- EP3006196A1 EP3006196A1 EP13885966.5A EP13885966A EP3006196A1 EP 3006196 A1 EP3006196 A1 EP 3006196A1 EP 13885966 A EP13885966 A EP 13885966A EP 3006196 A1 EP3006196 A1 EP 3006196A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- upper die
- punch
- press machine
- carriage
- dies
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 48
- 238000005452 bending Methods 0.000 title claims abstract description 40
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 83
- 239000010959 steel Substances 0.000 claims abstract description 83
- 230000007246 mechanism Effects 0.000 claims abstract description 14
- 238000003825 pressing Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 description 18
- 238000004519 manufacturing process Methods 0.000 description 14
- 238000010586 diagram Methods 0.000 description 9
- 125000006850 spacer group Chemical group 0.000 description 8
- 238000013001 point bending Methods 0.000 description 5
- 230000000052 comparative effect Effects 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000010485 coping Effects 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 230000008719 thickening Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D5/00—Bending sheet metal along straight lines, e.g. to form simple curves
- B21D5/01—Bending sheet metal along straight lines, e.g. to form simple curves between rams and anvils or abutments
- B21D5/015—Bending sheet metal along straight lines, e.g. to form simple curves between rams and anvils or abutments for making tubes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B15/00—Details of, or accessories for, presses; Auxiliary measures in connection with pressing
- B30B15/02—Dies; Inserts therefor; Mounting thereof; Moulds
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/15—Making tubes of special shape; Making tube fittings
- B21C37/16—Making tubes with varying diameter in longitudinal direction
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D37/00—Tools as parts of machines covered by this subclass
- B21D37/14—Particular arrangements for handling and holding in place complete dies
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B15/00—Details of, or accessories for, presses; Auxiliary measures in connection with pressing
- B30B15/02—Dies; Inserts therefor; Mounting thereof; Moulds
- B30B15/026—Mounting of dies, platens or press rams
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B30—PRESSES
- B30B—PRESSES IN GENERAL
- B30B15/00—Details of, or accessories for, presses; Auxiliary measures in connection with pressing
- B30B15/02—Dies; Inserts therefor; Mounting thereof; Moulds
- B30B15/028—Loading or unloading of dies, platens or press rams
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21C—MANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
- B21C37/00—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
- B21C37/06—Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
- B21C37/08—Making tubes with welded or soldered seams
- B21C37/0815—Making tubes with welded or soldered seams without continuous longitudinal movement of the sheet during the bending operation
Definitions
- the present invention relates to an upper die replacing method of a leading end of a punch in a bending press machine manufacturing a thick welded steel pipe having a large diameter used for a line pipe or the like by performing three-point bending press forming multiple times, and an upper die carriage used for replacing the upper die.
- UOE steel pipe As a thick steel pipe having a large diameter used for a line pipe, a steel structure or the like, in general, a so-called "UOE steel pipe” has been widely used.
- the UOE steel pipe is formed so that a material steel plate having predetermined width, length, and thickness is press-formed into a U-shape and then is press-formed into an O-shape, and thereafter, butted parts are welded to obtain a material steel pipe, and the material steel pipe is expanded (so-called pipe expansion) in a circumferential direction to improve roundness.
- pipe expansion in a circumferential direction to improve roundness.
- a press bending method As a technique of reducing the press load when manufacturing the thick steel pipe having a large diameter, long length, and high strength, a press bending method has been developed and put into practical use.
- the three-point bending press forming is performed multiple times while feeding the steel plates in the width direction by a predetermined amount to press-form the steel plate into a substantially cylindrical shape (open pipe) having an opening portion, then, the opening portion of the open pipe is subjected to butt welding and pipe expansion, and the shape thereof is corrected, thereby manufacturing a steel pipe.
- Fig. 1 is a diagram that schematically illustrates a method of manufacturing a steel pipe using the above-described press bending method.
- this manufacturing method first, three-point bending press forming is performed multiple times toward a plate width center from one plate width end portion of a material steel plate 1 having both bent (crimping pressed) end portions by combining a punch 2 with a pair of dies 3 to form one half into an arc shape except for the plate width center of the steel plate (first half press), next, similarly, the three-point bending press forming is performed multiple times toward the plate width center from the other plate width end portion to form the remaining one half except for the plate width center of the steel plate into an arc shape, thereby obtaining a substantially C-shape (second half press), finally, the remaining plate width center portion is subjected to press forming (final press) to obtain a substantially cylindrical shape (open pipe) having an opening portion, and thereafter, the steel pipe is generally manufactured by performing butt welding of the opening portion.
- the material steel plate 1 having both
- a bending press machine used for the above-described three-point bending press forming has a pair of dies disposed in a feeding direction of a material steel plate at a predetermined gap, and a punch capable of vertically moving between the pair of dies, and is configured to press the material steel plate placed on the dies by the punch, thereby performing bending.
- the punch includes an upper die, attached to a leading end portion of a punch 2 directly coming into contact with the steel plate as a material to be machined, (hereinafter, simply referred to as a "upper die “), and a punch supporter (hereinafter, also referred to as a "beam”) that is connected to a main body of a press machine and supports the upper die at a leading end thereof, and the upper die and the punch supporter are commonly fastened by fixing bolts in an attachable and detachable manner.
- the beam is an integral body, but the upper die is commonly constituted by a plurality of segments so that the attachment and detachment operation and the handling are easily performed.
- the method is performed by a series of processes as follows. That is, after mounting a new upper die on a large dummy plate, the dummy plate is conveyed in a horizontal direction using conveyance facilities configured to supply a material steel plate to a press machine, the new upper die is moved to a vicinity just below a punch (beam), then, the punch is lowered to become a state of being in contact with the dummy plate of a position near the new upper die, fastening of bolts is released to detach the upper die from a beam leading end, then, the dummy plate is moved by the above-described conveyance facilities to move the new upper die to just below the beam, the new upper die is fitted to the beam leading end, and is attached thereto by being fastened with bolts.
