm 28. Thebore 44 is configured to receive a through-going bolt for attachment of the positioningmember 40 to thefirst arm 28. -
Fig. 3 c) illustrates a close-up view of the positioningmember 40 shown inFig. 3 a) . It can be seen fromFig. 3 c) that the positioningmember 40 comprises a basically circular profile (seen from a side perspective). Accordingly, the positioningmember 40 comprises acavity 42 shaped as a section of a sphere with a radius r (a circle with radius r is indicated with a dotted line). Therefore, the positioningmember 40 is configured to abut and engage a pipe structure having a circular cross-section (seeFig. 1 ,Fig. 2 b) and Fig. 2 c) ). - A through-going
bore 44 extends through the positioningmember 40 and thefirst arm 28. The through-goingbore 44 is indicated with dotted lines. Aspring 36 is provided between thenut 34 and thefirst arm 28. Hereby, it is possible to displace the positioningmember 40 perpendicular to (in a direction away from) thefirst arm 28, whereby the positioningmember 40 can rotate about thebore 44. -
Fig. 3 d) illustrates a schematic illustration of avertical structure 14 according to the invention. A first suspendingbracket 18 is moveably attached to thevertical structure 14 by means of abracket 48, onto which the suspendingbracket 18 is attached. A through-going bore configured to receive a bolt for attaching the suspendingbracket 18 to thevertical structure 14 extends through thebracket 48. Three through-goingbores bracket 18 are provided in thevertical structure 14. Hereby, it is possible to change the position of the suspendingbracket 18. By displacing the suspendingbracket 18 from the second bore 46' to thethird bore 46", the suspendingbracket 18 is displaced a length d as indicated onFig. 3 d) . -
Fig. 4 illustrates ascaffolding 56 provided with afirst guard rail 2 and a second guard rail 2' according to the invention. - The
scaffolding 56 is placed on asupport 50 provided with tiles and cobblestones by means of a plurality offeet 52. Thescaffolding 56 comprises ascaffold platform 58 to which thefirst guard rail 2 is detachably attached. - The
first guard rail 2 comprises avertical member 6 that is attached to one of thetransverse members 60 of thescaffolding 56 by means of four suspendingbrackets brackets transverse members 60 that prevent theguard rail 2 from being moved downwards. - The means for detachable attachment comprise a
locking device 8 that engages thescaffold platform 58 and thus is fixed to it. This fixation prevents theguard rail 2 from being moved perpendicular to the longitudinal axis of thescaffold platform 58. - A
rail 4 comprising a firstlongitudinal frame member 10 and a second frame member 10' extending parallel to thefirst frame member 10 is attached to thevertical member 6. Therail 4 is attached to four suspendingbrackets vertical member 6. The firstlongitudinal frame member 10 is attached to the two seconduppermost suspending brackets 22, 22', whereas the second longitudinal frame member 10' is attached to thevertical member 6 by means of the uppermost suspendingbrackets 24, 24'. Lockingmembers 54 formed as scaffolding split pins are attached to the uppermost suspendingbrackets 24, 24' in order to prevent therail 4 from being detached from thevertical member 6. - It can be seen that the
guard rail 2 according to the invention is light and easy to use and that thefirst guard rail 2 prevents the scaffolders from falling down from thescaffolding 56, when they step onto thescaffold platform 58 which has just been laid as the uppermost walk surface (where notransverse members guard rail 2, is very easy to assemble, because it can be mounted by means of the suspendingbrackets 18, 18' and thelocking device 8. Further hook bodies may, however, be used. - A second guard rail 2' is mounted on the end wall of the
scaffolding 56. The end wall of thescaffolding 56 is shorter than the long side of thescaffolding 56. The second guard rail 2' comprises a vertical member 6'. A first pair of suspendingbrackets 18, 18' is attached to the vertical member 6'. The first suspendingbrackets 18, 18' engage a first transverse member 60'. Similarly, a second pair of suspendingbrackets 20, 20' is attached to the vertical member 6'. The second suspendingbrackets 20, 20' engage a secondtransverse member 60". - The vertical member 6' is mechanically attached to the
