EP2758631B1 - Dual purpose observation and production well - Google Patents

Dual purpose observation and production well Download PDF

Info

Publication number
EP2758631B1
EP2758631B1 EP12778495.7A EP12778495A EP2758631B1 EP 2758631 B1 EP2758631 B1 EP 2758631B1 EP 12778495 A EP12778495 A EP 12778495A EP 2758631 B1 EP2758631 B1 EP 2758631B1
Authority
EP
European Patent Office
Prior art keywords
tubing
straddle packer
production
zone
lateral well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP12778495.7A
Other languages
German (de)
French (fr)
Other versions
EP2758631A2 (en
Inventor
Abdulaziz A. AL-AJAJI
Fahad A. AL-AJMI
Mohammad S. Kanfar
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saudi Arabian Oil Co
Original Assignee
Saudi Arabian Oil Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Saudi Arabian Oil Co filed Critical Saudi Arabian Oil Co
Publication of EP2758631A2 publication Critical patent/EP2758631A2/en
Application granted granted Critical
Publication of EP2758631B1 publication Critical patent/EP2758631B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0035Apparatus or methods for multilateral well technology, e.g. for the completion of or workover on wells with one or more lateral branches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/124Units with longitudinally-spaced plugs for isolating the intermediate space
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/12Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Definitions