- Patent Literatures 1 to 4 are techniques that can be used only for small bending machines and punch press machines, but are not techniques that can be directly applied to replacement of the upper die of the bending press machine for manufacturing the large diameter.
- the present invention has been made in view of the above-described problems of the related art, and an object thereof is to suggest an upper die replacing method by which the replacement of the upper die of a leading end of a punch in a bending press machine can be efficiently and safely performed in a short time, and to provide an upper die carriage for use in the method.
- the inventors have extensively studied to find a solution of the above-described problems. As a result, the inventors found out that by providing an upper die carriage capable of collectively mounting a plurality of divided upper die segments, and moving the carriage between a pair of dies below a press machine along a longitudinal direction of a punch, it is possible to accurately position and supply the upper die just below the punch, and it is preferable that the movement of the carriage be performed using a steel pipe carrying-out device that is installed in the press machine to carry out the steel pipe after press forming, which has led to the development of the present invention.
- an upper die replacing method of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies, wherein carry-in of the upper die to just below the punch and carry-out of the upper die from just below the punch are performed by mounting the upper die on an upper die carriage capable of moving between the pair of dies in a longitudinal direction of the punch.
- the carry-in of the upper die carriage to just below the punch and the carry-out from just below the punch are performed using a steel pipe carrying-out device disposed in the press machine.
- detachment of the upper die from the leading end of the punch and attachment of the upper die to the leading end of the punch are performed in a state in which an upper die storing unit of the upper die carriage is lifted and is brought into contact with the leading end of the punch.
- position adjustment of the upper die mounted on an upper die table in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch is performed by moving the upper die table while mounting the upper die.
- the upper die replacing method of the present invention when the upper die is divided into a plurality of segments, replacement of the upper die is collectively performed.
- the plurality of segments are divided into a plurality of sets connected by a shim, and loading and unloading to the upper die carriage are performed in the unit of the set.
- an upper die carriage used for upper die replacement of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies, wherein the upper die carriage is movable between the pair of dies in a longitudinal direction of the punch, by a device that is installed in the bending press machine and carries out a steel pipe after pressing.
- the upper die carriage of the present invention further includes an upper die storing unit that stores an upper die, and a lifting/lowering mechanism that lifts and lowers the upper die storing unit.
- the upper die carriage of the present invention further includes a position adjusting mechanism that performs position adjustment of the upper die stored in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch for each upper die table on which the upper die is mounted.
- the present invention relates to a method of replacing an upper die attached to a leading end of a punch supporter in a bending press machine for bending a steel plate on dies by a pair of dies and a punch vertically moving between the dies.
- Fig. 3 is a diagram illustrating a structure of the punch of a bending press machine used in the present invention.
- the punch is constituted by a punch supporter 4 (beam) attached to a main body of a press machine 7, and an upper die 5 attached to a leading end (lower end) of the beam by fixing bolts 6.
- a punch supporter 4 beam
- an upper die 5 attached to a leading end (lower end) of the beam by fixing bolts 6.
- grooves 8 to which a beam lower portion is fitted is formed, and a spacer 9 is inserted between the groove portion and the beam leading end.
- the upper die may be a single body, but is typically divided into a plurality of segments in consideration of productivity and handling properties of the upper die.
- carry-in of the upper die to a lower position of the press machine and carry-out from the lower position of the press machine are performed by moving the upper die while being mounted on a dummy plate.
- from the necessity to move the punch it was necessary to perform the replacement operation while keeping the power of the press machine on. For this reason, there was also need for multiple safety measures to ensure safety, and adverse effects on productivity were inevitable.
- carry-in of the upper die to just below the punch and carry-out of the metal from just below the punch are performed by being mounted on the upper die carriage that moves between the pair of dies installed below the press machine in a longitudinal direction of the punch.
- the upper die carriage is placed at a position different from the press machine during press operation, and when performing the replacement of the upper die, the upper die carriage is mounted on a carry-out line to which the steel pipe (open pipe) after the press forming is carried out, by a crane or the like.
- the upper die carriage has a length that is able to collectively mount the upper die divided into the plurality of segments, and at a press machine side end portion in the longitudinal direction of the carriage, for example, an upward (or downward) hook is provided.
- another connection mechanism connected to the connection mechanism of the upper die carriage for example, a downward (or upward) hook is provided.
- the carry-in of the upper die carriage from the press machine to just below the press machine can be performed, by connecting the connection mechanism of the upper die carriage side with the connection mechanism of the steel pipe carrying-out device side, and by moving the steel pipe carrying-out device in an opposite direction to the direction at the time of carrying out the steel plate.
- carry-out of the upper die carriage from just below the press machine to the outside of the press machine can be performed, by bringing an extruding tool provided in the steel pipe carrying-out device for carrying out the steel pipe after the press forming into contact with the upper die carriage, or by connecting the connection mechanism of the upper die carriage side with the connection mechanism of the steel pipe carrying-out device side, and by moving the steel pipe carrying-out device in the carrying-out direction of the steel pipe.
- moving means (driving source) of the steel pipe carrying-out device is not particularly limited, and may be driven by, for example, a chain, a belt or the like connected to a power source such as a motor.
- the upper die carriage may run on a conveyance line constituted by a V roll, or may run on a rail by mounting wheels to the lower part of the upper die carriage, both may be used in combination with each other, and may not be particularly limited.
- V roll it is preferred to adopt a structure in which during the press operation, the V roll below the press machine moves downwards and retracts so as not to disturb the operation, and the V roll is lifted only when replacing the upper die.
- Fig. 4 illustrates a cross-section in a direction (hereinafter, referred to as a "width direction") perpendicular to the longitudinal direction of the punch, the upper die carriage 10 is constituted by a carriage base 11, and an upper die storing unit 12 in the upper portion, the cross-sectional shape in the width direction of the upper die storing unit 12 is a H-shape, and an upper die table 13 for mounting the upper die is provided in an upper concave part.
