EP2923007A1 - Tiled pitched roofs - Google Patents

Tiled pitched roofs

Info

Publication number
EP2923007A1
EP2923007A1 EP13814200.5A EP13814200A EP2923007A1 EP 2923007 A1 EP2923007 A1 EP 2923007A1 EP 13814200 A EP13814200 A EP 13814200A EP 2923007 A1 EP2923007 A1 EP 2923007A1
Authority
EP
European Patent Office
Prior art keywords
tiled
ridge
pitched roof
roof
tiles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP13814200.5A
Other languages
German (de)
French (fr)
Other versions
EP2923007B1 (en
Inventor
Phillip Mark KING
Timothy Michael BENSON
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Modugroup Ltd
Original Assignee
Moduloft Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GBGB1221237.9A external-priority patent/GB201221237D0/en
Priority claimed from GBGB1310959.0A external-priority patent/GB201310959D0/en
Application filed by Moduloft Ltd filed Critical Moduloft Ltd
Priority to PL13814200T priority Critical patent/PL2923007T3/en
Publication of EP2923007A1 publication Critical patent/EP2923007A1/en
Application granted granted Critical
Publication of EP2923007B1 publication Critical patent/EP2923007B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
    • E04B7/026Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of prefabricated modules, e.g. box-like or cell-like units
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34331Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by three-dimensional elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/34Fastenings for attaching roof-covering elements to the supporting elements
    • E04D1/3402Fastenings for attaching roof-covering elements to the supporting elements for ridge or roofhip tiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/12Roofing elements shaped as plain tiles or shingles, i.e. with flat outer surface

