EP2708647B1 - Maintenance vehicle for the rail construction on railway lines - Google Patents

Maintenance vehicle for the rail construction on railway lines Download PDF

Info

Publication number
EP2708647B1
EP2708647B1 EP13003865.6A EP13003865A EP2708647B1 EP 2708647 B1 EP2708647 B1 EP 2708647B1 EP 13003865 A EP13003865 A EP 13003865A EP 2708647 B1 EP2708647 B1 EP 2708647B1
Authority
EP
European Patent Office
Prior art keywords
work
materials
wagon
ballast
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP13003865.6A
Other languages
German (de)
French (fr)
Other versions
EP2708647A2 (en
EP2708647A3 (en
Inventor
Ralf Zuercher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zuercher Holding GmbH
Original Assignee
Zuercher Holding GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE102012019361.0A external-priority patent/DE102012019361B4/en
Application filed by Zuercher Holding GmbH filed Critical Zuercher Holding GmbH
Priority to EP13003865.6A priority Critical patent/EP2708647B1/en
Priority to PL13003865T priority patent/PL2708647T3/en
Publication of EP2708647A2 publication Critical patent/EP2708647A2/en
Publication of EP2708647A3 publication Critical patent/EP2708647A3/en
Application granted granted Critical
Publication of EP2708647B1 publication Critical patent/EP2708647B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/10Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track

Definitions

  • the invention relates to a work vehicle for track construction in railway lines, a work train for rehabilitation of the existing of a substructure and a track railway line, a use of the work vehicle and a method for operating a work train for rehabilitation of a railway line.
  • the work cart according to the invention for track construction on railway lines is intended and suitable to be ranked in a series of so-called material handling silo wagons (MFS cars).
  • the work trolley according to the invention and the MFS trolleys are part of a work train for the rehabilitation (but also for the preparation) of the existing of a substructure and a track railway line.
  • the MFS trolleys have at least one continuous bottom conveyor belt and at one end or at both ends a transfer conveyor for transferring material from one MFS car to the next MFS car.
  • one or more roof conveyor belts may be provided. These also have at least one transfer conveyor belt at the end.
  • the work trolley according to the invention can be a "conventional" work trolley on which, for example, materials such as sleepers can be stored.
  • This work cart does not necessarily have conveyor belts for material transport, but may have such conveyor belts.
  • the work trolley according to the invention may also be an independent cleaning trolley or a material trolley.
  • the classic MFS wagons have the task of transporting the materials on the construction sites on the one hand and buffering the materials on the other.
  • the materials can be transported on the track axis in one direction or in opposite directions, without having to leave the track restraint profile (clearance) with the material by means of these MFS cars.
  • track-laying machines which receive the excavated ballast, work up and reinstall.
  • These machines are also called ballast cleaning machines.
  • the material is cleaned within the entire machine.
  • the overall machine can consist of several related individual components.
  • the cleaned track ballast material is returned to the existing track body, while the waste material (undersize and dirt) is passed to the classic MFS wagon for removal.
  • cleaning techniques which are arranged within a trailer on track-bound machines within a train and form there specifically for this lined-up machine technology, the cleaning unit.
  • ballast cleaning machines are very complex structures, which are correspondingly complex and solid. They are integrated in a corresponding work car and have - above all - at the same time also a device for removing the ballast and a device for re-installation of the reconditioned ballast. However, this means that these ballast cleaning machines are very special and individual and can only be used for this one purpose.
  • EP 1 249 537 A2 discloses a method for cleaning bulk material using a track treatment train. This has a plurality of successively ranked work car, including work car with reprocessing facilities for developed gravel, which is expanded by a respect to the working direction behind this queued other work car, which has an expansion unit for gravel and an expansion unit for other substructure materials.
  • upper roof conveyors promote the substructure materials on the other work cars in the direction of a waste cart at the head of the work train
  • lower roof conveyors promote the developed gravel to the work car with the ballast processing facility where the developed ballast of the ballast processing equipment fed in the opposite direction or in Working direction is given to a bypass conveyor to dissipate the ballast with the substructure materials to the overburden at the head of the work train.
  • a bottom floor conveyor for removing the sieve residues from the ballast processing in the working direction
  • the one end to overlap with the conveyor belt in front arranged cart is bent, which transports the sieve residues together with the substructure materials and possibly gravel to Abraumwagen at the head of the work train.
  • the invention has for its object to provide a work car for track construction in railway lines of the type specified, on the one hand a special area of responsibility is supplied and on the other hand still universally applicable and can be queued at any point within a work train.
  • Another object of the invention is to provide a suitably universally applicable and modular assemblable work train for rehabilitation of the existing of a substructure and a track railway line.
  • a use of a universally applicable work car in a work train for the rehabilitation of the railway line is disclosed with the features of claim 18.
  • a method with the features of claim 22 solves the problem of providing a flexible logistical transport and delivery within a train modularly flexible train.
  • a first embodiment of a trolley according to the invention for track construction in railway lines provides that this work trolley can be modularly ranked at any location in any order of other work cars within a work train for rehabilitation of existing from a substructure and track track.
  • the work car has a reprocessing device for removed ballast and / or other substructure materials either for a subsequent complete or partial replacement or removal.
  • the ballast and / or the other substructure materials are neither removed nor installed by this work car.
  • the working carriage has conveyor belts for feeding the removed ballast and / or other substructure materials to the reprocessing device, for removing processed materials and for transporting through materials of the adjacent further work carts.
  • conveyor belts for supplying the excavated ballast and / or other substructure materials to the reprocessing device and the removal of processed materials are at least one upper floor conveyor belt, a lower floor conveyor belt, end transfer belts, which can be moved up and down and on a carriage retractable and extendable, and a roof conveyor belt is provided, which extends to a feed point of the reprocessing device and the end is pivoted in each case pivotally.
  • the upper floor conveyor belt, the lower floor conveyor belt, the end transfer belts and the roof conveyor belt carried reversible with respect to their transport direction and the upper floor conveyor is also displaceable in its end position and / or bent.
  • the work car has a transfer conveyor belt in the roof area, which is designed to be reversible with respect to its transport direction and extends to the roof conveyor from the other side of the feed point and the end is pivoted upward and downward bendable.
  • the conveyor belts of the work vehicle can be used for transporting or transporting materials to or from a specific location of a machine area adjacent other work cars of the work train in both directions
  • the roof conveyor or the transfer conveyor in the roof area individually as a conveyor belt for supplying materials to the Processing device and the roof conveyor and the transfer conveyor in the roof area are used together as a conveyor belt for transporting materials.
  • the materials need not have anything to do with the processing of excavated ballast and / or other substructure materials in the work-cart with work-up equipment, since during transport or transit of these materials the operation of the work-up equipment for all or part of the applications for which the work car is designed and usable, can be interrupted.
  • all conveyor belts according to the invention are reversible with respect to their transport direction and the transfer conveyor belts pivotable downwards and upwards and retractable and extendable on a carriage. Furthermore, the roof conveyor belt is bent at each end pivotally and the upper floor conveyor belt displaceable in its end position and / or bent. This makes it possible that with the conveyor belts, the variable promotion in both directions in and / or through the work car through in various ways is possible, so that it can be queued at any point within a work train.
  • the continuous roof conveyor belt is designed to be movable or bendable, so that it can also be used as a conveyor belt for feeding materials to a work-up module and / or as a conveyor belt for the transport of materials.
  • a universal material transport is possible and realized.
  • the work cart according to the invention is in a series of material handling silo wagons (MFS wagons) or the like queued.
  • the cleaning module according to the invention is variable and fully functional and can be queued and used anywhere within a train of material handling silo wagons or the like.
  • the processing of the ballast and / or the earth masses is to be understood in the most general sense.
  • this work cart represents a completely independent, modular unit or machine which can be used and used completely independently of other work cars or machines.
  • the modular work car according to the invention does not rely on it and is not intended to be classified in a very specific composite of several work cars, which define a machine in their entirety.
  • the modular work cart according to the invention is thus to be understood as an independent machine and not part of an overall machine, which is distributed on the basis of the machine length on several work cars.
  • the gravel and / or the other substructure materials are not removed by the work trolley according to the invention and possibly re-installed. In addition to the complete or partial replacement of the materials within the framework of the removal and replacement cycle, removal of the materials is also possible without these being reinstalled within this cycle. They can be deposited or processed elsewhere after temporary storage on appropriate work cars.
  • the particular advantage of the work cart according to the invention is that it is based on a conventional, classic work car, which is equipped or retrofitted with a special processing device for the removed ballast and / or other substructure materials.
  • this work car is designed with its reprocessing device only for this specific purpose.
  • the work cart according to the invention is not suitable and is not intended to remove and install the ballast and / or the other substructure materials.
  • the removal and replacement is carried out by other, special work cars, which are not work cars in the meaning of the invention.
  • a highly modular system for the provision of a work train in track construction is created, with each work car of this work train defining a special work module.
  • the gravel removal and bulkhead installation by means of an excavator in front of head can be made variable and cost-oriented.
  • the cheapest option for the work to be performed is also decided.
  • Another advantage of the invention modified by the work vehicle is that both purified gravel and incurred in the cleaning disposal shares can be better logistically separated and bunkered on the track appropriate for use.
  • the work trolley according to the invention is thus classified as a refurbishment trolley in a series of conventional MFS wagons.
  • the invention protection extends both to the work car in the form of the cleaning module according to the invention for the ranking within a car network per se, but also to the thus created modular cleaning train with its modular cleaning option.
  • the modified working car according to the invention is to be seen for the optional, separate track-bound and not track-bound removal and installation units for the ballast and / or the other substructure materials.
  • the modified work cart according to the invention with its reprocessing device can initially be designed in a basic version.
  • This basic version takes over the basic processing of the material, which initially receives the material to be processed of the variable work group.
  • the material especially ballast
  • the material can be expertly accessed by screening and classifying reuse. All technical solutions for screening, classifying, washing, drying, breaking, sharpening and other processes can be carried out in this work cart.
  • About corresponding conveyor belts while the materials are supplied to the work trolley according to the invention and abandoned the reprocessing device. Therein, the desired operations are then performed to work up the ballast (or more generally the material) and make it available for further use.
  • a modular reprocessing device is created by integration into a work car in a simple way, which are classified in a Häzugval can.
  • This can consist of all conceivable individual components, ie individual work cars and be strung as desired.
  • a track-bound or track-independent work unit for removal and installation of the ballast can be provided with optional transfer trolley, also optional conventional MFS trolley for insectsbunkern the materials, also the cleaning module according to the invention, further optionally trained accordingly further work carts for washing and separation in lack of space Components in the basic version of the work cart according to the invention and finally more conventional MFS wagon for temporary storage of non-usable cleaning.
  • the reusable gravel after processing is fed to the car with the appropriate installation unit.
  • the gravel is thereby incorporated as recycling gravel.
  • the reusable fines of the ballast cleaning can be added to the substructure layers, namely the gravel or surface protection layer, in an expanded optional form in a further processing module in the machine sequence.
  • the work cart according to the invention may have its own or a foreign drive for forward movement. This can be installed within a module within the machine series or also be classified as a separate drive unit within the ranking of the work car.
  • the work trolley according to the invention is, with its processing device for expanded gravel and / or other substructure materials - as already stated - queued in a series of further work trolleys (but of a different type) of the work train, the work trolley according to the invention having conveyor belts for transporting materials of these adjacent further work trolleys.
  • the work trolley according to the invention having conveyor belts for transporting materials of these adjacent further work trolleys.
  • the work car according to the invention on both sides different type of work, such as MFS wagon or the like.
  • Connect, with the need to transport the materials along the work train without the work trolley according to the invention with its processing device is an obstacle and interruption for this material transport and the material transport there increased.
  • this preferred development proposes that the materials can be transported to a certain extent without the work cart according to the invention being an obstacle with its reprocessing device.
  • a logistically flexibly expandable work cart in the form of a work-up module and / or cleaning module is created as a whole, which is based on the work trolley according to the invention.
  • the logistical possibilities of the work trolley according to the invention are so extended that the material flows can be performed by the work trolley according to the invention with its modular cleaning and processing technology, namely material flows associated with the work-up for developed ballast and / or other substructure materials in the work trolley according to the invention have nothing to do.
  • the work trolley according to the invention with the cleaning and / or refurbishment module according to the invention thus becomes part of a flexible logistical transport and conveying path within a modular, flexibly configurable train.
  • the starting point is thus the cleaning module according to the invention as well as any further processing module for the ranking within a carriage assembly made of MFS wagon or the like in conjunction with the modular logistical extension for cleaning and / or refurbishment services with a modular cleaning train / refurbishment train.
  • the extension can have modular washing, screening and refurbishment modules, etc., including the optionally used for the modular cleaning unit track-bound (or non-tracked) removal and installation unit. Due to the additional features of the work cart according to the invention with corresponding conveyor belts is the Adjustment of the work cart according to the invention within an arbitrarily lined train with material trolley possible. As a result, any number of modules of this type can be set in the conveyor line of MFS cars or the like, without hindering or impairing the flow rate through their function.
  • the conveyor belts of the work trolley according to the invention are used for transporting the materials.
  • These conveyor belts of the work car are reversibly operable. This means that the conveyor belts of the work carriage according to the invention which are already present are used for the transport of the materials. In this case, the operation of the reprocessing device can be interrupted.
  • the reprocessing device can accordingly be designed for the cleaning and / or washing and / or drying and / or screening and / or classifying and / or breaking and / or sharpening of ballast.
  • the work car has an intermediate conveyor belt in the middle region.
  • this intermediate conveyor belt it is possible to transport material in particular from the reprocessing device to the roof conveyor belt.
  • this intermediate conveyor belt further improves and optimizes material logistics.
  • the reprocessing device is either permanently arranged on the work car or is detachably arranged.
  • the reprocessing device can thus consist of a compact built, stand-alone machine or work car.
  • the system can also consist of a conventional standard railcar with a so-called Hukepacktivsmodul.
  • Hukepacktivsmodul a cleaning module available on the market (for example in the form of a mobile crushing and sieving plant or other modules) is reconstructed from the shape and the weight such that it acts as loading volume on a standard railcar can be saddled up and used as a cleaning module in track construction for the modular basic machine according to the invention.
  • this module which was then redesigned as a loading module for the railway wagon, can (in contrast to the permanent modular compact module) also be uncoupled and made available for further uses in the trackless sector.
  • This Hukepackalternative thus has optional other uses in the trackless area, which can lead to significant deployment extensions.
  • the Hukepack alternative can be used for all cleaning and washing module solutions.
  • the work trolley according to the invention can be classified with its reprocessing device or its reprocessing either in the row of other work cars of the work train or the work trolley according to the invention is designed as a head work car.
  • this may have a hopper for the material to be processed.
  • This feeding hopper from which the removed ballast and / or other substructure materials can be supplied to the processing device via one of the conveyor belts, can be retractable and / or foldable.
  • the work cart according to the invention with the reprocessing device can be modular in a train train einreihbar or - be extended with a hopper - performed for work on the head.
  • the hopper may be detachable so that the cleaning cart is either in front of the head (with hopper attached) or in line with the other cart (then without hopper).
  • conveyor belts are provided for transporting the materials, namely floor conveyor belts, roof conveyor belts and transfer conveyor belts in the end areas.
  • the conveyor belts can basically be single-row or preferably multi-row. This basically applies to all conveyor belts of the work train.
  • a further development proposes the use of different types of conveyor belts, namely simple conveyor belts or split conveyor belts.
  • Yet another embodiment proposes that the modular work cart according to the invention (in the manner of a locomotive) can be used as a tractor modular in the train. This has the advantage when in particular large vehicle networks must be moved.
  • a first embodiment of a work train according to the invention for the rehabilitation of a substructure as well as a railway track refers to a work train having a plurality of juxtaposed work car, of which at least one work car an inventive work car with reprocessing device, which at any Reihungsort in an arbitrary sequence of further work cars without reprocessing device is queued within a work train.
  • a preferred development provides that different work cars of the type according to the invention are provided for different types of workup of the ballast and / or the other substructure materials.
  • the particular advantage is that the modular character of the individual work cars is promoted.
  • the basic version of the work trolley according to the invention serves the basic processing of the material.
  • special work trolley according to the invention can then serve for further processing steps.
  • These special work cars can be combined in different ways and placed in a row.
  • one or more additional cars are added. This creates a high specification in terms of modular design.
  • the work cart according to the invention can screen and classify the recorded material and thus make it available for reuse.
  • the materials can optionally be washed and separated, for example, in the case of space shortage of the components in the work cart of the basic version.
  • the base module can be extended by one or more additional car modules that can serve the outsourcing of cleaning and laundry and other work.
  • the entire system can be designed arbitrarily and serves, inter alia, the space extension for the basic module according to the invention of the work car.
  • This advanced workup can thus involve a variety of steps, such as washing and sieving the ballast. But other treatment methods such as breaking or sharpening of the ballast can be done here as steps in one or more modules.
  • the work trolley according to the invention can be queued with his reprocessing or reprocessing either in the row of other work cars of the work train or the work trolley according to the invention is designed as a headwork car of the work train.
  • the work cart in the modular system is intended and designed both for track-bound and for track-independent removal and installation units for ballast and / or other substructure materials. This creates a universal and, above all, modular system for the removal and installation of materials.
  • the modular work cart according to the invention can be used as a separate work unit for ballast and / or other soil materials.
  • the work car can be used as a work unit behind a self-propelled or non-propelled, combined or un-combined disassembly and assembly device for ballast and / or other soil materials.
  • the ranking and supply / removal of new material and waste material in one and the same material trolley / work car allows by the work car is used as a transition point for an endless material cycle between an expansion unit and an installation unit for gravel and / or other soil materials. This further improves the logistics of the materials.
  • a further development proposes the control and technical connection of the modular work cart according to the invention in series with the other work cars of the work train. This means that the modular work cart according to the invention is integrated into the overall electronic logistics of the work train.
  • An embodiment of a use according to the invention of a work trolley according to the invention in a work train for rehabilitation of the railway track consisting of a substructure and of a track, wherein gravel and / or other substructure materials are not removed and rebuilt by the work trolley, provides that with respect to their transport direction reversibly running conveyor belts of the work cart optionally the removed gravel and / or other substructure materials of the reprocessing of the work car are supplied and then recycled materials are completely or partially rebuilt or transported away, or materials of the neighboring other work cars are transported through the work car.
  • a further development proposes the logistics for the reusable components and for the non-reusable components of the reclaimed ballast and / or other substructure materials. So the waste material (undersize and dirt) is handed over to the conventional MFS wagon for transport. After processing, the cleaned substances and the waste materials are discharged from the car in different directions. Thus, the usable material is provided in one direction, while in the other direction of the non-usable portion is discharged.
  • the modular work cart according to the invention is integrated in the total transport of the ballast (processed old ballast and Neuschotter) to a removal device or a built-in device with. It can by means of the work car the supply of the old ballot and the Neuschotters done simultaneously. Overall, this means optimal logistics for the supply of the ballast.
  • a method according to the invention provides for the operation of a work train according to the invention with a work car for the rehabilitation of a railway line consisting of a substructure and of a track, whereby gravel and / or other substructure materials are not removed and re-installed by the work trolley according to the invention.
  • the method comprises the steps that fed by the reversibly executed with respect to their transport conveyor belts of the work cart developed gravel and / or other substructure materials of the reprocessing of the work car and from there then the processed materials are fully or partially reincorporated or removed or the materials of the other adjacent Work car to be transported through the work car.
  • the continuously moving work train during work Fig. 1 initially has a work car 1 for removal and installation of ballast 10 of the railway line.
  • This ballast 10 is part of the substructure 11 for the track 12.
  • the work vehicle 1 follows - optionally - a transfer car 2 for the ballast 10th
  • the transfer trolley 2 is optionally followed by conventional material-conveying silo trolleys 3, 4 (so-called MFS trolleys) or the like.
  • MFS trolleys are not to be understood as limiting. It can also be other work cars.
  • the MFS trolleys 3, 4 serve on the one hand for the transport of the materials and on the other for the intermediate bunkering of materials.
  • These MFS cars 3, 4 each have one or more floor conveyor belts 13.
  • one end of the MFS carriage 3, 4 has a transfer conveyor belt 14. This is pivotable about a horizontal axis.
  • pivotable transfer conveyor belts 14 can also be provided at both ends of the MFS wagon 3, 4. These can also be telescopic in the horizontal direction, wherein the pivotable portion of the transfer belts 14 is bent over the horizontal part upwards.
  • the transfer conveyor belts 14 may be pivotable about a vertical axis.
  • the two MFS cars 3, 4 have roof conveyor belts 15. These also have end pivotable transfer conveyor belts 16.
  • the difference between these work cars 5, 6 to the above MFS cars 3, 4 is that the two work cars 5, 6 a reprocessing device 17 for dismounted ballast 10 (or generally for dismantled or otherwise Substructure materials).
  • the two work cars 5, 6 are identical in their basic concept, but differently designed with regard to the workup devices 17.
  • the work cart 6 defines with its reprocessing device 17 a basic version and the work car 5 with its reprocessing device 17 an additional version.
  • the transport of the ballast 10 takes place by means of the roof conveyor belts 15 of the two MFS cars 3, 4, to the work car 6.
  • the gravel of the reprocessing device 17 of this Work cart 6 supplied, which represents the basic version.
  • a basic workup of the supplied ballast 10 From there, the pre-processed ballast 10 of the processing device 17 of the second work vehicle 5 is supplied, where further processing steps take place.
  • the processed ballast is returned to the work car 1 via the bottom conveyor belts 13. This builds the recycled gravel 10.
  • waste materials are transported in the opposite direction and reach the area of the bottom conveyor belts 13 of the MFS carriages 7, 8.
  • Fig. 2a shows the work car 6a in a compact design, in which the reprocessing device 17 is solid and insoluble and thus made compact with the undercarriage as a unit.
  • the reprocessing device 17 is not intended to be removed from the undercarriage. Rather, in this work car 6a is the basic idea that the reprocessing device 17 remains permanently on the undercarriage.
  • FIG. 2b An alternative to this shows Fig. 2b ,
  • the reprocessing device 17 is removable, that is releasable. This means that the reprocessing device 17 is removed with its functional cleaning unit and can be used for other, not track-bound purposes.
  • the reprocessing device 17 can be removed from the undercarriage and placed, for example, in a central ballast processing plant and used there. In this case, either the entire work module or only a partial work module can be removed from the undercarriage.
  • the representation in Fig. 2b shows the undercarriage without conveyor belts (there is the reprocessing facility 17 provided with conveyor belts), while in the presentation below the undercarriage has conveyor belts (where the detachable reprocessing device 17 then no conveyor belts).
  • Fig. 3a to 3c Finally, the use of the work cart 6 with its reprocessing device 7 in the use as a head work cart (while in the previous embodiments of the work car 5, 6 is ranked in the row of work cars of the work train).
  • This cleaning module when used on the head has a retractable or retractable feeding hopper 18. This hopper 18 can be grown on the car.
  • Fig. 3a shows the feeding hopper 18 in the extended position, so that by means of a loading unit (for example, excavator or milling machine) or by means of a loading station, the material, in particular the ballast, the hopper 18 can be abandoned. From there, the material is then fed via a roof conveyor belt (but it can also be another conveyor belt) of the reprocessing device 17.
  • Fig. 3b shows the feeding hopper 18 in the retracted state and Fig. 3c the hopper 18 in the dumped state.
  • Fig. 4 shows a modified embodiment of the work train.
  • the carriages 5, 6 according to the invention for refurbishing the ballast, etc. are modified, while the remaining work cars have remained the same.
  • Fig. 5 there is the difference of the work carriage 6 according to the invention in comparison to the work car 6 of the work train in Fig. 1 in that the work cart 6 is suitable for transporting materials from the MFS carriages 3, 4 on one side to the MFS carriages 7, 8 on the other side (and vice versa).
  • the work cart 6 - as before - an upper floor conveyor belt 19 'and at a distance below a lower floor conveyor 19 "on, further end transfer belts 20 which are pivotable downwards and upwards and retractable on a carriage and extendable and possibly Furthermore, in the roof area, a roof conveyor belt 21, which is each bent at the end pivotably, and finally in the roof area a transfer conveyor belt 22, which can also be bent upwards and downwards at the ends.
  • Fig. 6a shows the work car 6 in its actual task, namely the processing of broken gravel 10 (or any other conversion material).
  • This cleaning module fulfills its basic task. This corresponds to the operation of the work carriage 6 of the above-described output variant of the work train.
  • the work cart 6 takes up the material to be worked up the variable work group.
  • the material is in this case 6 professionally made available by reusing sieving, classifying etc. in this work car. In this case, all technical solutions for screening, classifying, washing, drying and other operations can be performed in this work car 6.
  • the material is fed via the roof conveyor belts 21 of the cleaning unit and abandoned the processing unit of the cleaning module. In these units, the above-described operations are carried out to - as stated - to make the ballast 10 a utilization accessible.
  • the cleaned substances and the waste materials are discharged in different directions from the car.
  • the cleaned, reusable substances are discharged via the upper bottom conveyor belt 19 'and then via the right transfer conveyor belt 20, while the waste materials are discharged via the lower bottom conveyor belt 19 "and via the left transfer belt 20 of the work cart 6.
  • Pickup vehicles are the adjacent MFS cars or the like.
  • the supplied ballast 10 is first fed by means of roof conveyor belts 21 a Vorsiebritt at which the undersize is separated from the coarse grain.
  • the coarse grain is then fed via a Vorsiebrü which by vibration and movements as well as by the geometric arrangement also has a transportability, a stone crusher (eg baffle or cone cup).
  • a stone crusher eg baffle or cone cup
  • the grain is processed. It is cleaned again by striking and breaking, if necessary, sharpened and / or crushed.
  • the material is fractionated through a second screening unit into the end products. In this case, the unusable fine grain is fed to the lower bottom conveyor belt 19 "and the usable grain is fed to the upper bottom conveyor belt 19.
  • a washing by spraying with water can be carried out here on the preliminary screen and the after-sieve. to the transfer conveyors 20.
  • the unusable grain is transferred to adjacent material trolleys while the reusable grain (eg, recycled ballast) is transferred to the adjacent material trolley or a modular paving unit.
  • a modular cleaning unit is provided in a simple manner, which can be lined up in a train of material-conveying silo wagon or the like.
  • the machines can here - as stated - from all conceivable individual components, eg. As cleaning modules, washing modules, soil improvement modules, etc. exist and are lined up as desired before and after the cleaning unit.
  • the work cart 6 is not limited to the above-described workup work for excavated ballast and / or other substructure materials.
  • the work cart 6 has additional logistical functions.
  • the core idea lies in the extended conversion and transport options. In order to use the cleaning technology / processing technology within a train of MFS cars or the like. As a logistics hub for flowing and overflowing materials, extensions of the modular workbench 6 are necessary.
  • the conveyor belts namely the upper floor conveyor belt 19 ', the lower floor conveyor belt 19 “, the transfer conveyor belts 20, the roof conveyor belt 21 and the transfer belt 22 in the roof area are each reversibly designed, which means that the operating directions of the conveyor belts exceed the" normal "use for the performance of the cleaning modules can be changed out in their transport direction.
  • the transfer conveyor belts 20 are designed as retractable conveyor belts. This means that they can be changed via a joint in their angle of attack and thus in their position. These transfer conveyors 20 can be retracted in their horizontal position below the processing unit in a kind of sandwich bottom below the lower bottom conveyor belt 19 "(as shown in the illustration in Fig. 6b can be seen in the left transfer conveyor belt 20).
  • a reversible and / or displaceable transfer belt 22 in the form of a bypass short strip is assigned to the already existing, but now reversible roof conveyor belt 21.
  • the upper floor conveyor belt 19 'in its end position is optionally displaceable and / or bent, so as to ensure the reversing and the delivery in both directions.
  • this modular logistic machine technology makes it possible to flexibly redirect and transfer the material flows which run to the work cart 6 and run off the work cart 6, without the work cart 6 being restricted to the processing of removed materials.
  • the additional benefit is thus in the additional logistical possibilities for the transport of materials.
  • an independent of the workup conveyance and diversion of material flows of any kind is possible.
  • This allows completely new working concepts and series for the promotion of material flows within the train of MFS wagons or the like.
  • the individual components of the train may be: track-bound and track-bound working units for removal and installation of the ballast, further optional transfer trolley, further optional material conveyor Silo wagon or the like.
  • Fig. 6b now shows a first variant of the logistical extension of the work car 6.
  • the conveyor belts are repositioned accordingly. Specifically, material from the adjacent MFS car 7 via its transfer conveyor belt and a task unit 23 to the - in this case - lower bottom conveyor 19 "fed, which compared to the operation in Fig. 6a now transported in the opposite direction.
  • the upper floor conveyor 19 'releases the material to the extended transfer conveyor 20, which transfers the material to an adjacent MFS cart or the like. In this way, material can be conveyed through the modular cleaning unit / processing unit in a desired working direction and transferred to a material trolley or any working unit in front of or behind the modular cleaning unit / processing unit.
  • Fig. 6c shows a further operation of the work carriage 6 according to the invention, namely the transport of the material in the drawing from right to left.
  • the material is supplied to the reversible roof conveyor 21 via a transfer belt of an adjacent MFS truck or the like.
  • the transfer conveyor belt 22 can be adjusted in its position and its direction so that it can be used for these purposes. From the transfer conveyor belt 22 then passes the material to be conveyed on a corresponding conveyor belt of an adjacent MFS wagon or other working module.
  • Fig. 6d finally shows in comparison to Fig. 6c the reverse direction by means of the conveyor belts by corresponding repositioning.
  • Fig. 7 shows a modified embodiment of the work train, namely with a modified embodiment of the invention of the trolley 6 for processing the ballast 10. More detailed illustrations with regard to the material flow, namely the ballast 10 show in particular the Fig. 8b and Fig. 8c ,
  • FIG. 7 This shows first Fig. 7 in that a material reversal from the roof area to the floor area with reversed material flow direction in the sense of a material cycle is provided in the MFS carriage 8.
  • a special feature of this work cart 6 is that in the central region of the work carriage 6, an intermediate conveyor belt 24 is provided. In addition, the previously described conveyor belts are still provided in the floor area and in the roof area including transfer conveyors.
  • the intermediate conveyor 24, as it is in Fig. 8b is shown there is in a kind of rest position in which it is not involved in the transport of the ballast 10.
  • the intermediate conveyor belt 24 on the end transfer conveyor belts which are pivotable upwards and downwards.
  • Fig. 8c the situation in which the intermediate conveyor belt 24 picks up the ballast from the reprocessing device 17 and transports it to the roof conveyor belt 21 of the work car 6.
  • this roof conveyor belt 21 is not formed continuously with respect to the longitudinal extent of the work carriage 6, but it is divided into two individual roof conveyor belts 21, wherein the respective ends can be pivoted downwards and upwards. In this way, a transfer of the ballast by means of the intermediate conveyor belt 24 to the in Fig. 8c right roof conveyor 21 possible.
  • the roof conveyor 21 can also be divided into three or even more sections.
  • Fig. 8b recognizable that the cleaned ballast can be discharged via the end transfer conveyor belt 20.
  • Fig. 8c the situation in the same area shows how material is transported through the work car 6 (from right to left in the drawing). Also, in this drawings further streams of material can be seen.
  • Fig. 9a to 9c shows a further modification of the material flow (indicated by the circle). These modifications show how the tape guides can be used in a variety of ways to accomplish the desired transport path of the materials. This merely represents another example of conveyor belt logistics. Further variants for transporting the materials in the floor area and / or in the roof area are conceivable and possible.
  • additional conveyor belts can be attached to the above-described individual components. These correspond in their sequence-technical functions to the already mentioned conveyor belts. They have the advantage that the number of fabric layers and material flows that are available for an execution performance is increased. Thus, a variant with two adjacent bands is conceivable. However, the number of bands can hereby be supplemented arbitrarily according to the available space. So two or three or more bands can be arranged side by side.
  • the individual modules can be electronically coupled to supply the operations of a partial or full automation of the individual components of the machine network.
  • the conveyor belts can be additionally equipped with a water spray for dust prevention.
  • the feeding of the water spray can be done here by a separate water truck or by a water tank, which is assigned to the work car.
  • the bushing has the purpose of dust binding on the belts and can optionally be made and installed anywhere on the individual conveyor belts.
  • the conveyor belts can be additionally provided with an enclosure against dust.
  • All cleaning units or other processing units or associated loading or unloading stations can be used both track-bound on rail bogies as well as chain undercarriages (or in combination) and operated.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Electric Cable Installation (AREA)
  • Disintegrating Or Milling (AREA)