- a width direction hereinafter, referred to as a "width direction”
- a position adjusting bolt 14 as a position adjusting mechanism of the upper die table 13 is provided, and by rotating the bolt, the width direction position of the upper die table 13 in the concave part of the upper die storing unit can be finely adjusted in the state of attaching the upper die.
- the position adjusting bolt 14 it is possible to easily, quickly, and accurately fit a new upper die at the leading end of the punch supporter (beam).
- the carriage base 11 and the upper die storing unit 12 are separated from each other, and it is possible to lift and lower the upper die storing unit 12 by a hydraulic jack 15 as a lifting/lowering function disposed on the carriage base side.
- a hydraulic jack 15 as a lifting/lowering function disposed on the carriage base side.
- Step 1 the empty upper die carriage 10 is mounted on the steel pipe carry-out line 16 from the carriage storage space ( Fig. 5(a) )
- Step 2 the steel pipe carrying-out device 17 is moved up to the position of the upper die carriage 10 and connected thereto ( Fig. 5(b) ).
- Step 3 the upper die carriage 10 is moved up to just below the punch 2 of the press machine 7 by the steel pipe carrying-out device 17 ( Figs. 5(c) and 6(a) ).
- Step 4 the upper die storing unit 12 over the upper die carriage is lifted by the hydraulic jack 15 to bring the upper die table 13 in the storing unit into contact with the upper die 5 of the leading end of the punch ( Figs. 5(d) and 6(b) ).
- Step 5 fastening of the fixing bolt 6 is released to detach the upper die 5 from the leading end of the punch (leading end of the beam) ( Figs. 5(d) and 6(c) ).
- Step 6 the upper die 5 and the upper die storing unit 12 are lowered and stored on the upper die carriage base 11 ( Figs. 5(e) and 6(d) ).
- Step 7 the upper die carriage 10 is extruded to the outside of the press machine by the steel pipe carrying-out device 17 and mounted on the steel pipe carry-out line 16 ( Fig. 5(f) ).
- Step 8 the upper die carriage 10 is detached from the steel pipe carry-out line 16.
- Step 1 the upper die carriage 10 with the new upper die 5 mounted thereon is mounted on the steel pipe carry-out line 16.
- Step 2 the steel pipe carrying-out device 17 is moved up to the position of the upper die carriage 10 and connected thereto.
- Step 3 the upper die carriage 10 is moved to just below the punch 2 of the press machine 7 by the steel pipe carrying-out device 17.
- Step 4 the upper die storing unit 12 above the upper die carriage is lifted by the hydraulic jacks 15 to fit the groove portions 8 of the new upper die 5 in the storing unit and the leading end (beam) of the punch supporter 4 to each other. At this time, the width direction position of the upper die is finely adjusted using the position adjusting bolt 14 of the upper die table 13.
- Step 5 the fixing bolt 6 is fastened and the upper die 5 is attached to the leading end of the beam 4.
- Step 6 the upper die storing unit 12 is lowered and stored in the upper die carriage base 11.
- Step 7 the upper die carriage 10 is extruded by the steel pipe carrying-out device 17 and mounted on the steel pipe carry-out line 16.
- Step 8 the upper die carriage 10 is removed from the steel pipe carry-out line 16.
- the replacement of the plurality of segments is preferably performed integrally and collectively rather than the individual replacement, in view of the operating efficiency.
- the upper die constituted by the plurality of segments is divided into a plurality of sets obtained by connecting the small number of the plurality of segments and be mounted on the upper die carriage by the set unit.
- the set preferably has a structure in which parallel pins are embedded in a joint part of each segment and the segments are fastened by the bolts, where the length of the set is based on the length of the spacer inserted into the groove portions 8 formed on the upper die.
- the connection part between each of the sets is preferably configured so that the spacer of one set protrudes from the end portion of the set, the end portion of the other set has a spacer omission unit to which the protruded spacer is fitted, and both sets are connected to each other via the spacer.
- Figs. 7(a) and 7(b) illustrate an example in which one upper die divided into nine segments is divided into three sets made up of three segments.
- the order of mounting the plurality of sets on the upper die carriage be carried out first from the set provided with the spacer omission unit.
- the upper die replacement of the bending press machine capable of manufacturing a welded steel pipe having an outer diameter of 20 to 56 inches and a pipe wall thickness of 12.7 to 50.8 mm is performed by the use of two methods of the method (Comparative Example) of the related art using the dummy plate described in [0011] and the method (Example of the present invention) of replacing the upper die of the present invention, and the required times thereof are compared.
- the upper die has a total length of 13.5 m, and is divided into nine segments as illustrated in Figs. 7(a) and 7(b) , and three segments are used as one set to perform handling.
- Example of the present invention can be reduced to about 1/3 as compared to Comparative Example of the related art.
Abstract
Description
- The present invention relates to an upper die replacing method of a leading end of a punch in a bending press machine manufacturing a thick welded steel pipe having a large diameter used for a line pipe or the like by performing three-point bending press forming multiple times, and an upper die carriage used for replacing the upper die.
- Conventionally, as a thick steel pipe having a large diameter used for a line pipe, a steel structure or the like, in general, a so-called "UOE steel pipe" has been widely used. The UOE steel pipe is formed so that a material steel plate having predetermined width, length, and thickness is press-formed into a U-shape and then is press-formed into an O-shape, and thereafter, butted parts are welded to obtain a material steel pipe, and the material steel pipe is expanded (so-called pipe expansion) in a circumferential direction to improve roundness. Furthermore, in recent years, in terms of an improvement in safety and an increase in size, in the steel pipe used for the line pipe or the like, an increase in diameter, an increase in length, thickening, and strengthening of the material steel plate have been in progress.
