EP2696009A1 - Anchoring structure and method of anchoring a frescoed plaster layer to a wooden plaster-holding timber frame of a building ceiling - Google Patents
Anchoring structure and method of anchoring a frescoed plaster layer to a wooden plaster-holding timber frame of a building ceiling Download PDFInfo
- Publication number
- EP2696009A1 EP2696009A1 EP13180003.9A EP13180003A EP2696009A1 EP 2696009 A1 EP2696009 A1 EP 2696009A1 EP 13180003 A EP13180003 A EP 13180003A EP 2696009 A1 EP2696009 A1 EP 2696009A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- anchoring
- plaster
- timber frame
- holding timber
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004873 anchoring Methods 0.000 title claims abstract description 174
- 239000011505 plaster Substances 0.000 title claims abstract description 104
- 238000000034 method Methods 0.000 title claims description 30
- 239000000203 mixture Substances 0.000 claims abstract description 27
- 239000011347 resin Substances 0.000 claims description 22
- 229920005989 resin Polymers 0.000 claims description 22
- VTYYLEPIZMXCLO-UHFFFAOYSA-L Calcium carbonate Chemical compound [Ca+2].[O-]C([O-])=O VTYYLEPIZMXCLO-UHFFFAOYSA-L 0.000 claims description 14
- BVKZGUZCCUSVTD-UHFFFAOYSA-L Carbonate Chemical compound [O-]C([O-])=O BVKZGUZCCUSVTD-UHFFFAOYSA-L 0.000 claims description 9
- 239000000463 material Substances 0.000 claims description 9
- 229910052751 metal Inorganic materials 0.000 claims description 9
- 239000002184 metal Substances 0.000 claims description 9
- 229910000019 calcium carbonate Inorganic materials 0.000 claims description 7
- 230000000284 resting effect Effects 0.000 claims description 4
- 229960003563 calcium carbonate Drugs 0.000 claims 1
- 235000010216 calcium carbonate Nutrition 0.000 claims 1
- 238000005728 strengthening Methods 0.000 claims 1
- 239000004570 mortar (masonry) Substances 0.000 description 9
- 239000000853 adhesive Substances 0.000 description 4
- 230000001070 adhesive effect Effects 0.000 description 4
- 239000010440 gypsum Substances 0.000 description 4
- 229910052602 gypsum Inorganic materials 0.000 description 4
- 229920000049 Carbon (fiber) Polymers 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 3
- NIXOWILDQLNWCW-UHFFFAOYSA-N acrylic acid group Chemical group C(C=C)(=O)O NIXOWILDQLNWCW-UHFFFAOYSA-N 0.000 description 3
- 239000004917 carbon fiber Substances 0.000 description 3
- 238000013016 damping Methods 0.000 description 3
- 238000009826 distribution Methods 0.000 description 3
- 238000010438 heat treatment Methods 0.000 description 3
- 239000007788 liquid Substances 0.000 description 3
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 3
- 230000000750 progressive effect Effects 0.000 description 3
- 230000002441 reversible effect Effects 0.000 description 3
- 230000035939 shock Effects 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 230000005068 transpiration Effects 0.000 description 3
- 125000000391 vinyl group Chemical group [H]C([*])=C([H])[H] 0.000 description 3
- 229920002554 vinyl polymer Polymers 0.000 description 3
- 239000002023 wood Substances 0.000 description 3
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 2
- 239000013013 elastic material Substances 0.000 description 2
- 239000013536 elastomeric material Substances 0.000 description 2
- 238000009533 lab test Methods 0.000 description 2
- 239000004571 lime Substances 0.000 description 2
- 230000003647 oxidation Effects 0.000 description 2
- 238000007254 oxidation reaction Methods 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 239000001301 oxygen Substances 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 229920000642 polymer Polymers 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000002829 reductive effect Effects 0.000 description 2
- 238000005303 weighing Methods 0.000 description 2
- 239000004925 Acrylic resin Substances 0.000 description 1
- 229920000178 Acrylic resin Polymers 0.000 description 1
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 1
- 206010013647 Drowning Diseases 0.000 description 1
- 235000019738 Limestone Nutrition 0.000 description 1
- XUIMIQQOPSSXEZ-UHFFFAOYSA-N Silicon Chemical compound [Si] XUIMIQQOPSSXEZ-UHFFFAOYSA-N 0.000 description 1
- 235000011941 Tilia x europaea Nutrition 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000000593 degrading effect Effects 0.000 description 1
- 238000007791 dehumidification Methods 0.000 description 1
- 230000002542 deteriorative effect Effects 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 239000003365 glass fiber Substances 0.000 description 1
- 230000002427 irreversible effect Effects 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 235000012204 lemonade/lime carbonate Nutrition 0.000 description 1
- 239000006028 limestone Substances 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 229920002521 macromolecule Polymers 0.000 description 1
- 239000007769 metal material Substances 0.000 description 1
- 230000036961 partial effect Effects 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 239000000049 pigment Substances 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 229920001084 poly(chloroprene) Polymers 0.000 description 1
- 239000004540 pour-on Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 229910052710 silicon Inorganic materials 0.000 description 1
- 239000010703 silicon Substances 0.000 description 1
- 239000008247 solid mixture Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000002904 solvent Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
- E04F13/04—Bases for plaster
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
Definitions
- the present invention relates a system or structure and a method to anchor a plaster layer to a wooden plaster-holding timber frame of the ceiling of an ancient building, as for instance a mansion or a church; to which the following description refers purely by way of example.
