EP2708674A2 - Plastering strip, final rail and plaster chamfer - Google Patents

Plastering strip, final rail and plaster chamfer Download PDF

Info

Publication number
EP2708674A2
EP2708674A2 EP13165040.0A EP13165040A EP2708674A2 EP 2708674 A2 EP2708674 A2 EP 2708674A2 EP 13165040 A EP13165040 A EP 13165040A EP 2708674 A2 EP2708674 A2 EP 2708674A2
Authority
EP
European Patent Office
Prior art keywords
plaster
strip
area
plastering
leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP13165040.0A
Other languages
German (de)
French (fr)
Other versions
EP2708674B1 (en
EP2708674A3 (en
Inventor
August Braun
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BRAUN, AUGUST
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=47008061&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP2708674(A2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to PL13165040T priority Critical patent/PL2708674T3/en
Publication of EP2708674A2 publication Critical patent/EP2708674A2/en
Publication of EP2708674A3 publication Critical patent/EP2708674A3/en
Application granted granted Critical
Publication of EP2708674B1 publication Critical patent/EP2708674B1/en
Revoked legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/06Edge-protecting borders
    • E04F13/068Edge-protecting borders combined with mesh material or the like to allow plaster to bond therewith
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/06Edge-protecting borders
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/62Tightening or covering joints between the border of openings and the frame or between contiguous frames
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/06Edge-protecting borders
    • E04F2013/063Edge-protecting borders for corners
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
    • E04F13/04Bases for plaster
    • E04F13/06Edge-protecting borders
    • E04F2013/065Edge-protecting borders for lower edges of outer insulation layers
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/62Tightening or covering joints between the border of openings and the frame or between contiguous frames
    • E06B2001/624Tightening or covering joints between the border of openings and the frame or between contiguous frames with parts to be embedded in the stucco layer or otherwise linked to this layer

Definitions

  • the invention relates to a plaster molding, a finishing rail and a plaster molding.
  • plaster shrinks slightly during drying since window and door sills are exposed to vibrations, for example by violent slamming of the windows or doors, and since such building corners are also exposed to high temperature fluctuations, there is a risk that a crack or gap between the plaster and forms the window or door frame.
  • moisture can then penetrate, which permanently damages the window floor, the door frame or the plaster or the insulation, for example leads to crumbling of the plaster.
  • plaster moldings are often provided at the transition between the window or door frame to the plaster, which decouple the window or door frame from the plaster and at the same time provide a seal therebetween.
  • a plaster strip is for example from the EP 0 875 641 A2 known.
  • thermal insulation which consist for example of rigid foam or fiberboard.
  • Thermal insulation on building walls usually has a lower end just above the surface of the soil or a soil attachment approaching the building wall.
  • the lower end of the thermal insulation is a critical area because moisture can penetrate from underneath between the building wall and the thermal insulation and between the thermal insulation and the outer plaster, which can lead to damage up to crumbling plaster. Therefore, in the lower end of the thermal insulation often end rails are used, which are attached with a first leg to the building and on the second leg, the insulation rests with its end face. Because the Outside of such insulation panels is often provided with external plaster, such a finishing rail a reliable plaster finish must be guaranteed to prevent cracks in the plaster and even crumbling of the plaster.
  • a termination bar is for example from the DE 195 39 526 A1 known.
  • plaster corner strips are often applied, which serve to ensure a reliable completion of the plaster layer on the first side of the building corner and a reliable conclusion for the plaster layer on the second side of the building corner and to avoid the crumbling of plaster on the building corner .
  • a plaster cornice is for example from the DE 100 38 279 A1 known.
  • plaster strips, finishing rails and plaster corner strips has in common that essential components of them are often made by insulation for insulation reasons by extrusion.
  • These plaster strips, finishing rails and plaster corner strips are usually extruded from hard plastic, especially PVC.
  • All such plaster strips, finishing rails and plaster corner strips is still common that they are available on the site in fixed lengths and that it will be cut off at the construction site, the required plaster strips, finishing rails and plaster corner strips in the desired length. This creates waste, usually several short pieces that need to be disposed of.
  • a plaster strip according to the invention for placement at a transition between a first component of a building, in particular a window or door frame, a window sill, a beam, a metal connection or a Lisene, and a second component of a building, in particular a thermal insulation and / or a plaster layer comprises a fixing area, with which the plaster strip can be fastened to at least one component of the transition; and a plastering area for plastering into the plaster layer and / or intended for firm connection with the thermal insulation.
  • the fixing area and the plastering area are formed as a common extrusion part or as separate extrusion parts and have a material whose main component is a renewable raw material.
  • a finishing rail according to the invention for structural heat insulation or building sound insulation comprises an angle rail whose first leg is provided for attachment to the structure and the second leg for abutment against a termination end side of the insulation; and an outer bar attached to the end portion of the second leg of the angle rail and having an outer leg for engagement with the outside of the insulation.
  • the angle rail and the outer bar are formed as a common extrusion or as separate extrusion parts.
  • the angle rail and / or the outer bar have a material whose main component is a renewable raw material.
  • a trim corner strip according to the invention for arrangement on a vertical or a horizontal building corner, in particular a building corner provided with thermal insulation comprises a first leg for engagement with the building on the first side of the building corner; and a second leg for engagement with the structure on the second side of the building corner.
  • the first and second legs are formed as a common extrusion or as separate extrusions.
  • the first and / or the second leg comprise a material whose main component is a renewable raw material.
  • the plaster strip according to the invention ensures a permanently tight transition to a building component.
  • the end rail according to the invention ensures a permanent and secure closure for building thermal insulation or structural sound insulation.
  • a permanently dimensionally stable corner is ensured by a plaster corner strip according to the invention.
  • the resources available in nature can be used, and a considerable amount of petrochemical or similar materials, which are used for the production of such strips / rails made of hard plastic could be replaced by a renewable resource. This protects the resources and guarantees an environmentally friendly production.
  • renewable raw materials can be extruded with the addition of at least one further component which ensures cohesion and, after extrusion, are well suited to the requirements of the plaster molding according to the invention, the finishing rail according to the invention or the plaster molding of the type described above.
  • the disposal is significantly simplified due to the main component of a renewable resource , Therefore, on the construction site resulting waste from such strips / rails, usually several short pieces, can be disposed of more easily and decomposes after a manageable period in the ground, which makes the bar / rail according to the invention also in terms of waste disposal significantly more environmentally friendly.
  • the fixing area and the plastering area are integrally formed.
  • both the fixing area and the grooming area comprise a material whose main constituent is a renewable raw material.
  • Such a plaster molding seals the building transition reliably and is relatively simple.
  • the fixing region has an adhesive strip for attachment to the first building component.
  • the plaster strip is reliably connected with its fixing area with the building component.
  • adhesive strip also includes a strip of adhesive applied.
  • the design can be such that the adhesive strip, which adjoins the remaining plaster strip on one side and can be adhered to the first building component on the other side, already constitutes the fixing region as such. It is emphasized, however, that there are alternative ways of forming the fixing area, in particular screwing the plaster molding on one of the two building parts or pinching in a gap between the first component of the building and the thermal insulation or fixing or fixing to the insulation.
  • the plastering area is provided with a groove profile for improved adhesion to the plaster.
  • the surface of the plastering area, with which the plaster enters into a bond increases, and thus improves the adhesion.
  • a reinforcement fabric section is attached to the plastering area, which is intended for plastering.
  • the Arm michsgewebeabêt can be formed for example in the form of a coated with alkali-resistant material fiberglass mesh. After applying the plaster, the Arm michsgewebeabêt is below the plaster surface, in most cases, he is in turn attached by means of filler to the ground.
  • the reinforcing fabric section improves the adhesion of the plaster to the substrate and ensures the permanent crack-free of the plaster.
  • a detachable or breakable strip-shaped protective strip is provided.
  • a film can be attached, which spans the window frame and the window or the door frame and the door, or the like, and protects against dirt and damage during the plastering.
  • this protective tab is removed or disposed of by separating or canceling the rest of the cleaning strip, which is when the Protective tab also has a material whose main ingredient is a renewable resource, especially environmentally friendly.
  • the fixing area and the plastering area are formed separately from one another in such a way that a relative movement between the fixing area and the plastering area is made possible by separating a strip-shaped protective strip by means of a guide connection.
  • the cleaning strip is formed in two parts, with one part being formed by the fixing area and the other part by the plastering area.
  • the fixing and the plastering area are connected to one another via a flexible material section, which is also referred to as a loop, which permits relative movement between the fixing area and the plastering area.
  • the grout bar material movements for example due to temperature fluctuations between the first and the second building component compensate, by a movement, such as an elongation of the flexible material portion.
  • the sealing function of the plaster molding is maintained without the plaster being damaged.
  • this has an expansion strip which is designed so that it - possibly after releasing a Einperr Schemes - expands in the direction of one of the two building components towards and applies it, so as a seal between the two To ensure components.
  • the outer strip is glued to the angle rail or attached to the angle rail.
  • Both types of connection can be z. B. perform easily at the site and result in a lasting, even in adverse weather conditions stable connection.
  • the outer bar has a closure end-side leg, which is provided for abutment against a closure end face of the insulation. With such a front-end leg, the outer bar can be attached to the insulation easily and accurately positioned.
  • the angle rail and the outer strip are connected to one another by means of an adhesive strip, in particular by means of an adhesive strip provided between the second leg of the angle rail and the end-face leg of the outer strip.
  • This adhesive tape which also includes a quantity of adhesive applied, reliably and permanently bonds the angle rail and the outer panel, providing a good seal therebetween.
  • a Arm michsgewebeabêt for applied to the insulation plaster is attached to the outer bar, which is intended for plastering.
  • the Arm michsgewebeabites can be formed for example in the form of a coated with alkali-resistant material fiberglass mesh. After applying the plaster, the Arm michsgewebeabites is below the plaster surface, in most cases, he is in turn attached by means of filler to the ground.
  • the reinforcing fabric section improves the adhesion of the plaster to the substrate and ensures the permanent crack-free of the plaster.
  • the outer rail has a further leg, which forms a drip nose for water.
  • This further leg can protrude, for example, in the installation situation at the lower end of the insulation down and reduce the proportion of water that passes from the outside in the direction of thermal insulation and towards the building. This keeps the angle rail drier and also prevents, in the case that the outer bar is glued to the angle rail, that too much water gets to the adhesive strip.
  • a flexible transitional area is provided between the outer leg and the closing end-side leg of the outer bar. This can be a change in position between the Allow outer leg and the final front-side leg in a certain angular range, so that the end rail according to the invention can be used for different installation situations.
  • the transition region has an insertion region in the transverse direction for a plug connector.
  • a connector can be transversely inserted into the transition region, and the terminus can be connected and aligned with a transversely disposed terminus.
  • the adjacently arranged end rail is then preferably also provided a plug-in area in the transverse direction, in which the connector can be inserted.
  • the second leg of the angle rail forms a step-shaped profile, which is arranged in particular in its outer end region.
  • the outer end region may be at a height level below the height level of the remaining portion of the second leg of the angle rail.
  • the outer bar is often glued or plugged. It can thus be achieved that the upper side of the second leg of the angle rail and the upper side of the end front side leg of the outer strip are at the same height level, which allows a favorable connection to the heat insulation arranged above it.
  • a plastering area is formed by at least one of the legs. This facilitates the plastering of the plaster molding.
  • a reinforcing fabric section is fixed in at least one of the legs, in particular in both legs, on the side facing away from the plant side, which is intended for plastering.
  • the Arm michsgewebeabites can be formed for example in the form of a coated with alkali-resistant material fiberglass mesh. After applying the plaster, the Arm michsgewebeabêt is below the plaster surface, in most cases, he is in turn attached by means of filler to the ground.
  • the reinforcing fabric section improves the adhesion of the plaster to the substrate and ensures the permanent crack-free of the plaster.
  • a particularly flexible transition region between the first and the second leg is provided. This can allow a change in position between the two legs in a certain angular range, so that the plaster corner strip according to the invention can be used for different installation situations.
  • the transition region is provided with a groove-like profiling at least on the side facing a leg to be armed.
  • the transition region has an insertion region in the transverse direction for a connector.
  • a connector can be inserted in the transverse direction in the transition area, and the plaster molding can be connected to an adjacent, or above / below arranged plaster corner molding.
  • the adjacently arranged plaster corner strip is then preferably also provided an insertion in the transverse direction, in which the connector can be inserted.
  • the main component of the material consists of rice hulls or fibers or flour made of wood or fibers or flour thereof.
  • a mixture of the ingredients rice hulls, rock salts and mineral oil has been found.
  • Such a material absorbs little to no water, only the surface is wetted and is very resistant. In particular, it can be processed arbitrarily, for example sawed, cut, drilled, ground, painted and oiled. It does not crack or splinter and waste is completely recyclable.
  • natural fibers such as flax, hemp or other fiber plants have been proven.
  • Lignin which is a polymer, has proven to be a particularly suitable carrier material.
  • Another suitable material is bio-polyethylene.
  • Another suitable material is a mixture of co-polyester and polylactic acid PLA, which may contain a large amount of natural renewable resource.
  • the fixing area and / or the plastering area of the plastering strip according to the invention of the type described above, the angle rail and / or the outer strip of the inventive end rail of the type described above and the first and / or second leg of the plaster corner strip according to the invention of the above described type consist of a material mentioned above. All these materials have in common that they can be extruded, what they for the production of the fixing area and / or Anputz Schemes the plaster strip according to the invention of the type described above, the angle rail and / or the Au- ⁇ enance the inventive end rail of the type described above and first and / or the second leg of the plaster corner strip according to the invention of the type described above makes it suitable, since they are produced by extrusion.
  • the first plaster strip 2, the second plaster strip 26, the end rail 68 and the plaster corner strip 96 are described below representative of any plaster strips, finishing rails and plaster corner strips, in which at least one main area has been made by extrusion from a material whose Main component is a renewable raw material, and thus represents an extrusion of a material whose main component is a renewable raw material.
  • the extrusions are inexpensive to manufacture and are characterized by a consistent over their entire length profile cross-section.
  • Fig. 1 and 2 show the plaster strips 2 and 26 respectively in the delivery state, in which the strip-shaped protective strap has not yet been separated.
  • the first plastering strip 2 illustrated by way of example comprises a fixing area 4 and a plastering area 10 with a reinforcing fabric section 18 and a strip-like protective strip 22.
  • the fixing area 4 and the plastering area 10 are integrally formed with each other, so that the present plaster strip 2 can also be referred to as a one-piece plaster strip 2.
  • the strip-shaped protective tab 22 is connected by means of a break-off material bridge 24 with a cleaning end side 14 of the plastering area 10.
  • the strip-shaped protective flap 22 still has a spacer web which, in the assembled state of the plastering strip 2, can rest on the outside of a first building component.
  • the fixing area 4, the plastering area 10 and the strip-shaped protection strip 22 have been jointly produced by extrusion from a material whose main constituent is a renewable raw material, which will be described in more detail below.
  • the fixing area 4 is presently of a in Fig. 1 horizontally extending base wall 6 and an adhesive strip 8 fixed thereto, which is intended for attachment to a first building component, such as a window or door frame.
  • the first building component, on which the adhesive strip 8 is applied can also be designed as a window sill, as a beam, as a metal connection, or as a lisse.
  • the plastering area 12 is formed by the outside of the leg support 12, by the cleaning end side 14 directed away from the window or door frame, and by the reinforcing fabric section 18.
  • the first plaster strip 2 has a stepped course, the underside of the plaster end 14 is based on the installation situation, closer to the window / door frame as the bottom of the base wall. 6
  • the Arm istsgewebeabites 18 is presently connected to the Wegragschenkel 12 by means of a compound, which is exemplified here as Ultraschallversch spaung 20, respectively.
  • the cleaning end side 14 directed away from the window or door frame and the surface of the support leg 12 directed by the thermal insulation in the direction of the opposite window or door frame side are provided with a channel profiling 16 for improving the adhesion of the plaster.
  • the plastering strip 2 is first cut to the appropriate length predetermined by the dimensions of the window or door opening and then attached to the transition between the window / door frame and thermal insulation by placing the plastering strip 2 with its fixing region 4 in the gap between window and door frames. or door frame and insulation is inserted so that the plaster strip 2 rests with the top of its base wall 6 on the gap-side front side of the insulation, rests with the back of her Wegragschenkels 12 on the outside of the insulation and the adhesive strip 8 on the surface of the window or door frame is glued.
  • the plastering takes place.
  • the plastering area 10 applied to a plaster removal edge plaster layer, which is essentially formed by the end of Putzendseite 14, to which the strip-shaped protective flap 22 connects .
  • the strip-shaped protective flap 22 is broken off after the plastering and removed.
  • the adhesive strip 8 may have a certain expansion and shrinkage ability to compensate for changes in the distance between the bottom of the base wall 6 and the surface of the window or door frame within certain limits, which ensures a good seal under changing conditions.
  • the element 8 can also be designed as an expansion strip with a certain expansion and shrinkability, without the need for gluing on its side facing the window or door frame. In this case, an insertion and, as it were, a bracing in the gap or attachment to the insulation takes place. As a result, distance changes between the bottom of the base wall 6 and the surface of the window or door frame can also be compensated within certain limits, which ensures a good seal under changing conditions.
  • second plastering strip 26 like the first plastering strip 2, has a fixing region 28 which can be fastened with a section to a first building component, in particular a window or door frame, via a plastering area 40, which in the present case is designed as a displaceable front area 40, to which a reinforcing fabric section 64 is attached and which is intended together with the Arm michsgewebeabêt 64 for embedding in a plaster layer, as well as a strip-shaped protective tab 26th
  • the adhesive layer applied on the outside is now recognizable, it is connected via a break-off material bridge 62 both to the fixing area 28 and to the plastering area 40, otherwise it aligns with the strip-shaped protective flap 22 Fig. 1 and will not be explained again below.
  • the second plaster strip 26 is now formed in two parts, with a Festlegungs Council 28 and a displaceable for this purpose grooming area 40th
  • the fixing region 28 comprises a base wall 30 with an adhesive strip 32 attached to its underside, which sealingly bears against the window or door frame with its underside in the mounted state of the plastering strip 26 and is optionally adhesively bonded thereto.
  • a protective lip 34 extends downwards.
  • This protective lip may be formed of a softer flexible plastic material and thus have a certain flexibility.
  • Such a flexible protective lip 34 applies in the installed state of the second plaster strip 26 to the surface of the window or door frame, namely at a position outside of the adhesive strip 32 and thus reliably prevents moisture can reach the adhesive strip 32.
  • the protective lip 34 can be coextruded, in particular together with the base wall 30 and the guide extension 36, which will be explained in more detail below, with the plastering area 40 and the strip-shaped protective strip 60.
  • a guide extension 36 protrudes upward from the base wall 30 and is formed integrally therewith.
  • This guide extension 36 comprises an uppermost widened end head 38 arranged at the top, an extension wall area of lesser wall thickness underneath and a continuation wall area of further reduced wall thickness forming the connection to the base wall 30.
  • the displaceable plastering area 40 is divided into an uppermost arranged Wegragschenkel 36, an adjoining receiving space 42 with the inside thermal insulation plant side 48 and outer plaster side 54, wherein the Wegragschenkel 46 has an inner plaster side 50 and an outer plaster side 54, and in one at the bottom outer end of the receiving space 42 attaching and outwardly extending Putzendseite 56th
  • the receiving space 42 is dimensioned such that the front end of the end head 38 with completely in the receiving space 42önsfortsatz 36 and thus upon contact of the rear end surface of the side walls of the receiving space 42 at the front of the base wall 30 at a small distance from the upper wall of the receiving space 42nd is positioned.
  • opposite guide projections 44 At the lower end of the inner sides of the receiving space 42, opposite guide projections 44 abut each other and extend so far inwardly, with respect to the symmetry axis of the receiving space 42, that they receive and guide the guide projection 36 therebetween.
  • the guide projections 44 engage in the lowermost region of the guide projection 36 with reduced Wall thickness and hold this guide extension 36 and thus the entire Feststoffs Society 36 with respect to the displaceable Anputz Scheme 40 in the minimum displacement position.
  • the guide projections 44 can consist of a plastic material which is softer than the material of the displaceable plastering area 40.
  • the grooming area 40 can be displaced relative to the fixing area 28, up to a maximum displacement position, in which the guide projections 44 abut against the end head 38. As a result, movements between thermal insulation / plaster layer and window / door frame can be compensated in a particularly advantageous manner.
  • the upper Wegragschenkel 46 extends upward.
  • the inner plaster side 50 and the outer plaster side 52 of the Wegragschenkels 46, the outer plaster side 54 of the outer wall of the receiving space 42 and the Putzendseite 56 are provided with a channel profiling 58 to increase the surface to which the plaster adheres, and thus a to create a better connection with the plaster.
  • This channel profiling 58 may, as in Fig. 2 can also extend over the front wall of the receiving space 42.
  • the plaster layer extends either over the entire, provided with channel profiling 58 area of the plastering area 40 or, if filler has been applied, on the outer plaster sides 52, 54 and the cleaning end side 56 to Putzendkante defined by the end of Putzendseite 56 is.
  • the strip-shaped protective strip 60 can be removed by severing the break-off material bridges 62, for example by hand, optionally cutting the ends.
  • the displaceable plaster area 40 is now decoupled from the fastening area 28 and can be replaced by the construction with guide extension 36, end cap 38, move and receiving space 42 with guide projections 44 relative to the base wall 30, and thus compensate for movements between thermal insulation and plaster layer and window / door frame.
  • the second plastering strip 26 is a two-part plastering strip described by way of example in which two regions 28 and 40 can be displaced relative to one another in order to be able to compensate for movements between thermal insulation / plaster layer and window / door frame.
  • the invention also covers other two-part plaster moldings, in particular also two-part plaster moldings which are at least partially inserted into a gap between the thermal insulation and the window / door frame.
  • end rail 68 includes an angle rail 70 and an outer strip 80 connected thereto.
  • the angle rail 70 has a first leg 72, which is provided for engagement with a building, not shown here, for example, on a wall, and which can be attached thereto, for example, by bolted bolts or screws, and a second, substantially horizontally extending Leg 74, which attaches to the underside of the first leg 72, from there continues horizontally outwards and at its end remote from the wall has a step 76 down.
  • the outer strip 80 furthermore has a substantially horizontally extending end-side limb 82 and an upwardly projecting outer limb 84 connected therewith via a transition region 76.
  • the end-side limb 82 is above the step 76 of the second limb 74 of the angle rail 70 arranged and adhered by means of a foam adhesive tape or compressed sealing tape 78 on the recessed down Jardinnend Scheme 76.
  • the top of the second leg 74 (except for the portion of the step 76) and the top of the end face leg 82 in the present example form a plane.
  • a reinforcing fabric portion 92 is connected by means of suitable fasteners, which in the present case are designed as ultrasonic welds 94.
  • the transition region 86 between the end-side leg 82 and outer leg 84 is rounded in the present embodiment and describes approximately a half or two-thirds circle with an opening obliquely inwardly above, so that here in the transverse direction a plug-in area is formed for a connector.
  • a groove profiling 104 is formed in each case, and the right outer wall region of the transitional region 86 forms a plaster removal edge or a cleaning end side.
  • a drip lip 90 is provided which extends obliquely inwardly from the right lower end portion of the transition portion 86 downward. Such a drip lip lip 90 ensures that the underside of the angle rail 70 remains dry and that the proportion of water that can reach the adhesive strip 78 is minimized.
  • angle rail 70 When using the end rail 68, one normally operates such that, optionally after cutting the end rail 68 to the appropriate predetermined length, first the angle rail 70 is secured to the building wall, usually a plurality of angle rails 70 are fastened one after the other along the length of the wall can be used, wherein at the transitions with overlap can be worked or where at the junctions connectors which engage in the transition regions 86, each connecting two adjacent end rails 68 together.
  • the outer panel 80 is glued, usually several, one after the other along the length of the angle rails 70. Then the thermal insulation is introduced, in such a way that they lie with their building side against the first limb 72 and above against the wall and that they rest with their underside on the second limb 74 of the angle rail 70 and the end face limb 82.
  • the insulation of the outer leg 74 can be pivoted together with Arm michsgewebeabêt 92 to the outside.
  • the insulation is fixed in the usual way on the wall.
  • the Arm istsgewebeabites 92 is attached from the outside with putty on the outside of the thermal insulation. It is understood that further reinforcing fabric, which is not shown, overlaps the reinforcing fabric section 92 at the top and is likewise fastened to the insulation. After the putty has tightened or hardened, a plaster layer is applied on the outside.
  • the in Fig. 3 the outermost transition region portion 86 serve as a trigger edge.
  • the Putzeckor 96 of Fig. 4 has like the outer bar 80 of the end rail 68 a first in Fig. 4 horizontal leg 98, a second, in Fig. 4 perpendicular, so upwardly extending leg 100, and a transition region 102 which connects the right end of the first leg 98 and the lower end of the second leg 100 and essentially describes the course of a half or two-thirds circle, so that the legs 98th and 100 can be pivoted against each other and that a connector or plug in the transverse direction can be introduced into the transition region 102 to connect two transverse adjacent plaster corner strips 96 together.
  • a first reinforcement fabric section 110 is attached, which runs in the direction of the first leg 98 to the left.
  • a second reinforcement fabric portion 114 is attached by means of suitable connections, which are exemplified herein as ultrasonic welds 116.
  • This second Arm istsgewebeabêt 114 extends in the direction of the second leg 100 upwards.
  • the outer wall region of the transitional region 102 pointing to the lower left and pointing to the upper right is in each case provided with a channel profiling 104 for improving the adhesion of the plaster.
  • the lowermost wall portion of the transition region 102 forms a first plaster removal edge 106, and the rightmost wall portion of the transition region 102 forms a second drainage edge 108.
  • the procedure is as follows. First, the trim cornice 96, applied in practice a plurality of adjacent or stacked plaster corner strips 96 to the building corner and connected in the usual way with the building, for example by the shooting of bolts. Here you can work with overlap, or it can be connected together by connectors or spigot, which are inserted into the transition regions 102 of the adjacent plaster corner strips 96 adjacent plaster facing corners. Then the Arm michsgewebeabête 102 are attached from the outside with putty on the building walls on both sides of the building corner, and then further not shown Arm mich stressessgewebeabête can be attached and also secured with putty on the building wall. Now the plaster is applied to both sides of the building corner from the outside on both walls, wherein the plaster removal edges 106 and 108 can specify here the thickness of the applied plaster layer. After hardening the plaster layer, the building corner is plastered ready.
  • rice hulls in particular flour or fibers thereof, wood, in particular flour or fibers thereof, or a mixture thereof, have proven useful in tests of the present applicant.
  • These main components are provided in particular with a suitable carrier material, which ensures that the composite material is firm and dimensionally stable and can be extruded.
  • a particularly suitable composite material is a so-called wood plastic composite, ie a wood-plastic composite material.
  • Another particularly suitable composite material consists of the ingredients rice hulls, rock salts and mineral oil.
  • a particularly suitable material is a composite material of rice hulls with a proportion of 50-70, in particular of about 60%, rock salt with a content of 17-27, in particular of 22%, and with a mineral oil content of 13-23, in particular of about 18%.
  • Such a composite material has a density of about 1.46 g / cm 3 and a thermal expansion coefficient of 3.6 x 10 (-5) m / mC.
  • natural fibers such as flax, hemp or other fiber plants have been proven.
  • Lignin which is a polymer, has proven to be a particularly suitable carrier material.
  • a mixture of lignin with natural fibers forms a processable composite under temperature increase, which can be extruded among other things and also represents a particularly suitable material.
  • Another suitable material is bio-polyethylene.
  • Another suitable material is a mixture of co-polyester and polylactic acid PLA, which may contain a large amount of natural renewable resource.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Door And Window Frames Mounted To Openings (AREA)

