EP3006196A1 - Mold replacement method and mold platform in bending press - Google Patents

Mold replacement method and mold platform in bending press Download PDF

Info

Publication number
EP3006196A1
EP3006196A1 EP13885966.5A EP13885966A EP3006196A1 EP 3006196 A1 EP3006196 A1 EP 3006196A1 EP 13885966 A EP13885966 A EP 13885966A EP 3006196 A1 EP3006196 A1 EP 3006196A1
Authority
EP
European Patent Office
Prior art keywords
upper die
punch
press machine
carriage
dies
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP13885966.5A
Other languages
German (de)
French (fr)
Other versions
EP3006196B1 (en
EP3006196A4 (en
Inventor
Toshihiro Miwa
Kouzi HORIGIWA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Publication of EP3006196A1 publication Critical patent/EP3006196A1/en
Publication of EP3006196A4 publication Critical patent/EP3006196A4/en
Application granted granted Critical
Publication of EP3006196B1 publication Critical patent/EP3006196B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D5/00Bending sheet metal along straight lines, e.g. to form simple curves
    • B21D5/01Bending sheet metal along straight lines, e.g. to form simple curves between rams and anvils or abutments
    • B21D5/015Bending sheet metal along straight lines, e.g. to form simple curves between rams and anvils or abutments for making tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B15/00Details of, or accessories for, presses; Auxiliary measures in connection with pressing
    • B30B15/02Dies; Inserts therefor; Mounting thereof; Moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/15Making tubes of special shape; Making tube fittings
    • B21C37/16Making tubes with varying diameter in longitudinal direction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/14Particular arrangements for handling and holding in place complete dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B15/00Details of, or accessories for, presses; Auxiliary measures in connection with pressing
    • B30B15/02Dies; Inserts therefor; Mounting thereof; Moulds
    • B30B15/026Mounting of dies, platens or press rams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B15/00Details of, or accessories for, presses; Auxiliary measures in connection with pressing
    • B30B15/02Dies; Inserts therefor; Mounting thereof; Moulds
    • B30B15/028Loading or unloading of dies, platens or press rams
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/08Making tubes with welded or soldered seams
    • B21C37/0815Making tubes with welded or soldered seams without continuous longitudinal movement of the sheet during the bending operation