- However, in the method of manufacturing the above-described UOE steel pipe, in order to perform the press forming of the material steel plate having increased thickness, increased length and higher strength into a U-shape and an O-shape, there is a need for a great press load. Thus, there is a problem in that the production range is limited or productivity is significantly lowered in conventional UOE steel pipe manufacturing equipment.
- Thus, as a technique of reducing the press load when manufacturing the thick steel pipe having a large diameter, long length, and high strength, a press bending method has been developed and put into practical use. According to such a method, after the application of bending (so-called end bending) to both width end portions of a material steel plate, the three-point bending press forming is performed multiple times while feeding the steel plates in the width direction by a predetermined amount to press-form the steel plate into a substantially cylindrical shape (open pipe) having an opening portion, then, the opening portion of the open pipe is subjected to butt welding and pipe expansion, and the shape thereof is corrected, thereby manufacturing a steel pipe.
-
Fig. 1 is a diagram that schematically illustrates a method of manufacturing a steel pipe using the above-described press bending method. In this manufacturing method, first, three-point bending press forming is performed multiple times toward a plate width center from one plate width end portion of amaterial steel plate 1 having both bent (crimping pressed) end portions by combining apunch 2 with a pair ofdies 3 to form one half into an arc shape except for the plate width center of the steel plate (first half press), next, similarly, the three-point bending press forming is performed multiple times toward the plate width center from the other plate width end portion to form the remaining one half except for the plate width center of the steel plate into an arc shape, thereby obtaining a substantially C-shape (second half press), finally, the remaining plate width center portion is subjected to press forming (final press) to obtain a substantially cylindrical shape (open pipe) having an opening portion, and thereafter, the steel pipe is generally manufactured by performing butt welding of the opening portion. In addition, in some cases, the material steel plate may not be subjected to the end bending. - A bending press machine used for the above-described three-point bending press forming has a pair of dies disposed in a feeding direction of a material steel plate at a predetermined gap, and a punch capable of vertically moving between the pair of dies, and is configured to press the material steel plate placed on the dies by the punch, thereby performing bending. The punch includes an upper die, attached to a leading end portion of a
punch 2 directly coming into contact with the steel plate as a material to be machined, (hereinafter, simply referred to as a " upper die "), and a punch supporter (hereinafter, also referred to as a "beam") that is connected to a main body of a press machine and supports the upper die at a leading end thereof, and the upper die and the punch supporter are commonly fastened by fixing bolts in an attachable and detachable manner. Furthermore, the beam is an integral body, but the upper die is commonly constituted by a plurality of segments so that the attachment and detachment operation and the handling are easily performed. - In addition, as a method of replacing the upper die, several replacing methods of a tool in a small bending machine and a punch press machine have been suggested (for example, see
Patent Literatures 1 to 4). However, these methods are techniques that can be used only for small bending machines and punch press machines and are not suitable for application to the replacement of the upper die of the bending press machine for manufacturing a large diameter pipe. -
- Patent Literature 1:
JP 11-005131 A - Patent Literature 2:
JP 2001-276936 A - Patent Literature 3:
JP 2002-096120 A - Patent Literature 4:
JP 2001-150032 A - Incidentally, there is a need to replace the upper die attached to the leading end portion of the punch depending on changes in sizes (inner diameter and outer diameter) of the steel pipe to be manufactured and in (thickness and strength of) the material steel plate.
- However, there is a problem as follows. In the related art, as illustrated in
Fig. 2(a) , a relatively small radius of curvature R (leading end R) of an upper die surface coming into direct-contact with the steel plate is used, and then the range capable of coping with changes in the steel pipe size and the material steel plate is wide. At the same time, however, since the bending part is local, roundness of the steel pipe after forming is degraded, and since there is a need to perform the press forming little by little, the number of presses increases, and the productivity is degraded. - Thus, as counter-measures of the above-described problems, as illustrated in
Fig. 2(b) , increasing the leading end R and widening a width of the punch in accordance with a steel pipe diameter are performed to improve the roundness or to improve the productivity. However, though widening the punch width or increasing the leading end R as described above leads to improvement in roundness and productivity, there is a need to frequently replace the upper die depending on changes in the steel pipe size and in the material strength. In particular, when the width of the upper die widens, not only the load required for pressing increases, but also a great bending moment is applied to the base of the beam attached to the upper die and the moment easily exceeds the endurance strength of the punch, in the case where a feed rate of the steel plate is small relative to a distance between the dies and a shape of the material steel plate on the dies is right-and-left asymmetric with respect to the axis center of the punch. For that reason, there is a need to frequently replace the upper die of the leading end portion of the punch depending on the changes in the steel pipe size, the material steel plate, and press conditions. - Conventionally, as a method of replacing the upper die, for example, the method is performed by a series of processes as follows. That is, after mounting a new upper die on a large dummy plate, the dummy plate is conveyed in a horizontal direction using conveyance facilities configured to supply a material steel plate to a press machine, the new upper die is moved to a vicinity just below a punch (beam), then, the punch is lowered to become a state of being in contact with the dummy plate of a position near the new upper die, fastening of bolts is released to detach the upper die from a beam leading end, then, the dummy plate is moved by the above-described conveyance facilities to move the new upper die to just below the beam, the new upper die is fitted to the beam leading end, and is attached thereto by being fastened with bolts.
- For that reason, in the conventional method of replacing the upper die, it is not possible to supply a new upper die to just below the beam, since it is not possible to accurately move the dummy plate in the horizontal direction, and since it is not possible to finely adjust the position of the upper die in the state of being mounted on the dummy plate. For this reason, it takes a long time for mounting the upper die to the beam leading end. Furthermore, since the upper die is divided into a plurality of segments, it is necessary to repeat the above-described replacement operation. Thus, a lot of time is required for one upper die replacement, which significantly reduces the operation efficiency. Furthermore, since it is not possible to turn off the power source of the press machine when replacing the upper die in view of the need to lift and lower the punch, there is a need to take multiple safety measures so as to ensure safety, and thus, the reduction in productivity cannot be avoided.