scaffold platform 58 by means of afirst fastening member 62 connecting the firstvertical structure 14 and thescaffold platform 58 and by means of a second fastening member 62' connecting the second vertical structure 14' and thescaffold platform 58. Thefastening members 62, 62' can comprise a wire connected to a scaffolding split pin, suspending brackets or other suitable mechanical attachment means. - Since the second guard rail 2' has to cover a shorter side (end wall of the scaffolding 56), the rail 4' attached to the second vertical structure 6' is shorter than the
first rail 4 attached to thefirst guard rail 2. - The second rail 4' comprises a first
longitudinal frame member 10 and a second longitudinal frame member 10', extending parallel to each other. The second rail 4' is attached to four suspendingbrackets longitudinal frame member 10 is attached to the two seconduppermost suspending brackets 22, 22', whereas the second frame member 10' is attached to the two uppermost suspendingbrackets 24, 24'.Scaffolding split pins 54 are attached to the uppermost suspendingbrackets 24, 24' in order to prevent the rail 4' from detaching from the vertical structure 6'. -
Fig. 5 illustrates twoguard rails 2, 2' according to the invention attached to ascaffolding 56. Thescaffolding 56 is arranged on asupport 50 up against a building (a block of flats) 64. Thesupport 50 is a pavement upon which the feet 53 of thescaffolding 56 rest. - The
first guard rail 2 comprises avertical structure 6 attached to atransverse member 60 by means of two suspendingbrackets 18, 18' that engage thetransverse member 60 and rest upon it. Thevertical structure 6 comprises alocking device 8 attached to thescaffold platform 58. - The
first guard rail 2 furthermore comprises arail 4 attached to the two upper most pairs of suspendingbrackets vertical structure 6.Scaffolding split pins 54 are attached to the uppermost suspendingbrackets 24, 24' in order to fix therail 4 to the uppermost pair of suspendingbrackets 24, 24'. - The second guard rail 2' comprises a vertical structure 6' attached to a first transverse member 60' by means of two suspending
brackets 18, 18' and to a secondtransverse member 60" by means of two suspendingbrackets 20, 20'. The vertical structure 6' comprises a locking device 8' attached to thescaffold platform 58. - The second guard rail 2' comprises a rail 4' attached to the two uppermost pairs of suspending
brackets vertical structure 6. - The two
guard rails 2, 2' are easy and fast to apply and they are capable of preventing scaffolders from falling down when the scaffolders step on thescaffold platform 58 when no side structures yet are mounted. Theguard rail 2 is fast to assemble and fix to the scaffolding, since it is only attached by means of the suspendingbrackets locking device 8. The twoguard rails 2, 2' almost bear against each other. A small gap is, however, provided between the twoguard rails 2, 2' in order to mount theguard rails 2, 2'. -
Fig, 6 a) illustrates a schematic top view of a positioningmember 40 brought into engagement with a longitudinalvertical structure 14. The longitudinalvertical structure 14 has a circular profile that fits thecavity 42 of the positioningmember 40. The positioningmember 40 is attached to thearm 28. A bore 44 extends through the positioningmember 40 and thearm 28. A bolt extends through thebore 44, and anut 34 is attached to the free end of the bolt. Aspring 36 that presses thenut 34 away from thearm 28 is provided between thenut 34 and thearm 28. - When the
spring 36 is pressed together, and the positioningmember 40 no longer engages the longitudinalvertical structure 14, it is possible to rotate the positioningmember 40 relative to the longitudinalvertical structure 14. - A three-dimensional Cartesian coordinate system having a vertical axis Y and two horizontal axes X, Z corresponding to the one shown in
Fig. 1 andFig. 2 is illustrated inFig. 6 a) . -
Fig. 6 b) illustrates a schematic top view of a positioningmember 40 brought into engagement with a longitudinalvertical structure 14. InFig. 6 b) , thearm 28 and the positioningmember 40 attached to thearm 28 are rotated 90 degrees compared toFig. 6 a) . A three-dimensional Cartesian coordinate system having a vertical axis Y and two horizontal axes X, Z corresponding to the one shown inFig. 1 andFig. 2 is illustrated inFig. 6 b) . -
Fig. 6 c) illustrates a schematic top view of a positioningmember 40 brought into engagement with a longitudinalvertical structure 14. InFig. 6 c) , thearm 28 and the positioningmember 40 attached to thearm 28 are arranged in the same manner relative to each other as inFig. 6 b) . This can be seen in the Cartesian coordinate system having a vertical axis Y and two horizontal axes X, Z corresponding to the one shown inFig. 1 andFig. 2 . -