Definitions

  • the present invention relates to an upper die replacing method of a leading end of a punch in a bending press machine manufacturing a thick welded steel pipe having a large diameter used for a line pipe or the like by performing three-point bending press forming multiple times, and an upper die carriage used for replacing the upper die.
  • UOE steel pipe As a thick steel pipe having a large diameter used for a line pipe, a steel structure or the like, in general, a so-called "UOE steel pipe” has been widely used.
  • the UOE steel pipe is formed so that a material steel plate having predetermined width, length, and thickness is press-formed into a U-shape and then is press-formed into an O-shape, and thereafter, butted parts are welded to obtain a material steel pipe, and the material steel pipe is expanded (so-called pipe expansion) in a circumferential direction to improve roundness.
  • pipe expansion in a circumferential direction to improve roundness.
  • a press bending method As a technique of reducing the press load when manufacturing the thick steel pipe having a large diameter, long length, and high strength, a press bending method has been developed and put into practical use.
  • the three-point bending press forming is performed multiple times while feeding the steel plates in the width direction by a predetermined amount to press-form the steel plate into a substantially cylindrical shape (open pipe) having an opening portion, then, the opening portion of the open pipe is subjected to butt welding and pipe expansion, and the shape thereof is corrected, thereby manufacturing a steel pipe.
  • Fig. 1 is a diagram that schematically illustrates a method of manufacturing a steel pipe using the above-described press bending method.
  • this manufacturing method first, three-point bending press forming is performed multiple times toward a plate width center from one plate width end portion of a material steel plate 1 having both bent (crimping pressed) end portions by combining a punch 2 with a pair of dies 3 to form one half into an arc shape except for the plate width center of the steel plate (first half press), next, similarly, the three-point bending press forming is performed multiple times toward the plate width center from the other plate width end portion to form the remaining one half except for the plate width center of the steel plate into an arc shape, thereby obtaining a substantially C-shape (second half press), finally, the remaining plate width center portion is subjected to press forming (final press) to obtain a substantially cylindrical shape (open pipe) having an opening portion, and thereafter, the steel pipe is generally manufactured by performing butt welding of the opening portion.
  • the material steel plate 1 having both
  • a bending press machine used for the above-described three-point bending press forming has a pair of dies disposed in a feeding direction of a material steel plate at a predetermined gap, and a punch capable of vertically moving between the pair of dies, and is configured to press the material steel plate placed on the dies by the punch, thereby performing bending.
  • the punch includes an upper die, attached to a leading end portion of a punch 2 directly coming into contact with the steel plate as a material to be machined, (hereinafter, simply referred to as a "upper die “), and a punch supporter (hereinafter, also referred to as a "beam”) that is connected to a main body of a press machine and supports the upper die at a leading end thereof, and the upper die and the punch supporter are commonly fastened by fixing bolts in an attachable and detachable manner.
  • the beam is an integral body, but the upper die is commonly constituted by a plurality of segments so that the attachment and detachment operation and the handling are easily performed.
  • the method is performed by a series of processes as follows. That is, after mounting a new upper die on a large dummy plate, the dummy plate is conveyed in a horizontal direction using conveyance facilities configured to supply a material steel plate to a press machine, the new upper die is moved to a vicinity just below a punch (beam), then, the punch is lowered to become a state of being in contact with the dummy plate of a position near the new upper die, fastening of bolts is released to detach the upper die from a beam leading end, then, the dummy plate is moved by the above-described conveyance facilities to move the new upper die to just below the beam, the new upper die is fitted to the beam leading end, and is attached thereto by being fastened with bolts.
  • Patent Literatures 1 to 4 are techniques that can be used only for small bending machines and punch press machines, but are not techniques that can be directly applied to replacement of the upper die of the bending press machine for manufacturing the large diameter.
  • the present invention has been made in view of the above-described problems of the related art, and an object thereof is to suggest an upper die replacing method by which the replacement of the upper die of a leading end of a punch in a bending press machine can be efficiently and safely performed in a short time, and to provide an upper die carriage for use in the method.
  • the inventors have extensively studied to find a solution of the above-described problems. As a result, the inventors found out that by providing an upper die carriage capable of collectively mounting a plurality of divided upper die segments, and moving the carriage between a pair of dies below a press machine along a longitudinal direction of a punch, it is possible to accurately position and supply the upper die just below the punch, and it is preferable that the movement of the carriage be performed using a steel pipe carrying-out device that is installed in the press machine to carry out the steel pipe after press forming, which has led to the development of the present invention.
  • an upper die replacing method of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies, wherein carry-in of the upper die to just below the punch and carry-out of the upper die from just below the punch are performed by mounting the upper die on an upper die carriage capable of moving between the pair of dies in a longitudinal direction of the punch.
  • the carry-in of the upper die carriage to just below the punch and the carry-out from just below the punch are performed using a steel pipe carrying-out device disposed in the press machine.
  • detachment of the upper die from the leading end of the punch and attachment of the upper die to the leading end of the punch are performed in a state in which an upper die storing unit of the upper die carriage is lifted and is brought into contact with the leading end of the punch.
  • position adjustment of the upper die mounted on an upper die table in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch is performed by moving the upper die table while mounting the upper die.
  • the upper die replacing method of the present invention when the upper die is divided into a plurality of segments, replacement of the upper die is collectively performed.
  • the plurality of segments are divided into a plurality of sets connected by a shim, and loading and unloading to the upper die carriage are performed in the unit of the set.
  • an upper die carriage used for upper die replacement of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies, wherein the upper die carriage is movable between the pair of dies in a longitudinal direction of the punch, by a device that is installed in the bending press machine and carries out a steel pipe after pressing.
  • the upper die carriage of the present invention further includes an upper die storing unit that stores an upper die, and a lifting/lowering mechanism that lifts and lowers the upper die storing unit.
  • the upper die carriage of the present invention further includes a position adjusting mechanism that performs position adjustment of the upper die stored in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch for each upper die table on which the upper die is mounted.
  • the present invention relates to a method of replacing an upper die attached to a leading end of a punch supporter in a bending press machine for bending a steel plate on dies by a pair of dies and a punch vertically moving between the dies.
  • Fig. 3 is a diagram illustrating a structure of the punch of a bending press machine used in the present invention.
  • the punch is constituted by a punch supporter 4 (beam) attached to a main body of a press machine 7, and an upper die 5 attached to a leading end (lower end) of the beam by fixing bolts 6.
  • a punch supporter 4 beam
  • an upper die 5 attached to a leading end (lower end) of the beam by fixing bolts 6.
  • grooves 8 to which a beam lower portion is fitted is formed, and a spacer 9 is inserted between the groove portion and the beam leading end.
