EP2777122A1 - Procede pour fournir une puissance de régulation au moyen d'un accumulateur d'énergie en mettant a profit des tolerances lors de la détermination de l'écart de fréquence - Google Patents

Procede pour fournir une puissance de régulation au moyen d'un accumulateur d'énergie en mettant a profit des tolerances lors de la détermination de l'écart de fréquence

Info

Publication number
EP2777122A1
EP2777122A1 EP12781074.5A EP12781074A EP2777122A1 EP 2777122 A1 EP2777122 A1 EP 2777122A1 EP 12781074 A EP12781074 A EP 12781074A EP 2777122 A1 EP2777122 A1 EP 2777122A1
Authority
EP
European Patent Office
Prior art keywords
charge
control power
power
state
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP12781074.5A
Other languages
German (de)
English (en)
Inventor
Georg Markowz
Wolfgang SCHWEISSTHAL
Carsten Kolligs
Holger BREZSKI
Wolfgang Deis
Michael Igel
Anna FLEMMING
Dennis GAMRAD
Sébastien COCHET
Stefan Winternheimer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Steag Power Saar GmbH
Evonik Operations GmbH
Original Assignee
Evonik Degussa GmbH
Evonik Industries AG
Steag Power Saar GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Evonik Degussa GmbH, Evonik Industries AG, Steag Power Saar GmbH filed Critical Evonik Degussa GmbH
Publication of EP2777122A1 publication Critical patent/EP2777122A1/fr
Withdrawn legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/24Arrangements for preventing or reducing oscillations of power in networks
    • H02J3/241The oscillation concerning frequency
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02KDYNAMO-ELECTRIC MACHINES
    • H02K5/00Casings; Enclosures; Supports
    • H02K5/04Casings or enclosures characterised by the shape, form or construction thereof
    • H02K5/10Casings or enclosures characterised by the shape, form or construction thereof with arrangements for protection from ingress, e.g. water or fingers
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K5/00Casings, cabinets or drawers for electric apparatus
    • H05K5/06Hermetically-sealed casings
    • H05K5/068Hermetically-sealed casings having a pressure compensation device, e.g. membrane

