EP2823140B1 - Method for zone isolation in a subterranean well - Google Patents
Method for zone isolation in a subterranean well Download PDFInfo
- Publication number
- EP2823140B1 EP2823140B1 EP13757768.0A EP13757768A EP2823140B1 EP 2823140 B1 EP2823140 B1 EP 2823140B1 EP 13757768 A EP13757768 A EP 13757768A EP 2823140 B1 EP2823140 B1 EP 2823140B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- well
- pipe body
- zone
- plug
- accordance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 49
- 238000002955 isolation Methods 0.000 title claims description 9
- 238000004519 manufacturing process Methods 0.000 claims description 42
- 239000012530 fluid Substances 0.000 claims description 37
- 238000005406 washing Methods 0.000 claims description 33
- 230000015572 biosynthetic process Effects 0.000 claims description 29
- 239000000463 material Substances 0.000 claims description 15
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 12
- 239000004568 cement Substances 0.000 claims description 8
- 229930195733 hydrocarbon Natural products 0.000 claims description 4
- 150000002430 hydrocarbons Chemical class 0.000 claims description 4
- 238000005086 pumping Methods 0.000 claims description 4
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims description 3
- 239000003208 petroleum Substances 0.000 claims description 3
- 239000004215 Carbon black (E152) Substances 0.000 claims description 2
- 239000002002 slurry Substances 0.000 claims description 2
- 230000004888 barrier function Effects 0.000 description 7
- 238000004140 cleaning Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 1
- 238000003801 milling Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B37/00—Methods or apparatus for cleaning boreholes or wells
- E21B37/08—Methods or apparatus for cleaning boreholes or wells cleaning in situ of down-hole filters, screens, e.g. casing perforations, or gravel packs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/11—Perforators; Permeators
Definitions
- the invention relates to a method for zone isolation in a subterranean producing well. More specifically, the invention relates to a method in which a balanced plug is established over a longitudinal section and in the entire cross section of the well to prevent undesired production from a reservoir.
- Isolation between zones in different production intervals is essential to be able to control and optimize the production from a subterranean well, such as a petroleum well or a geothermal well.
- a subterranean well such as a petroleum well or a geothermal well.
- the fluid flows within the reservoir may change so that the production decreases or, at worst, comes to a halt.
- the interface between water and oil may gradually be draw upwards and enter the producing zone, so-called coning, so that a flow of water completely or partially replaces the flow of hydrocarbons into the production string of the well. Gas coning may also occur.
- Barriers intended to prevent undesired fluid flows between different zones of a reservoir are subjected to great strains, in the form of powerful pressures and temperature differences among other things, hence intense tension and stress forces. It is known that this may result in damage to a cement barrier so that the integrity of the barrier is ruined. This may result in undesired fluid production behind casing and casing liners, among other things, and could further reduce or, at worst, make further production from the well impossible.
- the invention has for its object to remedy or reduce at least one of the drawbacks of the prior art, or at least to provide a useful alternative to the prior art.
- a method for zone isolation in a subterranean producing well is disclosed, the method preventing fluid flow between a formation zone, from which undesired fluids are entering and flowing in the well, and a production zone located at a distance from said formation zone, the well being provided with a pipe body, at least in a portion of the well, the method including the following steps:
- the pipe body may be, for example, a casing or a casing liner of types known per se and the pipe body may be part of a longer pipe string.
- the surrounding well body may be another pipe body, or it may be the formation itself.
- a well plug may be established by means of a method and devices as proposed in Norwegian patent application 20111641 entitled “Method for combined cleaning and plugging in a well, washing tool for directional washing in a well, and use of the washing tool", and by means of Norwegian patent application 20120099 entitled “Apparatus and method for positioning of a fluidized plugging material in an oil well or gas well", both filed in the name of the present applicant.
- the perforation tool may be a perforation gun of a type known per se.
- the perforation may be carried out in an undamaged/un-perforated portion of the pipe body or in an already perforated portion of the pipe body if the number, distribution and design of the perforations are not sufficient to ensure good circulation for subsequent washing and plugging.
- a preferred distribution of the perforations in the pipe body may be in the order of 40 perforations per meter (12 perforations per foot) in a 135/45 degrees' phase within said longitudinal section.
- the method includes providing one or more new perforations in a portion of the pipe body located outside the longitudinal section in which the plug has been set, thereby allowing production from said production zone. This may be necessary if, for example, existing production perforations have been blocked or closed off from the rest of the well in connection with the zone isolation.