Abstract

The plastering strip (2) has a fixing area (4), with which the plastering strip is fixed at a component of the transition. A plastering area (10) is determined for plastering in the plaster layer and for fixed connection with a thermal insulation. The fixing area and the plastering strip are formed as a common extrusion part or as separate extrusion parts. The fixing area or the plastering area has a material, whose main component is made from a renewable raw material or wood plastic. Independent claims are included for the following: (1) an end rail for a building-thermal insulation or building-sound insulation; and (2) a plaster-corner strip for arrangement on a vertical or a horizontal building corner, particularly a building corner with thermal insulation.

Description

Die Erfindung betrifft eine Anputzleiste, eine Abschlussschiene und eine Putz-Eckleiste.The invention relates to a plaster molding, a finishing rail and a plaster molding.

Beim Bau von Gebäuden wird in der Regel so vorgegangen, dass Fensterstöcke und Türstöcke, das sind die fest mit dem Bauwerk verbundenen feststehenden Fenster- oder Türrahmen, in die entsprechenden Wandöffnungen des Rohbaus eingesetzt und dort befestigt werden. In einer späteren Phase wird der Rohbau außen und innen verputzt. Hierbei ist insbesondere an der Außenseite des Bauwerks der Anschluss des Putzes an den Fensterstock oder Türstock an die kritische Stelle, weil der Putz stirnseitig an das Material des Fensterstocks oder Türstocks anstößt und dort keine perfekte Bindung eingeht. Da der Putz beim Trocknen etwas schwindet, da Fenster- und Türstöcke Erschütterungen ausgesetzt sind, beispielsweise durch heftiges Zuschlagen der Fenster oder Türen, und da solche Bauwerksecken zudem hohen Temperaturschwankungen ausgesetzt sind, besteht die Gefahr, dass sich ein Riss oder Spalt zwischen dem Putz und dem Fenster- oder Türstock bildet. Hier kann dann Feuchtigkeit eindringen, die auf Dauer den Fensterstock, den Türstock oder den Putz oder die Dämmung schädigt, beispielsweise zur Ausbröckelung des Putzes führt. Daher werden häufig Anputzleisten am Übergang zwischen Fenster- oder Türstock zum Putz vorgesehen, die den Fenster- oder Türstock vom Putz entkoppeln und gleichzeitig eine Abdichtung dazwischen bereitstellen. Eine solche Anputzleiste ist beispielsweise aus der EP 0 875 641 A2 bekannt.In the construction of buildings is usually proceeded so that window bars and door frames, which are firmly connected to the building fixed window or door frame, are inserted into the corresponding wall openings of the shell and fastened there. In a later phase, the shell is plastered outside and inside. Here, in particular on the outside of the structure of the connection of the plaster to the window sash or door frame to the critical point, because the plaster abuts the front of the material of the window sash or door sill and there does not form a perfect bond. As the plaster shrinks slightly during drying, since window and door sills are exposed to vibrations, for example by violent slamming of the windows or doors, and since such building corners are also exposed to high temperature fluctuations, there is a risk that a crack or gap between the plaster and forms the window or door frame. Here moisture can then penetrate, which permanently damages the window floor, the door frame or the plaster or the insulation, for example leads to crumbling of the plaster. For this reason, plaster moldings are often provided at the transition between the window or door frame to the plaster, which decouple the window or door frame from the plaster and at the same time provide a seal therebetween. Such a plaster strip is for example from the EP 0 875 641 A2 known.

Eine ganz ähnliche Problematik ergibt sich bei Endbereichen von Bauwerkswärmedämmungen und Bauwerksschalldämmungen. Bauwerke werden heutzutage mehr und mehr auf ihrer Außenseite mit Wärmedämmungen versehen, die beispielsweise aus Hartschaumstoff oder Faserplatten bestehen. Eine Wärmedämmung auf Bauwerkswänden hat normalerweise ein unteres Ende etwas oberhalb der Oberfläche des Erdreichs oder einer Erdreichbefestigung, das bzw. die an die Bauwerkswand heranreicht. Das untere Ende der Wärmedämmung ist ein kritischer Bereich, weil dort von unten her Feuchtigkeit zwischen die Bauwerkswand und die Wärmedämmung und zwischen die Wärmedämmung und den äußeren Putz eindringen kann, was Schäden bis zu hin zu abbröckelndem Putz nach sich ziehen kann. Daher werden im unteren Endbereich der Wärmedämmung häufig Abschlussschienen eingesetzt, die mit einem ersten Schenkel an dem Bauwerk befestigt werden und auf deren zweitem Schenkel die Dämmung mit ihrer Abschluss-Stirnseite aufliegt. Da die Außenseite von solchen Dämmungsplatten häufig mit äußerem Putz versehen wird, muss durch eine solche Abschlussschiene ein zuverlässiger Putzabschluss gewährleistet werden, um Risse im Putz und gar ein Ausbröckeln des Putzes zu vermeiden. Eine solche Abschlussleiste ist beispielsweise aus der DE 195 39 526 A1 bekannt.A similar problem arises in the case of end sections of structural insulations and structural sound insulation. Structures are nowadays more and more provided on their outside with thermal insulation, which consist for example of rigid foam or fiberboard. Thermal insulation on building walls usually has a lower end just above the surface of the soil or a soil attachment approaching the building wall. The lower end of the thermal insulation is a critical area because moisture can penetrate from underneath between the building wall and the thermal insulation and between the thermal insulation and the outer plaster, which can lead to damage up to crumbling plaster. Therefore, in the lower end of the thermal insulation often end rails are used, which are attached with a first leg to the building and on the second leg, the insulation rests with its end face. Because the Outside of such insulation panels is often provided with external plaster, such a finishing rail a reliable plaster finish must be guaranteed to prevent cracks in the plaster and even crumbling of the plaster. Such a termination bar is for example from the DE 195 39 526 A1 known.

Eine ganz ähnliche Problematik ergibt sich auch bei mit Putz versehenen Gebäudeecken. An Gebäudeecken werden häufig Putz-Eckleisten aufgebracht, die dazu dienen, einen zuverlässigen Abschluss für die Putzschicht auf der ersten Seite der Bauwerksecke und einen zuverlässigen Abschluss für die Putzschicht auf der zweiten Seite der Bauwerksecke zu gewährleisten und das Abbröckeln von Putz an der Bauwerksecke zu vermeiden. Eine solche Putz-Eckleiste ist beispielsweise aus der DE 100 38 279 A1 bekannt.A very similar problem arises even with plastered building corners. At building corners plaster corner strips are often applied, which serve to ensure a reliable completion of the plaster layer on the first side of the building corner and a reliable conclusion for the plaster layer on the second side of the building corner and to avoid the crumbling of plaster on the building corner , Such a plaster cornice is for example from the DE 100 38 279 A1 known.