Definitions

  • the invention relates to methods for providing control power for a power grid in which at least one connected to the power grid energy storage supplies the power grid as needed energy and / or from the power grid as needed absorbs energy, the control power in response to a frequency deviation from a nominal value of a grid frequency is provided.
  • the invention also relates to a device for carrying out such a method.
  • Electricity grids are used to distribute electricity from many energy generators in large areas to many users and to supply households and industry with energy. Energy producers mostly in the form of power plants provide the required energy. As a rule, power generation is planned and provided based on the forecasted consumption.
  • Both the generation and the consumption of energy can lead to unplanned fluctuations. These can arise on the energy producer side, for example, in that a power plant or part of the power grid fails or, for example, in the case of renewable energies such as wind, that the energy production is higher than predicted. Consumers may also experience unexpectedly high or low consumption. For example, the failure of a portion of the grid, which cuts off some consumers from the power supply, can lead to a sudden reduction in power consumption.
  • the desired AC frequency is, for example, in Europe 50,000 Hz. This frequency is often referred to as the desired frequency.
  • a reduction of consumption compared to the plan leads to an increase in the frequency of planned power generated by the energy producers, the same applies to an increase in electricity production compared to the plan for scheduled consumption.
  • a reduction in the output of the energy producers leads to a reduction in the network frequency at scheduled consumption, as well as an increase in consumption compared with the plan when scheduled production.
  • SRL secondary control power
  • MR minute reserve power
  • hydro pumped storage plants to provide control power is state of the art. In Europe, the various types of control are provided by pumped storage. However, hydropumps are also often referred to as the most economical renewable energy storage and retrieval technology today to better match energy supply and demand over time. The potential for expanding storage capacity - especially in Norway - is a matter of controversy, as significant capacity in power lines needs to be approved and installed for use. Consequently, the use for the energy management of load management is in competition with the provision of control power.
  • DE 10 2008 046 747 A1 also proposes operating an energy store in an island power grid in such a way that the energy store is used to compensate for consumption peaks and consumption minima.
  • the disadvantage hereof is that the energy stores do not have the necessary capacity to compensate for a longer disturbance or a plurality of disturbances rectified with respect to the frequency deviation one after the other.
  • the comparatively high capacities are associated with corresponding investment costs and make the use of storage often uneconomical.
  • the price for the provision of control power depends largely on how quickly the control power can be provided after a request, that is, after a frequency deviation outside the tolerance.
  • PRL and SRL the provision of energy is compensated. SRL and MR also pay for work.
  • the prequalifiable secondary control power results from the power change activated and measured within 5 minutes (each control direction)
  • a short-term overshoot of a maximum of 10% above the secondary control power setpoint is permitted. In any case, a short-term overshoot of up to 5 MW is permissible.
  • the compensation for the secondary control power provision consists of a performance fee for the provision of the secondary control power and a remuneration for the actual energy provided in the context of the secondary control power provision.
  • Accumulators and other energy stores can absorb or release energy very quickly, making them basically suitable for providing PRL.
  • the disadvantage is that very large capacities of the batteries must be provided in order to deliver the power over a longer period or repeatedly.
  • very large capacity batteries are also very expensive. Due to the losses during storage and withdrawal of energy takes place at a statistically symmetric deviation of the mains frequencies from the setpoint by the operation sooner or later emptying of the energy storage, such as a rechargeable battery. It is therefore necessary to recharge the energy storage more or less regularly targeted. It may be necessary to pay for this charging current separately.
  • the object of the invention is therefore to overcome the disadvantages of the prior art.
  • a possibility should be found to improve the economic efficiency of the operation of energy storage devices, such as accumulators, in particular for the primary control power supply by avoiding inefficient charging states.
  • the provision of primary control power with a lower energy storage capacity should be made possible.
  • the provision of primary control power while avoiding intermediate charging would also be desirable.
  • control power is to be provided with efficient energy yield of the control power supplier.
  • a further object of the invention is to be seen in that, in particular when using galvanic elements, such as accumulators, the capacity of the energy store should be as low as possible in order to provide the required control power.
  • the object of the invention is achieved in that the tolerance with respect to the frequency deviation is used to adjust the state of charge of the energy storage simultaneously with the provision of the control power through the energy storage.
  • the tolerance of the amount of the control power to be provided is used as a function of the frequency deviation to adjust the state of charge of the energy storage, preferably simultaneously with the provision of the control power by the energy storage.
  • the tolerance with regard to the amount of the control power provided and the tolerance in the determination of the frequency deviation is to be understood by the network operator, due to technical conditions such as the measurement accuracy in determining the control power supplied or the grid frequency, certain differences between an ideal target power and the actually delivered control power will be accepted.
  • the tolerance may be granted by the network operator, but could also comply with a legal requirement.
  • the advantage of these procedures is that during the provision of the control power and thus also continuously it is possible to regulate the state of charge (charge state) of the energy store.
  • state of charge and state of charge are to be regarded as equivalent according to the invention.
  • energy storage in particular LESRs (Limited Energy Storage Resources) come into question.
  • the frequency deviation is determined by the nominal value of the network frequency and the demand for positive and / or negative control power is determined from the frequency deviation.
  • the frequency deviation In the direct determination of the mains frequency or the frequency deviation own measuring equipment can be used. This provides the opportunity to determine the frequency deviation with a higher accuracy than prescribed by the network operator. This allows a greater frequency tolerance can be used to control the state of charge of the energy storage.
  • a particularly preferred embodiment of the invention provides that the frequency deviation is measured with greater accuracy than necessary for the provision of the control power, preferably with an accuracy of at least ⁇ 8 mHz, more preferably of at least ⁇ 4 mHz, most preferably of at least ⁇ 2 mHz, especially preferred of at least ⁇ 1 mHz.
  • a further particularly advantageous embodiment of the method according to the invention results if it is provided that the amount of the requested control power is exceeded in order to utilize the tolerance with respect to the amount of the control power provided, preferably by a maximum of 30% and / or by 10 MW, particularly preferably by a maximum 20% and / or by 5 MW, wherein in particular the percentage exceeding of the amount of the requested control power proportional to the deviation of the state of charge of the energy storage is selected from a desired average state of charge. Exceeding the limit is more appropriate in the provision of control power as a shortfall that could lead to problems in the power grid.
  • the grid operator can grant a greater tolerance when exceeding the control power, as in the case of a shortfall.
  • the amount of the control power provided is measured with a greater accuracy than necessary for the provision of the control power, preferably with an accuracy of at least ⁇ 10 kW, more preferably of at least ⁇ 1 kW, especially preferably of at least ⁇ 100 W, more preferably 10 W, in particular with an accuracy of 1%, preferably 0.1% of the prequalified power.
  • the state of charge of the energy storage is adjusted by the fact that in the case in which the state of charge of the energy storage is above a first limit, the energy storage within the tolerance or tolerances larger control power in feeding in the power grid or receiving a smaller control power within the tolerance or tolerances from the power grid and / or in the event that the state of charge of the energy store is below a second threshold, the energy store has a smaller control power within the tolerance or tolerances feeds the power grid or receives a greater control power from within the grid within the tolerance or tolerances.
  • the first limit of the state of charge between 40% and 80% of the maximum charge of the energy storage is, preferably between 45% and 70%, more preferably between 50% and 60%, and / or the second limit of the state of charge between 20% and 60% of the maximum load, Preferably, between 30% and 55%, more preferably between 40% and 50%, or the first and the second limit of the state of charge at 50% of the maximum charge of the energy storage are.
  • the limit values of the state of charge of the energy store are particularly suitable according to the invention for the realization of methods according to the invention.
  • the limit values can also be 80% or 20% of the maximum charge of the energy store.
  • the percentage figures refer to the maximum energy content of the energy storage.
  • the first and / or the second limit of the state of charge are selected depending on whether positive or negative control power is needed, so that when a request for positive control power, the first limit and / or the second limit of the state of charge is selected at a larger charge of the energy storage and is selected in a request for negative control power of the first limit and / or the second limit of the charge state at a smaller charge of the energy storage, the limit values are preferably selected as a function of the frequency deviation of the power frequency.
  • a flywheel, a heat accumulator, a hydrogen generator and storage with fuel cell, a natural gas generator with gas power plant, a pumped storage power plant, a compressed air storage power plant, a superconducting magnetic energy storage, a redox flow element and / or or a galvanic element is used, preferably an accumulator and / or a battery storage power plant, particularly preferably a lithium-ion accumulator.
  • a greater control power is provided than a contracted control power in order to set the state of charge of the energy storage.
  • a contracted service is the service that is marketed to the network operator in the current operation.
  • the contracted capacity is at most as high as the prequalified service.
  • the state of charge of the energy store is adjusted such that a medium state of charge is sought, preferably a state of charge between 20% and 80% of the maximum charge of the energy store, more preferably between 40% and 60%, most preferably a state of charge of 50% of the maximum charge of the energy store.
  • the maximal Charge refers here again to the maximum energy storable in the energy storage.
  • a further embodiment of the invention provides that the energy store is operated together with at least one energy generator and / or at least one energy consumer, which is used to adjust the state of charge of the energy store.
  • Energy producers such as power plants and energy consumers, such as electrolysis plants can take permanent control power loads. In addition, they can also be used to adjust the state of charge of the energy storage device without taking power from the grid or putting it into the power grid.
