EP2836658B1 - Supporting head for the construction of a superstructure - Google Patents
Supporting head for the construction of a superstructure Download PDFInfo
- Publication number
- EP2836658B1 EP2836658B1 EP13722558.7A EP13722558A EP2836658B1 EP 2836658 B1 EP2836658 B1 EP 2836658B1 EP 13722558 A EP13722558 A EP 13722558A EP 2836658 B1 EP2836658 B1 EP 2836658B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- slide
- beams
- heads
- supporting
- superstructure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims description 8
- 238000000034 method Methods 0.000 claims description 11
- 230000000284 resting effect Effects 0.000 claims description 4
- 239000004927 clay Substances 0.000 description 6
- 238000009415 formwork Methods 0.000 description 6
- 230000005484 gravity Effects 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/486—Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads
Definitions
- the present invention relates to a supporting head for supporting at least a first and a second beam that are suitable for contributing to the temporary support of a superstructure.
- the present invention further relates to a method for constructing a floor.
- the invention has particular application in the construction of concrete or concrete and hollow clay block floors or other forms of floor slabs where it is required to support the structure for a period extending beyond laying.
- a method for constructing a floor envisages positioning an array of posts, each provided with a supporting head for temporarily supporting a superstructure.
- this superstructure comprises formwork in which concrete is poured for the construction of the floor slab.
- Each of said heads is provided with an upper support and a drop-head element.
- the drop-head element is movable between a raised position and a lowered position.
- the drop-head element supports beams. When the drop-head element is in the raised position, all of the beams of the head are used, together with the upper support, to prop up the formwork. In the lowered position, the drop-head element determines the dismantlement, from the superstructure, of all the beams of the head (which can thus be removed).
- the technical task at the basis of the present invention is to propose a supporting head which is capable of offering considerable operating versatility. It is a further object of the present invention to provide an economical and flexible method for constructing a ceiling.
- the reference number 1 indicates a supporting head of at least a first and a second beam suitable for contributing to the temporary support of a superstructure, in particular a floor under construction.
- this head is also known as a "drop head”.
- the head 1 comprises a structure 2 extending upward.
- the structure 2 comprises at a top thereof a rest 21 suitable for supporting the superstructure 10 at least partially.
- This rest 21 is also known in the art as a "head plate" and defines a terminal whereupon the superstructure 10 rests.
- the structure 2 further comprises a base plate 23.
- the base plate 23 of advantageously comprises a plurality of holes for the passage of connection means through the plate 23, said connection means serving to constrain the plate 23 to an underlying support, typically a post 70.
- the structure 2 comprises two vertical rods 24, 25 (preferably tubular). The two tubular rods 24, 25 are interposed between the base plate 23 and the rest 21.
- the structure 2 comprises a spacer 26 which keeps the two rods 24, 25 separate and parallel.
- the two rods 24, 25 are welded to the base plate 23.
- the head 1 further comprises a first slide 3 designed to support the first beam 22 and that is movable along said structure 2 at least between a first and a second position. In the first position (see figure 2 or 3 or 5 or 6 ) the first slide 3 is at a greater height than in the second position (see figure 4 or 7 ).
- the head 1 comprises a second slide 4 that is designed to support the second beam 12.
- the second slide 4 is movable along said structure 2 at least between a third and a fourth position. In the third position (see figure 2 or 5 ) the second slide 4 is at a greater height than in the fourth position (see figure 3 or 4 or 6 or 7 ).
- the second slide 4 is movable along said two rods 24, 25.
- the second slide 4 is below the first slide 3.
- the first and the second slides 3, 4 are distinct and separate bodies.
- the head 1 comprises means 5 for supporting the first slide 3 in the first position.
- the means 5 for supporting the first slide in the first position comprise a locking dowel 500, typically a pin 50.
- the dowel 500 can be inserted in a first seat 30 made on the first slide 3 and in at least a second seat 22 made on the structure 2 so as to support the first slide 3 in the first position.
- the second seat 22 is made in one of said two rods 24, 25, whereas another of said two rods 24, 25 comprises a third seat 32.
- the dowel 500 is inserted in the first, second and third seats 30,22,32.
- the dowel 500 can be removed from the second and third seats 22, 32 (and advantageously also from the first seat 30) to release the first slide 3 relative to the structure 2, permitting the passage of the first slide 3 from the first to the second position; the expression “permitting the passage” means that the dowel 500, if released from the structure 2, no longer opposes the drop of the first slide 3; in the preferred embodiment, in order for the first slide 3 to actually pass from the first to the second position it is also necessary for the second slide 4 not to be locked in the third position; conveniently, the height at which the first slide is located in the second position is lower than the height at which the second slide is located in the third position (in fact, in the preferred embodiment the first slide 3 cannot be located in the second position if the second slide 4 is located in the third position).
- the head 1 comprises means 6 for supporting the second slide 4 at least in the third position.
- the means 6 for supporting the second slide opposes the action of the force of gravity which pushes the second slide downwards, thus blocking the natural movement of the second sliding element.
- the means 5 for supporting the first slide is constrained to the structure 2.
- the means 6 for supporting the second slide is constrained to the structure 2.
- the means 6 for supporting the second slide comprises an element 60, which fits by interference into said structure 2 and supports from below the second slide 4 in the third position.