  • the upper die may be a single body, but is typically divided into a plurality of segments in consideration of productivity and handling properties of the upper die.
  • carry-in of the upper die to a lower position of the press machine and carry-out from the lower position of the press machine are performed by moving the upper die while being mounted on a dummy plate.
  • from the necessity to move the punch it was necessary to perform the replacement operation while keeping the power of the press machine on. For this reason, there was also need for multiple safety measures to ensure safety, and adverse effects on productivity were inevitable.
  • carry-in of the upper die to just below the punch and carry-out of the metal from just below the punch are performed by being mounted on the upper die carriage that moves between the pair of dies installed below the press machine in a longitudinal direction of the punch.
  • the upper die carriage is placed at a position different from the press machine during press operation, and when performing the replacement of the upper die, the upper die carriage is mounted on a carry-out line to which the steel pipe (open pipe) after the press forming is carried out, by a crane or the like.
  • the upper die carriage has a length that is able to collectively mount the upper die divided into the plurality of segments, and at a press machine side end portion in the longitudinal direction of the carriage, for example, an upward (or downward) hook is provided.
  • another connection mechanism connected to the connection mechanism of the upper die carriage for example, a downward (or upward) hook is provided.
  • the carry-in of the upper die carriage from the press machine to just below the press machine can be performed, by connecting the connection mechanism of the upper die carriage side with the connection mechanism of the steel pipe carrying-out device side, and by moving the steel pipe carrying-out device in an opposite direction to the direction at the time of carrying out the steel plate.
  • carry-out of the upper die carriage from just below the press machine to the outside of the press machine can be performed, by bringing an extruding tool provided in the steel pipe carrying-out device for carrying out the steel pipe after the press forming into contact with the upper die carriage, or by connecting the connection mechanism of the upper die carriage side with the connection mechanism of the steel pipe carrying-out device side, and by moving the steel pipe carrying-out device in the carrying-out direction of the steel pipe.
  • moving means (driving source) of the steel pipe carrying-out device is not particularly limited, and may be driven by, for example, a chain, a belt or the like connected to a power source such as a motor.
  • the upper die carriage may run on a conveyance line constituted by a V roll, or may run on a rail by mounting wheels to the lower part of the upper die carriage, both may be used in combination with each other, and may not be particularly limited.
  • V roll it is preferred to adopt a structure in which during the press operation, the V roll below the press machine moves downwards and retracts so as not to disturb the operation, and the V roll is lifted only when replacing the upper die.
  • Fig. 4 illustrates a cross-section in a direction (hereinafter, referred to as a "width direction") perpendicular to the longitudinal direction of the punch, the upper die carriage 10 is constituted by a carriage base 11, and an upper die storing unit 12 in the upper portion, the cross-sectional shape in the width direction of the upper die storing unit 12 is a H-shape, and an upper die table 13 for mounting the upper die is provided in an upper concave part.
  • a width direction hereinafter, referred to as a "width direction”
  • a position adjusting bolt 14 as a position adjusting mechanism of the upper die table 13 is provided, and by rotating the bolt, the width direction position of the upper die table 13 in the concave part of the upper die storing unit can be finely adjusted in the state of attaching the upper die.
  • the position adjusting bolt 14 it is possible to easily, quickly, and accurately fit a new upper die at the leading end of the punch supporter (beam).
  • the carriage base 11 and the upper die storing unit 12 are separated from each other, and it is possible to lift and lower the upper die storing unit 12 by a hydraulic jack 15 as a lifting/lowering function disposed on the carriage base side.
  • a hydraulic jack 15 as a lifting/lowering function disposed on the carriage base side.
  • Step 1 the empty upper die carriage 10 is mounted on the steel pipe carry-out line 16 from the carriage storage space ( Fig. 5(a) )
  • Step 2 the steel pipe carrying-out device 17 is moved up to the position of the upper die carriage 10 and connected thereto ( Fig. 5(b) ).
  • Step 3 the upper die carriage 10 is moved up to just below the punch 2 of the press machine 7 by the steel pipe carrying-out device 17 ( Figs. 5(c) and 6(a) ).
  • Step 4 the upper die storing unit 12 over the upper die carriage is lifted by the hydraulic jack 15 to bring the upper die table 13 in the storing unit into contact with the upper die 5 of the leading end of the punch ( Figs. 5(d) and 6(b) ).
  • Step 5 fastening of the fixing bolt 6 is released to detach the upper die 5 from the leading end of the punch (leading end of the beam) ( Figs. 5(d) and 6(c) ).
  • Step 6 the upper die 5 and the upper die storing unit 12 are lowered and stored on the upper die carriage base 11 ( Figs. 5(e) and 6(d) ).
  • Step 7 the upper die carriage 10 is extruded to the outside of the press machine by the steel pipe carrying-out device 17 and mounted on the steel pipe carry-out line 16 ( Fig. 5(f) ).
  • Step 8 the upper die carriage 10 is detached from the steel pipe carry-out line 16.
  • Step 1 the upper die carriage 10 with the new upper die 5 mounted thereon is mounted on the steel pipe carry-out line 16.
  • Step 2 the steel pipe carrying-out device 17 is moved up to the position of the upper die carriage 10 and connected thereto.
  • Step 3 the upper die carriage 10 is moved to just below the punch 2 of the press machine 7 by the steel pipe carrying-out device 17.
  • Step 4 the upper die storing unit 12 above the upper die carriage is lifted by the hydraulic jacks 15 to fit the groove portions 8 of the new upper die 5 in the storing unit and the leading end (beam) of the punch supporter 4 to each other. At this time, the width direction position of the upper die is finely adjusted using the position adjusting bolt 14 of the upper die table 13.
  • Step 5 the fixing bolt 6 is fastened and the upper die 5 is attached to the leading end of the beam 4.
  • Step 6 the upper die storing unit 12 is lowered and stored in the upper die carriage base 11.
  • Step 7 the upper die carriage 10 is extruded by the steel pipe carrying-out device 17 and mounted on the steel pipe carry-out line 16.
  • Step 8 the upper die carriage 10 is removed from the steel pipe carry-out line 16.
  • the replacement of the plurality of segments is preferably performed integrally and collectively rather than the individual replacement, in view of the operating efficiency.
  • the upper die constituted by the plurality of segments is divided into a plurality of sets obtained by connecting the small number of the plurality of segments and be mounted on the upper die carriage by the set unit.
  • the set preferably has a structure in which parallel pins are embedded in a joint part of each segment and the segments are fastened by the bolts, where the length of the set is based on the length of the spacer inserted into the groove portions 8 formed on the upper die.
  • the connection part between each of the sets is preferably configured so that the spacer of one set protrudes from the end portion of the set, the end portion of the other set has a spacer omission unit to which the protruded spacer is fitted, and both sets are connected to each other via the spacer.
  • Figs. 7(a) and 7(b) illustrate an example in which one upper die divided into nine segments is divided into three sets made up of three segments.
  • the order of mounting the plurality of sets on the upper die carriage be carried out first from the set provided with the spacer omission unit.
  • the upper die replacement of the bending press machine capable of manufacturing a welded steel pipe having an outer diameter of 20 to 56 inches and a pipe wall thickness of 12.7 to 50.8 mm is performed by the use of two methods of the method (Comparative Example) of the related art using the dummy plate described in [0011] and the method (Example of the present invention) of replacing the upper die of the present invention, and the required times thereof are compared.
  • the upper die has a total length of 13.5 m, and is divided into nine segments as illustrated in Figs. 7(a) and 7(b) , and three segments are used as one set to perform handling.
  • Example of the present invention can be reduced to about 1/3 as compared to Comparative Example of the related art.