Description

Die Erfindung betrifft einen Arbeitswagen für den Gleisbau bei Bahnstrecken, einen Arbeitszug zur Sanierung der aus einem Unterbau sowie aus einem Gleis bestehenden Bahnstrecke, eine Verwendung des Arbeitswagens und ein Verfahren zum Betrieb eines Arbeitszugs zur Sanierung einer Bahnstrecke.The invention relates to a work vehicle for track construction in railway lines, a work train for rehabilitation of the existing of a substructure and a track railway line, a use of the work vehicle and a method for operating a work train for rehabilitation of a railway line.

Der erfindungsgemäße Arbeitswagen für den Gleisbau bei Bahnstrecken ist dafür bestimmt und geeignet, in einer Reihe von sogenannten Material-Förder-Silo-Wagen (MFS-Wagen) eingereiht zu werden. Der erfindungsgemäße Arbeitswagen sowie die MFS-Wagen sind dabei Teil eines Arbeitszuges zur Sanierung (aber auch zur Erstellung) der aus einem Unterbau sowie aus einem Gleis bestehenden Bahnstrecke. Die MFS-Wagen weisen wenigstens ein durchgehendes Bodenförderband sowie am einen Ende oder an beiden Enden ein Übergabeförderband zur Übergabe von Material von einem MFS-Wagen zum nächsten MFS-Wagen auf. Optional können noch ein oder mehrere Dachförderbänder vorgesehen sein. Auch diese weisen endseitig wenigstens ein Übergabeförderband auf. Beim erfindungsgemäßen Arbeitswagen kann es sich hingegen um einen "herkömmlichen" Arbeitswagen handeln, auf welchem beispielsweise Materialien wie Schwellen gelagert werden können. Dieser Arbeitswagen weist nicht notwendigerweise Transportbänder für den Materialtransport auf, kann aber solche Transportbänder aufweisen. Es kann sich bei dem erfindungsgemäßen Arbeitswagen auch um einen eigenständigen Reinigungswagen oder um einen Materialwagen handeln.The work cart according to the invention for track construction on railway lines is intended and suitable to be ranked in a series of so-called material handling silo wagons (MFS cars). The work trolley according to the invention and the MFS trolleys are part of a work train for the rehabilitation (but also for the preparation) of the existing of a substructure and a track railway line. The MFS trolleys have at least one continuous bottom conveyor belt and at one end or at both ends a transfer conveyor for transferring material from one MFS car to the next MFS car. Optionally, one or more roof conveyor belts may be provided. These also have at least one transfer conveyor belt at the end. By contrast, the work trolley according to the invention can be a "conventional" work trolley on which, for example, materials such as sleepers can be stored. This work cart does not necessarily have conveyor belts for material transport, but may have such conveyor belts. The work trolley according to the invention may also be an independent cleaning trolley or a material trolley.

Die klassischen MFS-Wagen haben die Aufgabe, auf den Baustellen die Materialien einerseits zu transportieren und andererseits die Materialien zwischenzubunkern. Dabei können mittels dieser MFS-Wagen die Materialien auf der Gleisachse in eine Arbeitsrichtung oder in entgegengesetzte Arbeitsrichtungen transportiert werden, ohne das Gleiseinschränkungsprofil (Lichtraumprofil) mit dem Material verlassen zu müssen.The classic MFS wagons have the task of transporting the materials on the construction sites on the one hand and buffering the materials on the other. In this case, the materials can be transported on the track axis in one direction or in opposite directions, without having to leave the track restraint profile (clearance) with the material by means of these MFS cars.

Weiterhin sind sogenannte Gleisbaumaschinen bekannt, welche den auszubauenden Schotter aufnehmen, aufarbeiten und wieder einbauen. Diese Maschinen werden auch Bettungsreinigungsmaschinen genannt. Bei den marktüblichen Reinigungsmaschinen wird das Material innerhalb der Gesamtmaschine gereinigt. Die Gesamtmaschine kann hierbei aus mehreren zusammengehörenden Einzelkomponenten bestehen. Das gereinigte Gleisschottermaterial wird dem vorhandenen Gleiskörper wieder zugeführt, während das Abfallmaterial (Unterkorn und Schmutz) den klassischen MFS-Wagen für den Abtransport übergeben wird. Es gibt auch Reinigungstechniken, welche innerhalb eines Anhangs an gleisgebundenen Maschinen innerhalb eines Zugverbandes angeordnet sind und dort speziell für diese aufgereihte Maschinentechnik die Reinigungseinheit bilden.Furthermore, so-called track-laying machines are known, which receive the excavated ballast, work up and reinstall. These machines are also called ballast cleaning machines. In the conventional cleaning machines, the material is cleaned within the entire machine. The overall machine can consist of several related individual components. The cleaned track ballast material is returned to the existing track body, while the waste material (undersize and dirt) is passed to the classic MFS wagon for removal. There are also cleaning techniques, which are arranged within a trailer on track-bound machines within a train and form there specifically for this lined-up machine technology, the cleaning unit.

Diese Bettungsreinigungsmaschinen sind sehr komplexe Gebilde, welche entsprechend komplex und massiv ausgebildet sind. Sie sind in einem entsprechenden Arbeitswagen integriert und weisen - vor allem - gleichzeitig auch eine Einrichtung zum Ausbauen des Schotters sowie eine Einrichtung zum Wiedereinbau des aufgearbeiteten Schotters auf. Dies bedeutet aber, dass diese Bettungsreinigungsmaschinen sehr speziell und individuell ausgebildet sind und nur für diesen einen Zweck verwendet werden können.These ballast cleaning machines are very complex structures, which are correspondingly complex and solid. They are integrated in a corresponding work car and have - above all - at the same time also a device for removing the ballast and a device for re-installation of the reconditioned ballast. However, this means that these ballast cleaning machines are very special and individual and can only be used for this one purpose.