- each of the ribs od the plaster layer presents an end coming out, meaning that the end stretches onto two consecutive laths and it is shaped in order to form an anchoring tab leant on the laths, so to prevent the rib in slipping out from the slits, anchoring in such way the plaster layer to the timber frame.
- the sudden thermal shocks caused by heating systems inside the building determine, especially in relatively crowded buildings such as churches, also relevant humidity variations in correspondence of the ceiling.
- the moisture is absorbed and released cyclically by the laths and by the layer of plaster, causing on both different dimensional variations determining a progressive crumbling of the ribs, in particular of the ends, and therefore weakening the mechanical anchoring of the plaster to the timber frame until the anchoring becomes inexistent.
- the technique known to date used to consolidate the anchoring of the plaster layer to the frame essentially provides to pour on the top surface of the frame, i.e. on the so-called extrados surface, a certain amount of consolidating liquid resin of film forming kind.
- the liquid resin gradually penetrates into the cracks/fissures present in the layer of plaster, in the space between the ribs and the laths, and through the slots of the boards themselves and, once solidified, makes the portions of plaster, and the laths impregnated, mutually holding.
- the consolidation technique to anchor plaster by pouring consolidating resin, as described above, has many technical problems, unsolved to present.
- the resin penetrates selectively between the crumbling portions of the ribs so as to form a partial waterproofing of the ceiling which covers the ribs, leaving nevertheless uncovered the laths.
- GB 475 347 discloses a system designed to suspend or support heating or cooling pipes embedded in the concrete or material forming the wall, floor or ceiling of the building.
- US 2007 0029 025 discloses a method for adhering a first structure to a second structure wherein the method comprises: applying an adhesive composition to the surfaces, the adhesive composition comprising a first polymer or another polymer, and allowing the adhesive composition to bond the surfaces.
- GB 475 347 and US 2007 0029 025 fail to disclose a structure and a method for anchoring and/or consolidating the anchoring of a frescoed layer of plaster to a plaster-holding timber frame in wood of a building, which is designed to overcome the drawbacks above technical described.
- GB 475 347 discloses anchoring members for anchoring a pipe to a ceiling wherein anchoring members have a shape completely unsuitable to be used for anchoring of a frescoed plaster layer to a wooden plaster-holding timber frame of a building
- US 2007 0029 025 suggests to use an adhesive composition, i.e. a "film-forming" polymeric composition which, if applied to a frescoed plaster layer, would produce the same technical problems disclosed above, i.e. a progressive oxidation on the fresco and a barrier preventing the humidity present inside the building to properly penetrate the ceiling and flow freely towards the external environment.
- Aim of the present invention is therefore to provide a structure and a method for anchoring and/or consolidating the anchoring of a layer of plaster to a plaster-holding timber frame in wood of a building, in order to overcome the drawbacks above technical described.
- This aim is achieved by the present invention since it relates to a structure and a method for anchoring a layer of plaster to a plaster-holding timber frame in wood of a building, as defined in the attached claims.
- the number 100 indicates ceiling of a building as a whole, for example of a villa or of a church (shown only partially) having a lower surface 110 (intrados) preferably but not necessarily frescoed, facing the base of the building, i.e. the floor (not shown), and an upper surface 120 (extrados) facing the roof of the building.
- a lower surface 110 intraados
- frescoed preferably but not necessarily frescoed
- the ceiling 100 comprises a wooden parget-bearing frame or plaster-holding timber frame 200 connected in a known manner to the walls and / or to the roof of the building (for example through a supporting structure formed by the holding beams connected together and to the building), and a plaster layer 300 of predetermined thickness, which is anchored to the plaster holding timber frame 200 and it extends in such a way as to cover the bottom surface 200a of the latter so as to form the lower surface 110 of the ceiling 100.
- the plaster-holding timber frame 200 extends in a plane preferably horizontal, and comprises a plurality of beams or wooden laths 210 (Italian term "arelle”), extending preferably parallel to a longitudinal axis A in such a way as to be substantially/ preferably coplanar among them, and they are spaced apart from one another so as to determine between them grooves or embrasures 220.
- each lath 210 mat have preferably although not necessarily a roughly rectangular section and is preferably but not necessarily about 2-5 cm wide, while the embrasure 220 has a predetermined width among the two strips 210, preferably, but not necessarily, of between about 1 to 2 cm.
- laths 201 may have a different section from rectangular section above disclosed and the ceiling 100 may have the shape of a vault and therefore the plaster-holding timber frame 200 may have an arcuate/curved shape.
- the plaster layer 300 may comprise a solid mixture based on lime and calcium carbonate (limestone), and has an upper surface 300a (opposite to the bottom surface 110 in sight), which covers the lower surface 200a of the plaster-holding timber frame 200, in such a way as to form a homogeneous layer of coverage of predetermined thickness which seeps into/partially protrudes towards plaster-holding timber frame 200, inside the embrasures 220, in order to form stiff crests or ribs 310 among the laths 210, structured to anchor the layer of plaster 300 to the timber frame holding the plaster 200.
- lime and calcium carbonate limestone
- crests or ribs 310 may be comprised in a render (render-float) sub-layer of the plaster layer 300 (in Italian "strato di intonaco di rinzaffo e/o arriccio").
- the present invention is essentially based on the principle of providing an anchoring mechanical structure or system 1, which is structured to be connected to the upper surface 300a of the plaster layer 300, preferably to the render (render-float) plaster sub-layer, in correspondence of a plurality of fixing points, and it extends above the upper surface 200b of the plaster-holding timber frame 200 in such a way as to lean/rest on the same in order to mechanically anchor the plaster layer 310 to the plaster-holding timber frame 200 and/or consolidate the mechanical anchoring of the same.