- the element 60 which is fit is plate-like and has a first and a second hole 601, 602.
- the supporting means 5 and/or 6 are removably connectable to the structure 2.
- Both the first and second holes 601, 602 have two converging limiting walls.
- One of the two rods 24, 25 is inserted into the first hole and one into the second hole 601, 602.
- the two rods 24, 25 are fit into the converging zone of the first and second holes 601, 602.
- the base plate 23 advantageously also comprises one or more protuberances 230 (typically obtained by pressing).
- the protuberance 230 is a stop for said element 60; the protuberance 230 prevents the element 60, if released from the structure 2, from interfering with the underlying anchorage elements; said anchorage elements are responsible for connecting an end plate of the post and remaining parts of the post; the end plate of the post is the portion of the post upon which the base plate 23 rests.
- the means 6 for supporting the second slide can be disengaged independently from the engagement of the means 5 for supporting the first slide 3.
- the means 6 for supporting the second slide can be disengaged even if the means 5 for supporting the first slide 3 is engaged.
- the head 1 can take on a configuration wherein the means 5 for supporting the first slide performs its support function and the means 6 for supporting the second slide is disengaged (i.e. does not perform its support function). This permits a shifting of the second slide 4 from the third to the fourth position, even in the case in which the first slide 3 remains fixed in the first position.
- the first and second slides 3, 4 are separate and distinct.
- the means 5 and the means 6 are also separate and distinct.
- the first slide 3 comprises a rest zone 31 for the first beam 11.
- the first slide 3 comprises at least one projecting element intended to fit into the first beam 11 (it preferably comprises a plurality of projecting elements intended to fit into in the first beam 11).
- projecting elements comprise:
- the rest zone 31 for the first beam and the rest zone 42 for the second beam are located along two directions rotated by 90°.
- the rest zone 31 for the first beam and the rest zone 33 for the third beam are reciprocally opposite relative to the structure 2.
- the rest zone 44 for the fourth beam and the rest zone 42 for the second beam are reciprocally opposite relative to the structure 2.
- the structure 2 is thus interposed between the zones 31 and 33.
- Analogously, the structure 2 is interposed between the zones 42 and 44.
- the first slide 3 provides and completely surrounds at least a first opening 34 for the passage of the structure 2; the second slide 4 provides and completely surrounds at least a second opening 41 for the passage of the structure 2 (in particular, the second opening 41 coincides with said first or said second hole 601, 602).
- the present invention further relates to a kit comprising (see figures 8 and 9 ):
- the appendage 71 projects in a distancing direction from head 1.
- the appendage 71 comprises a support 72 in turn comprising at its upper end gripping means (for example a clip 73) for gripping a beam (in particular the above-specified first or second beam 11, 12).
- the gripping means are elastically returned.
- the clip 73 comprises an elastic spring 86 which tends to tighten two arms of said clip 73.
- the appendage 71 (typically via the gripping means) is suitable for defining an additional rest point for the first or the second beam 11, 12.
- the support 72 is adjustable in height.
- the appendage 71 is used above all whenever the first or the second beam is projecting or more in general to better stabilize it.
- the kit 1 also comprises the post 70 below the head 1.
- the appendage 71 comprises a clamp 87 which traps the base plate 23 and an upper plate of the post 70 (which are inserted and remain interposed between two parts of the clamp).
- the upper plate of the post was previously also defined as "end plate" of the post.
- the present invention also relates to a shoring framework 100 for constructing a floor.
- the floor can for example be a concrete floor slab as indicated, for example, in figure 11 or 12 , or else it could be made of concrete and clay blocks as indicated, for example, in figure 13 .
- Said shoring framework 100 comprises a group of posts 70 and heads 1, each head 1 topping a corresponding post 70 and having one or more of the previously described features.
- the shoring framework 100 in particular comprises a first group of beams, each beam of said first group extending between a pair of said heads 1.
- the beams of the first group comprise:
- the first and the second set of beams support the weight of a superstructure 10.
- the superstructure 10 comprises a formwork (the formwork usually includes a set of panels on the inside of which concrete is poured).
- the shoring framework 100 comprises walkway platforms 76 set by side; for example, said platforms 76 enable an operator to work more comfortably and in complete safety during the construction of the superstructure 10.
- the platforms 70 are supported or constrained to the beams of the second set.
- the beams of the first set extend along a first direction 74
- the beams of the second set extend along a second direction 75 extend first direction 74.
- the superstructure comprises hollow blocks having a preponderant direction of extension parallel to the second direction 75.
- Said shoring framework 100 takes on at least:
- the shoring framework 100 takes on a third configuration wherein the heads 1 have the first and the second slide 3, 4 respectively in the second and in the fourth position and wherein the beams of the first set are distanced from the superstructure and removable.
- the heads 1 In the third configuration, the heads 1 have the rest 21 which supports the superstructure 10.
- the user has utmost versatility of use.
- the first and the second slide 3,4 of the heads 1 are respectively in the first and in the third position.
- the user can choose between two options described here below.
- a first option envisages that the operator decides that the support provided by the beams that rest on the first slide 3 of the heads 1 is sufficient on its own; consequently, the beams set on the second slide 4 of the various heads 1 can be lowered.
- this operation could be carried out immediately after pouring the concrete which contributes to defining the superstructure.