Definitions

  • This invention relates to tiled pitched roofs.
  • pitched roof structures are assembled onto the walls of a new building on site.
  • the pitched roof structure includes timber roof rafters extending at an angle from timber beams fixed along the tops of the walls which they overhang at the roof eaves, up to the ridge where they support a substantially horizontally extending timber ridge board through a ridge tree fixed to the roof rafters.
  • An underlay such as a breather membrane or roofing felt, is laid in overlapping sheets over the roof rafters and tiling battens are fixed to the roof rafters on top of the underlay in spaced apart substantially horizontal relationship.
  • the spacing between the roof battens is dependent upon the length of the roof tiles between their head and tail.
  • a tiler is employed to lay the tiles by fixing them on the battens in overlapping head to tail and side by side relationship, starting from the eaves and finishing at the ridge board.
  • roof tiles on site is time consuming, because it is dependent inter alia upon suitable weather conditions, and the reliability of the tiler turning up for work. Quality control is also difficult to maintain on a building site, sometimes necessitating relaying of at least some of the roof tiles. These factors increase building industry costs, which is particularly relevant to the building industry in times of recession.
  • DE 9414313(111) describes a modular roof system in which a plurality of roof modules are individually constructed in an off-site location away from the building site. Each roof module is individually finished with roof coverings, such as roof tiles, and with other finishings, such as fascia board, guttering and so on. The modules are transported to the building site and are arranged side-by-side on the walls of the building to provide a finished roof.
  • roof coverings such as roof tiles
  • other finishings such as fascia board, guttering and so on.
  • the modules are transported to the building site and are arranged side-by-side on the walls of the building to provide a finished roof.
  • a mismatch between the tiles of even a few centimetres in any direction is sufficient to leave the roof susceptible to leaking, and in practice such mismatches are difficult to avoid.
  • the result is that the finished roof is of inferior quality to that of a roof that is fully-constructed onsite.
  • the invention resides in a method of making a plurality of pre-tiled pitched roof sections for arrangement on the walls of a building.
  • the method includes building a pitched roof structure having a plurality of separable sections, tiling the pitched roof structure in courses and separating the tiled pitched roof structure into a plurality of separate pre-tiled roof sections.
  • the pitched roof structure is therefore tiled as a single continuous structure before it is separated into the plurality of pre-tiled pitched roof sections.
  • pre-tiled pitched roof sections are arranged on a building to form a tiled pitched roof, there is no risk of misalignment of the tiles, and hence no need for any adjustment or cutting of the tiles.
  • the quality of the roof is maintained despite its modular nature.
  • the services of a skilled tiler can be dispensed with altogether, or at least minimised. All of these factors contribute to reduced building costs and more consistent quality of construction.
  • the plurality of separable sections may be separable along one or more join lines that are generally parallel to rafters of the pitched roof structure. In this way, the separable sections can be easily separated with little disruption to the underlying roof structure.
  • Tiling the pitched roof structure may include arranging junction tiles over the join line, the junction tiles being removable from the pitched roof structure. In this way, tiles that are over the join line may be quickly and easily removed when required.
  • the method may include removing the junction tiles from the tiled roof structure before separating the tiled roof structure. Removing the junction tiles before separation of the tiled roof structure also reduces the risk of damage to the junction tiles during handling and transportation of the pre- tiled pitched roof sections, as the junction tiles would otherwise be exposed at outer edges of the pitched roof structure.
  • the method may include removing the junction tiles from the join line one-at-a-time, moving from a course of tiles at a ridge of the tiled roof structure to a course of tiles at an eave of the tiled roof structure.
  • the method may also include removing a ridge tile at the join line before separating the tiled roof structure.
  • Tiling the pitched roof structure may include laying ridge filler units at the ridge, and the method may include removing a ridge filler unit at the join line before separating the tiled roof structure.
  • the ridge filler unit may be removed by sliding the ridge filler unit out from beneath a ridge tile in a sideways direction that is generally parallel to the ridge. In this way, the ridge filler unit may be easily removed from beneath the ridge tile, without the need to remove additional ridge tiles from the tiled roof structure.
  • the ridge filler unit may include a slot that opens onto an edge of the ridge filler unit, the slot being co-operable with a lug of a neighbouring ridge filler unit.
  • building the pitched roof structure may include building a plurality of sections and separably joining the sections together. Separably joining the sections together may include arranging a linking member between outer rafters of neighbouring sections, and separably joining the outer rafters to the linking member. The outer rafters may be joined to the linking member by means of a tie bar.
  • the pitched roof structure may be built as a single roof structure and may be built so as to have separable sections.
  • the method may include laying a roof underlay on each separable section, the roof underlay having an overlap portion that extends beyond an outer rafter of the section. In this way, the overlap portions can be overlapped in the finished roof structure to guard against the ingress of water beneath the underlay sections at the join between the roof sections.
  • the method may include fixing the overlap portion of the underlay to one or more battens of the section.
  • the invention also extends to a pre-tiled pitched roof section made according to the method described above.
  • the invention extends further to a method of erecting a tiled pitched roof on the walls of a building, the method including transporting a plurality of pre-tiled pitched roof sections made according to the method described above to a building site and arranging the plurality of pre- tiled pitched roof sections on the walls of a building.
  • the method may include joining the plurality of pre-tiled pitched roof sections together along one or more join lines that are generally parallel to rafters of the pitched roof. In this way, the separable sections can be joined together particularly easily.
  • the method may include inserting at least one junction tile into at least one course of tiles over the or each join line and fixing the junction tile to the tiled pitched roof.
  • the method may include inserting at least one junction tile into each course of tiles over the or each join line.
  • the method may include inserting the or each junction tile into each course of tiles one-course-at-a-time, moving from a course of tiles at an eave of the tiled pitched roof to a course of tiles at a ridge of the tiled pitched roof.
  • the method may include adjusting a tile adjacent to the or each junction tile before inserting the respective junction tile into the course of tiles.
  • the method may include loosening the tile adjacent to the or each junction tile sufficiently to facilitate insertion of the or each junction tile into the course of tiles.
  • the method may include fixing a ridge tile over the or each join line at a ridge of the roof.
  • the method may include fitting a ridge filler unit at the or each join line.
  • the ridge filler unit may be fitted by sliding the ridge filler unit beneath a ridge tile in a sideways direction generally parallel to the ridge. In this way, the ridge filler unit may be fitted without the need to remove the ridge tile.
  • the ridge filler unit may include a slot that opens onto an edge of the ridge filler unit, the slot being co- operable with a lug of a neighbouring ridge filler unit.
  • Joining the pre-tiled pitched roof sections together may include arranging a linking member between outer rafters of neighbouring pre-tiled pitched roof sections, and joining the outer rafters to the linking member.
  • the pre-tiled pitched roof sections may be joined to the linking member by means of a tie bar.
  • Each pre-tiled pitched roof section may include a roof underlay, the roof underlay having an overlap portion that extends beyond an outer rafter of that section, and the method may including overlapping the overlap portions of neighbouring pre-tiled pitched roof sections. Overlapping the overlap portions of the underlay in this way guards against the ingress of water beneath the underlay at the join between the roof sections.
  • the method may including adhering the overlap portions together.
  • Each overlap portion may initially be removably fixed to a batten of its respective pre-tiled pitched roof section, and the method may include removing each overlap portion from its respective batten before overlapping the overlap portions.
  • the invention also extends to a tiled pitched roof made according to the method described above, and to a tiled pitched roof including a plurality of pre-tiled pitched roof sections made according to the method described above.
  • the invention resides in a pitched roof structure having a plurality of joined separable sections.
  • Figure 1a is a perspective view of a pitched roof structure
  • Figure 1 b is a perspective view of the pitched roof structure of Figure 1a split into three roof sections;
  • Figure 1c is a plan view of the join line between adjacent roof sections of the pitched roof structure of Figure 1a;
  • Figure 2 is a perspective view of the pitched roof structure of Figure 1 a that has been tiled to provide a tiled pitched roof structure;
  • Figure 3 is a perspective view of the tiled pitched roof structure of Figure 2 with junction tiles removed at the join line between adjacent roof sections;
  • Figure 4 is a perspective view of the pitched roof structure of Figure 3 when separated into a plurality of pre-tiled pitched roof sections;
  • Figure 5 is a perspective view of one of the pre-tiled pitched roof sections of Figure 4 arranged on the walls of a building;
  • Figure 6 is a perspective view of all the pre-tiled pitched roof sections of Figure 4 arranged on the walls of a building to form a partially-tiled pitched roof;
  • Figure 7 is a perspective view of the partially-tiled pitched roof of Figure 6 with the junction tiles replaced at one of the join lines between adjacent pre-tiled pitched roof sections;
  • Figure 8 is a perspective view of the partially-tiled pitched roof of Figure 7 with all the junction tiles replaced to form a fully-tiled pitched roof on the walls of the building;
  • Figures 9a to 9f illustrate a method of removing the junction tiles from a join line between adjacent roof sections
  • Figures 10a to 10i illustrate a method of replacing the junction tiles at a join line between adjacent roof sections
  • Figure 11 illustrates a conventional ridge filler unit for use in a conventional tiled pitched roof
  • Figure 12 illustrates an adapted ridge filler unit for use in the tiled pitched roof of Figure 8.
  • FIG. 1a illustrates a pitched roof structure 10 a pitched roof that lies beneath and supports tiles.
  • the pitched roof structure 10 is therefore a sub-tile pitched roof structure that will hereafter be referred to for convenience simply as the roof structure 10.
  • the roof structure 10 includes a plurality of rafters 12 extending from the ridge 16 of the roof structure 10 to its eave 14, and a plurality of battens 18 extending orthogonally with respect to the rafters 12.
  • the roof structure 10 includes three separable sections or roof modules 20, illustrated in Figure 1 b.
  • the roof structure 10 is formed from three roof modules 20: a left roof module 20a, a central roof module 20b and a right roof module 20c.
  • the three roof modules 20 are separably joined together along join lines 21 that lie parallel to the rafters 12 (see Figure 1a).
  • the battens 14 extend across to width of a single roof module