- an anchoring mechanical structure or system 1 which is structured to be connected to the upper surface 300a of the plaster layer 300, preferably to the render (render-float) plaster sub-layer, in correspondence of a plurality of fixing points, and it extends above the upper surface 200b of the plaster-holding timber frame 200 in such a way as to lean/rest on the same in order to mechanically anchor the plaster layer 310 to the plaster-holding timber frame 200 and/or consolidate the mechanical anchoring of the same.
- the mechanical anchoring structure 1 is preferably structured to be connected integrally with the plaster layer 300, preferably with the ribs 310, and extends on either side of the ribs 310 above the upper surface 200b of the plaster-holding timber frame 200 in order to lean on the same, so as to realize a mechanical anchor from above onto the plaster layer 300.
- the mechanical anchoring structure 1 is provided with a plurality of anchoring members 2 comprising an anchoring portion designed to be coupled in a stable manner with the plaster layer 300 in correspondence to the fixing points, and a support portion, which is shaped so as to extend above, and leaning on the upper surface 200b of the plaster-holding timber frame 200 so as to at least partly lean on the same.
- the anchoring portion of the anchoring member 2 comprises a preferably straight anchoring stem 3 realized in hard and/or elastic material, for example a metallic material preferably steel or carbon fiber or any other similar material, which is inserted in a hole, preferably a blind hole 5 preferably made in the rib 310, and it is firmly fastened, i.e. in an integral manner, to the body of the rib 310 through a fixing mixture injected into the hole 5.
- a preferably straight anchoring stem 3 realized in hard and/or elastic material, for example a metallic material preferably steel or carbon fiber or any other similar material, which is inserted in a hole, preferably a blind hole 5 preferably made in the rib 310, and it is firmly fastened, i.e. in an integral manner, to the body of the rib 310 through a fixing mixture injected into the hole 5.
- a fixing mixture comprising calcium carbonate, gypsum, and an acrylic or vinyl resin advantageously enables on the one hand to ensure the fixing of the anchoring stem 3 to the rib 310 of the plaster, and secondly ensures a certain degree of elasticity of the anchor.
- the hole 5 may be preferably formed in the central part of the top of the rib 310 and it extends inside the rib 310 towards the lower surface 110 along a preferably transverse direction to the longitudinal axis A and to the laths 210, while the anchoring stem 3 is inserted into the hole 5 in such a way that its upper end at least partially comes out from the mouth of the hole 5 itself.
- anchoring member 2 is further provided with a support portion comprising a support beam 4, which is connected in the middle to the upper end of the anchoring stem 3, extends on either side of the rib 310 in a direction preferably substantially transverse to the anchoring stem 3, and is structured in such a way as to lean at least partially on the upper surface of the support laths 210 which are adjacent to the embrasure 220 containing the rib 310.
- the support beam 4 and the anchoring stem 3 may be made of hard and/or elastic material such as steel or carbon fiber or any similar material, and may be connected firmly to one another.
- the anchoring element 2 may comprise a T-shaped element designed to be inserted in the hole 5 according to the example shown in Figure 3 .
- the support beam 4 may be structured to be connected firmly but still in a easily removable manner to the anchoring stem 3.
- the upper end of the anchoring stem 3 may be conveniently shaped in order to present a hole passing throughout crosswise the anchoring stem 3, inside of which is possible to insert/withdraw the support beam 4. Therefore, the support beam 4 can be joint/disjoint advantageously just as quickly and easily to the anchoring stem 3 and enables to obtain a reversible anchoring.
- the support beam 4 may, however, be joined in a stable but removable manner end anchor 3 through any mechanical joining system (not shown).
- the method for consolidating the anchoring of the plaster layer 300 to the frame 200 may include the following operative steps.
- the method may include the step of removing, from the embrasures 220, the portions of crumbled plaster belonging to the ribs 310.
- the method may include the step of filling the empty spaces present in the embrasures 220 caused by the disintegration of the ribs 310, through the use of a consolidating dough (shown with inclined lines in Figure 16 ).
- the Applicant has found that by using a consolidating mixture including mostly calcium carbonate and gypsum, on the one hand we may obtain a high degree of fixing of the rebuilt rib 310 to the plaster layer 300 and/or to the existing part (and not crumbled)of the rib 310, and on the other the mixture determines, after its solidification, a narrowing of the width of the rib 310 which, consequently, decouples/detaches itself from the external surfaces of the laths 210 thereby making the mechanical anchoring structure 1 independent from the plaster-holding timber frame 200.
- a consolidating mixture including mostly calcium carbonate and gypsum
- the method further comprises the steps of forming at least one hole, preferably a blind hole 5 on the ribs 310 preferably in correspondence of the predetermined fixing point ( Figure 17 ), and preferably of injecting a certain amount of consolidating resin in the hole 5 so as to increase both the hardness of the part of rib 310a which surrounds the hole 5, and the elasticity of part itself 310a ( Figure 18 ).
- the Applicant has found that by injecting into the hole 5, 1-4 milliliters consolidating of resin, preferably 3 milliliters of acrylic or vinyl resin, one may obtain a considerable increase in the hardness and elasticity of the portion of rib 310a subject to the anchor.
- the consolidating resin injected into the hole 5, thanks to its composition, is absorbed by the portion of rib 310a in particular by the render sub-layer, which surrounds the hole 5 by determining the localized increase of hardness and elasticity of the portion.