- the longitudinal section may be located opposite said formation zone, from which undesired fluids are entering and flowing in the well.
- said production zone is located below said formation zone, from which undesired fluids are entering and flowing in the well, wherein the method, after step (A), includes a step of:
- the plug remains set in the entire cross section of the well. This may be advantageous in, for example, a case in which a barrier element set earlier has lost its integrity and there is undesired fluid production behind a casing or a casing liner, and from a part of the formation below.
- a plug covering the entire cross section could isolate the formation, from which the undesired fluid production is coming, from the rest of the well.
- the method is suitable for use in a situation wherein said subterranean well is a petroleum well;
- a displacement member may be used in the method to further displace and distribute the fluidized plugging material in the pipe body and further into the annulus.
- a displacement member in the form of a pressure apparatus as described in Norwegian patent application 20120099 mentioned above, is used to further displace and distribute the fluidized plugging material in the casing and further out into the annulus.
- the steps of perforation (A2) and washing (A3, A4) may be carried out in separate trips down into the well.
- the steps of perforation (A2) and washing (A3, A4) may be carried out in one and the same trip down into the well.
- a combined perforation and washing apparatus is described in Norwegian patent application 20111641 mentioned above.
- the perforation tool and the washing tool may be releasable in combination or individually from the string.
- the method may further include leaving the perforation tool in the well. This may be practical to save operation time if the perforation tool can be "hidden” in the well and/or if the perforation tool is a drillable one.
- the method may further include leaving the washing tool in the well. This may be advantageous in order to save operation time and/or to use the washing tool as a base for the plug that is to be established. It may be advantageous if the washing tool is a drillable one.
- the fluidized plugging material may include cement slurry for the formation of a cement plug.
- the fluidized plugging material may include unconsolidated mass for the formation of an unconsolidated-mass plug.
- the reference numeral 1 indicates a subterranean well as used in the method of the present invention.
- the well 1 has been drawn in a schematic and greatly simplified manner, and well elements not being central to the invention may have been left out of the drawings.
- Well fluids and cement barriers already established and known to a person skilled in the art, are not shown in the figures.
- a casing 21 extends down into the well 1, forming a radial boundary between a well path 2 and a surrounding formation 7.
- a pipe body 211 in the form of a casing liner is hung from the lower portion of the casing 21, extending down into a producing part of the well 1.
- the casing liner 211 is formed with perforations 212, through which fluids may flow from the formation 7 into the well 1.
- connection pipe 210 and the casing liner 211 together form a pipe string which extends throughout the length of the well 1.
- the pipe string is formed with one and the same inner diameter.
- the purpose of the method of the present invention is to isolate formation zones, from which undesired fluids are entering the well 1, from the rest of the well 1, whether it be undesired fluid flow through producing perforations 212, as shown in the figures 1-8 , or undesired fluid flow behind casing 21 or casing liners 211, as shown in the figures 9-10 .
- Figure 1 shows a producing well 1.
- An interface between water and oil has been drawn upwards and into the producing zone of the formation 7, so that an undesired flow of water, indicated by arrows in towards the perforations 212, has completely or partially replaced the flow of hydrocarbons into the well 1.
- the reference numeral 221 indicates a safety/production valve of a type known per se.
- Figure 2 shows the well 1 after a perforation tool 33 has been lowered into the casing liner 211 and placed along a longitudinal section L1 opposite the perforations 212.
- the perforation tool 33 may be a perforation gun of a type known per se.
- the perforation tool 33 is used to form new perforations 213 in the casing liner 211, as shown in figure 3 , the perforations of which are to be used in subsequent washing and plugging.
- the existing perforations 212 satisfy the requirements for design, position and density, as required in the subsequent washing and plugging operations as described above, it will not be necessary to form new perforations 213.
- Figure 3 shows the well 1 after the string 3 with the perforation tool 33 has been pulled out and new perforations 213 have been formed in the casing liner 211.
- a combined washing and plugging tool 35 is then lowered into the well 1 within the casing liner 211, as shown in figure 4 .
- Perforation and cleaning and plugging may be carried out in the same trip or in separate trips down the well 1.
- a washing fluid (not shown) is carried through the string 3, into the casing liner 211 and further out into an annulus 5 via the perforations 213. It may be an advantage if the washing fluid is directed substantially radially into the annulus 5 by means of a directional-control means 351, as described in the Norwegian patent application 20111641 .
