- Publication number
- EP2935703B1 EP2935703B1 EP13824407.4A EP13824407A EP2935703B1 EP 2935703 B1 EP2935703 B1 EP 2935703B1 EP 13824407 A EP13824407 A EP 13824407A EP 2935703 B1 EP2935703 B1 EP 2935703B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- earth
- anchoring means
- cladding element
- adjusting means
- anchoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 21
- 238000005253 cladding Methods 0.000 claims description 82
- 238000004873 anchoring Methods 0.000 claims description 62
- 238000009415 formwork Methods 0.000 claims description 32
- 239000000463 material Substances 0.000 claims description 28
- 229910000831 Steel Inorganic materials 0.000 description 5
- 230000003014 reinforcing effect Effects 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 239000004746 geotextile Substances 0.000 description 2
- 210000001367 artery Anatomy 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000012779 reinforcing material Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0291—Retaining or protecting walls characterised by constructional features made up of filled, bag-like elements
Definitions
- a method of constructing a reinforced earth structure comprising one or more cladding elements and a reinforced earth structure comprising one or more cladding elements.
- the invention relates to a method of constructing a reinforced earth structure and to a reinforced earth structure.
- Reinforced earth structures are also called stabilized earth structures.
- Reinforced earth structures are earth structures in which the earth has been reinforced using reinforcing elements, e.g. steel or geosynthetic materials.
- Geosynthetic materials may include geotextiles, geogrids, geonets and geomembrames.
- Reinforced earth structures are used for such applications as reinforcing unstable slopes and/or are used as bridge ramps, dykes, reinforced slopes, abutments, quays or as parts thereof
- Reinforced earth structures are sometimes provided with cladding elements, often in the form of modular blockwalls comprising concrete panels or gabions for example.
- the walls of the reinforced earth structure can be finished with such cladding elements for various reasons, e.g. for architectural reasons or for aesthetical or safety considerations.
- These cladding elements may get damaged, for example by movements resulting from the settlement of the earth while, or relatively soon after, constructing the reinforced earth structure or at a later time. This may also cause the mutual positions of the cladding elements to shift, resulting in a less taut look.
- Replacing a cladding element is costly and time-consuming and may also bring other disadvantages such as a traffic artery having to be closed in order to replace a damaged cladding element.
- An objective of the invention is to reduce the cost and time involved in replacing a damaged cladding element and/or the risk of a cladding element being damaged and/or to obtain a better result.
- the method according to the invention is characterized in that formwork is erected after which an earth-retaining layer is provided that contains a flexible casing material and a fill material, with the casing material having a border on a side facing the formwork, after which an anchoring means is placed on the border which anchoring means contains a coupler on a side facing the formwork for coupling the anchoring means to a cladding element after which a next earth-retaining layer is provided, thus securing the anchoring means between the earth-retaining layer and the next earth-retaining layer.
- the cladding elements are applied during the building process such that they form one whole with the earth structure.
- the cladding elements have protruding reinforcing elements and the earth is provided around the reinforcing elements connected to the cladding elements.
- anchoring means are installed between layers of earth, which anchoring means contain couplers to couple the anchoring means to a cladding element.
- the cladding elements are installed later after initial settlement of at least part of the earth has already taken place.
- the cladding elements are installed after the earth structure has been constructed and has largely undergone settlement. This reduces the risk of deformation.
- a formwork wall is applied that extends over more than one earth-retaining layer.
- the anchoring means are aligned to the formwork wall when installing them and the formwork wall is removed after several earth-retaining layers have been put in place.
- a formwork wall that extends past more than one earth-retaining layer and aligning the anchoring means relative to the formwork wall enables the mutual positions of the anchoring means to be determined accurately. This enables more accurate positioning of the anchoring means.
- the anchoring means can be placed against the formwork wall or at a short, defined distance from that wall.
- the formwork wall Prior to applying a layer, can be provided with one or more marks that correspond with a desired position for one or several anchoring means.
- the formwork wall forms a reference plane for the anchoring means.
- adjusting means are attached to the anchoring means in order to set the position of a cladding element coupled to an anchoring means and specifically and preferably in a direction in the plane of the cladding element.
- the adjusting means offer more freedom to determine the position of the cladding elements.