Abstract

When replacing an upper die of a leading end of a punch of a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies, carry-in of the upper die to just below the punch and carry-out of the upper die from just below the punch are performed, by the use of an upper die carriage that is movable between the pair of dies in a longitudinal direction of the punch and has an upper die storing unit configured to store the upper die and a lifting/lowering mechanism capable of vertically lifting and lowering the upper die storing unit. Accordingly, provided are an upper die replacing method of the bending press machine capable of efficiently and safely performing the replacement of the upper die in a short time, and a carriage for upper die replacement used for the method.

Description

    Technical Field
  • The present invention relates to an upper die replacing method of a leading end of a punch in a bending press machine manufacturing a thick welded steel pipe having a large diameter used for a line pipe or the like by performing three-point bending press forming multiple times, and an upper die carriage used for replacing the upper die.
  • Background Art
  • Conventionally, as a thick steel pipe having a large diameter used for a line pipe, a steel structure or the like, in general, a so-called "UOE steel pipe" has been widely used. The UOE steel pipe is formed so that a material steel plate having predetermined width, length, and thickness is press-formed into a U-shape and then is press-formed into an O-shape, and thereafter, butted parts are welded to obtain a material steel pipe, and the material steel pipe is expanded (so-called pipe expansion) in a circumferential direction to improve roundness. Furthermore, in recent years, in terms of an improvement in safety and an increase in size, in the steel pipe used for the line pipe or the like, an increase in diameter, an increase in length, thickening, and strengthening of the material steel plate have been in progress.
  • However, in the method of manufacturing the above-described UOE steel pipe, in order to perform the press forming of the material steel plate having increased thickness, increased length and higher strength into a U-shape and an O-shape, there is a need for a great press load. Thus, there is a problem in that the production range is limited or productivity is significantly lowered in conventional UOE steel pipe manufacturing equipment.
  • Thus, as a technique of reducing the press load when manufacturing the thick steel pipe having a large diameter, long length, and high strength, a press bending method has been developed and put into practical use. According to such a method, after the application of bending (so-called end bending) to both width end portions of a material steel plate, the three-point bending press forming is performed multiple times while feeding the steel plates in the width direction by a predetermined amount to press-form the steel plate into a substantially cylindrical shape (open pipe) having an opening portion, then, the opening portion of the open pipe is subjected to butt welding and pipe expansion, and the shape thereof is corrected, thereby manufacturing a steel pipe.
  • Fig. 1 is a diagram that schematically illustrates a method of manufacturing a steel pipe using the above-described press bending method. In this manufacturing method, first, three-point bending press forming is performed multiple times toward a plate width center from one plate width end portion of a material steel plate 1 having both bent (crimping pressed) end portions by combining a punch 2 with a pair of dies 3 to form one half into an arc shape except for the plate width center of the steel plate (first half press), next, similarly, the three-point bending press forming is performed multiple times toward the plate width center from the other plate width end portion to form the remaining one half except for the plate width center of the steel plate into an arc shape, thereby obtaining a substantially C-shape (second half press), finally, the remaining plate width center portion is subjected to press forming (final press) to obtain a substantially cylindrical shape (open pipe) having an opening portion, and thereafter, the steel pipe is generally manufactured by performing butt welding of the opening portion. In addition, in some cases, the material steel plate may not be subjected to the end bending.
  • A bending press machine used for the above-described three-point bending press forming has a pair of dies disposed in a feeding direction of a material steel plate at a predetermined gap, and a punch capable of vertically moving between the pair of dies, and is configured to press the material steel plate placed on the dies by the punch, thereby performing bending. The punch includes an upper die, attached to a leading end portion of a punch 2 directly coming into contact with the steel plate as a material to be machined, (hereinafter, simply referred to as a " upper die "), and a punch supporter (hereinafter, also referred to as a "beam") that is connected to a main body of a press machine and supports the upper die at a leading end thereof, and the upper die and the punch supporter are commonly fastened by fixing bolts in an attachable and detachable manner. Furthermore, the beam is an integral body, but the upper die is commonly constituted by a plurality of segments so that the attachment and detachment operation and the handling are easily performed.
  • In addition, as a method of replacing the upper die, several replacing methods of a tool in a small bending machine and a punch press machine have been suggested (for example, see Patent Literatures 1 to 4). However, these methods are techniques that can be used only for small bending machines and punch press machines and are not suitable for application to the replacement of the upper die of the bending press machine for manufacturing a large diameter pipe.
  • Citation List Patent Literatures
    • Patent Literature 1: JP 11-005131 A
    • Patent Literature 2: JP 2001-276936 A
    • Patent Literature 3: JP 2002-096120 A
    • Patent Literature 4: JP 2001-150032 A
    Summary of Invention Technical Problem
  • Incidentally, there is a need to replace the upper die attached to the leading end portion of the punch depending on changes in sizes (inner diameter and outer diameter) of the steel pipe to be manufactured and in (thickness and strength of) the material steel plate.
  • However, there is a problem as follows. In the related art, as illustrated in Fig. 2(a), a relatively small radius of curvature R (leading end R) of an upper die surface coming into direct-contact with the steel plate is used, and then the range capable of coping with changes in the steel pipe size and the material steel plate is wide. At the same time, however, since the bending part is local, roundness of the steel pipe after forming is degraded, and since there is a need to perform the press forming little by little, the number of presses increases, and the productivity is degraded.
  • Thus, as counter-measures of the above-described problems, as illustrated in Fig. 2(b), increasing the leading end R and widening a width of the punch in accordance with a steel pipe diameter are performed to improve the roundness or to improve the productivity. However, though widening the punch width or increasing the leading end R as described above leads to improvement in roundness and productivity, there is a need to frequently replace the upper die depending on changes in the steel pipe size and in the material strength. In particular, when the width of the upper die widens, not only the load required for pressing increases, but also a great bending moment is applied to the base of the beam attached to the upper die and the moment easily exceeds the endurance strength of the punch, in the case where a feed rate of the steel plate is small relative to a distance between the dies and a shape of the material steel plate on the dies is right-and-left asymmetric with respect to the axis center of the punch. For that reason, there is a need to frequently replace the upper die of the leading end portion of the punch depending on the changes in the steel pipe size, the material steel plate, and press conditions.
  • Conventionally, as a method of replacing the upper die, for example, the method is performed by a series of processes as follows. That is, after mounting a new upper die on a large dummy plate, the dummy plate is conveyed in a horizontal direction using conveyance facilities configured to supply a material steel plate to a press machine, the new upper die is moved to a vicinity just below a punch (beam), then, the punch is lowered to become a state of being in contact with the dummy plate of a position near the new upper die, fastening of bolts is released to detach the upper die from a beam leading end, then, the dummy plate is moved by the above-described conveyance facilities to move the new upper die to just below the beam, the new upper die is fitted to the beam leading end, and is attached thereto by being fastened with bolts.