Allen solchen Anputzleisten, Abschlussschienen und Putz-Eckleisten ist gemeinsam, dass wesentliche Bestandteile von ihnen aus dämmtechnischen Gründen häufig durch Extrusion hergestellt werden. Diese Anputzleisten, Abschlussschienen und Putz-Eckleisten werden in der Regel aus Hartkunststoff, insbesondere aus PVC extrudiert.All such plaster strips, finishing rails and plaster corner strips has in common that essential components of them are often made by insulation for insulation reasons by extrusion. These plaster strips, finishing rails and plaster corner strips are usually extruded from hard plastic, especially PVC.

Allen solchen Anputzleisten, Abschlussschienen und Putz-Eckleisten ist weiterhin gemeinsam, dass sie auf der Baustelle in festen Längen zur Verfügung stehen und dass daraus auf der Baustelle die jeweils benötigten Anputzleisten, Abschlussschienen und Putz-Eckleisten in der gewünschten Länge abgeschnitten werden. Dabei entsteht Abfall, meistens mehrere kurze Stücke, die entsorgt werden müssen.All such plaster strips, finishing rails and plaster corner strips is still common that they are available on the site in fixed lengths and that it will be cut off at the construction site, the required plaster strips, finishing rails and plaster corner strips in the desired length. This creates waste, usually several short pieces that need to be disposed of.

Es ist daher eine Aufgabe der vorliegenden Erfindung, eine Anputzleiste, eine Abschlusschiene und eine Putz-Eckleiste bereitzustellen, die umweltfreundlicher hergestellt werden können und bei denen auf der Baustelle anfallender Abfall umweltfreundlicher entsorgt werden kann.It is therefore an object of the present invention to provide a plaster molding, a finishing rail and a plaster molding, which can be produced environmentally friendly and where waste accumulating on the site can be disposed of environmentally friendly.

Diese Aufgabe wird durch den Gegenstand der unabhängigen Ansprüche gelöst. Vorteilhafte Weiterbildungen ergeben sich aus den abhängigen Ansprüchen.This object is solved by the subject matter of the independent claims. Advantageous developments emerge from the dependent claims.

Eine erfindungsgemäße Anputzleiste zur Platzierung an einem Übergang zwischen einem ersten Bauteil eines Gebäudes, insbesondere einem Fenster- oder Türrahmen, einer Fensterbank, einem Balken, einer Metallverbindung oder einer Lisene, und einem zweiten Bauteil eines Gebäudes, insbesondere einer Wärmedämmung und/oder einer Putzschicht, umfasst einen Festlegungsbereich, mit dem die Anputzleiste an wenigstens einem Bauteil des Übergangs befestigbar ist; und einen Anputzbereich, der zum Einputzen in die Putzschicht und/oder zur festen Verbindung mit der Wärmedämmung bestimmt ist. Der Festlegungsbereich und der Anputzbereich sind als ein gemeinsames Extrusionsteil oder als separate Extrusionsteile ausgebildet und weisen ein Material auf, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist.A plaster strip according to the invention for placement at a transition between a first component of a building, in particular a window or door frame, a window sill, a beam, a metal connection or a Lisene, and a second component of a building, in particular a thermal insulation and / or a plaster layer, comprises a fixing area, with which the plaster strip can be fastened to at least one component of the transition; and a plastering area for plastering into the plaster layer and / or intended for firm connection with the thermal insulation. The fixing area and the plastering area are formed as a common extrusion part or as separate extrusion parts and have a material whose main component is a renewable raw material.

Eine erfindungsgemäße Abschlussschiene für eine Bauwerks-Wärmedämmung oder eine Bauwerks-Schalldämmung umfasst eine Winkelschiene, deren erster Schenkel zur Befestigung an dem Bauwerk und deren zweiter Schenkel zur Anlage gegen eine Abschluss-Stirnseite der Dämmung vorgesehen ist; und eine Außenleiste, die am Endbereich des zweiten Schenkels der Winkelschiene befestigt ist und einen Außenschenkel zur Anlage an der Außenseite der Dämmung aufweist. Die Winkelschiene und die Außenleiste sind als gemeinsames Extrusionsteil oder als separate Extrusionsteile ausgebildet. Die Winkelschiene und/oder die Außenleiste weisen ein Material auf, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist.A finishing rail according to the invention for structural heat insulation or building sound insulation comprises an angle rail whose first leg is provided for attachment to the structure and the second leg for abutment against a termination end side of the insulation; and an outer bar attached to the end portion of the second leg of the angle rail and having an outer leg for engagement with the outside of the insulation. The angle rail and the outer bar are formed as a common extrusion or as separate extrusion parts. The angle rail and / or the outer bar have a material whose main component is a renewable raw material.

Eine erfindungsgemäße Putz-Eckleiste zur Anordnung an einer vertikalen oder einer horizontalen Bauwerksecke, insbesondere einer mit Wärmedämmung versehenen Bauwerksecke, umfasst einen ersten Schenkel zur Anlage an dem Bauwerk an der ersten Seite der Bauwerksecke; und einen zweiten Schenkel zur Anlage an dem Bauwerk an der zweiten Seite der Bauwerksecke. Der erste und der zweite Schenkel sind als gemeinsames Extrusionsteil oder als separate Extrusionsteile ausgebildet. Der erste und/oder der zweite Schenkel weisen ein Material auf, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist.A trim corner strip according to the invention for arrangement on a vertical or a horizontal building corner, in particular a building corner provided with thermal insulation, comprises a first leg for engagement with the building on the first side of the building corner; and a second leg for engagement with the structure on the second side of the building corner. The first and second legs are formed as a common extrusion or as separate extrusions. The first and / or the second leg comprise a material whose main component is a renewable raw material.

Durch die erfindungsgemäße Anputzleiste wird ein dauerhaft dichter Übergang zu einem Gebäudebauteil sichergestellt. Ebenso wird durch die erfindungsgemäße Abschlussschiene ein dauerhafter und sicherer Abschluss für eine Bauwerks-Wärmedämmung oder eine Bauwerks-Schalldämmung sichergestellt. Ebenso wird durch eine erfindungsgemäße Putz-Eckleiste eine dauerhaft formstabile Ecke gewährleistet.The plaster strip according to the invention ensures a permanently tight transition to a building component. Likewise, the end rail according to the invention ensures a permanent and secure closure for building thermal insulation or structural sound insulation. Likewise, a permanently dimensionally stable corner is ensured by a plaster corner strip according to the invention.

Aufgrund der Ausbildung des Festlegungsbereichs und/oder des Anputzbereichs (bei der Anputzleiste), der Winkelschiene und/oder der Außenleiste (bei der Abschlussschiene) und des ersten und/oder zweiten Schenkels (bei der Putz-Eckleiste) aus einem Material, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist, und somit mehrheitlich aus nachwachsenden Rohstoffen, können die in der Natur zur Verfügung stehenden Ressourcen genutzt werden, und eine beachtliche Menge an petrochemischen oder ähnlichen Stoffen, die zur Herstellung solcher Leisten/Schienen aus Hartkunststoff eingesetzt werden mussten, kann durch einen nachwachsenden Rohstoff ersetzt werden. Dies schont die Ressourcen und garantiert eine umweltfreundliche Herstellung.Due to the formation of the fixing area and / or the Anputzbereichs (in the plaster molding), the angle rail and / or the outer strip (at the end rail) and the first and / or second leg (in the plaster corner molding) of a material whose main component a renewable raw material, and thus mainly from renewable raw materials, the resources available in nature can be used, and a considerable amount of petrochemical or similar materials, which are used for the production of such strips / rails made of hard plastic could be replaced by a renewable resource. This protects the resources and guarantees an environmentally friendly production.

Gemäß einer Erkenntnis des Erfinders können nachwachsende Rohstoffe unter Zugabe wenigstens einer weiteren Komponenten, die für den Zusammenhalt sorgt, extrudiert werden und eignen sich nach Extrusion gut für die Anforderungen der erfindungsgemäßen Anputzleiste, der erfindungsgemäßen Abschlussschiene oder der erfindungsgemäßen Putz-Eckleiste der oben beschriebenen Art.According to one finding by the inventor, renewable raw materials can be extruded with the addition of at least one further component which ensures cohesion and, after extrusion, are well suited to the requirements of the plaster molding according to the invention, the finishing rail according to the invention or the plaster molding of the type described above.

Während die erfindungsgemäße Anputzleiste, die erfindungsgemäße Abschlussschiene und die erfindungsgemäße Putz-Eckleiste, die ja im Einbauzustand nur wenig mit Wasser in Berührung kommen, im Einbauzustand dauerhaft formstabil bleiben und ihre Funktion erfüllen können, ist die Entsorgung aufgrund des Hauptbestandteils aus einem nachwachsenden Rohstoff deutlich vereinfacht. Daher kann auf der Baustelle entstehender Abfall von solchen Leisten/Schienen, meistens mehrere kurze Stücke, einfacher entsorgt werden und zersetzt sich nach einem überschaubaren Zeitraum im Erdreich, was die erfindungsgemäße Leiste/Schiene auch im Hinblick auf die Abfallentsorgung deutlich umweltfreundlicher macht.While the plaster strip according to the invention, the inventive finishing rail and the plaster corner molding according to the invention, which in the installed state only slightly come into contact with water in the installed state permanently dimensionally stable and can fulfill their function, the disposal is significantly simplified due to the main component of a renewable resource , Therefore, on the construction site resulting waste from such strips / rails, usually several short pieces, can be disposed of more easily and decomposes after a manageable period in the ground, which makes the bar / rail according to the invention also in terms of waste disposal significantly more environmentally friendly.

Alternativ zur Entsorgung von solchen entstehenden Abfälle können diese auch vollständig recycled und für die Herstellung, insbesondere Extrusion neuer Anputzleisten, Abschlussschienen und Putz-Eckleisten verwendet werden.As an alternative to the disposal of such waste, they can also be fully recycled and used for the production, in particular extrusion of new plaster moldings, finishing rails and plaster corner moldings.

Der Gewichts- oder Volumenanteil solcher meist recht kurzen Abfall-Leisten/Schienen-Stücke ist bezogen auf die gesamte Menge an verwendeten Leisten/Schienen verhältnismäßig gering.The weight or volume fraction of such mostly quite short waste strips / rail pieces is relatively small relative to the total amount of strips / rails used.

Generell sind von der erfindungsgemäßen Anputzleiste, von der erfindungsgemäßen Abschlussschiene und von der erfindungsgemäßen Putz-Eckleiste alle denkbaren Bauformen solcher Anputzleisten, solcher Abschlussschienen und solcher Putz-Eckleisten umfasst, die ein Material aufweisen, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist.In general, all conceivable designs of such plaster strips, such cover rails and such plaster corner strips comprising the material of the invention, the main component of which is a renewable raw material of the plaster strip according to the invention, of the invention and.

Gemäß einer ersten Ausführungsform der erfindungsgemäßen Anputzleiste sind der Festlegungsbereich und der Anputzbereich einstückig ausgebildet. In diesem Fall weisen sowohl der Festlegungsbereich als auch der Anputzbereich ein Material auf, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist. Eine solche Anputzleiste dichtet den Gebäude-Übergang zuverlässig ab und ist verhältnismäßig einfach aufgebaut.According to a first embodiment of the plaster molding according to the invention, the fixing area and the plastering area are integrally formed. In this case, both the fixing area and the grooming area comprise a material whose main constituent is a renewable raw material. Such a plaster molding seals the building transition reliably and is relatively simple.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Anputzleiste verfügt der Festlegungsbereich über einen Klebestreifen zur Befestigung an dem ersten Gebäudebauteil. Durch einen solchen Klebestreifen wird die Anputzleiste mit ihrem Festlegungsbereich zuverlässig mit dem Gebäudebestandteil verbunden.According to a further embodiment of the plastering strip according to the invention, the fixing region has an adhesive strip for attachment to the first building component. By means of such an adhesive strip, the plaster strip is reliably connected with its fixing area with the building component.

Der Begriff "Klebestreifen" umfasst auch eine streifenförmig aufgebrachte Klebstoffmenge. Die Ausführung kann so sein, dass der Klebestreifen, welcher auf einer Seite an die restliche Anputzleiste anschließt und auf der anderen Seite an dem ersten Gebäudebauteil anklebbar ist, schon als solches den Festlegungsbereich darstellt. Es wird jedoch betont, dass es alternative Arten der Ausbildung des Festlegungsbereiches gibt, insbesondere Anschrauben der Anputzleiste an einem der beiden Gebäudeteile oder Einklemmen in einen Spalt zwischen dem ersten Bauteil des Gebäudes und der Wärmedämmung oder Fixieren oder Befestigen an der Dämmung.The term "adhesive strip" also includes a strip of adhesive applied. The design can be such that the adhesive strip, which adjoins the remaining plaster strip on one side and can be adhered to the first building component on the other side, already constitutes the fixing region as such. It is emphasized, however, that there are alternative ways of forming the fixing area, in particular screwing the plaster molding on one of the two building parts or pinching in a gap between the first component of the building and the thermal insulation or fixing or fixing to the insulation.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Anputzleiste ist der Anputzbereich mit einer Rinnenproflierung für eine verbesserte Anhaftung an dem Putz versehen. Durch eine solche Rinnenprofilierung wird die Oberfläche des Anputzbereichs, mit der der Putz eine Bindung eingeht, vergrößert, und somit die Anhaftung verbessert.According to a further embodiment of the plaster molding according to the invention, the plastering area is provided with a groove profile for improved adhesion to the plaster. Through such groove profiling, the surface of the plastering area, with which the plaster enters into a bond increases, and thus improves the adhesion.

Bei einer weiteren Ausführungsform der erfindungsgemäßen Anputzleiste ist an dem Anputzbereich ein Armierungsgewebeabschnitt befestigt, der zum Einputzen bestimmt ist. Der Armierungsgewebeabschnitt kann dabei beispielsweise in Form eines mit alkalibeständigem Material beschichteten Glasfasergitters ausgebildet sein. Nach dem Aufbringen des Putzes befindet sich der Armierungsgewebeabschnitt unter der Putzoberfläche, in den meisten Fällen ist er seinerseits mittels Spachtelmasse an dem Untergrund befestigt. Der Armierungsgewebeabschnitt verbessert die Haftung des Putzes am Untergrund und stellt die dauerhafte Rissfreiheit des Putzes sicher.In a further embodiment of the plastering strip according to the invention, a reinforcement fabric section is attached to the plastering area, which is intended for plastering. The Armierungsgewebeabschnitt can be formed for example in the form of a coated with alkali-resistant material fiberglass mesh. After applying the plaster, the Armierungsgewebeabschnitt is below the plaster surface, in most cases, he is in turn attached by means of filler to the ground. The reinforcing fabric section improves the adhesion of the plaster to the substrate and ensures the permanent crack-free of the plaster.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Anputzleiste ist eine abtrennbare oder abbrechbare streifenförmige Schutzlasche vorgesehen. An dieser Schutzlasche, an der ebenfalls ein Klebestreifen vorgesehen sein kann, kann eine Folie befestigt werden, die den Fensterrahmen und das Fenster oder den Türrahmen und die Tür, oder dergleichen, überspannt, und während des Einputzens vor Verschmutzung und Beschädigungen schützt. Nach dem erfolgten Einputzen wird diese Schutzlasche durch Abtrennen oder Abbrechen von der restlichen Anputzleiste entfernt und entsorgt, was wenn die Schutzlasche ebenfalls ein Material aufweist, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist, besonders umweltfreundlich möglich ist.According to a further embodiment of the plaster strip according to the invention, a detachable or breakable strip-shaped protective strip is provided. At this protective tab on which an adhesive strip can also be provided, a film can be attached, which spans the window frame and the window or the door frame and the door, or the like, and protects against dirt and damage during the plastering. After the plastering is done, this protective tab is removed or disposed of by separating or canceling the rest of the cleaning strip, which is when the Protective tab also has a material whose main ingredient is a renewable resource, especially environmentally friendly.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Anputzleiste sind der Festlegungsbereich und der Anputzbereich derart getrennt voneinander ausgebildet, dass - gegebenenfalls nach Abtrennen einer streifenförmigen Schutzlasche - mittels einer Führungsverbindung eine Relativbewegung zwischen Festlegungsbereich und Anputzbereich ermöglicht wird. In diesem Fall ist die Anputzleiste zweiteilig ausgebildet, wobei ein Teil von dem Festlegungsbereich und der andere Teil von dem Anputzbereich gebildet wird. Durch eine derartige Relativbeweglichkeit zwischen Festlegungs- und Anputzbereich können Materialbewegungen, beispielsweise infolge von Temperaturschwankungen oder Abschwindungen zwischen dem fest mit dem ersten Gebäude-Bauteil verbundenen Festlegungsbereich und dem fest mit der Putzschicht verbundenen Anputzbereich einfach und zuverlässig ausgeglichen werden, indem eine Relativbewegung des Anputzbereichs zu dem Festlegungsbereich ermöglicht. Gleichzeitig wird die Abdichtungsfunktion der Anputzleiste beibehalten, ohne dass der Putzanschluss oder der Putz Schaden nimmt.According to a further embodiment of the plastering strip according to the invention, the fixing area and the plastering area are formed separately from one another in such a way that a relative movement between the fixing area and the plastering area is made possible by separating a strip-shaped protective strip by means of a guide connection. In this case, the cleaning strip is formed in two parts, with one part being formed by the fixing area and the other part by the plastering area. By such a relative mobility between Festlegungs- and Anputzbereich material movements, for example as a result of temperature fluctuations or dwindling between the fixedly connected to the first building component fixing area and the permanently connected to the plaster layer Anputzbereich can be easily and reliably compensated by a relative movement of the Anputzbereichs to Fixing area allows. At the same time, the sealing function of the plaster molding is maintained without damaging the plaster or the plaster.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Anputzleiste sind der Festlegungs- und der Anputzbereich über einen flexiblen Materialabschnitt, der auch als Schlaufe bezeichnet wird, miteinander verbunden, der eine Relativbewegung zwischen Festlegungs- und Anputzbereich erlaubt. Auch bei dieser Ausführungsform kann die Anputzleiste Materialbewegungen, beispielsweise infolge von Temperaturschwankungen zwischen dem ersten und dem zweiten Gebäude-Bauteil ausgleichen, und zwar durch eine Bewegung, beispielsweise eine Dehnung des flexiblen Materialabschnitts. Gleichzeitig wird die Abdichtungsfunktion der Anputzleiste beibehalten, ohne dass der Putz Schaden nimmt.According to a further embodiment of the plaster strip according to the invention, the fixing and the plastering area are connected to one another via a flexible material section, which is also referred to as a loop, which permits relative movement between the fixing area and the plastering area. Also in this embodiment, the grout bar material movements, for example due to temperature fluctuations between the first and the second building component compensate, by a movement, such as an elongation of the flexible material portion. At the same time the sealing function of the plaster molding is maintained without the plaster being damaged.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Anputzleiste verfügt diese über einen Expansionsstreifen, der so ausgebildet ist, dass er - gegebenenfalls nach Lösen eines Einsperrbereichs - sich in Richtung auf eines der beiden Gebäude-Bauteile hin ausdehnt und sich daran anlegt, um so eine Abdichtung zwischen beiden Bauteilen zu gewährleisten.According to a further embodiment of the plasterboard according to the invention this has an expansion strip which is designed so that it - possibly after releasing a Einperrbereichs - expands in the direction of one of the two building components towards and applies it, so as a seal between the two To ensure components.