- the beams that rest on the first slide 3 of the various heads 1 can be removed and those beams can be reused in another area of the building site.
- the walkway platforms 76 are also freed and can thus be reused.
- the superstructure will thus be supported only by the top rests 21 of the heads 1 and by the beams that rest on the first slide 3 of the various heads 1 (advantageously the beams that rest on the first slide 3 of the various heads can be removed after complete curing of the concrete; in the case of a concrete and hollow clay block ceiling, this usually takes place around 28 days after laying).
- a second option envisages that the user decides at a certain point of the work that it is possible to simultaneously remove the beams that rest both on the first and on the second slide 3, 4 of each head 1. Consequently, it is possible to lower both the first and the second slide of each head 1.
- the floor slab is instead made solely of concrete, given the greater weight thereof it could be decided to keep all the beams erected until the concrete is completely cured.
- At least one of the beams used has a profile having an "upside-down T" shaped cross section (see figure 10 ). What is described with reference to said "upside-down T" shaped beam can be advantageously repeated for a plurality of said beams, preferably for all the beams.
- said beam is hollow at least at the ends.
- the "upside-down T" shaped beam has a section having a base 81 and a stem 82; the stem 82 projects upward from the base 81, in a distancing direction from the base 81.
- said beam comprises a protuberance 83 for coupling to the walkway platform 76; said protuberance 83 projects upwards from the base 81.
- Said protuberance 83 is positioned beside the stem 82.
- the base 81 has two edges 84,85 which converge toward the inside of the base 81 and are inclined relative to the horizontal plane, preferably by an angle of 8.21°. This serves to improve the gripping action by the appendage 71.
- the present invention also relates to a method for constructing a floor.
- Said method comprises a stage of positioning a network of temporary posts 70 and heads; each of said heads being placed at the top of a corresponding post and having one or more of the above-specified features; the posts of the network are in a vertical position.
- the method further comprises a stage of positioning a plurality of beams, oriented according to a first and a second direction 74, 75 on pairs of said heads.
- the first and the second direction 74, 75 are reciprocally perpendicular.
- the beams extending along the first direction 74 rest on the first slide 3 of said heads 1.
- the beams extending along the second direction 75 rest on the second slide 4 of said heads 1.
- the method further envisages applying a superstructure 10 above said beams.
- the superstructure 10 can comprise formwork intended to receive the poured concrete.
- the stage of applying the superstructure 10 comprises the stage of resting a set of walkway platforms 76 on the beams extending along the second direction 75.
- the formwork is placed above said platforms.
- the method can further comprise the stages of:
- the stage of lowering the second slide 4 causes the lowering of said platforms 76 which, disengaged from the remaining parts of the superstructure 10, can be removed. At least a part of said superstructure is thus destined to remain incorporated in the ceiling; at least a part of said superstructure can be removed after the ceiling is completed.
- the invention thus conceived enables a number of advantages to be obtained.
- the invention offers the user the option of dismantling only some of the beams, leaving others in place; this makes it possible to limit costs.
- the dismantled beams can be reused in another area of the building site (and therefore a smaller number of beams will be necessary overall because some can be reused).
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Bridges Or Land Bridges (AREA)
Description
- The present invention relates to a supporting head for supporting at least a first and a second beam that are suitable for contributing to the temporary support of a superstructure. The present invention further relates to a method for constructing a floor. The invention has particular application in the construction of concrete or concrete and hollow clay block floors or other forms of floor slabs where it is required to support the structure for a period extending beyond laying.
- A method for constructing a floor is known. It envisages positioning an array of posts, each provided with a supporting head for temporarily supporting a superstructure. In particular, this superstructure comprises formwork in which concrete is poured for the construction of the floor slab. Each of said heads is provided with an upper support and a drop-head element. The drop-head element is movable between a raised position and a lowered position. The drop-head element supports beams. When the drop-head element is in the raised position, all of the beams of the head are used, together with the upper support, to prop up the formwork. In the lowered position, the drop-head element determines the dismantlement, from the superstructure, of all the beams of the head (which can thus be removed).
-
DE 10135664 already discloses a head with all the features of the preamble ofclaim 1. - In this context, the technical task at the basis of the present invention is to propose a supporting head which is capable of offering considerable operating versatility. It is a further object of the present invention to provide an economical and flexible method for constructing a ceiling.
- The stated technical task and specified objects are substantially achieved by a supporting head and a method comprising the technical features disclosed in one or more of the appended claims.