  • the present invention relates to subterranean wells for the production of oil and gas or other fluids. More specifically, the invention relates to an apparatus and method for a providing a single well for simultaneously producing and observing.
  • US 2008/0223585 describes a tubing string run into a well, the tubing string including a tubing and an isolation valve.
  • a toolstring including the electrical pump is run into an inner bore of the tubing for engagement inside the tubing string. Removal of the toolstring including the electrical pump is enabled without removing the tubing string due to presence of the isolation valve.
  • a common practice is to drill a vertical well across multiple zones and perforate the target zone for production and pressure monitoring purposes. At the same time, it is possible to intervene rig-less and run saturation logs across all zones or run production logging across the perforated zone. Inconveniently, this practice has several setbacks. For example, continuous pressure measurement is not possible. Producing the well will cause the pressure immediately around the well bore to drop, and therefore the pressure readings will not be representative of the general area around the well. Getting a representative pressure reading requires shutting-in the well for few days until pressure stabilizes. Shutting-in the well will cause losing potential production and thus revenue.
  • Another disadvantage of current methods is that production and pressure monitoring have to be in the same reservoir. If production from another zone/reservoir is desired, two reservoirs have to be perforated, isolated with straddle packers and completed with dual completion. Doing so will restrict running logs since the reservoirs will be behind both a tubing and a casing string which will hinder logs from reading the formation. In addition, vertical wells have low production rates compared to horizontal producers so it would be advantageous to have a production well that is horizontal.
  • Embodiments of the current application provide a method and apparatus for addressing the shortcomings of the current art, as discussed above.
  • the current application discloses a single well able to serve as a horizontal producer and a vertical observation well simultaneously with the luxury of full accessibility to both production and observation regions within the well.
  • the cost of drilling an additional well is eliminated, more drilling slots can be availed for producers rather than observation wells, and more data can be acquired from a single slot. In offshore operations this can amount to significant cost saving.
  • the invention revolves around drilling one well with two laterals; one vertical for observing a single or multiple reservoirs, and one horizontal for producing. After drilling the vertical observation section, the well will be sidetracked with level-four technology into a selected reservoir providing a producing lateral. The vertical section of the well is maintained for observation purposes and will continuously provide pressure data from one reservoir through perforations. Whenever water saturation profiles are needed across the different reservoirs, the well will be temporarily shut-in and the saturation logs are run across the observation section through a Y-tool.
  • the integrated well design allows full flexibility for intervention in the producing lateral, where coiled tubing can be utilized to stimulate or log the well with a production log tool ("PLT").
  • Dual purpose wells of the present application will significantly reduce cost and efficiently utilize resources including the costs associated with drilling time and completion. Additionally, they avail more drilling slots to be utilized for drilling producing wells, making them particularly attractive for offshore developments or those with limited drilling slots. In addition to monitoring pressure and saturation, the dual purpose wells of the present application serve as a horizontal producer.
  • One embodiment of the current application includes a method for producing hydrocarbons in a subterranean well useful for observing properties of one or more subterranean zones, as described in claim 1.
  • the method also includes installing a sidetrack window in the tubing between the lower straddle packer and the upper straddle packer for providing access to the lateral well section, the tubing sidetrack window having a sliding means for opening and closing access to the tubing sidetrack window.
  • the method may further include opening the sliding means of the tubing sidetrack window, running coiled tubing from the surface down the tubing, through the tubing sidetrack window and into the lateral well section, and performing an intervention procedure on the lateral well section.
  • the method includes providing a sliding sleeve opening in the tubing below the upper straddle packer and opening the sliding sleeve opening to allow fluids from the lateral well section to enter the tubing.
  • the method may also include the step of installing an isolation means below the upper straddle packer to prevent fluids below the isolation means within the tubing from flowing towards the surface.
  • the method might also include installing a Y-tool above the upper straddle packer, connecting the tubing to a first lower branch of the Y-tool, connecting an electrical submersible pump to a second lower branch of the Y-tool, and operating the electrical submersible pump to assist with the production of fluids from the lateral well section.
  • Logging equipment may be run through the first lower branch of the Y-tool to bypass the electrical submersible pump.
  • the method may include providing a means for opening and closing the sidetrack window, opening the tubing sidetrack window, running coiled tubing from the surface down the tubing, through the first lower branch of the Y-tool, through tubing sidetrack window and into the lateral well section, and performing an intervention procedure on the lateral well section.
  • the method may further comprise perforating the vertical well below the lower straddle packer at the level of the observation zone.
  • Pressure information may be obtained with the gauge in the production zone, saturation information may be obtained in both the production and observation zones, and production logs may be obtained in the observation zone.
  • the apparatus further comprises a sidetrack window in the tubing between the lower straddle packer and the upper straddle packer for providing access to the lateral well section, the tubing sidetrack window having a sliding means for opening and closing access to the sidetrack window.
  • the sliding sleeve opening in the tubing below the upper straddle packer may be operable such that when the sliding sleeve opening is opened, fluids from the lateral well section may enter the tubing and flow to the surface.
  • the isolation means is a nipple profile located below the sliding sleeve opening.
  • the apparatus may include a Y-tool located above the upper straddle packer, the tubing being connected to a first lower branch of the Y-tool and an electrical submersible pump connected to a second lower branch of the Y-tool to assist with the production of fluids from the lateral well section.
  • the lateral well section may be located in a production zone which is separate from the perforated zone.
  • Logging equipment may be run through the first lower branch of the Y-tool to the perforated zone, the logging equipment operable to provide saturation information on both the production zone and the perforated zone and to provide production information across the perforated zone.
  • the pressure gauge may be located in a production zone and be operable to collect pressure information from the production zone.
  • an offshore hydrocarbon production system may include a surface platform 10 located at the surface of the water. Alternatively, the platform could be situated on land.