  • a power plant is used as the energy generator, preferably a coal-fired power station, gas-fired power plant or a hydroelectric power station and / or a plant for producing a substance is used as the energy consumer, in particular an electrolysis plant or a metal plant, preferably an aluminum plant or a steel plant.
  • Such energy producers and consumers are well-suited to providing longer-term balancing services. Their inertia can be compensated according to the invention well with energy storage.
  • a particularly preferred embodiment of a method according to the invention is realized in that the time tolerance is used to adjust the state of charge of the energy storage, with a change in the required control power, the time after the change of the required control power, provided from the energy storage a modified control power is selected depending on the current state of charge of the energy storage.
  • the time tolerance in the provision of control power stems from the fact that most sources of control power are clearly carriers as energy storage, especially as accumulators. Therefore, the suppliers of PRL, SRL and MR becomes time given to respond to a change in the required control power. This time can be used according to the invention to adjust the state of charge of the energy storage.
  • a positive control power at an early stage preferably immediately fed into the grid and / or a negative control power is taken at a late date, preferably at the latest possible time from the mains, if the state of charge of the energy store is above a first limit value and / or a change in the required control power a negative control power early, preferably immediately removed from the mains and / or fed a positive control power at a late date, preferably at the latest possible time in the power grid when the state of charge of the energy store is below a second limit.
  • the time is in a time interval between the change of the required control power and a maximum time after the change of the required control power, the time interval depending on the type of demanded control power, in particular the time interval in case of provision of primary control power 30 seconds, in case of provision of secondary control power 5 minutes and in case of provision of minute reserve 15 minutes.
  • a further embodiment of the invention taking advantage of the time tolerance can provide that is adjusted by the choice of the timing of the state of charge of the energy storage. Since energy is power times, the time tolerance can be used to adjust the state of charge of the energy storage.
  • a control power gradient is selected as a function of the state of charge of the energy store, wherein in particular the time profile of the amount of the control power is set and the tolerance of the amount of the control power to be provided is used over time.
  • the dynamic behavior with which the energy storage on the change of Setpoint reacts is selected as a function of the current state of charge of the energy storage, preferably the selected dynamic behavior depends on the type of demanded control power, in particular the time in which the full control power must be provided in the case of provision of primary control power 30 seconds, in the case a provision of secondary control power is 5 minutes and in the case of providing minute reserve 15 minutes.
  • a further embodiment of the invention taking advantage of the dynamic tolerance, can provide for responding to the change in a control power request by suitably selecting the dynamic behavior of the energy store, thereby adapting the state of charge of the energy store.
  • a particularly preferred embodiment of a method according to the invention results if it is provided that a control power gradient is selected as a function of the state of charge of the energy store, wherein in particular the time profile of the amount of the control power is set and the tolerance of the amount of the control power to be provided is used over time.
  • a modified control power is only provided to adjust the state of charge of the energy store, in particular the changed control power is only provided if
  • the state of charge of the energy store as much as possible to the middle state of charge or as little as possible from the average state of charge invites or discharges.
  • the change of the frequency deviation here refers to the frequency deviation at which the last control power adjustment took place. in this connection another tolerance is used. This tolerance may be given by the network operator or the legislator or system immanent. The tolerance allows that if only small changes in the frequency deviation of the mains frequency of the desired frequency occur, then no adjustment of the control power must be made. In order to develop the state of charge of the energy storage in the desired direction, however, control power can be provided. This control power delivery is optionally carried out in the way it is desired, so for example directly antiproportional to the frequency deviation. Thus, if control power is provided to adjust the state of charge, this would contribute to regulating the grid frequency. The adaptation of the state of charge is thus always constructive in the sense of regulating the grid frequency. The prerequisite for this is that the frequency deviation can be measured with a higher accuracy than the dead band.
  • the dead band is a measure of the tolerance of the change in frequency deviation above which a change in the control power is required or necessary.
  • the device comprises a controller and an energy store, wherein the device is connected or connectable to a power supply, the controller is connected to the energy store and the output from the energy storage and / or recorded control power controls.
  • each control comprises a control, as in a control, a control in dependence on a difference of an actual value to a desired value takes place.
  • the controller is thus designed as a control, in particular with respect to the state of charge.
  • the controller is a control system.
  • the device comprises a device for measuring a frequency deviation from a nominal value of the mains frequency of the power network, a device for measuring the injected and recorded power and a memory, wherein in the memory to be provided, dependent on the frequency deviation control power together is stored with the tolerances and preferably at least one state of charge of the Energy storage is stored as a target value or as a limit or are stored as two states of charge as limits, the controller has access to the memory and is designed, depending on the frequency deviation and the state of charge of the energy storage, the output from the energy storage and / or absorbed energy regulate.
  • the energy store is an accumulator, preferably a lithium-ion accumulator, a lead-sulfuric acid accumulator, a nickel-cadmium accumulator, a sodium sulfide accumulator and / or a Li-ion accumulator. Accumulator and / or a composite of at least two of these accumulators.
  • Accumulators include in particular lead-acid batteries, sodium-nickel-chloride accumulators, sodium-sulfur accumulators, nickel-iron accumulators, nickel-cadmium accumulators, nickel-metal hydride accumulators.
  • accumulators are preferred, which have a high efficiency and a high operational and calendar life.
  • control energy or control power is delivered to the power grid (positive control energy or positive control power) or taken from the mains (negative control energy or negative control power). All mentioned control cycles can be carried out according to the invention and particularly preferably also any number of times in succession, by the energy storage is repeatedly recharged or discharged during a control cycle to again to have a suitable average state of charge for a second cycle.
  • the inventive method also ensures that the wishes of the customer, that is, the grid operator can be met for a predictable and defined control power and no regulatory oscillations are generated in the power grid.
  • the rated power of the device for providing control power is the power achievable within a certain time. It is also spoken of the praqualifiable performance, since this meets the criteria of the customer, that is the network operator.
  • the invention is based on the surprising finding that energy stores can be operated in such a way that the tolerances given by the grid operators when providing control power are used to maintain the state of charge of the energy store in a central area and thus the capacity of the energy store in a cost-effective framework to keep. This is especially true for energy storage, the energy quickly, that is record high power gradients and can deliver, such as flywheels and especially accumulators and battery storage.
  • the tolerances granted by the network operators stem from the fact that the control power is currently mostly provided by larger power plants, such as coal power plants and larger consumers, such as electrolysis plants. These control power suppliers have a comparatively large inertia in the reception and output of control power, that is, their power gradients are small and effects such as overshoot are inevitable to some extent.
  • control power suppliers do not have to deliver control power even with very small deviations, but a tolerance is granted in the frequency deviation of the power frequency, from which control power must be made available. Thus, it can be ensured that the provision of control power only serves to stabilize the network frequency.
  • a tolerance in the measurement of the frequency deviation of the mains frequency is granted, so that the control power to be provided within a certain scope (in a tolerance) can be chosen freely.
  • the latter tolerance is used in the invention to adjust the state of charge of the energy storage in which more or less energy is stored in the energy storage or more or less energy is released from the energy storage to the power grid.
  • Another tolerance is also the accuracy of what power can be fed into the grid or absorbed from the mains. It is usually not so important for the network operator whether the required control power is provided or whether it is exceeded by a certain amount or slightly below.
  • the state of charge then no longer has to or can be regulated with less energy from the mains.
  • the capacity of the energy storage can be chosen smaller. Both save costs.
  • the state of charge in the case of accumulators as energy storage corresponds to the state of charge (English: “State of charge”, SOC) or the energy content (English: State of Energy, SoE).
  • Battery storage devices distinguish themselves from conventional technologies for providing primary and / or secondary control functions, inter alia, in that they can change the power provided much faster. In most cases, however, is disadvantageous in battery storage that they have a relatively small storage capacity, so can provide the required services only over a limited period. In a statistical evaluation of the frequency deviations over time, it has surprisingly been found in the context of the present invention that the requested powers in more than 75% of the active time (that is to say a power deviating from zero) are less than 20% of the maximum power. Performance or marketed performance.
  • the energy taken into the memory in the event of negative PR or SR power can be sold on the spot market, in particular if the conditions there are advantageous.
  • control power that, in particular, more energy is absorbed from the network than is fed in by the energy store. This can be done by providing very much negative control power in accordance with the regulations including the procedure outlined above, whereas according to the regulations including the procedure set out above, preferably only the at least guaranteed power is provided at positive control power.
  • an average of at least 0.1% more energy is withdrawn from the network than is supplied, in particular at least 0.2%, preferably at least 0.5%, more preferably at least 1.0%, especially preferably 5%, these values being based on a Average measured over a period of at least 15 minutes, preferably at least 4 hours, more preferably at least 24 hours and especially preferably at least 7 days, and refer to the energy fed.
  • the control power provision set out above can be used to extract a maximum of energy from the network, whereby the maximum possible negative control power is provided, whereas only a minimum of positive control power is provided.
  • the energy thus extracted from the network can be sold via the energy trade described above, preferably at times when the highest possible price is to be achieved.
  • forecasts of the price development based on historical data can be used.