- Additional features and advantages of the present invention will be more apparent from the approximate, and hence non-limiting, description of a preferred but not exclusive embodiment of a supporting head illustrated in the appended drawings, in which:
-
figure 1 shows an exploded view of the head according to the present invention; -
figures 2 ,3, 4 show perspective views of the head according to the present invention in three different configurations; -
figures 5, 6 ,7 show perspective views, in three different configurations, of a part of shoring framework comprising a head according to the present invention; -
figures 8 and9 show components of a kit comprising a head according to the present invention; -
figure 10 shows a cross section view of a beam used infigures 5, 6 ,7 ; -
figures 11 and12 show a first embodiment of a shoring framework comprising a head according to the present invention; -
figure 13 shows a second embodiment of a shoring framework comprising a head according to the present invention. - In the appended figures, the
reference number 1 indicates a supporting head of at least a first and a second beam suitable for contributing to the temporary support of a superstructure, in particular a floor under construction. In the art this head is also known as a "drop head". - The
head 1 comprises astructure 2 extending upward. Conveniently, thestructure 2 comprises at a top thereof arest 21 suitable for supporting thesuperstructure 10 at least partially. Thisrest 21 is also known in the art as a "head plate" and defines a terminal whereupon thesuperstructure 10 rests. - The
structure 2 further comprises abase plate 23. Thebase plate 23 of advantageously comprises a plurality of holes for the passage of connection means through theplate 23, said connection means serving to constrain theplate 23 to an underlying support, typically apost 70. Conveniently, thestructure 2 comprises twovertical rods 24, 25 (preferably tubular). The twotubular rods base plate 23 and therest 21. Conveniently, thestructure 2 comprises aspacer 26 which keeps the tworods rods base plate 23. - The
head 1 further comprises afirst slide 3 designed to support thefirst beam 22 and that is movable along saidstructure 2 at least between a first and a second position. In the first position (seefigure 2 or3 or5 or 6 ) thefirst slide 3 is at a greater height than in the second position (seefigure 4 or7 ). - The
head 1 comprises asecond slide 4 that is designed to support thesecond beam 12. Thesecond slide 4 is movable along saidstructure 2 at least between a third and a fourth position. In the third position (seefigure 2 or5 ) thesecond slide 4 is at a greater height than in the fourth position (seefigure 3 or 4 or6 or7 ). In particular, thesecond slide 4 is movable along said tworods second slide 4 is below thefirst slide 3. The first and thesecond slides - Conveniently, the
head 1 comprises means 5 for supporting thefirst slide 3 in the first position. - The means 5 for supporting the first slide in the first position comprise a
locking dowel 500, typically a pin 50. In the preferred embodiment thedowel 500 can be inserted in afirst seat 30 made on thefirst slide 3 and in at least asecond seat 22 made on thestructure 2 so as to support thefirst slide 3 in the first position. Preferably, thesecond seat 22 is made in one of said tworods rods third seat 32. In a locked configuration of thefirst slide 3, thedowel 500 is inserted in the first, second andthird seats - Preferably, the
dowel 500 can be removed from the second andthird seats 22, 32 (and advantageously also from the first seat 30) to release thefirst slide 3 relative to thestructure 2, permitting the passage of thefirst slide 3 from the first to the second position; the expression "permitting the passage" means that thedowel 500, if released from thestructure 2, no longer opposes the drop of thefirst slide 3; in the preferred embodiment, in order for thefirst slide 3 to actually pass from the first to the second position it is also necessary for thesecond slide 4 not to be locked in the third position; conveniently, the height at which the first slide is located in the second position is lower than the height at which the second slide is located in the third position (in fact, in the preferred embodiment thefirst slide 3 cannot be located in the second position if thesecond slide 4 is located in the third position). - The
head 1 comprises means 6 for supporting thesecond slide 4 at least in the third position. Themeans 6 for supporting the second slide opposes the action of the force of gravity which pushes the second slide downwards, thus blocking the natural movement of the second sliding element. The means 5 for supporting the first slide is constrained to thestructure 2. Themeans 6 for supporting the second slide is constrained to thestructure 2. - The
means 6 for supporting the second slide comprises anelement 60, which fits by interference into saidstructure 2 and supports from below thesecond slide 4 in the third position. In particular, theelement 60 which is fit is plate-like and has a first and asecond hole structure 2. - Both the first and
second holes rods second hole second slide 4 in the third position, the tworods second holes element 60 is locked relative to thestructure 2 and can thus support thesecond slide 4 above it. When theelement 60 is released, thesecond slide 4 will drop due to gravity (moving toward the base plate 23). Conveniently, when theelement 60 is released from thestructure 2, it too will drop due to gravity. In particular, thebase plate 23 advantageously also comprises one or more protuberances 230 (typically obtained by pressing). Theprotuberance 230 is a stop for saidelement 60; theprotuberance 230 prevents theelement 60, if released from thestructure 2, from interfering with the underlying anchorage elements; said anchorage elements are responsible for connecting an end plate of the post and remaining parts of the post; the end plate of the post is the portion of the post upon which thebase plate 23 rests. - Conveniently, the
means 6 for supporting the second slide can be disengaged independently from the engagement of the means 5 for supporting thefirst slide 3. Practically speaking, themeans 6 for supporting the second slide can be disengaged even if the means 5 for supporting thefirst slide 3 is engaged. Thehead 1 can take on a configuration wherein the means 5 for supporting the first slide performs its support function and themeans 6 for supporting the second slide is disengaged (i.e. does not perform its support function). This permits a shifting of thesecond slide 4 from the third to the fourth position, even in the case in which thefirst slide 3 remains fixed in the first position. The first andsecond slides means 6 are also separate and distinct. - In the preferred embodiment the
first slide 3 comprises a rest zone 31 for thefirst beam 11. In particular, in the zone 31 thefirst slide 3 comprises at least one projecting element intended to fit into the first beam 11 (it preferably comprises a plurality of projecting elements intended to fit into in the first beam 11). For example, such projecting elements comprise: - a
lower tooth 88, designed to fit into a lower groove of the first beam; and/or - two
protrusions first beam 11, preventing thefirst beam 11 from shifting horizontally and perpendicularly to the preponderant line of extension of thefirst beam 11. Conveniently, thefirst slide 3 comprises arest zone 33 for athird beam 13. Thesecond slide 4 comprises arest zone 42 for thesecond beam 12. Preferably thesecond slide 4 comprises arest zone 44 for afourth beam 14. - Starting from an