  • a single slot can be used to drill a well 12, which includes vertical well section 14 and horizontal well section 16 which meet at junction 20.
  • the horizontal well section 16 is located within the target production zone 22 and will allow for hydrocarbons within production zone 22 to be produced along flow path 18.
  • Horizontal well section 16 is an example of a lateral well section.
  • Vertical well section 14 passes through production zone 22 and into lower zone 23. Vertical well section 14 can be used to observe conditions both in production zone 22 and lower zone 23, which is an observation zone.
  • a vertical well section 14 for observation is drilled, cased and cemented.
  • a whipstock is installed below the point in vertical well section 14 where junction 20 forms to guide the drilling of the horizontal well section 16.
  • the horizontal well section 16 will then be sidetracked through casing sidetrack window 52 to the production zone 22 away from the vertical well section 14.
  • the horizontal well section 16 will be cased and cemented.
  • other know means can be used to drill horizontal well section 16 of the well 12.
  • straddle packer 24 may be, for example, a standard industry seal bore packer.
  • Lower straddle packer 26 may be, for example, a standard industry packer with tail pipe 28.
  • Tail pipe 28 extends from the bottom of lower straddle packer 26 to the production zone 22 and has a central bore which may be open to the fluids in vertical well section 14.
  • Tail pipe 28 may also have a valve or other means for creating a barrier between its internal bore and the fluids in vertical well section 14.
  • Operation gauge 36 may be capable of collecting data from the well 12, including pressure.
  • Communications and power for operation gauge 36 may be provided by wires running from operation gauge 36 to the surface or by other means known in the industry.
  • Perforations 60 will be made into the lower zone 23 in the vertical well section 14 below the bottom of tail pipe 28. Perforations 60 may be situated in liner 70 installed below the bottom of casing 68 of vertical well section 14.
  • Tubing 30 Between straddle packers 24, 26 there is tubing 30 with bore 54 for transporting production fluids to the surface.
  • Tubing 30 includes a sliding sleeve opening 32 which may be opened and closed by an operator and may be, for example, a sliding side door. Sliding sleeve opening 32, when open, will allow fluids from horizontal well section 16 to enter bore 54 of tubing 30. When closed, sliding sleeve opening 32 will not allow fluids to enter bore 54 of tubing 30.
  • Tubing 30 also includes a nipple profile 37 located below sliding sleeve opening 32 and above tubing sidetrack window 34.
  • Nipple profile 37 can be used to prevent cross flow and isolate the well below the level of nipple profile 37. Therefore any fluid entering tubing 30 from vertical well section 14 or horizontal well section 16 below nipple profile 37 can be blocked from progressing further up tubing 30 and only the fluids that enter tubing 30 through sliding sleeve opening 32 will reach the surface.
  • Tubing 30 will also comprise tubing sidetrack window 34 on the same side of tubing 30 as the junction 20 between the horizontal well section 16 and the vertical well section 14.
  • Tubing sidetrack window 34 will be in close proximity to casing sidetrack window 52 and will be used for access to horizontal well 16, if needed for intervention.
  • Latch profile 38 located above lower straddle packer 26 ensures that the rotational orientation of the components of tubing 30 are correct so that tubing sidetrack window 34 is aligned with casino, sidetrack window 52.
  • tubing sidetrack window 34 may include a means for opening or closing access to the window such as window sliding sleeve 62.
  • Above upper straddle packer 24 may be seal assembly 40 and tubing 42.
  • Tubing 42 is connected to first lower branch 64 of a Y-tool 44 and has bore 56 which is in fluid communication with bore 54 of tubing 30.
  • Second lower branch 66 of Y-tool 44 is connected to an electrical submersible pump ("ESP") 46.
  • ESP packer 48 is located above Y-tool 44 and production line 50, which is in fluid communication with the upper end of Y-tool 44 is located above ESP packer 48.
  • Tubing 42 may be pre-perforated to allow fluid communication between bore 56 of tubing 42 and well bore 58 in the region above upper straddle packer 24 and below ESP packer 48.
  • operation gauge 36 will provide representative and continuous pressure and saturation measurements without hindering production from the horizontal well section 16.
  • the components can be removed and operation gauge 36 can be repaired, recalibrated or replaced.
  • the ESP will provide lift to assist with the production of fluids from horizontal well section 16 and in addition, will provide pressure measurements from the horizontal well section 16.
  • sliding sleeve opening 32 will be open to allow produced fluids from horizontal well section 16 to enter bore 54 of tubing 30. The produced fluids will continue upwards and into bore 56 of tubing 42 then into production line 50 to the surface.
  • Nipple profile 37 which creates an internal barrier within bore 54 of tubing 30, will ensure that fluids in bore 54 of tubing 30 below nipple profile 37 will not be able to reach tubing 42.
  • Window sliding sleeve 62 may also be closed to ensure any fluids entering tubing 30 through tail pipe 28 from vertical well section 14 does not exit into horizontal well section 16 and mix with the produced fluids.
  • a valve or other isolation means in tail pipe 28 may be closed so that no fluids from vertical well section 14 enter tubing 30.
  • Coiled tubing can be lowered through an internal bore of production line 50, and through ESP packer 48 and into first lower branch 64 of Y-tool 44, thereby bypassing ESP 46. The coiled tubing will then continue through upper straddle packer 24 and into bore 54 of tubing 30.
  • the coiled tubing will be fed through nipple profile 37. Window sliding sleeve 62 will be opened.
  • the lower end of coiled tubing can be curved such that it can enter tubing sidetrack window 34, pass through the casing sidetrack window 52 and enter horizontal well section 16. Intervention of horizontal well section 16 can therefore be accomplished without the need to pull any tubing and without bringing in a rig for any completion or de-completion operations.
  • well 12 When saturation or production logs are needed, well 12 will be temporarily shut-in, and sliding sleeve opening 32 will be closed and window sliding sleeve 62 may also be closed.
  • the logging equipment can be lowered through internal bore of production line 50, through ESP packer 48 and into first lower branch 64 of Y-tool 44, thereby bypassing ESP 46. The logging equipment will then continue through upper straddle packer 24 and into bore 54 of tubing 30. The logging equipment will be fed through nipple profile 37 and downward through lower straddle packer 26, out the open end of tail pipe 28 and past perforations 60 of vertical well section 14.
  • Lower zone 23 with perforations 60 may also be logged for a production profile.
  • well 12 may comprise multiple horizontal wells, each with a set of straddle packers, an ESP packer, and a Y-tool, for performing as described above. Observations may take place for a single or for multiple zones or reservoirs.
  • horizontal well section 16 has been described as a horizontal well, the embodiments of the present application apply equally to this and other lateral well configurations.
  • Spatial terms describe the relative position of an object or a group of objects relative to another object or group of objects.
  • the spatial relationships apply along vertical and horizontal axes.
  • Orientation and relational words including “uphole” and “downhole”; “above” and “below”; “up” and “down” and other like terms are for descriptive convenience and are not limiting unless otherwise indicated.