- the method may further include the step of injecting the fixing mixture into the hole 5 ( Figure 19 ) and insert the anchoring stem 3 of the anchoring device 2 into the hole 5 in such a way that it is embedded/drowned in the fixing mixture, contextually putting the supporting beam 4 leaning on the laths 210 ( Figure 20 ).
- the fixing mixture preferably comprises calcium carbonate and/or gypsum, an acrylic or vinyl resin and it is enriched with oxygen. The Applicant has found that by enriching the fixing mixture with oxygen there is the achievement of a major increase in the number of air macromolecules present in the structure of the mixture which confers to the latter a high elasticity.
- the dimensions of the anchoring stem 3, in particular its diameter and length may be varied depending of the physical and mechanical characteristics of the plaster to be anchored, i.e. the thickness of the layer of plaster 300, the height of the ribs 310, and the weight of the portion of the plaster layer 300 that the anchoring element 2 must support.
- the diameter of the anchoring stem 3 may be roughly between about 0.1 mm and 0.3 mm, preferably 0.2 mm, while its length may be between about 1 and 5 cm, preferably 3 cm. It should be however understood that the size of the hole 5 must be such as to accommodate the stem of anchor 3.
- the hole 5 may have a diameter comprised between about 1 mm and 5 mm, preferably 3 mm.
- the number and distribution of the fixing points on the upper surface of the ceiling 100 may vary depending on the intensity of the vibrations to be damped down, and on the distribution of the weight of the plaster layer 300 to be consolidated. Laboratory tests carried out by the Applicant proved that the number of fixing points and thus the number of anchor members 2 used per square meter may be between about 20 and 60 elements/ m 2 .
- the mechanical anchoring structure in addition to being extremely simple and inexpensive to put in place, it makes the whole operation of anchoring completely reversible, and enables not to affect the fresco in any way, differently from what happens in the known solutions in which it is made use of a consolidating resin. It should be understood that anchoring is preferably made on the render sub-layer without causing weaken on the other plaster sub-layers.
- the mechanical anchoring realized on the ribs 310 by the anchoring members 2 allows to dampen the vibrations transmitted to the plaster layer 300 by the plaster-holding timber frame 310.
- the anchoring members 2 made in accordance with the presente invention remain leaning on the laths 210 and, consequently, is able to move smoothly on themselves thus reducing the vibration transmitted to the anchored rib 310.
- the micro-grinding of the rib 310 is significantly reduced.
- the Applicant has also found that preferably by interposing a shock absorbing element 6 between the support beam 4 of each anchoring device 3 and the upper surface of the lath 210, it is possible to lower a great deal of the vibrations transmitted from timber frame 200 to the plaster layer 300.
- the shock absorbing element 5 may include, for example, a cylindrical spring or an annular rubber bearing or anti-vibrating neoprene or any similar material fitting in the anchoring stem 3.
- the Applicant has also found that preferably by interposing a reticular structure or supporting net or grid 7 between the support beams 4 of the anchorage elements 2, and the upper surface 220b of the plaster holding timber frame 200, the structural elasticity of the ceiling 100 is further increased, and consequently the capacity of the same to withstand mechanical stress caused by high intensity vibrations.
- the Applicant has realized a different embodiment shown in Figures 5 and 6 , in which the mechanical anchoring structure 1 comprises the flat grid 7 which is arranged leaning/resting on the upper surface 200b of the plaster holding timber 200.
- the upper end of the anchoring stem 3 is put inside an opening in the grid 7 in such a way as to stick out at least partially above the grid itself, while the support beam 4 is coupled to the upper end of the stem 3 and is disposed resting on the upper face of the grid 7.
- the grid 7 increases the elasticity of the mechanical anchoring structure 1 as well as the ability to maintain the anchored layer of plaster 300 even in case of high vibrations.
- the net or grid 7 is able to make slight shifts on the upper surface 220b of the plaster holding timber frame 200 and simultaneously enables the ends of the anchoring stems 3 to shift freely a few millimeters within the openings of the grid 7 and enables the beams 4 to slide a few millimeter or the surface 220b of the grid. Therefore in the case of major vibration, thanks to the combining of the anchoring members 2 to the grid 7, the anchoring structure 1 shows an elastic behavior which allows to dampen the vibrations transmitted from the frame 200, while ensuring a stable anchoring of the plaster layer 300 below.
- the grid 7 may be preferably shaped so as to present one or more transversal sections to the longitudinal axis A, shaped as an inverted V forming cross channels for ventilation/air passage designed to increase, on the one hand, the degree of transpiration of the plaster layer 300 and of the laths 210, and on the other hand, the carrying capacity of the anchoring structure 1.
- the grid 7 may be made in metallic or plastic material such as polyvinyl-acrylate and/or glass fiber and/or carbon fiber or similar.
- the grid 7 may be metallic and correspond, for example, to the one called "Pernevometal" (registered trademark), made by Logitec System SRL.
- the mechanical anchoring structure 1 may comprises preferably although not necessarily a layer of carbonate mortar 9 made mostly by calcium carbonate, gypsum and an acrylic resin.
- the mortar layer 9 extends on the upper surface of the grid 7 of predetermined thickness, and is permanently fixed to the latter or to the ribs 310, if present, through the openings in the grid 7 itself.
- the mechanical anchoring structure 1 may also comprise preferably although not necessarily at least one net or mesh 10 of elastic and flexible material, for example of elastomeric material, which may be embedded within the layer of carbonate mortar 9, if the latter is present, and is arranged on a flat surface substantially parallel to the metal grid 7.
