EP2836658B1 - Supporting head for the construction of a superstructure - Google Patents

Supporting head for the construction of a superstructure Download PDF

Info

Publication number
EP2836658B1
EP2836658B1 EP13722558.7A EP13722558A EP2836658B1 EP 2836658 B1 EP2836658 B1 EP 2836658B1 EP 13722558 A EP13722558 A EP 13722558A EP 2836658 B1 EP2836658 B1 EP 2836658B1
Authority
EP
European Patent Office
Prior art keywords
slide
beams
heads
supporting
superstructure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP13722558.7A
Other languages
German (de)
French (fr)
Other versions
EP2836658A1 (en
Inventor
Davide PEDRAZZANI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tecnotelai Components Srl
Original Assignee
Tecnotelai Components Srl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tecnotelai Components Srl filed Critical Tecnotelai Components Srl
Publication of EP2836658A1 publication Critical patent/EP2836658A1/en
Application granted granted Critical
Publication of EP2836658B1 publication Critical patent/EP2836658B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/486Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads

Definitions

  • the present invention relates to a supporting head for supporting at least a first and a second beam that are suitable for contributing to the temporary support of a superstructure.
  • the present invention further relates to a method for constructing a floor.
  • the invention has particular application in the construction of concrete or concrete and hollow clay block floors or other forms of floor slabs where it is required to support the structure for a period extending beyond laying.
  • a method for constructing a floor envisages positioning an array of posts, each provided with a supporting head for temporarily supporting a superstructure.
  • this superstructure comprises formwork in which concrete is poured for the construction of the floor slab.
  • Each of said heads is provided with an upper support and a drop-head element.
  • the drop-head element is movable between a raised position and a lowered position.
  • the drop-head element supports beams. When the drop-head element is in the raised position, all of the beams of the head are used, together with the upper support, to prop up the formwork. In the lowered position, the drop-head element determines the dismantlement, from the superstructure, of all the beams of the head (which can thus be removed).
  • the technical task at the basis of the present invention is to propose a supporting head which is capable of offering considerable operating versatility. It is a further object of the present invention to provide an economical and flexible method for constructing a ceiling.
  • the reference number 1 indicates a supporting head of at least a first and a second beam suitable for contributing to the temporary support of a superstructure, in particular a floor under construction.
  • this head is also known as a "drop head”.
  • the head 1 comprises a structure 2 extending upward.
  • the structure 2 comprises at a top thereof a rest 21 suitable for supporting the superstructure 10 at least partially.
  • This rest 21 is also known in the art as a "head plate" and defines a terminal whereupon the superstructure 10 rests.
  • the structure 2 further comprises a base plate 23.
  • the base plate 23 of advantageously comprises a plurality of holes for the passage of connection means through the plate 23, said connection means serving to constrain the plate 23 to an underlying support, typically a post 70.
  • the structure 2 comprises two vertical rods 24, 25 (preferably tubular). The two tubular rods 24, 25 are interposed between the base plate 23 and the rest 21.
  • the structure 2 comprises a spacer 26 which keeps the two rods 24, 25 separate and parallel.
  • the two rods 24, 25 are welded to the base plate 23.
  • the head 1 further comprises a first slide 3 designed to support the first beam 22 and that is movable along said structure 2 at least between a first and a second position. In the first position (see figure 2 or 3 or 5 or 6 ) the first slide 3 is at a greater height than in the second position (see figure 4 or 7 ).
  • the head 1 comprises a second slide 4 that is designed to support the second beam 12.
  • the second slide 4 is movable along said structure 2 at least between a third and a fourth position. In the third position (see figure 2 or 5 ) the second slide 4 is at a greater height than in the fourth position (see figure 3 or 4 or 6 or 7 ).
  • the second slide 4 is movable along said two rods 24, 25.
  • the second slide 4 is below the first slide 3.
  • the first and the second slides 3, 4 are distinct and separate bodies.
  • the head 1 comprises means 5 for supporting the first slide 3 in the first position.
  • the means 5 for supporting the first slide in the first position comprise a locking dowel 500, typically a pin 50.
  • the dowel 500 can be inserted in a first seat 30 made on the first slide 3 and in at least a second seat 22 made on the structure 2 so as to support the first slide 3 in the first position.
  • the second seat 22 is made in one of said two rods 24, 25, whereas another of said two rods 24, 25 comprises a third seat 32.
  • the dowel 500 is inserted in the first, second and third seats 30,22,32.
  • the dowel 500 can be removed from the second and third seats 22, 32 (and advantageously also from the first seat 30) to release the first slide 3 relative to the structure 2, permitting the passage of the first slide 3 from the first to the second position; the expression “permitting the passage” means that the dowel 500, if released from the structure 2, no longer opposes the drop of the first slide 3; in the preferred embodiment, in order for the first slide 3 to actually pass from the first to the second position it is also necessary for the second slide 4 not to be locked in the third position; conveniently, the height at which the first slide is located in the second position is lower than the height at which the second slide is located in the third position (in fact, in the preferred embodiment the first slide 3 cannot be located in the second position if the second slide 4 is located in the third position).