Description

    BACKGROUND OF THE INVENTION 1. Field of the Invention
  • The present invention relates to subterranean wells for the production of oil and gas or other fluids. More specifically, the invention relates to an apparatus and method for a providing a single well for simultaneously producing and observing.
  • 2. Description of the Related Art
  • Monitoring pressure and saturation in a producing reservoir is critical for proper reservoir management, and it is being accomplished throughout the industry in a variety of ways. In offshore fields, wells are drilled from expensive platforms with limited number of drilling slots. Therefore, dedicating a slot for observation only instead of production is costly. US 2008/0223585 describes a tubing string run into a well, the tubing string including a tubing and an isolation valve. A toolstring including the electrical pump is run into an inner bore of the tubing for engagement inside the tubing string. Removal of the toolstring including the electrical pump is enabled without removing the tubing string due to presence of the isolation valve.
  • A common practice is to drill a vertical well across multiple zones and perforate the target zone for production and pressure monitoring purposes. At the same time, it is possible to intervene rig-less and run saturation logs across all zones or run production logging across the perforated zone. Inconveniently, this practice has several setbacks. For example, continuous pressure measurement is not possible. Producing the well will cause the pressure immediately around the well bore to drop, and therefore the pressure readings will not be representative of the general area around the well. Getting a representative pressure reading requires shutting-in the well for few days until pressure stabilizes. Shutting-in the well will cause losing potential production and thus revenue.
  • Another disadvantage of current methods is that production and pressure monitoring have to be in the same reservoir. If production from another zone/reservoir is desired, two reservoirs have to be perforated, isolated with straddle packers and completed with dual completion. Doing so will restrict running logs since the reservoirs will be behind both a tubing and a casing string which will hinder logs from reading the formation. In addition, vertical wells have low production rates compared to horizontal producers so it would be advantageous to have a production well that is horizontal.
  • From the foregoing, a need has arisen to design a method and apparatus that enables continuous pressure measurement, production and pressure monitoring from separate reservoirs, and production from an accessible horizontal lateral.
  • SUMMARY OF THE INVENTION
  • Embodiments of the current application provide a method and apparatus for addressing the shortcomings of the current art, as discussed above. The current application discloses a single well able to serve as a horizontal producer and a vertical observation well simultaneously with the luxury of full accessibility to both production and observation regions within the well. In the embodiments of the current invention, the cost of drilling an additional well is eliminated, more drilling slots can be availed for producers rather than observation wells, and more data can be acquired from a single slot. In offshore operations this can amount to significant cost saving.
  • The invention revolves around drilling one well with two laterals; one vertical for observing a single or multiple reservoirs, and one horizontal for producing. After drilling the vertical observation section, the well will be sidetracked with level-four technology into a selected reservoir providing a producing lateral. The vertical section of the well is maintained for observation purposes and will continuously provide pressure data from one reservoir through perforations. Whenever water saturation profiles are needed across the different reservoirs, the well will be temporarily shut-in and the saturation logs are run across the observation section through a Y-tool. The integrated well design allows full flexibility for intervention in the producing lateral, where coiled tubing can be utilized to stimulate or log the well with a production log tool ("PLT").
  • Dual purpose wells of the present application will significantly reduce cost and efficiently utilize resources including the costs associated with drilling time and completion. Additionally, they avail more drilling slots to be utilized for drilling producing wells, making them particularly attractive for offshore developments or those with limited drilling slots. In addition to monitoring pressure and saturation, the dual purpose wells of the present application serve as a horizontal producer.
  • One embodiment of the current application includes a method for producing hydrocarbons in a subterranean well useful for observing properties of one or more subterranean zones, as described in claim 1.
  • In some preferred further embodiments, the method also includes installing a sidetrack window in the tubing between the lower straddle packer and the upper straddle packer for providing access to the lateral well section, the tubing sidetrack window having a sliding means for opening and closing access to the tubing sidetrack window. The method may further include opening the sliding means of the tubing sidetrack window, running coiled tubing from the surface down the tubing, through the tubing sidetrack window and into the lateral well section, and performing an intervention procedure on the lateral well section.
  • In other preferred further embodiments, the method includes providing a sliding sleeve opening in the tubing below the upper straddle packer and opening the sliding sleeve opening to allow fluids from the lateral well section to enter the tubing. The method may also include the step of installing an isolation means below the upper straddle packer to prevent fluids below the isolation means within the tubing from flowing towards the surface.
  • In alternative preferred further embodiments, the method might also include installing a Y-tool above the upper straddle packer, connecting the tubing to a first lower branch of the Y-tool, connecting an electrical submersible pump to a second lower branch of the Y-tool, and operating the electrical submersible pump to assist with the production of fluids from the lateral well section. Logging equipment may be run through the first lower branch of the Y-tool to bypass the electrical submersible pump.
  • In yet other alternative preferred further embodiments, the method may include providing a means for opening and closing the sidetrack window, opening the tubing sidetrack window, running coiled tubing from the surface down the tubing, through the first lower branch of the Y-tool, through tubing sidetrack window and into the lateral well section, and performing an intervention procedure on the lateral well section.
  • There may be both a production zone and an observation zone and the method may further comprise perforating the vertical well below the lower straddle packer at the level of the observation zone. Pressure information may be obtained with the gauge in the production zone, saturation information may be obtained in both the production and observation zones, and production logs may be obtained in the observation zone.
  • Another embodiment of the current application, an apparatus for producing hydrocarbons from a subterranean well while observing properties of one or more subterranean zones is described in claim 11.
  • In some preferred further embodiments, the apparatus further comprises a sidetrack window in the tubing between the lower straddle packer and the upper straddle packer for providing access to the lateral well section, the tubing sidetrack window having a sliding means for opening and closing access to the sidetrack window. In addition, the sliding sleeve opening in the tubing below the upper straddle packer, may be operable such that when the sliding sleeve opening is opened, fluids from the lateral well section may enter the tubing and flow to the surface. The isolation means is a nipple profile located below the sliding sleeve opening.
  • In other preferred further embodiments, the apparatus may include a Y-tool located above the upper straddle packer, the tubing being connected to a first lower branch of the Y-tool and an electrical submersible pump connected to a second lower branch of the Y-tool to assist with the production of fluids from the lateral well section. The lateral well section may be located in a production zone which is separate from the perforated zone. Logging equipment may be run through the first lower branch of the Y-tool to the perforated zone, the logging equipment operable to provide saturation information on both the production zone and the perforated zone and to provide production information across the perforated zone. The pressure gauge may be located in a production zone and be operable to collect pressure information from the production zone.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • So that the manner in which the above-recited features, aspects and advantages of the invention, as well as others that will become apparent, are attained and can be understood in detail, a more particular description of the invention briefly summarized above may be had by reference to the embodiments thereof that are illustrated in the drawings that form a part of this specification. It is to be noted, however, that the appended drawings illustrate only preferred embodiments of the invention and are, therefore, not to be considered limiting of the invention's scope, for the invention may admit to other equally effective embodiments.