- a washing fluid at great velocity may remove various particles, deposits and remains from earlier downhole operations, so that a fluidized plugging material, which is subsequently to be carried into the annulus 5, may flow freely and be adhered in a better way.
- the fluidized plugging material is pumped through the string 3 and out into the casing liner 211, and thereby also into the annulus 5 via the perforations 213 in the casing liner 211, so that a plug 25 is formed over the longitudinal section L1, as shown in figure 5 .
- the plug 25 of cured plugging material extends over the entire cross section T1 of the well 1. It may be an advantage if an apparatus, as described in Norwegian patent application 20120099 , is used in order to further displace and distribute the fluidized plugging material in the casing liner 211 and out into the annulus 5. The latter apparatus is not shown in the figures connected to the present document.
- Figure 6 shows the well 1 after a central through-going portion of the plug 25 has been drilled away by means of a drilling tool 31.
- a cross-sectional section T3 of the plug 25 outside the casing liner 211 is left inside the longitudinal section L1.
- the remaining cross-sectional section T3 of the plug 25 outside the casing liner 211 forms a barrier 51 in the annulus 5 between the casing liner 211 and the formation 7, thereby isolating the well 1 from the reservoir zone from which the undesired water production was coming.
- Figure 7 shows the well 1 after it has been fully isolated for the above-mentioned purposes
- figure 8 shows the well 1 after new perforations 214 have been formed in the casing liner 211 at a distance from the longitudinal section L1, so that there may be production from another zone without undesired water drive.
- the distance between the longitudinal section L1 and the new perforations 214 may be very large, maybe in the order of kilometres.
- Figure 9 shows a well 1 in which an undesired water flow, indicated by arrows, is coming from a formation zone below the production zone and is flowing in behind the casing liner 211, i.e. undesired water is flowing in the annulus 5.
- a plug is set in the entire cross section of the well, as shown in figure 10 , and in a portion below perforations 212 already producing, by means of steps indicated in the figures 2-5 .
- the plug 25 isolates the well 1 from the zone from which the undesired water production was coming, and the production may be resumed via the perforations 212 existing already.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Cleaning By Liquid Or Steam (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Mechanical Engineering (AREA)
Description
- The invention relates to a method for zone isolation in a subterranean producing well. More specifically, the invention relates to a method in which a balanced plug is established over a longitudinal section and in the entire cross section of the well to prevent undesired production from a reservoir.
- Isolation between zones in different production intervals is essential to be able to control and optimize the production from a subterranean well, such as a petroleum well or a geothermal well. As a reservoir is being emptied and/or existing barriers for isolation between different zones are becoming weaker, the fluid flows within the reservoir may change so that the production decreases or, at worst, comes to a halt. For example, when a production interval is emptied of oil, the interface between water and oil may gradually be draw upwards and enter the producing zone, so-called coning, so that a flow of water completely or partially replaces the flow of hydrocarbons into the production string of the well. Gas coning may also occur. Barriers intended to prevent undesired fluid flows between different zones of a reservoir are subjected to great strains, in the form of powerful pressures and temperature differences among other things, hence intense tension and stress forces. It is known that this may result in damage to a cement barrier so that the integrity of the barrier is ruined. This may result in undesired fluid production behind casing and casing liners, among other things, and could further reduce or, at worst, make further production from the well impossible.
- The invention has for its object to remedy or reduce at least one of the drawbacks of the prior art, or at least to provide a useful alternative to the prior art.
- The object is achieved through features specified in the description below and in the claims that follow.
- A method for zone isolation in a subterranean producing well is disclosed, the method preventing fluid flow between a formation zone, from which undesired fluids are entering and flowing in the well, and a production zone located at a distance from said formation zone, the well being provided with a pipe body, at least in a portion of the well, the method including the following steps:
- (A) providing a plug over a longitudinal section of the well located between said formation zone and said production zone, the plug covering substantially the entire cross section of the well at least in a portion of the longitudinal section, so that the plug fills the inside of the pipe body and an annulus between the outside of the pipe body and a surrounding well body, wherein step (A) also includes the following sub-steps:
- (A1) lowering a perforation tool into the pipe body to the longitudinal section where the plug is to be set;
- (A2) forming perforations in the pipe body along the longitudinal section by means of the perforation tool;
- (A3) by means of a washing tool which is attached to a string allowing through-flow and which is lowered to the longitudinal section, pumping a washing fluid down the string and out into the pipe body via the washing tool;
- (A4) by means of a directional-control means connected to the washing tool, directing the washing fluid into the annulus between the outside of the pipe body and the surrounding well body; and
- (A5) pumping a fluidized plugging material down the string and out into the pipe body, and thereby also into the annulus via the perforations in the pipe body.