  • the state of charge of the energy store at the time of a planned sale of energy may preferably be at least 70%, particularly preferably at least 80% and particularly preferably at least 90% of the storage capacity, the state of charge after sale preferably not exceeding 80%, in particular not more than 70% and especially preferably at most 60% of the storage capacity amounts.
  • a plurality of energy stores are pooled and operated in accordance with the method of the invention.
  • the size of the energy storage within the pool can vary.
  • the change from one parameter setting to another is not synchronized, but deliberately offset in time, in order to minimize or at least tolerate any disturbances in the network.
  • the tolerances used in the various procedures vary depending on the time of day, the day of the week or the season. For example, within a period of 5 minutes before to 5 minutes after the hour change, the tolerances can be more narrowly defined. This is due to the fact that often very rapid frequency changes take place here. It may be in the interest of transmission system operators that there are lower tolerances and thus the control energy supply is more secure in the sense of sharper.
  • FIG. 1 is a schematic diagram of the normalized power P / Psoii on the frequency deviation Af to provide control power;
  • FIG. 2 shows a flow chart for a method according to the invention.
  • Figure 3 a schematic representation of an inventive device for providing control power.
  • Figure 1 shows an exemplary schematic diagram of the normalized power P / Psoii over the frequency deviation Af for providing control power as required by network operators.
  • a grid frequency of 50,000 Hz is set, the tolerance in the measurement of the frequency deviation is currently ⁇ 10 mHz.
  • the mean solid curve shows the control power P desired by the grid operator as dimensionless power P / Psoii normalized to the prequalified or contracted power P SO II.
  • the power P SO II is achieved as a positive control power and at a value of - 1 the power -P SO II as a negative control power.
  • the power P SO II is to be provided from frequency deviations of 200 mHz from the desired power frequency 50,000 Hz.
  • control power may also be (unlike in Figure 1 shown) that from frequency deviations of +10 mHz or -10 mHz, the control power is to be increased leaps and bounds. Then in the deadband no control power would be provided and when working outside the deadband is a control power that is proportional to the frequency deviation.
  • the negative and positive control power provided including the control power to be provided from a frequency deviation of 200 mHz, may be exceeded by up to 20%, but not undershot.
  • This tolerance is shown in the diagram of Figure 1 by the dotted line.
  • the control power P can be provided in a tolerance around the solid curve, which is bounded by the two dashed curves, or even bounded by the dashed and dotted curves.
  • the dashed and Dotted lines represent the maximum and minimum control power that can be fed into the grid or taken out of the grid using these two tolerances for a given frequency deviation. It should be noted that under real conditions a distance to the dashed and / or dotted curves is to be observed, which is limited by the own measuring accuracy.
  • time tolerance that is, for example, only a few seconds after a frequency deviation Af has occurred, which requires feeding or receiving control power, an actual provision or adjustment of the control power must be made.
  • This time tolerance can be used according to the invention and according to a particularly preferred embodiment of a method according to the invention to adjust the state of charge of the energy storage, which is used to provide control power.
  • the energy storage device absorbs less energy than if it were operated in accordance with the solid middle line.
  • the state of charge of the energy storage is closer to the desired average state of charge after a control cycle, as if it would be operated as conventional along the solid line.
  • the energy store is charged relatively low, that is, the state of charge of the energy storage is in the lower range, so for example between 10% and 25% of the maximum charge of the energy storage, the energy storage is driven in the vicinity of the lower left dashed or dotted curve .
  • a request for positive control power is detected by a negative frequency deviation ⁇ f, then a positive control power is provided very late and also a control power that tends to be lower than actually required by the network operator and as indicated by the solid middle line. This results in the energy storage being discharged less than if it were operated according to the solid middle line.
  • a request for negative control power which is determined by a positive frequency deviation Af, however, is responded to as early as possible to the request and then with a higher energy intake at higher benefits.
  • the energy storage device absorbs more energy than if operated according to the solid middle line. Even in these two cases is thus achieved by the inventive method that the state of charge of the energy storage is closer to the desired average state of charge after a control cycle, as if it would be operated as conventional along the solid line.
  • a smaller capacity of the energy store must be kept available than with a conventional method.
  • energy storage devices with larger capacities are more expensive than those with lower capacity, this can save costs and consume fewer resources during construction.
  • a larger control power can be provided with a same sized energy storage, if the power electronics is adapted or sufficient.
  • FIG. 2 shows a flow chart for a method according to the invention. The method uses an energy store and a controller. Decision step 1 tests whether the state of charge of the energy store is within a desired range or above or below it.
  • step 4 If the state of charge is within the desired range, go to step 4. If the state of charge is below the desired range or the tolerance, as much energy as possible should be supplied to the energy store, or at least only little further energy should be withdrawn, and step 2 is continued. Is the charge state above the desired Range, energy should be removed from the energy storage as possible or at least only a little more energy supplied and it is continued with step 6.
  • step 2 it is checked how large the frequency deviation Af of the mains frequency of the power grid is and then proceeded with steps 3, 5 and 7 respectively. If the energy store is in the desired state of charge, in step 5, which follows step 4, the control power P provided from the energy store is set as a function of and as a function of the frequency deviation ⁇ f measured in step 4 and thus made available to the power grid. If energy should be supplied to the energy store as far as possible or at least only little further energy should be withdrawn, this is achieved in step 3 by adjusting the control power P provided from the energy store not only as a function of and as a function of the frequency deviation ⁇ f measured in step 2, and thus the Power grid is provided. Instead, the state of charge of the energy store in the amount of the provided control power P is taken into account. Since the state of charge is below the desired range, more energy is supplied to the energy storage device or less further energy is withdrawn.
  • the tolerances are used in the provision of balancing power, which allows one of the grid operators.
  • the provided positive or negative control power thus always moves within the limits shown in the embodiment of Figure 1. How far this tolerance is exploited can depend on various factors, including the time of day, the season, the day of the week, the current price on the electricity market or other events to be expected.
  • step 7 when the state of charge is above the desired range, the energy store should be deprived of energy as far as possible or at least only a little more energy should be supplied.
  • the control power P provided from the energy store is set not only as a function of and as a function of the frequency deviation ⁇ f measured in step 2, and thus made available to the power grid is considered, but also the state of charge of the energy storage in the amount of the provided control power P. Since the state of charge is above the desired range, less energy is supplied to the energy store or additional energy is withdrawn. In turn, the tolerances in the provision of balancing power, which one of the grid operators admits, are used.
  • a linear relationship between the frequency deviation Af and the control power P to be provided can be selected.
  • An additional summand S in which the other factors such as time of day, season, the day of the week, the current price on the electricity market or other expected events but also especially the state of charge L of the energy storage can be considered, can be additionally introduced.
  • An example of such a functional relationship with reference to FIG. 1 is for frequency deviations Af in a range of ⁇ 200 mHz:
  • For the first function S has the dimension of a frequency and ranges between +0.2 * Af + 10mHz and - 10mHz for positive control power and between - 0.2 * Af - 10mHz and + 10mHz for negative control power.
  • the summand S depending on the state of charge of the energy storage can be selected or depend exclusively on the state of charge L of the energy storage.
  • the dependence on the state of charge L can represent a curve of any kind that moves within the limits specified by the tolerances.
  • a linear relationship can be used within the limits of tolerance and in the limits ⁇ 200 mHz. It may also be advantageous if the limits of the tolerance are not fully exploited if the measurement accuracy of the network frequency is not accurate enough.
  • the distance from the limits of the tolerance must at least correspond to the distance that corresponds to the uncertainty of the own measurements.
  • the present functions are exemplary embodiments of how, in steps 3, 5 or 7, the state of charge of the energy store can be adapted according to the invention.
  • FIG. 3 shows a schematic view of a device 21 according to the invention comprising an energy store 22.
  • a controller 23 is connected to the energy store 22 so that the controller 23 can adjust the power consumption and output of the energy store 22.
  • the energy storage 22 is connected to a power grid 24 and can absorb power from the power grid 24 and / or deliver.
  • the controller 23 is connected to a device 25 for measuring the frequency deviation of the mains frequency of the power network 24. When there is a need for control power - positive or negative control power - the controller 23 generates a signal. Subsequently, the control power of the energy storage 22 is increased.
  • the device 25 is capable of more accurately determining the frequency deviation of the line frequency than required.
  • the tolerance in the determination of the network frequency can be used to adjust the state of charge of the energy storage device 22.
  • the state of charge of the energy store 22 can be determined by a suitable measuring device by the controller 23 in order to implement a method according to the invention.
  • the controller 23 can thus intelligently charge or discharge the energy store 22, so that a certain desired state of charge is sought.
  • tolerances in the frequency deviation, from which a control power is to be provided, and tolerances in the amount to be provided at a certain frequency deviation control power, or tolerances in the determination of the frequency deviation, as well as tolerances in the maximum to be provided prequalified or contracted control power used be developed to develop the state of charge of the energy storage device 22 in the desired direction.
  • the power of the energy storage 22 may be provided even at a lower frequency deviation than a frequency deviation of 10 MHz to charge or discharge the energy storage 22 when deemed necessary.
  • an over-fulfillment for example by an overshoot, of up to 20% beyond the maximum control power can be generated by the energy store 22 in order to regulate the charge state of the energy store 22.
  • a particularly fast-reacting and easy to charge and discharge energy storage 22 is particularly advantageous.
  • Batteries are best suited for this purpose.
  • Li-ion batteries are quickly and frequently charged and discharged without damaging influences on the battery, so that they are particularly suitable and preferred for all embodiments according to the invention. This requires the provision of Li-ion accumulators of considerable capacity. For example, these are easily accommodated in one or more 40-foot ISO containers.
  • a device 21 according to the invention is therefore particularly well suited as a primary control power source or as a secondary control power source.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