    • FIG. 1 is a schematic drawings of a hydrocarbon production system utilizing embodiments of the present application.
    • FIG. 2 is a partial sectional view of an embodiment of the apparatus of the present application.
    DETAILED DESCRIPTION OF THE EXEMPLARY EMBODIMENTS
  • Looking at FIG. 1, an offshore hydrocarbon production system may include a surface platform 10 located at the surface of the water. Alternatively, the platform could be situated on land. A single slot can be used to drill a well 12, which includes vertical well section 14 and horizontal well section 16 which meet at junction 20. The horizontal well section 16 is located within the target production zone 22 and will allow for hydrocarbons within production zone 22 to be produced along flow path 18. Horizontal well section 16 is an example of a lateral well section. Vertical well section 14 passes through production zone 22 and into lower zone 23. Vertical well section 14 can be used to observe conditions both in production zone 22 and lower zone 23, which is an observation zone.
  • A vertical well section 14 for observation is drilled, cased and cemented. A whipstock is installed below the point in vertical well section 14 where junction 20 forms to guide the drilling of the horizontal well section 16. The horizontal well section 16 will then be sidetracked through casing sidetrack window 52 to the production zone 22 away from the vertical well section 14. The horizontal well section 16 will be cased and cemented. Alternatively, other know means can be used to drill horizontal well section 16 of the well 12.
  • Turning to FIG. 2, the junction 20 will be isolated with straddle packers 24, 26, Upper straddle packer 24 may be, for example, a standard industry seal bore packer. Lower straddle packer 26 may be, for example, a standard industry packer with tail pipe 28. Tail pipe 28 extends from the bottom of lower straddle packer 26 to the production zone 22 and has a central bore which may be open to the fluids in vertical well section 14. Tail pipe 28 may also have a valve or other means for creating a barrier between its internal bore and the fluids in vertical well section 14. At the lower end of tail pipe 28 is operation gauge 36. Operation gauge 36 may be capable of collecting data from the well 12, including pressure. Communications and power for operation gauge 36 may be provided by wires running from operation gauge 36 to the surface or by other means known in the industry. Perforations 60 will be made into the lower zone 23 in the vertical well section 14 below the bottom of tail pipe 28. Perforations 60 may be situated in liner 70 installed below the bottom of casing 68 of vertical well section 14.
  • Between straddle packers 24, 26 there is tubing 30 with bore 54 for transporting production fluids to the surface. Tubing 30 includes a sliding sleeve opening 32 which may be opened and closed by an operator and may be, for example, a sliding side door. Sliding sleeve opening 32, when open, will allow fluids from horizontal well section 16 to enter bore 54 of tubing 30. When closed, sliding sleeve opening 32 will not allow fluids to enter bore 54 of tubing 30.
  • Tubing 30 also includes a nipple profile 37 located below sliding sleeve opening 32 and above tubing sidetrack window 34. Nipple profile 37 can be used to prevent cross flow and isolate the well below the level of nipple profile 37. Therefore any fluid entering tubing 30 from vertical well section 14 or horizontal well section 16 below nipple profile 37 can be blocked from progressing further up tubing 30 and only the fluids that enter tubing 30 through sliding sleeve opening 32 will reach the surface.
  • Tubing 30 will also comprise tubing sidetrack window 34 on the same side of tubing 30 as the junction 20 between the horizontal well section 16 and the vertical well section 14. Tubing sidetrack window 34 will be in close proximity to casing sidetrack window 52 and will be used for access to horizontal well 16, if needed for intervention. Latch profile 38 located above lower straddle packer 26 ensures that the rotational orientation of the components of tubing 30 are correct so that tubing sidetrack window 34 is aligned with casino, sidetrack window 52. In some embodiments, tubing sidetrack window 34 may include a means for opening or closing access to the window such as window sliding sleeve 62.
  • Above upper straddle packer 24 may be seal assembly 40 and tubing 42. Tubing 42 is connected to first lower branch 64 of a Y-tool 44 and has bore 56 which is in fluid communication with bore 54 of tubing 30. Second lower branch 66 of Y-tool 44 is connected to an electrical submersible pump ("ESP") 46. ESP packer 48 is located above Y-tool 44 and production line 50, which is in fluid communication with the upper end of Y-tool 44 is located above ESP packer 48. Tubing 42 may be pre-perforated to allow fluid communication between bore 56 of tubing 42 and well bore 58 in the region above upper straddle packer 24 and below ESP packer 48.
  • In operation gauge 36 will provide representative and continuous pressure and saturation measurements without hindering production from the horizontal well section 16. In the case of a malfunction of operation gauge 36, the components can be removed and operation gauge 36 can be repaired, recalibrated or replaced. The ESP will provide lift to assist with the production of fluids from horizontal well section 16 and in addition, will provide pressure measurements from the horizontal well section 16. During normal production operations, sliding sleeve opening 32 will be open to allow produced fluids from horizontal well section 16 to enter bore 54 of tubing 30. The produced fluids will continue upwards and into bore 56 of tubing 42 then into production line 50 to the surface. Nipple profile 37, which creates an internal barrier within bore 54 of tubing 30, will ensure that fluids in bore 54 of tubing 30 below nipple profile 37 will not be able to reach tubing 42. Window sliding sleeve 62 may also be closed to ensure any fluids entering tubing 30 through tail pipe 28 from vertical well section 14 does not exit into horizontal well section 16 and mix with the produced fluids. Alternatively, a valve or other isolation means in tail pipe 28 may be closed so that no fluids from vertical well section 14 enter tubing 30.
  • If the horizontal well section 16 requires intervention, such as stimulation or to PLT the horizontal well section 16. it will be possible to access horizontal well 16 through tubing sidetrack window 34 using coiled tubing. Coiled tubing can be lowered through an internal bore of production line 50, and through ESP packer 48 and into first lower branch 64 of Y-tool 44, thereby bypassing ESP 46. The coiled tubing will then continue through upper straddle packer 24 and into bore 54 of tubing 30.
  • The coiled tubing will be fed through nipple profile 37. Window sliding sleeve 62 will be opened. The lower end of coiled tubing can be curved such that it can enter tubing sidetrack window 34, pass through the casing sidetrack window 52 and enter horizontal well section 16. Intervention of horizontal well section 16 can therefore be accomplished without the need to pull any tubing and without bringing in a rig for any completion or de-completion operations.
  • When saturation or production logs are needed, well 12 will be temporarily shut-in, and sliding sleeve opening 32 will be closed and window sliding sleeve 62 may also be closed. The logging equipment can be lowered through internal bore of production line 50, through ESP packer 48 and into first lower branch 64 of Y-tool 44, thereby bypassing ESP 46. The logging equipment will then continue through upper straddle packer 24 and into bore 54 of tubing 30. The logging equipment will be fed through nipple profile 37 and downward through lower straddle packer 26, out the open end of tail pipe 28 and past perforations 60 of vertical well section 14.
  • In this way, it will be possible to evaluate all zones for saturation, including production zone 22 and lower zone 23. Lower zone 23 with perforations 60 may also be logged for a production profile.
  • In alternative embodiments, well 12 may comprise multiple horizontal wells, each with a set of straddle packers, an ESP packer, and a Y-tool, for performing as described above. Observations may take place for a single or for multiple zones or reservoirs. Although horizontal well section 16 has been described as a horizontal well, the embodiments of the present application apply equally to this and other lateral well configurations.
  • Although the present invention has been described in detail, it should be understood that various changes, substitutions, and alterations can be made hereupon without departing from the scope of the invention as determined by the following claims.
  • The singular forms "a", "an" and "the" include plural referents, unless the context clearly dictates otherwise. Optional or optionally means that the subsequently described event or circumstances may or may not occur. The description includes instances where the event or circumstance occurs and instances where it does not occur. Ranges may be expressed herein as from about one particular value, and/or to about another particular value. When such a range is expressed, it is to be understood that another embodiment is from the one particular value and/or to the other particular value, along with all combinations within said range.
  • Spatial terms describe the relative position of an object or a group of objects relative to another object or group of objects. The spatial relationships apply along vertical and horizontal axes. Orientation and relational words including "uphole" and "downhole"; "above" and "below"; "up" and "down" and other like terms are for descriptive convenience and are not limiting unless otherwise indicated.