  • the head 1 comprises means 6 for supporting the second slide 4 at least in the third position.
  • the means 6 for supporting the second slide opposes the action of the force of gravity which pushes the second slide downwards, thus blocking the natural movement of the second sliding element.
  • the means 5 for supporting the first slide is constrained to the structure 2.
  • the means 6 for supporting the second slide is constrained to the structure 2.
  • the means 6 for supporting the second slide comprises an element 60, which fits by interference into said structure 2 and supports from below the second slide 4 in the third position.
  • the element 60 which is fit is plate-like and has a first and a second hole 601, 602.
  • the supporting means 5 and/or 6 are removably connectable to the structure 2.
  • Both the first and second holes 601, 602 have two converging limiting walls.
  • One of the two rods 24, 25 is inserted into the first hole and one into the second hole 601, 602.
  • the two rods 24, 25 are fit into the converging zone of the first and second holes 601, 602.
  • the base plate 23 advantageously also comprises one or more protuberances 230 (typically obtained by pressing).
  • the protuberance 230 is a stop for said element 60; the protuberance 230 prevents the element 60, if released from the structure 2, from interfering with the underlying anchorage elements; said anchorage elements are responsible for connecting an end plate of the post and remaining parts of the post; the end plate of the post is the portion of the post upon which the base plate 23 rests.
  • the means 6 for supporting the second slide can be disengaged independently from the engagement of the means 5 for supporting the first slide 3.
  • the means 6 for supporting the second slide can be disengaged even if the means 5 for supporting the first slide 3 is engaged.
  • the head 1 can take on a configuration wherein the means 5 for supporting the first slide performs its support function and the means 6 for supporting the second slide is disengaged (i.e. does not perform its support function). This permits a shifting of the second slide 4 from the third to the fourth position, even in the case in which the first slide 3 remains fixed in the first position.
  • the first and second slides 3, 4 are separate and distinct.
  • the means 5 and the means 6 are also separate and distinct.
  • the first slide 3 comprises a rest zone 31 for the first beam 11.
  • the first slide 3 comprises at least one projecting element intended to fit into the first beam 11 (it preferably comprises a plurality of projecting elements intended to fit into in the first beam 11).
  • projecting elements comprise:
  • the rest zone 31 for the first beam and the rest zone 42 for the second beam are located along two directions rotated by 90°.
  • the rest zone 31 for the first beam and the rest zone 33 for the third beam are reciprocally opposite relative to the structure 2.
  • the rest zone 44 for the fourth beam and the rest zone 42 for the second beam are reciprocally opposite relative to the structure 2.
  • the structure 2 is thus interposed between the zones 31 and 33.
  • Analogously, the structure 2 is interposed between the zones 42 and 44.
  • the first slide 3 provides and completely surrounds at least a first opening 34 for the passage of the structure 2; the second slide 4 provides and completely surrounds at least a second opening 41 for the passage of the structure 2 (in particular, the second opening 41 coincides with said first or said second hole 601, 602).
  • the present invention further relates to a kit comprising (see figures 8 and 9 ):
  • the appendage 71 projects in a distancing direction from head 1.
  • the appendage 71 comprises a support 72 in turn comprising at its upper end gripping means (for example a clip 73) for gripping a beam (in particular the above-specified first or second beam 11, 12).
  • the gripping means are elastically returned.
  • the clip 73 comprises an elastic spring 86 which tends to tighten two arms of said clip 73.
  • the appendage 71 (typically via the gripping means) is suitable for defining an additional rest point for the first or the second beam 11, 12.
  • the support 72 is adjustable in height.
  • the appendage 71 is used above all whenever the first or the second beam is projecting or more in general to better stabilize it.
  • the kit 1 also comprises the post 70 below the head 1.
  • the appendage 71 comprises a clamp 87 which traps the base plate 23 and an upper plate of the post 70 (which are inserted and remain interposed between two parts of the clamp).
  • the upper plate of the post was previously also defined as "end plate" of the post.
  • the present invention also relates to a shoring framework 100 for constructing a floor.
  • the floor can for example be a concrete floor slab as indicated, for example, in figure 11 or 12 , or else it could be made of concrete and clay blocks as indicated, for example, in figure 13 .
  • Said shoring framework 100 comprises a group of posts 70 and heads 1, each head 1 topping a corresponding post 70 and having one or more of the previously described features.
  • the shoring framework 100 in particular comprises a first group of beams, each beam of said first group extending between a pair of said heads 1.
  • the beams of the first group comprise:
  • the first and the second set of beams support the weight of a superstructure 10.
  • the superstructure 10 comprises a formwork (the formwork usually includes a set of panels on the inside of which concrete is poured).
  • the shoring framework 100 comprises walkway platforms 76 set by side; for example, said platforms 76 enable an operator to work more comfortably and in complete safety during the construction of the superstructure 10.
  • the platforms 70 are supported or constrained to the beams of the second set.
  • the beams of the first set extend along a first direction 74
  • the beams of the second set extend along a second direction 75 extend first direction 74.
  • the superstructure comprises hollow blocks having a preponderant direction of extension parallel to the second direction 75.
  • Said shoring framework 100 takes on at least:
  • the shoring framework 100 takes on a third configuration wherein the heads 1 have the first and the second slide 3, 4 respectively in the second and in the fourth position and wherein the beams of the first set are distanced from the superstructure and removable.
  • the heads 1 In the third configuration, the heads 1 have the rest 21 which supports the superstructure 10.
  • the user has utmost versatility of use.
  • the first and the second slide 3,4 of the heads 1 are respectively in the first and in the third position.
  • the user can choose between two options described here below.
  • a first option envisages that the operator decides that the support provided by the beams that rest on the first slide 3 of the heads 1 is sufficient on its own; consequently, the beams set on the second slide 4 of the various heads 1 can be lowered.
  • this operation could be carried out immediately after pouring the concrete which contributes to defining the superstructure.
  • the beams that rest on the first slide 3 of the various heads 1 can be removed and those beams can be reused in another area of the building site.
  • the walkway platforms 76 are also freed and can thus be reused.
  • the superstructure will thus be supported only by the top rests 21 of the heads 1 and by the beams that rest on the first slide 3 of the various heads 1 (advantageously the beams that rest on the first slide 3 of the various heads can be removed after complete curing of the concrete; in the case of a concrete and hollow clay block ceiling, this usually takes place around 28 days after laying).
  • a second option envisages that the user decides at a certain point of the work that it is possible to simultaneously remove the beams that rest both on the first and on the second slide 3, 4 of each head 1. Consequently, it is possible to lower both the first and the second slide of each head 1.
  • the floor slab is instead made solely of concrete, given the greater weight thereof it could be decided to keep all the beams erected until the concrete is completely cured.
  • At least one of the beams used has a profile having an "upside-down T" shaped cross section (see figure 10 ). What is described with reference to said "upside-down T" shaped beam can be advantageously repeated for a plurality of said beams, preferably for all the beams.
  • said beam is hollow at least at the ends.
  • the "upside-down T" shaped beam has a section having a base 81 and a stem 82; the stem 82 projects upward from the base 81, in a distancing direction from the base 81.
  • said beam comprises a protuberance 83 for coupling to the walkway platform 76; said protuberance 83 projects upwards from the base 81.
  • Said protuberance 83 is positioned beside the stem 82.
  • the base 81 has two edges 84,85 which converge toward the inside of the base 81 and are inclined relative to the horizontal plane, preferably by an angle of 8.21°. This serves to improve the gripping action by the appendage 71.
  • the present invention also relates to a method for constructing a floor.
  • Said method comprises a stage of positioning a network of temporary posts 70 and heads; each of said heads being placed at the top of a corresponding post and having one or more of the above-specified features; the posts of the network are in a vertical position.
  • the method further comprises a stage of positioning a plurality of beams, oriented according to a first and a second direction 74, 75 on pairs of said heads.
  • the first and the second direction 74, 75 are reciprocally perpendicular.
  • the beams extending along the first direction 74 rest on the first slide 3 of said heads 1.
  • the beams extending along the second direction 75 rest on the second slide 4 of said heads 1.
  • the method further envisages applying a superstructure 10 above said beams.
  • the superstructure 10 can comprise formwork intended to receive the poured concrete.
  • the stage of applying the superstructure 10 comprises the stage of resting a set of walkway platforms 76 on the beams extending along the second direction 75.
  • the formwork is placed above said platforms.
  • the method can further comprise the stages of:
  • the stage of lowering the second slide 4 causes the lowering of said platforms 76 which, disengaged from the remaining parts of the superstructure 10, can be removed. At least a part of said superstructure is thus destined to remain incorporated in the ceiling; at least a part of said superstructure can be removed after the ceiling is completed.
  • the invention thus conceived enables a number of advantages to be obtained.
  • the invention offers the user the option of dismantling only some of the beams, leaving others in place; this makes it possible to limit costs.
  • the dismantled beams can be reused in another area of the building site (and therefore a smaller number of beams will be necessary overall because some can be reused).