L'invention concerne un procédé pour fournir une puissance de régulation pour un réseau électrique, selon lequel au moins un accumulateur d'énergie raccordé au réseau électrique y injecte de l'énergie et/ou en absorbe, selon les besoins, la puissance de régulation étant créée en fonction d'un écart de fréquence relativement à une valeur théorique d'une fréquence de réseau, la tolérance étant mise en valeur pour l'écart de fréquence pour régler l'état de charge de l'accumulateur simultanément à la fourniture de la puissance de régulation par ledit accumulateur. L'invention concerne également un dispositif qui permet de réaliser ce procédé, ce dispositif comportant une commande et un accumulateur d'énergie et étant ou pouvant être raccordé à un réseau électrique, et la commande étant reliée à l'accumulateur d'énergie et régulant la puissance de régulation fournie et/ou absorbée par l'accumulateur d'énergie.
EP12781074.5A 2011-11-10 2012-10-29 Procede pour fournir une puissance de régulation au moyen d'un accumulateur d'énergie en mettant a profit des tolerances lors de la détermination de l'écart de fréquence Withdrawn EP2777122A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102011055229A DE102011055229A1 (de) 2011-11-10 2011-11-10 Verfahren zur Bereitstellung von Regelleistung mit einem Energiespeicher unter Ausnutzung von Toleranzen bei der Bestimmung der Frequenzabweichung
PCT/EP2012/071342 WO2013068256A1 (fr) 2011-11-10 2012-10-29 Procede pour fournir une puissance de régulation au moyen d'un accumulateur d'énergie en mettant a profit des tolerances lors de la détermination de l'écart de fréquence