  • FIG. 1c illustrates the boundary between two neighbouring roof modules 20 at the join line
  • Each roof module 20 includes at least one outermost joining rafter 12a that borders the join line 21 and faces an opposed joining rafter 12a of the neighbouring roof module 20.
  • the left roof module 20a has a single joining rafter 12a at its right-most side
  • the right roof module 20c has a single joining rafter 12a at its left-most side
  • the centre roof module 20b has two joining rafters 12a, one at each of its left and right sides.
  • a linking member in the form of a beam 13 is disposed in face- to-face relation between the joining rafters 12a of the neighbouring modules 20.
  • the linking beam 13 is removably fixed to the two joining rafters 12a by a tie bar 24 that extends through the joining rafters 12a and the linking beam 13 sandwiched between them.
  • the tie bar 24 can be removed when required to separate the modules 20.
  • a roof underlay 26 is disposed between the rafters 12 and the battens 14 of each section.
  • the roof underlay 26 extends across the roof module 20, and also extends beyond the joining rafter 12a to provide an overlap portion 28.
  • the overlap portion 28 of each roof module 20 is tacked to the ends 15 of the battens 14, so that the overlap section 28 lies clear of the join line, 21 ready for later separation of the roof modules 20.
  • Figure 1c also shows how the overlap portions 28 may be released from the battens 14 to lie in overlapping relation over the linking beam 13 between the joining rafters, 12a whereupon a peel-to-stick butyl rubber strip 30 provided on the underside 32 of an upper overlap portion 28 seals against the upper side 34 of a lower overlap portion 28.
  • the roof structure 10 described is assembled at an off-site location such as a factory by joining together the three roof modules 20.
  • the roof modules 20 are joined by sandwiching the linking beam 13 between the joining rafters 12a and fitting the tie bar 24 to secure the join.
  • the overlap portions 28 remain tacked to the ends 15 of the battens 14.
  • the roof structure 10 is then fully tiled and finished in the off-site location, as illustrated in Figure 2.
  • tiles 34 are fixed to the battens 14 in courses 35 using fixings such as a steel screw.
  • the tiles 34 are fixed to the battens 14 one course 35 at a time, moving from the eave 14 to the ridge 16.
  • First the eaves course 35a is laid, then the course 35b above the eaves course 35a is laid, and so on until the uppermost course 35c has been laid at the ridge line.
  • junction tile 36 is laid over each join line 21.
  • These junction tiles 36 differ from the remaining roof tiles 34 in that they either remain unfixed to the batten 14 below, or are removably fixed to the batten 14. The junction tiles 36 can therefore be easily removed, as will be explained.
  • ridge 16 is finished.
  • Ridge filler units 40 (not visible in Figure 2, but visible in Figure 9b) are laid above the uppermost course 35c of tiles 34, and ridge tiles 38 are laid over the ridge filler units 40 to complete the ridge 16. Additional finishings such as fascia boards, guttering etc. (not shown) may also be fitted at this stage.
  • the junction tiles 36 and ridge tile 38 are removed from the join line 21 between the roof modules 20 to allow the separable pre-tiled roof structure 50 to be separated into three pre-tiled roof sections or modules 60, shown in Figure 4.
  • the pre-tiled roof structure 50 is separated by removing the tie bars 24 and linking beams 13 at each join line 21 (see Figure 1 b), which are then stored for later re-use.
  • the pre-tiled roof modules 60 are transported to a building site where, as shown in Figures 5 and 6, they are arranged one-at-a-time on the walls 62 of a building 64. Once in place, the pre-tiled roof modules 60 are re-joined. To re-join the pre-tiled roof modules 60, the linking beam 13 is sandwiched between the joining rafters 12a of adjacent modules 50 and the tie bar 24 is arranged through the linking beam 13 and the two joining rafters 12a to secure the pre-tiled roof modules 60 (see Figure 1c).
  • the overlap portions 28 of the roof underlay 26 are un-tacked from the end 15 of each batten 14, and the overlap portions 28 are arranged one-on-top-of-another to cover the join line 21 , secured in place by the peel-to-stick butyl strip 30.
  • the junction tiles 36 and ridge tiles 38 are replaced at the join line 21 as shown in Figure 7. After all the junction tiles 36 have been replaced, the erection of the tiled pitched roof is complete, and the building 64 has a finished, tiled pitched roof 70, shown in Figure 8.
  • the invention therefore provides a pre-tiled roof structure 50 that can be separated into pre- tiled roof modules 60 that are small enough to be transported from on off-site location such as a factory to an on-site location such as a building site, for re-assembly on the walls 62 of a building 64.
  • the on-site time needed to erect the tiled pitched roof 70 is greatly reduced compared to assembling an entire roof structure on the building 64 from scratch, because on-site tile-laying process is limited to only a small number of junction tiles 36 at the join line 21.
  • the underlying roof structure 10 is tiled in its entirety at an off-site location before it is separated into the three pre-tiled roof modules 60, the tiles 34 are already in alignment with one another across the join lines 21 between neighbouring pre- tiled roof modules 60.
  • the pre-tiled roof modules 60 are arranged on the walls 62 of the building 64 there is no risk of mis-alignment of the tiles 34 across the join lines 21 , and hence no need for any adjustment or cutting of the junction tiles 36. Quality is therefore maintained, weather conditions are less of a limitation and the services of a skilled tiler can be dispensed with altogether, or at least minimised.
  • the tiles 34, 36 are double-cambered plain tiles of the sort illustrated in the Applicant's UK registered design number 2089250, although it will be appreciated that any suitable tiles may be used.
  • join line 21 is first identified. Tiles that lie on the join line 21 are junction tiles 36 that will be removed.
  • the ridge tile 38 that lies on the join line 21 is removed by unscrewing the ridge tile 38 from the ridge timber 39.
  • a left ridge filler unit 40a is then removed from beneath the left-hand adjacent ridge tile 38a and, as shown in Figure 9c, a right ridge filler unit 40b is removed from beneath the right-hand adjacent ridge tile 38b, as shown in Figure 9c.
  • the ridge filler units 40a, 40b are removed by sliding in a sideways direction that is generally parallel to the ridge 16.
  • the ridge filler units 40a, 40b are specially adapted to permit removal by this sliding movement, as will be later described.
  • junction tile 36 is then removed from the join line 21 , as shown in Figure 9d.
  • Each junction tile 36 is removed, working down the join line 21 , until all the junction tiles 36 have been removed, as shown in Figure 9e.
  • the roof structure 50 can now be separated into the pre-tiled roof modules 60, which are transported to the building site, and re-joined on the walls 62 of a building 64 as has already been described.
  • the junction tile 36 of the eaves course 35a of tiles 34 is firstly slid into place over the join line 21 and is fixed to the underlying batten 14 with a steel screw.
  • a tile clip 42 is placed on the exposed end of the tile 34 to the right of the join line 21 in the course 35b above the eaves course 35a.
  • An adjacent tile 37 that lies to the left of the join line 21 is loosened by loosening the screw 37a or other fixing that attaches the adjacent tile 37 to the underlying rafter 14, as shown in Figure 10c.
  • the loosened adjacent tile 37 can be adjusted to permit insertion of a junction tile 36 into that course 35b of tiles 34.
  • the junction tile 36 is then fixed to the rafter 14 with a screw and the adjacent tile 37 is re-secured to the batten 14 by tightening the fixing.
  • the replacement of the junction tiles 36 then continues in the same manner for each course 35 of tiles 34 in turn moving upwardly from the eave (not visible in Figure 10d) to the ridge 16, by applying the tile clip 42 to the tile 24 to the right of the join line 21 , loosening the adjacent tile 37 to the left of the join line 21 , sliding in the junction tile 36 and fixing the junction tile to the batten 14 below, and finally re-securing the adjacent tile 37 to the batten 14.
  • the ridge 16 can be finished.
  • the left ridge filler unit 40a is firstly slid into place under the ridge tile 38a to the left of the join line 21.
  • the right ridge filler unit 40b is slid into place under the ridge tile 38b to the right of the join line 21.
  • the ridge filler units 40a, 40b are slid beneath the ridge tiles 38a, 38b in a sideways direction that is generally parallel to the ridge 16.
  • ridge-to-ridge seals 44 are then placed against exposed ends of the ridge tiles 38.
  • the missing ridge tile 38 is fitted in place over the join line 21 and secured to the ridge timber 39 (see Figure 10g). The process is repeated for any additional join lines 21 to give the finished pitched roof 70 on the walls 62 of the building 64, shown in Figure 10i.
  • the ridge filler units 40a, 40b in the region of the join line 21 are specially adapted so as to permit easy reinsertion of the ridge filler units 40a, 40b beneath the ridge tiles 38, as will now be explained with reference to Figures 11 and 12.
  • Figure 11 illustrates a conventional ridge filler unit 140, which is an elongate strip of plastic material.
  • a left side 146 of the ridge filler unit 140 includes an elongate aperture 147.
  • a right side 148 of the ridge filler unit includes lugs (not visible) on the undersurface of the ridge filler unit 140. The lugs are co-operable with the aperture 147 of a neighbouring ridge filler unit 140.
  • the right side 148 of a first ridge filler unit 140 is lapped over the left side 148 of a neighbouring ridge filler unit 140 with the lugs and the aperture 147 aligned.
  • the right side 148 of the first ridge filler unit 140 is then pushed downwardly so that the lugs are locked into the aperture 147 with a push-fit.
  • the right side 148 of the ridge filler unit must be pulled upwardly, away from the left side 146 of the neighbouring ridge filler unit 140, so as to pull the lugs out of engagement with the aperture 147.
  • Figure 12 illustrates the adapted ridge filler unit 40, which is also visible in Figures 10e and 10f.
  • the adapted ridge filler unit 40 differs from the conventional ridge filler unit 40 in that at the left side 46 of the ridge filler unit 40 the aperture is replaced with an elongate slot 47 that opens onto the left edge 46a of the ridge filler unit 40.
  • the provision of a slot 47 rather than an aperture allows the left side 46 of the ridge filler unit 40 to be slid under the right side 48 of a neighbouring ridge filler unit 40 such that the lugs can be slid into and out of the slot 47.
  • the left side 46 of the ridge filler unit 40 can simply be slid out from beneath the right side 48 of a neighbouring ridge filler unit 40, moving the slot 47 out of engagement with the lugs.
  • the left side 46 of the ridge filler unit 40 can simply be slid back beneath the right side 48 of the neighbouring ridge filler unit 40, thereby sliding the slot 47 back into engagement with the lugs.
  • the arrangement of the lugs and the slot may be reversed, such that the lugs are arranged on the right side of the ridge filler unit and the slot is arranged on the left side of the ridge filler unit.
  • roof structure is made of three separable sections or roof modules, it will be appreciated that the roof structure may be made of any suitable number of sections, which may be of any suitable size or shape.
  • the linking beam may be omitted, and the joining rafters may be joined together directly.
  • the joining rafters, and linking beam if used, need not be joined together by means of a tie bar, but may be joined together by any suitable joining means.
  • a plurality of tie bars or other joining means may be used.
  • the overlapping portions of the roof underlay may be tacked to the rafters by any suitable means, and may be
  • a single junction tile is removed from each course of tiles over the join line.
  • the adjacent tiles to the left side of the join line are loosened to facilitate reinsertion of the junction tiles.
  • adjacent tiles to the right side of the join line may be loosened instead of, or in addition to, the adjacent tiles to the left side of the join line.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