- the positions of the anchoring means may vary slightly due to further settlement over time.
- the position of the coupler is adjustable and the cladding elements can be installed accurately and the risk of the cladding getting damaged is slight.
- the position of a cladding element can be readjusted to compensate any settlement that may occur over time after constructing the structure.
- a reinforced earth structure according to the invention contains a number of earth-retaining layers with a flexible casing material and a fill material, with the outside of the casing material having a border and with an anchoring means having been installed between two layers on the border, with the anchoring means containing a coupler to couple the anchoring means to a cladding element such that it can be detached.
- Adjusting means have preferably been attached to the anchoring means.
- a cavity has preferably been formed.
- Woven geotextile is preferably used as the flexible casing material.
- the reinforced earth structure contains a number of layers where rod-shaped distancers are placed between the layers of earth, either while piling the layers of earth on top of each other or after piling by driving in the distancers between layers of earth, is known from EP 1 054 110 .
- the rod-shaped distancers protrude 10 to 15 cm, for example.
- a large, rigid welded mesh panel is attached on or to the rods from the bottom to the top of the earth structure.
- a fine meshed material may be applied to an interior side of the coarse-meshed welded mesh panel.
- the space between the welded mesh panel and the layers of earth is filled with material, for example vegetation soil, gravel, pebbles or concrete.
- the welded mesh panel keeps the fill material in place.
- the fill material between the layers of earth and the welded mesh panel may be applied before or after applying the welded mesh panel.
- the welded mesh panel's position is fixed once the fill material has been applied.
- a structure where L-shaped elements from reinforcing material are placed in front of the layers of earth to reinforce the structure is known from EP 0 603 460 .
- a part of the L-shape is clamped between layers of earth in some examples. The space between the L-shaped parts and the layers of earth is then filled up.
- Figure 1 shows a step in the method according to the invention.
- a formwork wall 1 is placed near, for example, a slope 2 that is to be reinforced.
- a first earth-retaining layer containing a flexible casing material 3 and fill material 4 is provided.
- An anchoring means 1 is placed on the border on the side facing the formwork wall 1. The anchoring means can be placed against the formwork wall or at a short distance from that wall.
- Figure 2 shows a next step: a next earth-retaining layer containing a flexible casing material 3' and fill material 4' is applied and a next anchoring means 5' is placed on the border of 3' and on the side facing the formwork wall 1.
- the formwork wall may also be placed at an angle and while constructing the earth structure different formwork walls may be used at different heights.
- the different earth-retaining layers may be constructed of similar materials, but it is also possible that consecutive layers have different compositions, e.g. that they contain another fill material 4. In this way the bottom layer can be made to be different from the top layer.
- FIG 4 shows a front view of a reinforced earth structure according to the invention.
- Anchoring means 5 have been fitted in a number of places. The example shown is an example and must not be considered to impose any restrictions; different anchoring means patterns are possible; some anchoring means directly under each other, a staggered pattern, a zigzag pattern and other patterns.
- a cladding element 6 is installed against the earth structure and attached to the couplers 7 of anchoring means 5, as shown schematically in figures 5 and 6 .
- the cladding elements 6 may consist of or contain various materials:
- Embodiments may make use of cladding elements of a relatively slight strength and thickness. Since the cladding elements have not been incorporated directly in the earth structure, their thickness and, as a result, weight can be decreased. Lightweight cladding elements result in a CO 2 reduction because less energy and, consequently, less CO 2 are required both to manufacture the cladding elements and to supply and install the cladding elements.
- FIG. 6 shows a next step: adjusting means 7 are secured to the anchoring means 5. Once installed, the adjusting means are located between the cladding element 6 and the anchoring means 5.
- Figure 7 shows the installed structure.
- the adjusting means are such that a cavity 8 is formed between the exterior, indicated as B in figure 8 , of the layers and the cladding elements 6.
- the earth may shift and cause the outside of the earth to bulge out over time.
- the presence of the cavity prevents or decreases the risk of such bulging to apply pressure to a cladding element 6.
- the cavity is at least 5 cm wide, preferably more than 10 cm and preferably between 10 and 25 cm.
- Figure 8 shows an anchoring element 5, which in this example contains an anchoring part 10 and an anchor 11.