Publications (1)

Publication Number Publication Date
EP2777122A1 true EP2777122A1 (fr) 2014-09-17

Family

ID=47137695

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12781074.5A Withdrawn EP2777122A1 (fr) 2011-11-10 2012-10-29 Procede pour fournir une puissance de régulation au moyen d'un accumulateur d'énergie en mettant a profit des tolerances lors de la détermination de l'écart de fréquence

Country Status (4)

Country Link
US (1) US9667071B2 (fr)
EP (1) EP2777122A1 (fr)
DE (1) DE102011055229A1 (fr)
WO (1) WO2013068256A1 (fr)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011055231A1 (de) * 2011-11-10 2013-05-16 Evonik Industries Ag Verfahren zur Bereitstellung von Regelleistung
DE102012113051A1 (de) 2012-12-21 2014-06-26 Evonik Industries Ag Verfahren zur Erbringung von Regelleistung zur Stabilisierung eines Wechselstromnetzes, umfassend einen Energiespeicher
DE102013206808A1 (de) * 2013-04-16 2014-10-16 Younicos Ag Verfahren und Vorrichtung zur Regelung des Ladezustandes eines Batteriekraftwerks
US10074986B2 (en) 2013-05-23 2018-09-11 Caterva Gmbh System for providing a primary control power for a power grid
WO2014198292A1 (fr) * 2013-06-11 2014-12-18 Caterva Gmbh Procédé et système pour charger un dispositif de stockage d'énergie
US9709035B2 (en) 2014-09-03 2017-07-18 General Electric Company System and method for regulating power in a wind farm
DE102014114792A1 (de) 2014-10-13 2016-04-14 Thyssenkrupp Ag Verfahren zum Betrieb eines Stromnetzes, insbesondere eines Stromnetzes eines Wasserfahrzeugs
KR101677832B1 (ko) * 2015-02-11 2016-11-18 엘에스산전 주식회사 에너지 저장 시스템의 제어 장치 및 그 제어 방법
CN105529728B (zh) * 2016-01-18 2022-03-18 中国电力科学研究院 考虑多源信息融合和计划出力的储能可调度容量预测方法
KR102067830B1 (ko) * 2017-09-25 2020-01-17 효성중공업 주식회사 Ess 출력 제어 방법
WO2020125883A1 (fr) * 2018-12-21 2020-06-25 Vestas Wind Systems A/S Centrale électrique hybride et procédé destiné à commander une centrale électrique hybride
FR3116393A1 (fr) * 2020-11-17 2022-05-20 Electricite De France Commande optimisée en puissance d’une batterie participant au réglage primaire de fréquence