Gemäß einer ersten Ausführungsform der erfindungsgemäßen Abschlussschiene ist deren Außenleiste an deren Winkelschiene angeklebt oder auf deren Winkelschiene aufgesteckt. Beide Verbindungsarten lassen sich z. B. an der Baustelle problemlos durchführen und ergeben eine dauerhafte, auch unter widrigen Witterungsbedingungen standhaltende Verbindung.According to a first embodiment of the end rail according to the invention the outer strip is glued to the angle rail or attached to the angle rail. Both types of connection can be z. B. perform easily at the site and result in a lasting, even in adverse weather conditions stable connection.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Abschlussschiene weist die Außenleiste einen Abschluss-stirnseitigen Schenkel auf, der zur Anlage gegen eine Abschluss-Stirnseite der Dämmung vorgesehen ist. Mit einem solchen Abschluss-stirnseitigen Schenkel kann die Außenleiste an der Dämmung einfach und positionsgenau angebracht werden.According to a further embodiment of the inventive end rail, the outer bar has a closure end-side leg, which is provided for abutment against a closure end face of the insulation. With such a front-end leg, the outer bar can be attached to the insulation easily and accurately positioned.

Gemäß einer weiteren Ausführungsform der Erfindung sind die Winkelschiene und die Außenleiste mittels eines Klebestreifens, insbesondere mittels eines zwischen dem zweiten Schenkel der Winkelschiene und dem Abschluss-stirnseitigen Schenkel der Außenleiste vorgesehenen Klebestreifens miteinander verbunden. Dieser Klebestreifen, der auch eine Menge von aufgebrachtem Kleber umfasst, verbindet die Winkelschiene und die Außenleiste zuverlässig und dauerhaft, und stellt eine gute Abdichtung dazwischen bereit.According to a further embodiment of the invention, the angle rail and the outer strip are connected to one another by means of an adhesive strip, in particular by means of an adhesive strip provided between the second leg of the angle rail and the end-face leg of the outer strip. This adhesive tape, which also includes a quantity of adhesive applied, reliably and permanently bonds the angle rail and the outer panel, providing a good seal therebetween.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Abschlussschiene ist an der Außenleiste ein Armierungsgewebeabschnitt für auf die Dämmung aufzubringenden Putz befestigt, der zum Einputzen bestimmt ist. Der Armierungsgewebeabschnitt kann dabei beispielsweise in Form eines mit alkalibeständigem Material beschichteten Glasfasergitters ausgebildet sein. Nach dem Aufbringen des Putzes befindet sich der Armierungsgewebeabschnitt unter der Putzoberfläche, in den meisten Fällen ist er seinerseits mittels Spachtelmasse an dem Untergrund befestigt. Der Armierungsgewebeabschnitt verbessert die Haftung des Putzes am Untergrund und stellt die dauerhafte Rissfreiheit des Putzes sicher.According to a further embodiment of the closure rail according to the invention a Armierungsgewebeabschnitt for applied to the insulation plaster is attached to the outer bar, which is intended for plastering. The Armierungsgewebeabschnitt can be formed for example in the form of a coated with alkali-resistant material fiberglass mesh. After applying the plaster, the Armierungsgewebeabschnitt is below the plaster surface, in most cases, he is in turn attached by means of filler to the ground. The reinforcing fabric section improves the adhesion of the plaster to the substrate and ensures the permanent crack-free of the plaster.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Abschlussschiene verfügt die Außenleiste über einen weiteren Schenkel, der eine Tropfnase für Wasser bildet. Dieser weitere Schenkel kann beispielsweise in der Einbausituation am unteren Ende der Wärmedämmung nach unten vorragen und den Anteil an Wasser, der von der Außenseite in Richtung Wärmedämmung und in Richtung Bauwerk gelangt, reduzieren. Dies hält die Winkelschiene trockener und verhindert auch, in dem Fall, dass die Außenleiste an die Winkelschiene angeklebt ist, dass zu viel Wasser zu dem Klebestreifen gelangt.According to a further embodiment of the invention, the outer rail has a further leg, which forms a drip nose for water. This further leg can protrude, for example, in the installation situation at the lower end of the insulation down and reduce the proportion of water that passes from the outside in the direction of thermal insulation and towards the building. This keeps the angle rail drier and also prevents, in the case that the outer bar is glued to the angle rail, that too much water gets to the adhesive strip.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Abschlussschiene ist ein flexibler Übergangsbereich zwischen dem Außenschenkel und dem Abschluss-stirnseitigen Schenkel der Außenleiste vorgesehen. Dieser kann eine Positionsänderung zwischen dem Außenschenkel und dem Abschluss-stirnseitigen Schenkel in einem gewissen Winkelbereich erlauben, so dass die erfindungsgemäße Abschlussschiene für unterschiedliche Einbausituationen eingesetzt werden kann.In accordance with a further embodiment of the closure rail according to the invention, a flexible transitional area is provided between the outer leg and the closing end-side leg of the outer bar. This can be a change in position between the Allow outer leg and the final front-side leg in a certain angular range, so that the end rail according to the invention can be used for different installation situations.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Abschlussschiene weist der Übergangsbereich einen Einsteckbereich in Querrichtung für einen Steckverbinder auf. Somit kann ein Steckverbinder in Querrichtung in den Übergangsbereich eingesteckt, und die Abschlussschiene kann mit einer in Querrichtung daneben angeordneten Abschlussschiene verbunden und justiert werden. Bei der daneben angeordneten Abschlussschiene ist dann vorzugsweise ebenfalls ein Einsteckbereich in Querrichtung vorgesehen, in den der Steckverbinder eingesteckt werden kann. So kann eine Fixierung der beiden nebeneinander angeordneten Abschlussschienen gewährleistet werden.According to a further embodiment of the end rail according to the invention, the transition region has an insertion region in the transverse direction for a plug connector. Thus, a connector can be transversely inserted into the transition region, and the terminus can be connected and aligned with a transversely disposed terminus. In the adjacently arranged end rail is then preferably also provided a plug-in area in the transverse direction, in which the connector can be inserted. Thus, a fixation of the two adjacent end rails can be ensured.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Abschlussschiene bildet der zweite Schenkel der Winkelschiene einen insbesondere in dessen äußeren Endbereich angeordneten stufenförmigen Verlauf aus. Insbesondere kann der äußere Endbereich auf einem Höhenniveau unterhalb des Höhenniveaus des restlichen Bereichs des zweiten Schenkels der Winkelschiene liegen. Auf dem äußeren Endbereich des zweiten Schenkels wird häufig die Außenleiste angeklebt oder aufgesteckt. Somit kann erreicht werden, dass die Oberseite des zweiten Schenkels der Winkelschiene und die Oberseite des Abschluss-stirnseitigen Schenkels der Außenleiste auf dem gleichen Höhenniveau liegen, was einen günstigen Anschluss an die darüber angeordnete Wärmedämmung ermöglicht.According to a further embodiment of the end rail according to the invention, the second leg of the angle rail forms a step-shaped profile, which is arranged in particular in its outer end region. In particular, the outer end region may be at a height level below the height level of the remaining portion of the second leg of the angle rail. On the outer end portion of the second leg, the outer bar is often glued or plugged. It can thus be achieved that the upper side of the second leg of the angle rail and the upper side of the end front side leg of the outer strip are at the same height level, which allows a favorable connection to the heat insulation arranged above it.

Gemäß einer ersten Ausführungsform der erfindungsgemäßen Putz-Eckleiste wird von wenigstens einem der Schenkel ein Anputzbereich gebildet. Dadurch wird das Einputzen der Putz-Eckleiste erleichtert.According to a first embodiment of the trim strip according to the invention, a plastering area is formed by at least one of the legs. This facilitates the plastering of the plaster molding.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Putz-Eckleiste ist bei wenigstens einem der Schenkel, insbesondere bei beiden Schenkeln, an der der Anlageseite abgewandten Außenseite ein Armierungsgewebeabschnitt befestigt, der zum Einputzen bestimmt ist. Der Armierungsgewebeabschnitt kann dabei beispielsweise in Form eines mit alkalibeständigem Material beschichteten Glasfasergitters ausgebildet sein. Nach dem Aufbringen des Putzes befindet sich der Armierungsgewebeabschnitt unter der Putzoberfläche, in den meisten Fällen ist er seinerseits mittels Spachtelmasse an dem Untergrund befestigt. Der Armierungsgewebeabschnitt verbessert die Haftung des Putzes am Untergrund und stellt die dauerhafte Rissfreiheit des Putzes sicher.According to a further embodiment of the trim strip according to the invention a reinforcing fabric section is fixed in at least one of the legs, in particular in both legs, on the side facing away from the plant side, which is intended for plastering. The Armierungsgewebeabschnitt can be formed for example in the form of a coated with alkali-resistant material fiberglass mesh. After applying the plaster, the Armierungsgewebeabschnitt is below the plaster surface, in most cases, he is in turn attached by means of filler to the ground. The reinforcing fabric section improves the adhesion of the plaster to the substrate and ensures the permanent crack-free of the plaster.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Putz-Eckleiste ist ein insbesondere flexibler Übergangsbereich zwischen dem ersten und dem zweiten Schenkel vorgesehen. Dieser kann eine Positionsänderung zwischen den beiden Schenkel in einem gewissen Winkelbereich erlauben, so dass die erfindungsgemäße Putz-Eckleiste für unterschiedliche Einbausituationen eingesetzt werden kann.According to a further embodiment of the trim strip according to the invention a particularly flexible transition region between the first and the second leg is provided. This can allow a change in position between the two legs in a certain angular range, so that the plaster corner strip according to the invention can be used for different installation situations.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Putz-Eckleiste ist der Übergangsbereich mindestens an der einem einzuputzenden Schenkel zugewandten Seite mit einer rinnenartigen Profilierung versehen. Durch eine solche Rinnenprofilierung wird die Oberfläche des Schenkels, mit der der Putz eine Bindung eingeht, vergrößert, und somit die Anhaftung verbessert.According to a further embodiment of the trim strip according to the invention, the transition region is provided with a groove-like profiling at least on the side facing a leg to be armed. By such a channel profiling, the surface of the leg, with which the plaster enters into a bond increases, and thus improves the adhesion.

Gemäß einer weiteren Ausführungsform der erfindungsgemäßen Putz-Eckleiste weist der Übergangsbereich einen Einsteckbereich in Querrichtung für einen Steckverbinder auf. Somit kann ein Steckverbinder in Querrichtung in den Übergangsbereich eingesteckt, und die Putz-Eckleiste kann mit einer daneben, oder darüber/darunter angeordneten Putz-Eckleiste verbunden werden. Bei der daneben angeordneten Putz-Eckleiste ist dann vorzugsweise ebenfalls ein Einsteckbereich in Querrichtung vorgesehen, in den der Steckverbinder eingesteckt werden kann. So kann eine Fixierung der beiden nebeneinander angeordneten Putz-Eckleisten gewährleistet werden.According to a further embodiment of the plaster molding according to the invention, the transition region has an insertion region in the transverse direction for a connector. Thus, a connector can be inserted in the transverse direction in the transition area, and the plaster molding can be connected to an adjacent, or above / below arranged plaster corner molding. In the adjacently arranged plaster corner strip is then preferably also provided an insertion in the transverse direction, in which the connector can be inserted. Thus, a fixation of the two adjacent plaster corner strips can be ensured.

Gemäß einer Ausführungsform der Erfindung, die für die erfindungsgemäße Anputzleiste der oben beschriebenen Art, für die erfindungsgemäße Abschlussschiene der oben beschriebenen Art und für die erfindungsgemäße Putz-Eckleiste der oben beschriebenen Art gleichermaßen zutrifft, besteht der Hauptbestandteil des Materials aus Reishülsen bzw. Fasern oder Mehl daraus, oder aus Holz bzw. Fasern oder Mehl daraus.According to one embodiment of the invention, which is equally applicable to the plasterboard according to the invention of the type described above, for the inventive finishing rail of the type described above and for the plaster molding according to the invention of the type described above, the main component of the material consists of rice hulls or fibers or flour made of wood or fibers or flour thereof.

Als besonders vorteilhaft hat sich als Material ein sogenannter wood plastic composite, also ein Holz-Kunststoff-Verbundwerkstoff herausgestellt.To be particularly advantageous as a material so-called wood plastic composite, so a wood-plastic composite has been found.

Als ein ebenfalls besonders geeignetes Material hat sich eine Mischung aus den Bestandteilen Reishülsen, Steinsalzen und Mineralöl herausgestellt. Ein solches Material nimmt wenig bis überhaupt kein Wasser auf, nur die Oberfläche wird benetzt und ist sehr widerstandsfähig. Insbesondere kann es beliebig bearbeitet werden, beispielsweise gesägt, geschnitten, gebohrt, geschliffen, lackiert und geölt werden. Es reißt und splittert nicht, und entstehende Abfälle sind vollständig recyclebar.As a likewise particularly suitable material, a mixture of the ingredients rice hulls, rock salts and mineral oil has been found. Such a material absorbs little to no water, only the surface is wetted and is very resistant. In particular, it can be processed arbitrarily, for example sawed, cut, drilled, ground, painted and oiled. It does not crack or splinter and waste is completely recyclable.

Als weiterer besonders geeigneter Hauptbestandteil haben sich Naturfasern wie Flachs, Hanf oder andere Faserpflanzen bewährt.As a further particularly suitable main component, natural fibers such as flax, hemp or other fiber plants have been proven.

Als besonders geeignetes Trägermaterial hat sich Lignin bewährt, das ein Polymer ist.Lignin, which is a polymer, has proven to be a particularly suitable carrier material.

Eine Mischung aus Lignin mit Naturfasern, wie Flachs, Hanf oder anderen Faserpflanzen, bildet einen unter Temperaturerhöhung verarbeitungsfähigen Verbundwerkstoff, der ebenfalls ein besonders geeignetes Material darstellt.A mixture of lignin with natural fibers, such as flax, hemp or other fiber plants, forms a workable under temperature increase composite material, which is also a particularly suitable material.

Ein weiteres geeignetes Material ist Bio-Polyethylen.Another suitable material is bio-polyethylene.

Ein weiteres geeignetes Material ist eine Mischung aus Co-Polyester und Polymilchsäure PLA, die eine große Menge von natürlichem nachwachsendem Rohstoff enthalten kann.Another suitable material is a mixture of co-polyester and polylactic acid PLA, which may contain a large amount of natural renewable resource.