axis 20 wherealong saidstructure 2 extends, the rest zone 31 for the first beam and therest zone 42 for the second beam are located along two directions rotated by 90°. - What has been described with reference to the projecting elements of the
first slide 3 in the zone 31 can be repeated for projecting elements situated in the zone 33 (in such a case the projecting elements will interact with the third beam 13). What has been described with reference to the projecting elements of thefirst slide 3 can be repeated for the second slide 4 (in such a case the projecting elements will be in thezone 42 and/or 44 and will interact respectively with the second and/or thefourth beam 12, 14). - The rest zone 31 for the first beam and the
rest zone 33 for the third beam are reciprocally opposite relative to thestructure 2. Therest zone 44 for the fourth beam and therest zone 42 for the second beam are reciprocally opposite relative to thestructure 2. Thestructure 2 is thus interposed between thezones 31 and 33. Analogously, thestructure 2 is interposed between thezones - The
first slide 3 provides and completely surrounds at least afirst opening 34 for the passage of thestructure 2; thesecond slide 4 provides and completely surrounds at least asecond opening 41 for the passage of the structure 2 (in particular, thesecond opening 41 coincides with said first or saidsecond hole 601, 602). - The present invention further relates to a kit comprising (see
figures 8 and9 ): - a
head 1 having one or more of the above-specified features; - an
appendage 71 hooked with thehead 1 and/or hookable with apost 70 below thehead 1. - The
appendage 71 projects in a distancing direction fromhead 1. Conveniently, theappendage 71 comprises asupport 72 in turn comprising at its upper end gripping means (for example a clip 73) for gripping a beam (in particular the above-specified first orsecond beam 11, 12). As can be seen infigure 8 , the gripping means are elastically returned. In particular, theclip 73 comprises anelastic spring 86 which tends to tighten two arms of saidclip 73. The appendage 71 (typically via the gripping means) is suitable for defining an additional rest point for the first or thesecond beam support 72 is adjustable in height. - The
appendage 71 is used above all whenever the first or the second beam is projecting or more in general to better stabilize it. In the preferred embodiment thekit 1 also comprises thepost 70 below thehead 1. Theappendage 71 comprises aclamp 87 which traps thebase plate 23 and an upper plate of the post 70 (which are inserted and remain interposed between two parts of the clamp). The upper plate of the post was previously also defined as "end plate" of the post. - The present invention also relates to a shoring
framework 100 for constructing a floor. By way of non-limiting example, the floor can for example be a concrete floor slab as indicated, for example, infigure 11 or12 , or else it could be made of concrete and clay blocks as indicated, for example, infigure 13 . - Said shoring
framework 100 comprises a group ofposts 70 and heads 1, eachhead 1 topping acorresponding post 70 and having one or more of the previously described features. The shoringframework 100 in particular comprises a first group of beams, each beam of said first group extending between a pair of said heads 1. - In particular the beams of the first group comprise:
- a first set of beams that rest on the
first slide 3 of theheads 1; and - a second set of beams that rest on the
second slide 4 of theheads 1. The beams of the first set do not rest on thesecond slide 4. The beams of the second set do not rest on thefirst slide 3. Conveniently, thefirst beam 11 belongs to the first set of beams and thesecond beam 12 belongs to the second set. - The first and the second set of beams support the weight of a
superstructure 10. Typically, thesuperstructure 10 comprises a formwork (the formwork usually includes a set of panels on the inside of which concrete is poured). Moreover, the shoringframework 100 compriseswalkway platforms 76 set by side; for example, saidplatforms 76 enable an operator to work more comfortably and in complete safety during the construction of thesuperstructure 10. Theplatforms 70 are supported or constrained to the beams of the second set. - Conveniently, the beams of the first set extend along a
first direction 74, whereas the beams of the second set extend along asecond direction 75 extendfirst direction 74. Advantageously, in concrete and hollow clay block floors the superstructure comprises hollow blocks having a preponderant direction of extension parallel to thesecond direction 75. Said shoringframework 100 takes on at least: - a first configuration wherein the
heads 1 have thefirst slide 3 in the first position and thesecond slide 4 in the third position and wherein the beams of the first and of the second set determine a rest plane of asuperstructure 10; - a second configuration wherein the heads have the
first slide 3 in the first position and thesecond slide 4 in the fourth position and wherein the beams of the first set support at least partially thesuperstructure 10, - Conveniently, the shoring
framework 100 takes on a third configuration wherein theheads 1 have the first and thesecond slide heads 1 have the rest 21 which supports thesuperstructure 10. - In this manner, the user has utmost versatility of use. At the moment of construction of the
superstructure 10, the first and thesecond slide heads 1 are respectively in the first and in the third position. Subsequently, the user can choose between two options described here below. A first option envisages that the operator decides that the support provided by the beams that rest on thefirst slide 3 of theheads 1 is sufficient on its own; consequently, the beams set on thesecond slide 4 of thevarious heads 1 can be lowered. In the case of a concrete and hollow clay block ceiling, this operation could be carried out immediately after pouring the concrete which contributes to defining the superstructure. In this manner, the beams that rest on thefirst slide 3 of thevarious heads 1 can be removed and those beams can be reused in another area of the building site. Moreover, in this manner thewalkway platforms 76 are also freed and can thus be reused. The superstructure will thus be supported only by the top rests 21 of theheads 1 and by the beams that rest on thefirst slide 3 of the various heads 1 (advantageously the beams that rest on thefirst slide 3 of the various heads can be removed after complete curing of the concrete; in the case of a concrete and hollow clay block ceiling, this usually takes place around 28 days after laying). - Alternatively, a second option envisages that the user decides at a certain point of the work that it is possible to simultaneously remove the beams that rest both on the first and on the
second slide head 1. Consequently, it is possible to lower both the first and the second slide of eachhead 1. - For example, in the case of a concrete and hollow clay block ceiling, given the lighter weight thereof, it possible to dismantle the beams that rest on the
second slide 4 of the heads 1 a few hours after the concrete has been laid; in the meantime, however, the beams that rest on thefirst slide 3 of theheads 1 will remain erected for an additional period of time. - If the floor slab is instead made solely of concrete, given the greater weight thereof it could be decided to keep all the beams erected until the concrete is completely cured.