- The pipe body may be, for example, a casing or a casing liner of types known per se and the pipe body may be part of a longer pipe string.
- The surrounding well body may be another pipe body, or it may be the formation itself.
- It is also known that a well plug may be established by means of a method and devices as proposed in Norwegian patent application 20111641 entitled "Method for combined cleaning and plugging in a well, washing tool for directional washing in a well, and use of the washing tool", and by means of Norwegian patent application
20120099 - Further details about the sub-steps A1-A5 and also about said washing tool can be found in the above-mentioned Norwegian patent application
20111641 - Norwegian patent application
20111641 WO 2012/096580 A1 . The method and washing tool disclosed in these publications were also disclosed to some extent in a presentation held by Arne G. Larsen in a "P&A Forum Workshop" at Sola, Norway on 9th June 2011. This presentation was titled "HydraWash™ - a new approach to get cement behind casing without milling". This new approach is also referred to as the HydraWash system in the industry. - The noted method and washing tool were also disclosed to some extent in a presentation held at the "SPE Arctic and Extreme Environments Conference & Exhibition" in Moscow, Russia on 18th October 2011. The presentation was also prepared as SPE paper 148640 titled "Novel Approach to More Effective Plug and Abandonment Cementing Techniques". This novel approach is referred to as the Perforate, Wash and Cement (PWC) system in SPE 148640, but also in the industry.
- Further, the perforation tool may be a perforation gun of a type known per se.
- This may be appropriate in order to ensure good circulation of a plugging material from the inside of the pipe body out into the annulus on the outside of the pipe body. The perforation may be carried out in an undamaged/un-perforated portion of the pipe body or in an already perforated portion of the pipe body if the number, distribution and design of the perforations are not sufficient to ensure good circulation for subsequent washing and plugging. A preferred distribution of the perforations in the pipe body may be in the order of 40 perforations per meter (12 perforations per foot) in a 135/45 degrees' phase within said longitudinal section.
- In one embodiment, the method includes providing one or more new perforations in a portion of the pipe body located outside the longitudinal section in which the plug has been set, thereby allowing production from said production zone. This may be necessary if, for example, existing production perforations have been blocked or closed off from the rest of the well in connection with the zone isolation. For example, the longitudinal section may be located opposite said formation zone, from which undesired fluids are entering and flowing in the well.
- In one variant of the preceding embodiment, said production zone is located below said formation zone, from which undesired fluids are entering and flowing in the well, wherein the method, after step (A), includes a step of:
- (B) drilling out a central, through-going portion of the plug, so that there is at least a cross-sectional section of the plug left on the outside of the pipe body; and
- providing said one or more new perforations in a portion of the pipe body located below the longitudinal section, thereby allowing production from the lower production zone whilst preventing flow of undesired fluids in said annulus outside the pipe body.
In another embodiment of the method, and before step (A) thereof, said production zone is producing into the well via perforations in the pipe body; - wherein said formation zone, from which undesired fluids are entering and flowing in the well, is located below said production zone;
- wherein said undesired fluids are flowing from the lower formation zone onto the upper production zone via said annulus of the well; and
- wherein the method, in step (A), includes providing the plug between said lower formation zone and said upper production zone, thereby isolating the annulus and the flow of undesired fluids therein.
- providing said one or more new perforations in a portion of the pipe body located below the longitudinal section, thereby allowing production from the lower production zone whilst preventing flow of undesired fluids in said annulus outside the pipe body.
- In the latter embodiment of the method, the plug remains set in the entire cross section of the well. This may be advantageous in, for example, a case in which a barrier element set earlier has lost its integrity and there is undesired fluid production behind a casing or a casing liner, and from a part of the formation below. Thus, a plug covering the entire cross section could isolate the formation, from which the undesired fluid production is coming, from the rest of the well.
- Further, the method is suitable for use in a situation wherein said subterranean well is a petroleum well;
- wherein said production zone produces hydrocarbon fluids; and
- wherein said undesired fluids are water.
- Yet further, a displacement member may be used in the method to further displace and distribute the fluidized plugging material in the pipe body and further into the annulus. Thus, it may be an advantage if a displacement member in the form of a pressure apparatus, as described in Norwegian patent application
20120099 - In one embodiment of the method, the steps of perforation (A2) and washing (A3, A4) may be carried out in separate trips down into the well.