  • For that reason, in the conventional method of replacing the upper die, it is not possible to supply a new upper die to just below the beam, since it is not possible to accurately move the dummy plate in the horizontal direction, and since it is not possible to finely adjust the position of the upper die in the state of being mounted on the dummy plate. For this reason, it takes a long time for mounting the upper die to the beam leading end. Furthermore, since the upper die is divided into a plurality of segments, it is necessary to repeat the above-described replacement operation. Thus, a lot of time is required for one upper die replacement, which significantly reduces the operation efficiency. Furthermore, since it is not possible to turn off the power source of the press machine when replacing the upper die in view of the need to lift and lower the punch, there is a need to take multiple safety measures so as to ensure safety, and thus, the reduction in productivity cannot be avoided.
  • The methods described in Patent Literatures 1 to 4 are techniques that can be used only for small bending machines and punch press machines, but are not techniques that can be directly applied to replacement of the upper die of the bending press machine for manufacturing the large diameter.
  • The present invention has been made in view of the above-described problems of the related art, and an object thereof is to suggest an upper die replacing method by which the replacement of the upper die of a leading end of a punch in a bending press machine can be efficiently and safely performed in a short time, and to provide an upper die carriage for use in the method.
  • Solution to Problem
  • The inventors have extensively studied to find a solution of the above-described problems. As a result, the inventors found out that by providing an upper die carriage capable of collectively mounting a plurality of divided upper die segments, and moving the carriage between a pair of dies below a press machine along a longitudinal direction of a punch, it is possible to accurately position and supply the upper die just below the punch, and it is preferable that the movement of the carriage be performed using a steel pipe carrying-out device that is installed in the press machine to carry out the steel pipe after press forming, which has led to the development of the present invention.
  • That is, according to the present invention, there is provided an upper die replacing method of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies, wherein carry-in of the upper die to just below the punch and carry-out of the upper die from just below the punch are performed by mounting the upper die on an upper die carriage capable of moving between the pair of dies in a longitudinal direction of the punch.
  • In the upper die replacing method of the present invention, the carry-in of the upper die carriage to just below the punch and the carry-out from just below the punch are performed using a steel pipe carrying-out device disposed in the press machine.
  • Further, in the upper die replacing method of the present invention, detachment of the upper die from the leading end of the punch and attachment of the upper die to the leading end of the punch are performed in a state in which an upper die storing unit of the upper die carriage is lifted and is brought into contact with the leading end of the punch.
  • Further, in the upper die replacing method of the present invention, position adjustment of the upper die mounted on an upper die table in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch is performed by moving the upper die table while mounting the upper die.
  • Further, in the upper die replacing method of the present invention, when the upper die is divided into a plurality of segments, replacement of the upper die is collectively performed.
  • Further, in the upper die replacing method of the present invention, the plurality of segments are divided into a plurality of sets connected by a shim, and loading and unloading to the upper die carriage are performed in the unit of the set.
  • Further, according to the present invention, there is provided an upper die carriage used for upper die replacement of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies, wherein the upper die carriage is movable between the pair of dies in a longitudinal direction of the punch, by a device that is installed in the bending press machine and carries out a steel pipe after pressing.
  • Furthermore, the upper die carriage of the present invention further includes an upper die storing unit that stores an upper die, and a lifting/lowering mechanism that lifts and lowers the upper die storing unit.
  • Furthermore, the upper die carriage of the present invention further includes a position adjusting mechanism that performs position adjustment of the upper die stored in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch for each upper die table on which the upper die is mounted.
  • Advantageous Effects of Invention
  • According to the present invention, since it is possible to efficiently perform the replacement of the upper die in the bending press machine in a short time, it is possible to manufacture a welded steel pipe having a large diameter, thickness, length, and high strength with high productivity.
  • Brief Description of Drawings
    • Fig. 1 is a diagram schematically illustrating a method of manufacturing a steel pipe according to a press bending method.
    • Figs. 2(a) and 2(b) are diagrams illustrating an influence of an upper die width of a leading end of a punch on manufacturing of the steel pipe.
    • Fig. 3 is an example view illustrating a structure of the punch of a bending press machine.
    • Fig. 4 is a diagram illustrating a cross-sectional structure of an upper die carriage.
    • Figs. 5(a) to 5(f) are diagrams illustrating the procedure of a replacement of the upper die (detaching method).
    • Figs. 6(a) to 6(d) are diagrams illustrating an upper die detaching operation in the upper die carriage.
    • Figs. 7(a) and 7(b) are diagrams illustrating a handling method of the upper die divided into a plurality of segments.
    Description of Embodiments
  • The present invention relates to a method of replacing an upper die attached to a leading end of a punch supporter in a bending press machine for bending a steel plate on dies by a pair of dies and a punch vertically moving between the dies.
  • Fig. 3 is a diagram illustrating a structure of the punch of a bending press machine used in the present invention. The punch is constituted by a punch supporter 4 (beam) attached to a main body of a press machine 7, and an upper die 5 attached to a leading end (lower end) of the beam by fixing bolts 6. On a side of the upper die coming into contact with the beam leading end, grooves 8 to which a beam lower portion is fitted is formed, and a spacer 9 is inserted between the groove portion and the beam leading end.
  • The upper die may be a single body, but is typically divided into a plurality of segments in consideration of productivity and handling properties of the upper die. As described previously, in a conventional method of the replacement of the upper die, carry-in of the upper die to a lower position of the press machine and carry-out from the lower position of the press machine are performed by moving the upper die while being mounted on a dummy plate. However, in the above-described method, it has not been possible to accurately position the upper die just below the beam leading end, and it has taken a great deal of time for mounting, which has been a cause of impeding the productivity. In addition, from the necessity to move the punch, it was necessary to perform the replacement operation while keeping the power of the press machine on. For this reason, there was also need for multiple safety measures to ensure safety, and adverse effects on productivity were inevitable.
  • Thus, according to the present invention, carry-in of the upper die to just below the punch and carry-out of the metal from just below the punch are performed by being mounted on the upper die carriage that moves between the pair of dies installed below the press machine in a longitudinal direction of the punch.
  • The upper die carriage is placed at a position different from the press machine during press operation, and when performing the replacement of the upper die, the upper die carriage is mounted on a carry-out line to which the steel pipe (open pipe) after the press forming is carried out, by a crane or the like. The upper die carriage has a length that is able to collectively mount the upper die divided into the plurality of segments, and at a press machine side end portion in the longitudinal direction of the carriage, for example, an upward (or downward) hook is provided. Meanwhile, in the steel pipe carrying-out device that is provided in the press machine and carries out the steel pipe after the press forming, another connection mechanism connected to the connection mechanism of the upper die carriage, for example, a downward (or upward) hook is provided.
  • Moreover, the carry-in of the upper die carriage from the press machine to just below the press machine can be performed, by connecting the connection mechanism of the upper die carriage side with the connection mechanism of the steel pipe carrying-out device side, and by moving the steel pipe carrying-out device in an opposite direction to the direction at the time of carrying out the steel plate.
  • Meanwhile, carry-out of the upper die carriage from just below the press machine to the outside of the press machine can be performed, by bringing an extruding tool provided in the steel pipe carrying-out device for carrying out the steel pipe after the press forming into contact with the upper die carriage, or by connecting the connection mechanism of the upper die carriage side with the connection mechanism of the steel pipe carrying-out device side, and by moving the steel pipe carrying-out device in the carrying-out direction of the steel pipe.