A method of making a plurality of pre-tiled pitched roof sections for arrangement on the walls of a building. The method includesbuilding a pitched roof structure having a plurality of separable sections, tiling the pitched roof structure in courses and separating the tiled pitched roof structure into a plurality of separate pre-tiled roof sections.

Description

Tiled Pitched Roofs
This invention relates to tiled pitched roofs. Introduction
Traditionally, when erecting new-build structures, pitched roof structures are assembled onto the walls of a new building on site. The pitched roof structure includes timber roof rafters extending at an angle from timber beams fixed along the tops of the walls which they overhang at the roof eaves, up to the ridge where they support a substantially horizontally extending timber ridge board through a ridge tree fixed to the roof rafters.
An underlay, such as a breather membrane or roofing felt, is laid in overlapping sheets over the roof rafters and tiling battens are fixed to the roof rafters on top of the underlay in spaced apart substantially horizontal relationship. The spacing between the roof battens is dependent upon the length of the roof tiles between their head and tail. A tiler is employed to lay the tiles by fixing them on the battens in overlapping head to tail and side by side relationship, starting from the eaves and finishing at the ridge board.
Laying roof tiles on site is time consuming, because it is dependent inter alia upon suitable weather conditions, and the reliability of the tiler turning up for work. Quality control is also difficult to maintain on a building site, sometimes necessitating relaying of at least some of the roof tiles. These factors increase building industry costs, which is particularly relevant to the building industry in times of recession.
Consideration has been given to the concept of transporting an entire pre-assembled and pre-tiled roof structure to a building site, to be erected directly onto the walls of the structure. However, this is not practicable because of the size and weight of the pre-assembled roof structure.
DE 9414313(111) describes a modular roof system in which a plurality of roof modules are individually constructed in an off-site location away from the building site. Each roof module is individually finished with roof coverings, such as roof tiles, and with other finishings, such as fascia board, guttering and so on. The modules are transported to the building site and are arranged side-by-side on the walls of the building to provide a finished roof. Although such a modular system can reduce the on-site time required to build the roof structure, there are problems associated with the system. For example, there is very little tolerance for mismatch of the tiles at the join between the modules if the tiles are to provide an effective and leak-free roof covering. A mismatch between the tiles of even a few centimetres in any direction is sufficient to leave the roof susceptible to leaking, and in practice such mismatches are difficult to avoid. The result is that the finished roof is of inferior quality to that of a roof that is fully-constructed onsite.
Accordingly, it is an object of the invention to provide a pre-tiled pitched roof structure for erection on a building site which overcomes or at least substantially reduces the aforesaid disadvantages.
Statements of the invention
Against this background, and from a first aspect, the invention resides in a method of making a plurality of pre-tiled pitched roof sections for arrangement on the walls of a building. The method includes building a pitched roof structure having a plurality of separable sections, tiling the pitched roof structure in courses and separating the tiled pitched roof structure into a plurality of separate pre-tiled roof sections.
The pitched roof structure is therefore tiled as a single continuous structure before it is separated into the plurality of pre-tiled pitched roof sections. Thus, when the pre-tiled pitched roof sections are arranged on a building to form a tiled pitched roof, there is no risk of misalignment of the tiles, and hence no need for any adjustment or cutting of the tiles. Thus, the quality of the roof is maintained despite its modular nature. Furthermore, because there is no need to adjust or cut the tiles onsite, the services of a skilled tiler can be dispensed with altogether, or at least minimised. All of these factors contribute to reduced building costs and more consistent quality of construction.
The plurality of separable sections may be separable along one or more join lines that are generally parallel to rafters of the pitched roof structure. In this way, the separable sections can be easily separated with little disruption to the underlying roof structure.
Tiling the pitched roof structure may include arranging junction tiles over the join line, the junction tiles being removable from the pitched roof structure. In this way, tiles that are over the join line may be quickly and easily removed when required. To facilitate access to the pitched roof structure once the pitched roof structure has been tiled, thereby facilitating separation of the separable sections, the method may include removing the junction tiles from the tiled roof structure before separating the tiled roof structure. Removing the junction tiles before separation of the tiled roof structure also reduces the risk of damage to the junction tiles during handling and transportation of the pre- tiled pitched roof sections, as the junction tiles would otherwise be exposed at outer edges of the pitched roof structure.
For particular ease of removal of the junction tiles, the method may include removing the junction tiles from the join line one-at-a-time, moving from a course of tiles at a ridge of the tiled roof structure to a course of tiles at an eave of the tiled roof structure.
The method may also include removing a ridge tile at the join line before separating the tiled roof structure.
Tiling the pitched roof structure may include laying ridge filler units at the ridge, and the method may include removing a ridge filler unit at the join line before separating the tiled roof structure. The ridge filler unit may be removed by sliding the ridge filler unit out from beneath a ridge tile in a sideways direction that is generally parallel to the ridge. In this way, the ridge filler unit may be easily removed from beneath the ridge tile, without the need to remove additional ridge tiles from the tiled roof structure.
To facilitate removal of the ridge filler unit by sliding, the ridge filler unit may include a slot that opens onto an edge of the ridge filler unit, the slot being co-operable with a lug of a neighbouring ridge filler unit.
For particular ease of manufacture, building the pitched roof structure may include building a plurality of sections and separably joining the sections together. Separably joining the sections together may include arranging a linking member between outer rafters of neighbouring sections, and separably joining the outer rafters to the linking member. The outer rafters may be joined to the linking member by means of a tie bar.
In alternative embodiments, the pitched roof structure may be built as a single roof structure and may be built so as to have separable sections.
The method may include laying a roof underlay on each separable section, the roof underlay having an overlap portion that extends beyond an outer rafter of the section. In this way, the overlap portions can be overlapped in the finished roof structure to guard against the ingress of water beneath the underlay sections at the join between the roof sections.
To keep the overlap portions out of the way during tiling and separation of the pitched roof structure, the method may include fixing the overlap portion of the underlay to one or more battens of the section.
The invention also extends to a pre-tiled pitched roof section made according to the method described above.
The invention extends further to a method of erecting a tiled pitched roof on the walls of a building, the method including transporting a plurality of pre-tiled pitched roof sections made according to the method described above to a building site and arranging the plurality of pre- tiled pitched roof sections on the walls of a building.
The method may include joining the plurality of pre-tiled pitched roof sections together along one or more join lines that are generally parallel to rafters of the pitched roof. In this way, the separable sections can be joined together particularly easily.
The method may include inserting at least one junction tile into at least one course of tiles over the or each join line and fixing the junction tile to the tiled pitched roof. The method may include inserting at least one junction tile into each course of tiles over the or each join line.
For particular ease of insertion of the junction tiles, The method may include inserting the or each junction tile into each course of tiles one-course-at-a-time, moving from a course of tiles at an eave of the tiled pitched roof to a course of tiles at a ridge of the tiled pitched roof.
To facilitate insertion of the junction tiles into the course of tiles even further, and to reduce the possibility of damage to the junction tile and surrounding tiles, the method may include adjusting a tile adjacent to the or each junction tile before inserting the respective junction tile into the course of tiles. The method may include loosening the tile adjacent to the or each junction tile sufficiently to facilitate insertion of the or each junction tile into the course of tiles.
To complete a ridge of the pitched tiled roof, the method may include fixing a ridge tile over the or each join line at a ridge of the roof.