Fig. 7 illustrates a front view of aguard rail 2 according to an embodiment of the invention. Theguard rail 2 comprises arail 4 having a frame-shaped grate structure. Therail 4 comprises two parallellongitudinal frame members 10, 10'. Four paralleltransversal frame members frame members 10, 10'. Therail 4 may be produced in metal, e.g. a light metal such as aluminium or in steel (e.g. galvanized steel). The twocentral frame members 12', 12" are arranged closer to each other that the other adjacent frame members. - The
guard rail 2 comprises avertical member 6 comprising two longitudinalvertical structures 14, 14' and threetransverse structures - Four pairs of suspending
brackets vertical structures 14, 14'. The suspendingbrackets vertical structure 14, whereas the suspending brackets 18', 20', 22', 24' are attached to the second vertical structure 14'. - The suspending
brackets brackets rail 4 fixed to a scaffolding. - The
guard rail 2 comprises alocking device 8 rotatably attached to thevertical member 6. Thelocking device 8 comprises ahandle 26 shaped as a pipe structure that is a little shorter than thetransverse structures - The
locking device 8 moreover comprises two parallel arms shaped as plate-shaped structures attached to the end structures of the handle (on each end of the handle) 26. The two parallel arms are rotatably attached to the first longitudinalvertical structure 14 and the second longitudinal vertical structure 14', respectively. - The
vertical member 6 is attached tofirst frame member 10 and the second frame member 10' of therail 4 between theframe members 12 and 12'. Accordingly, therail 4 protrudes to the right side of thevertical member 6 to a much greater extent than to the left side of the vertical member. By changing the position of therail 4 on which thevertical member 6 is attached, it is possible to arrange therail 4 according to space specific requirements. - The distance W2 between the first frame member 12' and the
second frame member 12" is larger than the width W1 of thevertical member 6. -
- 2, 2'
- Guard rail
- 4, 4'
- Rail
- 6, 6'
- Vertical member
- 8, 8'
- Locking device
- 10, 10', 12, 12', 12", 12'"
- Frame member
- 14, 14'
- Vertical structure
- 16, 16', 16"
- Transverse structure
- 18, 18', 20, 20'
- Suspending bracket (hook body)
- 22, 22', 24, 24'
- Suspending bracket
- 26
- Handle
- 28, 28'
- Arm
- 30, 30'
- Locking arm
- 32, 32'
- Bolt
- 34, 34'
- Nut
- 36
- Spring
- 40
- Positioning member
- 42
- Cavity
- 44, 44', 46, 46', 46"
- Bore
- 48
- Bracket
- 50
- Support
- 52
- Foot
- 54, 54'
- Locking member
- 56
- Scaffolding
- 58
- Scaffold platform
- 60, 60', 60"
- Transverse member
- 62, 62'
- Fastening member
- 64
- Building
- X, Y, Z
- Axis
- A, B
- Position
- α
- Axes of rotation
- W1, W2
- Distance/width
Claims (15)
- A guard rail (2, 2') configured to be attached to a scaffolding (56), wherein the guard rail (2, 2') comprises a rail (4, 4'), adapted to cordon off a work area in one or more horizontal directions (X, Z), wherein the guard rail (2, 2') comprises a vertical member (6, 6') and a rail (4, 4') extending basically perpendicular to the vertical member (6, 6'), characterised in that the rail (4, 4') is formed as a one-piece body that is configured to be detachably attached to the vertical member (6, 6').
- A guard rail (2, 2') according to claim 1, characterised in that the vertical member (6, 6') comprises means (18, 18', 20, 20', 8, 8') for detachable attachment to the scaffolding (56).
- A guard rail (2, 2') according to claim 1 or claim 2, characterised in that the vertical member (6, 6') comprises a first vertical structure (14) and a second vertical structure (14') extending parallel to the first vertical structure (14), wherein a plurality of transverse structures (16, 16', 16") extend between the first vertical structure (14) and the second vertical structure (14').
- A guard rail (2, 2') according to one of the preceding claims, characterised in that the rail (4, 4') overlaps the vertical member (6, 6').
- A guard rail (2, 2') according to claim 4, characterised in that the rail (4, 4') overlaps the top portion of the vertical member (6, 6').
- A guard rail (2, 2') according to one of the preceding claims, characterised in that the rail (4, 4') comprises two longitudinal frame members (10, 10') and one or more frame members (12', 12") extending between the two longitudinal frame members (10, 10').