  • Thus, moving means (driving source) of the steel pipe carrying-out device is not particularly limited, and may be driven by, for example, a chain, a belt or the like connected to a power source such as a motor.
  • Furthermore, for example, as illustrated by broken lines in a lower part of Fig. 4, the upper die carriage may run on a conveyance line constituted by a V roll, or may run on a rail by mounting wheels to the lower part of the upper die carriage, both may be used in combination with each other, and may not be particularly limited. In addition, when adopting the V roll, it is preferred to adopt a structure in which during the press operation, the V roll below the press machine moves downwards and retracts so as not to disturb the operation, and the V roll is lifted only when replacing the upper die.
  • Furthermore, Fig. 4 illustrates a cross-section in a direction (hereinafter, referred to as a "width direction") perpendicular to the longitudinal direction of the punch, the upper die carriage 10 is constituted by a carriage base 11, and an upper die storing unit 12 in the upper portion, the cross-sectional shape in the width direction of the upper die storing unit 12 is a H-shape, and an upper die table 13 for mounting the upper die is provided in an upper concave part. Furthermore, on both sides of the upper die storing unit, a position adjusting bolt 14 as a position adjusting mechanism of the upper die table 13 is provided, and by rotating the bolt, the width direction position of the upper die table 13 in the concave part of the upper die storing unit can be finely adjusted in the state of attaching the upper die. By using the position adjusting bolt 14, it is possible to easily, quickly, and accurately fit a new upper die at the leading end of the punch supporter (beam).
  • Furthermore, the carriage base 11 and the upper die storing unit 12 are separated from each other, and it is possible to lift and lower the upper die storing unit 12 by a hydraulic jack 15 as a lifting/lowering function disposed on the carriage base side. Thus, when attaching the new upper die to the punch lower end, it is possible to bring the upper die into contact with the leading end of the punch (beam leading end) by lifting the upper die in the state of being mounted on the upper die table in the upper die storing unit. Furthermore, when detaching the upper die from the leading end of the punch, it is possible to detach the upper die, after bringing the upper die into contact with the upper die table by lifting the upper die storing unit. Therefore, during the upper die replacing operation, for example, even when an operator performs the operation of fastening the leading end portion of the punch and the upper die by the fixing bolts or releasing the fastening below the press machine, it is possible to more safely perform the replacement of the upper die, since there is no need to operate the main body of a press machine.
  • The method of replacing the upper die of the present invention using the above-described upper die carriage is carried out in the following procedures.
  • <Detachment of Upper Die >
  • The method of detaching the upper die will be described with reference to Figs. 5 and 6.
  • Step 1: the empty upper die carriage 10 is mounted on the steel pipe carry-out line 16 from the carriage storage space (Fig. 5(a))
  • Step 2: the steel pipe carrying-out device 17 is moved up to the position of the upper die carriage 10 and connected thereto (Fig. 5(b)).
  • Step 3: the upper die carriage 10 is moved up to just below the punch 2 of the press machine 7 by the steel pipe carrying-out device 17 (Figs. 5(c) and 6(a)).
  • Step 4: the upper die storing unit 12 over the upper die carriage is lifted by the hydraulic jack 15 to bring the upper die table 13 in the storing unit into contact with the upper die 5 of the leading end of the punch (Figs. 5(d) and 6(b)).
  • Step 5: fastening of the fixing bolt 6 is released to detach the upper die 5 from the leading end of the punch (leading end of the beam) (Figs. 5(d) and 6(c)).
  • Step 6: the upper die 5 and the upper die storing unit 12 are lowered and stored on the upper die carriage base 11 (Figs. 5(e) and 6(d)).
  • Step 7: the upper die carriage 10 is extruded to the outside of the press machine by the steel pipe carrying-out device 17 and mounted on the steel pipe carry-out line 16 (Fig. 5(f)).
  • Step 8: the upper die carriage 10 is detached from the steel pipe carry-out line 16.
  • <Attachment of Upper Die >
  • Next, the method of attaching the upper die will be described. In addition, since this method only needs to be performed substantially in reverse order of the above-described method of detaching the upper die, the description diagram thereof will not be provided.
  • Step 1: the upper die carriage 10 with the new upper die 5 mounted thereon is mounted on the steel pipe carry-out line 16.
  • Step 2: the steel pipe carrying-out device 17 is moved up to the position of the upper die carriage 10 and connected thereto.
  • Step 3: the upper die carriage 10 is moved to just below the punch 2 of the press machine 7 by the steel pipe carrying-out device 17.
  • Step 4: the upper die storing unit 12 above the upper die carriage is lifted by the hydraulic jacks 15 to fit the groove portions 8 of the new upper die 5 in the storing unit and the leading end (beam) of the punch supporter 4 to each other. At this time, the width direction position of the upper die is finely adjusted using the position adjusting bolt 14 of the upper die table 13.
  • Step 5: the fixing bolt 6 is fastened and the upper die 5 is attached to the leading end of the beam 4.
  • Step 6: the upper die storing unit 12 is lowered and stored in the upper die carriage base 11.
  • Step 7: the upper die carriage 10 is extruded by the steel pipe carrying-out device 17 and mounted on the steel pipe carry-out line 16.
  • Step 8: the upper die carriage 10 is removed from the steel pipe carry-out line 16.
  • In addition, in the method of replacing the punch in the bending press machine of the present invention, when the upper die is divided into the plurality of segments, the replacement of the plurality of segments is preferably performed integrally and collectively rather than the individual replacement, in view of the operating efficiency. However, when the length of the upper die is long, it may be difficult to mount the upper die on the upper die carriage at a time. In such a case, it is preferred that the upper die constituted by the plurality of segments is divided into a plurality of sets obtained by connecting the small number of the plurality of segments and be mounted on the upper die carriage by the set unit.
  • In this case, the set preferably has a structure in which parallel pins are embedded in a joint part of each segment and the segments are fastened by the bolts, where the length of the set is based on the length of the spacer inserted into the groove portions 8 formed on the upper die. Furthermore, the connection part between each of the sets is preferably configured so that the spacer of one set protrudes from the end portion of the set, the end portion of the other set has a spacer omission unit to which the protruded spacer is fitted, and both sets are connected to each other via the spacer.
  • In this way, it is possible to mount the upper die having a plurality of segments on the upper die carriage without the position deviation in the width direction, and it is possible to accurately attach the upper die to the punch supporter (beam). Figs. 7(a) and 7(b) illustrate an example in which one upper die divided into nine segments is divided into three sets made up of three segments. In addition, it is preferred that the order of mounting the plurality of sets on the upper die carriage be carried out first from the set provided with the spacer omission unit.
  • Examples
  • The upper die replacement of the bending press machine capable of manufacturing a welded steel pipe having an outer diameter of 20 to 56 inches and a pipe wall thickness of 12.7 to 50.8 mm is performed by the use of two methods of the method (Comparative Example) of the related art using the dummy plate described in [0011] and the method (Example of the present invention) of replacing the upper die of the present invention, and the required times thereof are compared. The upper die has a total length of 13.5 m, and is divided into nine segments as illustrated in Figs. 7(a) and 7(b), and three segments are used as one set to perform handling.
  • As a result, the upper die replacement time of Example of the present invention can be reduced to about 1/3 as compared to Comparative Example of the related art.
  • Reference Signs List
    • 1: material steel plate
    • 2: punch
    • 3: die
    • 4: punch supporter (beam)
    • 5: upper die
    • 6: fixing bolt
    • 7: main body of press machine
    • 8: fitting groove
    • 9: spacer
    • 10: upper die carriage
    • 11: upper die carriage base
    • 12: upper die storing unit
    • 13: upper die table
    • 14: position adjusting mechanism (position adjusting bolt)
    • 15: lifting/lowering mechanism (hydraulic jack)
    • 16: steel pipe carry-out line
    • 17: steel pipe carrying-out device
    • 18: parallel pin