- Anchor 11 has been provided with an adjusting means 7 that is attached by means of bolts for example.
- This adjusting means 7 is connected to the cladding element 6.
- the cladding element contains a plate 12 in a hole bigger than plate 12 that can be attached to the adjusting means 7.
- the adjusting means preferably has means that enable adjustment in the X and Y directions, i.e. directions in the plane of the cladding element. This makes the position of a cladding element in the plane of the cladding element adjustable.
- the look of a wall that shows a number of cladding elements is also determined by their mutual positions and then often particularly by distances between cladding elements. Even a relatively minor variation in distances may be visible. The human eye is susceptible to this. Adjusting means that enable a cladding element to be moved in the plane of the cladding element enable the distances between cladding elements to be adjusted.
- Means to make adjustment possible in the Z-direction, i.e. transversally to the plane of the cladding element, to adjust the width of the cavity also form part of a preferred embodiment.
- the anchoring part 10 may contain geogrid, plastic strips, steel strips or rods, which may be galvanised and/or provided with a profile. The length and strengths of such parts can be adjusted to the requirements.
- the anchoring part contains a geogrid since a geogrid offers a high degree of friction and, consequently, better anchoring.
- the adjusting means 7 may contain a filler plate to align the cladding element as well as a mounting plate. Furthermore, the adjusting means 7 may contain an anchor rail and slotted holes to provide margins within which the position of the cladding element can be adjusted both in a vertical and in a horizontal direction, i.e. the X and Y directions.
- the adjusting means may depend on their positions, for example adjusting means that have to carry a relatively high weight may be constructed more heavy than adjusting means that have to carry a relatively low weight.
- the method and earth structure according to the invention offer high security and great flexibility for the design and look of the earth structure. This offers such parties as architects a lot of freedom to achieve their designs.
- Different cladding elements may be incorporated into a wall of an earth structure.
- the high degree of flexibility provided by the invention enables solar panels or instruction signs to be used as cladding elements.
- Figure 9 shows another embodiment of the invention.
- This embodiment features separate formwork 11a, 11b, 11c and 11d being applied for every layer.
- An earth-retaining layer is provided in the formwork 11a, an anchoring means 5 is installed on the border of the flexible material 3, after which formwork 11b is installed on the lower earth-retaining layer using anchoring means 5, in which a next earth-retaining layer is applied and a next anchoring means 5, after which formwork 11c is installed and so on.
- An earth structure according to the invention is constructed on this.
- the difference between this embodiment and the embodiment shown in figures 1 to 3 is that the formwork 11a, 11b, 11c, 11d is integrated into the earth structure.
- the advantage is that this formwork increases the strength of the earth structure to a certain extent. This may be useful in some circumstances.
- the disadvantage is that the anchoring means 5 are hard to position accurately relative to each other.
- the advantage of using a formwork wall 1 as shown in figures 1 to 3 which can be removed later, is that a reference plane, i.e. the formwork wall is provided for the positions of the anchoring means. This enables the construction to comply with the dimensions specified much more rigidly so that, if adjustment is desired later, there is much less to be adjusted and simpler adjusting means will suffice.
- Figure 10 shows an embodiment where the width of the cavity varies, i.e. increases from the bottom up.
- the invention enables the design to be adjusted to an architect's wishes.
- Figures 11 and 12 show another embodiment of the invention.
- the anchoring means 5 may contain steel rods.
- the anchoring means 5 in this embodiment contain a number of steel, preferably galvanised, rods 13 between the layers of earth.
- Figure 11 shows a top view, figure 14 a side view. Plates 15 have been fitted to the front ends of rods 13 and an anchor construction 14 is fitted on the rear side of every rod, i.e. on the side located between the layers of earth.
- An adjusting means 7 extends between the plates and a cladding element 6. The adjusting means keeps the cladding element 6 at a distance from the plates 15, as a result of which a cavity has been formed.
- the cladding element 6 features a plate 12.
- the plate has been fitted in a slotted cavity in cladding element 12 where the dimensions of the slotted cavity are larger than the dimensions of plate 12.
- the cladding element contains two holes 16 in which the rods can be secured and a slotted hole 17 in which plate 12 can be secured using a sliding bolt and nut construction.