- the Applicant has found that the use of the mesh 10 in elastic and flexible material, also gives a certain elasticity to the layer of carbonate mortar 9 and, consequently, increases the overall elasticity of the mechanical anchoring structure 1.
- the method for consolidating the anchoring of the plaster layer 300 to the plaster holding timber frame 200 based on the example shown in Figures 5 and 6 comprises the following steps.
- the method may involve the step of removing the portions of crumbling plaster belonging to the ribs 310 from the embrasures 220.
- the method may include the step of filling the empty spaces present in the embrasures 220, caused by the disintegration of the ribs 310, with the consolidating mixture, in order to rebuild or complete the crumbling ribs 310 within the embrasures 220.
- the method may further comprise the step of forming holes 5 on the ribs 310 in correspondence of the predetermined fixing points.
- the method may further comprises the steps of:
- the anchoring element 2 of the mechanical anchoring structure 1 comprises a screw 12 in which the anchoring threaded stem 3 screwed to a nut 13 trapped in the hole 5 and preferably a head 12a (corresponding to the support portion) arranged outside of the hole 5 and is structured/dimensioned so as to be put leaning on the laths 210, preferably through the interposition of the cushioning element 6 according to the example shown in Figure 7 , or by the interposition of the grid 7 according to the example shown in Figure 8 .
- the screw 12 may be arranged in a manner such as to present the head 12a or at least the threaded stem 4 trapped inside the hole 5, and the nut 13 disposed outside the hole 5 and shaped to be disposed in the support laths 210, preferably through the interposition of the cushioning member 6, similarly to the example shown in Figure 7 , or through the interposition of the grid 7 according to the example shown in Figure 9 .
- the Applicant has found that using a screw 12 and a nut 13 it is possible, from one side, to adjust the traction force imparted on the rib 310, and consequently on the plaster layer 300, and the other to detach the anchoring mechanical structure 1 from the plaster layer 300 in a quick, simple, and extremely cheap way.
- an end of the anchoring stem of the threaded stem 4 extends outside from the mouth of the hole 5 and is sliding inserted inside of an striker element, i.e. a washer, which is preferably arranged in abutment/rest on the layer of carbonate mortar 9, if the latter is present, i.e. on the upper surface 220b of the plaster holding timber frame 200, whereas a first elastic damper element corresponding for example to a spring is fitted in the anchoring stem 4 between the head 12a of the screw 12 and the washer 14 and is designed to elastically oppose the movement of the head 12a toward the washer 14, i.e. the anchoring stem toward down under the action of the weight of the plaster layer 300.
- an striker element i.e. a washer
- the Applicant has found that using an elastic damper element 16 arranged between the head 12a and the washer 14 allows to further increase the damping of vibrations that plaster holding timber frame 200 transmits to the plaster layer 300.
- first elastic damper element 16 allows to detect/determine based on of its compression a critical condition indicating a possible detachment of the plaster layer 300 from plaster holding timber frame 200.
- the critical condition may be detected/determined when the distance between the head 12a and the washer 14 is preferably lower or equal to D1.
- the Applicant has found that it is possible to regulate/control the damping degree/level of the plaster layer 300 and signal the critical condition, by calibrating the elastic constant spring of the spring 16.
- the first elastic damper element 16 may be provided with annular colored portions, which, during the spring compression, superimpose one to another in order to highlight a prefixed color such that reaching of critical condition is signaled.
- anchoring element 2 corresponding to the screw 12 differs from anchoring element 2 of the embodiment illustrated in Figures 10 e 11 , because it comprises a second elastic damper element 19, i.e. a spring, which is fitted in the portion of anchoring stem 14 which is in turn inserted in the hole 5 and is arranged between the nut 13 and the washer 14.
- a second elastic damper element 19 i.e. a spring
- the Applicant has found that combined using of the first 16 and second elastic damper elements 15 further increase the damping of vibrations that plaster holding timber frame 200 transmits to the plaster layer 300.
- the anchoring portion of the anchoring member 2 comprises a first segment/portion 20 of at least one metal wire inserted in the hole 5 and embedded in the latter preferably by means of the fixing mixture, whereas the support portion of the anchoring member 2 comprises a second segment/portion 21 of the same thin metal wire.
- the second segment/portion 21 extends upon the wooden laths 210 and connect the first segment/portion 20 of two or more anchoring members 2.
- the first 20 and second segments/portions 21 of a number of anchoring members 2 may be parts of a single wire and are obtained by folding said metal wire in more points in order to be inserted in the hole 5.
- an free end of the first segment/portion 20 arranged outside from the hole may be substantially shaped as an eyelet, whereas the second segments/portions 21 is partially inserted in the eyelet.
- the mechanical structure of anchoring 1 comprises the flexible mesh 10 interposed between the second segments/portions 21 of the wires and the upper surface 200b of the plaster holding timber 200.
- the mechanical structure of anchoring 1 further preferably comprise a thin layer of carbonate mortar 9, which extends upon the flexible mesh 10 to embed the latter, such that an elastic and stable connection is provided.
- the Applicant has found that by using a thin steel wire, a simple and cheaper anchoring mechanical structure is obtained, imperceptible to see and thus not aesthetically degrading, wherein the vibration are reduced and at the same time anchoring in the ceiling presenting a thin plaster layer is assured.