Claims (9)

  1. An upper die replacing method of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies,
    wherein carry-in of the upper die to just below the punch and carry-out of the upper die from just below the punch are performed by mounting the upper die on an upper die carriage capable of moving between the pair of dies in a longitudinal direction of the punch.
  2. The upper die replacing method in a bending press machine according to claim 1, wherein the carry-in of the upper die carriage to just below the punch and the carry-out from just below the punch are performed using a steel pipe carrying-out device disposed in the press machine.
  3. The upper die replacing method in a bending press machine according to claim 1 or 2, wherein detachment of the upper die from the leading end of the punch and attachment of the upper die to the leading end of the punch are performed in a state in which an upper die storing unit of the upper die carriage is lifted and is brought into contact with the leading end of the punch.
  4. The upper die replacing method in a bending press machine according to any one of claims 1 to 3, wherein position adjustment of the upper die mounted on an upper die table in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch is performed by moving the upper die table while mounting the upper die.
  5. The upper die replacing method in a bending press machine according to any one of claims 1 to 4, wherein when the upper die is divided into a plurality of segments, replacement of the upper die is collectively performed.
  6. The upper die replacing method in a bending press machine according to claim 5, wherein the plurality of segments are divided into a plurality of sets connected by a shim, and loading and unloading to the upper die carriage are performed in the unit of the set.
  7. An upper die carriage used for upper die replacement of a leading end of a punch in a bending press machine that bends a steel plate on dies by a pair of dies and a punch vertically moving between the dies,
    wherein the upper die carriage is movable between the pair of dies in a longitudinal direction of the punch, by a device that is installed in the bending press machine and carries out a steel pipe after pressing.
  8. The upper die carriage for upper die replacement in a bending press machine according to claim 7, comprising
    an upper die storing unit that stores an upper die, and a lifting/lowering mechanism that lifts and lowers the upper die storing unit.
  9. The upper die carriage for upper die replacement in a bending press machine according to claim 7 or 8, further comprising
    a position adjusting mechanism that performs position adjustment of the upper die stored in the upper die storing unit in a direction perpendicular to the longitudinal direction of the punch for each upper die table on which the upper die is mounted.
EP13885966.5A 2013-05-31 2013-05-31 Mold replacement method and mold platform in bending press Active EP3006196B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/065141 WO2014192129A1 (en) 2013-05-31 2013-05-31 Mold replacement method and mold platform in bending press

Publications (3)

Publication Number Publication Date
EP3006196A1 true EP3006196A1 (en) 2016-04-13
EP3006196A4 EP3006196A4 (en) 2016-08-24
EP3006196B1 EP3006196B1 (en) 2022-01-12