- In another embodiment of the method, the steps of perforation (A2) and washing (A3, A4) may be carried out in one and the same trip down into the well. A combined perforation and washing apparatus is described in Norwegian patent application
20111641 - In one embodiment, the method may further include leaving the perforation tool in the well. This may be practical to save operation time if the perforation tool can be "hidden" in the well and/or if the perforation tool is a drillable one.
- As an alternative or addition, the method may further include leaving the washing tool in the well. This may be advantageous in order to save operation time and/or to use the washing tool as a base for the plug that is to be established. It may be advantageous if the washing tool is a drillable one.
- Further, the fluidized plugging material may include cement slurry for the formation of a cement plug. As an alternative or addition, the fluidized plugging material may include unconsolidated mass for the formation of an unconsolidated-mass plug.
- In what follows, examples of preferred embodiments are described, which are visualized in the accompanying drawings, in which:
- Figures 1-8
- show, in side views, simplified schematic sections of a well in different stages in accordance with a first embodiment of the method of the present invention; and
- Figures 9-10
- show, in side views, simplified schematic sections of a well in different stages in accordance with a second embodiment of the method of the present invention.
- In what follows, the
reference numeral 1 indicates a subterranean well as used in the method of the present invention. Thewell 1 has been drawn in a schematic and greatly simplified manner, and well elements not being central to the invention may have been left out of the drawings. Well fluids and cement barriers already established and known to a person skilled in the art, are not shown in the figures. Acasing 21 extends down into thewell 1, forming a radial boundary between awell path 2 and asurrounding formation 7. Apipe body 211 in the form of a casing liner is hung from the lower portion of thecasing 21, extending down into a producing part of thewell 1. Thecasing liner 211 is formed withperforations 212, through which fluids may flow from theformation 7 into thewell 1. Aconnection pipe 210 and thecasing liner 211 together form a pipe string which extends throughout the length of thewell 1. In the exemplary embodiment shown, the pipe string is formed with one and the same inner diameter. The purpose of the method of the present invention is to isolate formation zones, from which undesired fluids are entering thewell 1, from the rest of thewell 1, whether it be undesired fluid flow through producingperforations 212, as shown in thefigures 1-8 , or undesired fluid flow behind casing 21 orcasing liners 211, as shown in thefigures 9-10 . -
Figure 1 shows a producing well 1. An interface between water and oil has been drawn upwards and into the producing zone of theformation 7, so that an undesired flow of water, indicated by arrows in towards theperforations 212, has completely or partially replaced the flow of hydrocarbons into thewell 1. To remove or at least reduce the undesired water flow into thewell 1, there is a wish to isolate the zone, from which the undesired production is coming, from the rest of thewell 1. Thereference numeral 221 indicates a safety/production valve of a type known per se. -
Figure 2 shows thewell 1 after aperforation tool 33 has been lowered into thecasing liner 211 and placed along a longitudinal section L1 opposite theperforations 212. Theperforation tool 33 may be a perforation gun of a type known per se. Theperforation tool 33 is used to formnew perforations 213 in thecasing liner 211, as shown infigure 3 , the perforations of which are to be used in subsequent washing and plugging. In a case in which the existingperforations 212 satisfy the requirements for design, position and density, as required in the subsequent washing and plugging operations as described above, it will not be necessary to formnew perforations 213.Figure 3 shows thewell 1 after thestring 3 with theperforation tool 33 has been pulled out andnew perforations 213 have been formed in thecasing liner 211. - A combined washing and plugging
tool 35 is then lowered into thewell 1 within thecasing liner 211, as shown infigure 4 . Perforation and cleaning and plugging may be carried out in the same trip or in separate trips down thewell 1. A washing fluid (not shown) is carried through thestring 3, into thecasing liner 211 and further out into anannulus 5 via theperforations 213. It may be an advantage if the washing fluid is directed substantially radially into theannulus 5 by means of a directional-control means 351, as described in the Norwegian patent application20111641 annulus 5, may flow freely and be adhered in a better way. Then the fluidized plugging material is pumped through thestring 3 and out into thecasing liner 211, and thereby also into theannulus 5 via theperforations 213 in thecasing liner 211, so that aplug 25 is formed over the longitudinal section L1, as shown infigure 5 . At least in a portion within the longitudinal section L1, theplug 25 of cured plugging material extends over the entire cross section T1 of thewell 1. It may be an advantage if an apparatus, as described in Norwegian patent application20120099 casing liner 211 and out into theannulus 5. The latter apparatus is not shown in the figures connected to the present document. -