- the slotted hole and the freedom offered to plate 12 in the cavity in cladding element 6 enable the position of the cladding element to be adjusted in the plane of the cladding element, i.e. in X and Y directions.
- the plates 15 can be placed onto a threaded end of rods 13 such that the positions of the plates 15 can be adjusted, enabling the cavity width to be adjusted.
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Piles And Underground Anchors (AREA)
Description
- A method of constructing a reinforced earth structure comprising one or more cladding elements and a reinforced earth structure comprising one or more cladding elements.
- The invention relates to a method of constructing a reinforced earth structure and to a reinforced earth structure. Reinforced earth structures are also called stabilized earth structures.
- Reinforced earth structures are earth structures in which the earth has been reinforced using reinforcing elements, e.g. steel or geosynthetic materials. Geosynthetic materials may include geotextiles, geogrids, geonets and geomembrames.
- Reinforced earth structures are used for such applications as reinforcing unstable slopes and/or are used as bridge ramps, dykes, reinforced slopes, abutments, quays or as parts thereof
- Reinforced earth structures are sometimes provided with cladding elements, often in the form of modular blockwalls comprising concrete panels or gabions for example. The walls of the reinforced earth structure can be finished with such cladding elements for various reasons, e.g. for architectural reasons or for aesthetical or safety considerations.
- These cladding elements may get damaged, for example by movements resulting from the settlement of the earth while, or relatively soon after, constructing the reinforced earth structure or at a later time. This may also cause the mutual positions of the cladding elements to shift, resulting in a less taut look.
- If any damage has occurred, the damaged cladding elements will have to be replaced.
- Replacing a cladding element is costly and time-consuming and may also bring other disadvantages such as a traffic artery having to be closed in order to replace a damaged cladding element.
- An objective of the invention is to reduce the cost and time involved in replacing a damaged cladding element and/or the risk of a cladding element being damaged and/or to obtain a better result.
- To this end, the method according to the invention is characterized in that formwork is erected after which an earth-retaining layer is provided that contains a flexible casing material and a fill material, with the casing material having a border on a side facing the formwork, after which an anchoring means is placed on the border which anchoring means contains a coupler on a side facing the formwork for coupling the anchoring means to a cladding element after which a next earth-retaining layer is provided, thus securing the anchoring means between the earth-retaining layer and the next earth-retaining layer.
- In existing methods, the cladding elements are applied during the building process such that they form one whole with the earth structure. The cladding elements have protruding reinforcing elements and the earth is provided around the reinforcing elements connected to the cladding elements.
- As most settlement occurs while building the earth structure, settlement of the earth causes the cladding elements that are coupled to the earth structure to deform. The reinforcing elements have been integrated into the earth structure, as a result of which their positions are fixed and they have to follow the movements of and in the earth structure.
- In the method according to the invention, anchoring means are installed between layers of earth, which anchoring means contain couplers to couple the anchoring means to a cladding element.
- As is the case in the existing method, settlement will occur in the method according to the invention while constructing the earth structure.
- However, in the method according to the invention, the cladding elements are installed later after initial settlement of at least part of the earth has already taken place.
- The cladding elements are installed after the earth structure has been constructed and has largely undergone settlement. This reduces the risk of deformation.
- Should any damage occur, a cladding element will be easy to replace.
- Preferably, a formwork wall is applied that extends over more than one earth-retaining layer. The anchoring means are aligned to the formwork wall when installing them and the formwork wall is removed after several earth-retaining layers have been put in place.
- The use of a formwork wall that extends past more than one earth-retaining layer and aligning the anchoring means relative to the formwork wall enables the mutual positions of the anchoring means to be determined accurately. This enables more accurate positioning of the anchoring means. For example, the anchoring means can be placed against the formwork wall or at a short, defined distance from that wall. Prior to applying a layer, the formwork wall can be provided with one or more marks that correspond with a desired position for one or several anchoring means. The formwork wall forms a reference plane for the anchoring means.
- Preferably, adjusting means are attached to the anchoring means in order to set the position of a cladding element coupled to an anchoring means and specifically and preferably in a direction in the plane of the cladding element.
- The adjusting means offer more freedom to determine the position of the cladding elements.