Claims (15)

  1. A method for producing hydrocarbons in a subterranean well useful for observing properties of one or more subterranean zones, the subterranean well having a vertical well section (14) and one or more lateral well sections (16), the intersection of the vertical well section and each of the one or more lateral well sections creating a junction (20), the method comprising the steps of:
    (a) installing a lower straddle packer (26) in the vertical well section (14) below each junction (20) with a lateral well section (16);
    (b) installing an upper straddle packer (24) in the vertical well section (14) above each junction (20) to create one or more isolation zones between the lower straddle packer (26) and the upper straddle packer (24) around each junction (20);
    (c) conveying hydrocarbons from the one or more lateral well sections (16) to the surface with a tubing (30);
    (d) observing pressure information in at least one measurement zone with a pressure gauge (36) located in the vertical well section (14) below all of the one or more isolation zones, so that the pressure gauge (36) does not hinder production from the one or more lateral well sections (16); and
    (e) obtaining information in at least one measurement zone with a logging equipment run through the tubing (30).
  2. The method of claim 1, further comprising the step of installing a sidetrack window (34) in the tubing (30) between the lower straddle packer (26) and the upper straddle packer (24) of each junction for providing access to the one or more lateral well sections (16), the tubing sidetrack window (34) having a sliding means (62) for opening and closing access to the tubing sidetrack window (34).
  3. The method of claim 2, further comprising the steps of:
    opening the sliding means (62) of the tubing sidetrack window (34);
    running coiled tubing from the surface down the tubing (30), through the tubing sidetrack window (34) and into at least one of the one or more lateral well sections (16); and
    performing an intervention procedure on the at least one of the lateral well sections (16).
  4. The method of claim 1, wherein step (c) further comprises:
    providing a sliding sleeve opening (32) in the tubing (30) below the upper straddle packer (24); and
    opening the sliding sleeve opening (32) to allow fluids from at least one of the one or more lateral well sections (16) to enter the tubing (30).
  5. The method of any of the preceding claims, further comprising the step of installing an isolation means (37) below the upper straddle packer (24) to prevent fluids below the isolation means (37) within the tubing (30) from flowing towards the surface.
  6. The method of any of the preceding claims, further comprising the steps of:
    installing a Y-tool (44) above the upper straddle packer (24);
    connecting the tubing (42) to a first lower branch (64) of the Y-tool (44);
    connecting an electrical submersible pump (46) to a second lower branch (66) of the Y-tool (44); and
    operating the electrical submersible pump (46) to assist with the production of fluids from at least one of the one or more lateral well sections (16),
    optionally
    wherein step (e) further comprises running the logging equipment through the first lower branch (64) of the Y-tool (44) to bypass the electrical submersible pump (46).
  7. The method of claim 6, further comprising the steps of:
    providing a sidetrack window (34) in the tubing (30) between the lower straddle packer (26) and the upper straddle packer (24);
    opening the tubing sidetrack window (34);
    running coiled tubing from the surface down the tubing (30), through the first lower branch (64) of the Y-tool (44), through tubing sidetrack window (34) and into the at least of the lateral well sections (16); and
    performing an intervention procedure on the at least one of the lateral well sections (16).
  8. The method of any of the preceding claims, wherein the at least one measurement zone comprises a production zone (22) and an observation zone (23) and the method further comprises perforating the vertical well section (14) below the lower straddle packer (26) of at least one of the one or more isolation zones at the level of the observation zone (23), optionally wherein step (d) comprises observing pressure information with the gauge (36) in the production zone (22).
  9. The method of claim 8, wherein step (e) comprises obtaining saturation information in both the production (22) and observation zones (23).
  10. The method of claim 8 or 9, wherein step (e) comprises obtaining production logs in the observation zone (23).
  11. An apparatus for producing hydrocarbons from a subterranean well while observing properties of one or more subterranean zones the subterranean well having a vertical well section (14) and one or more lateral well sections (16), the intersection of the vertical well section (14) and each of the one or more lateral well sections (16) creating a junction (20), the apparatus comprising:
    an upper straddle packer (24) located in the vertical well section (14) above each junction (20);
    a lower straddle packer (26) located in the vertical well section (14) below each junction (20) to create one or more isolation zones between the upper straddle packer (24) and the lower straddle packer (26) around each junction (20);
    a pressure gauge (36) located in a vertical well section (14) below all of the one or more isolation zones, so that the pressure gauge (36) does not hinder production from the one or more lateral well sections (16);
    a tubing (30) located in the vertical well for conveying hydrocarbons from at least one of the one or more lateral well section (16) to the surface and for running tools from the surface through the upper straddle packer (24) during use; and
    a nipple profile (37) located below a sliding sleeve opening (32) in the tubing for isolating fluids in the vertical well section (14) below the lower straddle packer (26) from fluids in the at least one of the one or more lateral well sections (16) associated with the at least one or more of the isolation zones, and for providing access to both the at least one of the one or more lateral well sections and the vertical well section during use.
  12. The apparatus of claim 11, further comprising a sidetrack window (34) in the tubing (30) in at least one of the one or more isolation zones for providing access to at least one of the one or more lateral well sections (16) during use, the tubing sidetrack window (34) having a sliding means (62) for opening and closing access to the sidetrack window (34).
  13. The apparatus of claim 11, wherein the sliding sleeve opening (32) in the tubing (30) is below the upper straddle packer (24), and is operable such that when the sliding sleeve opening (32) is opened, fluids from the associated lateral well section (16) may enter the tubing (30) and flow to the surface during use.
  14. The apparatus of any of the preceding claims, further comprising:
    a Y-tool (44) located above the upper straddle packer (24), the tubing (30) being connected to a first lower branch (64) of the Y-tool (44); and
    an electrical submersible pump (46) connected to a second lower branch (66) of the Y-tool (44) to assist with the production of fluids from at least one of the one or more lateral well sections (16) during use, optionally
    wherein at least one of the one or more lateral well sections (16) is located during use in a production zone (22) which is separate from a perforated zone, the apparatus further comprising logging equipment run through the first lower branch (64) of the Y-tool (44) to the perforated zone, the logging equipment operable to provide saturation information on both the production zone (22) and the perforated zone and to provide production information across the perforated zone during use.
  15. The apparatus of any of the preceding claims wherein the pressure gauge (36) is located in a production zone (22) and is operable to collect pressure information from the production zone (22) during use.
EP12778495.7A 2011-09-20 2012-09-19 Dual purpose observation and production well Active EP2758631B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US13/236,816 US9540921B2 (en) 2011-09-20 2011-09-20 Dual purpose observation and production well
PCT/US2012/056016 WO2013043663A2 (en) 2011-09-20 2012-09-19 Dual purpose observation and production well