Figure 6 shows thewell 1 after a central through-going portion of theplug 25 has been drilled away by means of adrilling tool 31. A cross-sectional section T3 of theplug 25 outside thecasing liner 211 is left inside the longitudinal section L1. The remaining cross-sectional section T3 of theplug 25 outside thecasing liner 211 forms abarrier 51 in theannulus 5 between thecasing liner 211 and theformation 7, thereby isolating the well 1 from the reservoir zone from which the undesired water production was coming. -
Figure 7 shows thewell 1 after it has been fully isolated for the above-mentioned purposes, whereasfigure 8 shows thewell 1 afternew perforations 214 have been formed in thecasing liner 211 at a distance from the longitudinal section L1, so that there may be production from another zone without undesired water drive. The distance between the longitudinal section L1 and thenew perforations 214 may be very large, maybe in the order of kilometres. -
Figure 9 shows a well 1 in which an undesired water flow, indicated by arrows, is coming from a formation zone below the production zone and is flowing in behind thecasing liner 211, i.e. undesired water is flowing in theannulus 5. This may quite possibly be a result of an earlier poor and/or difficult cementation job. There is therefore a need for new zone isolation. A plug is set in the entire cross section of the well, as shown infigure 10 , and in a portion belowperforations 212 already producing, by means of steps indicated in thefigures 2-5 . Theplug 25 isolates the well 1 from the zone from which the undesired water production was coming, and the production may be resumed via theperforations 212 existing already.
Claims (13)
- A method for zone isolation in a subterranean producing well (1), the method preventing fluid flow between a formation zone, from which undesired fluids are entering and flowing in the well (1), and a production zone located at a distance from said formation zone, the well (1) being provided with a pipe body (211), at least in a portion of the well (1), the method including the following steps:(A) providing a plug (25) over a longitudinal section (L1) of the well (1) located between said formation zone and said production zone, the plug (25) covering substantially the entire cross section (T1) of the well (1) at least in a portion of the longitudinal section (L1), so that the plug (1) fills the inside of the pipe body (211) and an annulus (5) between the outside of the pipe body (211) and a surrounding well body (7), wherein step (A) also includes the following sub-steps:(A1) lowering a perforation tool (33) into the pipe body (211) to the longitudinal section (L1) where the plug (25) is to be set;(A2) forming perforations (213) in the pipe body (211) along the longitudinal section (L1) by means of the perforation tool (33);(A3) by means of a washing tool (35) which is attached to a string (3) allowing through-flow and which is lowered to the longitudinal section (L1),pumping a washing fluid down the string (3) and out into the pipe body (211) via the washing tool (35);(A4) by means of a directional-control means connected to the washing tool (35), directing the washing fluid into the annulus (5) between the outside of the pipe body (211) and the surrounding well body (7); and(A5) pumping a fluidized plugging material down the string (3) and out into the pipe body (211), and thereby also into the annulus (5) via the perforations (213) in the pipe body (211).
- The method in accordance with claim 1, wherein the method includes providing one or more new perforations (214) in a portion of the pipe body (211) located outside the longitudinal section (L1) in which the plug (25) has been set, thereby allowing production from said production zone.
- The method in accordance with claim 2, wherein the longitudinal section (L1) is located opposite said formation zone, from which undesired fluids are entering and flowing in the well (1).
- The method in accordance with claim 2 or 3, wherein said production zone is located below said formation zone, from which undesired fluids are entering and flowing in the well (1), and wherein the method, after step (A), includes a step of:(B) drilling out a central, through-going portion of the plug (25), so that there is at least a cross-sectional section (T3) of the plug (25) left on the outside of the pipe body (211); and- providing said one or more new perforations (214) in a portion of the pipe body (211) located below the longitudinal section (L1), thereby allowing production from the lower production zone whilst preventing flow of undesired fluids in said annulus (5) outside the pipe body (211).
- The method in accordance with claim 1, wherein before step (A) of the method, said production zone is producing into the well (1) via perforations (212) in the pipe body (211);- wherein said formation zone, from which undesired fluids are entering and flowing in the well (1), is located below said production zone;- wherein said undesired fluids are flowing from the lower formation zone onto the upper production zone via said annulus (5) of the well (1); and- wherein the method, in step (A), includes providing the plug (25) between said lower formation zone and said upper production zone, thereby isolating the annulus (5) and the flow of undesired fluids therein.