EP 1 249 537 A2 offenbart ein Verfahren zur Reinigung von Schüttgut mithilfe eines Gleisbehandlungszugs. Dieser weist mehrere hintereinander gereihte Arbeitswagen auf, darunter auch Arbeitswagen mit Aufarbeitungseinrichtungen für ausgebauten Schotter, der durch einen bezüglich der Arbeitsrichtung dahinter eingereihten anderen Arbeitswagen ausgebaut wird, der dazu eine Ausbaueinheit für Schotter sowie eine Ausbaueinheit für anderweitige Unterbaumaterialien aufweist. Von diesem Ausbauwagen fördern obere Dachförderbänder die Unterbaumaterialien über die anderen Arbeitswagen in Arbeitsrichtung bis zu einem Abraumwagen am Kopf des Arbeitszugs, und untere Dachförderbänder fördern den ausgebauten Schotter bis zu dem Arbeitswagen mit der Schotteraufbereitungseinrichtung, wo der ausgebaute Schotter der Schotteraufbereitungseinrichtung in entgegengesetzte Arbeitsrichtung zugeführt oder in Arbeitsrichtung einem Bypassförderband aufgegeben wird, um den Schotter mit den Unterbaumaterialien zu dem Abraumwagen am Kopf des Arbeitszugs abzuführen. Neben den zwei Dachförderbändern, die einenends zum Überlapp mit dem Förderband eines benachbarten, dahinter angeordneten Wagens abgeknickt sind, weist der Arbeitswagen mit der Schotteraufarbeitungseinrichtung ein unteres Bodenförderband zum Abtransport der Siebrückstände aus der Schotteraufbereitung in Arbeitsrichtung auf, das einenends zum Überlapp mit dem Förderband des davor angeordneten Wagens abgeknickt ist, das die Siebrückstände zusammen mit den Unterbaumaterialien und ggf. Schotter zum Abraumwagen am Kopf des Arbeitszug transportiert. Die Anordnung der Förderbänder innerhalb eines Wagens und zwischen den Wägen sowie die Transportrichtung jedes Förderbands sind festgelegt und nicht veränderbar. Der Arbeitszug funktioniert nur in einer definierten Reihung. EP 1 249 537 A2 discloses a method for cleaning bulk material using a track treatment train. This has a plurality of successively ranked work car, including work car with reprocessing facilities for developed gravel, which is expanded by a respect to the working direction behind this queued other work car, which has an expansion unit for gravel and an expansion unit for other substructure materials. From this expansion trolley upper roof conveyors promote the substructure materials on the other work cars in the direction of a waste cart at the head of the work train, and lower roof conveyors promote the developed gravel to the work car with the ballast processing facility where the developed ballast of the ballast processing equipment fed in the opposite direction or in Working direction is given to a bypass conveyor to dissipate the ballast with the substructure materials to the overburden at the head of the work train. In addition to the two roof conveyor belts, which are bent at one end to overlap with the conveyor belt of an adjacent, behind it arranged car, the work car with the ballast processing device, a bottom floor conveyor for removing the sieve residues from the ballast processing in the working direction, the one end to overlap with the conveyor belt in front arranged cart is bent, which transports the sieve residues together with the substructure materials and possibly gravel to Abraumwagen at the head of the work train. The arrangement of the conveyor belts within a carriage and between the carriages and the transport direction of each conveyor belt are fixed and can not be changed. The work train only works in a defined sequence.

Der Erfindung liegt die Aufgabe zugrunde, einen Arbeitswagen für den Gleisbau bei Bahnstrecken der eingangs angegebenen Art zu schaffen, der einerseits einem speziellen Aufgabengebiet zugeführt ist und der andererseits dennoch universell einsetzbar ist und an beliebiger Stelle innerhalb eines Arbeitszuges eingereiht werden kann.The invention has for its object to provide a work car for track construction in railway lines of the type specified, on the one hand a special area of responsibility is supplied and on the other hand still universally applicable and can be queued at any point within a work train.

Die Aufgabe wird gelöst durch einen Arbeitswagen mit den Merkmalen des Anspruchs 1.The object is achieved by a work cart with the features of claim 1.

Eine weitere Aufgabe der Erfindung besteht in der Bereitstellung eines entsprechend universell einsetzbaren und modular zusammenstellbaren Arbeitszugs zur Sanierung der aus einem Unterbau sowie aus einem Gleis bestehenden Bahnstrecke.Another object of the invention is to provide a suitably universally applicable and modular assemblable work train for rehabilitation of the existing of a substructure and a track railway line.

Diese Aufgabe wird durch einen Arbeitszug mit den Merkmalen des Anspruchs 9 gelöst.This object is achieved by a work train with the features of claim 9.

Eine Verwendung eines universell einsetzbaren Arbeitswagens in einem Arbeitszug zur Sanierung der Bahnstrecke wird mit den Merkmalen des Anspruchs 18 offenbart.A use of a universally applicable work car in a work train for the rehabilitation of the railway line is disclosed with the features of claim 18.

Ein Verfahren mit den Merkmalen des Anspruchs 22 löst die Aufgabe, einen flexiblen logistischen Transport- und Förderweg innerhalb eines modular flexibel gestaltbaren Zugverbandes bereitzustellen.A method with the features of claim 22 solves the problem of providing a flexible logistical transport and delivery within a train modularly flexible train.

Eine erste Ausführungsform eines erfindungsgemäßen Arbeitswagens für den Gleisbau bei Bahnstrecken sieht vor, dass dieser Arbeitswagen modular an einem beliebigen Reihungsort in einer beliebigen Reihung von weiteren Arbeitswagen innerhalb eines Arbeitszuges zur Sanierung der aus einem Unterbau sowie aus einem Gleis bestehenden Bahnstrecke eingereiht werden kann. Dabei hat der Arbeitswagen eine Aufarbeitungseinrichtung für ausgebauten Schotter und/oder anderweitige Unterbaumaterialien entweder für einen anschließenden vollständigen oder teilweisen Wiedereinbau oder für einen Abtransport. Allerdings wird der Schotter und/oder die anderweitigen Unterbaumaterialien durch diesen Arbeitswagen weder ausgebaut noch eingebaut. Hingegen weist der Arbeitswagen Transportbänder zur Zufuhr des ausgebauten Schotters und/oder anderweitiger Unterbaumaterialien zu der Aufarbeitungseinrichtung, zur Abfuhr aufbereiteter Materialien und zum Durchtransport von Materialien der benachbarten weiteren Arbeitswagen auf. Als Transportbänder zur Zufuhr des ausgebauten Schotters und/oder anderweitiger Unterbaumaterialien zu der Aufarbeitungseinrichtung und zur Abfuhr aufbereiteter Materialien sind zumindest ein oberes Bodenförderband, ein unteres Bodenförderband, endseitige Übergabeförderbänder, die nach unten und nach oben verschwenkbar und auf einem Schlitten einfahrbar und ausfahrbar sind, und ein Dachförderband vorgesehen, das sich bis zu einer Aufgabestelle der Aufarbeitungseinrichtung erstreckt und endseitig jeweils verschwenkbar abgeknickt ist. Dabei sind das obere Bodenförderband, das untere Bodenförderband, die endseitigen Übergabeförderbänder und das Dachförderband bezüglich ihrer Transportrichtung reversibel ausgeführt und das obere Bodenförderband ist zudem in seiner Endlage verschiebbar und/oder abknickbar. Des Weiteren weist der Arbeitswagen ein Übergabeförderband im Dachbereich auf, das bezüglich seiner Transportrichtung reversibel ausgeführt ist und sich zu dem Dachförderband von der anderen Seite der Aufgabestelle erstreckt und endseitig nach oben und nach unten verschwenkbar abknickbar ist. Dadurch können die Transportbänder des Arbeitswagens zum Transport oder zum Durchtransport von Materialien zu einem oder von einem bestimmten Ort eines Maschinenbereichs benachbarter weiterer Arbeitswagen des Arbeitszuges in beide Richtungen verwendet werden, wobei das Dachförderband oder das Übergabeförderband im Dachbereich einzeln als Transportband zum Zuführen von Materialien zu der Aufarbeitungseinrichtung und das Dachförderband und das Übergabeförderband im Dachbereich gemeinsam als Transportband zum Durchtransport von Materialien verwendet werden. Die Materialien müssen mit der Aufarbeitung für ausgebauten Schotter und/oder anderweitiger Unterbaumaterialien in dem Arbeitswagens mit Aufarbeitungseinrichtung an sich nichts zu tun haben, da während des Transports oder des Durchtransports dieser Materialien der Betrieb der Aufarbeitungseinrichtung für sämtliche oder für einen Teil der Anwendungen, für die der Arbeitswagen ausgebildet und einsetzbar ist, unterbrochen werden kann.A first embodiment of a trolley according to the invention for track construction in railway lines provides that this work trolley can be modularly ranked at any location in any order of other work cars within a work train for rehabilitation of existing from a substructure and track track. In this case, the work car has a reprocessing device for removed ballast and / or other substructure materials either for a subsequent complete or partial replacement or removal. However, the ballast and / or the other substructure materials are neither removed nor installed by this work car. By contrast, the working carriage has conveyor belts for feeding the removed ballast and / or other substructure materials to the reprocessing device, for removing processed materials and for transporting through materials of the adjacent further work carts. As conveyor belts for supplying the excavated ballast and / or other substructure materials to the reprocessing device and the removal of processed materials are at least one upper floor conveyor belt, a lower floor conveyor belt, end transfer belts, which can be moved up and down and on a carriage retractable and extendable, and a roof conveyor belt is provided, which extends to a feed point of the reprocessing device and the end is pivoted in each case pivotally. Here are the upper floor conveyor belt, the lower floor conveyor belt, the end transfer belts and the roof conveyor belt carried reversible with respect to their transport direction and the upper floor conveyor is also displaceable in its end position and / or bent. Furthermore, the work car has a transfer conveyor belt in the roof area, which is designed to be reversible with respect to its transport direction and extends to the roof conveyor from the other side of the feed point and the end is pivoted upward and downward bendable. Thereby, the conveyor belts of the work vehicle can be used for transporting or transporting materials to or from a specific location of a machine area adjacent other work cars of the work train in both directions, the roof conveyor or the transfer conveyor in the roof area individually as a conveyor belt for supplying materials to the Processing device and the roof conveyor and the transfer conveyor in the roof area are used together as a conveyor belt for transporting materials. The materials need not have anything to do with the processing of excavated ballast and / or other substructure materials in the work-cart with work-up equipment, since during transport or transit of these materials the operation of the work-up equipment for all or part of the applications for which the work car is designed and usable, can be interrupted.

Anders als im Stand der Technik sind erfindungsgemäß alle Transportbänder bezüglich ihrer Transportrichtung reversibel ausgeführt und die Übergabeförderbänder nach unten und nach oben verschwenkbar und auf einem Schlitten einfahrbar und ausfahrbar. Ferner ist das Dachförderband endseitig jeweils verschwenkbar abgeknickt und das obere Bodenförderband in seiner Endlage verschiebbar und/oder abknickbar. Hierdurch wird ermöglicht, dass mit den Transportbändern die variable Förderung in beiden Richtungen in und/oder durch den Arbeitswagen hindurch auf verschiedene Weise möglich wird, so dass dieser an beliebiger Stelle innerhalb eines Arbeitszuges eingereiht werden kann.Unlike in the prior art, all conveyor belts according to the invention are reversible with respect to their transport direction and the transfer conveyor belts pivotable downwards and upwards and retractable and extendable on a carriage. Furthermore, the roof conveyor belt is bent at each end pivotally and the upper floor conveyor belt displaceable in its end position and / or bent. This makes it possible that with the conveyor belts, the variable promotion in both directions in and / or through the work car through in various ways is possible, so that it can be queued at any point within a work train.

So ist das durchgehende Dachförderband derart beweglich oder knickbar ausgebildet, dass es auch als Transportband zum Zuführen von Materialien zu einem Aufarbeitungsmodul und/oder als Transportband zum Durchtransport von Materialien verwendbar ist. Dadurch ist ein universeller Materialtransport möglich und realisiert.Thus, the continuous roof conveyor belt is designed to be movable or bendable, so that it can also be used as a conveyor belt for feeding materials to a work-up module and / or as a conveyor belt for the transport of materials. As a result, a universal material transport is possible and realized.

Dadurch ist ein spezieller modularer Arbeitswagen in Form eines Reinigungs- bzw. Aufarbeitungsmoduls zur Reinigung bzw. Aufarbeitung von Schotter und/oder Erdmassen innerhalb eines modular gestaltbaren Arbeitsverbandes von Einzelmaschinen geschaffen. Der erfindungsgemäße Arbeitswagen ist in einer Reihe von Material-Förder-Silo-Wagen (MFS-Wagen) oder dgl. eingereiht. Das erfindungsgemäße Reinigungsmodul ist dabei variabel und voll funktionsfähig und kann an jeder beliebigen Stelle innerhalb eines Zugverbandes aus Material-Förder-Silo-Wagen oder dgl. eingereiht und verwendet werden. Die Aufarbeitung des Schotters und/oder der Erdmassen (also diejenigen Bestandteile des Gleisbettes, welche sich unter dem Schotter befinden) ist dabei im allgemeinsten Sinne zu verstehen.This creates a special modular work cart in the form of a cleaning or refurbishment module for cleaning or refurbishment of gravel and / or earth masses within a modular design work group of individual machines. The work cart according to the invention is in a series of material handling silo wagons (MFS wagons) or the like queued. The cleaning module according to the invention is variable and fully functional and can be queued and used anywhere within a train of material handling silo wagons or the like. The processing of the ballast and / or the earth masses (ie those components of the track bed, which are located below the ballast) is to be understood in the most general sense.

Wesentlich beim erfindungsgemäßen modularen Arbeitswagen ist, dass dieser Arbeitswagen eine vollständig eigenständige, modulare Einheit bzw. Maschine darstellt, welche völlig unabhängig von anderen Arbeitswagen bzw. Maschinen verwendet und eingesetzt werden kann und wird. Dies bedeutet auch, dass der erfindungsgemäße modulare Arbeitswagen nicht darauf angewiesen und nicht dafür bestimmt ist, in einem ganz bestimmten Verbund von mehreren Arbeitswagen eingereiht zu werden, welche in ihrer Gesamtheit eine Maschine definieren. Der erfindungsgemäßen modularer Arbeitswagen ist somit als eigenständige Maschine zu verstehen und nicht Teil einer Gesamtmaschine, welche aufgrund der Maschinenlänge auf mehrere Arbeitswagen verteilt ist. Wesentlich ist weiterhin, dass der Schotter und/oder die anderweitigen Unterbaumaterialien nicht durch den erfindungsgemäßen Arbeitswagen ausgebaut und ggf. wieder eingebaut werden. Neben dem vollständigen oder teilweisen Wiedereinbau der Materialien im Rahmen des Ausbau- und Wiedereinbauarbeitszyklusses ist auch ein Abtransport der Materialien möglich, ohne dass diese innerhalb dieses Zyklusses wieder eingebaut werden. Sie können nach einer Zwischenspeicherung auf entsprechenden Arbeitswagen anderweitig deponiert oder verarbeitet werden.It is essential in the case of the modular work cart according to the invention that this work cart represents a completely independent, modular unit or machine which can be used and used completely independently of other work cars or machines. This also means that the modular work car according to the invention does not rely on it and is not intended to be classified in a very specific composite of several work cars, which define a machine in their entirety. The modular work cart according to the invention is thus to be understood as an independent machine and not part of an overall machine, which is distributed on the basis of the machine length on several work cars. It is also essential that the gravel and / or the other substructure materials are not removed by the work trolley according to the invention and possibly re-installed. In addition to the complete or partial replacement of the materials within the framework of the removal and replacement cycle, removal of the materials is also possible without these being reinstalled within this cycle. They can be deposited or processed elsewhere after temporary storage on appropriate work cars.

Der besondere Vorteil des erfindungsgemäßen Arbeitswagens besteht darin, dass von einem herkömmlichen, klassischen Arbeitswagen ausgegangen wird, welcher mit einer speziellen Aufarbeitungseinrichtung für den ausgebauten Schotter und/oder anderweitiger Unterbaumaterialien ausgerüstet bzw. nachgerüstet ist. Dabei ist dieser Arbeitswagen mit seiner Aufarbeitungseinrichtung nur für diesen speziellen Zweck ausgebildet. Insbesondere ist der erfindungsgemäße Arbeitswagen nicht dazu geeignet und nicht dafür bestimmt, den Schotter und/oder die anderweitigen Unterbaumaterialien auszubauen und einzubauen. Der Ausbau und der Wiedereinbau erfolgt durch andere, spezielle Arbeitswagen, welche nicht Arbeitswagen im erfindungsgemäßen Sinne sind. Dadurch ist insgesamt ein hochmodulares System für die Bereitstellung eines Arbeitszuges im Gleisbau geschaffen, wobei jeder Arbeitswagen dieses Arbeitszuges ein spezielles Arbeitsmodul definiert.The particular advantage of the work cart according to the invention is that it is based on a conventional, classic work car, which is equipped or retrofitted with a special processing device for the removed ballast and / or other substructure materials. In this case, this work car is designed with its reprocessing device only for this specific purpose. In particular, the work cart according to the invention is not suitable and is not intended to remove and install the ballast and / or the other substructure materials. The removal and replacement is carried out by other, special work cars, which are not work cars in the meaning of the invention. As a result, a highly modular system for the provision of a work train in track construction is created, with each work car of this work train defining a special work module.

Somit ist erfindungsgemäß mittels des modifizierten Arbeitswagens der Erfindung eine Aufarbeitung des ausgebauten Schotters und/oder anderweitiger Unterbaumaterialien ohne komplexe Reinigungsmaschinen möglich, und zwar vor allem unabhängig von der Art der Aus- und Einbaueinheit für den Schotter. Somit ist erfindungsgemäß sowohl für separate Schotterausbaueinheiten als auch für separate Schottereinbaueinheiten unterschiedlichster Art eine Reinigungsmöglichkeit für den Schotter innerhalb eines Arbeitswagenverbundes in dem Sinne geschaffen, dass hierdurch ein modulares Aufarbeiten der Materialien möglich ist, und zwar unabhängig von der Technik, welche den Aus- und den Einbau der Materialien, beispielsweise Schotter, vornimmt. Dadurch ist eine Reinigung für verschiedene Anwendungen im modularen Einsatz geschaffen. Durch diese Arbeitsweise kann beispielsweise der Schotterausbau und Schottereinbau mittels eines Baggers vor Kopf, aber auch mit komplexen Aus- und Einbaueinheiten variabel und kostenorientiert ermöglicht werden. Je nach Erfordernis der Arbeitsgeschwindigkeit innerhalb des Baufensters kann dann immer die günstigste Variante für die auszuführenden Arbeiten gewählt werden. Ein weiterer Vorteil mittels des erfindungsgemäß modifizierten Arbeitswagens besteht darin, dass sowohl gereinigter Schotter als auch die bei der Reinigung anfallenden Entsorgungsanteile logistisch besser getrennt und auf dem Gleis verwendungsgerechter zwischengebunkert werden können. Der erfindungsgemäße Arbeitswagen wird somit als Aufarbeitungswagen in eine Reihung von herkömmlichen MFS-Wagen eingereiht. Der Erfindungsschutz erstreckt sich dabei sowohl auf den Arbeitswagen in Form des erfindungsgemäßen Reinigungsmoduls für die Reihung innerhalb eines Wagenverbundes an sich, aber auch auf den dadurch geschaffenen modularen Reinigungszug mit seiner modularen Reinigungsmöglichkeit. Der erfindungsgemäße modifizierte Arbeitswagen ist dabei für die optional zu verwendenden, separaten gleisgebundenen sowie nicht gleisgebundenen Aus- und Einbaueinheiten für den Schotter und/oder die anderweitigen Unterbaumaterialien zu sehen.Thus, according to the invention by means of the modified work carriage of the invention, a processing of the developed ballast and / or other substructure materials without complex cleaning machines possible, and especially regardless of the type of removal and installation unit for the ballast. Thus, according to the invention for both separate Schotterausbaueinheiten as well as separate Schottereinbaueinheiten different types a cleaning option for the ballast within a Arbeitswagenverbundes created in the sense that this way a modular refurbishment of the materials is possible, regardless of the technique, which the removal and installation of materials, such as gravel , makes. This creates a cleaning for various applications in modular use. By this procedure, for example, the gravel removal and bulkhead installation by means of an excavator in front of head, but also with complex removal and installation units can be made variable and cost-oriented. Depending on the requirement of the working speed within the Baufensters can then always be chosen the cheapest option for the work to be performed. Another advantage of the invention modified by the work vehicle is that both purified gravel and incurred in the cleaning disposal shares can be better logistically separated and bunkered on the track appropriate for use. The work trolley according to the invention is thus classified as a refurbishment trolley in a series of conventional MFS wagons. The invention protection extends both to the work car in the form of the cleaning module according to the invention for the ranking within a car network per se, but also to the thus created modular cleaning train with its modular cleaning option. The modified working car according to the invention is to be seen for the optional, separate track-bound and not track-bound removal and installation units for the ballast and / or the other substructure materials.