- The methods described in
Patent Literatures 1 to 4 are techniques that can be used only for small bending machines and punch press machines, but are not techniques that can be directly applied to replacement of the upper die of the bending press machine for manufacturing the large diameter. - The present invention has been made in view of the above-described problems of the related art, and an object thereof is to suggest an upper die replacing method by which the replacement of the upper die of a leading end of a punch in a bending press machine can be efficiently and safely performed in a short time, and to provide an upper die carriage for use in the method.
- The inventors have extensively studied to find a solution of the above-described problems. As a result, the inventors found out that by providing an upper die carriage capable of collectively mounting a plurality of divided upper die segments, and moving the carriage between a pair of dies below a press machine along a longitudinal direction of a punch, it is possible to accurately position and supply the upper die just below the punch, and it is preferable that the movement of the carriage be performed using a steel pipe carrying-out device that is installed in the press machine to carry out the steel pipe after press forming, which has led to the development of the present invention.
- That is, according to the present invention, there is provided an upper die replacing method of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies, wherein carry-in of the upper die to just below the punch and carry-out of the upper die from just below the punch are performed by mounting the upper die on an upper die carriage capable of moving between the pair of dies in a longitudinal direction of the punch.
- In the upper die replacing method of the present invention, the carry-in of the upper die carriage to just below the punch and the carry-out from just below the punch are performed using a steel pipe carrying-out device disposed in the press machine.
- Further, in the upper die replacing method of the present invention, detachment of the upper die from the leading end of the punch and attachment of the upper die to the leading end of the punch are performed in a state in which an upper die storing unit of the upper die carriage is lifted and is brought into contact with the leading end of the punch.
- Further, in the upper die replacing method of the present invention, position adjustment of the upper die mounted on an upper die table in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch is performed by moving the upper die table while mounting the upper die.
- Further, in the upper die replacing method of the present invention, when the upper die is divided into a plurality of segments, replacement of the upper die is collectively performed.
- Further, in the upper die replacing method of the present invention, the plurality of segments are divided into a plurality of sets connected by a shim, and loading and unloading to the upper die carriage are performed in the unit of the set.
- Further, according to the present invention, there is provided an upper die carriage used for upper die replacement of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies, wherein the upper die carriage is movable between the pair of dies in a longitudinal direction of the punch, by a device that is installed in the bending press machine and carries out a steel pipe after pressing.
- Furthermore, the upper die carriage of the present invention further includes an upper die storing unit that stores an upper die, and a lifting/lowering mechanism that lifts and lowers the upper die storing unit.
- Furthermore, the upper die carriage of the present invention further includes a position adjusting mechanism that performs position adjustment of the upper die stored in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch for each upper die table on which the upper die is mounted.
- According to the present invention, since it is possible to efficiently perform the replacement of the upper die in the bending press machine in a short time, it is possible to manufacture a welded steel pipe having a large diameter, thickness, length, and high strength with high productivity.
-
-
Fig. 1 is a diagram schematically illustrating a method of manufacturing a steel pipe according to a press bending method. -
Figs. 2(a) and 2(b) are diagrams illustrating an influence of an upper die width of a leading end of a punch on manufacturing of the steel pipe. -
Fig. 3 is an example view illustrating a structure of the punch of a bending press machine. -
Fig. 4 is a diagram illustrating a cross-sectional structure of an upper die carriage. -
Figs. 5(a) to 5(f) are diagrams illustrating the procedure of a replacement of the upper die (detaching method). -
Figs. 6(a) to 6(d) are diagrams illustrating an upper die detaching operation in the upper die carriage. -
Figs. 7(a) and 7(b) are diagrams illustrating a handling method of the upper die divided into a plurality of segments. - The present invention relates to a method of replacing an upper die attached to a leading end of a punch supporter in a bending press machine for bending a steel plate on dies by a pair of dies and a punch vertically moving between the dies.
-
Fig. 3 is a diagram illustrating a structure of the punch of a bending press machine used in the present invention. The punch is constituted by a punch supporter 4 (beam) attached to a main body of apress machine 7, and anupper die 5 attached to a leading end (lower end) of the beam by fixingbolts 6. On a side of the upper die coming into contact with the beam leading end,grooves 8 to which a beam lower portion is fitted is formed, and aspacer 9 is inserted between the groove portion and the beam leading end. - The upper die may be a single body, but is typically divided into a plurality of segments in consideration of productivity and handling properties of the upper die. As described previously, in a conventional method of the replacement of the upper die, carry-in of the upper die to a lower position of the press machine and carry-out from the lower position of the press machine are performed by moving the upper die while being mounted on a dummy plate. However, in the above-described method, it has not been possible to accurately position the upper die just below the beam leading end, and it has taken a great deal of time for mounting, which has been a cause of impeding the productivity. In addition, from the necessity to move the punch, it was necessary to perform the replacement operation while keeping the power of the press machine on. For this reason, there was also need for multiple safety measures to ensure safety, and adverse effects on productivity were inevitable.
- Thus, according to the present invention, carry-in of the upper die to just below the punch and carry-out of the metal from just below the punch are performed by being mounted on the upper die carriage that moves between the pair of dies installed below the press machine in a longitudinal direction of the punch.
- The upper die carriage is placed at a position different from the press machine during press operation, and when performing the replacement of the upper die, the upper die carriage is mounted on a carry-out line to which the steel pipe (open pipe) after the press forming is carried out, by a crane or the like. The upper die carriage has a length that is able to collectively mount the upper die divided into the plurality of segments, and at a press machine side end portion in the longitudinal direction of the carriage, for example, an upward (or downward) hook is provided. Meanwhile, in the steel pipe carrying-out device that is provided in the press machine and carries out the steel pipe after the press forming, another connection mechanism connected to the connection mechanism of the upper die carriage, for example, a downward (or upward) hook is provided.