The method may include fitting a ridge filler unit at the or each join line. The ridge filler unit may be fitted by sliding the ridge filler unit beneath a ridge tile in a sideways direction generally parallel to the ridge. In this way, the ridge filler unit may be fitted without the need to remove the ridge tile. To facilitate insertion of the ridge filler unit by sliding, the ridge filler unit may include a slot that opens onto an edge of the ridge filler unit, the slot being co- operable with a lug of a neighbouring ridge filler unit.
Joining the pre-tiled pitched roof sections together may include arranging a linking member between outer rafters of neighbouring pre-tiled pitched roof sections, and joining the outer rafters to the linking member. The pre-tiled pitched roof sections may be joined to the linking member by means of a tie bar.
Each pre-tiled pitched roof section may include a roof underlay, the roof underlay having an overlap portion that extends beyond an outer rafter of that section, and the method may including overlapping the overlap portions of neighbouring pre-tiled pitched roof sections. Overlapping the overlap portions of the underlay in this way guards against the ingress of water beneath the underlay at the join between the roof sections.
The method may including adhering the overlap portions together.
Each overlap portion may initially be removably fixed to a batten of its respective pre-tiled pitched roof section, and the method may include removing each overlap portion from its respective batten before overlapping the overlap portions.
The invention also extends to a tiled pitched roof made according to the method described above, and to a tiled pitched roof including a plurality of pre-tiled pitched roof sections made according to the method described above.
According to another aspect, the invention resides in a pitched roof structure having a plurality of joined separable sections.
Brief Description of the Drawings
In order that the invention may be more readily understood, reference will now be made, by way of example only, to the accompanying drawings, in which:
Figure 1a is a perspective view of a pitched roof structure;
Figure 1 b is a perspective view of the pitched roof structure of Figure 1a split into three roof sections; Figure 1c is a plan view of the join line between adjacent roof sections of the pitched roof structure of Figure 1a;
Figure 2 is a perspective view of the pitched roof structure of Figure 1 a that has been tiled to provide a tiled pitched roof structure;
Figure 3 is a perspective view of the tiled pitched roof structure of Figure 2 with junction tiles removed at the join line between adjacent roof sections;
Figure 4 is a perspective view of the pitched roof structure of Figure 3 when separated into a plurality of pre-tiled pitched roof sections;
Figure 5 is a perspective view of one of the pre-tiled pitched roof sections of Figure 4 arranged on the walls of a building;
Figure 6 is a perspective view of all the pre-tiled pitched roof sections of Figure 4 arranged on the walls of a building to form a partially-tiled pitched roof;
Figure 7 is a perspective view of the partially-tiled pitched roof of Figure 6 with the junction tiles replaced at one of the join lines between adjacent pre-tiled pitched roof sections;
Figure 8 is a perspective view of the partially-tiled pitched roof of Figure 7 with all the junction tiles replaced to form a fully-tiled pitched roof on the walls of the building;
Figures 9a to 9f illustrate a method of removing the junction tiles from a join line between adjacent roof sections;
Figures 10a to 10i illustrate a method of replacing the junction tiles at a join line between adjacent roof sections;
Figure 11 illustrates a conventional ridge filler unit for use in a conventional tiled pitched roof; and
Figure 12 illustrates an adapted ridge filler unit for use in the tiled pitched roof of Figure 8. Detailed Description of Embodiments of the Invention
Figure 1a illustrates a pitched roof structure 10 a pitched roof that lies beneath and supports tiles. The pitched roof structure 10 is therefore a sub-tile pitched roof structure that will hereafter be referred to for convenience simply as the roof structure 10. The roof structure 10 includes a plurality of rafters 12 extending from the ridge 16 of the roof structure 10 to its eave 14, and a plurality of battens 18 extending orthogonally with respect to the rafters 12.
The roof structure 10 includes three separable sections or roof modules 20, illustrated in Figure 1 b. In the example illustrated, the roof structure 10 is formed from three roof modules 20: a left roof module 20a, a central roof module 20b and a right roof module 20c. To produce the roof structure 10, the three roof modules 20 are separably joined together along join lines 21 that lie parallel to the rafters 12 (see Figure 1a).
Referring again to Figure 1a, the battens 14 extend across to width of a single roof module
20, and are truncated at outer rafters or joining rafters 12a that are provided at the end of each roof module 20. In this way, there is a gap between the neighbouring battens 14 at the join line 21 between the roof modules 20 that exposes ends 15 of the battens 14.
Figure 1c illustrates the boundary between two neighbouring roof modules 20 at the join line
21. Each roof module 20 includes at least one outermost joining rafter 12a that borders the join line 21 and faces an opposed joining rafter 12a of the neighbouring roof module 20. Specifically, as most clearly seen in Figure 1b, the left roof module 20a has a single joining rafter 12a at its right-most side, the right roof module 20c has a single joining rafter 12a at its left-most side, and the centre roof module 20b has two joining rafters 12a, one at each of its left and right sides.
Referring again to Figure 1c, a linking member in the form of a beam 13 is disposed in face- to-face relation between the joining rafters 12a of the neighbouring modules 20. The linking beam 13 is removably fixed to the two joining rafters 12a by a tie bar 24 that extends through the joining rafters 12a and the linking beam 13 sandwiched between them. The tie bar 24 can be removed when required to separate the modules 20.
A roof underlay 26 is disposed between the rafters 12 and the battens 14 of each section. The roof underlay 26 extends across the roof module 20, and also extends beyond the joining rafter 12a to provide an overlap portion 28. In the structure illustrated in Figure 1 c, the overlap portion 28 of each roof module 20 is tacked to the ends 15 of the battens 14, so that the overlap section 28 lies clear of the join line, 21 ready for later separation of the roof modules 20. However, Figure 1c also shows how the overlap portions 28 may be released from the battens 14 to lie in overlapping relation over the linking beam 13 between the joining rafters, 12a whereupon a peel-to-stick butyl rubber strip 30 provided on the underside 32 of an upper overlap portion 28 seals against the upper side 34 of a lower overlap portion 28.
The roof structure 10 described is assembled at an off-site location such as a factory by joining together the three roof modules 20. The roof modules 20 are joined by sandwiching the linking beam 13 between the joining rafters 12a and fitting the tie bar 24 to secure the join. At this stage, the overlap portions 28 remain tacked to the ends 15 of the battens 14.
The roof structure 10 is then fully tiled and finished in the off-site location, as illustrated in Figure 2. Specifically, tiles 34 are fixed to the battens 14 in courses 35 using fixings such as a steel screw. As is conventional in the art, the tiles 34 are fixed to the battens 14 one course 35 at a time, moving from the eave 14 to the ridge 16. First the eaves course 35a is laid, then the course 35b above the eaves course 35a is laid, and so on until the uppermost course 35c has been laid at the ridge line.
In each course 35 of tiles 34, a junction tile 36 is laid over each join line 21. These junction tiles 36 differ from the remaining roof tiles 34 in that they either remain unfixed to the batten 14 below, or are removably fixed to the batten 14. The junction tiles 36 can therefore be easily removed, as will be explained.
Once the tiles 34, 36 have been laid, ridge 16 is finished. Ridge filler units 40 (not visible in Figure 2, but visible in Figure 9b) are laid above the uppermost course 35c of tiles 34, and ridge tiles 38 are laid over the ridge filler units 40 to complete the ridge 16. Additional finishings such as fascia boards, guttering etc. (not shown) may also be fitted at this stage.
In this way, the entire roof structure 10 is fully tiled off-site to make a separable pre-tiled roof structure 50, shown in Figure 2.
As shown in Figure 3, once the separable pre-tiled roof structure 50 has been produced, the junction tiles 36 and ridge tile 38 are removed from the join line 21 between the roof modules 20 to allow the separable pre-tiled roof structure 50 to be separated into three pre-tiled roof sections or modules 60, shown in Figure 4. The pre-tiled roof structure 50 is separated by removing the tie bars 24 and linking beams 13 at each join line 21 (see Figure 1 b), which are then stored for later re-use.
The pre-tiled roof modules 60 are transported to a building site where, as shown in Figures 5 and 6, they are arranged one-at-a-time on the walls 62 of a building 64. Once in place, the pre-tiled roof modules 60 are re-joined. To re-join the pre-tiled roof modules 60, the linking beam 13 is sandwiched between the joining rafters 12a of adjacent modules 50 and the tie bar 24 is arranged through the linking beam 13 and the two joining rafters 12a to secure the pre-tiled roof modules 60 (see Figure 1c). The overlap portions 28 of the roof underlay 26 are un-tacked from the end 15 of each batten 14, and the overlap portions 28 are arranged one-on-top-of-another to cover the join line 21 , secured in place by the peel-to-stick butyl strip 30.