Der erfindungsgemäße modifizierte Arbeitswagen mit seiner Aufarbeitungseinrichtung kann dabei zunächst in einer Grundversion ausgebildet sein. Diese Grundversion übernimmt die Basisaufarbeitung des Materials, welches zunächst das aufzuarbeitende Material des variablen Arbeitsverbundes aufnimmt. So kann in dieser Grundversion des Arbeitswagens das Material (insbesondere Schotter) fachgerecht mittels Sieben und Klassieren einer Wiederverwendung zugänglich gemacht werden. In diesem Arbeitswagen können sämtliche technische Lösungen für Sieben, Klassieren, Waschen, Trocknen, Brechen, Schärfen sowie weitere Vorgänge durchgeführt werden. Über entsprechende Transportbänder werden dabei die Materialien dem erfindungsgemäßen Arbeitswagen zugeführt und der Aufarbeitungseinrichtung aufgegeben. Darin werden dann die gewünschten Arbeitsvorgänge ausgeführt, um den Schotter (oder allgemein das Material) aufzuarbeiten und einer weiteren Verwertung zugänglich zu machen.The modified work cart according to the invention with its reprocessing device can initially be designed in a basic version. This basic version takes over the basic processing of the material, which initially receives the material to be processed of the variable work group. Thus, in this basic version of the work cart, the material (especially ballast) can be expertly accessed by screening and classifying reuse. All technical solutions for screening, classifying, washing, drying, breaking, sharpening and other processes can be carried out in this work cart. About corresponding conveyor belts while the materials are supplied to the work trolley according to the invention and abandoned the reprocessing device. Therein, the desired operations are then performed to work up the ballast (or more generally the material) and make it available for further use.

Auf diese Weise ist auf einfache Art eine modulare Aufarbeitungseinrichtung durch Integration in einen Arbeitswagen geschaffen, welche in einen Arbeitszugverband eingereiht werden kann. Dieser kann hierbei aus allen denkbaren Einzelkomponenten, d. h. Einzelarbeitswagen bestehen und beliebig aufgereiht sein. So kann eine gleisgebundene oder gleisunabhängige Arbeitseinheit zum Ausbau und zum Einbau des Schotters mit optionalen Übergabewagen vorgesehen sein, weiterhin optional herkömmliche MFS-Wagen für das Zwischenbunkern der Materialien, weiterhin das erfindungsgemäße Reinigungsmodul, weiterhin optional entsprechend ausgebildete weitere Arbeitswagen für Waschung und Separation bei Platzmangel der Komponenten in der Grundversion des erfindungsgemäßen Arbeitswagens sowie schließlich weitere herkömmliche MFS-Wagen zur Zwischenspeicherung von nicht verwendungsfähigem Reinigungsgut. Nach der Aufarbeitung der Materialien (insbesondere des Schotters) wird der nach der Aufarbeitung wiederverwendbare Schotter dem Wagen mit der entsprechenden Einbaueinheit zugeführt. Der Schotter wird dabei als Recyclingschotter eingebaut. Die wiederverwendbaren Feinanteile der Schotterreinigung können bei Bedarf in erweiterter optionaler Form in einem weiteren Aufarbeitungsmoduls in der Maschinenreihung den Unterbauschichten, nämlich der Kies- oder Planumsschutzschicht, beigemischt werden.In this way, a modular reprocessing device is created by integration into a work car in a simple way, which are classified in a Arbeitszugverband can. This can consist of all conceivable individual components, ie individual work cars and be strung as desired. Thus, a track-bound or track-independent work unit for removal and installation of the ballast can be provided with optional transfer trolley, also optional conventional MFS trolley for Zwischenbunkern the materials, also the cleaning module according to the invention, further optionally trained accordingly further work carts for washing and separation in lack of space Components in the basic version of the work cart according to the invention and finally more conventional MFS wagon for temporary storage of non-usable cleaning. After working up the materials (in particular the ballast), the reusable gravel after processing is fed to the car with the appropriate installation unit. The gravel is thereby incorporated as recycling gravel. If necessary, the reusable fines of the ballast cleaning can be added to the substructure layers, namely the gravel or surface protection layer, in an expanded optional form in a further processing module in the machine sequence.

Weitere denkbare Varianten und Optionen sind durch die Anbringung von zusätzlichen Transportbändern an den einzelnen MFS-Wagen denkbar. Hier können ablauftechnisch Bodenförderbänder mit endseitigen Übergabeförderbändern, Dachförderbänder mit endseitigen Übergabeförderbändern für einen optimalen ablauftechnischen Transportfluß der Materialien vorgesehen sein. Weiterhin können die Einzelmodule elektronisch gekoppelt werden, um die Abläufe teil- oder voll zu automatisieren. Ebenso kann das Material durch jegliche denkbare Aufgabeeinheit, so beispielsweise durch einfache Bagger oder Fräsen, aufgegeben oder auch wieder mittels Bagger und Walzen eingebaut werden. Es kann somit im Kopfbereich des Arbeitszuges sowohl die gleisgebundene modulare Verfahrensweise stattfinden als auch die gleisungebundene. Dies hängt lediglich von der gewählten Technologie zum Ausbau und Einbau der Materialien am Ausbau- und Einbauort ab.Further conceivable variants and options are conceivable by attaching additional conveyor belts to the individual MFS wagons. Bottom conveyor belts with end-side transfer belts, roof conveyor belts with end transfer conveyor belts for optimal process-flow transport of the materials can be provided here. Furthermore, the individual modules can be electronically coupled to partially or fully automate the processes. Likewise, the material can be abandoned by any conceivable task unit, such as by simple excavators or milling, or also be rebuilt by means of excavators and rollers. It can thus take place in the head area of the work train, both the track-bound modular procedure as well as the track-bound. This depends only on the chosen technology for the removal and installation of materials at the expansion and installation location.

Ebenso kann der erfindungsgemäße Arbeitswagen einen eigenen oder einen fremden Antrieb zur Vorwärtsbewegung besitzen. Dieser kann innerhalb eines Moduls innerhalb der Maschinenreihung eingebaut sein oder aber auch als separate Antriebseinheit innerhalb der Reihung der Arbeitswagen eingereiht werden.Likewise, the work cart according to the invention may have its own or a foreign drive for forward movement. This can be installed within a module within the machine series or also be classified as a separate drive unit within the ranking of the work car.

Der erfindungsgemäße Arbeitswagen ist mit seiner Aufarbeitungseinrichtung für ausgebauten Schotter und/oder anderweitiger Unterbaumaterialien - wie bereits ausgeführt - in einer Reihe von weiteren Arbeitswagen (jedoch anderen Typs) des Arbeitszuges eingereiht, wobei der erfindungsgemäße Arbeitswagen Transportbänder zum Durchtransport von Materialien dieser benachbarten weiteren Arbeitswagen aufweist. Darunter ist zu verstehen, dass sich an den erfindungsgemäßen Arbeitswagen beidseitig andersartige Arbeitswagen, beispielsweise MFS-Wagen oder dgl. anschließen, wobei die Notwendigkeit besteht, die Materialien längs des Arbeitszuges zu transportieren, ohne dass der erfindungsgemäße Arbeitswagen mit seiner Aufarbeitungseinrichtung ein Hindernis und Unterbruch für diesen Materialtransport darstellt und der Materialtransport dort stockt. Insofern schlägt diese bevorzugte Weiterbildung vor, dass die Materialien gewissermaßen durchtransportiert werden können, ohne dass der erfindungsgemäße Arbeitswagen mit seiner Aufarbeitungseinrichtung ein Hindernis darstellt.The work trolley according to the invention is, with its processing device for expanded gravel and / or other substructure materials - as already stated - queued in a series of further work trolleys (but of a different type) of the work train, the work trolley according to the invention having conveyor belts for transporting materials of these adjacent further work trolleys. By this is meant that on the work car according to the invention on both sides different type of work, such as MFS wagon or the like. Connect, with the need to transport the materials along the work train without the work trolley according to the invention with its processing device is an obstacle and interruption for this material transport and the material transport there increased. In this respect, this preferred development proposes that the materials can be transported to a certain extent without the work cart according to the invention being an obstacle with its reprocessing device.

Dadurch ist insgesamt ein logistisch flexibel erweiterbarer Arbeitswagen in Form eines Aufarbeitungsmoduls und/oder Reinigungsmoduls geschaffen, welcher auf dem erfindungsgemäßen Arbeitswagen basiert. Damit sind die logistischen Möglichkeiten des erfindungsgemäßen Arbeitswagens derart erweitert, dass die Materialströme durch den erfindungsgemäßen Arbeitswagen mit seiner modularen Reinigungs- und Aufarbeitungstechnik geführt werden können, und zwar Materialströme, welche mit der Aufarbeitung für ausgebauten Schotter und/oder anderweitiger Unterbaumaterialien in dem erfindungsgemäßen Arbeitswagen an sich nichts zu tun haben. Der erfindungsgemäße Arbeitswagen mit dem erfindungsgemäßen Reinigungs- und/oder Aufarbeitungsmodul wird also Teil eines flexiblen logistischen Transport- und Förderweges innerhalb eines modular flexibel gestaltbaren Zugverbandes. Es wird dadurch ermöglicht, innerhalb eines beliebig aufgereihten Zugverbandes aus Material-Förder-Silo-Wagen oder dgl. den erfindungsgemäßen Arbeitswagen mit seiner Aufarbeitungseinrichtung einreihen zu können, ohne in der Reihung der Arbeitswagen Zwänge im Materialfluß zu haben. Dadurch können die möglichen Materialförderströme der angrenzen den Materialförderwagen durch den erfindungsgemäßen logistischen Arbeitswagen mit dem Reinigungsmodul variabel so geführt werden, dass der erfindungsgemäße Arbeitswagen mit seiner Aufarbeitungseinrichtung auch ohne (gleichzeitige) Reinigungsleistung als Durchlaufmodul für die Materialien in allen möglichen Förderrichtungen von angrenzenden Materialförderwagen fungiert.As a result, a logistically flexibly expandable work cart in the form of a work-up module and / or cleaning module is created as a whole, which is based on the work trolley according to the invention. Thus, the logistical possibilities of the work trolley according to the invention are so extended that the material flows can be performed by the work trolley according to the invention with its modular cleaning and processing technology, namely material flows associated with the work-up for developed ballast and / or other substructure materials in the work trolley according to the invention have nothing to do. The work trolley according to the invention with the cleaning and / or refurbishment module according to the invention thus becomes part of a flexible logistical transport and conveying path within a modular, flexibly configurable train. It is thus possible, within an arbitrarily lined train of material-handling silo wagon or the like. To queue the work cart according to the invention with its reprocessing device, without having in the sequence of work cars constraints in the material flow. As a result, the possible material delivery streams adjacent the material trolley can be variably guided by the logistic work trolley with the cleaning module such that the work trolley with its processing device also functions without a (simultaneous) cleaning performance as a pass-through module for the materials in all possible conveying directions of adjacent material trolleys.

Ausgangspunkt ist somit das erfindungsgemäße Reinigungsmodul sowie jegliches weitere Aufarbeitungsmodul für die Reihung innerhalb eines Wagenverbundes aus MFS-Wagen oder dgl. in Verbindung mit der modularen logistischen Erweiterung bei Reinigungs- und/oder Aufarbeitungsleistungen mit einem modularen Reinigungszug/Aufarbeitungszug. Die Erweiterung kann dabei modulare Wasch-, Sieb- sowie Aufarbeitungsmodule etc. aufweisen, einschließlich die für die modulare Reinigungseinheit optional verwendbare gleisgebundene (oder auch gleisungebundene) Aus- und Einbaueinheit. Durch die zusätzliche Ausstattung des erfindungsgemäßen Arbeitswagens mit entsprechenden Förderbändern ist die Einstellung des erfindungsgemäßen Arbeitswagens innerhalb eines beliebig aufgereihten Zugverbandes mit Materialförderwagen möglich. Dadurch lassen sich beliebig viele Module dieser Bauart in die Förderstraße von MFS-Wagen oder dgl. einstellen, ohne durch deren Funktion die Förderstromleistung zu behindern oder zu beeinträchtigen. Somit ist eine beliebige Reihung verschiedenster Maschinentechnik im modularen System innerhalb eines Verbundes aus Materialförderwagen möglich, ohne negative Einflüsse und Zwänge auf die Materialströme der angrenzenden und aufgereihten Materialförderwagen zu haben. Dies erlaubt in vielerlei Hinsicht ganz neue Möglichkeiten von Maschinenzusammenstellungen und logistischen Anwendungen im Gleisbausektor mit modularer Technik.The starting point is thus the cleaning module according to the invention as well as any further processing module for the ranking within a carriage assembly made of MFS wagon or the like in conjunction with the modular logistical extension for cleaning and / or refurbishment services with a modular cleaning train / refurbishment train. The extension can have modular washing, screening and refurbishment modules, etc., including the optionally used for the modular cleaning unit track-bound (or non-tracked) removal and installation unit. Due to the additional features of the work cart according to the invention with corresponding conveyor belts is the Adjustment of the work cart according to the invention within an arbitrarily lined train with material trolley possible. As a result, any number of modules of this type can be set in the conveyor line of MFS cars or the like, without hindering or impairing the flow rate through their function. Thus, any sequence of different machine technology in a modular system within a composite of material trolley is possible without negative influences and constraints on the material flows of the adjacent and lined material trolley to have. This allows in many ways entirely new possibilities of machine assortments and logistic applications in the track construction sector with modular technology.

Schließlich werden zum Durchtransport der Materialien die Transportbänder des erfindungsgemäßen Arbeitswagens verwendet. Diese Transportbänder des Arbeitswagens sind dabei reversibel betreibbar. Dies bedeutet, dass für den Durchtransport der Materialien die an sich schon vorhandenen Transportbänder des erfindungsgemäßen Arbeitswagens verwendet werden. Für diesen Fall kann der Betrieb der Aufarbeitungseinrichtung unterbrochen werden.Finally, the conveyor belts of the work trolley according to the invention are used for transporting the materials. These conveyor belts of the work car are reversibly operable. This means that the conveyor belts of the work carriage according to the invention which are already present are used for the transport of the materials. In this case, the operation of the reprocessing device can be interrupted.

Eine Weiterbildung schlägt verschiedene Möglichkeiten der Aufarbeitungseinrichtung für Schotter vor. Die Aufarbeitungseinrichtung kann demnach für das Reinigen und/oder Waschen und/oder Trocknen und/oder Sieben und/oder Klassieren und/oder Brechen und/oder Schärfen von Schotter ausgebildet sein.A further development proposes various possibilities of the processing device for ballast. The reprocessing device can accordingly be designed for the cleaning and / or washing and / or drying and / or screening and / or classifying and / or breaking and / or sharpening of ballast.

Ferner kann vorgesehen sein, dass der Arbeitswagen im mittleren Bereich ein Zwischenförderband aufweist. Mit diesem Zwischenförderband ist es möglich, Material insbesondere von der Aufarbeitungseinrichtung zu dem Dachförderband zu transportieren. Gleichermaßen ist es auch denkbar, Material vom Dachbereich in den Bodenbereich des Arbeitswagens zu transportieren. Durch dieses Zwischenförderband ist die Materiallogistik weiter verbessert und optimiert.Furthermore, it can be provided that the work car has an intermediate conveyor belt in the middle region. With this intermediate conveyor belt, it is possible to transport material in particular from the reprocessing device to the roof conveyor belt. Similarly, it is also conceivable to transport material from the roof area in the floor area of the work car. This intermediate conveyor belt further improves and optimizes material logistics.

Weiterhin schlägt eine Weiterbildung vor, dass die Aufarbeitungseinrichtung auf dem Arbeitswagen entweder permanent angeordnet ist oder lösbar anordenbar ist. Die Aufarbeitungseinrichtung kann somit aus einer kompakt verbauten, eigenständigen Maschine bzw. Arbeitswagen bestehen. Alternativ kann das System auch aus einem herkömmlichen Standardbahnwagen mit einem sogenannten Hukepackreinigungsmodul bestehen. Dies bedeutet, dass bei dieser letztgenannten Alternative ein am Markt vorhandenes Reinigungsmodul (z.B. in Form einer mobilen Brech- und Siebanlage oder anderweitigen Modulen) von der Form und dem Gewicht so umkonstruiert wird, dass es als Ladevolumen auf einen Standardbahnwagen aufgesattelt werden kann und als Reinigungsmodul im Gleisbau für die erfindungsgemäße modulare Grundmaschine eingesetzt werden kann. Dieses Modul, welches dann als Lademodul für den Bahnwagen umkonstruiert wurde, kann hierbei (im Gegensatz zum permanenten modularen Kompaktmodul) jedoch auch abgesattelt und weiteren Verwendungen im gleislosen Sektor zur Verfügung gestellt werden. Diese Hukepackalternative hat also optional weitere Einsatzmöglichkeiten im gleislosen Bereich, welche zu erheblichen Einsatzerweiterungen führen können. Die Hukepackalternative kann für alle Reinigungs- und Waschmodullösungen zur Anwendung kommen.Furthermore, a development proposes that the reprocessing device is either permanently arranged on the work car or is detachably arranged. The reprocessing device can thus consist of a compact built, stand-alone machine or work car. Alternatively, the system can also consist of a conventional standard railcar with a so-called Hukepackreinigungsmodul. This means that in this last-mentioned alternative, a cleaning module available on the market (for example in the form of a mobile crushing and sieving plant or other modules) is reconstructed from the shape and the weight such that it acts as loading volume on a standard railcar can be saddled up and used as a cleaning module in track construction for the modular basic machine according to the invention. However, this module, which was then redesigned as a loading module for the railway wagon, can (in contrast to the permanent modular compact module) also be uncoupled and made available for further uses in the trackless sector. This Hukepackalternative thus has optional other uses in the trackless area, which can lead to significant deployment extensions. The Hukepack alternative can be used for all cleaning and washing module solutions.