- Advantageously, at least one of the beams used has a profile having an "upside-down T" shaped cross section (see
figure 10 ). What is described with reference to said "upside-down T" shaped beam can be advantageously repeated for a plurality of said beams, preferably for all the beams. - Advantageously, said beam is hollow at least at the ends.
- Conveniently, the "upside-down T" shaped beam has a section having a base 81 and a
stem 82; thestem 82 projects upward from thebase 81, in a distancing direction from thebase 81. Advantageously, said beam comprises a protuberance 83 for coupling to thewalkway platform 76; said protuberance 83 projects upwards from thebase 81. Said protuberance 83 is positioned beside thestem 82. Conveniently, thebase 81 has twoedges 84,85 which converge toward the inside of thebase 81 and are inclined relative to the horizontal plane, preferably by an angle of 8.21°. This serves to improve the gripping action by theappendage 71. - The present invention also relates to a method for constructing a floor. Said method comprises a stage of positioning a network of
temporary posts 70 and heads; each of said heads being placed at the top of a corresponding post and having one or more of the above-specified features; the posts of the network are in a vertical position. - The method further comprises a stage of positioning a plurality of beams, oriented according to a first and a
second direction second direction - The beams extending along the
first direction 74 rest on thefirst slide 3 of said heads 1. The beams extending along thesecond direction 75 rest on thesecond slide 4 of said heads 1. - The method further envisages applying a
superstructure 10 above said beams. - The
superstructure 10 can comprise formwork intended to receive the poured concrete. The stage of applying thesuperstructure 10 comprises the stage of resting a set ofwalkway platforms 76 on the beams extending along thesecond direction 75. The formwork is placed above said platforms. - The method can further comprise the stages of:
- lowering the
second slide 4 of the heads per so as to disengage the beams extending along thesecond direction 75 from thesuperstructure 10; - keeping the
first slide 3 of the heads in the first position for an additional period of time, so that the beams extending along thefirst direction 74 remain further as support for thesuperstructure 10. - The stage of lowering the
second slide 4 causes the lowering of saidplatforms 76 which, disengaged from the remaining parts of thesuperstructure 10, can be removed. At least a part of said superstructure is thus destined to remain incorporated in the ceiling; at least a part of said superstructure can be removed after the ceiling is completed. - The invention thus conceived enables a number of advantages to be obtained.
- In particular, it allows the user utmost operating flexibility, meeting the plurality of needs that may present themselves from one occasion to the next. In particular, the invention offers the user the option of dismantling only some of the beams, leaving others in place; this makes it possible to limit costs. In fact, the dismantled beams can be reused in another area of the building site (and therefore a smaller number of beams will be necessary overall because some can be reused).
- The invention thus conceived is susceptible of numerous modifications and variants, all falling within the scope of the inventive concept that characterises it. Moreover, all the details may be replaced with technically equivalent ones. In practice, all of the materials used, as well as the dimensions, can be any whatsoever according to need.
Claims (10)
- A supporting head for supporting at least a first and second beam that are suitable for contributing to the temporary support of a superstructure, particularly a floor under construction, the head (1) comprising:- a structure (2) extending upward with a head plate (21) at the top thereof defining a terminal where upon the superstructure rents;- a first slide (3) designed to support the first beam and that is movable along said structure (2) at least between a first and a second position; in the first position, the first slide (3) being located at a greater height than in the second position;- means (5) for supporting the first slide in the first position;- a second slide (4) that is: designed to support the second beam, below the first slide (3) and that is movable along said structure (2) at least between a third and a fourth position; in the third position, the second slide (4) being located at a greater height than in the fourth position;- means (6) for supporting the second slide (4) at least in the third position; the head being able to take on a configuration wherein the means (5) for supporting the first slide performs its support function and the means (6) for supporting the second slide is disengaged, thereby permitting a shifting of the second slide (4) from the third to the fourth position, even in the case in which the first slide (3) remains fixed in the first position;characterized in that
the means (5) for supporting the first slide in the first position and the means (6) for supporting the second slide in the third position are separate and distinct. - The head according to claim 1, characterized in that the means (5) for supporting the first slide comprises a pin (50):- that can be inserted in a first seat (30) made on the first slide (3) and in a second seat (22) made on the structure (2) so as to support the first slide (3) in the first position;- that can be removed from the first and the second seat (30, 22) so as to release the first slide (3) with respect to the structure (2), permitting the passage of the first slide (3) from the first position to the second.