- The positions of the anchoring means may vary slightly due to further settlement over time.
- Since adjusting means that enable the anchoring means to be coupled adjustably to a cladding element have been attached to the anchoring means, the position of the coupler is adjustable and the cladding elements can be installed accurately and the risk of the cladding getting damaged is slight. The position of a cladding element can be readjusted to compensate any settlement that may occur over time after constructing the structure.
- A reinforced earth structure according to the invention contains a number of earth-retaining layers with a flexible casing material and a fill material, with the outside of the casing material having a border and with an anchoring means having been installed between two layers on the border, with the anchoring means containing a coupler to couple the anchoring means to a cladding element such that it can be detached.
- Adjusting means have preferably been attached to the anchoring means.
- A cavity has preferably been formed.
- Woven geotextile is preferably used as the flexible casing material.
- It is noted that a method where the reinforced earth structure contains a number of layers where rod-shaped distancers are placed between the layers of earth, either while piling the layers of earth on top of each other or after piling by driving in the distancers between layers of earth, is known from
EP 1 054 110 - A structure where L-shaped elements from reinforcing material are placed in front of the layers of earth to reinforce the structure is known from
EP 0 603 460 . A part of the L-shape is clamped between layers of earth in some examples. The space between the L-shaped parts and the layers of earth is then filled up. - These and further aspects of the invention are described below and illustrated by means of the drawing:
- The figures contained in the drawing show the following:
-
Figure 1 shows a step in the method according to the invention; -
Figure 2 shows a next step; -
Figure 3 shows a further step; -
Figure 4 shows a front view of a reinforced earth structure according to the invention; -
Figure 5 shows a front view of a reinforced earth structure according to the invention with a cladding element; -
Figure 6 shows a side view of a reinforced earth structure according to the invention with a cladding element before the cladding element has been secured; -
Figure 7 shows a side view of a reinforced earth structure according to the invention with a cladding element after the cladding element has been secured; -
Figure 8 shows a reinforced earth structure according to the invention with a cladding element after the cladding element has been secured; -
Figure 9 shows another embodiment of a method according to the invention; -
Figure 10 shows a side view of another embodiment of a reinforced earth structure according to the invention; -
Figures 11 and12 show a further example of a detail of an earth structure according to the invention; -
Figures 13 and14 show an example of an adjusting means.
-
- The figures are exemplary figures, wherein, as a rule, like numerals denote like elements.
-
Figure 1 shows a step in the method according to the invention. Aformwork wall 1 is placed near, for example, aslope 2 that is to be reinforced. A first earth-retaining layer containing aflexible casing material 3 and fillmaterial 4 is provided. An anchoring means 1 is placed on the border on the side facing theformwork wall 1. The anchoring means can be placed against the formwork wall or at a short distance from that wall. -
Figure 2 shows a next step: a next earth-retaining layer containing a flexible casing material 3' and fill material 4' is applied and a next anchoring means 5' is placed on the border of 3' and on the side facing theformwork wall 1. - These steps are repeated, see
figure 3 , until a reinforced earth structure of the required height has been constructed. - Please note that an
upright formwork wall 1 is shown in this example. - The formwork wall may also be placed at an angle and while constructing the earth structure different formwork walls may be used at different heights. The different earth-retaining layers may be constructed of similar materials, but it is also possible that consecutive layers have different compositions, e.g. that they contain another
fill material 4. In this way the bottom layer can be made to be different from the top layer. -
Figure 4 shows a front view of a reinforced earth structure according to the invention. Anchoring means 5 have been fitted in a number of places. The example shown is an example and must not be considered to impose any restrictions; different anchoring means patterns are possible; some anchoring means directly under each other, a staggered pattern, a zigzag pattern and other patterns. Acladding element 6 is installed against the earth structure and attached to thecouplers 7 of anchoring means 5, as shown schematically infigures 5 and6 . - The
cladding elements 6 may consist of or contain various materials: - Concrete
- Steel
- Timber
- Plastic
- Glass
- Gabions
- The above list is not intended to be an exhaustive list. Embodiments may make use of cladding elements of a relatively slight strength and thickness. Since the cladding elements have not been incorporated directly in the earth structure, their thickness and, as a result, weight can be decreased. Lightweight cladding elements result in a CO2 reduction because less energy and, consequently, less CO2 are required both to manufacture the cladding elements and to supply and install the cladding elements.