Gemäß einer weiteren Weiterbildung kann der erfindungsgemäße Arbeitswagen mit seiner Aufarbeitungseinrichtung oder seinen Aufarbeitungseinrichtungen entweder in die Reihe der anderen Arbeitswagen des Arbeitszuges eingereiht sein oder aber der erfindungsgemäße Arbeitswagen ist als Kopfarbeitswagen ausgebildet. Bei der Verwendung des erfindungsgemäßen Arbeitswagens als Kopfreinigungsmodul kann dieses einen Aufgabetrichter für das aufzuarbeitende Material besitzen. Dieser Aufgabetrichter, von dem aus der ausgebaute Schotter und/oder anderweitige Unterbaumaterialien über eines der Transportbänder der Aufarbeitungseinrichtung zuführbar sind, kann einziehbar und/oder einklappbar sein. Diesem Aufgabetrichter bzw. dem Kopfarbeitswagen wird das Material mittels eine Beladeeinheit (beispielsweise Bagger oder Fräse) oder mittels eine Beladestation aufgegeben. Insgesamt kann somit der erfindungsgemäße Arbeitswagen mit der Aufarbeitungseinrichtung modular in einem Zugverband einreihbar sein oder aber - erweitert mit einem Aufgabetrichter - für Arbeiten am Kopf ausgeführt werden. Beispielsweise kann der Aufgabetrichter abnehmbar sein, so dass der Reinigungswagen entweder vor Kopf (mit anmontiertem Aufgabetrichter) angeordnet ist oder aber in die Reihe der anderen Arbeitswagen (dann ohne Aufgabetrichter) eingereiht ist.According to a further development, the work trolley according to the invention can be classified with its reprocessing device or its reprocessing either in the row of other work cars of the work train or the work trolley according to the invention is designed as a head work car. When using the work cart according to the invention as a head cleaning module this may have a hopper for the material to be processed. This feeding hopper, from which the removed ballast and / or other substructure materials can be supplied to the processing device via one of the conveyor belts, can be retractable and / or foldable. This feed hopper or the overhead work cart, the material by means of a loading unit (eg excavator or tiller) or by means of a loading station abandoned. Overall, therefore, the work cart according to the invention with the reprocessing device can be modular in a train train einreihbar or - be extended with a hopper - performed for work on the head. For example, the hopper may be detachable so that the cleaning cart is either in front of the head (with hopper attached) or in line with the other cart (then without hopper).

Ferner werden zum Durchtransport der Materialien zusätzliche Transportbänder vorgesehen, nämlich Bodenförderbänder, Dachförderbänder und Übergabeförderbänder in den Endbereichen. Die Förderbänder können dabei grundsätzlich einreihig oder vorzugsweise mehrreihig ausgebildet sein. Dies gilt grundsätzlich für sämtliche Förderbänder des Arbeitszuges.Furthermore, additional conveyor belts are provided for transporting the materials, namely floor conveyor belts, roof conveyor belts and transfer conveyor belts in the end areas. The conveyor belts can basically be single-row or preferably multi-row. This basically applies to all conveyor belts of the work train.

Eine weitere Weiterbildung schlägt die Verwendung von unterschiedlichen Typen von Förderbändern vor, nämlich einfache Förderbänder oder geteilte Förderbänder.A further development proposes the use of different types of conveyor belts, namely simple conveyor belts or split conveyor belts.

Noch eine Weiterbildung schlägt vor, dass der erfindungsgemäße modulare Arbeitswagen (in der Art einer Lokomotive) als Zugmaschine modular im Zugverband eingesetzt werden kann. Dies hat den Vorteil, wenn insbesondere große Wagenverbünde bewegt werden müssen.Yet another embodiment proposes that the modular work cart according to the invention (in the manner of a locomotive) can be used as a tractor modular in the train. This has the advantage when in particular large vehicle networks must be moved.

Eine erste Ausführungsform eines erfindungsgemäßen Arbeitszugs zur Sanierung der aus einem Unterbau sowie aus einem Gleis bestehenden Bahnstrecke, bezieht sich auf einen Arbeitszug, der eine Mehrzahl aneinander gereihte Arbeitswagen aufweist, von denen zumindest ein Arbeitswagen ein erfindungsgemäßer Arbeitswagen mit Aufarbeitungseinrichtung, der an einem beliebigen Reihungsort in einer beliebigen Reihung von weiteren Arbeitswagen ohne Aufarbeitungseinrichtung innerhalb eines Arbeitszuges eingereiht ist.A first embodiment of a work train according to the invention for the rehabilitation of a substructure as well as a railway track, refers to a work train having a plurality of juxtaposed work car, of which at least one work car an inventive work car with reprocessing device, which at any Reihungsort in an arbitrary sequence of further work cars without reprocessing device is queued within a work train.

Eine bevorzugte Weiterbildung sieht vor, dass unterschiedliche Arbeitswagen des erfindungsgemäßen Typs für unterschiedliche Aufarbeitungsarten des Schotters und/oder der anderweitigen Unterbaumaterialien vorgesehen sind. Der besondere Vorteil besteht darin, dass der Modulcharakter der einzelnen Arbeitswagen gefördert wird. Die Grundversion des erfindungsgemäßen Arbeitswagens dient dabei der Basisaufarbeitung des Materials. Optional zugeschaltete weitere, spezielle erfindungsgemäße Arbeitswagen können dann für weitere Aufarbeitungsschritte dienen. Diese speziellen Arbeitswagen können auf unterschiedliche Weise miteinander kombiniert und in einem Reihenverbund aufgestellt werden. Somit können neben der Grundvariante des erfindungsgemäßen Arbeitswagens ein oder mehrere Zusatzwagen hinzugefügt werden. Dadurch ist eine hohe Spezifikation hinsichtlich der Modulbauweise geschaffen. So kann in der Grundversion der erfindungsgemäße Arbeitswagen das aufgenommene Material sieben und klassieren und somit einer Wiederverwendung zugänglich machen. In einem Zusatzwagen können optional beispielsweise bei Platzmangel der Komponenten im Arbeitswagen der Grundversion die Materialien gewaschen und separiert werden. Je nach Ausbildung der Zusatzwagen ist dadurch eine hohe Individualität in dem Sinne geschaffen, dass das Basismodul um ein oder mehrere zusätzliche Wagenmodule erweitert werden kann, die der Auslagerung von Reinigungs- und Wascharbeiten sowie anderer Arbeiten dienen können. Das ganze System ist dabei beliebig gestaltbar und dient u. a. der Platzerweiterung für das erfindungsgemäße Basismodul des Arbeitswagens. Diese erweiterte Aufarbeitung kann somit die unterschiedlichsten Schritte beinhalten, beispielsweise Waschen und Sieben des Schotters. Aber auch andere Behandlungsmethoden wie Brechen oder Schärfen des Schotters können hier als Arbeitsschritte in ein oder mehreren Modulen erfolgen.A preferred development provides that different work cars of the type according to the invention are provided for different types of workup of the ballast and / or the other substructure materials. The particular advantage is that the modular character of the individual work cars is promoted. The basic version of the work trolley according to the invention serves the basic processing of the material. Optionally connected further, special work trolley according to the invention can then serve for further processing steps. These special work cars can be combined in different ways and placed in a row. Thus, in addition to the basic version of the work trolley according to the invention, one or more additional cars are added. This creates a high specification in terms of modular design. Thus, in the basic version, the work cart according to the invention can screen and classify the recorded material and thus make it available for reuse. In an additional car, the materials can optionally be washed and separated, for example, in the case of space shortage of the components in the work cart of the basic version. Depending on the design of the additional car is thereby created a high degree of individuality in the sense that the base module can be extended by one or more additional car modules that can serve the outsourcing of cleaning and laundry and other work. The entire system can be designed arbitrarily and serves, inter alia, the space extension for the basic module according to the invention of the work car. This advanced workup can thus involve a variety of steps, such as washing and sieving the ballast. But other treatment methods such as breaking or sharpening of the ballast can be done here as steps in one or more modules.

Auch ist es denkbar, wiederverwendbare Feinanteile der Schotterreinigung bei Bedarf in einem entsprechenden Aufarbeitungsmodul des Arbeitswagens beispielsweise den Unterbauschichten, insbesondere der Kies- oder Planumsschutzschicht, beizumischen. In diesem optionalen Aufarbeitungsschritt in einem entsprechend ausgebildeten Arbeitswagen können zusätzlich noch Bodenverbesserungsmaßnahmen durchgeführt werden. Durch Beigabe von Bodenverbesserungsmitteln und Zuschlagstoffen kann hierbei eine gezielte Rezeptur und Sieblinie im Bereich der Kies- und Planumsschutzschichten optional hergestellt und eingebaut werden. Hierdurch ist eine Erhöhung der Verwendung der Ausbaustoffe durch diese optionalen Erweiterungsmodule gewährleistet. Die Maschine kann somit durch Erweiterungsmodule in entsprechenden separaten Arbeitswagen mit flexiblem und bedarfsgerechtem Einsatz eine maximale Verwertung aller Ausbaustoffe erreichen. Nur die reinen Abfallstoffe müssen im maximalen Ausbaustadium der Maschine abgeführt und entsorgt werden.It is also conceivable, reusable fines of the ballast cleaning if necessary in a corresponding processing module of the work cart, for example, the subbing layers, especially the gravel or layer protection layer to mix. In this optional work-up step in a suitably trained work vehicle, soil improvement measures can additionally be carried out. By adding soil conditioners and additives, a specific recipe and grading curve in the area of the gravel and surface protection layers can be optionally produced and installed. As a result, an increase in the use of the expansion materials is ensured by these optional expansion modules. The machine can thus achieve a maximum utilization of all expansion materials by expansion modules in appropriate separate work car with flexible and needs-based use. Only the pure waste materials must be removed and disposed of in the maximum stage of expansion of the machine.

Gemäß einer weiteren Weiterbildung kann der erfindungsgemäße Arbeitswagen mit seiner Aufarbeitungseinrichtung oder seinen Aufarbeitungseinrichtungen entweder in die Reihe der anderen Arbeitswagen des Arbeitszuges eingereiht sein oder aber der erfindungsgemäße Arbeitswagen ist als Kopfarbeitswagen des Arbeitszugs ausgebildet.According to a further development, the work trolley according to the invention can be queued with his reprocessing or reprocessing either in the row of other work cars of the work train or the work trolley according to the invention is designed as a headwork car of the work train.

Ferner kann vorgesehen sein, dass der Arbeitswagen im modularen System sowohl für gleisgebundene als auch für gleisunabhängige Aus- und Einbaueinheiten für Schotter und/oder anderweitige Unterbaumaterialien bestimmt und ausgebildet ist. Dadurch ist ein universelles und vor allem modulares System geschaffen, was den Ausbau und den Einbau der Materialien betrifft.Furthermore, it can be provided that the work cart in the modular system is intended and designed both for track-bound and for track-independent removal and installation units for ballast and / or other substructure materials. This creates a universal and, above all, modular system for the removal and installation of materials.

Eine andere Weiterbildung schlägt vor, dass der erfindungsgemäße modulare Arbeitswagen als separate Arbeitseinheit für Schotter und/oder andere Bodenmaterialien verwendet werden kann. So ist der Arbeitswagen als Arbeitseinheit hinter einer selbstangetriebenen oder nicht selbstangetriebenen, kombinierten oder nicht kombinierten Aus- und Einbaueinrichtung für Schotter und/oder andere Bodenmaterialien verwendbar.Another development proposes that the modular work cart according to the invention can be used as a separate work unit for ballast and / or other soil materials. Thus, the work car can be used as a work unit behind a self-propelled or non-propelled, combined or un-combined disassembly and assembly device for ballast and / or other soil materials.

Ferner wird durch eine weitere Weiterbildung die Reihung sowie Zufuhr/Abfuhr von Neumaterial sowie Altmaterial in ein und denselben Materialförderwagen/Arbeitswagen ermöglicht, indem der Arbeitswagen als Umschlagpunkt für einen endlosen Materialkreislauf zwischen einer Ausbaueinheit und einer Einbaueinheit für Schotter und/oder andere Bodenmaterialien verwendbar ist. Dadurch ist die Logistik der Materialien weiter verbessert.Furthermore, by a further development, the ranking and supply / removal of new material and waste material in one and the same material trolley / work car allows by the work car is used as a transition point for an endless material cycle between an expansion unit and an installation unit for gravel and / or other soil materials. This further improves the logistics of the materials.

Eine weitere Weiterbildung schlägt die steuerungsmäßige sowie bedientechnische Verknüpfung des erfindungsgemäßen modularen Arbeitswagens in der Reihe mit den anderen Arbeitswagen des Arbeitszuges vor. Dies bedeutet, dass der erfindungsgemäße modulare Arbeitswagen in die elektronische Gesamtlogistik des Arbeitszuges eingebunden ist.A further development proposes the control and technical connection of the modular work cart according to the invention in series with the other work cars of the work train. This means that the modular work cart according to the invention is integrated into the overall electronic logistics of the work train.

Eine Weiterbildung hiervon schlägt vor, dass die elektronischen Verbindungen zur Automatisierung von Prozessen der einzelnen Arbeitswagen im gesamten Zug- oder Arbeitsverband vorgesehen sind.A further development of this suggests that the electronic connections are provided for the automation of processes of the individual work cars in the entire train or work organization.

Schließlich schlägt noch eine weitere Weiterbildung vor, dass beim Einsatz einer modularen Aus- und Einbaueinrichtung für den Schotter zusammen mit dem modularen Reinigungsmodul gemäß dem erfindungsgemäßen Arbeitswagen mit Aufarbeitungseinrichtung für den Schotter die Arbeitsrichtung des Gesamtverbandes des Arbeitszuges beliebig ist.Finally, a further development proposes that when using a modular removal and installation device for the ballast together with the modular cleaning module according to the invention work cart with processing device for the ballast, the working direction of the Gesamtverbandes the work train is arbitrary.

Eine Ausführungsform einer erfindungsgemäßen Verwendung eines erfindungsgemäßen Arbeitswagens in einem Arbeitszug zur Sanierung der aus einem Unterbau sowie aus einem Gleis bestehenden Bahnstrecke, wobei Schotter und/oder anderweitige Unterbaumaterialien nicht durch den Arbeitswagen ausgebaut sowie wieder eingebaut werden, sieht vor, dass durch die bezüglich ihrer Transportrichtung reversibel ausgeführten Förderbänder des Arbeitswagens wahlweise der ausgebaute Schotter und/oder anderweitige Unterbaumaterialien der Aufarbeitungseinrichtung des Arbeitswagens zugeführt werden und von dort aufbereitete Materialien anschließend vollständig oder teilweise wiedereingebaut oder abtransportiert werden, oder Materialien der benachbarten weiteren Arbeitswagen durch den Arbeitswagen durchtransportiert werden.An embodiment of a use according to the invention of a work trolley according to the invention in a work train for rehabilitation of the railway track consisting of a substructure and of a track, wherein gravel and / or other substructure materials are not removed and rebuilt by the work trolley, provides that with respect to their transport direction reversibly running conveyor belts of the work cart optionally the removed gravel and / or other substructure materials of the reprocessing of the work car are supplied and then recycled materials are completely or partially rebuilt or transported away, or materials of the neighboring other work cars are transported through the work car.

Eine Weiterbildung schlägt die Logistik für die wiederverwendbaren Bestandteile und für die nicht wiederverwendbaren Bestandteile des aufgearbeiteten Schotters und/oder anderweitiger Unterbaumaterialien vor. So wird das Abfallmaterial (Unterkorn und Schmutz) den herkömmlichen MFS-Wagen für den Abtransport übergeben. Dabei werden nach der Aufarbeitung die gereinigten Stoffe und die Abfallstoffe in unterschiedliche Richtungen aus dem Wagen ausgegeben. Somit wird in einer Arbeitsrichtung das verwendbare Material zur Verfügung gestellt, während in die andere Arbeitsrichtung der nicht verwendbare Anteil ausgetragen wird.A further development proposes the logistics for the reusable components and for the non-reusable components of the reclaimed ballast and / or other substructure materials. So the waste material (undersize and dirt) is handed over to the conventional MFS wagon for transport. After processing, the cleaned substances and the waste materials are discharged from the car in different directions. Thus, the usable material is provided in one direction, while in the other direction of the non-usable portion is discharged.

In einer anderen Weiterbildung wird der erfindungsgemäße modulare Arbeitswagen in den Gesamttransport des Schotters (aufbereiteter Altschotter sowie Neuschotter) zu einem Ausbaugerät bzw. einem Einbaugerät mit eingebunden. Dabei kann mittels des Arbeitswagens die Zuführung des Altschotters sowie des Neuschotters gleichzeitig erfolgen. Dies bedeutet insgesamt eine optimale Logistik für die Zuführung des Schotters.In another development, the modular work cart according to the invention is integrated in the total transport of the ballast (processed old ballast and Neuschotter) to a removal device or a built-in device with. It can by means of the work car the supply of the old ballot and the Neuschotters done simultaneously. Overall, this means optimal logistics for the supply of the ballast.

Ferner kann vorgesehen sein, dass bei der Aufarbeitung des Schotters und/oder anderweitiger Unterbaumaterialien anfallende Feinanteile oder nicht verwertbare Stoffe durch die Zugabe von Zuschlagsstoffen verbessert und aufgearbeitet werden. Derartige Verbesserungsmittel können Kalk oder Zement sein. Andere Verbesserungsmittel bzw. Verbesserungsstoffe sind denkbar. Durch diese Aufarbeitung können die zunächst nicht verwertbaren Materialien der Aufarbeitung dann doch entsprechend wiederverwendet werden und gehen somit in den Recyclingzyklus ein. Diese Verbesserung sowie Aufarbeitung der Stoffe erfolgt insbesondere in einem separaten Arbeitswagen.Furthermore, it can be provided that during the processing of the ballast and / or other substructure materials resulting fines or non-recyclable substances are improved and worked up by the addition of aggregates. Such improvers may be lime or cement. Other improvers or enhancers are conceivable. As a result of this workup, the materials that are initially not usable can then be reused accordingly and thus enter into the recycling cycle. This improvement and processing of the substances takes place in particular in a separate work car.

Ein erfindungsgemäßes Verfahren sieht den Betrieb eines erfindungsgemäßen Arbeitszuges mit Arbeitswagen zur Sanierung einer aus einem Unterbau sowie aus einem Gleis bestehenden Bahnstrecke vor, wobei Schotter und/oder anderweitige Unterbaumaterialien nicht durch den erfindungsgemäßen Arbeitswagen ausgebaut sowie wieder eingebaut werden. Das Verfahren umfasst die Schritte, dass durch die bezüglich ihrer Transportrichtung reversibel ausgeführten Förderbänder des Arbeitswagens wahlweise ausgebauter Schotter und/oder anderweitiger Unterbaumaterialien der Aufarbeitungseinrichtung des Arbeitswagens zugeführt und von dort anschließend die aufbereiteten Materialien vollständig oder teilweise wiedereingebaut oder abtransportiert werden oder die Materialien der benachbarten weiteren Arbeitswagen durch den Arbeitswagen durchtransportiert werden.A method according to the invention provides for the operation of a work train according to the invention with a work car for the rehabilitation of a railway line consisting of a substructure and of a track, whereby gravel and / or other substructure materials are not removed and re-installed by the work trolley according to the invention. The method comprises the steps that fed by the reversibly executed with respect to their transport conveyor belts of the work cart developed gravel and / or other substructure materials of the reprocessing of the work car and from there then the processed materials are fully or partially reincorporated or removed or the materials of the other adjacent Work car to be transported through the work car.