- The method in accordance with any one of claims 1-5, wherein said subterranean well is a petroleum well;- wherein said production zone produces hydrocarbon fluids; and- wherein said undesired fluids are water.
- The method in accordance with any one of claims 1-6, wherein a displacement member is used to further displace and distribute the fluidized plugging material in the pipe body (211) and further out into the annulus (5).
- The method in accordance with any one of claims 1-7, wherein the steps of perforation (A2) and washing (A3, A4) are performed in separate trips down into the well (1).
- The method in accordance with any one of claims 1-7, wherein the steps of perforation (A2) and washing (A3, A4) are performed in one and the same trip down into the well (1).
- The method in accordance with any one of claims 1-9, wherein the method further includes leaving the perforation tool (33) in the well (1).
- The method in accordance with any one of claims 1-10, wherein the method further includes leaving the washing tool (35) in the well (1).
- The method in accordance with any one of claims 1-11, wherein the fluidized plugging material includes cement slurry for the formation of a cement plug (25).
- The method in accordance with any one of claims 1-12, wherein the fluidized plugging material includes unconsolidated mass for the formation of an unconsolidated-mass plug (25).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO20120275A NO336527B1 (en) | 2012-03-09 | 2012-03-09 | Method of zone isolation in an underground well |
PCT/NO2013/050046 WO2013133720A1 (en) | 2012-03-09 | 2013-03-06 | Method for zone isolation in a subterranean well |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2823140A1 EP2823140A1 (en) | 2015-01-14 |
EP2823140A4 EP2823140A4 (en) | 2015-03-18 |
EP2823140B1 true EP2823140B1 (en) | 2017-11-15 |
Family
ID=49117096
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13757768.0A Active EP2823140B1 (en) | 2012-03-09 | 2013-03-06 | Method for zone isolation in a subterranean well |
Country Status (7)
Country | Link |
---|---|
US (1) | US20150027705A1 (en) |
EP (1) | EP2823140B1 (en) |
AU (1) | AU2013228114B2 (en) |
CA (1) | CA2897621C (en) |
DK (1) | DK2823140T3 (en) |
NO (1) | NO336527B1 (en) |
WO (1) | WO2013133720A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NO339082B1 (en) | 2012-03-09 | 2016-11-14 | Hydra Systems As | Procedure for combined cleaning and plugging in a well |
NO339191B1 (en) * | 2013-09-06 | 2016-11-14 | Hydra Systems As | Method of isolating a permeable zone in an underground well |
RU2612693C1 (en) * | 2016-02-12 | 2017-03-13 | Закрытое акционерное общество "ХИМЕКО-ГАНГ" | Method to reduce water inflow in production wells without lifting of downhole pumping equipment |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010060620A1 (en) * | 2008-11-27 | 2010-06-03 | Services Petroliers Schlumberger | Method for monitoring cement plugs |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4083406A (en) * | 1976-11-18 | 1978-04-11 | Metz Thomas L | Method and apparatus for sealing drill casing |
US4589490A (en) * | 1984-11-08 | 1986-05-20 | Conoco Inc. | Well bore recompletion |
US4759408A (en) * | 1987-06-08 | 1988-07-26 | Texaco Inc. | Method of shutting off a portion of a producing zone in a hydrocarbon producing well |
US5402850A (en) * | 1994-01-13 | 1995-04-04 | Lalande; Phillip T. | Methods of using reverse circulating tool in a well borehole |
NO981998D0 (en) * | 1998-05-04 | 1998-05-04 | Henning Hansen | Method of multi-phase sealing borehole plugging used for hydrocarbon production or injection of downhole liquids or exploratory boreholes |
US6394184B2 (en) * | 2000-02-15 | 2002-05-28 | Exxonmobil Upstream Research Company | Method and apparatus for stimulation of multiple formation intervals |
US6595289B2 (en) * | 2001-05-04 | 2003-07-22 | Weatherford/Lamb, Inc. | Method and apparatus for plugging a wellbore |
US20080314591A1 (en) * | 2007-06-21 | 2008-12-25 | Hales John H | Single trip well abandonment with dual permanent packers and perforating gun |
US7640983B2 (en) * | 2007-07-12 | 2010-01-05 | Schlumberger Technology Corporation | Method to cement a perforated casing |
NO335972B1 (en) * | 2011-01-12 | 2015-04-07 | Hydra Systems As | Procedure for combined cleaning and plugging in a well, washing tool for directional flushing in a well, and use of the washing tool |
NO339025B1 (en) * | 2012-02-03 | 2016-11-07 | Hydra Systems As | Method of establishing an annular barrier in an underground well |
NO335689B1 (en) * | 2012-02-17 | 2015-01-19 | Hydra Systems As | Procedure for establishing a new well path from an existing well |