Once the pre-tiled roof modules 60 have been re-joined, the junction tiles 36 and ridge tiles 38 are replaced at the join line 21 as shown in Figure 7. After all the junction tiles 36 have been replaced, the erection of the tiled pitched roof is complete, and the building 64 has a finished, tiled pitched roof 70, shown in Figure 8.
The invention therefore provides a pre-tiled roof structure 50 that can be separated into pre- tiled roof modules 60 that are small enough to be transported from on off-site location such as a factory to an on-site location such as a building site, for re-assembly on the walls 62 of a building 64. The on-site time needed to erect the tiled pitched roof 70 is greatly reduced compared to assembling an entire roof structure on the building 64 from scratch, because on-site tile-laying process is limited to only a small number of junction tiles 36 at the join line 21.
Furthermore, because the underlying roof structure 10 is tiled in its entirety at an off-site location before it is separated into the three pre-tiled roof modules 60, the tiles 34 are already in alignment with one another across the join lines 21 between neighbouring pre- tiled roof modules 60. In this way, when the pre-tiled roof modules 60 are arranged on the walls 62 of the building 64 there is no risk of mis-alignment of the tiles 34 across the join lines 21 , and hence no need for any adjustment or cutting of the junction tiles 36. Quality is therefore maintained, weather conditions are less of a limitation and the services of a skilled tiler can be dispensed with altogether, or at least minimised.
The process of removing the junction tiles 36 from the join line 21 of the tiled roof structure 50 will now be described in further detail with reference to Figures 9a to 9e. In the embodiment illustrated, the tiles 34, 36 are double-cambered plain tiles of the sort illustrated in the Applicant's UK registered design number 2089250, although it will be appreciated that any suitable tiles may be used.
Referring to Figure 9a, the join line 21 is first identified. Tiles that lie on the join line 21 are junction tiles 36 that will be removed.
Next, as shown in Figure 9b the ridge tile 38 that lies on the join line 21 is removed by unscrewing the ridge tile 38 from the ridge timber 39. A left ridge filler unit 40a is then removed from beneath the left-hand adjacent ridge tile 38a and, as shown in Figure 9c, a right ridge filler unit 40b is removed from beneath the right-hand adjacent ridge tile 38b, as shown in Figure 9c. The ridge filler units 40a, 40b are removed by sliding in a sideways direction that is generally parallel to the ridge 16. The ridge filler units 40a, 40b are specially adapted to permit removal by this sliding movement, as will be later described.
The upper-most junction tile 36 is then removed from the join line 21 , as shown in Figure 9d. Each junction tile 36 is removed, working down the join line 21 , until all the junction tiles 36 have been removed, as shown in Figure 9e.
The roof structure 50 can now be separated into the pre-tiled roof modules 60, which are transported to the building site, and re-joined on the walls 62 of a building 64 as has already been described.
The method of replacing the junction tiles 36 to produce the finished pitched roof 70 will now be described with reference to Figures 10a to 10i.
As shown in Figure 10a, the junction tile 36 of the eaves course 35a of tiles 34 is firstly slid into place over the join line 21 and is fixed to the underlying batten 14 with a steel screw. Next, as shown in Figure 10b, a tile clip 42 is placed on the exposed end of the tile 34 to the right of the join line 21 in the course 35b above the eaves course 35a.
An adjacent tile 37 that lies to the left of the join line 21 is loosened by loosening the screw 37a or other fixing that attaches the adjacent tile 37 to the underlying rafter 14, as shown in Figure 10c. In this way, the loosened adjacent tile 37 can be adjusted to permit insertion of a junction tile 36 into that course 35b of tiles 34. The junction tile 36 is then fixed to the rafter 14 with a screw and the adjacent tile 37 is re-secured to the batten 14 by tightening the fixing. Referring now to Figure 10d, the replacement of the junction tiles 36 then continues in the same manner for each course 35 of tiles 34 in turn moving upwardly from the eave (not visible in Figure 10d) to the ridge 16, by applying the tile clip 42 to the tile 24 to the right of the join line 21 , loosening the adjacent tile 37 to the left of the join line 21 , sliding in the junction tile 36 and fixing the junction tile to the batten 14 below, and finally re-securing the adjacent tile 37 to the batten 14. As shown in Figure 10e, once the last junction tile 36 of the uppermost course 35c of tiles 34 has been fixed in place, all the junction tiles 36 at the join line 21 have been replaced, and the ridge 16 can be finished.
To finish the ridge 16, the left ridge filler unit 40a is firstly slid into place under the ridge tile 38a to the left of the join line 21. Next, as shown in Figure 10f, the right ridge filler unit 40b is slid into place under the ridge tile 38b to the right of the join line 21. The ridge filler units 40a, 40b are slid beneath the ridge tiles 38a, 38b in a sideways direction that is generally parallel to the ridge 16.
Referring to Figure 10g, ridge-to-ridge seals 44 are then placed against exposed ends of the ridge tiles 38. Finally, as shown in Figure 10h, the missing ridge tile 38 is fitted in place over the join line 21 and secured to the ridge timber 39 (see Figure 10g). The process is repeated for any additional join lines 21 to give the finished pitched roof 70 on the walls 62 of the building 64, shown in Figure 10i.
The ridge filler units 40a, 40b in the region of the join line 21 are specially adapted so as to permit easy reinsertion of the ridge filler units 40a, 40b beneath the ridge tiles 38, as will now be explained with reference to Figures 11 and 12.
Figure 11 illustrates a conventional ridge filler unit 140, which is an elongate strip of plastic material. A left side 146 of the ridge filler unit 140 includes an elongate aperture 147. A right side 148 of the ridge filler unit includes lugs (not visible) on the undersurface of the ridge filler unit 140. The lugs are co-operable with the aperture 147 of a neighbouring ridge filler unit 140.
To fix neighbouring ridge filler units 140 together, the right side 148 of a first ridge filler unit 140 is lapped over the left side 148 of a neighbouring ridge filler unit 140 with the lugs and the aperture 147 aligned. The right side 148 of the first ridge filler unit 140 is then pushed downwardly so that the lugs are locked into the aperture 147 with a push-fit. To separate neighbouring ridge filler units 140 that are fixed together, the right side 148 of the ridge filler unit must be pulled upwardly, away from the left side 146 of the neighbouring ridge filler unit 140, so as to pull the lugs out of engagement with the aperture 147.
Figure 12 illustrates the adapted ridge filler unit 40, which is also visible in Figures 10e and 10f. The adapted ridge filler unit 40 differs from the conventional ridge filler unit 40 in that at the left side 46 of the ridge filler unit 40 the aperture is replaced with an elongate slot 47 that opens onto the left edge 46a of the ridge filler unit 40. The provision of a slot 47 rather than an aperture allows the left side 46 of the ridge filler unit 40 to be slid under the right side 48 of a neighbouring ridge filler unit 40 such that the lugs can be slid into and out of the slot 47.
Thus, to remove the adapted ridge filler unit 40 as the pre-tiled roof structure 50 is prepared for separation, the left side 46 of the ridge filler unit 40 can simply be slid out from beneath the right side 48 of a neighbouring ridge filler unit 40, moving the slot 47 out of engagement with the lugs. Conversely, to replace the adapted ridge filler unit 40 as the pre-tiled roof sections 60 are re-joined, the left side 46 of the ridge filler unit 40 can simply be slid back beneath the right side 48 of the neighbouring ridge filler unit 40, thereby sliding the slot 47 back into engagement with the lugs.
It will be appreciated that the arrangement of the lugs and the slot may be reversed, such that the lugs are arranged on the right side of the ridge filler unit and the slot is arranged on the left side of the ridge filler unit.
Although in the embodiments described the roof structure is made of three separable sections or roof modules, it will be appreciated that the roof structure may be made of any suitable number of sections, which may be of any suitable size or shape.
In some embodiments, the linking beam may be omitted, and the joining rafters may be joined together directly. The joining rafters, and linking beam if used, need not be joined together by means of a tie bar, but may be joined together by any suitable joining means. A plurality of tie bars or other joining means may be used. The overlapping portions of the roof underlay may be tacked to the rafters by any suitable means, and may be
In the illustrated embodiment, a single junction tile is removed from each course of tiles over the join line. However, if required, there may be more than one junction tile that is removed from each course of tiles. In the embodiment illustrated the adjacent tiles to the left side of the join line are loosened to facilitate reinsertion of the junction tiles. However, adjacent tiles to the right side of the join line may be loosened instead of, or in addition to, the adjacent tiles to the left side of the join line.
The present invention is not limited to the exemplary embodiments described above and many other variations or modifications will be apparent to the skilled person without departing from the scope of the present invention as defined in the following claims.