- Moreover, the carry-in of the upper die carriage from the press machine to just below the press machine can be performed, by connecting the connection mechanism of the upper die carriage side with the connection mechanism of the steel pipe carrying-out device side, and by moving the steel pipe carrying-out device in an opposite direction to the direction at the time of carrying out the steel plate.
- Meanwhile, carry-out of the upper die carriage from just below the press machine to the outside of the press machine can be performed, by bringing an extruding tool provided in the steel pipe carrying-out device for carrying out the steel pipe after the press forming into contact with the upper die carriage, or by connecting the connection mechanism of the upper die carriage side with the connection mechanism of the steel pipe carrying-out device side, and by moving the steel pipe carrying-out device in the carrying-out direction of the steel pipe.
- Thus, moving means (driving source) of the steel pipe carrying-out device is not particularly limited, and may be driven by, for example, a chain, a belt or the like connected to a power source such as a motor.
- Furthermore, for example, as illustrated by broken lines in a lower part of
Fig. 4 , the upper die carriage may run on a conveyance line constituted by a V roll, or may run on a rail by mounting wheels to the lower part of the upper die carriage, both may be used in combination with each other, and may not be particularly limited. In addition, when adopting the V roll, it is preferred to adopt a structure in which during the press operation, the V roll below the press machine moves downwards and retracts so as not to disturb the operation, and the V roll is lifted only when replacing the upper die. - Furthermore,
Fig. 4 illustrates a cross-section in a direction (hereinafter, referred to as a "width direction") perpendicular to the longitudinal direction of the punch, theupper die carriage 10 is constituted by acarriage base 11, and an upperdie storing unit 12 in the upper portion, the cross-sectional shape in the width direction of the upperdie storing unit 12 is a H-shape, and an upper die table 13 for mounting the upper die is provided in an upper concave part. Furthermore, on both sides of the upper die storing unit, aposition adjusting bolt 14 as a position adjusting mechanism of the upper die table 13 is provided, and by rotating the bolt, the width direction position of the upper die table 13 in the concave part of the upper die storing unit can be finely adjusted in the state of attaching the upper die. By using theposition adjusting bolt 14, it is possible to easily, quickly, and accurately fit a new upper die at the leading end of the punch supporter (beam). - Furthermore, the
carriage base 11 and the upperdie storing unit 12 are separated from each other, and it is possible to lift and lower the upperdie storing unit 12 by ahydraulic jack 15 as a lifting/lowering function disposed on the carriage base side. Thus, when attaching the new upper die to the punch lower end, it is possible to bring the upper die into contact with the leading end of the punch (beam leading end) by lifting the upper die in the state of being mounted on the upper die table in the upper die storing unit. Furthermore, when detaching the upper die from the leading end of the punch, it is possible to detach the upper die, after bringing the upper die into contact with the upper die table by lifting the upper die storing unit. Therefore, during the upper die replacing operation, for example, even when an operator performs the operation of fastening the leading end portion of the punch and the upper die by the fixing bolts or releasing the fastening below the press machine, it is possible to more safely perform the replacement of the upper die, since there is no need to operate the main body of a press machine. - The method of replacing the upper die of the present invention using the above-described upper die carriage is carried out in the following procedures.
- The method of detaching the upper die will be described with reference to
Figs. 5 and6 . - Step 1: the empty
upper die carriage 10 is mounted on the steel pipe carry-outline 16 from the carriage storage space (Fig. 5(a) ) - Step 2: the steel pipe carrying-out
device 17 is moved up to the position of theupper die carriage 10 and connected thereto (Fig. 5(b) ). - Step 3: the
upper die carriage 10 is moved up to just below thepunch 2 of thepress machine 7 by the steel pipe carrying-out device 17 (Figs. 5(c) and6(a) ). - Step 4: the upper
die storing unit 12 over the upper die carriage is lifted by thehydraulic jack 15 to bring the upper die table 13 in the storing unit into contact with theupper die 5 of the leading end of the punch (Figs. 5(d) and6(b) ). - Step 5: fastening of the fixing
bolt 6 is released to detach theupper die 5 from the leading end of the punch (leading end of the beam) (Figs. 5(d) and6(c) ). - Step 6: the
upper die 5 and the upperdie storing unit 12 are lowered and stored on the upper die carriage base 11 (Figs. 5(e) and6(d) ). - Step 7: the
upper die carriage 10 is extruded to the outside of the press machine by the steel pipe carrying-outdevice 17 and mounted on the steel pipe carry-out line 16 (Fig. 5(f) ). - Step 8: the
upper die carriage 10 is detached from the steel pipe carry-outline 16. - Next, the method of attaching the upper die will be described. In addition, since this method only needs to be performed substantially in reverse order of the above-described method of detaching the upper die, the description diagram thereof will not be provided.
- Step 1: the
upper die carriage 10 with the newupper die 5 mounted thereon is mounted on the steel pipe carry-outline 16. - Step 2: the steel pipe carrying-out
device 17 is moved up to the position of theupper die carriage 10 and connected thereto. - Step 3: the
upper die carriage 10 is moved to just below thepunch 2 of thepress machine 7 by the steel pipe carrying-outdevice 17. - Step 4: the upper
die storing unit 12 above the upper die carriage is lifted by thehydraulic jacks 15 to fit thegroove portions 8 of the newupper die 5 in the storing unit and the leading end (beam) of thepunch supporter 4 to each other. At this time, the width direction position of the upper die is finely adjusted using theposition adjusting bolt 14 of the upper die table 13. - Step 5: the fixing
bolt 6 is fastened and theupper die 5 is attached to the leading end of thebeam 4. - Step 6: the upper
die storing unit 12 is lowered and stored in the upperdie carriage base 11. - Step 7: the
upper die carriage 10 is extruded by the steel pipe carrying-outdevice 17 and mounted on the steel pipe carry-outline 16. - Step 8: the
upper die carriage 10 is removed from the steel pipe carry-outline 16. - In addition, in the method of replacing the punch in the bending press machine of the present invention, when the upper die is divided into the plurality of segments, the replacement of the plurality of segments is preferably performed integrally and collectively rather than the individual replacement, in view of the operating efficiency. However, when the length of the upper die is long, it may be difficult to mount the upper die on the upper die carriage at a time. In such a case, it is preferred that the upper die constituted by the plurality of segments is divided into a plurality of sets obtained by connecting the small number of the plurality of segments and be mounted on the upper die carriage by the set unit.