- The head according to claim 1 or 2, characterized in that the means (6) for supporting the second slide comprises an element (60) that fits by interference into said structure (2) and that supports from below the second slide (4) in the third position.
- The head according to claim 1, 2 or 3, characterized in that the first slide (3) comprises a rest zone (31) for the first beam; the second slide (4) comprising a rest zone (42) for the second beam; starting from an axis (20) wherealong said structure (2) extends, the rest zone (31) for the first beam and the rest zone (42) for the second beam are located along two directions rotated by 90°.
- The head according to claim 1, 2 or 3, characterized in that the first slide (3) comprises a rest zone (31) for the first beam and a rest zone (33) for a third beam, the rest zone (31) for the first beam and the rest zone (33) for the third beam being reciprocally opposite with respect to the structure (2); the second slide (4) comprising a rest zone (42) for the second beam and a rest zone (44) for a fourth beam, the rest zone (44) for the fourth beam and the rest zone (42) for the second beam being reciprocally opposite with respect to the structure (2).
- The head according to any one of the preceding claims, characterized in that the first slide (3) provides and completely surrounds a first opening (34) for the passage of the structure (2); the second slide (4) provides and completely surrounds a second opening (41) for the passage of the structure (2).
- A kit characterized in that it comprises:- a head (1) according to any one of claims 1 to 6;- an appendage (71) hooked with the head (1) and/or hookable with a supporting post (70) for supporting the head (1), said appendage (71) projecting in a distancing direction from the head (1);said appendage (71) comprising a support (72) that is adjustable in height and in turn comprising at the upper end a clip (73) suitable for gripping the first or second beam (11, 12), said appendage (71) being suitable for defining an additional rest point for the first or the second beam (11, 12).
- A shoring framework for the construction of a ceiling and characterized in that it comprises:- a group of supporting posts (70) and heads (1), each of said heads (1) topping a corresponding supporting post (70) and being in accordance with one or more of claims 1 to 6;- a first group of beams, each beam of said first group extending between a pair of said heads; the beams of the first group comprising a first set of beams that rest on the first slide (3) of the heads (1) and a second set of beams that rest on the second slide (4) of the heads (1);
the beams of the first set extending along a first direction (74), and the beams of the second set extending along a second direction (75) perpendicular to the first direction (74);- platforms (76) that are walkways and supported or constrained to the beams of the second set;said shoring framework taking on at least:- a first configuration wherein the heads have the first slide (3) in the first position, the second slide (4) in the third position and wherein the beams of the first and second set determine a rest plane of a superstructure;- a second configuration wherein the heads have the first slide (3) in the first position, the second slide (4) in the fourth position and wherein the beams of the first set support at least partially the superstructure (10), whereas the beams of the second set and said walkway platforms (76) are distanced from the superstructure (10) with respect to the first configuration and are thus removable. - A method for constructing a floor comprising the stages of:- positioning a network of temporary supporting posts (70) and a group of heads, each of said heads being in accordance with any one of claims 1 to 6; each head of said group being placed at the top of a corresponding supporting post (70);- positioning a plurality of beams oriented according to a first and a second direction (74, 75) on pairs of said heads, said first and second direction (74, 75) being reciprocally perpendicular; the beams extending along the first direction (74) resting on the first slide (3) of said heads (1), the beams extending along the second direction (75) resting on the second slide (4) of said heads;- applying a superstructure (10) above said beams, at least a part of said superstructure being intended to be part of the ceiling;- lowering the second slide (4) of the heads so as to disengage the beams extending along the second direction (75) from the superstructure (10);- keeping the first slide (3) of the heads in the first position for an additional period of time, so that the beams extending along the first direction (74) remain further as support for the superstructure (10).