Claims

Claims
1. A method of making a plurality of pre-tiled pitched roof sections for arrangement on the walls of a building, the method including building a pitched roof structure having a plurality of separable sections, tiling the pitched roof structure in courses and separating the tiled pitched roof structure into a plurality of separate pre-tiled roof sections.
2. The method of Claim 1 , wherein the plurality of separable sections are separable along one or more join lines that are generally parallel to rafters of the pitched roof structure.
3. The method of Claim 2, wherein the tiling includes arranging junction tiles over the join line, the junction tiles being removable from the pitched roof structure.
4. The method of Claim 3, wherein the method includes removing the junction tiles from the tiled roof structure before separating the tiled roof structure.
5. The method of Claim 4, wherein the method includes removing the junction tiles from the join line one-at-a-time, moving from a course of tiles at a ridge of the tiled roof structure to a course of tiles at an eave of the tiled roof structure.
6. The method of Claim 4 or Claim 5, wherein the method includes removing a ridge tile at the join line before separating the tiled roof structure.
7. The method of Claim 6, wherein the tiling includes laying ridge filler units at the ridge, and wherein the method includes removing a ridge filler unit at the join line before separating the tiled roof structure.
8. The method of Claim 7, wherein the ridge filler unit is removed by sliding the ridge filler unit out from beneath a ridge tile in a sideways direction that is generally parallel to the ridge.
9. The method of Claim 7 or Claim 8, wherein the ridge filler unit includes a slot that opens onto an edge of the ridge filler unit, the slot being co-operable with a lug of a neighbouring ridge filler unit.
10. The method of any preceding claim, wherein building the pitched roof structure includes building a plurality of sections and separably joining the sections together.
11. The method of Claim 10, wherein separably joining the sections together includes arranging a linking member between outer rafters of neighbouring sections, and separably joining the outer rafters to the linking member.
12. The method of Claim 11 , including joining the outer rafters to the linking member by means of a tie bar.
13. The method of any of Claims 10 to 12, wherein the method includes laying a roof underlay on each separable section, the roof underlay having an overlap portion that extends beyond an outer rafter of the section.
14. The method of Claim 12, including fixing the overlap portion of the underlay to one or more battens of the section.
15. A pre-tiled pitched roof section made according to the method of any of Claims 1 to 14.
16. A method of erecting a tiled pitched roof on the walls of a building, the method including transporting a plurality of pre-tiled pitched roof sections according to Claim 15 to a building site and arranging the plurality of pre-tiled pitched roof sections on the walls of a building.
17. The method of Claim 16, wherein the method includes joining the plurality of pre-tiled pitched roof sections together along one or more join lines that are generally parallel to rafters of the pitched roof.
18. The method of Claim 17, including inserting at least one junction tile into at least one course of tiles over the or each join line and fixing the junction tile to the tiled pitched roof.
19. The method of Claim 18 including inserting at least one junction tile into each course of tiles over the or each join line.
20. The method of Claim 19, including inserting the or each junction tile into each course of tiles one-course-at-a-time, moving from a course of tiles at an eave of the tiled pitched roof to a course of tiles at a ridge of the tiled pitched roof.
21. The method of any of Claims 18 to 20, including adjusting a tile adjacent to the or each junction tile before inserting the respective junction tile into the course of tiles.
22. The method of Claim 21 comprising loosening the tile adjacent to the or each junction tile sufficiently to facilitate insertion of the or each junction tile into the course of tiles.
23. The method of any of Claims 18 to 22, wherein the method includes fixing a ridge tile over the or each join line at a ridge of the roof.
24. The method of Claim 23, wherein the method includes fitting a ridge filler unit at the or each join line.
25. The method of Claim 24, wherein the ridge filler unit is fitted by sliding the ridge filler unit beneath a ridge tile in a sideways direction generally parallel to the ridge.
26. The method of Claim 25, wherein the ridge filler unit includes a slot that opens onto an edge of the ridge filler unit, the slot being co-operable with a lug of a neighbouring ridge filler unit.
27. The method of any of Claims 17 to 26, wherein joining the pre-tiled pitched roof sections together includes arranging a linking member between outer rafters of neighbouring pre-tiled pitched roof sections, and joining the outer rafters to the linking member.
28. The method of Claim 27, including joining the pre-tiled pitched roof sections to the linking member by means of a tie bar.
29. The method of any of Claims 17 to 28, wherein each pre-tiled pitched roof section includes a roof underlay, the roof underlay having an overlap portion that extends beyond an outer rafter of that section, and including overlapping the overlap portions of neighbouring pre-tiled pitched roof sections.
30. The method of Claim 29, including adhering the overlap portions together.
31. The method of Claim 29 or Claim 30, wherein each overlap portion is initially removably fixed to a batten of its respective pre-tiled pitched roof section, and wherein the method includes removing each overlap portion from its respective batten before overlapping the overlap portions.
32. A tiled pitched roof made according to the method of any of Claims 16 to 31.
33. A tiled pitched roof including a plurality of pre-tiled pitched roof sections according to Claim 15.
34. A pitched roof structure having a plurality of joined separable sections.
35. A method of making a plurality of pre-tiled pitched roof sections for arrangement on the walls of a building substantially as hereinbefore described with reference to Figures 1a to 1c, 2 to 4, 9a to 9f and 12 of the accompanying drawings.
36. A pre-tiled pitched roof section substantially as hereinbefore described with reference to Figures 1a to 1 c, 2 to 4, 9a to 9f and 12 of the accompanying drawings.
37. A method of erecting a tiled pitched roof on the walls of a building substantially as hereinbefore described with reference to Figures 5 to 8, 10a to 10i and 12 of the
accompanying drawings.
38. A tiled pitched roof substantially as hereinbefore described with reference to Figures 1a to 1c, 2 to 8, 9a to 9f, 10a to 10i and 12 of the accompanying drawings.
39. A pitched roof structure substantially as hereinbefore described with reference to Figures 1 a to 1c of the accompanying drawings.
EP13814200.5A 2012-11-26 2013-11-26 Tiled pitched roofs Active EP2923007B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL13814200T PL2923007T3 (en) 2012-11-26 2013-11-26 Tiled pitched roofs