-
Figure 6 shows a next step: adjusting means 7 are secured to the anchoring means 5. Once installed, the adjusting means are located between thecladding element 6 and the anchoring means 5. -
Figure 7 shows the installed structure. Preferably, the adjusting means are such that acavity 8 is formed between the exterior, indicated as B infigure 8 , of the layers and thecladding elements 6. The earth may shift and cause the outside of the earth to bulge out over time. The presence of the cavity prevents or decreases the risk of such bulging to apply pressure to acladding element 6. Preferably, the cavity is at least 5 cm wide, preferably more than 10 cm and preferably between 10 and 25 cm. -
Figure 8 shows ananchoring element 5, which in this example contains an anchoringpart 10 and ananchor 11. The front of theanchor 11 is located on the outside B of the earth.Anchor 11 has been provided with an adjusting means 7 that is attached by means of bolts for example. This adjusting means 7 is connected to thecladding element 6. In this example, the cladding element contains aplate 12 in a hole bigger thanplate 12 that can be attached to the adjusting means 7. The adjusting means preferably has means that enable adjustment in the X and Y directions, i.e. directions in the plane of the cladding element. This makes the position of a cladding element in the plane of the cladding element adjustable. The look of a wall that shows a number of cladding elements is also determined by their mutual positions and then often particularly by distances between cladding elements. Even a relatively minor variation in distances may be visible. The human eye is susceptible to this. Adjusting means that enable a cladding element to be moved in the plane of the cladding element enable the distances between cladding elements to be adjusted. - Means to make adjustment possible in the Z-direction, i.e. transversally to the plane of the cladding element, to adjust the width of the cavity, also form part of a preferred embodiment.
- The anchoring
part 10 may contain geogrid, plastic strips, steel strips or rods, which may be galvanised and/or provided with a profile. The length and strengths of such parts can be adjusted to the requirements. - Preferably, the anchoring part contains a geogrid since a geogrid offers a high degree of friction and, consequently, better anchoring.
- The adjusting means 7 may contain a filler plate to align the cladding element as well as a mounting plate. Furthermore, the adjusting means 7 may contain an anchor rail and slotted holes to provide margins within which the position of the cladding element can be adjusted both in a vertical and in a horizontal direction, i.e. the X and Y directions.
- The adjusting means may depend on their positions, for example adjusting means that have to carry a relatively high weight may be constructed more heavy than adjusting means that have to carry a relatively low weight.
- The method and earth structure according to the invention offer high security and great flexibility for the design and look of the earth structure. This offers such parties as architects a lot of freedom to achieve their designs. Different cladding elements may be incorporated into a wall of an earth structure. For example, the high degree of flexibility provided by the invention enables solar panels or instruction signs to be used as cladding elements.
-
Figure 9 shows another embodiment of the invention. This embodiment featuresseparate formwork formwork 11a, an anchoring means 5 is installed on the border of theflexible material 3, after whichformwork 11b is installed on the lower earth-retaining layer using anchoring means 5, in which a next earth-retaining layer is applied and a next anchoring means 5, after whichformwork 11c is installed and so on. - An earth structure according to the invention is constructed on this. The difference between this embodiment and the embodiment shown in
figures 1 to 3 is that theformwork formwork wall 1 as shown infigures 1 to 3 , which can be removed later, is that a reference plane, i.e. the formwork wall is provided for the positions of the anchoring means. This enables the construction to comply with the dimensions specified much more rigidly so that, if adjustment is desired later, there is much less to be adjusted and simpler adjusting means will suffice. -
Figure 10 shows an embodiment where the width of the cavity varies, i.e. increases from the bottom up. The invention enables the design to be adjusted to an architect's wishes. -
Figures 11 and12 show another embodiment of the invention. As stated above, the anchoring means 5 may contain steel rods. The anchoring means 5 in this embodiment contain a number of steel, preferably galvanised,rods 13 between the layers of earth.Figure 11 shows a top view,figure 14 a side view.Plates 15 have been fitted to the front ends ofrods 13 and ananchor construction 14 is fitted on the rear side of every rod, i.e. on the side located between the layers of earth. An adjusting means 7 extends between the plates and acladding element 6. The adjusting means keeps thecladding element 6 at a distance from theplates 15, as a result of which a cavity has been formed. Thecladding element 6 features aplate 12. The plate has been fitted in a slotted cavity incladding element 12 where the dimensions of the slotted cavity are larger than the dimensions ofplate 12. As shown infigures 13 and14 , the cladding element contains twoholes 16 in which the rods can be secured and a slottedhole 17 in whichplate 12 can be secured using a sliding bolt and nut construction. The slotted hole and the freedom offered to plate 12 in the cavity incladding element 6 enable the position of the cladding element to be adjusted in the plane of the cladding element, i.e. in X and Y directions. Theplates 15 can be placed onto a threaded end ofrods 13 such that the positions of theplates 15 can be adjusted, enabling the cavity width to be adjusted. - In summary, the invention can be described as follows:
- A reinforced earth structure is constructed from several earth-retaining layers. When applying the layers, anchoring elements are fitted between the layers. Cladding elements are attached to these anchoring elements, with, preferably, there being adjusting means between the anchoring means and the cladding elements and a cavity preferably having been formed between a cladding element and the anchoring means.