- the mechanical structure of anchoring 1 may comprise one or more blind holes 5, which instead of being made in the ribs 310, as disclosed in the several embodiments illustrated in Figures 1-20 , are made in the wooden laths 210 and each of them presents a first portion, which extends inside of the rib 310 and a second portion which protrudes under the rib 310 and extends in the plaster layer 300 beneath.
- the anchoring portion of the anchoring member 2 is inserted in the blind hole 5 and is assigned/set such that it extends at least partially inside the second portion of the blind hole 5 made in the plaster layer 300, whereas support portion of the anchoring member 2 which is outer of the first portion of the blind hole 5 extends upon the upper surface 200b of the plaster holding timber 200 to be lean on the latter.
- the anchoring portion of the anchoring member 2 may be further made integral with the plaster layer 300 inside of the second portion of the hole 5, by the fixing mixture in the analog manner of the embodiments disclosed above.
- the embodiment of the mechanical structure of anchoring 1 illustrated in Figure 21 may be extended to a any of embodiments disclosed above and illustrated in the Figures from 1 to 20, wherein, depending on the embodiment, it is used an anchoring threaded stem 3, and/or a grid 7, and/or the layer of carbonate mortar 9, and/or the screw 12, and/or the metallic connecting wire (illustrated in Figure 14 ).
- the anchoring members 2 may be conveniently connected one to the other by one or more profiled preferably straight and preferably made in flexible material, which are arranged rests on the upper surface (300a) facing the plaster-holding timber frame (200).
- the anchoring mechanical structure assures fixing of high loaded, i.e. heavy plaster layer to the plaster-holding timber frame also when it is subjected to external vibrations/mechanical stress, granting an high security for people inside the buildings.
- anchoring mechanical structure made according to the present invention allows transpiration of the fresco that does not deteriorate. Moreover the anchoring mechanical structure is reversible, i.e. is uncoupled from the plaster layer at any instant and allows therefore to recover and/or remove the plaster layer from the ceiling.
- the anchoring mechanical structure is cheaper to be made and being very simple it may be quickly installed from not-skilled operators.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Building Environments (AREA)
- Door And Window Frames Mounted To Openings (AREA)
Abstract
Description
- The present invention relates a system or structure and a method to anchor a plaster layer to a wooden plaster-holding timber frame of the ceiling of an ancient building, as for instance a mansion or a church; to which the following description refers purely by way of example.
- It is known that in antiquity, meaning until the nineteenth century, the technique used to effectuate building ceilings (for example mansions or churches) which were intended to be frescoed, was after all common and essentially foresaw: first of all to prepare, in correspondence of the ceiling, a wooden plaster-holding timber frame made by a number of small wooden beams or wooden laths (usually designed by the Italian term "arelle") stretching rectilinear, and parallel and spaced to each other in order to form grooves and slits; apply a layer of plaster of prearranged thickness made by lime, mixed with silicon sand, the latter composed of calcium carbonate, onto the inferior surface of the wooden plaster-holding timber frame in order to cover completely the inferior surface and causing part of the plaster to penetrate in the slits, entering/seeping into in the slits forming crests or anchoring rigid ribs, partially overabundant onto the superior surface. Thanks to the process of hardening and consolidation of the plaster (also known as process of carbonation of the plaster), the ribs remain held by and anchored to the laths. In this case, each of the ribs od the plaster layer presents an end coming out, meaning that the end stretches onto two consecutive laths and it is shaped in order to form an anchoring tab leant on the laths, so to prevent the rib in slipping out from the slits, anchoring in such way the plaster layer to the timber frame.
- It is also well known that recently, in many building ceilings made based on the above explained technique, cracks and fissures/splits have occurred, and it has been found that remarkable parts of the plaster layer have come off the timer frame. This detachment, not only puts in danger heavily both people and things underneath the ceiling, but also damages remarkably the fresco, generating many and multiple problems concerning the artistic damage provoked, as well as in economic terms.
- Studies carried out by the Applicant have shown that the causes of the detachment of the plaster layer from the timber frame are associated both to the vibrations generated by the multiple noise sources present or transiting in correspondence of the buildings, such as motor vehicles (non-existent in antiquity), both to wide thermic fluctuations originated inside the buildings by the use of heating systems, which also were not used in antiquity.
- More specifically, external vibrations investing the building stress mechanically the structure of the roof which, is also performing in many cases a load-bearing function, supporting the timber frame, transfers part of such solicitations to the layer of plaster of the ceiling causing it to be damaged.
- Moreover, the sudden thermal shocks caused by heating systems inside the building, determine, especially in relatively crowded buildings such as churches, also relevant humidity variations in correspondence of the ceiling. The moisture is absorbed and released cyclically by the laths and by the layer of plaster, causing on both different dimensional variations determining a progressive crumbling of the ribs, in particular of the ends, and therefore weakening the mechanical anchoring of the plaster to the timber frame until the anchoring becomes inexistent.
- The technique known to date used to consolidate the anchoring of the plaster layer to the frame, essentially provides to pour on the top surface of the frame, i.e. on the so-called extrados surface, a certain amount of consolidating liquid resin of film forming kind. The liquid resin gradually penetrates into the cracks/fissures present in the layer of plaster, in the space between the ribs and the laths, and through the slots of the boards themselves and, once solidified, makes the portions of plaster, and the laths impregnated, mutually holding.
- The consolidation technique to anchor plaster by pouring consolidating resin, as described above, has many technical problems, unsolved to present.