- A guard rail (2, 2') according to claim 3 and claim 6, characterised in that the rail (4, 4') comprises one or more frame members (12', 12") that are offset relative to the vertical structures (14, 14') of the vertical member (6, 6').
- A guard rail (2, 2') according to claim 7, characterised in that the rail (4, 4') comprises a first frame member (12') and a second frame member (12") that are offset relative to the vertical structures (14, 14') of the vertical member (6, 6').
- A guard rail (2, 2') according to claim 8, characterised in that the distance (W2) between the first frame member (12') and a second frame member (12") is larger than the width (W1) of the vertical member (6, 6').
- A guard rail (2, 2') according to one of the preceding claims, characterised in that the guard rail (2, 2') comprises a locking device (8, 8') configured to be brought into engagement with a scaffold platform (58), wherein the locking device (8, 8') comprises a handle (26) and is configured to be positioned in a locked position (B) and in an unlocked position (A), wherein the locking device (8, 8') comprises means (26, 28, 28', 40, 30, 30', 36, 32, 32', 34, 34') for maintaining the locking device (8, 8') fixed in the positions (A, B), wherein the locking device (8, 8') comprises means for bringing the locking device (8, 8') from a locked position (B) to an unlocked position (A) and for bringing the locking device (8, 8') from an unlocked position (A) to a locked position (B) solely by rotation and/or displacement of the handle (26).
- A guard rail (2, 2') according to claim 10, characterised in that the locking device (8, 8') is rotatably attached to the vertical structures (14, 14') of the vertical member (6, 6').
- A guard rail (2, 2') according to claims 10 or claim 11, characterised in that the guard rail (2, 2') comprises a positioning member (40) configured to maintain the locking device (8, 8') in a locked position (B) and in an unlocked position (A), wherein the positioning member (40) comprises a cavity (42) configured to bear against an abutting structure (14, 14') of the guard rail (2, 2') in such a manner that the locking device (8, 8') is fixed to the abutting structure (14, 14').
- A guard rail (2, 2') according to claims 12, characterised in that the guard rail (2, 2') comprises a spring (36) or another resilient member arranged to provide a force keeping the positioning member (40) in engagement with the abutting structure (14, 14').
- A guard rail (2, 2') according to one of the preceding claims, characterised in that the guard rail (2, 2') comprises a locking device (8, 8') comprising locking arms (30, 30') configured to engage with a portion of the scaffolding (56), preferably a scaffold platform (58).
- A guard rail (2, 2') according to one of the preceding claims, characterised in that the guard rail (2, 2') comprises suspension brackets (18, 18', 20, 20') configured to be attached to a transverse member (60, 60', 60") of the scaffolding (56).
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SI201530117T SI3006648T1 (en) | 2014-10-10 | 2015-10-09 | Guard rail |
PL15189071T PL3006648T3 (en) | 2014-10-10 | 2015-10-09 | Guard rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DK201400583A DK178217B1 (en) | 2014-10-10 | 2014-10-10 | safety Railings |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3006648A1 true EP3006648A1 (en) | 2016-04-13 |
EP3006648B1 EP3006648B1 (en) | 2017-07-26 |
Family
ID=54010689
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15189071.2A Active EP3006648B1 (en) | 2014-10-10 | 2015-10-09 | Guard rail |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP3006648B1 (en) |
DK (1) | DK178217B1 (en) |
ES (1) | ES2644687T3 (en) |
PL (1) | PL3006648T3 (en) |
SI (1) | SI3006648T1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200120184A (en) * | 2019-04-11 | 2020-10-21 | 에스폼 주식회사 | Working platform |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003105966A (en) * | 2001-10-02 | 2003-04-09 | Japan Steels International Inc | Handrail post and temporary handrail |
WO2011062483A2 (en) * | 2009-11-20 | 2011-05-26 | Harsco Infrastructure B.V. | Scaffolding and guard rail for application therein |
AU2010224325A1 (en) * | 2010-09-17 | 2012-04-05 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
EP2527563A2 (en) * | 2011-05-25 | 2012-11-28 | Harsco Infrastructure B.V. | Scaffolding and guard rail for use therein |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3638761B2 (en) * | 1997-09-03 | 2005-04-13 | 川鉄機材工業株式会社 | H-framework scaffold |
AU2012200673B2 (en) * | 2011-02-11 | 2014-01-30 | Independent Ezy Access Pty Ltd | Barrier |
-
2014
- 2014-10-10 DK DK201400583A patent/DK178217B1/en active
-
2015
- 2015-10-09 SI SI201530117T patent/SI3006648T1/en unknown
- 2015-10-09 EP EP15189071.2A patent/EP3006648B1/en active Active
- 2015-10-09 ES ES15189071.2T patent/ES2644687T3/en active Active