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Bridges Or Land Bridges (AREA)

Description

    Technical field
  • The present invention relates to a supporting head for supporting at least a first and a second beam that are suitable for contributing to the temporary support of a superstructure. The present invention further relates to a method for constructing a floor. The invention has particular application in the construction of concrete or concrete and hollow clay block floors or other forms of floor slabs where it is required to support the structure for a period extending beyond laying.
  • State of the art
  • A method for constructing a floor is known. It envisages positioning an array of posts, each provided with a supporting head for temporarily supporting a superstructure. In particular, this superstructure comprises formwork in which concrete is poured for the construction of the floor slab. Each of said heads is provided with an upper support and a drop-head element. The drop-head element is movable between a raised position and a lowered position. The drop-head element supports beams. When the drop-head element is in the raised position, all of the beams of the head are used, together with the upper support, to prop up the formwork. In the lowered position, the drop-head element determines the dismantlement, from the superstructure, of all the beams of the head (which can thus be removed).
  • DE 10135664 already discloses a head with all the features of the preamble of claim 1.
  • Object of the invention
  • In this context, the technical task at the basis of the present invention is to propose a supporting head which is capable of offering considerable operating versatility. It is a further object of the present invention to provide an economical and flexible method for constructing a ceiling.
  • Brief description of the drawings
  • The stated technical task and specified objects are substantially achieved by a supporting head and a method comprising the technical features disclosed in one or more of the appended claims.
  • Additional features and advantages of the present invention will be more apparent from the approximate, and hence non-limiting, description of a preferred but not exclusive embodiment of a supporting head illustrated in the appended drawings, in which:
    • figure 1 shows an exploded view of the head according to the present invention;
    • figures 2, 3, 4 show perspective views of the head according to the present invention in three different configurations;
    • figures 5, 6, 7 show perspective views, in three different configurations, of a part of shoring framework comprising a head according to the present invention;
    • figures 8 and 9 show components of a kit comprising a head according to the present invention;
    • figure 10 shows a cross section view of a beam used in figures 5, 6, 7;
    • figures 11 and 12 show a first embodiment of a shoring framework comprising a head according to the present invention;
    • figure 13 shows a second embodiment of a shoring framework comprising a head according to the present invention.
    Detailed description of preferred embodiments of the invention
  • In the appended figures, the reference number 1 indicates a supporting head of at least a first and a second beam suitable for contributing to the temporary support of a superstructure, in particular a floor under construction. In the art this head is also known as a "drop head".
  • The head 1 comprises a structure 2 extending upward. Conveniently, the structure 2 comprises at a top thereof a rest 21 suitable for supporting the superstructure 10 at least partially. This rest 21 is also known in the art as a "head plate" and defines a terminal whereupon the superstructure 10 rests.
  • The structure 2 further comprises a base plate 23. The base plate 23 of advantageously comprises a plurality of holes for the passage of connection means through the plate 23, said connection means serving to constrain the plate 23 to an underlying support, typically a post 70. Conveniently, the structure 2 comprises two vertical rods 24, 25 (preferably tubular). The two tubular rods 24, 25 are interposed between the base plate 23 and the rest 21. Conveniently, the structure 2 comprises a spacer 26 which keeps the two rods 24, 25 separate and parallel. Advantageously, the two rods 24, 25 are welded to the base plate 23.
  • The head 1 further comprises a first slide 3 designed to support the first beam 22 and that is movable along said structure 2 at least between a first and a second position. In the first position (see figure 2 or 3 or 5 or 6) the first slide 3 is at a greater height than in the second position (see figure 4 or 7).
  • The head 1 comprises a second slide 4 that is designed to support the second beam 12. The second slide 4 is movable along said structure 2 at least between a third and a fourth position. In the third position (see figure 2 or 5) the second slide 4 is at a greater height than in the fourth position (see figure 3 or 4 or 6 or 7). In particular, the second slide 4 is movable along said two rods 24, 25. The second slide 4 is below the first slide 3. The first and the second slides 3, 4 are distinct and separate bodies.
  • Conveniently, the head 1 comprises means 5 for supporting the first slide 3 in the first position.
  • The means 5 for supporting the first slide in the first position comprise a locking dowel 500, typically a pin 50. In the preferred embodiment the dowel 500 can be inserted in a first seat 30 made on the first slide 3 and in at least a second seat 22 made on the structure 2 so as to support the first slide 3 in the first position. Preferably, the second seat 22 is made in one of said two rods 24, 25, whereas another of said two rods 24, 25 comprises a third seat 32. In a locked configuration of the first slide 3, the dowel 500 is inserted in the first, second and third seats 30,22,32.
  • Preferably, the dowel 500 can be removed from the second and third seats 22, 32 (and advantageously also from the first seat 30) to release the first slide 3 relative to the structure 2, permitting the passage of the first slide 3 from the first to the second position; the expression "permitting the passage" means that the dowel 500, if released from the structure 2, no longer opposes the drop of the first slide 3; in the preferred embodiment, in order for the first slide 3 to actually pass from the first to the second position it is also necessary for the second slide 4 not to be locked in the third position; conveniently, the height at which the first slide is located in the second position is lower than the height at which the second slide is located in the third position (in fact, in the preferred embodiment the first slide 3 cannot be located in the second position if the second slide 4 is located in the third position).
  • The head 1 comprises means 6 for supporting the second slide 4 at least in the third position. The means 6 for supporting the second slide opposes the action of the force of gravity which pushes the second slide downwards, thus blocking the natural movement of the second sliding element. The means 5 for supporting the first slide is constrained to the structure 2. The means 6 for supporting the second slide is constrained to the structure 2.