- In this case, the set preferably has a structure in which parallel pins are embedded in a joint part of each segment and the segments are fastened by the bolts, where the length of the set is based on the length of the spacer inserted into the
groove portions 8 formed on the upper die. Furthermore, the connection part between each of the sets is preferably configured so that the spacer of one set protrudes from the end portion of the set, the end portion of the other set has a spacer omission unit to which the protruded spacer is fitted, and both sets are connected to each other via the spacer. - In this way, it is possible to mount the upper die having a plurality of segments on the upper die carriage without the position deviation in the width direction, and it is possible to accurately attach the upper die to the punch supporter (beam).
Figs. 7(a) and 7(b) illustrate an example in which one upper die divided into nine segments is divided into three sets made up of three segments. In addition, it is preferred that the order of mounting the plurality of sets on the upper die carriage be carried out first from the set provided with the spacer omission unit. - The upper die replacement of the bending press machine capable of manufacturing a welded steel pipe having an outer diameter of 20 to 56 inches and a pipe wall thickness of 12.7 to 50.8 mm is performed by the use of two methods of the method (Comparative Example) of the related art using the dummy plate described in [0011] and the method (Example of the present invention) of replacing the upper die of the present invention, and the required times thereof are compared. The upper die has a total length of 13.5 m, and is divided into nine segments as illustrated in
Figs. 7(a) and 7(b) , and three segments are used as one set to perform handling. - As a result, the upper die replacement time of Example of the present invention can be reduced to about 1/3 as compared to Comparative Example of the related art.
-
- 1: material steel plate
- 2: punch
- 3: die
- 4: punch supporter (beam)
- 5: upper die
- 6: fixing bolt
- 7: main body of press machine
- 8: fitting groove
- 9: spacer
- 10: upper die carriage
- 11: upper die carriage base
- 12: upper die storing unit
- 13: upper die table
- 14: position adjusting mechanism (position adjusting bolt)
- 15: lifting/lowering mechanism (hydraulic jack)
- 16: steel pipe carry-out line
- 17: steel pipe carrying-out device
- 18: parallel pin
Claims (9)
- An upper die replacing method of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies,
wherein carry-in of the upper die to just below the punch and carry-out of the upper die from just below the punch are performed by mounting the upper die on an upper die carriage capable of moving between the pair of dies in a longitudinal direction of the punch. - The upper die replacing method in a bending press machine according to claim 1, wherein the carry-in of the upper die carriage to just below the punch and the carry-out from just below the punch are performed using a steel pipe carrying-out device disposed in the press machine.
- The upper die replacing method in a bending press machine according to claim 1 or 2, wherein detachment of the upper die from the leading end of the punch and attachment of the upper die to the leading end of the punch are performed in a state in which an upper die storing unit of the upper die carriage is lifted and is brought into contact with the leading end of the punch.
- The upper die replacing method in a bending press machine according to any one of claims 1 to 3, wherein position adjustment of the upper die mounted on an upper die table in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch is performed by moving the upper die table while mounting the upper die.
- The upper die replacing method in a bending press machine according to any one of claims 1 to 4, wherein when the upper die is divided into a plurality of segments, replacement of the upper die is collectively performed.
- The upper die replacing method in a bending press machine according to claim 5, wherein the plurality of segments are divided into a plurality of sets connected by a shim, and loading and unloading to the upper die carriage are performed in the unit of the set.
- An upper die carriage used for upper die replacement of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies,
wherein the upper die carriage is movable between the pair of dies in a longitudinal direction of the punch, by a device that is installed in the bending press machine and carries out a steel pipe after pressing. - The upper die carriage for upper die replacement in a bending press machine according to claim 7, comprising
an upper die storing unit that stores an upper die, and a lifting/lowering mechanism that lifts and lowers the upper die storing unit. - The upper die carriage for upper die replacement in a bending press machine according to claim 7 or 8, further comprising
a position adjusting mechanism that performs position adjustment of the upper die stored in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch for each upper die table on which the upper die is mounted.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2013/065141 WO2014192129A1 (en) | 2013-05-31 | 2013-05-31 | Mold replacement method and mold platform in bending press |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3006196A1 true EP3006196A1 (en) | 2016-04-13 |
EP3006196A4 EP3006196A4 (en) | 2016-08-24 |
EP3006196B1 EP3006196B1 (en) | 2022-01-12 |
Family
ID=51988198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13885966.5A Active EP3006196B1 (en) | 2013-05-31 | 2013-05-31 | Mold replacement method and mold platform in bending press |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP3006196B1 (en) |
JP (1) | JP5967395B2 (en) |
CN (1) | CN105246674B (en) |
RU (1) | RU2630094C2 (en) |
WO (1) | WO2014192129A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106736278A (en) * | 2016-12-12 | 2017-05-31 | 邓惠芬 | The processing method for bending ignition tip |
CN110681736B (en) * | 2019-10-17 | 2020-12-18 | 赣州市恒邦金属制品有限公司 | High-efficient equipment of bending with two functions of trading |
CN111069374A (en) * | 2019-12-26 | 2020-04-28 | 华钰汽配有限公司 | Bending device and method for automobile front license plate support |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5797625U (en) * | 1980-12-04 | 1982-06-16 | ||