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GBGB1221237.9A GB201221237D0 (en) 2012-11-26 2012-11-26 Pitched roof structure
GBGB1310959.0A GB201310959D0 (en) 2013-06-19 2013-06-19 Pitched roof structure
PCT/GB2013/053127 WO2014080234A1 (en) 2012-11-26 2013-11-26 Tiled pitched roofs

Publications (2)

Publication Number Publication Date
EP2923007A1 true EP2923007A1 (en) 2015-09-30
EP2923007B1 EP2923007B1 (en) 2018-03-21

Family

ID=49883133

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13814200.5A Active EP2923007B1 (en) 2012-11-26 2013-11-26 Tiled pitched roofs

Country Status (6)

Country Link
EP (1) EP2923007B1 (en)
DK (1) DK2923007T3 (en)
ES (1) ES2674074T3 (en)
GB (1) GB2508304C (en)
PL (1) PL2923007T3 (en)
WO (1) WO2014080234A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104805905A (en) * 2015-05-06 2015-07-29 冯菊英 Building structure, building and greenhouse

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1482182A (en) * 1966-04-14 1967-05-26 Applic Ind Des Resines De Synt Prefabricated monobloc roof made up of interchangeable elements assembled
US4207714A (en) * 1978-12-22 1980-06-17 Mehls William L Building construction
GB2123050B (en) * 1982-06-25 1986-01-29 Marley Roof Tile Roof ridge capping system
US5092099A (en) * 1987-09-08 1992-03-03 Valente Daniel J Modular roof system
GB2257170B (en) * 1991-06-28 1995-01-11 Omar Homes Limited Improvements in or relating to buildings and roofs therefore
DE29718740U1 (en) * 1997-10-07 1998-01-02 Erlus Baustoffwerke AG, 84088 Neufahrn Roof element for the production of a house roof
DE10227564A1 (en) * 2002-06-20 2004-01-08 Rieter-Werke Gmbh Method for tiling roof using prefabricated large panels has the gaps between the vertical edges of the panels covered by special tiles which overlap the fixed tiles at both edges
ES2389417B1 (en) * 2010-11-30 2013-09-13 Cupa Innovacion Slu COVER FOR ROOFS AND FACADES.

Also Published As

Publication number Publication date
GB2508304B (en) 2014-10-22
EP2923007B1 (en) 2018-03-21
PL2923007T3 (en) 2018-08-31
WO2014080234A1 (en) 2014-05-30
DK2923007T3 (en) 2018-06-25
GB2508304C (en) 2021-06-23
GB2508304B8 (en) 2015-07-08
GB2508304A (en) 2014-05-28
GB2508304A8 (en) 2015-07-08
ES2674074T3 (en) 2018-06-27
GB201320844D0 (en) 2014-01-08

Similar Documents

Publication Publication Date Title
US8991116B2 (en) Roof solar panel for conventional sloping roof and shingle integration
US8371083B2 (en) Retrofit roof assembly
US8256185B2 (en) Pre-assembled shingle set and installation system
US8122649B2 (en) Interlocking tiles employing adjustable rain lock
US9388565B2 (en) Siding and roofing panels and method for mounting same
US10829936B2 (en) Hip and ridge shingle
EP3406818B1 (en) Dormer assembly
WO1989010455A1 (en) Roofing shingle
US9294032B2 (en) Modular roof solar panel for conventional roof and roofing integration
EP2872709B1 (en) Pitched roof structures and their methods of assembly and construction
EP2923007B1 (en) Tiled pitched roofs
US4655020A (en) Cinch strap and backup plate for metal roof endlap joint
US20040172901A1 (en) Insulated weather-resistant interlocking roof system and method
US20090293375A1 (en) Arrangement for a roof or a facade of a building
AU2020262609B2 (en) Roof panel, roof structure and roof structure construction method
EP2146159B1 (en) Method for building a solar panel assembly on a slanted roof base
DE29718740U1 (en) Roof element for the production of a house roof
GB2400868A (en) Trapezially ridged roofing sheet supporting insulation
JP2011226231A (en) Roofing structure and roofing material
AU2019204459B2 (en) A Roof
EP4600435A1 (en) Flashing panel for tiled roof
EP3438367A1 (en) Insulation lamella structure with split lamellas and method for installing the same
JP6632032B2 (en) Roof tile fixing structure and roof tile fixing method
GB2413806A (en) Adjoining roof coverings using roof gutter units or strips thereof
NO830395L (en) SUBSTANCES FOR USE BY COVERING TREASURES WITH TAKSTEIN.

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20150622

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20160523

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: TLCUK LIMITED

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: MODUGROUP LIMITED

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170418

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20171004

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

GRAR Information related to intention to grant a patent recorded

Free format text: ORIGINAL CODE: EPIDOSNIGR71

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

INTC Intention to grant announced (deleted)
AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

INTG Intention to grant announced

Effective date: 20180214

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 981259

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180415

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013034800

Country of ref document: DE

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20180621

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2674074

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20180627

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 981259

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180321

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20180321

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180621

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180723

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20181129

Year of fee payment: 6

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602013034800

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20181204

Year of fee payment: 6

Ref country code: FI

Payment date: 20181130

Year of fee payment: 6

Ref country code: NO

Payment date: 20181203

Year of fee payment: 6

26N No opposition filed

Effective date: 20190102

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20181205

Year of fee payment: 6

Ref country code: IT

Payment date: 20181129

Year of fee payment: 6

Ref country code: BE

Payment date: 20181129

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181126

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181126

REG Reference to a national code

Ref country code: CH

Ref legal event code: PCAR

Free format text: NEW ADDRESS: ROUTE DU COUTSET 18, 1485 NUVILLY (CH)

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180321

REG Reference to a national code

Ref country code: FI

Ref legal event code: MAE

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20191130

Ref country code: NO

Ref legal event code: MMEP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180321

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20131126

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20191201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191130

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191130

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191130

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191126

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20191130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191130

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191126

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191130

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20210601

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191127

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20251126

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20251126

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20251126

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20251126

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IE

Payment date: 20251125

Year of fee payment: 13

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20251126

Year of fee payment: 13