- The method according to claim 9, characterized in that the stage of applying the superstructure (10) comprises the stage of resting a set of walkway platforms (76) on the beams extending along the second direction (75), the stage of lowering the second slide (4) determining the lowering of said platforms (76), which, once disengaged from the remaining parts of the superstructure (10), can be removed.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT000022A ITPR20120022A1 (en) | 2012-04-11 | 2012-04-11 | SUPPORT HEAD FOR THE REALIZATION OF A SUPERSTRUCTURE |
PCT/IB2013/052522 WO2013153478A1 (en) | 2012-04-11 | 2013-03-28 | Supporting head for the construction of a superstructure |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2836658A1 EP2836658A1 (en) | 2015-02-18 |
EP2836658B1 true EP2836658B1 (en) | 2016-05-11 |
Family
ID=46028076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13722558.7A Active EP2836658B1 (en) | 2012-04-11 | 2013-03-28 | Supporting head for the construction of a superstructure |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP2836658B1 (en) |
ES (1) | ES2586725T3 (en) |
IT (1) | ITPR20120022A1 (en) |
MA (1) | MA20150064A1 (en) |
PL (1) | PL2836658T3 (en) |
WO (1) | WO2013153478A1 (en) |
ZA (1) | ZA201407333B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2014215950B2 (en) * | 2014-08-19 | 2019-09-19 | Form 700 Pty Ltd | Concrete formwork and a formwork support bracket |
ITUB20159267A1 (en) * | 2015-12-22 | 2017-06-22 | Tecnotelai Componenets S R L | Support head of at least one beam and method of connecting the beam to the head |
US10053877B2 (en) * | 2016-09-19 | 2018-08-21 | Michael L. Lenkin | Adjustable support device and shoring system |
DE102018203873A1 (en) * | 2018-03-14 | 2019-09-19 | Peri Gmbh | Formwork carrier assembly |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1166867A (en) * | 1981-07-22 | 1984-05-08 | Robert K. Gregory | Adjustable release stringer shore head with integral load carrying stringer |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2099902A (en) * | 1981-06-08 | 1982-12-15 | Acrow Eng Ltd | Drop head for formwork prop |
DE3215002A1 (en) * | 1982-04-22 | 1983-10-27 | Emil Steidle Gmbh & Co, 7480 Sigmaringen | CONSTRUCTION SUPPORT |
DE10135664B4 (en) * | 2001-07-21 | 2008-06-26 | HĂĽnnebeck GmbH | Support for slab formwork od. Like. |
BRPI0520046A2 (en) * | 2005-02-23 | 2009-12-01 | Ulma C Y E S Coop | perimeter frame system and assembly and disassembly process for a perimeter frame system |
DE102010001042B4 (en) * | 2010-01-20 | 2012-03-01 | Doka Industrie Gmbh | Drop head for a slab formwork system and slab formwork system |
-
2012
- 2012-04-11 IT IT000022A patent/ITPR20120022A1/en unknown
-
2013
- 2013-03-28 EP EP13722558.7A patent/EP2836658B1/en active Active
- 2013-03-28 ES ES13722558.7T patent/ES2586725T3/en active Active
- 2013-03-28 WO PCT/IB2013/052522 patent/WO2013153478A1/en active Application Filing
- 2013-03-28 PL PL13722558.7T patent/PL2836658T3/en unknown
- 2013-03-28 MA MA37399A patent/MA20150064A1/en unknown
-
2014
- 2014-10-09 ZA ZA2014/07333A patent/ZA201407333B/en unknown
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1166867A (en) * | 1981-07-22 | 1984-05-08 | Robert K. Gregory | Adjustable release stringer shore head with integral load carrying stringer |
Also Published As
Publication number | Publication date |
---|---|
MA20150064A1 (en) | 2015-02-27 |
ZA201407333B (en) | 2016-05-25 |
PL2836658T3 (en) | 2016-12-30 |
ITPR20120022A1 (en) | 2013-10-12 |
WO2013153478A1 (en) | 2013-10-17 |
ES2586725T3 (en) | 2016-10-18 |
EP2836658A1 (en) | 2015-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3652394B1 (en) | Method of installing a formwork support system, formwork support system and longitudinal beam | |
US10407925B2 (en) | Method of installing a formwork support system, formwork support system and longitudinal beam | |
CN212453615U (en) | Formwork support system | |
US8673189B2 (en) | Method for implementing a rail-guided self-climbing formwork system with climbing rail extension pieces | |
EP2836658B1 (en) | Supporting head for the construction of a superstructure | |
EP2880228B1 (en) | Scaffold structure | |
BR9711314A (en) | Demountable facade scaffolding, and processes for the assembly and disassembly of said scaffolding. | |
US8632056B1 (en) | Safety rail system | |
KR102049630B1 (en) | Scaffolding equipment for aggregate smokestack dismantling and dismantling method for aggregate smokestack using same equipment | |
KR20060115444A (en) | Movable concrete form and multi-level construction method using the same | |
KR20230066338A (en) | Formwork system and method | |
KR100570261B1 (en) | Temporary bracket for construction of steel bridge and the installation method using the same | |
KR102534830B1 (en) | PIT floor multi support system and PIT floor construction method using the same | |
CN217975308U (en) | Base platform of movable scaffold | |
CA2650278A1 (en) | Spring assembly for reshore posts | |
KR200408920Y1 (en) | The one body puncheons for bridge construction | |
KR20070041669A (en) | A slab formwork system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20140926 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: PEDRAZZANI, DAVIDE |
|
17Q | First examination report despatched |
Effective date: 20150904 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20151118 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 798814 Country of ref document: AT Kind code of ref document: T Effective date: 20160515 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013007448 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: RO Ref legal event code: EPE |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20160511 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2586725 Country of ref document: ES Kind code of ref document: T3 Effective date: 20161018 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160811 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160912 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160812 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013007448 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20170214 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20170330 Year of fee payment: 5 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20170324 Year of fee payment: 5 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20170531 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20171130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170328 Ref country code: RO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160511 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170328 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: FP Effective date: 20160804 Ref country code: BE Ref legal event code: MM Effective date: 20170331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170328 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602013007448 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170328 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20180328 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181002 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180328 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 798814 Country of ref document: AT Kind code of ref document: T Effective date: 20180328 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 798814 Country of ref document: AT Kind code of ref document: T Effective date: 20160511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130328 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180328 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160911 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180328 |
|