Family Cites Families (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4894764A (en) 1988-04-08 1990-01-16 Omnion Power Engineering Corporation Modular AC output battery load levelling system
DE4215550A1 (de) 1992-05-12 1993-11-18 Siemens Ag Verfahren und Einrichtung zur Bereitstellung von elektrischer Energie aus einem Gleichstromspeicher
DE19516838A1 (de) 1995-05-08 1996-11-14 Hagen Batterie Ag Verfahren und Schaltungsanordnung zur Deckung von Energiespitzenbedarf bei elektrischen Wechselstrom- bzw. Drehstromnetzen
JPH0965588A (ja) 1995-08-24 1997-03-07 Hitachi Ltd 電力貯蔵システム
DE19600289A1 (de) 1996-01-05 1997-07-10 F X Mittermaier & Soehne Ohg Verfahren und Vorrichtung zum Ausgleichen einer Stoßbelastung in einem elektrischen Stromversorgungsnetz
ATE207188T1 (de) 1996-08-02 2001-11-15 Va Tech Hydro Gmbh & Co Wasserkraftanlage
JP2001327083A (ja) 2000-05-18 2001-11-22 Ngk Insulators Ltd 高温二次電池による電力貯蔵及び補償システム
WO2004005685A1 (fr) 2002-07-04 2004-01-15 Alstom Technology Ltd Procede pour faire fonctionner une installation generatrice d'energie
CA2535458C (fr) 2003-08-15 2018-12-04 Beacon Power Corporation Procedes, systemes et dispositif permettant de reguler la frequence d'une puissance produite au moyen de systemes de stockage d'energie par volant d'inertie a charge et/ou a puissance variables
JP4945077B2 (ja) 2004-12-03 2012-06-06 シャープ株式会社 蓄電設備管理システム
US7737578B2 (en) 2005-01-07 2010-06-15 Evonik Power Saar Gmbh Method and device for supporting the alternating current frequency in an electricity network
GB0511361D0 (en) 2005-06-03 2005-07-13 Responsiveload Ltd Grid responsive control device
DE602006020617D1 (de) 2005-12-30 2011-04-21 Evonik Roehm Gmbh Lactoferrin-peptide, geeignet als in die zelle eindringende peptide
WO2007104167A1 (fr) * 2006-03-16 2007-09-20 Abb Research Ltd Procédé permettant de faire fonctionner un système de stockage d'énergie de batterie (bess) et système de stockage d'énergie de batterie associé
US20090066287A1 (en) * 2006-08-10 2009-03-12 V2Green, Inc. Business Methods in a Power Aggregation System for Distributed Electric Resources
US7747739B2 (en) * 2006-08-10 2010-06-29 Gridpoint, Inc. Connection locator in a power aggregation system for distributed electric resources
JP4802945B2 (ja) * 2006-08-31 2011-10-26 トヨタ自動車株式会社 二次電池の制御システムおよびそれを搭載したハイブリッド車両
DE102006047792A1 (de) 2006-10-06 2008-04-10 Technische Universität Clausthal Konditionierungseinrichtung für Energieversorgungsnetze
DE102006055120B4 (de) 2006-11-21 2015-10-01 Evonik Degussa Gmbh Thermoelektrische Elemente, Verfahren zu deren Herstellung und deren Verwendung
JP5100132B2 (ja) 2007-01-18 2012-12-19 株式会社東芝 周波数調整システムおよび周波数調整方法
EP2122798A1 (fr) 2007-01-25 2009-11-25 Eveready Battery Company, Inc. Système d'alimentation portable
JP4388094B2 (ja) * 2007-03-28 2009-12-24 株式会社東芝 組電池の保護装置及び電池パック装置
DE102008024222A1 (de) 2007-08-14 2009-02-26 Karl-Friedrich Schilling Elektrotechnik Gmbh Verfahren und Vorrichtung zur Bereitstellung von Regelleistung im Energieversorgungsbereich zur Frequenzstabilisierung eines elektrischen Netzes
US8373312B2 (en) * 2008-01-31 2013-02-12 General Electric Company Solar power generation stabilization system and method
US8368351B2 (en) * 2008-04-09 2013-02-05 Qualcomm Incorporated Transmission line directional awareness for a charging station
EP2139090A1 (fr) * 2008-06-24 2009-12-30 ABB Research Ltd. Procédé de fonctionnement d'un système de stockage d'énergie de batterie
DE102008046747A1 (de) 2008-09-11 2010-03-18 Hoppecke Advanced Battery Technology Gmbh Verfahren zum Betrieb eines Produktionssystems und/oder einer lokalen Anlage im Inselbetrieb
US7839027B2 (en) 2008-10-09 2010-11-23 The Aes Corporation Frequency responsive charge sustaining control of electricity storage systems for ancillary services on an electrical power grid
US8258746B2 (en) * 2008-12-19 2012-09-04 General Electric Company Charger and charging method
JP5439126B2 (ja) * 2009-03-31 2014-03-12 株式会社日立製作所 電源装置用状態検知装置
JP5230010B2 (ja) 2009-04-09 2013-07-10 古野電気株式会社 基準信号発生システム、タイミング信号供給装置及び基準信号発生装置
US8183826B2 (en) * 2009-05-15 2012-05-22 Battelle Memorial Institute Battery charging control methods, electric vehicle charging methods, battery charging apparatuses and rechargeable battery systems
AU2010273752A1 (en) 2009-06-29 2012-02-02 Stem, Inc. High speed feedback for power load reduction using a variable generator
JP4807443B2 (ja) 2009-07-08 2011-11-02 トヨタ自動車株式会社 二次電池の温度推定装置
DE102009050042A1 (de) 2009-08-10 2011-02-17 Rwe Ag Ladestation für Elektrofahrzeuge mit Netzstabilisierung
DE102009037239B4 (de) 2009-08-12 2011-04-14 Repower Systems Ag Windenergieanlage mit einstellbarer Leistungsreserve
DE102009054078A1 (de) 2009-11-20 2011-05-26 Li-Tec Battery Gmbh Batterieproduktionseinrichtung
EP2515412A1 (fr) 2009-12-14 2012-10-24 Sanyo Electric Co., Ltd. Système de charge/décharge
US8478452B2 (en) * 2010-04-06 2013-07-02 Battelle Memorial Institute Grid regulation services for energy storage devices based on grid frequency
WO2012049910A1 (fr) 2010-10-15 2012-04-19 三洋電機株式会社 Circuit de sortie pour système d'alimentation électrique
US8531158B2 (en) 2010-11-01 2013-09-10 GM Global Technology Operations LLC Method and apparatus for assessing battery state of health
PL2697231T3 (pl) 2011-04-12 2015-07-31 Evonik Degussa Gmbh Zdolny do ciągłego działania sposób wytwarzania związków karbonylowych za pomocą katalizatorów zawierających rodnik nitroksylowy
DE102011077788A1 (de) 2011-06-20 2012-12-20 Evonik Degussa Gmbh Verfahren zur Modifizierung eines methanhaltigen Gasvolumenstroms
JP5728582B2 (ja) 2011-09-16 2015-06-03 株式会社日立製作所 電力配分装置
DE102011083017A1 (de) 2011-09-20 2013-03-21 Evonik Industries Ag Verbundwerkstoffe umfassend eine offenzellige Polymermatrix und darin eingebettete Granulate
DE102012107348A1 (de) 2012-08-09 2014-02-13 Evonik Industries Ag Verfahren zur Begrenzung der Belastung von Stromübertragungsnetzen
DE102012107347A1 (de) 2012-08-09 2014-02-13 Evonik Industries Ag Verfahren zur Erlangung von einem kohlenwasserstoffhaltigen Gas