NO339082B1 (en) * | 2012-03-09 | 2016-11-14 | Hydra Systems As | Procedure for combined cleaning and plugging in a well |
-
2012
- 2012-03-09 NO NO20120275A patent/NO336527B1/en unknown
-
2013
- 2013-03-06 EP EP13757768.0A patent/EP2823140B1/en active Active
- 2013-03-06 DK DK13757768.0T patent/DK2823140T3/en active
- 2013-03-06 WO PCT/NO2013/050046 patent/WO2013133720A1/en active Application Filing
- 2013-03-06 CA CA2897621A patent/CA2897621C/en active Active
- 2013-03-06 US US14/381,540 patent/US20150027705A1/en not_active Abandoned
- 2013-03-06 AU AU2013228114A patent/AU2013228114B2/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010060620A1 (en) * | 2008-11-27 | 2010-06-03 | Services Petroliers Schlumberger | Method for monitoring cement plugs |
Also Published As
Publication number | Publication date |
---|---|
AU2013228114A1 (en) | 2014-09-18 |
DK2823140T3 (en) | 2018-02-05 |
AU2013228114B2 (en) | 2015-12-17 |
EP2823140A1 (en) | 2015-01-14 |
NO336527B1 (en) | 2015-09-21 |
CA2897621A1 (en) | 2013-09-12 |
NO20120275A1 (en) | 2013-09-10 |
EP2823140A4 (en) | 2015-03-18 |
CA2897621C (en) | 2020-09-22 |
WO2013133720A1 (en) | 2013-09-12 |
US20150027705A1 (en) | 2015-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10738567B2 (en) | Through tubing P and A with two-material plugs | |
US10612342B2 (en) | Plugging tool, and method of plugging a well | |
US20240141746A1 (en) | Helical coil annular access plug and abandonment | |
US8267173B2 (en) | Open hole completion apparatus and method for use of same | |
EP2935771B1 (en) | Method and apparatus for treating a subterranean region | |
EP3475522B1 (en) | Downhole drilling system | |
WO2020106593A1 (en) | Frac plug setting system | |
WO2019122857A1 (en) | Improvements in or relating to well abandonment and slot recovery | |
EP2823140B1 (en) | Method for zone isolation in a subterranean well | |
EP2809876B1 (en) | A method for establishment of an annulus barrier in a subterranean well | |
US11047196B2 (en) | Production tubing conversion device and methods of use | |
US11920418B2 (en) | Apparatus and method for behind casing washout | |
US20150240595A1 (en) | Valve, system and method for completion, stimulation and subsequent re-stimulation of wells for hydrocarbon production | |
WO2022171604A1 (en) | Method for abandoning a completed wellbore | |
US10036237B2 (en) | Mechanically-set devices placed on outside of tubulars in wellbores | |
US10822928B2 (en) | Running tool for an expandable tubular | |
US20160369603A1 (en) | Redressing method and redressed completion system | |
Furgier et al. | Different Applications of Expandable Screens Through Three Case Studies | |
EP3106605A1 (en) | Redressing method and redressed completion system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20140904 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20150218 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 37/08 20060101ALI20150212BHEP Ipc: E21B 33/13 20060101AFI20150212BHEP |
|
17Q | First examination report despatched |
Effective date: 20150226 |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170614 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: GB Ref legal event code: FG4D Ref country code: AT Ref legal event code: REF Ref document number: 946484 Country of ref document: AT Kind code of ref document: T Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013029498 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20180131 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 6 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 946484 Country of ref document: AT Kind code of ref document: T Effective date: 20171115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180215 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180216 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180215 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013029498 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20180817 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130306 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180315 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IE Payment date: 20230317 Year of fee payment: 11 Ref country code: FR Payment date: 20230317 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20230303 Year of fee payment: 11 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230524 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240320 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240321 Year of fee payment: 12 Ref country code: GB Payment date: 20240320 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20240229 Year of fee payment: 12 |