Gemäß einem weiteren Ausführungsbeispiel können der Festlegungsbereich und/oder der Anputzbereich der erfindungsgemäßen Anputzleiste der oben beschriebenen Art, die Winkelschiene und/oder die Außenleiste der erfindungsgemäßen Abschlussschiene der oben beschriebenen Art und der erste und/oder der zweite Schenkel der erfindungsgemäßen Putz-Eckleiste der oben beschriebenen Art aus einem vorstehend angegebenen Materialien bestehen. Allen diesen Materialien ist gemein, dass sie extrudiert werden können, was sie für die Herstellung des Festlegungsbereichs und/oder des Anputzbereichs der erfindungsgemäßen Anputzleiste der oben beschriebenen Art, der Winkelschiene und/oder der Au-βenleiste der erfindungsgemäßen Abschlussschiene der oben beschriebenen Art und des ersten und/oder des zweiten Schenkel der erfindungsgemäßen Putz-Eckleiste der oben beschriebenen Art geeignet macht, da diese durch Extrusion hergestellt werden.According to a further exemplary embodiment, the fixing area and / or the plastering area of the plastering strip according to the invention of the type described above, the angle rail and / or the outer strip of the inventive end rail of the type described above and the first and / or second leg of the plaster corner strip according to the invention of the above described type consist of a material mentioned above. All these materials have in common that they can be extruded, what they for the production of the fixing area and / or Anputzbereichs the plaster strip according to the invention of the type described above, the angle rail and / or the Au-βenleiste the inventive end rail of the type described above and first and / or the second leg of the plaster corner strip according to the invention of the type described above makes it suitable, since they are produced by extrusion.

Die Erfindung ist nachfolgend anhand von Ausführungsbeispielen mit Bezug auf die beiliegenden Figuren näher erläutert.

  • Fig. 1 zeigt eine Seitenansicht einer ersten Anputzleiste gemäß einem ersten Ausführungsbeispiel der Erfindung;
  • Fig. 2 zeigt eine Seitenansicht einer zweiten Anputzleiste gemäß einem zweiten Ausführungsbeispiel der Erfindung;
  • Fig. 3 zeigt eine Seitenansicht einer Abschlussschiene gemäß einem dritten Ausführungsbeispiel der Erfindung; und
  • Fig. 4 zeigt eine Seitenansicht einer Putz-Eckleiste gemäß einem vierten Ausführungsbeispiel der Erfndung.
The invention is explained in more detail by means of embodiments with reference to the accompanying figures.
  • Fig. 1 shows a side view of a first grout strip according to a first embodiment of the invention;
  • Fig. 2 shows a side view of a second grout strip according to a second embodiment of the invention;
  • Fig. 3 shows a side view of a closure rail according to a third embodiment of the invention; and
  • Fig. 4 shows a side view of a trim cornice according to a fourth embodiment of the Erfndung.

Die erste Anputzleiste 2, die zweite Anputzleiste 26, die Abschlussschiene 68 und die Putz-Eckleiste 96 sind nachfolgend stellvertretend für beliebige Anputzleisten, Abschlussschienen und Putz-Eckleisten beschrieben, bei denen wenigstens ein Hauptbereich im Wege der Extrusion aus einem Material hergestellt worden ist, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist, und somit ein Extrusionsteil aus einem Material darstellt, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist. Die Extrusionsteile sind günstig herstellbar und zeichnen sich durch einen über ihre gesamte Länge gleichbleibenden Profilquerschnitt aus.The first plaster strip 2, the second plaster strip 26, the end rail 68 and the plaster corner strip 96 are described below representative of any plaster strips, finishing rails and plaster corner strips, in which at least one main area has been made by extrusion from a material whose Main component is a renewable raw material, and thus represents an extrusion of a material whose main component is a renewable raw material. The extrusions are inexpensive to manufacture and are characterized by a consistent over their entire length profile cross-section.

Fig. 1 und 2 zeigen die Anputzleisten 2 und 26 jeweils im Auslieferungszustand, bei dem die streifenförmige Schutzlasche noch nicht abgetrennt worden ist. Fig. 1 and 2 show the plaster strips 2 and 26 respectively in the delivery state, in which the strip-shaped protective strap has not yet been separated.

Die in Fig. 1 exemplarisch dargestellte erste Anputzleiste 2 umfasst einen Festlegungsbereich 4 und einen Anputzbereich 10 mit einem Armierungsgewebeabschnitt 18 und eine streifenförmige Schutzlasche 22.In the Fig. 1 The first plastering strip 2 illustrated by way of example comprises a fixing area 4 and a plastering area 10 with a reinforcing fabric section 18 and a strip-like protective strip 22.

Der Festlegungsbereich 4 und der Anputzbereich 10 sind integral miteinander ausgebildet, so dass die vorliegende Anputzleiste 2 auch als einstückige Anputzleiste 2 bezeichnet werden kann.The fixing area 4 and the plastering area 10 are integrally formed with each other, so that the present plaster strip 2 can also be referred to as a one-piece plaster strip 2.

Die streifenförmige Schutzlasche 22 ist mittels einer Abbrech-Materialbrücke 24 mit einer Putzendseite 14 des Anputzbereichs 10 verbunden. Die streifenförmige Schutzlasche 22 verfügt noch über einen Abstandssteg, der im Montagezustand der Anputzleiste 2 an der Außenseite eines ersten Gebäude-Bauteils anliegen kann.The strip-shaped protective tab 22 is connected by means of a break-off material bridge 24 with a cleaning end side 14 of the plastering area 10. The strip-shaped protective flap 22 still has a spacer web which, in the assembled state of the plastering strip 2, can rest on the outside of a first building component.

Der Festlegungsbereich 4, der Anputzbereich 10 und die streifenförmige Schutzlasche 22 sind gemeinsam im Wege der Extrusion aus einem Material hergestellt worden, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist, das nachfolgend noch genauer beschrieben wird.The fixing area 4, the plastering area 10 and the strip-shaped protection strip 22 have been jointly produced by extrusion from a material whose main constituent is a renewable raw material, which will be described in more detail below.

Der Festlegungsbereich 4 wird vorliegend von einer in Fig. 1 waagrecht verlaufenden Basiswand 6 und einem daran fixierten Klebestreifen 8 gebildet, der zur Befestigung an einem ersten Gebäude-Bauteil, beispielsweise einem Fenster- oder Türrahmen, bestimmt ist. Das erste Gebäude-Bauteil, an dem der Klebestreifen 8 anliegt, kann auch als Fensterbank, als Balken, als Metallverbindung, oder als Lisene ausgebildet sein.The fixing area 4 is presently of a in Fig. 1 horizontally extending base wall 6 and an adhesive strip 8 fixed thereto, which is intended for attachment to a first building component, such as a window or door frame. The first building component, on which the adhesive strip 8 is applied, can also be designed as a window sill, as a beam, as a metal connection, or as a lisse.

Der Anputzbereich 12 wird von der Außenseite des Wegragschenkels 12, von der von dem Fenster- oder Türrahmen weggerichteten Putzendseite 14 und von dem Armierungsgewebeabschnitt 18 gebildet.The plastering area 12 is formed by the outside of the leg support 12, by the cleaning end side 14 directed away from the window or door frame, and by the reinforcing fabric section 18.

An der Unterseite hat die erste Anputzleiste 2 einen gestuften Verlauf, die Unterseite der Putzendseite 14 liegt, bezogen auf die Einbausituation, näher an dem Fenster-/Türrahmen als die Unterseite der Basiswand 6.At the bottom, the first plaster strip 2 has a stepped course, the underside of the plaster end 14 is based on the installation situation, closer to the window / door frame as the bottom of the base wall. 6

Der Armierungsgewebeabschnitt 18 ist vorliegend mit dem Wegragschenkel 12 mittels einer Verbindung, die vorliegend exemplarisch als Ultraschallverschweißung 20 dargestellt ist, verbunden.The Armierungsgewebeabschnitt 18 is presently connected to the Wegragschenkel 12 by means of a compound, which is exemplified here as Ultraschallverschweißung 20, respectively.

Die von dem Fenster- oder Türrahmen weggerichtete Putzendseite 14 und die von der Wärmedämmung in Richtung zu der gegenüberliegenden Fenster- oder Türrahmenseite gerichtete Oberfläche des Wegragschenkels 12 sind mit einer Rinnenprofilierung 16 zur Verbesserung der Anhaftung des Putzes versehen.The cleaning end side 14 directed away from the window or door frame and the surface of the support leg 12 directed by the thermal insulation in the direction of the opposite window or door frame side are provided with a channel profiling 16 for improving the adhesion of the plaster.

Auf der Baustelle wird zunächst die Anputzleiste 2 auf die entsprechende, durch die Maße der Fenster- oder Türöffnung vorgegebene Länge abgeschnitten und danach am Übergang zwischen Fenster-/Türrahmen und Wärmedämmung angebracht, indem die Anputzleiste 2 mit ihrem Festlegungsbereich 4 in den Spalt zwischen Fenster- oder Türrahmen und Wärmedämmung eingeschoben wird, sodass die Anputzleiste 2 mit der Oberseite ihrer Basiswand 6 an der spaltseitigen Stirnseite der Wärmedämmung anliegt, mit der Rückseite ihres Wegragschenkels 12 auf der Außenseite der Wärmedämmung aufliegt und mit dem Klebestreifen 8 an der Oberfläche des Fenster- oder Türrahmens angeklebt wird.On the construction site, the plastering strip 2 is first cut to the appropriate length predetermined by the dimensions of the window or door opening and then attached to the transition between the window / door frame and thermal insulation by placing the plastering strip 2 with its fixing region 4 in the gap between window and door frames. or door frame and insulation is inserted so that the plaster strip 2 rests with the top of its base wall 6 on the gap-side front side of the insulation, rests with the back of her Wegragschenkels 12 on the outside of the insulation and the adhesive strip 8 on the surface of the window or door frame is glued.

Nach Überspannen des Fensters mit Fensterrahmen oder der Tür mit Türrahmens mit einer Folie, die an der streifenförmigen Schutzlasche 22 befestigt, insbesondere angeklebt wird, erfolgt das Verputzen. Dabei wird, ggf. nach vorherigem Aufbringen einer Spachtelmasse hinter dem Armierungsgewebeabschnitt 18 eine den Armierungsgewebeabschnitt 18 und den Anputzbereich 10 bis zu einer Putzabzugskante einbettende Putzschicht aufgebracht, die im Wesentlichen durch das Ende der Putzendseite 14 gebildet wird, an die sich die streifenförmige Schutzlasche 22 anschließt. Die streifenförmige Schutzlasche 22 wird nach erfolgtem Einputzen abgebrochen und entfernt.After overstretching the window with window frame or the door with door frame with a film which is attached to the strip-shaped protective flap 22, in particular glued, the plastering takes place. In this case, if necessary after prior application of a putty behind the Armierungsgewebeabschnitt 18 a Armierungsgewebeabschnitt 18 and the plastering area 10 applied to a plaster removal edge plaster layer, which is essentially formed by the end of Putzendseite 14, to which the strip-shaped protective flap 22 connects , The strip-shaped protective flap 22 is broken off after the plastering and removed.

Der Klebestreifen 8 kann eine gewisse Ausdehn- und Schrumpffähigkeit haben, um Abstandsänderungen zwischen der Unterseite der Basiswand 6 und der Oberfläche des Fenster- oder Türrahmens in gewissen Grenzen auszugleichen, was eine gute Abdichtung bei sich ändernden Bedingungen gewährleistet.The adhesive strip 8 may have a certain expansion and shrinkage ability to compensate for changes in the distance between the bottom of the base wall 6 and the surface of the window or door frame within certain limits, which ensures a good seal under changing conditions.

Alternativ zum Vorsehen eines Klebestreifens 8 kann das Element 8 auch als Expansionsstreifen mit einer gewissen Ausdehn- und Schrumpffähigkeit ausgebildet sein, ohne dass an seiner dem Fenster- oder Türrahmen zugewandten Seite eine Klebung erfolgen muss. In diesem Falle erfolgt ein Einsetzen und quasi ein Verspannen in dem Spalt oder ein Befestigen an der Dämmung. Dadurch können ebenfalls Abstandsänderungen zwischen der Unterseite der Basiswand 6 und der Oberfläche des Fenster- oder Türrahmens in gewissen Grenzen ausgeglichen werden, was eine gute Abdichtung bei sich ändernden Bedingungen gewährleistet.As an alternative to providing an adhesive strip 8, the element 8 can also be designed as an expansion strip with a certain expansion and shrinkability, without the need for gluing on its side facing the window or door frame. In this case, an insertion and, as it were, a bracing in the gap or attachment to the insulation takes place. As a result, distance changes between the bottom of the base wall 6 and the surface of the window or door frame can also be compensated within certain limits, which ensures a good seal under changing conditions.

Die in Fig. 2 exemplarisch dargestellte zweite Anputzleiste 26 verfügt wie die erste Anputzleiste 2 über einen Festlegungsbereich 28, der mit einem Abschnitt an einem ersten Gebäude-Bauteil, insbesondere einem Fenster- oder Türrahmen befestigbar ist, über einen Anputzbereich 40, der vorliegend als verschiebbarer Vorderbereich 40 ausgebildet ist, an dem ein Armierungsgewebeabschnitt 64 befestigt ist und der zusammen mit dem Armierungsgewebeabschnitt 64 zum Einbetten in eine Putzschicht bestimmt ist, sowie über eine streifenförmige Schutzlasche 26.In the Fig. 2 by way of example, second plastering strip 26, like the first plastering strip 2, has a fixing region 28 which can be fastened with a section to a first building component, in particular a window or door frame, via a plastering area 40, which in the present case is designed as a displaceable front area 40, to which a reinforcing fabric section 64 is attached and which is intended together with the Armierungsgewebeabschnitt 64 for embedding in a plaster layer, as well as a strip-shaped protective tab 26th

Bei der streifenförmigen Schutzlasche 60 ist nun die auf der Außenseite aufgebrachte Klebeschicht erkennbar, sie ist über eine Abbrech-Materialbrücke 62 sowohl mit dem Festlegungsbereich 28 als auch mit dem Anputzbereich 40 verbunden, ansonsten stimmt sie mit der streifenförmigen Schutzlasche 22 aus Fig. 1 überein und wird im Folgenden nicht noch einmal erläutert.In the strip-like protective tab 60, the adhesive layer applied on the outside is now recognizable, it is connected via a break-off material bridge 62 both to the fixing area 28 and to the plastering area 40, otherwise it aligns with the strip-shaped protective flap 22 Fig. 1 and will not be explained again below.

Anders als die einteilig ausgebildete erste Anputzleiste 2 ist die zweite Anputzleiste 26 nun zweiteilig ausgebildet, mit einem Festlegungsbereich 28 und einem dazu verschiebbaren Anputzbereich 40.Unlike the integrally formed first plaster strip 2, the second plaster strip 26 is now formed in two parts, with a Festlegungsbereich 28 and a displaceable for this purpose grooming area 40th

Der Festlegungsbereich 28 umfasst eine Basiswand 30 mit einem an deren Unterseite angebrachten Klebestreifen 32, der mit seiner Unterseite im montierten Zustand der Anputzleiste 26 an dem Fenster- oder Türrahmen dichtend anliegt und gegebenenfalls damit verklebt ist.The fixing region 28 comprises a base wall 30 with an adhesive strip 32 attached to its underside, which sealingly bears against the window or door frame with its underside in the mounted state of the plastering strip 26 and is optionally adhesively bonded thereto.

Falls es sich um einen Expansionsstreifen 32 aus einem flexiblen Material handelt, so kann dieser zusammengedrückt werden und sich wieder ausdehnen, um so Abstandsänderungen zwischen der Unterseite der Basiswand 30 und der Oberfläche des Fenster- oder Türrahmens in gewissen Grenzen ausgleichen zu können.If it is an expansion strip 32 of a flexible material, so this can be compressed and expand again so as to compensate for changes in distance between the bottom of the base wall 30 and the surface of the window or door frame within certain limits.

Am rechten außenseitigen Ende der Basiswand 38 erstreckt sich eine Schutzlippe 34 nach unten. Diese Schutzlippe kann aus einem weicheren flexiblen Kunststoffmaterial ausgebildet sein und somit eine gewisse Flexibilität aufweisen. Eine solche flexible Schutzlippe 34 legt sich im eingebauten Zustand der zweiten Anputzleiste 26 an die Oberfläche des Fenster- oder Türrahmens an, und zwar an einer Position außerhalb des Klebestreifens 32 und verhindert somit zuverlässig, dass Feuchtigkeit zu dem Klebestreifen 32 gelangen kann. Die Schutzlippe 34 kann insbesondere zusammen mit der Basiswand 30 und dem nachfolgend noch näher erläuterten Führungsfortsatz 36, mit dem Anputzbereich 40 und der streifenförmigen Schutzlasche 60 koextrudiert werden.At the right outside end of the base wall 38, a protective lip 34 extends downwards. This protective lip may be formed of a softer flexible plastic material and thus have a certain flexibility. Such a flexible protective lip 34 applies in the installed state of the second plaster strip 26 to the surface of the window or door frame, namely at a position outside of the adhesive strip 32 and thus reliably prevents moisture can reach the adhesive strip 32. The protective lip 34 can be coextruded, in particular together with the base wall 30 and the guide extension 36, which will be explained in more detail below, with the plastering area 40 and the strip-shaped protective strip 60.

Ein Führungsfortsatz 36 ragt nach oben hin von der Basiswand 30 weg und ist integral mit dieser ausgebildet. Dieser Führungsfortsatz 36 umfasst einen zuoberst angeordneten verbreiterten Endkopf 38, einen darunterliegenden Fortsatz-Wandbereich geringerer Wandstärke und einen die Verbindung mit der Basiswand 30 bildenden Fortsatz-Wandbereich von weiter verringerter Wandstärke.A guide extension 36 protrudes upward from the base wall 30 and is formed integrally therewith. This guide extension 36 comprises an uppermost widened end head 38 arranged at the top, an extension wall area of lesser wall thickness underneath and a continuation wall area of further reduced wall thickness forming the connection to the base wall 30.