Die Merkmale in den Unteransprüchen stellen eigenständige Erfindungen dar, unabhängig vom Gegenstand des Hauptanspruches.The features in the dependent claims represent independent inventions, regardless of the subject of the main claim.

Ausführungsbeispiele eines erfindungsgemäßen Arbeitswagens im Verbund eines Arbeitszuges für den Gleisbau bei Bahnstrecken werden nachfolgend anhand der Zeichnungen beschrieben. In diesen zeigt:

Fig. 1
in schematischer Weise einen nicht erfindungsgemäßen Arbeitszug, wobei die einzelnen Abschnitte dieses Arbeitszuges in der Zeichnung übereinander angeordnet sind;
Fig. 2a
eine Darstellung eines nicht erfindungsgemäßen Arbeitswagens, bei welchem die Aufarbeitungseinrichtung permanent auf dem Wagengestell angeordnet ist;
Fig. 2b
eine Darstellung des nicht erfindungsgemäßen Arbeitswagens, bei welchem die Aufarbeitungseinrichtung lösbar auf dem Wagengestell angeordnet ist, und zwar in verschiedenen Ausführungsformem sowie in verschiedenen Darstellungen;
Fig. 3a bis 3c
die Verwendung des nicht erfindungsgemäßen Arbeitswagens als Kopfarbeitswagen mit einem Aufgabetrichter;
Fig. 4
eine Darstellung entsprechend der in Fig. 1 mit einer schematischen Darstellung eines erfindungsgemäßen Arbeitszuges, wobei die einzelnen Abschnitte dieses Arbeitszuges in der Zeichnung übereinander angeordnet sind;
Fig. 5
eine schematische Ansicht des erfindungsgemäßen Arbeitswagens im Arbeitszug der Fig. 5;
Fig. 6a
der Wagen in Fig. 5 im normalen Betrieb zur Aufarbeitung für ausgebauten Schotter und/oder anderweitiger Unterbaumaterialien;
Fig. 6b
die Verwendung des erfindungsgemäßen Arbeitswagens in Fig. 5 beim Durchtransport von Materialien im Bodenbereich;
Fig. 6c
die Verwendung des erfindungsgemäßen Arbeitswagens in Fig. 5 beim Durchtransport von Materialien im Dachbereich;
Fig. 6d
die Verwendung des erfindungsgemäßen Arbeitswagens in Fig. 5 beim Durchtransport von Materialien im Dachbereich, jedoch im Vergleich zu Fig. 6c in entgegengesetzter Richtung;
Fig. 7
eine weitere schematische Darstellung des Arbeitszuges entsprechend der Darstellung in Fig. 1, jedoch mit einem modifizierten erfindungsgemäßen Arbeitswagen;
Fig. 8a bis 8c
der modifizierte erfindungsgemäße Arbeitswagen in Fig. 7 mit verschiedenen Einsatzmöglichkeiten des Materialflusses;
Fig. 9a bis 9c
der Arbeitswagen wie in den Fig. 7 sowie Fig. 8a bis 8c mit weiteren Varianten.
Embodiments of a work cart according to the invention in the composite of a work train for track construction in railway lines are described below with reference to the drawings. In these shows:
Fig. 1
schematically a non-inventive work train, the individual sections of this work train are arranged one above the other in the drawing;
Fig. 2a
an illustration of a non-inventive work vehicle, in which the reprocessing device is permanently arranged on the carriage frame;
Fig. 2b
a representation of the non-inventive work vehicle, in which the reprocessing device is arranged detachably on the carriage frame, in different embodiments and in various representations;
Fig. 3a to 3c
the use of the work cart not according to the invention as a headwork cart with a feeding hopper;
Fig. 4
a representation according to the in Fig. 1 with a schematic representation of a work train according to the invention, wherein the individual sections of this work train are arranged one above the other in the drawing;
Fig. 5
a schematic view of the work carriage according to the invention in the work train of Fig. 5 ;
Fig. 6a
the car in Fig. 5 in normal operation for reclamation of excavated ballast and / or other substructure materials;
Fig. 6b
the use of the work cart according to the invention in Fig. 5 during the transport of materials in the ground area;
Fig. 6c
the use of the work cart according to the invention in Fig. 5 when transporting materials in the roof area;
Fig. 6d
the use of the work cart according to the invention in Fig. 5 when transporting materials in the roof area, but in comparison to Fig. 6c in the opposite direction;
Fig. 7
a further schematic representation of the work train as shown in Fig. 1 but with a modified work cart according to the invention;
Fig. 8a to 8c
the modified work cart according to the invention in Fig. 7 with different applications of material flow;
Fig. 9a to 9c
the work car as in the Fig. 7 such as Fig. 8a to 8c with other variants.

Der während der Arbeiten kontinuierlich vorwärtsbewegte Arbeitszug der Fig. 1 weist zunächst einen Arbeitswagen 1 zum Ausbau und zum Einbau von Schotter 10 der Bahnstrecke auf. Dieser Schotter 10 ist Teil des Unterbaus 11 für das Gleis 12. Dem Arbeitswagen 1 folgt - optional - ein Übergabewagen 2 für den Schotter 10.The continuously moving work train during work Fig. 1 initially has a work car 1 for removal and installation of ballast 10 of the railway line. This ballast 10 is part of the substructure 11 for the track 12. The work vehicle 1 follows - optionally - a transfer car 2 for the ballast 10th

Dem Übergabewagen 2 folgen optional - herkömmliche - Material-Förder-Silo-Wagen 3, 4 (sogenannte MFS-Wagen) oder dgl. die MFS-Wagen sind dabei nicht beschränkend zu verstehen. Es können auch andere Arbeitswagen sein.The transfer trolley 2 is optionally followed by conventional material-conveying silo trolleys 3, 4 (so-called MFS trolleys) or the like. The MFS trolleys are not to be understood as limiting. It can also be other work cars.

Die MFS-Wagen 3, 4 dienen zum einen dem Transport der Materialien und zum anderen dem Zwischenbunkern von Materialien. Diese MFS-Wagen 3, 4 weisen jeweils ein oder mehrere Bodenförderbänder 13 auf. Im dargestellten Ausführungsbeispiel weist das eine Ende des MFS-Wagens 3, 4 ein Übergabeförderband 14 auf. Dieses ist um eine horizontale Achse verschwenkbar. Grundsätzlich können auch an beiden Enden des MFS-Wagens 3, 4 derartige verschwenkbare Übergabeförderbänder 14 vorgesehen sein. Diese können darüber hinaus in horizontaler Richtung teleskopierbar sein, wobei der verschwenkbare Abschnitt der Übergabeförderbänder 14 gegenüber dem horizontalen Teil nach oben hin abgeknickt ist. Auch können die Übergabeförderbänder 14 um eine vertikale Achse verschwenkbar sein. Weiterhin weisen die beiden MFS-Wagen 3, 4 Dachförderbänder 15 auf. Auch diese weisen endseitig verschwenkbare Übergabeförderbänder 16 auf.The MFS trolleys 3, 4 serve on the one hand for the transport of the materials and on the other for the intermediate bunkering of materials. These MFS cars 3, 4 each have one or more floor conveyor belts 13. In the exemplary embodiment shown, one end of the MFS carriage 3, 4 has a transfer conveyor belt 14. This is pivotable about a horizontal axis. In principle, such pivotable transfer conveyor belts 14 can also be provided at both ends of the MFS wagon 3, 4. These can also be telescopic in the horizontal direction, wherein the pivotable portion of the transfer belts 14 is bent over the horizontal part upwards. Also, the transfer conveyor belts 14 may be pivotable about a vertical axis. Furthermore, the two MFS cars 3, 4 have roof conveyor belts 15. These also have end pivotable transfer conveyor belts 16.

Es folgen nicht erfindungsgemäße Arbeitswagen 5, 6. Der Unterschied dieser Arbeitswagen 5, 6 zu den vorbeschriebenen MFS-Wagen 3, 4 besteht darin, dass die beiden Arbeitswagen 5, 6 eine Aufarbeitungseinrichtung 17 für ausgebauten Schotter 10 (oder allgemein für ausgebaute oder für anderweitige Unterbaumaterialien) aufweisen. Dabei sind die beiden Arbeitswagen 5, 6 vom Grundkonzept her identisch, jedoch bezüglich der Aufarbeitungseinrichtungen 17 unterschiedlich ausgebildet. Dabei definiert der Arbeitswagen 6 mit seiner Aufarbeitungseinrichtung 17 eine Grundversion und der Arbeitswagen 5 mit seiner Aufarbeitungseinrichtung 17 eine Zusatzversion.The difference between these work cars 5, 6 to the above MFS cars 3, 4 is that the two work cars 5, 6 a reprocessing device 17 for dismounted ballast 10 (or generally for dismantled or otherwise Substructure materials). In this case, the two work cars 5, 6 are identical in their basic concept, but differently designed with regard to the workup devices 17. Here, the work cart 6 defines with its reprocessing device 17 a basic version and the work car 5 with its reprocessing device 17 an additional version.

Schließlich folgen in diesem Ausführungsbeispiel noch zwei weitere - herkömmliche - Material-Förder-Silo-Wagen 7, 8 (MFS-Wagen). Diese weisen - im Ausführungsbeispiel - wiederum Bodenförderbänder 13 mit Übergabeförderbändern 14, jedoch keine Dachförderbänder auf.Finally, follow in this embodiment, two more - conventional - material handling silo wagons 7, 8 (MFS cars). These have - in the embodiment - turn Bottom conveyor belts 13 with transfer conveyors 14, but no roof conveyors on.

Diese dargestellte Zusammenstellung der Wagen ist rein beispielhaft. Andere Zusammenstellungen der Wagen sind selbstverständlich möglich.This illustrated compilation of the car is purely exemplary. Other compilations of the car are of course possible.

Die Funktionsweise ist wie folgt:The operation is as follows:

Der Ausbau des Schotters 1 erfolgt mittels des Arbeitswagens 1. Nach Passieren des Übergabewagens 2 erfolgt der Transport des Schotters 10 mittels der Dachförderbänder 15 der beiden MFS-Wagen 3, 4, und zwar zu dem Arbeitswagen 6. Dort wird der Schotter der Aufarbeitungseinrichtung 17 dieses Arbeitswagens 6 zugeführt, welcher die Grundversion darstellt. Hier folgt eine Grundaufarbeitung des zugeführten Schotters 10. Von dort aus wird der voraufgearbeitete Schotter 10 der Aufarbeitungseinrichtung 17 des zweiten Arbeitswagens 5 zugeführt, wo weitere Aufarbeitungsschritte erfolgen.After passing the transfer car 2, the transport of the ballast 10 takes place by means of the roof conveyor belts 15 of the two MFS cars 3, 4, to the work car 6. There, the gravel of the reprocessing device 17 of this Work cart 6 supplied, which represents the basic version. Here is a basic workup of the supplied ballast 10. From there, the pre-processed ballast 10 of the processing device 17 of the second work vehicle 5 is supplied, where further processing steps take place.

Der aufbereitete Schotter wird über die Bodenförderbänder 13 dem Arbeitswagen 1 rückgeführt. Dieser baut den wieder aufbereiteten Schotter 10 ein.The processed ballast is returned to the work car 1 via the bottom conveyor belts 13. This builds the recycled gravel 10.

Die Abfallstoffe hingegen werden in der entgegengesetzten Richtung transportiert und gelangen dabei in den Bereich der Bodenförderbänder 13 der MFS-Wagen 7, 8.By contrast, the waste materials are transported in the opposite direction and reach the area of the bottom conveyor belts 13 of the MFS carriages 7, 8.

Die Variante in Fig. 2a zeigt den Arbeitswagen 6a in einer kompakten Bauweise, bei welcher die Aufarbeitungseinrichtung 17 fest und unlösbar und damit in sich kompakt mit dem Unterwagen als Einheit hergestellt ist. Dies bedeutet, dass die Aufarbeitungseinrichtung 17 nicht dazu bestimmt ist, von dem Unterwagen abgenommen zu werden. Vielmehr ist bei diesem Arbeitswagen 6a der Grundgedanke, dass die Aufarbeitungseinrichtung 17 dauerhaft auf dem Unterwagen verbleibt.The variant in Fig. 2a shows the work car 6a in a compact design, in which the reprocessing device 17 is solid and insoluble and thus made compact with the undercarriage as a unit. This means that the reprocessing device 17 is not intended to be removed from the undercarriage. Rather, in this work car 6a is the basic idea that the reprocessing device 17 remains permanently on the undercarriage.

Eine Alternative hierzu zeigt Fig. 2b. Bei dem dort dargestellten Arbeitswagen 6b ist die Aufarbeitungseinrichtung 17 abnehmbar, d. h. lösbar. Dies bedeutet, dass die Aufarbeitungseinrichtung 17 mit ihrer funktionstüchtigen Reinigungseinheit abgenommen und für andere, nicht gleisgebundene Zwecke einsetzbar ist. So kann die Aufarbeitungseinrichtung 17 vom Unterwagen abgenommen und beispielsweise bei einer zentralen Schotteraufbereitungsanlage plaziert und dort eingesetzt werden. Dabei kann entweder das gesamte Arbeitsmodul oder aber nur ein Teilarbeitsmodul vom Unterwagen abgenommen werden. Die Darstellung in Fig. 2b zeigt den Unterwagen ohne Transportbänder (dort ist die Aufarbeitungseinrichtung 17 mit Transportbändern versehen), während bei der Darstellung unten der Unterwagen Transportbänder aufweist (dort weist die abnehmbare Aufarbeitungseinrichtung 17 dann keine Transportbänder auf).An alternative to this shows Fig. 2b , In the work vehicle 6b shown there, the reprocessing device 17 is removable, that is releasable. This means that the reprocessing device 17 is removed with its functional cleaning unit and can be used for other, not track-bound purposes. Thus, the reprocessing device 17 can be removed from the undercarriage and placed, for example, in a central ballast processing plant and used there. In this case, either the entire work module or only a partial work module can be removed from the undercarriage. The representation in Fig. 2b shows the undercarriage without conveyor belts (there is the reprocessing facility 17 provided with conveyor belts), while in the presentation below the undercarriage has conveyor belts (where the detachable reprocessing device 17 then no conveyor belts).

Fig. 3a bis 3c schließlich zeigt die Verwendung des Arbeitswagens 6 mit seiner Aufarbeitungseinrichtung 7 in der Verwendung als Kopfarbeitswagen (während in den vorhergehenden Ausführungsformen der Arbeitswagen 5, 6 in die Reihe der Arbeitswagen des Arbeitszuges eingereiht ist). Dieses Reinigungsmodul bei der Verwendung am Kopf verfügt dabei über einen einziehbaren oder einklappbaren Aufgabetrichter 18. Dieser Aufgabetrichter 18 kann dabei an den Wagen angebaut werden. Fig. 3a to 3c Finally, the use of the work cart 6 with its reprocessing device 7 in the use as a head work cart (while in the previous embodiments of the work car 5, 6 is ranked in the row of work cars of the work train). This cleaning module when used on the head has a retractable or retractable feeding hopper 18. This hopper 18 can be grown on the car.

Fig. 3a zeigt den Aufgabetrichter 18 in der ausgefahrenen Position, so dass mittels einer Beladeeinheit (beispielsweise Bagger oder Fräse) oder mittels eine Beladestation das Material, insbesondere der Schotter, dem Aufgabetrichter 18 aufgegeben werden kann. Von dort aus wird das Material dann über ein Dachförderband (es kann aber auch ein anderes Förderband sein) der Aufarbeitungseinrichtung 17 aufgegeben. Fig. 3b zeigt den Aufgabetrichter 18 im eingefahrenen Zustand und Fig. 3c den Aufgabetrichter 18 im abgekippten Zustand. Fig. 3a shows the feeding hopper 18 in the extended position, so that by means of a loading unit (for example, excavator or milling machine) or by means of a loading station, the material, in particular the ballast, the hopper 18 can be abandoned. From there, the material is then fed via a roof conveyor belt (but it can also be another conveyor belt) of the reprocessing device 17. Fig. 3b shows the feeding hopper 18 in the retracted state and Fig. 3c the hopper 18 in the dumped state.

Fig. 4 zeigt eine modifizierte Ausführungsform des Arbeitszuges. Dabei sind die erfindungsgemäßen Wagen 5, 6 zum Aufarbeiten des Schotters etc. modifiziert, während die restlichen Arbeitswagen gleich geblieben sind. Fig. 4 shows a modified embodiment of the work train. In this case, the carriages 5, 6 according to the invention for refurbishing the ballast, etc. are modified, while the remaining work cars have remained the same.

Wie in Fig. 5 erkennbar ist, besteht der Unterschied des erfindungsgemäßen Arbeitswagens 6 im Vergleich zum Arbeitswagen 6 des Arbeitszuges in Fig. 1 darin, dass der Arbeitswagen 6 zum Durchtransport von Materialien von den MFS-Wagen 3, 4 auf der einen Seite zu den MFS-Wagen 7, 8 auf der anderen Seite (und umgekehrt) geeignet ist. Zu diesem Zweck weist der Arbeitswagen 6 - wie bisher - ein oberes Bodenförderband 19' sowie mit Abstand darunter ein unteres Bodenförderband 19" auf, weiterhin endseitige Übergabeförderbänder 20, welche nach unten und nach oben verschwenkbar und auf einem Schlitten einfahrbar und ausfahrbar sind sowie ggf. um eine vertikale Achse seitlich verschwenkbar sind, weiterhin im Dachbereich ein Dachförderband 21, welches endseitig jeweils verschwenkbar abgeknickt ist, sowie schließlich im Dachbereich ein Übergabeförderband 22, welches ebenfalls endseitig nach oben und nach unten verschwenkbar abknickbar ist.As in Fig. 5 can be seen, there is the difference of the work carriage 6 according to the invention in comparison to the work car 6 of the work train in Fig. 1 in that the work cart 6 is suitable for transporting materials from the MFS carriages 3, 4 on one side to the MFS carriages 7, 8 on the other side (and vice versa). For this purpose, the work cart 6 - as before - an upper floor conveyor belt 19 'and at a distance below a lower floor conveyor 19 "on, further end transfer belts 20 which are pivotable downwards and upwards and retractable on a carriage and extendable and possibly Furthermore, in the roof area, a roof conveyor belt 21, which is each bent at the end pivotably, and finally in the roof area a transfer conveyor belt 22, which can also be bent upwards and downwards at the ends.

Die Funktionsweise ist wie folgt:The operation is as follows:

Fig. 6a zeigt den Arbeitswagen 6 bei seiner eigentlichen Aufgabe, nämlich der Aufarbeitung von ausgebautem Schotter 10 (oder eines anderweitigen Umbaumaterials). Dieses Reinigungsmodul erfüllt dabei seine grundlegende Aufgabe. Dies entspricht der Arbeitsweise des Arbeitswagens 6 der vorbeschriebenen Ausgangsvariante des Arbeitszuges. Fig. 6a shows the work car 6 in its actual task, namely the processing of broken gravel 10 (or any other conversion material). This cleaning module fulfills its basic task. This corresponds to the operation of the work carriage 6 of the above-described output variant of the work train.