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
None *
See also references of WO2013068256A1 *

Also Published As

Publication number Publication date
US9667071B2 (en) 2017-05-30
DE102011055229A1 (de) 2013-05-16
WO2013068256A1 (fr) 2013-05-16
US20140327404A1 (en) 2014-11-06

Similar Documents

Publication Publication Date Title
EP2777124A1 (fr) Procede pour fournir une puissance de régulation au moyen d'un accumulateur d'énergie en mettant a profit des tolerances lors de la fourniture de la puissance
WO2013068256A1 (fr) Procede pour fournir une puissance de régulation au moyen d'un accumulateur d'énergie en mettant a profit des tolerances lors de la détermination de l'écart de fréquence
EP2777121B1 (fr) Procede pour fournir une puissance de régulation au moyen d'un accumulateur d'énergie en mettant a profit des tolerances au moment de la fourniture de la puissance de régulation
EP2777125B1 (fr) Procede pour fournir une puissance de régulation au moyen d'un accumulateur d'énergie à largeur de bande morte variable lors de la fourniture de la puissance
EP2777130A2 (fr) Procédé pour fournir une puissance de régulation
EP2777120B1 (fr) Procédé pour fournir une puissance de régulation en utilisant des accumulateurs d'énergie
EP2777126A1 (fr) Procede pour fournir une puissance de régulation en tenant compte d'une fréquence nominale variable
WO2013068258A1 (fr) Procédé pour mettre à disposition une puissance de régulation dans un réseau électrique
EP3382841B1 (fr) Utilisation hybride d'accumulateurs d'énergie
EP2936645A2 (fr) Procédé de fourniture de puissance de réglage en vue de stabiliser un réseau à courant alternatif, faisant intervenir un accumulateur d'énergie
WO2013068244A2 (fr) Procédé pour fournir une puissance de régulation
WO2014095346A2 (fr) Procédé de fourniture de puissance de réglage en vue de stabiliser un réseau à courant alternatif
EP2777119A2 (fr) Procédé pour fournir une puissance de régulation au moyen d'un générateur d'énergie et d'un consommateur d'énergie
EP2875560B1 (fr) Procédé de réglage du rapport entre l'énergie électrique injectée et prélevée dans un réseau d'alimentation en énergie électrique
WO2014180839A1 (fr) Procédé de fourniture de puissance de réglage à un réseau électrique au moyen d'un accumulateur
WO2014180830A1 (fr) Procédé de fourniture de puissance de réglage à un réseau électrique au moyen d'un accumulateur
WO2013068233A2 (fr) Procede pour fournir une puissance de régulation en vue de stabiliser un réseau de courant alternatif
WO2014095343A2 (fr) Procédé de fonctionnement d'accumulateurs d'énergie
DE102013102461A1 (de) Verfahren zur Bestimmung des Ladezustands eines Akkumulators

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140425

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIN1 Information on inventor provided before grant (corrected)

Inventor name: MARKOWZ, GEORG

Inventor name: DEIS, WOLFGANG

Inventor name: SCHWEISSTHAL, WOLFGANG

Inventor name: FLEMMING, ANNA

Inventor name: BREZSKI, HOLGER

Inventor name: WINTERNHEIMER, STEFAN

Inventor name: COCHET, SEBASTIEN

Inventor name: IGEL, MICHAEL

Inventor name: KOLLIGS, CARSTEN

Inventor name: GAMRAD, DENNIS

DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: EVONIK DEGUSSA GMBH

Owner name: STEAG POWER SAAR GMBH

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20180126

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20180807