Der verschiebbare Anputzbereich 40 gliedert sich in einen zuoberst angeordneten Wegragschenkel 36, einen dahinter ansetzenden Aufnahmeraum 42 mit innen gelegener Wärmedämmungs-Anlageseite 48 und äußerer Putzseite 54, wobei der Wegragschenkel 46 eine innere Putzseite 50 und eine äußere Putzseite 54 aufweist, und in eine am unteren äußeren Ende des Aufnahmeraums 42 ansetzende und nach außen verlaufende Putzendseite 56.The displaceable plastering area 40 is divided into an uppermost arranged Wegragschenkel 36, an adjoining receiving space 42 with the inside thermal insulation plant side 48 and outer plaster side 54, wherein the Wegragschenkel 46 has an inner plaster side 50 and an outer plaster side 54, and in one at the bottom outer end of the receiving space 42 attaching and outwardly extending Putzendseite 56th

Der Aufnahmeraum 42 ist so bemessen, dass das vordere Ende des Endkopfs 38 bei vollständig in dem Aufnahmeraum 42 gelegenem Führungsfortsatz 36 und demgemäß bei Anlage der hinteren Endfläche der Seitenwände des Aufnahmeraums 42 an der Vorderseite der Basiswand 30 in geringem Abstand zur oberen Wand des Aufnahmeraums 42 positioniert ist. An dem unteren Ende der Innenseiten des Aufnahmeraums 42 setzen einander gegenüberliegende Führungsvorsprünge 44 an und erstrecken sich so weit innen, bezogen auf die Symmetrieachse des Aufnahmeraums 42, dass sie den Führungsfortsatz 36 dazwischen aufnehmen und führen. In der gezeigten Position des Führungsfortsatzes 36 greifen die Führungsvorsprünge 44 in den untersten Bereich des Führungsfortsatzes 36 mit verringerter Wandstärke ein und halten diesen Führungsfortsatz 36 und somit den gesamten Festlegungsbereich 36 bezüglich dem verschiebbaren Anputzbereich 40 in der minimalen Verschiebeposition. Die Führungsvorsprünge 44 können dabei aus einem gegenüber dem Material des verschiebbaren Anputzbereichs 40 weicherem Kunststoffmaterial bestehen.The receiving space 42 is dimensioned such that the front end of the end head 38 with completely in the receiving space 42 Führungsfortsatz 36 and thus upon contact of the rear end surface of the side walls of the receiving space 42 at the front of the base wall 30 at a small distance from the upper wall of the receiving space 42nd is positioned. At the lower end of the inner sides of the receiving space 42, opposite guide projections 44 abut each other and extend so far inwardly, with respect to the symmetry axis of the receiving space 42, that they receive and guide the guide projection 36 therebetween. In the illustrated position of the guide extension 36, the guide projections 44 engage in the lowermost region of the guide projection 36 with reduced Wall thickness and hold this guide extension 36 and thus the entire Festlegungsbereich 36 with respect to the displaceable Anputzbereich 40 in the minimum displacement position. The guide projections 44 can consist of a plastic material which is softer than the material of the displaceable plastering area 40.

Wenn man sich vorstellt, dass die Abbrech-Materialbrücke bzw. die AbbrechMaterialbrücken 62 des Festlegungsbereichs 28 und des verschiebbaren Anputzbereichs 40 zu der streifenförmigen Schutzlasche 60 durchtrennt werden, kann der Anputzbereich 40 gegenüber dem Festlegungsbereich 28 verschoben werden, und zwar bis zu einer maximalen Verschiebeposition, bei der die Führungsvorsprünge 44 an den Endkopf 38 anschlagen. Dadurch können Bewegungen zwischen Wärmedämmung/Putzschicht und Fenster-/Türrahmen auf besonders vorteilhafte Weise kompensiert werden.If one imagines that the break-off material bridge or bridging material bridges 62 of the fixing region 28 and the displaceable plastering area 40 are severed to form the strip-like protective tongue 60, the grooming area 40 can be displaced relative to the fixing area 28, up to a maximum displacement position, in which the guide projections 44 abut against the end head 38. As a result, movements between thermal insulation / plaster layer and window / door frame can be compensated in a particularly advantageous manner.

Von einem Mittenbereich der oberen Wand des Aufnahmeraums 42 erstreckt sich der obere Wegragschenkel 46 nach oben. Die innere Putzseite 50 und die äußere Putzseite 52 des Wegragschenkels 46, die äußere Putzseite 54 der äußeren Wand des Aufnahmeraums 42 und die Putzendseite 56 sind mit einer Rinnenprofilierung 58 versehen, um die Oberfläche, an welcher der Putz anhaftet, zu vergrößern, und somit eine bessere Verbindung mit dem Putz zu schaffen. Diese Rinnenprofilierung 58 kann sich, wie in Fig. 2 ersichtlich, auch über die vordere Wand des Aufnahmeraums 42 erstrecken.From a central region of the upper wall of the receiving space 42, the upper Wegragschenkel 46 extends upward. The inner plaster side 50 and the outer plaster side 52 of the Wegragschenkels 46, the outer plaster side 54 of the outer wall of the receiving space 42 and the Putzendseite 56 are provided with a channel profiling 58 to increase the surface to which the plaster adheres, and thus a to create a better connection with the plaster. This channel profiling 58 may, as in Fig. 2 can also extend over the front wall of the receiving space 42.

An der äußeren Putzseite 52 des Wegragschenkels 46 ist ein in Fig. 2 sich nach vorne erstreckender Armierungsgewebeabschnitt 64 befestigt, und zwar mittels einer hier beispielhaft gezeigten Ultraschallverschweißung 66.On the outer plaster side 52 of the Wegragschenkels 46 is an in Fig. 2 attached to the front extending Armierungsgewebeabschnitt 64, by means of an ultrasonic welding 66 shown here as an example.

Bei der Montage der zweiten Anputzleiste 26 muss kein Spalt zwischen Wärmedämmung und Fenster-/Türrahmen vorhanden sein.
Auf der Baustelle wird zunächst die Anputzleiste 26 auf die entsprechende, durch die Maße der Fenster- oder Türöffnung vorgegebene Länge abgeschnitten und danach am Übergang zwischen Fenster-/Türrahmen und Wärmedämmung angebracht, indem sie mit der Wärmedämmungs-Anlageseite 48 an die Wärmedämmung angelegt und mit dem Klebestreifen 32 an den Fenster-/Türrahmen angelegt und verklebt. Danach wird die Schutzfolie über den Fenster- oder Türrahmen gespannt und an der Klebeschicht der streifenförmigen Schutzlasche 60 fixiert. Dann erfolgt das Einputzen des Anputzbereichs 40, gegebenenfalls nach zuvor erfolgtem Anbringen von Spachtelmasse hinter dem Armierungsgewebeabschnitt 64. Diese Spachtelmasse kann dabei insbesondere den Zwischenraum zwischen der Außenseite der Wärmedämmung und zum Armierungsgewebeabschnitt 64 ausfüllen. Beim Putzen erstreckt sich die Putzschicht entweder über den gesamten, mit Rinnenprofilierung 58 versehenen Bereich des Anputzbereichs 40 oder, falls Spachtelmasse aufgebracht worden ist, über die äußeren Putzseiten 52, 54 und über die Putzendseite 56 bis zur Putzendkante, die durch das Ende der Putzendseite 56 definiert ist.
When installing the second plaster strip 26 no gap between thermal insulation and window / door frame must be present.
On the construction site, first the plaster strip 26 is cut to the appropriate, predetermined by the dimensions of the window or door opening length and then attached to the transition between window / door frame and insulation by applying the heat insulation plant side 48 to the insulation and with the adhesive strip 32 applied to the window / door frame and glued. Thereafter, the protective film is stretched over the window or door frame and fixed to the adhesive layer of the strip-shaped protective flap 60. Then, the plastering of the plastering area 40, optionally after previously done applying putty behind the Armierungsgewebeabschnitt 64. This filler can in particular fill the gap between the outside of the insulation and Armierungsgewebeabschnitt 64. At the Cleaning the plaster layer extends either over the entire, provided with channel profiling 58 area of the plastering area 40 or, if filler has been applied, on the outer plaster sides 52, 54 and the cleaning end side 56 to Putzendkante defined by the end of Putzendseite 56 is.

Nach dem erfolgten Einputzen kann die streifenförmige Schutzlasche 60 entfernt werden, indem die Abbrechmaterialbrücken 62 durchtrennt, beispielsweise von Hand abgezogen werden, gegebenenfalls unter Anschneiden der Enden.After the plastering has taken place, the strip-shaped protective strip 60 can be removed by severing the break-off material bridges 62, for example by hand, optionally cutting the ends.

Durch das Durchtrennen der Abbrechmaterialbrücke 62, die über die streifenförmige Schutzlasche 60 vorher noch den Festlegungsbereich 28 und den verschiebbaren Anputzbereich 40 zusammengehalten hat, ist der verschiebbare Anputzbereich 40 nun von dem Festlegungsbereich 28 entkoppelt und kann sich durch die Konstruktion mit Führungsfortsatz 36, Endkopf 38, und Aufnahmeraum 42 mit Führungsvorsprüngen 44 gegenüber der Basiswand 30 bewegen, und somit Bewegungen zwischen Wärmedämmung und Putzschicht sowie Fenster-/Türrahmen ausgleichen.Due to the severing of the break-off material bridge 62, which has previously held together the fastening area 28 and the displaceable plaster area 40 via the strip-shaped protective strip 60, the displaceable plaster area 40 is now decoupled from the fastening area 28 and can be replaced by the construction with guide extension 36, end cap 38, move and receiving space 42 with guide projections 44 relative to the base wall 30, and thus compensate for movements between thermal insulation and plaster layer and window / door frame.

Bei der zweiten Anputzleiste 26 handelt es sich um eine beispielhaft beschriebene zweiteilige Anputzleiste, bei der zwei Bereiche 28 und 40 gegeneinander verschoben werden können, um Bewegungen zwischen Wärmedämmung/Putzschicht und Fenster-/Türrahmen ausgleichen zu können.The second plastering strip 26 is a two-part plastering strip described by way of example in which two regions 28 and 40 can be displaced relative to one another in order to be able to compensate for movements between thermal insulation / plaster layer and window / door frame.

Von der Erfindung sind auch andere zweiteilige Anputzleisten erfasst, insbesondere auch zweiteilige Anputzleisten, die wenigstens teilweise in einen Spalt zwischen Wärmedämmung und Fenster-/Türrahmen eingeschoben werden.The invention also covers other two-part plaster moldings, in particular also two-part plaster moldings which are at least partially inserted into a gap between the thermal insulation and the window / door frame.

Die in Fig. 3 gezeigte Abschlussschiene 68 umfasst eine Winkelschiene 70 und eine damit verbundene Außenleiste 80.In the Fig. 3 shown end rail 68 includes an angle rail 70 and an outer strip 80 connected thereto.

Die Winkelschiene 70 verfügt über einen ersten Schenkel 72, der zur Anlage an einem hier nicht gezeigten Bauwerk, beispielsweise an einer Wand vorgesehen ist, und der beispielsweise durch eingeschossene Bolzen oder durch Schrauben daran befestigt werden kann, und über einen zweiten, im Wesentlichen waagrecht verlaufenden Schenkel 74, der an der Unterseite des ersten Schenkels 72 ansetzt, sich von dort waagrecht nach außen fortsetzt und an seinem von der Wand abgelegenen Ende eine Stufe 76 nach unten aufweist.The angle rail 70 has a first leg 72, which is provided for engagement with a building, not shown here, for example, on a wall, and which can be attached thereto, for example, by bolted bolts or screws, and a second, substantially horizontally extending Leg 74, which attaches to the underside of the first leg 72, from there continues horizontally outwards and at its end remote from the wall has a step 76 down.

Die Außenleiste 80 verfügt weiterhin über einen im Wesentlichen waagrecht verlaufenden Abschluss-stirnseitigen Schenkel 82 und über einen damit über einen Übergangsbereich 76 verbundenen, nach oben ragenden Außenschenkel 84. Der Abschluss-stirnseitige Schenkel 82 ist oberhalb der Stufe 76 des zweiten Schenkels 74 der Winkelschiene 70 angeordnet und mittels eines Schaumstoff-Klebebands oder komprimierten Dichtbands 78 auf den nach unten zurückgesetzten Stufenendbereich 76 aufgeklebt. Dabei bilden die Oberseite des zweiten Schenkels 74 (mit Ausnahme des Abschnitts der Stufe 76) und die Oberseite des Abschluss-stirnseitigen Schenkels 82 im vorliegenden Beispiel eine Ebene.The outer strip 80 furthermore has a substantially horizontally extending end-side limb 82 and an upwardly projecting outer limb 84 connected therewith via a transition region 76. The end-side limb 82 is above the step 76 of the second limb 74 of the angle rail 70 arranged and adhered by means of a foam adhesive tape or compressed sealing tape 78 on the recessed down Stufenendbereich 76. In this case, the top of the second leg 74 (except for the portion of the step 76) and the top of the end face leg 82 in the present example form a plane.

An der Außenseite des Außenschenkels 84 ist ein Armierungsgewebeabschnitt 92 mittels geeigneten Befestigungen, die vorliegend als Ultraschallverschweißungen 94 ausgeführt sind, verbunden.On the outside of the outer leg 84, a reinforcing fabric portion 92 is connected by means of suitable fasteners, which in the present case are designed as ultrasonic welds 94.

Der Übergangsbereich 86 zwischen Abschluss-stirnseitigem Schenkel 82 und Außenschenkel 84 ist im vorliegenden Ausführungsbeispiel gerundet ausgebildet und beschreibt in etwa einen Halb- oder Zweidrittelkreis mit Öffnung schräg nach innen oben, so dass hier in Querrichtung ein Einsteckbereich für einen Steckverbinder gebildet wird. An den schräg nach unten innen und schräg nach oben außen liegenden Außenwandbereichen ist jeweils eine Rinnenprofilierung 104 ausgebildet, und der rechte Außenwandbereich des Übergangsbereichs 86 bildet eine Putzabzugskante bzw. eine Putzendseite.The transition region 86 between the end-side leg 82 and outer leg 84 is rounded in the present embodiment and describes approximately a half or two-thirds circle with an opening obliquely inwardly above, so that here in the transverse direction a plug-in area is formed for a connector. At the obliquely downwards inwardly and obliquely upwardly outward outer wall regions, a groove profiling 104 is formed in each case, and the right outer wall region of the transitional region 86 forms a plaster removal edge or a cleaning end side.

Des Weiteren ist eine Tropfnasenlippe 90 vorgesehen, die sich von dem rechten unteren Endbereich des Übergangsbereichs 86 nach unten schräg nach innen erstreckt. Durch eine solche Tropfnasenlippe 90 wird erreicht, dass die Unterseite der Winkelschiene 70 trocken bleibt und dass der Anteil an Wasser, der zu dem Klebestreifen 78 gelangen kann, minimiert wird.Further, a drip lip 90 is provided which extends obliquely inwardly from the right lower end portion of the transition portion 86 downward. Such a drip lip lip 90 ensures that the underside of the angle rail 70 remains dry and that the proportion of water that can reach the adhesive strip 78 is minimized.

Bei der Verwendung der Abschlussschiene 68 arbeitet man normalerweise so, dass, ggf. nach Abschneiden der Abschlussschiene 68 auf die entsprechende vorgegebene Länge, zunächst die Winkelschiene 70 an der Gebäudewand befestigt wird, normalerweise mehrere Winkelschienen 70 eine nach der anderen entlang der Länge der Wand befestigt werden, wobei an den Übergängen mit Überlappung gearbeitet werden kann oder wobei an den Übergängen Steckverbinder, die in die Übergangsbereiche 86 eingreifen, angebracht werden, die jeweils zwei benachbarte Abschlussschienen 68 miteinander verbinden.When using the end rail 68, one normally operates such that, optionally after cutting the end rail 68 to the appropriate predetermined length, first the angle rail 70 is secured to the building wall, usually a plurality of angle rails 70 are fastened one after the other along the length of the wall can be used, wherein at the transitions with overlap can be worked or where at the junctions connectors which engage in the transition regions 86, each connecting two adjacent end rails 68 together.

Dann wird die Außenleiste 80 aufgeklebt, normalerweise mehrere, eine nach der anderen entlang der Länge der Winkelschienen 70. Dann werden die Wärmedämmungen eingebracht, und zwar so, dass sie mit ihrer Gebäudeseite an dem ersten Schenkel 72 und darüber an der Wand anliegen und dass sie mit der Unterseite auf dem zweiten Schenkel 74 der Winkelschiene 70 und dem Abschluss-stirnseitigen Schenkel 82 aufliegen. Beim Einbringen und Aufsetzen der Dämmung kann der Außenschenkel 74 mitsamt Armierungsgewebeabschnitt 92 nach außen geschwenkt werden. Die Dämmung wird in üblicher Weise an der Wand befestigt.Then, the outer panel 80 is glued, usually several, one after the other along the length of the angle rails 70. Then the thermal insulation is introduced, in such a way that they lie with their building side against the first limb 72 and above against the wall and that they rest with their underside on the second limb 74 of the angle rail 70 and the end face limb 82. When introducing and placing the insulation of the outer leg 74 can be pivoted together with Armierungsgewebeabschnitt 92 to the outside. The insulation is fixed in the usual way on the wall.