  • The means 6 for supporting the second slide comprises an element 60, which fits by interference into said structure 2 and supports from below the second slide 4 in the third position. In particular, the element 60 which is fit is plate-like and has a first and a second hole 601, 602. The supporting means 5 and/or 6 are removably connectable to the structure 2.
  • Both the first and second holes 601, 602 have two converging limiting walls. One of the two rods 24, 25 is inserted into the first hole and one into the second hole 601, 602. To support the second slide 4 in the third position, the two rods 24, 25 are fit into the converging zone of the first and second holes 601, 602. In this manner the element 60 is locked relative to the structure 2 and can thus support the second slide 4 above it. When the element 60 is released, the second slide 4 will drop due to gravity (moving toward the base plate 23). Conveniently, when the element 60 is released from the structure 2, it too will drop due to gravity. In particular, the base plate 23 advantageously also comprises one or more protuberances 230 (typically obtained by pressing). The protuberance 230 is a stop for said element 60; the protuberance 230 prevents the element 60, if released from the structure 2, from interfering with the underlying anchorage elements; said anchorage elements are responsible for connecting an end plate of the post and remaining parts of the post; the end plate of the post is the portion of the post upon which the base plate 23 rests.
  • Conveniently, the means 6 for supporting the second slide can be disengaged independently from the engagement of the means 5 for supporting the first slide 3. Practically speaking, the means 6 for supporting the second slide can be disengaged even if the means 5 for supporting the first slide 3 is engaged. The head 1 can take on a configuration wherein the means 5 for supporting the first slide performs its support function and the means 6 for supporting the second slide is disengaged (i.e. does not perform its support function). This permits a shifting of the second slide 4 from the third to the fourth position, even in the case in which the first slide 3 remains fixed in the first position. The first and second slides 3, 4 are separate and distinct. The means 5 and the means 6 are also separate and distinct.
  • In the preferred embodiment the first slide 3 comprises a rest zone 31 for the first beam 11. In particular, in the zone 31 the first slide 3 comprises at least one projecting element intended to fit into the first beam 11 (it preferably comprises a plurality of projecting elements intended to fit into in the first beam 11). For example, such projecting elements comprise:
    • a lower tooth 88, designed to fit into a lower groove of the first beam; and/or
    • two protrusions 89, 90 side by side which fit into an end opening of the first beam 11, preventing the first beam 11 from shifting horizontally and perpendicularly to the preponderant line of extension of the first beam 11. Conveniently, the first slide 3 comprises a rest zone 33 for a third beam 13. The second slide 4 comprises a rest zone 42 for the second beam 12. Preferably the second slide 4 comprises a rest zone 44 for a fourth beam 14.
  • Starting from an axis 20 wherealong said structure 2 extends, the rest zone 31 for the first beam and the rest zone 42 for the second beam are located along two directions rotated by 90°.
  • What has been described with reference to the projecting elements of the first slide 3 in the zone 31 can be repeated for projecting elements situated in the zone 33 (in such a case the projecting elements will interact with the third beam 13). What has been described with reference to the projecting elements of the first slide 3 can be repeated for the second slide 4 (in such a case the projecting elements will be in the zone 42 and/or 44 and will interact respectively with the second and/or the fourth beam 12, 14).
  • The rest zone 31 for the first beam and the rest zone 33 for the third beam are reciprocally opposite relative to the structure 2. The rest zone 44 for the fourth beam and the rest zone 42 for the second beam are reciprocally opposite relative to the structure 2. The structure 2 is thus interposed between the zones 31 and 33. Analogously, the structure 2 is interposed between the zones 42 and 44.
  • The first slide 3 provides and completely surrounds at least a first opening 34 for the passage of the structure 2; the second slide 4 provides and completely surrounds at least a second opening 41 for the passage of the structure 2 (in particular, the second opening 41 coincides with said first or said second hole 601, 602).
  • The present invention further relates to a kit comprising (see figures 8 and 9):
    • a head 1 having one or more of the above-specified features;
    • an appendage 71 hooked with the head 1 and/or hookable with a post 70 below the head 1.
  • The appendage 71 projects in a distancing direction from head 1. Conveniently, the appendage 71 comprises a support 72 in turn comprising at its upper end gripping means (for example a clip 73) for gripping a beam (in particular the above-specified first or second beam 11, 12). As can be seen in figure 8, the gripping means are elastically returned. In particular, the clip 73 comprises an elastic spring 86 which tends to tighten two arms of said clip 73. The appendage 71 (typically via the gripping means) is suitable for defining an additional rest point for the first or the second beam 11, 12. Preferably the support 72 is adjustable in height.
  • The appendage 71 is used above all whenever the first or the second beam is projecting or more in general to better stabilize it. In the preferred embodiment the kit 1 also comprises the post 70 below the head 1. The appendage 71 comprises a clamp 87 which traps the base plate 23 and an upper plate of the post 70 (which are inserted and remain interposed between two parts of the clamp). The upper plate of the post was previously also defined as "end plate" of the post.
  • The present invention also relates to a shoring framework 100 for constructing a floor. By way of non-limiting example, the floor can for example be a concrete floor slab as indicated, for example, in figure 11 or 12, or else it could be made of concrete and clay blocks as indicated, for example, in figure 13.
  • Said shoring framework 100 comprises a group of posts 70 and heads 1, each head 1 topping a corresponding post 70 and having one or more of the previously described features. The shoring framework 100 in particular comprises a first group of beams, each beam of said first group extending between a pair of said heads 1.
  • In particular the beams of the first group comprise:
    • a first set of beams that rest on the first slide 3 of the heads 1; and
    • a second set of beams that rest on the second slide 4 of the heads 1. The beams of the first set do not rest on the second slide 4. The beams of the second set do not rest on the first slide 3. Conveniently, the first beam 11 belongs to the first set of beams and the second beam 12 belongs to the second set.
  • The first and the second set of beams support the weight of a superstructure 10. Typically, the superstructure 10 comprises a formwork (the formwork usually includes a set of panels on the inside of which concrete is poured). Moreover, the shoring framework 100 comprises walkway platforms 76 set by side; for example, said platforms 76 enable an operator to work more comfortably and in complete safety during the construction of the superstructure 10. The platforms 70 are supported or constrained to the beams of the second set.