- 2015-10-09 PL PL15189071T patent/PL3006648T3/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003105966A (en) * | 2001-10-02 | 2003-04-09 | Japan Steels International Inc | Handrail post and temporary handrail |
WO2011062483A2 (en) * | 2009-11-20 | 2011-05-26 | Harsco Infrastructure B.V. | Scaffolding and guard rail for application therein |
AU2010224325A1 (en) * | 2010-09-17 | 2012-04-05 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
EP2527563A2 (en) * | 2011-05-25 | 2012-11-28 | Harsco Infrastructure B.V. | Scaffolding and guard rail for use therein |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20200120184A (en) * | 2019-04-11 | 2020-10-21 | 에스폼 주식회사 | Working platform |
Also Published As
Publication number | Publication date |
---|---|
PL3006648T3 (en) | 2017-12-29 |
ES2644687T3 (en) | 2017-11-30 |
DK178217B1 (en) | 2015-08-31 |
EP3006648B1 (en) | 2017-07-26 |
SI3006648T1 (en) | 2017-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TWI662176B (en) | Scaffolding | |
JP5642209B2 (en) | Temporary handrail mounting jig | |
WO2016079372A1 (en) | Scaffolding arrangement | |
US20150152654A1 (en) | Support steel pipe and bracket for scaffolding or falsework, and scaffolding or falsework | |
US20230279678A1 (en) | Side protector, ceiling formwork system having at least one such side protector, and method for erecting such a side protector | |
KR200490153Y1 (en) | Hanger type check equipment for bridge | |
JP2013076315A (en) | Wedge framed clamp | |
CN107912050B (en) | Scaffold clamp | |
US20080264725A1 (en) | Hook-On Scaffold | |
JP6021604B2 (en) | Temporary scaffolding and its assembly method | |
JP2013256770A (en) | Suspension frame for suspended scaffolding | |
EP3006648A1 (en) | Guard rail | |
JP5888796B2 (en) | Gantry | |
RU2668608C2 (en) | Scaffold | |
EP1691007A2 (en) | Detachable cross-piece for supporting platforms in scaffolds | |
EP3245376B1 (en) | Fencing bracket | |
KR20120014569A (en) | Scaffolding system comprising a scaffolding element and method for erecting a scaffolding system | |
JP7051642B2 (en) | Mobile lift scaffolding | |
PL234108B1 (en) | System of the formwork for hoops of the circumferential concrete structures | |
JP5728379B2 (en) | Wall material mounting jig and wall material construction method using the same | |
ES2464518T3 (en) | Protective handrail support | |
GB2539375A (en) | Scaffold safety apparatus | |
KR20090051796A (en) | Adjustment debris net system | |
JP2009227419A (en) | Suspension stand | |
KR101219633B1 (en) | Fixture for stationary gondola |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
17P | Request for examination filed |
Effective date: 20160509 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
17Q | First examination report despatched |
Effective date: 20160614 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170322 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 912528 Country of ref document: AT Kind code of ref document: T Effective date: 20170815 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602015003735 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 3 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2644687 Country of ref document: ES Kind code of ref document: T3 Effective date: 20171130 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 912528 Country of ref document: AT Kind code of ref document: T Effective date: 20170726 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20170726 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171026 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171126 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171027 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602015003735 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20180430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171009 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171009 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 4 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20151009 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181031 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170726 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CZ Payment date: 20230925 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SK Payment date: 20230919 Year of fee payment: 9 Ref country code: PL Payment date: 20230925 Year of fee payment: 9 Ref country code: NL Payment date: 20231026 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20231027 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20231102 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SI Payment date: 20230920 Year of fee payment: 9 Ref country code: SE Payment date: 20231027 Year of fee payment: 9 Ref country code: NO Payment date: 20231027 Year of fee payment: 9 Ref country code: IE Payment date: 20231027 Year of fee payment: 9 Ref country code: FR Payment date: 20231025 Year of fee payment: 9 Ref country code: DE Payment date: 20231027 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20231027 Year of fee payment: 9 |