Jetzt wird der Armierungsgewebeabschnitt 92 von außen her mit Spachtelmasse auf der Außenseite der Wärmedämmung befestigt. Es versteht sich, dass nach oben hin weiteres Armierungsgewebe, das nicht eingezeichnet ist, überlappend an dem Armierungsgewebeabschnitt 92 anschließt und ebenfalls an der Dämmung befestigt wird. Nachdem die Spachtelmasse angezogen hat oder erhärtet ist, wird außenseitig eine Putzschicht aufgetragen. Dabei kann der in Fig. 3 am weitesten außen gelegene Übergangsbereichsabschnitt 86 als Abzugskante dienen.Now the Armierungsgewebeabschnitt 92 is attached from the outside with putty on the outside of the thermal insulation. It is understood that further reinforcing fabric, which is not shown, overlaps the reinforcing fabric section 92 at the top and is likewise fastened to the insulation. After the putty has tightened or hardened, a plaster layer is applied on the outside. Here, the in Fig. 3 the outermost transition region portion 86 serve as a trigger edge.

Die Putzeckleiste 96 der Fig. 4 weist wie die Außenleiste 80 der Abschlussschiene 68 einen ersten in Fig. 4 waagerecht verlaufenden Schenkel 98, einen zweiten, in Fig. 4 senkrecht, also nach oben verlaufenden Schenkel 100, und einen Übergangsbereich 102 auf, der das rechte Ende des ersten Schenkels 98 und das untere Ende des zweiten Schenkels 100 miteinander verbindet und im Wesentlichen den Verlauf eines Halb- oder Zweidrittelkreises beschreibt, so dass die Schenkel 98 und 100 gegeneinander verschwenkt werden können und dass ein Steckverbinder oder Steckzapfen in Querrichtung in den Übergangsbereich 102 eingebracht werden kann, um zwei in Querrichtung nebeneinander liegende Putz-Eckleisten 96 miteinander zu verbinden.The Putzeckleiste 96 of Fig. 4 has like the outer bar 80 of the end rail 68 a first in Fig. 4 horizontal leg 98, a second, in Fig. 4 perpendicular, so upwardly extending leg 100, and a transition region 102 which connects the right end of the first leg 98 and the lower end of the second leg 100 and essentially describes the course of a half or two-thirds circle, so that the legs 98th and 100 can be pivoted against each other and that a connector or plug in the transverse direction can be introduced into the transition region 102 to connect two transverse adjacent plaster corner strips 96 together.

An der Unterseite des ersten Schenkels 98 ist mittels geeigneter Verbindungen, die hier exemplarisch als Ultraschallverschweißungen 112 dargestellt sind, ein erster Armierungsgewebeabschnitt 110 befestigt, der in Richtung des ersten Schenkels 98 nach links verläuft. Ebenso ist an der Außenseite des zweiten Schenkels 100 ein zweiter Armierungsgewebeabschnitt 114 mittels geeigneten Verbindungen, die hier exemplarisch als Ultraschallverschweißungen 116 dargestellt sind, befestigt. Dieser zweite Armierungsgewebeabschnitt 114 verläuft in Richtung des zweiten Schenkels 100 nach oben.On the underside of the first leg 98, by means of suitable connections, which are shown here by way of example as ultrasonic weldings 112, a first reinforcement fabric section 110 is attached, which runs in the direction of the first leg 98 to the left. Likewise, on the outside of the second leg 100, a second reinforcement fabric portion 114 is attached by means of suitable connections, which are exemplified herein as ultrasonic welds 116. This second Armierungsgewebeabschnitt 114 extends in the direction of the second leg 100 upwards.

Der nach links unten weisende und der nach rechts oben weisende Außenwandbereich des Übergangsbereichs 102 ist jeweils mit einer Rinnenprofilierung 104 zur Verbesserung der Anhaftung des Putzes versehen.The outer wall region of the transitional region 102 pointing to the lower left and pointing to the upper right is in each case provided with a channel profiling 104 for improving the adhesion of the plaster.

Der am Weitesten unten gelegene Wandabschnitt des Übergangsbereichs 102 bildet eine erste Putzabzugskante 106 und der am Weitesten rechts gelegene Wandabschnitt des Übergangsbereichs 102 bildet eine zweite Putzabzugskante 108. Durch Verbiegen der Schenkel 98 und 100 zueinander kann die Putz-Eckleiste 96 auf praktisch jeden erforderlichen Winkel an einer Ecke eingestellt werden.The lowermost wall portion of the transition region 102 forms a first plaster removal edge 106, and the rightmost wall portion of the transition region 102 forms a second drainage edge 108. By bending the legs 98 and 100 toward one another, the trim molding 96 can approach virtually any required angle be set in a corner.

Beim Verputzen von Gebäudeecken wird wie folgt vorgegangen. Zunächst werden die Putz-Eckleiste 96, in der Praxis mehrere neben- oder übereinander angeordnete Putz-Eckleisten 96 an die Gebäudeecke angelegt und in üblicher Weise mit dem Gebäude verbunden, beispielsweise durch das Einschießen von Bolzen. Hierbei kann man mit Überlappung arbeiten, oder es können aneinander angrenzende Putz-Eckleisten durch Steckverbinder bzw. Steckzapfen, die in die Übergangsbereiche 102 der benachbarten Putz-Eckleisten 96 eingesetzt werden, miteinander verbunden werden können. Dann werden die Armierungsgewebeabschnitte 102 von außen mit Spachtelmasse an den Gebäudewänden beidseits der Gebäudeecke befestigt, und daran anschließend können weitere hier nicht gezeigte Armierungsgewebeabschnitte angebracht und ebenfalls mit Spachtelmasse an der Gebäudewand befestigt werden. Nun wird beidseits der Gebäudeecke von außen her auf beide Wände der Putz aufgetragen, wobei die Putzabzugskanten 106 und 108 hier die Dicke der aufzubringenden Putzschicht vorgeben können. Nach dem Erhärten-Lassen der Putzschicht ist die Gebäudeecke fertig verputzt.When plastering building corners, the procedure is as follows. First, the trim cornice 96, applied in practice a plurality of adjacent or stacked plaster corner strips 96 to the building corner and connected in the usual way with the building, for example by the shooting of bolts. Here you can work with overlap, or it can be connected together by connectors or spigot, which are inserted into the transition regions 102 of the adjacent plaster corner strips 96 adjacent plaster facing corners. Then the Armierungsgewebeabschnitte 102 are attached from the outside with putty on the building walls on both sides of the building corner, and then further not shown Armierungsgewebeabschnitte can be attached and also secured with putty on the building wall. Now the plaster is applied to both sides of the building corner from the outside on both walls, wherein the plaster removal edges 106 and 108 can specify here the thickness of the applied plaster layer. After hardening the plaster layer, the building corner is plastered ready.

Wenn die Extrusionsteile der Anputzleisten 2 und 26, dies sind bei der ersten Anputzleiste die Basiswand 6, der Wegragschenkel 12, die Putzendseite 14 und die streifenförmige Schutzlasche 22, bei der zweiten Anputzleiste 26 die Basiswand 30 mit Führungsfortsatz 36 des Festlegungsbereichs 28, der Aufnahmeraum 42, der Wegragschenkel 46 und die Putzendseite 56 des Anputzbereichs 40 und die streifenförmige Schutzlasche 60, bei der Abschlussschiene 68 die Winkelschiene 70 mit ihren beiden Schenkeln 72 und 74 und die Außenleiste 80 mit ihren Schenkeln 82 und 84 und mit ihrem Übergangsbereich 86 samt Tropfnase 90 und bei der Putz-Eckleiste 96 die beiden Schenkel 98 und 100 mitsamt Übergangsbereich 102, aus einem Material sind, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist, so können die Anputzleisten 2 und 26, die Abschlussschiene 68 und die Putz-Eckleiste 96 umweltfreundlicher und Ressourcen-schonender hergestellt werden, und es können bei der Produktion anfallender Ausschuss und auf der Baustelle entstehender Leisten- bzw. Schienen-Abfall besser und umweltfreundlicher entsorgt werden, weil eine deutlich schnellere Zersetzung im Erdreich erfolgt und daher eine umweltfreundlichere Entsorgung gegeben ist, oder anfallender Ausschuss und entstehender Leisten- bzw. Schienen-Abfall kann recycled werden.If the extruded parts of the plaster strips 2 and 26, these are the base wall 6, the Wegragschenkel 12, the Putzendseite 14 and the strip-shaped protective flap 22 in the first plaster strip 26, the base wall 30 with guide extension 36 of the fixing area 28, the receiving space 42 in the second plaster bar , the Wegragschenkel 46 and the Putzendseite 56 of the Anputzbereichs 40 and the strip-shaped protection tab 60, in the end rail 68, the angle rail 70 with its two legs 72 and 74 and the outer bar 80 with their legs 82 and 84 and with its transition region 86 including drip nose 90 and when the plaster cornice 96, the two legs 98 and 100, together with transition region 102, are made of a material whose main component is a renewable raw material, so the Anputzleisten 2 and 26, the end rail 68 and the trim cornice 96 environmentally friendly and resource be produced more gently, and it may in the production of accumulating A Committee and rail waste incurred on the site better and be disposed of environmentally friendly, because a much faster decomposition in the soil and therefore a more environmentally friendly disposal is given, or accruing Committee and resulting ingot or rail waste can be recycled ,

Als besonders geeigneter Hauptbestandteil haben sich bei Tests des vorliegenden Anmelders Reishülsen, insbesondere Mehl oder Fasern daraus, Holz, insbesondere Mehl oder Fasern daraus, oder eine Mischung davon bewährt.As a particularly suitable main component, rice hulls, in particular flour or fibers thereof, wood, in particular flour or fibers thereof, or a mixture thereof, have proven useful in tests of the present applicant.

Diese Hauptbestandteile werden dabei insbesondere mit einem geeigneten Trägermaterial versehen, das dafür sorgt, dass das Verbundmaterial fest und formstabil ist und extrudiert werden kann.These main components are provided in particular with a suitable carrier material, which ensures that the composite material is firm and dimensionally stable and can be extruded.

Ein besonders geeignetes Verbundmaterial stellt ein sogenannter wood plastic composite, also ein Holz-Kunststoff-Verbundmaterial dar.A particularly suitable composite material is a so-called wood plastic composite, ie a wood-plastic composite material.

Ein weiteres besonders geeignetes Verbundmaterial besteht aus den Bestandteilen Reishülsen, Steinsalzen und Mineralöl. Ein besonders geeignetes Material ist ein Verbundmaterial aus Reishülsen mit einem Anteil von 50-70, insbesondere von etwa 60%, Steinsalz mit einem Anteil von 17-27, insbesondere von 22%, und mit einem Anteil an Mineralöl von 13-23, insbesondere von etwa 18%. Ein solches Verbundmaterial hat eine Dichte von etwa 1.46 g/cm3 und einen thermischen Längenausdehnungskoeffzienten von 3,6 x 10 (-5) m/mC.Another particularly suitable composite material consists of the ingredients rice hulls, rock salts and mineral oil. A particularly suitable material is a composite material of rice hulls with a proportion of 50-70, in particular of about 60%, rock salt with a content of 17-27, in particular of 22%, and with a mineral oil content of 13-23, in particular of about 18%. Such a composite material has a density of about 1.46 g / cm 3 and a thermal expansion coefficient of 3.6 x 10 (-5) m / mC.

Als weiterer besonders geeigneter Hauptbestandteil haben sich Naturfasern wie Flachs, Hanf oder andere Faserpflanzen bewährt.As a further particularly suitable main component, natural fibers such as flax, hemp or other fiber plants have been proven.

Als besonders geeignetes Trägermaterial hat sich Lignin bewährt, das ein Polymer ist.Lignin, which is a polymer, has proven to be a particularly suitable carrier material.

Eine Mischung aus Lignin mit Naturfasern, wie Flachs, Hanf oder anderen Faserpflanzen, bildet einen unter Temperaturerhöhung verarbeitungsfähigen Verbundwerkstoff, der unter anderem extrudiert werden kann und ein ebenfalls besonders geeignetes Material darstellt.A mixture of lignin with natural fibers, such as flax, hemp or other fiber plants, forms a processable composite under temperature increase, which can be extruded among other things and also represents a particularly suitable material.

Ein weiteres geeignetes Material ist Bio-Polyethylen.Another suitable material is bio-polyethylene.

Ein weiteres geeignetes Material ist eine Mischung aus Co-Polyester und Polymilchsäure PLA, die eine große Menge von natürlichem nachwachsendem Rohstoff enthalten kann.Another suitable material is a mixture of co-polyester and polylactic acid PLA, which may contain a large amount of natural renewable resource.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

22
erste Anputzleistefirst plaster bar
44
Festlegungsbereicharea designation
66
Basiswandbase wall
88th
Klebestreifentape
1010
AnputzbereichAnputzbereich
1212
WegragschenkelWegragschenkel
1414
PutzendseitePutzendseite
1616
Rinnenprofilierunggroove profiling
1818
Armierungsgewebeabschnittreinforcing fabric
2020
Ultraschallverschweißungultrasonic welding
2222
streifenförmige Schutzlaschestrip-shaped protective flap
2424
Abbrech-MaterialbrückeBreak-material bridge
2626
zweite Anputzleistesecond plastering strip
2828
Festlegungsbereicharea designation
3030
Basiswandbase wall
3232
Klebestreifentape
3434
Schutzlippeprotective lip
3636
FührungsfortsatzGuide extension
3838
Endkopfend head
4040
verschiebbarer Vorderbereich/Anputzbereichsliding front area / plastering area
4242
Aufnahmeraumaccommodation space
4444
Führungsvorsprüngeguide projections
4646
WegragschenkelWegragschenkel
4848
Wärmedämmungs-AnlageseiteHeat barrier system page
5050
innere Putzseiteinside plaster side
5252
äußere Putzseiteouter plaster side
5454
äußere Putzseiteouter plaster side
5656
PutzendseitePutzendseite
5858
Rinnenprofilierunggroove profiling
6060
streifenförmige Schutzlaschestrip-shaped protective flap
6262
AbbrechmaterialbrückeAbbrechmaterialbrücke
6464
Armierungsgewebeabschnittreinforcing fabric
6666
Ultraschallverschweißungultrasonic welding
6868
Abschlussschieneend rail
7070
Winkelschieneangle rail
7272
erster Schenkelfirst leg
7474
zweiter Schenkelsecond leg
7676
Endstufefinal stage
7878
Kleberstreifenadhesive strips
8080
Außenleisteoutside bar
8282
Abschluss-stirnseitiger SchenkelFinishing frontal thigh
8484
Außenschenkelouter leg
8686
Übergangsbereich/Steckverbinder-EinsteckbereichTransition area / connector insertion
8888
RillenproflierungRillenproflierung
9090
TropfnasenlippeDrip lip
9292
Armierungsgewebeabschnittreinforcing fabric
9494
Ultraschallverschweißungultrasonic welding
9696
Putz-EckleistePlaster cornice
9898
erster Schenkelfirst leg
100100
zweiter Schenkelsecond leg
102102
Übergangsbereich/Steckverbinder-EinsteckbereichTransition area / connector insertion
104104
Rinnenprofilierunggroove profiling
106106
erste Putzabzugskantefirst plaster removal edge
108108
zweite Putzabzugskantesecond plaster removal edge
110110
erster Armierungsgewebeabschnittfirst reinforcement fabric section
112112
Ultraschallverschweißungenultrasonic welds
114114
zweiter Armierungsgewebeabschnittsecond reinforcement fabric section
116116
Ultraschallverschweißungenultrasonic welds

Claims (15)