  • Conveniently, the beams of the first set extend along a first direction 74, whereas the beams of the second set extend along a second direction 75 extend first direction 74. Advantageously, in concrete and hollow clay block floors the superstructure comprises hollow blocks having a preponderant direction of extension parallel to the second direction 75. Said shoring framework 100 takes on at least:
    • a first configuration wherein the heads 1 have the first slide 3 in the first position and the second slide 4 in the third position and wherein the beams of the first and of the second set determine a rest plane of a superstructure 10;
    • a second configuration wherein the heads have the first slide 3 in the first position and the second slide 4 in the fourth position and wherein the beams of the first set support at least partially the superstructure 10,
    whereas the beams of the second set and said walkway platforms 76 are distanced from the superstructure 10 and thus removable.
  • Conveniently, the shoring framework 100 takes on a third configuration wherein the heads 1 have the first and the second slide 3, 4 respectively in the second and in the fourth position and wherein the beams of the first set are distanced from the superstructure and removable. In the third configuration, the heads 1 have the rest 21 which supports the superstructure 10.
  • In this manner, the user has utmost versatility of use. At the moment of construction of the superstructure 10, the first and the second slide 3,4 of the heads 1 are respectively in the first and in the third position. Subsequently, the user can choose between two options described here below. A first option envisages that the operator decides that the support provided by the beams that rest on the first slide 3 of the heads 1 is sufficient on its own; consequently, the beams set on the second slide 4 of the various heads 1 can be lowered. In the case of a concrete and hollow clay block ceiling, this operation could be carried out immediately after pouring the concrete which contributes to defining the superstructure. In this manner, the beams that rest on the first slide 3 of the various heads 1 can be removed and those beams can be reused in another area of the building site. Moreover, in this manner the walkway platforms 76 are also freed and can thus be reused. The superstructure will thus be supported only by the top rests 21 of the heads 1 and by the beams that rest on the first slide 3 of the various heads 1 (advantageously the beams that rest on the first slide 3 of the various heads can be removed after complete curing of the concrete; in the case of a concrete and hollow clay block ceiling, this usually takes place around 28 days after laying).
  • Alternatively, a second option envisages that the user decides at a certain point of the work that it is possible to simultaneously remove the beams that rest both on the first and on the second slide 3, 4 of each head 1. Consequently, it is possible to lower both the first and the second slide of each head 1.
  • For example, in the case of a concrete and hollow clay block ceiling, given the lighter weight thereof, it possible to dismantle the beams that rest on the second slide 4 of the heads 1 a few hours after the concrete has been laid; in the meantime, however, the beams that rest on the first slide 3 of the heads 1 will remain erected for an additional period of time.
  • If the floor slab is instead made solely of concrete, given the greater weight thereof it could be decided to keep all the beams erected until the concrete is completely cured.
  • Advantageously, at least one of the beams used has a profile having an "upside-down T" shaped cross section (see figure 10). What is described with reference to said "upside-down T" shaped beam can be advantageously repeated for a plurality of said beams, preferably for all the beams.
  • Advantageously, said beam is hollow at least at the ends.
  • Conveniently, the "upside-down T" shaped beam has a section having a base 81 and a stem 82; the stem 82 projects upward from the base 81, in a distancing direction from the base 81. Advantageously, said beam comprises a protuberance 83 for coupling to the walkway platform 76; said protuberance 83 projects upwards from the base 81. Said protuberance 83 is positioned beside the stem 82. Conveniently, the base 81 has two edges 84,85 which converge toward the inside of the base 81 and are inclined relative to the horizontal plane, preferably by an angle of 8.21°. This serves to improve the gripping action by the appendage 71.
  • The present invention also relates to a method for constructing a floor. Said method comprises a stage of positioning a network of temporary posts 70 and heads; each of said heads being placed at the top of a corresponding post and having one or more of the above-specified features; the posts of the network are in a vertical position.
  • The method further comprises a stage of positioning a plurality of beams, oriented according to a first and a second direction 74, 75 on pairs of said heads. The first and the second direction 74, 75 are reciprocally perpendicular.
  • The beams extending along the first direction 74 rest on the first slide 3 of said heads 1. The beams extending along the second direction 75 rest on the second slide 4 of said heads 1.
  • The method further envisages applying a superstructure 10 above said beams.
  • The superstructure 10 can comprise formwork intended to receive the poured concrete. The stage of applying the superstructure 10 comprises the stage of resting a set of walkway platforms 76 on the beams extending along the second direction 75. The formwork is placed above said platforms.
  • The method can further comprise the stages of:
    • lowering the second slide 4 of the heads per so as to disengage the beams extending along the second direction 75 from the superstructure 10;
    • keeping the first slide 3 of the heads in the first position for an additional period of time, so that the beams extending along the first direction 74 remain further as support for the superstructure 10.
  • The stage of lowering the second slide 4 causes the lowering of said platforms 76 which, disengaged from the remaining parts of the superstructure 10, can be removed. At least a part of said superstructure is thus destined to remain incorporated in the ceiling; at least a part of said superstructure can be removed after the ceiling is completed.
  • The invention thus conceived enables a number of advantages to be obtained.
  • In particular, it allows the user utmost operating flexibility, meeting the plurality of needs that may present themselves from one occasion to the next. In particular, the invention offers the user the option of dismantling only some of the beams, leaving others in place; this makes it possible to limit costs. In fact, the dismantled beams can be reused in another area of the building site (and therefore a smaller number of beams will be necessary overall because some can be reused).
  • The invention thus conceived is susceptible of numerous modifications and variants, all falling within the scope of the inventive concept that characterises it. Moreover, all the details may be replaced with technically equivalent ones. In practice, all of the materials used, as well as the dimensions, can be any whatsoever according to need.