Family

ID=51988198

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13885966.5A Active EP3006196B1 (en) 2013-05-31 2013-05-31 Mold replacement method and mold platform in bending press

Country Status (5)

Country Link
EP (1) EP3006196B1 (en)
JP (1) JP5967395B2 (en)
CN (1) CN105246674B (en)
RU (1) RU2630094C2 (en)
WO (1) WO2014192129A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106736278A (en) * 2016-12-12 2017-05-31 邓惠芬 The processing method for bending ignition tip
CN110681736B (en) * 2019-10-17 2020-12-18 赣州市恒邦金属制品有限公司 High-efficient equipment of bending with two functions of trading
CN111069374A (en) * 2019-12-26 2020-04-28 华钰汽配有限公司 Bending device and method for automobile front license plate support

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5797625U (en) * 1980-12-04 1982-06-16
JPS6068114A (en) * 1983-09-22 1985-04-18 Nippon Steel Corp Method and device for carrying in and out die for u-press forming of uo steel pipe
SU1480949A1 (en) * 1987-01-23 1989-05-23 Предприятие П/Я А-7087 Die-changing arrangement
US5134873A (en) * 1989-04-10 1992-08-04 Yamazaki Mazak Kabushiki Kaisha Die exchange apparatus for the use of a press brake
SU1697942A1 (en) * 1989-10-16 1991-12-15 Нижегородский Автомобильный Завод Arrangement for replacing press stamps
WO1992016318A1 (en) * 1991-03-22 1992-10-01 Amada Company, Limited System for working on plate material
JP2532830Y2 (en) * 1991-12-27 1997-04-16 相生精機株式会社 Transfer equipment for dies, etc.
JP2871532B2 (en) * 1995-06-20 1999-03-17 住友金属工業株式会社 Manufacturing method of UO steel pipe
JP3204165B2 (en) 1997-06-16 2001-09-04 村田機械株式会社 Punch press machine
JP2001150032A (en) 1999-09-06 2001-06-05 Amada Eng Center Co Ltd Method and device for mold exchange in the bending machine
JP2001276936A (en) 2000-03-29 2001-10-09 Murata Mach Ltd Tool cartridge exchange apparatus
JP4284848B2 (en) 2000-09-20 2009-06-24 村田機械株式会社 Punch press
CN2491147Y (en) * 2001-04-20 2002-05-15 左年传 Self-controlled spiral jack I-type steel bulldozer
US7568371B2 (en) * 2006-01-17 2009-08-04 Cyril Bath Company Stretch-forming machine and method
CN202845584U (en) * 2012-09-28 2013-04-03 无锡市亚青机械厂 Bending press water tank cover plate press forming die structure

Also Published As

Publication number Publication date
JPWO2014192129A1 (en) 2017-02-23
CN105246674B (en) 2017-05-10
WO2014192129A1 (en) 2014-12-04
CN105246674A (en) 2016-01-13
JP5967395B2 (en) 2016-08-10
EP3006196B1 (en) 2022-01-12
RU2015155435A (en) 2017-07-05
EP3006196A4 (en) 2016-08-24
RU2630094C2 (en) 2017-09-05

Similar Documents

Publication Publication Date Title
EP3006196B1 (en) Mold replacement method and mold platform in bending press
KR101625497B1 (en) Carrying apparatus for piping spool
JP6607102B2 (en) Method and apparatus for forming welded steel pipe, method and apparatus for manufacturing welded steel pipe
KR20050047068A (en) Table for exchanging metallic mould
EP1698407B1 (en) Method and device for manufacturing uoe steel tube
KR101917433B1 (en) Apparatus for supporting coil and apparatus for banding coil using same
CN104476192B (en) A kind of tank body automatic roll-forming device and forming method
JP3504546B2 (en) Apparatus and method for pressing welded portion of drum and drum manufacturing apparatus
KR20220091611A (en) Manufacturing apparatus and manufacturing method of laminated iron core
JP3938918B2 (en) Roll changing method in a pipe welding stand and a longitudinal seam welder applying this roll changing method
JP5593191B2 (en) Metal pipe manufacturing equipment
CN102319776B (en) Processing device and processing method for end plate structure of electrolytic cell casing
JP2010099839A (en) Tire vulcanizing apparatus and method for manufacturing vulcanized tire
CN108788573B (en) Automatic welding equipment for longitudinal joints
KR20180021304A (en) Jig used for replacing sleeve and apparatus for replacing sleeve using same
CN107651583B (en) A kind of manufacturing method of ocean platform crane tower body
JP2005230892A (en) Roll exchange device for rolling mill
CN212174326U (en) Feeding device for forging production
CN104338799A (en) Plate leveler
CN212598044U (en) Production device for non-ferrous metal rolled material
CN217478305U (en) Rail butt joint deviation prevention mechanism of heavy-load suspension conveying elevator
CN220717359U (en) Middle part groove plastic frock
CN202263804U (en) Electrolytic cell housing end plate structure processing device
CN210476025U (en) Semitrailer boxboard welding supporting platform
KR101499958B1 (en) Preforming apparatus for hydro-forming

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20151124

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

A4 Supplementary search report drawn up and despatched

Effective date: 20160726

RIC1 Information provided on ipc code assigned before grant

Ipc: B21D 5/01 20060101ALI20160720BHEP

Ipc: B21C 37/08 20060101ALI20160720BHEP

Ipc: B30B 15/02 20060101AFI20160720BHEP

Ipc: B21D 37/04 20060101ALI20160720BHEP

DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20200212

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20210922

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

RAP3 Party data changed (applicant data changed or rights of an application transferred)

Owner name: JFE STEEL CORPORATION

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013080701

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1462094

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220215

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220112

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1462094

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220512

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220412

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220412

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220413

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220512

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602013080701

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

26N No opposition filed

Effective date: 20221013

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 11

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230411

Year of fee payment: 11

Ref country code: DE

Payment date: 20230404

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230406

Year of fee payment: 11

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20130531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220112