- It will be clear that the invention enables many variations and that the invention is not limited to the examples described above.
Claims (9)
- A method of constructing a reinforced earth structure characterized in that formwork (1, 11a, 11b, 11c, 11d) is erected after which an earth-retaining layer is provided that contains a flexible casing material (3) and a fill material (4), with the casing material having a border (3a) on a side facing the formwork (1, 11a, 11b, 11c, 11d), after which an anchoring means (5) is placed on the border which anchoring means (5) contains a coupler on a side facing the formwork to couple the anchoring means to a cladding element (6), after which a next earth-retaining layer is applied, thus securing the anchoring means (5) between the earth-retaining layer and the next earth-retaining layer.
- Method as claimed in claim 1 in which a formwork wall (1) is applied that extends over more than one earth-retaining layer, the anchoring means are aligned to the formwork wall and the formwork wall is removed after several earth-retaining layers have been put in place.
- Method as claimed in claims 1 or 2 with adjusting means (7) being attached to the anchoring means in order to set the position of a cladding element (6) that is coupled to an anchoring means (5).
- Method as claimed in claim 3, where a cladding element (6) is attached to a number of couplers using the adjusting means (7).
- Method as claimed in claim 3 where an attached cladding element is detached from the adjusting means (7) and is replaced by another cladding element that is attached to the adjusting means (7).
- Method as claimed in claim 3 where a cladding element is detached, the position of one coupler is or the positions of several couplers are readjusted using the adjusting means (7) and the cladding element (6) is again attached to the adjusting means (7).
- A reinforced earth structure comprising a number of earth-retaining layers with a flexible casing material (3) and a fill material (4), with the outside of the casing material having a border and with an anchoring means (5) having been installed between two earth-retaining layers on the border, with the anchoring means containing a coupler to couple the anchoring means to a cladding element such that it can be detached, with adjusting means (7) having been attached to anchoring means in order to set the position, within the plane of the cladding element, of a cladding element (6) that is coupled to an anchoring means (5) where a cladding element (6) has been attached to the adjusting means (7) and where a cavity (8) has been formed.
- Reinforced earth structure as claimed in claim 7 where adjusting means to adjust the width of the cavity have been secured to the anchoring means.