Claims (10)

  1. A supporting head for supporting at least a first and second beam that are suitable for contributing to the temporary support of a superstructure, particularly a floor under construction, the head (1) comprising:
    - a structure (2) extending upward with a head plate (21) at the top thereof defining a terminal where upon the superstructure rents;
    - a first slide (3) designed to support the first beam and that is movable along said structure (2) at least between a first and a second position; in the first position, the first slide (3) being located at a greater height than in the second position;
    - means (5) for supporting the first slide in the first position;
    - a second slide (4) that is: designed to support the second beam, below the first slide (3) and that is movable along said structure (2) at least between a third and a fourth position; in the third position, the second slide (4) being located at a greater height than in the fourth position;
    - means (6) for supporting the second slide (4) at least in the third position; the head being able to take on a configuration wherein the means (5) for supporting the first slide performs its support function and the means (6) for supporting the second slide is disengaged, thereby permitting a shifting of the second slide (4) from the third to the fourth position, even in the case in which the first slide (3) remains fixed in the first position;
    characterized in that
    the means (5) for supporting the first slide in the first position and the means (6) for supporting the second slide in the third position are separate and distinct.
  2. The head according to claim 1, characterized in that the means (5) for supporting the first slide comprises a pin (50):
    - that can be inserted in a first seat (30) made on the first slide (3) and in a second seat (22) made on the structure (2) so as to support the first slide (3) in the first position;
    - that can be removed from the first and the second seat (30, 22) so as to release the first slide (3) with respect to the structure (2), permitting the passage of the first slide (3) from the first position to the second.
  3. The head according to claim 1 or 2, characterized in that the means (6) for supporting the second slide comprises an element (60) that fits by interference into said structure (2) and that supports from below the second slide (4) in the third position.
  4. The head according to claim 1, 2 or 3, characterized in that the first slide (3) comprises a rest zone (31) for the first beam; the second slide (4) comprising a rest zone (42) for the second beam; starting from an axis (20) wherealong said structure (2) extends, the rest zone (31) for the first beam and the rest zone (42) for the second beam are located along two directions rotated by 90°.
  5. The head according to claim 1, 2 or 3, characterized in that the first slide (3) comprises a rest zone (31) for the first beam and a rest zone (33) for a third beam, the rest zone (31) for the first beam and the rest zone (33) for the third beam being reciprocally opposite with respect to the structure (2); the second slide (4) comprising a rest zone (42) for the second beam and a rest zone (44) for a fourth beam, the rest zone (44) for the fourth beam and the rest zone (42) for the second beam being reciprocally opposite with respect to the structure (2).
  6. The head according to any one of the preceding claims, characterized in that the first slide (3) provides and completely surrounds a first opening (34) for the passage of the structure (2); the second slide (4) provides and completely surrounds a second opening (41) for the passage of the structure (2).
  7. A kit characterized in that it comprises:
    - a head (1) according to any one of claims 1 to 6;
    - an appendage (71) hooked with the head (1) and/or hookable with a supporting post (70) for supporting the head (1), said appendage (71) projecting in a distancing direction from the head (1);
    said appendage (71) comprising a support (72) that is adjustable in height and in turn comprising at the upper end a clip (73) suitable for gripping the first or second beam (11, 12), said appendage (71) being suitable for defining an additional rest point for the first or the second beam (11, 12).
  8. A shoring framework for the construction of a ceiling and characterized in that it comprises:
    - a group of supporting posts (70) and heads (1), each of said heads (1) topping a corresponding supporting post (70) and being in accordance with one or more of claims 1 to 6;
    - a first group of beams, each beam of said first group extending between a pair of said heads; the beams of the first group comprising a first set of beams that rest on the first slide (3) of the heads (1) and a second set of beams that rest on the second slide (4) of the heads (1);
    the beams of the first set extending along a first direction (74), and the beams of the second set extending along a second direction (75) perpendicular to the first direction (74);
    - platforms (76) that are walkways and supported or constrained to the beams of the second set;
    said shoring framework taking on at least:
    - a first configuration wherein the heads have the first slide (3) in the first position, the second slide (4) in the third position and wherein the beams of the first and second set determine a rest plane of a superstructure;
    - a second configuration wherein the heads have the first slide (3) in the first position, the second slide (4) in the fourth position and wherein the beams of the first set support at least partially the superstructure (10), whereas the beams of the second set and said walkway platforms (76) are distanced from the superstructure (10) with respect to the first configuration and are thus removable.
  9. A method for constructing a floor comprising the stages of:
    - positioning a network of temporary supporting posts (70) and a group of heads, each of said heads being in accordance with any one of claims 1 to 6; each head of said group being placed at the top of a corresponding supporting post (70);
    - positioning a plurality of beams oriented according to a first and a second direction (74, 75) on pairs of said heads, said first and second direction (74, 75) being reciprocally perpendicular; the beams extending along the first direction (74) resting on the first slide (3) of said heads (1), the beams extending along the second direction (75) resting on the second slide (4) of said heads;
    - applying a superstructure (10) above said beams, at least a part of said superstructure being intended to be part of the ceiling;
    - lowering the second slide (4) of the heads so as to disengage the beams extending along the second direction (75) from the superstructure (10);
    - keeping the first slide (3) of the heads in the first position for an additional period of time, so that the beams extending along the first direction (74) remain further as support for the superstructure (10).
  10. The method according to claim 9, characterized in that the stage of applying the superstructure (10) comprises the stage of resting a set of walkway platforms (76) on the beams extending along the second direction (75), the stage of lowering the second slide (4) determining the lowering of said platforms (76), which, once disengaged from the remaining parts of the superstructure (10), can be removed.
EP13722558.7A 2012-04-11 2013-03-28 Supporting head for the construction of a superstructure Active EP2836658B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT000022A ITPR20120022A1 (en) 2012-04-11 2012-04-11 SUPPORT HEAD FOR THE REALIZATION OF A SUPERSTRUCTURE
PCT/IB2013/052522 WO2013153478A1 (en) 2012-04-11 2013-03-28 Supporting head for the construction of a superstructure