- In the first place, the distribution of the resin on the surface of the extrados and the degree of penetration of the same within the layer of plaster is hard to control. Therefore it happens quite often, in particular in ceilings with a thin layer of plaster, that the resin soaks completely through the plaster layer until reaching its outer surface and impregnate accidentally the fresco as well, incorporating with the surface of the latter and oxidises the particles deposited over time on the fresco. The presence of resin consolidated above the fresco causes an irreversible damage and most importantly a damage on the fresco itself. In fact, the removal of the resin is possible only using solvents, which on the one hand allow to remove oxides and/or particles embedded in the resin, but on the other heavily affect the pigments of the fresco, deteriorating them.
- Furthermore, having the resin a composition so-called "film-forming", it produces a skin that covers the plaster layer and the laths, reducing their transpiration and dehumidification and thus causing, on the one hand, a progressive oxidation on the fresco, which darkens over time, and on the other a barrier preventing the humidity present inside the building to properly penetrate the ceiling and flow freely towards the external environment.
- In cases where the technique of application of the resin is carried out properly, the resin penetrates selectively between the crumbling portions of the ribs so as to form a partial waterproofing of the ceiling which covers the ribs, leaving nevertheless uncovered the laths.
- However, in this case the humidity present in the ceiling concentrates in the laths resulting in an important change in their dimensions and thus causing a greater erosion on the ribs.
-
GB 475 347 -
US 2007 0029 025 discloses a method for adhering a first structure to a second structure wherein the method comprises: applying an adhesive composition to the surfaces, the adhesive composition comprising a first polymer or another polymer, and allowing the adhesive composition to bond the surfaces. -
GB 475 347 US 2007 0029 025 fail to disclose a structure and a method for anchoring and/or consolidating the anchoring of a frescoed layer of plaster to a plaster-holding timber frame in wood of a building, which is designed to overcome the drawbacks above technical described. - On the contrary,
GB 475 347 US 2007 0029 025 suggests to use an adhesive composition, i.e. a "film-forming" polymeric composition which, if applied to a frescoed plaster layer, would produce the same technical problems disclosed above, i.e. a progressive oxidation on the fresco and a barrier preventing the humidity present inside the building to properly penetrate the ceiling and flow freely towards the external environment. - Aim of the present invention is therefore to provide a structure and a method for anchoring and/or consolidating the anchoring of a layer of plaster to a plaster-holding timber frame in wood of a building, in order to overcome the drawbacks above technical described.
- This aim is achieved by the present invention since it relates to a structure and a method for anchoring a layer of plaster to a plaster-holding timber frame in wood of a building, as defined in the attached claims.
- The present invention will now be described with reference to the accompanying drawings, which illustrate a non-limiting example of the possible realization in which:
-
Figure 1 is a schematic perspective view of a portion of a ceiling of a building provided with the mechanical anchoring structure according to the teachings of the present invention; -
Figure 2 is a schematic perspective view of the mechanical anchoring structure used in the ceiling shown inFigure 1 and built according to the teachings of the present invention; -
Figure 3 is a front in-elevation view of the mechanical structure of the anchor shown inFigure 2 , with parts in section and parts removed for clarity; -
Figure 4 schematically shows one embodiment of the mechanical anchoring structure shown inFigure 3 , in two different operating configurations; -
Figure 5 schematically shows a view of one embodiment of the mechanical anchoring structure shown inFigures 1, 2 and 3 , with parts in section and parts removed for clarity; -
Figure 6 is a longitudinal section of the mechanical anchoring structure shown inFigure 5 along the line I-I; -
Figures 7, 8, and 9 are just as many schematic embodiments of the mechanical anchoring structure shown inFigure 1 and 2 ; -
Figures 10 and 11 show two schematic views in front elevation of one embodiment of the mechanical anchoring structure in two different operating conditions, with parts in section and parts removed for clarity,; -
Figures 12 and13 show two schematic views in front elevation of one embodiment of the mechanical anchoring structure in two different operating conditions; -
Figure 14 schematically shows a view of one embodiment of the mechanical anchoring structure shown inFigures 1, 2 and 3 , with parts in section and parts removed for clarity; -
Figures 15, 16 ,17, 18, 19 and 20 show just as many operational steps of the method for anchoring the plaster layer to the timber frame, according to the teaching of present invention; while -
Figures 21 to 23 schematically show just as many views of one embodiment of the mechanical anchoring structure shown inFigures 1 to 20 , with parts in section and parts removed for clarity. - With reference to
Figure 1 , thenumber 100 indicates ceiling of a building as a whole, for example of a villa or of a church (shown only partially) having a lower surface 110 (intrados) preferably but not necessarily frescoed, facing the base of the building, i.e. the floor (not shown), and an upper surface 120 (extrados) facing the roof of the building. - In accordance with one embodiment, the
ceiling 100 comprises a wooden parget-bearing frame or plaster-holdingtimber frame 200 connected in a known manner to the walls and / or to the roof of the building (for example through a supporting structure formed by the holding beams connected together and to the building), and aplaster layer 300 of predetermined thickness, which is anchored to the plaster holdingtimber frame 200 and it extends in such a way as to cover thebottom surface 200a of the latter so as to form thelower surface 110 of theceiling 100. - In accordance with one exemplary embodiment, the plaster-holding