Der Arbeitswagen 6 nimmt das aufzuarbeitende Material des variablen Arbeitsverbundes auf. Das Material wird dabei in diesem Arbeitswagen 6 fachgerecht mittels Sieben, Klassieren etc. einer Wiederverwendung zugänglich gemacht. Dabei können in diesem Arbeitswagen 6 sämtliche technische Lösungen für Sieben, Klassieren, Waschen, Trocknen und andere Arbeitsvorgänge durchgeführt werden.The work cart 6 takes up the material to be worked up the variable work group. The material is in this case 6 professionally made available by reusing sieving, classifying etc. in this work car. In this case, all technical solutions for screening, classifying, washing, drying and other operations can be performed in this work car 6.

Das Material wird über die Dachförderbänder 21 der Reinigungseinheit zugeführt und der Aufarbeitungseinheit des Reinigungsmoduls aufgegeben. In diesen Einheiten werden die vorbeschriebenen Arbeitsvorgänge ausgeführt, um - wie ausgeführt - den Schotter 10 einer Verwertung zugänglich zu machen. Nach dieser Aufarbeitung werden die gereinigten Stoffe sowie die Abfallstoffe in unterschiedliche Richtungen aus dem Wagen ausgegeben. Die gereinigten, wiederverwendbaren Stoffe werden dabei über das obere Bodenförderband 19' und anschließend über das rechte Übergabeförderband 20 abgeführt, während die Abfallstoffe über das untere Bodenförderband 19" und über das linke Übergabeförderband 20 des Arbeitswagens 6 abgeführt werden. Aufnahmewagen sind die benachbarten MFS-Wagen oder dgl.The material is fed via the roof conveyor belts 21 of the cleaning unit and abandoned the processing unit of the cleaning module. In these units, the above-described operations are carried out to - as stated - to make the ballast 10 a utilization accessible. After this processing, the cleaned substances and the waste materials are discharged in different directions from the car. The cleaned, reusable substances are discharged via the upper bottom conveyor belt 19 'and then via the right transfer conveyor belt 20, while the waste materials are discharged via the lower bottom conveyor belt 19 "and via the left transfer belt 20 of the work cart 6. Pickup vehicles are the adjacent MFS cars or the like.

Konkret wird der zugeführte Schotter 10 mittels der Dachförderbänder 21 zunächst einer Vorsiebeinheit aufgegeben, an welcher das Unterkorn vom Grobkorn getrennt wird. Das Grobkorn wird anschließend über eine Vorsiebeinheit, welche durch Schwingungen und Bewegungen sowie durch die geometrische Anordnung auch eine Transportfähigkeit besitzt, einem Steinbrecher (z. B. Prallbecher oder Kegelbecher) zugeführt. In dieser Steinbrechanlage wird das Korn bearbeitet. Es wird durch Anschlagen und Brechen nochmals gesäubert, erforderlichenfalls geschärft und/oder zerkleinert. Nach dem Arbeitsvorgang in der Steinbrechanlage wird das Material über eine zweite Siebeinheit in die Endstoffe fraktioniert. Dabei wird das nicht verwendbare Feinkorn dem unteren Bodenförderband 19" zugeführt und das verwendbare Korn dem oberen Bodenförderband 19' zugeführt. Zusätzlich kann hier auf dem Vorsieb und dem Nachsieb eine Waschung durch Bedüsung mit Wasser vorgenommen werden. Die vorbeschriebenen Fraktionen gelangen dann - wie ausgeführt - zu den Übergabeförderbändern 20. Das nicht verwertbare Korn wird auf benachbarte Materialförderwagen übergeben, während das wiederverwendbare Korn (z. B. Recyclingschotter) dem benachbarten Materialtransportwagen oder einer modularen Einbaueinheit übergeben wird.Specifically, the supplied ballast 10 is first fed by means of roof conveyor belts 21 a Vorsiebeinheit at which the undersize is separated from the coarse grain. The coarse grain is then fed via a Vorsiebeinheit which by vibration and movements as well as by the geometric arrangement also has a transportability, a stone crusher (eg baffle or cone cup). In this quarry plant, the grain is processed. It is cleaned again by striking and breaking, if necessary, sharpened and / or crushed. After the operation in the rock crushing plant, the material is fractionated through a second screening unit into the end products. In this case, the unusable fine grain is fed to the lower bottom conveyor belt 19 "and the usable grain is fed to the upper bottom conveyor belt 19. In addition, a washing by spraying with water can be carried out here on the preliminary screen and the after-sieve. to the transfer conveyors 20. The unusable grain is transferred to adjacent material trolleys while the reusable grain (eg, recycled ballast) is transferred to the adjacent material trolley or a modular paving unit.

Durch die vorbeschriebene Weise ist auf einfache Art eine modulare Reinigungseinheit geschaffen, welche in einem Zugverband aus Material-Förder-Silo-Wagen oder dgl. eingereiht werden kann. Die Arbeitsmaschinen können hierbei - wie ausgeführt - aus allen denkbaren Einzelkomponenten, z. B. Reinigungsmodule, Waschmodule, Bodenverbesserungsmodule etc. bestehen und beliebig vor und nach der Reinigungseinheit aufgereiht werden.By the manner described above, a modular cleaning unit is provided in a simple manner, which can be lined up in a train of material-conveying silo wagon or the like. The machines can here - as stated - from all conceivable individual components, eg. As cleaning modules, washing modules, soil improvement modules, etc. exist and are lined up as desired before and after the cleaning unit.

Der Arbeitswagen 6 ist jedoch nicht auf die vorbeschriebenen Aufarbeitungstätigkeiten für ausgebauten Schotter und/oder anderweitige Unterbaumaterialien beschränkt. Der Arbeitswagen 6 hat logistische Zusatzfunktionen. Der Kerngedanke liegt in den erweiterten Umrüst- und Transportmöglichkeiten. Um die Reinigungstechnik/Aufarbeitungstechnik innerhalb eines Zugverbandes aus MFS-Wagen oder dgl. als logistischen Knotenpunkt für durchströmende und überströmende Materialien nutzen zu können, sind Erweiterungen des modularen Arbeitswagens 6 notwendig.However, the work cart 6 is not limited to the above-described workup work for excavated ballast and / or other substructure materials. The work cart 6 has additional logistical functions. The core idea lies in the extended conversion and transport options. In order to use the cleaning technology / processing technology within a train of MFS cars or the like. As a logistics hub for flowing and overflowing materials, extensions of the modular workbench 6 are necessary.

Zunächst sind die Förderbänder, nämlich das obere Bodenförderband 19', das untere Bodenförderband 19", die Übergabeförderbänder 20, das Dachförderband 21 sowie das Übergabeförderband 22 im Dachbereich jeweils reversibel ausgeführt. Dies bedeutet, dass die Arbeitsrichtungen der Förderbänder über den "normalen" Gebrauch für die Arbeitsleistung der Reinigungsmodule hinaus in ihrer Transportrichtung verändert werden können.First, the conveyor belts, namely the upper floor conveyor belt 19 ', the lower floor conveyor belt 19 ", the transfer conveyor belts 20, the roof conveyor belt 21 and the transfer belt 22 in the roof area are each reversibly designed, which means that the operating directions of the conveyor belts exceed the" normal "use for the performance of the cleaning modules can be changed out in their transport direction.

Weiterhin sind die Übergabeförderbänder 20 als einfahrbare Transportbänder ausgebildet. Dies bedeutet, dass diese über ein Gelenk in ihrem Anstellwinkel und somit in ihrer Lage verändert werden können. Diese Übergabeförderbänder 20 können dabei in ihrer horizontalen Stellung unterhalb der Aufarbeitungseinheit in einer Art Sandwichboden unterhalb des unteren Bodenförderbandes 19" eingefahren werden (wie dies bei der Darstellung in Fig. 6b bei dem linken Übergabeförderband 20 erkennbar ist).Furthermore, the transfer conveyor belts 20 are designed as retractable conveyor belts. This means that they can be changed via a joint in their angle of attack and thus in their position. These transfer conveyors 20 can be retracted in their horizontal position below the processing unit in a kind of sandwich bottom below the lower bottom conveyor belt 19 "(as shown in the illustration in Fig. 6b can be seen in the left transfer conveyor belt 20).

Weiterhin wird dem - bereits vorhandenen - jedoch nunmehr reversiblen Dachförderband 21 ein reversibles und/oder verschiebbares Übergabeförderband 22 in Form eines Bypaßkurzbandes zugeordnet.Furthermore, a reversible and / or displaceable transfer belt 22 in the form of a bypass short strip is assigned to the already existing, but now reversible roof conveyor belt 21.

Weiterhin ist das obere Bodenförderband 19' in seiner Endlage optional verschiebbar und/oder abknickbar, um so die Reversierung und die Durchförderung in beiden Richtungen zu gewährleisten.Furthermore, the upper floor conveyor belt 19 'in its end position is optionally displaceable and / or bent, so as to ensure the reversing and the delivery in both directions.

Bei Bedarf können schließlich optional jeweils auch mehrere Bänder in der Tiefe des Arbeitswagens 6 nebeneinander angebracht werden. Dies wäre beispielsweise für weitere Materialströme mit angrenzenden Materialförderwagen, welche über zwei oder drei Bypaßbänder oder Grundarbeitsbänder verfügen, von Vorteil. Diese Optionen spielen hier jedoch keine Rolle.If required, finally, in each case optionally also several bands in the depth of the work carriage 6 are mounted side by side. This would, for example, for further material flows with adjacent material trolley, which have two or three Bypaßbänder or basic bands work, advantage. These options do not matter here.

Grundsätzlich ermöglicht es diese logistische Modul-Maschinentechnik, die zum Arbeitswagen 6 zulaufenden und vom Arbeitswagen 6 ablaufenden Materialströme flexibel umzuleiten und überzuleiten, ohne dass der Arbeitswagen 6 auf die Aufarbeitung von ausgebauten Materialien beschränkt ist. Der Zusatznutzen liegt somit in den zusätzlichen logistischen Möglichkeiten zum Durchtransport von Materialien. Konkret ist eine von der Aufarbeitung unabhängigen Durchförderung und Umleitung von Materialströmen jeglicher Art möglich. Dies erlaubt völlig neue Arbeitskonzepte und Reihungen zur Förderung von Materialströmen innerhalb des Zugverbandes aus MFS-Wagen oder dgl. Die Einzelkomponenten des Zugverbandes können dabei sein: gleisgebundene sowie gleisungebundene Arbeitseinheiten zum Ausbau und zum Einbau des Schotters, weiterhin optionale Übergabewagen, weiterhin optionale Material-Förder-Silo-Wagen oder dgl. für den Zwischenbunkerbedarf, weiterhin optionale (erfindungsgemäße) Arbeitswagen für Waschung und Separation bei Platzmangel der Komponenten im erfindungsgemäßen Arbeitswagen 6 als dessen Erweiterung, weiterhin erfindungsgemäße Reinigungsmodule mit logistischer Erweiterung für Förderströme durch und über den erfindungsgemäßen Arbeitswagen 6 sowie schließlich weitere Material-Förder-Silo-Wagen oder dgl. zur Zwischenspeicherung von nicht verwendungsfähigem Reinigungsgut oder anderen Transportleistungen.In principle, this modular logistic machine technology makes it possible to flexibly redirect and transfer the material flows which run to the work cart 6 and run off the work cart 6, without the work cart 6 being restricted to the processing of removed materials. The additional benefit is thus in the additional logistical possibilities for the transport of materials. Specifically, an independent of the workup conveyance and diversion of material flows of any kind is possible. This allows completely new working concepts and series for the promotion of material flows within the train of MFS wagons or the like. The individual components of the train may be: track-bound and track-bound working units for removal and installation of the ballast, further optional transfer trolley, further optional material conveyor Silo wagon or the like. For the intermediate bunker requirement, further optional (inventive) work carts for washing and separation in space shortage of the components in the work cart 6 according to the invention as its extension, further cleaning modules according to the invention with logistics extension for flow through and over the work cart 6 of the invention and finally other material handling silo wagons or the like for temporary storage of non-usable cleaning goods or other transport services.

Fig. 6b zeigt nunmehr eine erste Variante der logistischen Erweiterung des Arbeitswagens 6. Wie ein Vergleich zu Fig. 6a zeigt, sind die Förderbänder entsprechend neu positioniert. Konkret wird Material aus dem benachbarten MFS-Wagen 7 über dessen Übergabeförderband sowie über eine Aufgabeeinheit 23 dem - in diesem Fall - unteren Bodenförderband 19" zugeführt, welches im Vergleich zur Arbeitsweise in Fig. 6a nunmehr in die entgegengesetzte Richtung transportiert. Das obere Bodenförderband 19' gibt das Material dem ausgefahrenen Übergabeförderband 20 auf, welches das Material einem benachbarten MFS-Wagen oder dgl. übergibt. Auf diese Weise kann Material in einer gewünschten Arbeitsrichtung durch die modulare Reinigungseinheit/Aufarbeitungseinheit durchgefördert werden und einem Materialförderwagen oder einer beliebigen Arbeitseinheit vor oder hinter der modularen Reinigungseinheit/Aufarbeitungseinheit übergeben werden. Fig. 6b now shows a first variant of the logistical extension of the work car 6. As a comparison to Fig. 6a shows, the conveyor belts are repositioned accordingly. Specifically, material from the adjacent MFS car 7 via its transfer conveyor belt and a task unit 23 to the - in this case - lower bottom conveyor 19 "fed, which compared to the operation in Fig. 6a now transported in the opposite direction. The upper floor conveyor 19 'releases the material to the extended transfer conveyor 20, which transfers the material to an adjacent MFS cart or the like. In this way, material can be conveyed through the modular cleaning unit / processing unit in a desired working direction and transferred to a material trolley or any working unit in front of or behind the modular cleaning unit / processing unit.

Fig. 6c zeigt eine weitere Arbeitsweise des erfindungsgemäßen Arbeitswagens 6, und zwar den Transport des Materials in der Zeichnung von rechts nach links. Hier wird das Material über ein Übergabeförderband eines benachbarten MFS-Wagens oder dgl. dem reversiblen Dachförderband 21 zugeführt. Dieses führt das Material dem reversiblen und/oder verschiebbaren und/oder abknickbaren Übergabeförderband 22 zu. Dieses dient der Überbrückung der Aufgabepunkte der Aufarbeitungsmodule. Das Übergabeförderband 22 kann dabei in seiner Lage und seiner Laufrichtung so verstellt werden, dass es für diese Zwecke zum Einsatz kommen kann. Von dem Übergabeförderband 22 gelangt dann das zu fördernde Material auf ein entsprechendes Förderband eines benachbarten MFS-Wagens oder eines anderen Arbeitsmoduls. Fig. 6c shows a further operation of the work carriage 6 according to the invention, namely the transport of the material in the drawing from right to left. Here, the material is supplied to the reversible roof conveyor 21 via a transfer belt of an adjacent MFS truck or the like. This leads the material to the reversible and / or displaceable and / or bendable transfer conveyor belt 22. This serves to bridge the task points of the reprocessing modules. The transfer conveyor belt 22 can be adjusted in its position and its direction so that it can be used for these purposes. From the transfer conveyor belt 22 then passes the material to be conveyed on a corresponding conveyor belt of an adjacent MFS wagon or other working module.

Fig. 6d schließlich zeigt im Vergleich zu Fig. 6c die umgekehrte Arbeitsrichtung mittels der Förderbänder durch entsprechende Neupositionierungen. Fig. 6d finally shows in comparison to Fig. 6c the reverse direction by means of the conveyor belts by corresponding repositioning.

Fig. 7 zeigt eine modifizierte Ausführungsform des Arbeitszuges, nämlich mit einer modifizierten Ausführungsform des erfindungsgemäßen Arbeitswagens 6 zum Aufbereiten des Schotters 10. Detailliertere Darstellungen hinsichtlich des Materialflusses, nämlich des Schotters 10 zeigen insbesondere die Fig. 8b und Fig. 8c. Fig. 7 shows a modified embodiment of the work train, namely with a modified embodiment of the invention of the trolley 6 for processing the ballast 10. More detailed illustrations with regard to the material flow, namely the ballast 10 show in particular the Fig. 8b and Fig. 8c ,

Dabei zeigt zunächst Fig. 7, dass beim MFS-Wagen 8 eine Materialumkehr vom Dachbereich zum Bodenbereich mit umgekehrter Materialfließrichtung im Sinne eines Materialkreislaufes vorgesehen ist.This shows first Fig. 7 in that a material reversal from the roof area to the floor area with reversed material flow direction in the sense of a material cycle is provided in the MFS carriage 8.

Eine Besonderheit bei diesem Arbeitswagen 6 ist, dass im mittleren Bereich des Arbeitswagens 6 ein Zwischenförderband 24 vorgesehen ist. Außerdem sind nach wie vor noch die bisher beschriebenen Förderbänder im Bodenbereich sowie im Dachbereich einschließlich Übergabeförderbänder vorgesehen.A special feature of this work cart 6 is that in the central region of the work carriage 6, an intermediate conveyor belt 24 is provided. In addition, the previously described conveyor belts are still provided in the floor area and in the roof area including transfer conveyors.

Das Zwischenförderband 24, wie es in Fig. 8b dargestellt ist, befindet sich dort in einer Art Ruhestellung, bei welcher es nicht in den Transport des Schotters 10 eingebunden ist. Wie insbesondere auch im Vergleich mit der Darstellung in Fig. 8c erkennbar ist, weist das Zwischenförderband 24 endseitige Übergabeförderbänder auf, welche nach oben sowie nach unten verschwenkbar sind. Hierzu zeigt Fig. 8c die Situation, wie das Zwischenförderband 24 den Schotter von der Aufarbeitungseinrichtung 17 aufnimmt und ihn dabei auf das Dachförderband 21 des Arbeitswagens 6 transportiert. Zu diesem Zweck ist dieses Dachförderband 21 bezüglich der Längserstreckung des Arbeitswagens 6 nicht durchgehend ausgebildet, sondern es ist in zwei einzelne Dachförderbänder 21 unterteilt, wobei die jeweiligen Enden nach unten sowie nach oben verschwenkbar sind. Auf diese Weise ist eine Übergabe des Schotters mittels des Zwischenförderbandes 24 auf das in Fig. 8c rechte Dachförderband 21 möglich. Grundsätzlich kann das Dachförderband 21 auch in drei oder noch mehr Abschnitte unterteilt sein.The intermediate conveyor 24, as it is in Fig. 8b is shown there is in a kind of rest position in which it is not involved in the transport of the ballast 10. As in particular in comparison with the representation in Fig. 8c can be seen, the intermediate conveyor belt 24 on the end transfer conveyor belts, which are pivotable upwards and downwards. This shows Fig. 8c the situation in which the intermediate conveyor belt 24 picks up the ballast from the reprocessing device 17 and transports it to the roof conveyor belt 21 of the work car 6. For this purpose, this roof conveyor belt 21 is not formed continuously with respect to the longitudinal extent of the work carriage 6, but it is divided into two individual roof conveyor belts 21, wherein the respective ends can be pivoted downwards and upwards. In this way, a transfer of the ballast by means of the intermediate conveyor belt 24 to the in Fig. 8c right roof conveyor 21 possible. In principle, the roof conveyor 21 can also be divided into three or even more sections.