Anputzleiste zur Platzierung an einem Übergang zwischen einem ersten Bauteil eines Gebäudes, insbesondere einem Fenster- oder Türrahmen, einer Fensterbank, einem Balken, einer Metallverbindung oder einer Lisene, und einem zweiten Bauteil eines Gebäudes, insbesondere einer Wärmedämmung und/oder einer Putzschicht, aufweisend: einen Festlegungsbereich (4), mit dem die Anputzleiste (2) an wenigstens einem Bauteil des Übergangs befestigbar ist; und einen Anputzbereich (10), der zum Einputzen in die Putzschicht und/oder zur festen Verbindung mit der Wärmedämmung bestimmt ist; wobei der Festlegungsbereich (4) und der Anputzbereich (10) als ein gemeinsames Extrusionsteil oder als separate Extrusionsteile ausgebildet sind; dadurch gekennzeichnet, dass der Festlegungsbereich (4) und/oder der Anputzbereich (10) ein Material aufweisen, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist. Plaster strip for placement at a transition between a first component of a building, in particular a window or door frame, a window sill, a beam, a metal connection or a Lisene, and a second component of a building, in particular a thermal insulation and / or a plaster layer, comprising: a fixing region (4) with which the plaster strip (2) can be fastened to at least one component of the transition; and a plastering area (10) intended for plastering into the plaster layer and / or for firm connection with the thermal insulation; wherein the fixing area (4) and the plastering area (10) are formed as a common extrusion part or as separate extrusion parts; characterized in that the fixing area (4) and / or the plastering area (10) comprise a material whose main constituent is a renewable raw material. Anputzleiste nach Anspruch 1, wobei der Festlegungsbereich (4) und der Anputzbereich (10) einstückig ausgebildet sind;und/oder wobei der Festlegungsbereich (4) über einen Klebestreifen (8) zur Befestigung an dem ersten Gebäudebestandteil verfügt.Plastering strip according to claim 1, wherein the fixing area (4) and the plastering area (10) are integrally formed, and / or wherein the fixing area (4) has an adhesive strip (8) for attachment to the first building component. Anputzleiste nach Anspruch 1 oder 2, wobei der Festlegungsbereich (28) und der Anputzbereich (40) derart getrennt voneinander ausgebildet sind, dass - gegebenenfalls nach Abtrennen einer streifenförmige Schutzlasche (60) - mittels einer Führungsverbindung eine Relativbewegung zwischen Festlegungsbereich (28) und Anputzbereich (40) ermöglicht wird.Plaster strip according to claim 1 or 2, wherein the fixing area (28) and the plastering area (40) are formed separately from one another such that - optionally after separating a strip-shaped protective strip (60) - by means of a guide connection a relative movement between the fixing area (28) and the plaster area ( 40) is enabled. Anputzleiste nach einem der vorhergehenden Ansprüche, wobei der Festlegungsbereich und der Anputzbereich über einen flexiblen Materialabschnitt miteinander verbunden sind, der eine Relativbewegung zwischen Festlegungsbereich und Anputzbereich erlaubt.Plastering strip according to one of the preceding claims, wherein the fixing area and the plastering area are connected to one another via a flexible material section which allows a relative movement between the fixing area and the plastering area. Anputzleiste nach einem der vorhergehenden Ansprüche, wobei ein Expansionsstreifen mit verzögerter Expansion vorgesehen ist, der so ausgebildet ist, dass er - gegebenenfalls nach Lösen eines Einsperrbereichs - sich in Richtung auf eines der beiden Gebäude-Bauteile hin ausdehnt und daran anlegt.Plaster molding according to one of the preceding claims, wherein a expansion strip is provided with a delayed expansion, which is designed so that it - optionally after releasing a lock-in area - it expands towards and abuts one of the two building components. Abschlussschiene für eine Bauwerks-Wärmedämmung oder eine Bauwerks-Schalldämmung, aufweisend: eine Winkelschiene (70), deren erster Schenkel (72) zur Befestigung an dem Bauwerk und deren zweiter Schenkel (74) zur Anlage gegen eine Abschluss-Stirnseite der Dämmung vorgesehen ist; und eine Außenleiste (80), die am Endbereich des zweiten Schenkels (74) der Winkelschiene (70) befestigt ist und einen Außenschenkel (84) zur Anlage an der Außenseite der Dämmung aufweist, wobei die Winkelschiene (70) und die Außenleiste (80) als gemeinsames Extrusionsteil oder als separate Extrusionsteile ausgebildet sind; dadurch gekennzeichnet, dass die Winkelschiene (70) und/oder die Außenleiste (80) ein Material aufweisen, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist. End rail for structural heat insulation or structural sound insulation, comprising: an angle rail (70), the first leg (72) is provided for attachment to the building and the second leg (74) for abutment against a termination end face of the insulation; and an outer strip (80) fixed to the end portion of the second leg (74) of the angle rail (70) and having an outer leg (84) for engagement with the outside of the insulation, wherein the angle rail (70) and the outer strip (80) are formed as a common extrusion or as separate extrusion parts; characterized in that the angle rail (70) and / or the outer strip (80) comprise a material whose main component is a renewable raw material. Abschlussschiene nach Anspruch 6, wobei die Außenleiste (80) an die Winkelschiene (70) angeklebt oder auf die Winkelschiene (70) aufgesteckt ist; und/oder wobei die Außenleiste (80) einen Abschluss-stirnseitigen Schenkel (82) aufweist, der zur Anlage gegen eine Abschluss-Stirnseite der Dämmung vorgesehen ist; und/oder wobei die Außenleiste (80) über einen weiteren Schenkel (90) verfügt, der eine Tropfnase für Wasser bildet.A closure rail according to claim 6, wherein the outer strip (80) is glued to the angle rail (70) or attached to the angle rail (70); and / or wherein the outer strip (80) has a closing end-side limb (82) which is provided for abutment against a closing end side of the insulation; and / or wherein the outer strip (80) has a further leg (90) forming a drip nose for water. Abschlussschiene nach Anspruch 6 oder 7, wobei die Winkelschiene (70) und die Außenleiste (80) mittels eines Klebestreifens (78), insbesondere mittels eines zwischen dem zweiten Schenkel (74) der Winkelschiene (70) und dem Abschluss-stirnseitigen Schenkel (82) der Außenleiste (80) vorgesehenen Klebestreifens (78) miteinander verbunden sind.A closure rail according to claim 6 or 7, wherein the angle rail (70) and the outer strip (80) by means of an adhesive strip (78), in particular by means of a between the second leg (74) of the angle rail (70) and the end-face leg (82). the outer strip (80) provided adhesive strip (78) are interconnected. Abschlussschiene nach einem der Ansprüche 6 bis 8, wobei zwischen dem Außenschenkel (84) und dem Abschluss-stirnseitigen Schenkel (82) der Außenleiste (80) ein flexibler Übergangsbereich (86) vorgesehen ist;und/oder wobei der Übergangsbereich einen Einsteckbereich in Querrichtung für einen Steckverbinder aufweist; und/oder wobei der zweite Schenkel (74) der Winkelschiene (70) einen insbesondere in deren äußerem Endbereich angeordneten stufenförmigen Verlauf (76) ausbildet.A closure rail according to any one of claims 6 to 8, wherein a flexible transition region (86) is provided between the outer leg (84) and the end face leg (82) of the outer strip (80), and / or wherein the transition region has a transverse insertion region having a connector; and / or wherein the second leg (74) of the angle rail (70) forms a step-shaped profile (76), which is arranged in particular in its outer end region. Putz-Eckleiste zur Anordnung an einer vertikalen oder einer horizontalen Bauwerksecke, insbesondere einer mit Wärmedämmung versehenen Bauwerksecke, aufweisend: einen ersten Schenkel (98) zur Anlage an dem Bauwerk an der ersten Seite der Bauwerksecke; und einen zweiten Schenkel (100) zur Anlage an dem Bauwerk an der zweiten Seite der Bauwerksecke, wobei der erste und der zweite Schenkel (98, 100) als gemeinsames Extrusionsteil oder als separate Extrusionsteile ausgebildet sind, dadurch gekennzeichnet, dass der erste und/oder der zweite Schenkel (98, 100) ein Material aufweisen, dessen Hauptbestandteil aus einem nachwachsenden Rohstoff ist. Plaster corner strip for arrangement on a vertical or a horizontal building corner, in particular a building corner provided with thermal insulation, comprising: a first leg (98) for engaging the structure on the first side of the building corner; and a second leg (100) for engaging the structure on the second side of the building corner, wherein the first and second legs (98, 100) are formed as a common extrusion or as separate extrusions, characterized in that the first and / or the second leg (98, 100) comprise a material whose main component is a renewable raw material. Putz-Eckleiste nach Anspruch 10, wobei von wenigstens einem der Schenkel (98, 100) ein Anputzbereich gebildet wird.A plaster molding according to claim 10, wherein at least one of the legs (98, 100) forms a plastering area. Putz-Eckleiste nach Anspruch 10 oder 11, wobei ein Übergangsbereich (102) zwischen dem ersten und dem zweiten Schenkel (98, 100) vorgesehen ist; und/oder wobei der Übergangsbereich (102) mindestens an der dem Anputzbereich zugewandten Seite mit einer rinnenartigen Profilierung (104) versehen ist; und/oder wobei der Übergangsbereich (102) einen Einsteckbereich in Querrichtung für einen Steckverbinder aufweist.A trim molding according to claim 10 or 11, wherein a transition region (102) is provided between the first and second legs (98, 100); and / or wherein the transition region (102) is provided with a groove-like profiling (104) at least on the side facing the plastering area; and / or wherein the transition region (102) has a transverse insertion region for a connector. Anputzleiste, Abschlussschiene oder Putz-Eckleiste einem der vorhergehenden Ansprüche, wobei der Hauptbestandteil des Materials aus Reishülsen, insbesondere Fasern oder Mehl daraus, aus Holz, insbesondere Fasern oder Mehl daraus, oder einer Mischung daraus besteht.Plaster molding, finishing rail or plaster molding of any one of the preceding claims, wherein the main component of the material from rice hulls, in particular fibers or flour thereof, from wood, in particular fibers or flour thereof, or a mixture thereof. Anputzleiste, Abschlussschiene oder Putz-Eckleiste einem der vorhergehenden Ansprüche, wobei das Material ein wood plastic composite ist.Plaster molding, finishing rail or trim molding of any one of the preceding claims, wherein the material is a wood plastic composite. Anputzleiste, Abschlussschiene oder Putz-Eckleiste einem der vorhergehenden Ansprüche, wobei das Material aus den Bestandteilen Reishülsen, Steinsalzen und Mineralöl besteht.Plaster molding, finishing rail or trim molding of any one of the preceding claims, wherein the material consists of the ingredients rice hulls, rock salts and mineral oil.
EP13165040.0A 2012-08-10 2013-04-24 Plastering strip and plaster chamfer Revoked EP2708674B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL13165040T PL2708674T3 (en) 2012-08-10 2013-04-24 Plastering strip and plaster chamfer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202012007697U DE202012007697U1 (en) 2012-08-10 2012-08-10 Plastering bar, finishing rail and plaster molding

Publications (3)

Publication Number Publication Date
EP2708674A2 true EP2708674A2 (en) 2014-03-19
EP2708674A3 EP2708674A3 (en) 2017-08-23
EP2708674B1 EP2708674B1 (en) 2019-10-02

Family

ID=47008061

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13165040.0A Revoked EP2708674B1 (en) 2012-08-10 2013-04-24 Plastering strip and plaster chamfer

Country Status (4)

Country Link
EP (1) EP2708674B1 (en)
DE (1) DE202012007697U1 (en)
LT (1) LT2708674T (en)
PL (1) PL2708674T3 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2952649A1 (en) * 2014-06-05 2015-12-09 Braun, August Plastering strip
PL424136A1 (en) * 2017-12-30 2019-07-01 Michał Marian Kamiński Window expansion joint profile

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012221244A1 (en) * 2012-11-21 2014-05-22 Protektorwerk Florenz Maisch Gmbh & Co. Kg Bauprofil

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19539526A1 (en) 1995-10-24 1997-05-22 August Braun End rail for building thermal insulation or building sound insulation
EP0875641A2 (en) 1997-04-30 1998-11-04 August Braun Plaster bead with reinforcing material attached thereto
DE10038279A1 (en) 1999-08-12 2001-02-15 August Braun Decoration support for building corners has ribbed profiles attached to wall corner and each other by plastics pins

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5406768A (en) 1992-09-01 1995-04-18 Andersen Corporation Advanced polymer and wood fiber composite structural component
DE19605467B4 (en) 1996-02-14 2006-05-04 August Braun Cleaning strip for window sills, door frames or the like at the transition to plaster
DE29901060U1 (en) 1999-01-22 1999-05-12 Braun August Plastic trim
US6341458B1 (en) 2000-06-08 2002-01-29 Crane Products Ltd. Extruded composite corners for building construction
EP1669514A1 (en) * 2004-11-18 2006-06-14 Orac NV Method and means for finishing a room
DE202006007792U1 (en) 2006-05-16 2006-08-24 Rehau Ag + Co Molded article with wood surface, useful in framework, comprises a thermoplastic polymer, cellulose and/or lignocellulose fabric, adhesive agent and a coloring agent
EP2093346A3 (en) * 2006-06-28 2010-03-31 Under-Cover Plastering profile made of reinforced wall plastering material
DE102007023431B4 (en) * 2007-05-16 2012-07-26 Roman Zahner Connection profile strip, in particular soffit connection profile strip
DE102008036656A1 (en) 2008-08-06 2010-02-25 August Braun Plastic strip
DE202009013120U1 (en) 2009-09-29 2009-12-17 Braun, August One-piece plaster molding and transition between two components of a building
DE202009013121U1 (en) 2009-09-29 2009-12-17 Braun, August One-piece plaster molding and transition between two components of a building
DE202010017534U1 (en) 2010-02-19 2012-03-01 Patenta Asia Ltd. imitation wood

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19539526A1 (en) 1995-10-24 1997-05-22 August Braun End rail for building thermal insulation or building sound insulation
EP0875641A2 (en) 1997-04-30 1998-11-04 August Braun Plaster bead with reinforcing material attached thereto
DE10038279A1 (en) 1999-08-12 2001-02-15 August Braun Decoration support for building corners has ribbed profiles attached to wall corner and each other by plastics pins

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2952649A1 (en) * 2014-06-05 2015-12-09 Braun, August Plastering strip
PL424136A1 (en) * 2017-12-30 2019-07-01 Michał Marian Kamiński Window expansion joint profile

Also Published As

Publication number Publication date
PL2708674T3 (en) 2020-04-30
EP2708674B1 (en) 2019-10-02
EP2708674A3 (en) 2017-08-23
LT2708674T (en) 2020-03-10
DE202012007697U1 (en) 2012-09-11

Similar Documents

Publication Publication Date Title
DE2810517A1 (en) FLIGHT AND SEALING DEVICE
EP2072748A2 (en) Holding element for a shading device
EP2853653B1 (en) Strip
EP2708674B1 (en) Plastering strip and plaster chamfer
EP2952649B1 (en) Plug-in plastering strip
DE102013110110A1 (en) Plaster molding, finishing rail and plaster molding and method for producing the same
DE202015007368U1 (en) Window bench device with increased resistance to breakage
EP2492429B1 (en) Staff angle and building corner with staff angle
EP2330259B1 (en) Cladding element for an external wall
EP0918127B1 (en) Door case and mounting device
WO2013126939A2 (en) Insulating element
EP3118388B1 (en) Junction elements for a building with a plastic plaster strip and method for producing the strip
DE102010044680A1 (en) One-piece plaster molding and transition between two components of a building
DE10360940B4 (en) speed bump
DE102010009376A1 (en) Plaster end profile for use as plaster base at e.g. ceiling wall of building, has joint sealing tape producing connection to one wall, which is connected with outer side of one leg directed towards wall
AT517223B1 (en) Joint seal between insulation elements for building insulation
EP2522801A2 (en) Wall structure with window sill mould
EP2469003B1 (en) Fixed frame
DE102022126211A1 (en) Plate-shaped support system for reveal-cantilevered assembly of building elements
EP2932007B1 (en) Window sill and end piece therefor
EP3822426A1 (en) Synthetic sealing profile with reduced flame risk
EP1327731A1 (en) Façade
DE102022103122A1 (en) Insulation module for a building
DE102012212551A1 (en) Insulation board for window soffits of e.g. French window in building to perform renovation works in building, has connector block provided with compression sealing tapes in L-legs along narrow side for connection of board to window soffit
EP2227380A2 (en) Planar façade element and system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: E04F 13/06 20060101AFI20170717BHEP

Ipc: E06B 1/62 20060101ALI20170717BHEP

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BRAUN, AUGUST

RIN1 Information on inventor provided before grant (corrected)

Inventor name: BRAUN, AUGUST

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180109

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20180705

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190522

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1186326

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191015

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502013013673

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: THOMANNFISCHER, CH

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20191002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200203

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200102

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200103

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200102

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200224

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 502013013673

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

PG2D Information on lapse in contracting state deleted

Ref country code: IS

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200202

26 Opposition filed

Opponent name: PROTEKTORWERK FLORENZ MAISCH GMBH & CO. KG

Effective date: 20200629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200424

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200424

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

RDAF Communication despatched that patent is revoked

Free format text: ORIGINAL CODE: EPIDOSNREV1

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191002

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LT

Payment date: 20220411

Year of fee payment: 10

Ref country code: IT

Payment date: 20220429

Year of fee payment: 10

Ref country code: HU

Payment date: 20220419

Year of fee payment: 10

Ref country code: GB

Payment date: 20220425

Year of fee payment: 10

Ref country code: FR

Payment date: 20220420

Year of fee payment: 10

Ref country code: CZ

Payment date: 20220414

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20220412

Year of fee payment: 10

Ref country code: CH

Payment date: 20220421

Year of fee payment: 10

Ref country code: AT

Payment date: 20220414

Year of fee payment: 10

REG Reference to a national code

Ref country code: DE

Ref legal event code: R103

Ref document number: 502013013673

Country of ref document: DE

Ref country code: DE

Ref legal event code: R064

Ref document number: 502013013673

Country of ref document: DE

RDAG Patent revoked

Free format text: ORIGINAL CODE: 0009271

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: PATENT REVOKED

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: LT

Ref legal event code: MM9A

Effective date: 20330424

REG Reference to a national code

Ref country code: FI

Ref legal event code: MGE

27W Patent revoked

Effective date: 20220922

GBPR Gb: patent revoked under art. 102 of the ep convention designating the uk as contracting state

Effective date: 20220922

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20220627

Year of fee payment: 10

REG Reference to a national code

Ref country code: AT

Ref legal event code: MA03

Ref document number: 1186326

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220922