Publications (2)

Publication Number Publication Date
EP2836658A1 EP2836658A1 (en) 2015-02-18
EP2836658B1 true EP2836658B1 (en) 2016-05-11

Family

ID=46028076

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13722558.7A Active EP2836658B1 (en) 2012-04-11 2013-03-28 Supporting head for the construction of a superstructure

Country Status (7)

Country Link
EP (1) EP2836658B1 (en)
ES (1) ES2586725T3 (en)
IT (1) ITPR20120022A1 (en)
MA (1) MA20150064A1 (en)
PL (1) PL2836658T3 (en)
WO (1) WO2013153478A1 (en)
ZA (1) ZA201407333B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2014215950B2 (en) * 2014-08-19 2019-09-19 Form 700 Pty Ltd Concrete formwork and a formwork support bracket
ITUB20159267A1 (en) * 2015-12-22 2017-06-22 Tecnotelai Componenets S R L Support head of at least one beam and method of connecting the beam to the head
US10053877B2 (en) * 2016-09-19 2018-08-21 Michael L. Lenkin Adjustable support device and shoring system
DE102018203873A1 (en) * 2018-03-14 2019-09-19 Peri Gmbh Formwork carrier assembly

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1166867A (en) * 1981-07-22 1984-05-08 Robert K. Gregory Adjustable release stringer shore head with integral load carrying stringer

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2099902A (en) * 1981-06-08 1982-12-15 Acrow Eng Ltd Drop head for formwork prop
DE3215002A1 (en) * 1982-04-22 1983-10-27 Emil Steidle Gmbh & Co, 7480 Sigmaringen CONSTRUCTION SUPPORT
DE10135664B4 (en) * 2001-07-21 2008-06-26 HĂĽnnebeck GmbH Support for slab formwork od. Like.
BRPI0520046A2 (en) * 2005-02-23 2009-12-01 Ulma C Y E S Coop perimeter frame system and assembly and disassembly process for a perimeter frame system
DE102010001042B4 (en) * 2010-01-20 2012-03-01 Doka Industrie Gmbh Drop head for a slab formwork system and slab formwork system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1166867A (en) * 1981-07-22 1984-05-08 Robert K. Gregory Adjustable release stringer shore head with integral load carrying stringer

Also Published As

Publication number Publication date
MA20150064A1 (en) 2015-02-27
ZA201407333B (en) 2016-05-25
PL2836658T3 (en) 2016-12-30
ITPR20120022A1 (en) 2013-10-12
WO2013153478A1 (en) 2013-10-17
ES2586725T3 (en) 2016-10-18
EP2836658A1 (en) 2015-02-18

Similar Documents

Publication Publication Date Title
EP3652394B1 (en) Method of installing a formwork support system, formwork support system and longitudinal beam
US10407925B2 (en) Method of installing a formwork support system, formwork support system and longitudinal beam
CN212453615U (en) Formwork support system
US8673189B2 (en) Method for implementing a rail-guided self-climbing formwork system with climbing rail extension pieces
EP2836658B1 (en) Supporting head for the construction of a superstructure
EP2880228B1 (en) Scaffold structure
BR9711314A (en) Demountable facade scaffolding, and processes for the assembly and disassembly of said scaffolding.
US8632056B1 (en) Safety rail system
KR102049630B1 (en) Scaffolding equipment for aggregate smokestack dismantling and dismantling method for aggregate smokestack using same equipment
KR20060115444A (en) Movable concrete form and multi-level construction method using the same
KR20230066338A (en) Formwork system and method
KR100570261B1 (en) Temporary bracket for construction of steel bridge and the installation method using the same
KR102534830B1 (en) PIT floor multi support system and PIT floor construction method using the same
CN217975308U (en) Base platform of movable scaffold
CA2650278A1 (en) Spring assembly for reshore posts
KR200408920Y1 (en) The one body puncheons for bridge construction
KR20070041669A (en) A slab formwork system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140926

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIN1 Information on inventor provided before grant (corrected)

Inventor name: PEDRAZZANI, DAVIDE

17Q First examination report despatched

Effective date: 20150904

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20151118

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 798814

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160515

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013007448

Country of ref document: DE

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20160511

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2586725

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20161018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160811

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160912

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160812

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602013007448

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20170214

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20170330

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20170324

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20170531

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20171130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170328

Ref country code: RO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160511

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170328

REG Reference to a national code

Ref country code: BE

Ref legal event code: FP

Effective date: 20160804

Ref country code: BE

Ref legal event code: MM

Effective date: 20170331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170328

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602013007448

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170328

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180328

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 798814

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180328

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 798814

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20130328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180328

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160911

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180328

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20230420

Year of fee payment: 11

Ref country code: CH

Payment date: 20230405

Year of fee payment: 11