Weiterhin ist in Fig. 8b erkennbar, dass der gereinigte Schotter über das endseitige Übergabeförderband 20 abgeführt werden kann. Fig. 8c hingegen zeigt die Situation im selben Bereich, wie dort aber Material durch den Arbeitswagen 6 hindurchtransportiert wird (in der Zeichnung von rechts nach links). Auch sind in diesen Zeichnungen weitere Materialströme erkennbar.Furthermore, in Fig. 8b recognizable that the cleaned ballast can be discharged via the end transfer conveyor belt 20. Fig. 8c however, the situation in the same area shows how material is transported through the work car 6 (from right to left in the drawing). Also, in this drawings further streams of material can be seen.

Fig. 9a bis 9c zeigt eine weitere Modifikation des Materialflusses (angedeutet durch den Kreis). Diese Modifikationen zeigen, wie die Bandführungen auf unterschiedliche Art und Weise zur Ausführung kommen können, um den gewünschten Transportweg der Materialien zu realisieren. Dies stellt lediglich ein - weiteres - Beispiel für die Förderbandlogistik dar. Weitere Varianten zum Transport der Materialien im Bodenbereich und/oder im Dachbereich sind denkbar und möglich. Fig. 9a to 9c shows a further modification of the material flow (indicated by the circle). These modifications show how the tape guides can be used in a variety of ways to accomplish the desired transport path of the materials. This merely represents another example of conveyor belt logistics. Further variants for transporting the materials in the floor area and / or in the roof area are conceivable and possible.

Der Arbeitszug in Fig. 10 schließlich entspricht vom Grundsatz her dem Arbeitszug, wie er in Fig. 7 dargestellt ist. Der Unterschied besteht darin, dass die Arbeitsrichtung entgegengesetzt ist. Dies steht im Gegensatz zu bestehenden Systemen. Dadurch fahren die Arbeitswagen immer auf einem fertigen Gleis (altes Gleis) und unterliegen nicht wie bei den bestehenden Systemen der Befahrung eines Baugleises.The work train in Fig. 10 Finally, in principle, it corresponds to the work process as defined in Fig. 7 is shown. The difference is that the working direction is opposite. This is in contrast to existing systems. As a result, the work cars always drive on a finished track (old track) and are not subject to the same as in the existing systems of driving a Baugleises.

Wie bereits erwähnt, können an den vorbeschriebenen Einzelkomponenten zusätzliche Transportbänder angebracht werden. Diese entsprechen in ihren ablauftechnischen Funktionen den bereits erwähnten Transportbändern. Sie haben den Vorteil, dass die Anzahl der Stoffschichten und Stoffströmungen, die für eine Ausführungsleistung zur Verfügung stehen, erhöht ist. So ist eine Variante mit jeweils zwei nebeneinander liegenden Bändern denkbar. Die Anzahl der Bänder kann jedoch hierbei beliebig nach dem vorhandenen Platz ergänzt werden. So können zwei oder drei oder mehr Bänder nebeneinander angeordnet werden.As already mentioned, additional conveyor belts can be attached to the above-described individual components. These correspond in their sequence-technical functions to the already mentioned conveyor belts. They have the advantage that the number of fabric layers and material flows that are available for an execution performance is increased. Thus, a variant with two adjacent bands is conceivable. However, the number of bands can hereby be supplemented arbitrarily according to the available space. So two or three or more bands can be arranged side by side.

Weiterhin können die Einzelmodule elektronisch gekoppelt werden, um die Abläufe einer Teil- oder Vollautomatisierung der Einzelkomponenten des Maschinenverbundes zuzuführen.Furthermore, the individual modules can be electronically coupled to supply the operations of a partial or full automation of the individual components of the machine network.

Weiterhin können die Förderbänder zusätzlich mit einer Wasserbebrausung zur Staubvermeidung ausgestattet werden. Die Speisung der Wasserbebrausung kann hierbei von einem separaten Wasserwagen erfolgen oder von einem Wasserbehälter, welcher dem Arbeitswagen zugeordnet ist. Die Bebrausung hat den Zweck der Staubbindung auf den Bändern und kann optional an beliebiger Stelle der einzelnen Förderbänder erfolgen und installiert werden.Furthermore, the conveyor belts can be additionally equipped with a water spray for dust prevention. The feeding of the water spray can be done here by a separate water truck or by a water tank, which is assigned to the work car. The bushing has the purpose of dust binding on the belts and can optionally be made and installed anywhere on the individual conveyor belts.

Schließlich können die Förderbänder zusätzlich mit einer Einhausung gegen Staubentwicklung versehen werden.Finally, the conveyor belts can be additionally provided with an enclosure against dust.

Sämtliche Reinigungseinheiten oder anderweitige Aufarbeitungseinheiten oder dazugehörige Belade- oder Entladestationen (hierbei auch dazu separate Wagen), können sowohl gleisgebunden über Schienenfahrwerke als auch über Kettenfahrwerke (oder in Kombination) eingesetzt und betrieben werden.All cleaning units or other processing units or associated loading or unloading stations (here also separate wagons) can be used both track-bound on rail bogies as well as chain undercarriages (or in combination) and operated.

Claims (22)

  1. A work wagon (5, 6, 6a, 6b) for the track construction in railway lines,
    wherein this work wagon (5, 6, 6a, 6b) can be queued modularly at any queuing location in any queue of further work wagons within a work train for renovating the railway line consisting of a substructure (11) as well as of a track (12),
    wherein the work wagon (5, 6, 6a, 6b) has a reconditioning device (17) for extracted ballast (10) and/or other substructure materials either for a subsequent complete or partial re-laying or for a removal,
    wherein the ballast (10) and/or the other substructure materials cannot be extracted as well as re-laid by the work wagon (5, 6, 6a, 6b),
    wherein the work wagon (5, 6, 6a, 6b) has transport belts for supplying the extracted ballast (10) and/or other substructure materials to the reconditioning device (17), for removal of reconditioned materials, and for the through-transport of materials of the adjacent further work wagons, and
    wherein the work wagon (5, 6, 6a, 6b) has at least an upper floor conveyor belt (19'), a lower floor conveyor belt (19"), end-side transfer conveyor belts (20), which can be pivoted downwards and upwards and can be retracted and extended on a carriage, and a roof conveyor belt (21), which extends to a feeding point of the reconditioning device (17) and is in each case pivotably bent on the end side, as transport belts for supplying the extracted ballast (10) and/or other substructure materials to the reconditioning device (17) and for removal of reconditioned materials, wherein the upper floor conveyor belt (19'), the lower floor conveyor belt (19"), the end-sided transfer conveyor belts (20) and the roof conveyor belt (21) are embodied so as to be reversible with regard to the transport direction thereof and the upper floor conveyor belt (19') can be shifted and/or bent in the final position thereof, and the work wagon (5, 6, 6a, 6b) has a transfer conveyor belt (22) in the roof area, which is embodied so as to be reversible with regard to the transport direction thereof and extends to the roof conveyor belt (21) from the other side of the feeding point and can be bent so as to be capable of being pivoted upwards and downwards on the end side, so that the transport belts of the work wagon (5, 6, 6a, 6b) can be used for transporting or for through-transporting materials to a or from a specific location of a machine area of adjacent further work wagons of the work train in both directions, wherein the roof conveyor belt (21) or the transfer conveyor belt (22) in the roof area can be used individually as transport belt for supplying materials to the reconditioning device (17), and the roof conveyor (21) and the transfer conveyor belt (22) can be used jointly in the roof area as transport belt for the through-transport of materials,
    wherein these materials do not need to have anything to do per se with the reconditioning for extracted ballast (10) and/or other substructure materials in the work wagon (5, 6, 6a, 6b) with reconditioning device (17), and
    wherein the operation of the reconditioning device (17) for all or for a part of the applications, for which the work wagon (5, 6, 6a, 6b) is embodied and can be used, can be interrupted during the transport or the through-transport of these materials.
  2. The work wagon according to the preceding claim,
    characterised in
    that the reconditioning device (17) is embodied for a cleaning and/or washing and/or drying and/or screening and/or classifying and/or breaking and/or sharpening of ballast (10).
  3. The work wagon according to any one of the preceding claims,
    characterised in
    that the work wagon (5, 6, 6a, 6b) has an intermediate conveyor belt (24) in the middle area by means of which material can in particular be transported from the reconditioning device (17) into the roof area, and/or material can be transported from the roof area into the floor area of the work wagon (5, 6, 6a, 6b).
  4. The work wagon according to any one of the preceding claims,
    characterised in
    that the reconditioning device (17) is either permanently arranged or can be releasably arranged on the work wagon (5, 6, 6a, 6b).
  5. The work wagon according to any one of the preceding claims,
    characterised in
    that the work wagon (5, 6, 6a, 6b) is embodied as head work wagon, wherein the work wagon (5, 6, 6a, 6b) has a retractable or foldable feed hopper (18), from which the extracted ballast (10) and/or other substructure materials can be supplied to the reconditioning device (17) via one of the transport belts.
  6. The work wagon according to any one of the preceding claims,
    characterised in
    that, in addition to the transport belts, which are assigned to this reconditioning device (17), additional transport belts are provided for the through-transport of the materials of the work wagons (5, 6, 6a, 6b) by means of the reconditioning device (17).
  7. The work wagon according to any one of the preceding claims,
    characterised in
    that the transport belts are embodied as simple transport belts or as divided transport belts with reversible transport directions.
  8. The work wagon according any one of the preceding claims,
    characterised in
    that the work wagon (5, 6, 6a, 6b) has its own drive for moving on the track.
  9. A work train for renovating the railway line consisting of a substructure (11) as well as of a track (12), wherein the work train has a plurality of work wagons, which are queued,
    characterised in
    that at least one work wagon of the work train is a work wagon (5, 6, 6a, 6b) comprising reconditioning device (17) according to at least any one of claims 1 to 8, which is queued at any queuing location in any queue of further work wagons without reconditioning device within a work train.
  10. The work train according to claim 9,
    characterised in
    that the work train has at least two work wagons (5, 6, 6a, 6b) comprising reconditioning device (17), which are provided for different reconditioning types of the ballast (10) and/or of the other substructure material.
  11. The work train according to claim 9 or 10,
    characterised in
    that the work wagon (5, 6, 6a, 6b) is either queued in the row of the further work wagons of the work train or is embodied as head work wagon.
  12. The work train according to any one of claims 9 to 11,
    characterised in
    that the work wagon (5, 6, 6a, 6b) in the modular system is intended and embodied for track-bound as well as for track-independent extraction and laying units for ballast (10) and/or other substructure materials.
  13. The work train according to any one of claims 9 to 12,
    characterised in
    that the work wagon (5, 6, 6a, 6b) can be used as work unit downstream from a self-driven or non-self-driven, combined or non-combined extraction or laying device for ballast (10) and/or other soil materials.
  14. The work train according to any one of claims 9 to 13,
    characterised in
    that the work wagon (5, 6, 6a, 6b) can be used as distribution point for an endless material cycle between an extraction unit and a laying unit for ballast and/or other soil materials.
  15. The work train according to any one of claims 9 to 14,
    characterised in
    that the work wagon (5, 6, 6a, 6b) is electronically connected in a row of the further work wagons for controlling and for operation.
  16. The work train according to claim 15,
    characterised in
    that the electronic connections are provided for the automation of processes of the individual work wagons in the entire train or work group.
  17. The work train according to any one of claims 9 to 16,
    characterised in
    that the work direction of the entire group is arbitrary when using a modular extraction and laying device together with the modular cleaning module.
  18. Use of a work wagon (5, 6, 6a, 6b) according to at least any one of claims 1 to 8 in a work train according to at least any one of claims 9-17,
    wherein ballast (10) and/or other substructure materials are not extracted as well as laid again by the work wagon (5, 6, 6a, 6b),
    wherein, by means of the conveyor belts (19', 19", 20, 21) of the work wagon (5, 6, 6a, 6b), which are embodied to be reversible with regard to the transport direction thereof, optionally
    - the extracted ballast (10) and/or other substructure materials are supplied to the reconditioning device (17) of the work wagon (5, 6, 6a, 6b) and reconditioned materials are subsequently completely or partially re-laid or are removed from there,
    or
    materials of the adjacent further work wagons are through-transported through the work wagon (5, 6, 6a, 6b).
  19. The use according to claim 18,
    characterised in
    that the reusable components and the non-reusable components of the reconditioned ballast (10) and/or the other substructure materials are removed by the work wagons (5, 6, 6a, 6b) in opposite directions.
  20. The use according to claim 18 or 19,
    characterised in
    that the reusable components of the reconditioned ballast (10) as well as new ballast can be supplied simultaneously to an extraction device or to a laying device by means of the work wagon (5, 6, 6a, 6b).
  21. The use according to any one of claims 18 to 20,
    characterised in
    that fines and/or non-usable substances occurring during the reconditioning can be improved and/or reconditioned by means of additives and are thus reusable.
  22. A method for operating a work train according to any one of claims 9 to 17 for renovating a railway line consisting of a substructure (11) as well as of a track (12), wherein the work train has work wagons (5, 6, 6a, 6b), and wherein ballast (10) and/or other substructure materials are not extracted as well as laid again by means of the work wagon (5, 6, 6a, 6b),
    comprising the steps:
    by means of the conveyor belts (19', 19", 20, 21) of the work wagon (5, 6, 6a, 6b), which are embodied so as to be reversible with regard to the transport direction thereof, optionally
    - supplying the extracted ballast (10) and/or other substructure materials to the reconditioning device (17) of the work wagon (5, 6, 6a, 6b) and subsequently completely or partially re-laying or removing the reconditioned materials from there
    or
    - through-transporting the materials of the adjacent further work wagons through the work wagon (5, 6, 6a, 6b).
EP13003865.6A 2012-09-12 2013-08-02 Maintenance vehicle for the rail construction on railway lines Active EP2708647B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP13003865.6A EP2708647B1 (en) 2012-09-12 2013-08-02 Maintenance vehicle for the rail construction on railway lines
PL13003865T PL2708647T3 (en) 2012-09-12 2013-08-02 Maintenance vehicle for the rail construction on railway lines

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
DE102012017998 2012-09-12
DE102012019361.0A DE102012019361B4 (en) 2012-09-12 2012-10-02 Work car for track construction on railway lines
EP13003741 2013-07-26
EP13003865.6A EP2708647B1 (en) 2012-09-12 2013-08-02 Maintenance vehicle for the rail construction on railway lines

Publications (3)

Publication Number Publication Date
EP2708647A2 EP2708647A2 (en) 2014-03-19
EP2708647A3 EP2708647A3 (en) 2015-12-30
EP2708647B1 true EP2708647B1 (en) 2019-05-29

Family

ID=48917315

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13003865.6A Active EP2708647B1 (en) 2012-09-12 2013-08-02 Maintenance vehicle for the rail construction on railway lines

Country Status (2)

Country Link
EP (1) EP2708647B1 (en)
PL (1) PL2708647T3 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT515413B1 (en) 2014-03-25 2015-09-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Method for rehabilitating a ballast bed of a track
DE102016014833A1 (en) 2016-12-14 2018-06-14 Zürcher Holding GmbH Material trolley, material trolley association and method of loading the material trolley assembly
DE102021205190A1 (en) 2021-05-20 2022-11-24 Hyperion Verwaltung Gmbh Working machine and method for reducing the formation of dust during track construction work

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE50209854D1 (en) * 2001-04-12 2007-05-16 Gsg Knape Gleissanierung Gmbh Ballast bed renewal process and track maintenance train for its implementation
AT502187B1 (en) * 2005-11-14 2007-02-15 Plasser Bahnbaumasch Franz Method for cleaning of ballast bed of track, involves accomplishing of first and second working processes alternatively whereby first and second working processes depend on degree of contamination of ballast bed
DE102010007513B4 (en) * 2010-02-11 2012-01-19 Ralf Zürcher Cart for conveying material in track construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
PL2708647T3 (en) 2019-11-29
EP2708647A2 (en) 2014-03-19
EP2708647A3 (en) 2015-12-30

Similar Documents

Publication Publication Date Title
DE202005013204U1 (en) Copper ore conveyer belt assembly consists of segments mounted on tracked vehicles moving on uppermost leach pad
AT398097B (en) SYSTEM FOR PRODUCING A PLANUM PROTECTIVE LAYER
EP2708647B1 (en) Maintenance vehicle for the rail construction on railway lines
EP2298993B1 (en) Method for renewing the rail substructure of a rail track
EP1249535A2 (en) Wagon for conveying and storing, method for removing, storing and distributing materials
EP2500470B1 (en) Head maintenance vehicle
EP2708648B1 (en) Device for construction and/or renovation of a railway track
EP3412827B1 (en) Railway vehicle for track construction remediation
DE3151030A1 (en) MOBILE PLANT FOR PRODUCING A BETWEEN PLANUM AND BULLET BED OF A PROTECTIVE LAYER
EP2428611B1 (en) Refurbishment method for the multi-layer substructure of rail sections and vehicle assembly
DE102012019361B4 (en) Work car for track construction on railway lines
EP2159323B1 (en) Device for reconditioning track sections for train transport
WO2012103859A1 (en) Device and method for constructing and treating railway tracks
EP2374931B1 (en) Refurbishment method for multi-layer substructure of rail sections
DE10128374B4 (en) Method for supplying a line construction site with building materials and associated transport or conveyor chain, as well as applicable classifying and fractionating
EP1249536B1 (en) Method for supplying a building site with building materials
EP2787121B1 (en) Method for processing the substructure located under the track of a railway section
DE202008003997U1 (en) Device for renewing the multi-layer substructure of tracks
EP4130380B1 (en) Method and device for processing a track
EP3282055A1 (en) Work trolley combination, and method for treating the ballast of a railway track
DE2714055C2 (en)
EP2852706B1 (en) Method for repairing a ballast bed of a track
DE102011014266B4 (en) Between trolley
DE9321329U1 (en) System for the continuous renovation of ballast bedding of a track
DE102019101723A1 (en) Railroad car

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: E01B 27/00 20060101AFI20151124BHEP

17P Request for examination filed

Effective date: 20160629

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20180316

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20181121

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20190329

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1138334

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190615

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502013012899

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20190802

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20190529

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190930

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190830

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190829

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2742834

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20200217

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502013012899

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20200303

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20190831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190802

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190929

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20130802

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190529

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20230822

Year of fee payment: 11

Ref country code: LU

Payment date: 20230822

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20230731

Year of fee payment: 11

Ref country code: RO

Payment date: 20230727

Year of fee payment: 11

Ref country code: NO

Payment date: 20230825

Year of fee payment: 11

Ref country code: IT

Payment date: 20230823

Year of fee payment: 11

Ref country code: GB

Payment date: 20230822

Year of fee payment: 11

Ref country code: ES

Payment date: 20230918

Year of fee payment: 11

Ref country code: CH

Payment date: 20230902

Year of fee payment: 11

Ref country code: AT

Payment date: 20230828

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20230822

Year of fee payment: 11

Ref country code: PL

Payment date: 20230724

Year of fee payment: 11

Ref country code: FR

Payment date: 20230823

Year of fee payment: 11

Ref country code: DK

Payment date: 20230822

Year of fee payment: 11

Ref country code: DE

Payment date: 20230822

Year of fee payment: 11