- A reinforced earth structure as claimed in claim 7, characterized in that the anchoring means contains a geogrid (10).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL1039968A NL1039968C2 (en) | 2012-12-19 | 2012-12-19 | METHOD FOR MANUFACTURING AN ARMED GROUND CONSTRUCTION WITH ONE OR MORE COATING ELEMENTS AND A ARMED GROUND CONSTRUCTION WITH ONE OR MORE COATING ELEMENTS. |
PCT/NL2013/000061 WO2014098569A2 (en) | 2012-12-19 | 2013-12-17 | A method of constructing a reinforced earth structure comprising one or more cladding elements and a reinforced earth structure comprising one or more cladding elements |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2935703A2 EP2935703A2 (en) | 2015-10-28 |
EP2935703B1 true EP2935703B1 (en) | 2017-10-11 |
Family
ID=47748724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13824407.4A Active EP2935703B1 (en) | 2012-12-19 | 2013-12-17 | A method of constructing a reinforced earth structure |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2935703B1 (en) |
NL (1) | NL1039968C2 (en) |
WO (1) | WO2014098569A2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115897658B (en) * | 2022-11-10 | 2024-04-26 | 中铁二院工程集团有限责任公司 | Reinforced retaining wall structure and construction method thereof |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT1256489B (en) * | 1992-12-24 | 1995-12-07 | Augusto Bazzocchi | INTERNALLY REINFORCED GEOTECHNICAL STRUCTURE WITH VISIBLE SURFACE SUITABLE FOR FORMING SCARP, WALLS AND ANTIEROSION SYSTEMS. |
DE19922670A1 (en) * | 1999-05-18 | 2000-11-23 | Huesker Synthetic Gmbh & Co | Process for the production of a greenable outer skin of an earth embankment |
-
2012
- 2012-12-19 NL NL1039968A patent/NL1039968C2/en not_active IP Right Cessation
-
2013
- 2013-12-17 WO PCT/NL2013/000061 patent/WO2014098569A2/en active Application Filing
- 2013-12-17 EP EP13824407.4A patent/EP2935703B1/en active Active
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
NL1039968C2 (en) | 2014-06-23 |
WO2014098569A3 (en) | 2014-08-28 |
EP2935703A2 (en) | 2015-10-28 |
WO2014098569A2 (en) | 2014-06-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102162467B1 (en) | Thrust pile with prestress and self-supporting type pile construction using it | |
AU2004283242B2 (en) | Reinforced soil structure and method for constructing it | |
KR100968048B1 (en) | A retaining panel structure and construction method | |
CN107859054B (en) | Construction method of ecological gabion retaining wall | |
KR20140047924A (en) | Construction method of cast-in-place step retaining wall using pc panel needless of concrete forms for slope reinforcement | |
KR101136240B1 (en) | made of iron soil retaining plate and its support structure for form and retaining-wall vertical reinforcement | |
KR101031583B1 (en) | The natural stone retaining structure using blasted rocks and concrete resistance blocks and its construction technique | |
EP2935703B1 (en) | A method of constructing a reinforced earth structure | |
CN102144065B (en) | Retaining wall | |
CN108978704A (en) | A kind of reinforced soil retaining wall and its construction method | |
CN112323816A (en) | Unloading type combined retaining structure and construction method thereof | |
US20030143038A1 (en) | Multiple synthetic deformed bars and retaining walls | |
KR102490872B1 (en) | Reinforced earth retaining wall and construction method using tensile force of steel rod piles | |
CN215211149U (en) | Embedded self-balancing composite reinforced earth retaining wall | |
KR100789209B1 (en) | Land-side protection wall using composite pile connected two piles in a body | |
KR101733110B1 (en) | Roadbed reinforcement stiffness and its construction methods | |
KR20030097084A (en) | Construction Method of Reinforced Earth Retaining-Wall for using Anchoring | |
CN210315650U (en) | Anchor rod reinforced composite retaining wall | |
KR101132697B1 (en) | Reinfored earth retaining wall and construction method on the badness ground forcasted settlement | |
JP6393352B2 (en) | Repair method for existing waterways | |
CN209837093U (en) | High road bed reinforced earth retaining wall | |
CN106337435B (en) | A kind of pin-connected panel culvert end wall structure and construction method | |
CN217107050U (en) | Loess crack tunnel supporting construction | |
CN218373887U (en) | Unloading type combined retaining structure | |
KR200295956Y1 (en) | Grid fixing device for constructing of mechanically stabilized earth walls and reinforced soil slopes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20150623 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170315 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170502 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 936156 Country of ref document: AT Kind code of ref document: T Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013027914 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 936156 Country of ref document: AT Kind code of ref document: T Effective date: 20171011 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180111 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180111 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180211 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180112 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013027914 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
26N | No opposition filed |
Effective date: 20180712 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171217 Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171217 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171217 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171231 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171231 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20181024 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20131217 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20191218 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20200109 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171011 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20191217 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191217 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602013027914 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210701 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20221213 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20221213 Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20240101 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20231231 |