Publications (2)

Publication Number Publication Date
EP2758631A2 EP2758631A2 (en) 2014-07-30
EP2758631B1 true EP2758631B1 (en) 2020-12-16

Family

ID=47076368

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12778495.7A Active EP2758631B1 (en) 2011-09-20 2012-09-19 Dual purpose observation and production well

Country Status (4)

Country Link
US (1) US9540921B2 (en)
EP (1) EP2758631B1 (en)
CA (1) CA2847875C (en)
WO (1) WO2013043663A2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017074733A1 (en) * 2015-10-26 2017-05-04 Halliburton Energy Services, Inc. Junction isolation tool for fracking of wells with multiple laterals
US10724344B2 (en) 2015-10-29 2020-07-28 Halliburton Energy Services, Inc. Shiftable isolation sleeve for multilateral wellbore systems
US10689979B2 (en) * 2016-06-16 2020-06-23 Schlumberger Technology Corporation Flowline saturation pressure measurement
US10704379B2 (en) 2016-08-18 2020-07-07 Schlumberger Technology Corporation Flowline saturation pressure measurements
RU2745682C1 (en) * 2017-09-19 2021-03-30 Хэллибертон Энерджи Сервисиз, Инк. Energy transmission mechanism for a connection joint for connection with a lateral well finishing tool
US11118443B2 (en) * 2019-08-26 2021-09-14 Saudi Arabian Oil Company Well completion system for dual wellbore producer and observation well
US11131170B2 (en) 2019-09-30 2021-09-28 Saudi Arabian Oil Company Electrical submersible pump completion in a lateral well
US11261727B2 (en) 2020-02-11 2022-03-01 Saudi Arabian Oil Company Reservoir logging and pressure measurement for multi-reservoir wells
US20220389802A1 (en) * 2021-06-07 2022-12-08 Halliburton Energy Services, Inc. Spacer window sleeve

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080223585A1 (en) * 2007-03-13 2008-09-18 Schlumberger Technology Corporation Providing a removable electrical pump in a completion system