JPS6068114A (en) * | 1983-09-22 | 1985-04-18 | Nippon Steel Corp | Method and device for carrying in and out die for u-press forming of uo steel pipe |
SU1480949A1 (en) * | 1987-01-23 | 1989-05-23 | Предприятие П/Я А-7087 | Die-changing arrangement |
US5134873A (en) * | 1989-04-10 | 1992-08-04 | Yamazaki Mazak Kabushiki Kaisha | Die exchange apparatus for the use of a press brake |
SU1697942A1 (en) * | 1989-10-16 | 1991-12-15 | Нижегородский Автомобильный Завод | Arrangement for replacing press stamps |
WO1992016318A1 (en) * | 1991-03-22 | 1992-10-01 | Amada Company, Limited | System for working on plate material |
JP2532830Y2 (en) * | 1991-12-27 | 1997-04-16 | 相生精機株式会社 | Transfer equipment for dies, etc. |
JP2871532B2 (en) * | 1995-06-20 | 1999-03-17 | 住友金属工業株式会社 | Manufacturing method of UO steel pipe |
JP3204165B2 (en) | 1997-06-16 | 2001-09-04 | 村田機械株式会社 | Punch press machine |
JP2001150032A (en) | 1999-09-06 | 2001-06-05 | Amada Eng Center Co Ltd | Method and device for mold exchange in the bending machine |
JP2001276936A (en) | 2000-03-29 | 2001-10-09 | Murata Mach Ltd | Tool cartridge exchange apparatus |
JP4284848B2 (en) | 2000-09-20 | 2009-06-24 | 村田機械株式会社 | Punch press |
CN2491147Y (en) * | 2001-04-20 | 2002-05-15 | 左年传 | Self-controlled spiral jack I-type steel bulldozer |
US7568371B2 (en) * | 2006-01-17 | 2009-08-04 | Cyril Bath Company | Stretch-forming machine and method |
CN202845584U (en) * | 2012-09-28 | 2013-04-03 | 无锡市亚青机械厂 | Bending press water tank cover plate press forming die structure |
-
2013
- 2013-05-31 RU RU2015155435A patent/RU2630094C2/en active
- 2013-05-31 EP EP13885966.5A patent/EP3006196B1/en active Active
- 2013-05-31 JP JP2015519569A patent/JP5967395B2/en active Active
- 2013-05-31 WO PCT/JP2013/065141 patent/WO2014192129A1/en active Application Filing
- 2013-05-31 CN CN201380076715.9A patent/CN105246674B/en active Active
Also Published As
Publication number | Publication date |
---|---|
JPWO2014192129A1 (en) | 2017-02-23 |
CN105246674B (en) | 2017-05-10 |
WO2014192129A1 (en) | 2014-12-04 |
CN105246674A (en) | 2016-01-13 |
JP5967395B2 (en) | 2016-08-10 |
EP3006196B1 (en) | 2022-01-12 |
RU2015155435A (en) | 2017-07-05 |
EP3006196A4 (en) | 2016-08-24 |
RU2630094C2 (en) | 2017-09-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3006196B1 (en) | Mold replacement method and mold platform in bending press | |
KR101625497B1 (en) | Carrying apparatus for piping spool | |
JP6607102B2 (en) | Method and apparatus for forming welded steel pipe, method and apparatus for manufacturing welded steel pipe | |
KR20050047068A (en) | Table for exchanging metallic mould | |
EP1698407B1 (en) | Method and device for manufacturing uoe steel tube | |
KR101917433B1 (en) | Apparatus for supporting coil and apparatus for banding coil using same | |
CN104476192B (en) | A kind of tank body automatic roll-forming device and forming method | |
JP3504546B2 (en) | Apparatus and method for pressing welded portion of drum and drum manufacturing apparatus | |
KR20220091611A (en) | Manufacturing apparatus and manufacturing method of laminated iron core | |
JP3938918B2 (en) | Roll changing method in a pipe welding stand and a longitudinal seam welder applying this roll changing method | |
JP5593191B2 (en) | Metal pipe manufacturing equipment | |
CN102319776B (en) | Processing device and processing method for end plate structure of electrolytic cell casing | |
JP2010099839A (en) | Tire vulcanizing apparatus and method for manufacturing vulcanized tire | |
CN108788573B (en) | Automatic welding equipment for longitudinal joints | |
KR20180021304A (en) | Jig used for replacing sleeve and apparatus for replacing sleeve using same | |
CN107651583B (en) | A kind of manufacturing method of ocean platform crane tower body | |
JP2005230892A (en) | Roll exchange device for rolling mill | |
CN212174326U (en) | Feeding device for forging production | |
CN104338799A (en) | Plate leveler | |
CN212598044U (en) | Production device for non-ferrous metal rolled material | |
CN217478305U (en) | Rail butt joint deviation prevention mechanism of heavy-load suspension conveying elevator | |
CN220717359U (en) | Middle part groove plastic frock | |
CN202263804U (en) | Electrolytic cell housing end plate structure processing device | |
CN210476025U (en) | Semitrailer boxboard welding supporting platform | |
KR101499958B1 (en) | Preforming apparatus for hydro-forming |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20151124 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20160726 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B21D 5/01 20060101ALI20160720BHEP Ipc: B21C 37/08 20060101ALI20160720BHEP Ipc: B30B 15/02 20060101AFI20160720BHEP Ipc: B21D 37/04 20060101ALI20160720BHEP |
|
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20200212 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20210922 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
RAP3 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: JFE STEEL CORPORATION |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013080701 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1462094 Country of ref document: AT Kind code of ref document: T Effective date: 20220215 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20220112 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1462094 Country of ref document: AT Kind code of ref document: T Effective date: 20220112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220512 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220412 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220412 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220413 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220512 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013080701 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 |
|
26N | No opposition filed |
Effective date: 20221013 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20220531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 11 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20230411 Year of fee payment: 11 Ref country code: DE Payment date: 20230404 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20230406 Year of fee payment: 11 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220112 |