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3193005A (en) 1961-10-24 1965-07-06 Exxon Production Research Co Well completion and logging method
US4807704A (en) 1987-09-28 1989-02-28 Atlantic Richfield Company System and method for providing multiple wells from a single wellbore
EP0465543B1 (en) 1989-03-31 1995-06-28 Phoenix Petroleum Services Ltd. Method and apparatus for monitoring well fluid parameters
US5353876A (en) * 1992-08-07 1994-10-11 Baker Hughes Incorporated Method and apparatus for sealing the juncture between a verticle well and one or more horizontal wells using mandrel means
US5706896A (en) 1995-02-09 1998-01-13 Baker Hughes Incorporated Method and apparatus for the remote control and monitoring of production wells
US6041860A (en) 1996-07-17 2000-03-28 Baker Hughes Incorporated Apparatus and method for performing imaging and downhole operations at a work site in wellbores
US6296066B1 (en) * 1997-10-27 2001-10-02 Halliburton Energy Services, Inc. Well system
US6119780A (en) 1997-12-11 2000-09-19 Camco International, Inc. Wellbore fluid recovery system and method
US6308782B1 (en) 1998-01-30 2001-10-30 Halliburton Energy Services, Inc Method and apparatus for one-trip insertion and retrieval of a tool and auxiliary device
US6230800B1 (en) 1999-07-23 2001-05-15 Schlumberger Technology Corporation Methods and apparatus for long term monitoring of a hydrocarbon reservoir
US6199633B1 (en) * 1999-08-27 2001-03-13 James R. Longbottom Method and apparatus for intersecting downhole wellbore casings
US6439312B1 (en) 2000-08-11 2002-08-27 Halliburton Energy Services, Inc. Apparatus and methods for isolating a wellbore junction
US7363983B2 (en) * 2004-04-14 2008-04-29 Baker Hughes Incorporated ESP/gas lift back-up
US7303009B2 (en) 2006-01-03 2007-12-04 Saudi Arabian Oil Company Method to detect low salinity injection water encroachment into oil formations
US20080302529A1 (en) * 2007-06-11 2008-12-11 Fowler Jr Stewart Hampton Multi-zone formation fluid evaluation system and method for use of same

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080223585A1 (en) * 2007-03-13 2008-09-18 Schlumberger Technology Corporation Providing a removable electrical pump in a completion system

Also Published As

Publication number Publication date
CA2847875C (en) 2017-08-08
US9540921B2 (en) 2017-01-10
US20130068453A1 (en) 2013-03-21
WO2013043663A3 (en) 2013-09-12
EP2758631A2 (en) 2014-07-30
CA2847875A1 (en) 2013-03-28
WO2013043663A8 (en) 2014-03-20
WO2013043663A2 (en) 2013-03-28

Similar Documents

Publication Publication Date Title
EP2758631B1 (en) Dual purpose observation and production well
US20220042411A1 (en) Determining Wellbore Parameters Through Analysis Of The Multistage Treatments
US10465471B2 (en) Treatment methods for water or gas reduction in hydrocarbon production wells
US9416653B2 (en) Completion systems with a bi-directional telemetry system
CA2546537C (en) Apparatus and method for obtaining downhole samples
US20130180709A1 (en) Well Completion Apparatus, System and Method
EP3194708B1 (en) Fast-setting retrievable slim-hole test packer and method of use
US11047211B2 (en) Reverse circulation debris removal tool for setting isolation seal assembly
CA2924466C (en) Multilateral wellbore stimulation
US6543541B2 (en) Access control between a main bore and a lateral bore in a production system
EP2964873B1 (en) Wireline assisted coiled tubing portion and method for operation of such a coiled tubing portion
WO2018143825A1 (en) An apparatus for forming at least a part of a production system for a wellbore, and a line for an a method of performing an operation to set a cement plug in a wellbore
US11118443B2 (en) Well completion system for dual wellbore producer and observation well
CA3118994A1 (en) High flowrate formation tester
US9828826B2 (en) Wellbore isolation system with communication lines
US20180223631A1 (en) Isolating a multi-lateral well with a barrier
US11708745B2 (en) Method for incorporating scrapers in multi zone packer assembly
US11851992B2 (en) Isolation sleeve with I-shaped seal
Mody et al. Multilateral wells: maximizing well productivity
US20220162927A1 (en) Advanced lateral accessibility, segmented monitoring, and control of multi-lateral wells
NO346270B1 (en) An isolation system, a completion system and a method for isolating a lower completion
NO20190063A1 (en) Wellbore isolation system with communication lines

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140227

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIN1 Information on inventor provided before grant (corrected)

Inventor name: AL-AJMI, FAHAD, A.

Inventor name: AL-AJAJI, ABDULAZIZ, A.

Inventor name: KANFAR, MOHAMMAD, S.

DAX Request for extension of the european patent (deleted)
RIN1 Information on inventor provided before grant (corrected)

Inventor name: KANFAR, MOHAMMAD, S.

Inventor name: AL-AJAJI, ABDULAZIZ, A.

Inventor name: AL-AJMI, FAHAD, A.

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20170222

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20200717

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602012073760

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1345770

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210115

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210317

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1345770

Country of ref document: AT

Kind code of ref document: T

Effective date: 20201216

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20201216

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20201216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210316

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210416

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602012073760

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210416

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

26N No opposition filed

Effective date: 20210917

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602012073760

Country of ref document: DE

REG Reference to a national code

Ref country code: NO

Ref legal event code: MMEP

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20210930

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20210919

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210416

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210930

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210919

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210919

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210919

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210930

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220401

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210930

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20120919

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20201216

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230526