timber frame 200 extends in a plane preferably horizontal, and comprises a plurality of beams or wooden laths 210 (Italian term "arelle"), extending preferably parallel to a longitudinal axis A in such a way as to be substantially/ preferably coplanar among them, and they are spaced apart from one another so as to determine between them grooves orembrasures 220. In accordance with one exemplary embodiment, eachlath 210 mat have preferably although not necessarily a roughly rectangular section and is preferably but not necessarily about 2-5 cm wide, while theembrasure 220 has a predetermined width among the twostrips 210, preferably, but not necessarily, of between about 1 to 2 cm. It should be understood that according to a different possible embodiments not illustrated, laths 201 may have a different section from rectangular section above disclosed and theceiling 100 may have the shape of a vault and therefore the plaster-holdingtimber frame 200 may have an arcuate/curved shape. - As far as the
plaster layer 300 is concerned, in accordance with one embodiment, it may comprise a solid mixture based on lime and calcium carbonate (limestone), and has anupper surface 300a (opposite to thebottom surface 110 in sight), which covers thelower surface 200a of the plaster-holdingtimber frame 200, in such a way as to form a homogeneous layer of coverage of predetermined thickness which seeps into/partially protrudes towards plaster-holdingtimber frame 200, inside theembrasures 220, in order to form stiff crests orribs 310 among thelaths 210, structured to anchor the layer ofplaster 300 to the timber frame holding theplaster 200. - Preferably, crests or
ribs 310 may be comprised in a render (render-float) sub-layer of the plaster layer 300 (in Italian "strato di intonaco di rinzaffo e/o arriccio"). - In accordance with one embodiment illustrated in
Figures 1, 2 and 3 , the present invention is essentially based on the principle of providing an anchoring mechanical structure or system 1, which is structured to be connected to theupper surface 300a of theplaster layer 300, preferably to the render (render-float) plaster sub-layer, in correspondence of a plurality of fixing points, and it extends above theupper surface 200b of the plaster-holdingtimber frame 200 in such a way as to lean/rest on the same in order to mechanically anchor theplaster layer 310 to the plaster-holdingtimber frame 200 and/or consolidate the mechanical anchoring of the same. - According to one embodiment, the mechanical anchoring structure 1 is preferably structured to be connected integrally with the
plaster layer 300, preferably with theribs 310, and extends on either side of theribs 310 above theupper surface 200b of the plaster-holdingtimber frame 200 in order to lean on the same, so as to realize a mechanical anchor from above onto theplaster layer 300. - In accordance to one embodiment shown in
Figures 1, 2 and 3 , the mechanical anchoring structure 1 is provided with a plurality of anchoringmembers 2 comprising an anchoring portion designed to be coupled in a stable manner with theplaster layer 300 in correspondence to the fixing points, and a support portion, which is shaped so as to extend above, and leaning on theupper surface 200b of the plaster-holdingtimber frame 200 so as to at least partly lean on the same. - In accordance to one embodiment illustrated in
Figures 1, 2 and 3 , the anchoring portion of theanchoring member 2 comprises a preferablystraight anchoring stem 3 realized in hard and/or elastic material, for example a metallic material preferably steel or carbon fiber or any other similar material, which is inserted in a hole, preferably ablind hole 5 preferably made in therib 310, and it is firmly fastened, i.e. in an integral manner, to the body of therib 310 through a fixing mixture injected into thehole 5. - The Applicant has found that a fixing mixture comprising calcium carbonate, gypsum, and an acrylic or vinyl resin advantageously enables on the one hand to ensure the fixing of the
anchoring stem 3 to therib 310 of the plaster, and secondly ensures a certain degree of elasticity of the anchor. - Preferably, according to the realization shown in
Figure 3 , thehole 5 may be preferably formed in the central part of the top of therib 310 and it extends inside therib 310 towards thelower surface 110 along a preferably transverse direction to the longitudinal axis A and to thelaths 210, while theanchoring stem 3 is inserted into thehole 5 in such a way that its upper end at least partially comes out from the mouth of thehole 5 itself. - In accordance with one embodiment shown in
Figure 3 ,anchoring member 2 is further provided with a support portion comprising asupport beam 4, which is connected in the middle to the upper end of theanchoring stem 3, extends on either side of therib 310 in a direction preferably substantially transverse to theanchoring stem 3, and is structured in such a way as to lean at least partially on the upper surface of thesupport laths 210 which are adjacent to theembrasure 220 containing therib 310. - In accordance with one exemplary embodiment, the
support beam 4 and theanchoring stem 3 may be made of hard and/or elastic material such as steel or carbon fiber or any similar material, and may be connected firmly to one another. For this purpose theanchoring element 2 may comprise a T-shaped element designed to be inserted in thehole 5 according to the example shown inFigure 3 . - According to one embodiment shown in
Figure 4 , thesupport beam 4 may be structured to be connected firmly but still in a easily removable manner to theanchoring stem 3. In accordance with one embodiment, the upper end of theanchoring stem 3 may be conveniently shaped in order to present a hole passing throughout crosswise theanchoring stem 3, inside of which is possible to insert/withdraw thesupport beam 4. Therefore, thesupport beam 4 can be joint/disjoint advantageously just as quickly and easily to theanchoring stem 3 and enables to obtain a reversible anchoring. As above described, it should be understood that in accordance with other embodiments (not illustrated) thesupport beam 4 may, however, be joined in a stable but removablemanner end anchor 3 through any mechanical joining system (not shown). - The method for consolidating the anchoring of the
plaster layer 300 to theframe 200 may include the following operative steps. With reference toFigures 15 to 20 , preferably but not necessarily, the method may include the step of removing, from theembrasures 220, the portions of crumbled plaster belonging to theribs 310. Preferably, but not necessarily, the method may include the step of filling the empty spaces present in theembrasures 220 caused by the disintegration of theribs 310, through the use of a consolidating dough (shown with inclined lines inFigure 16 ). The Applicant has found that by using a consolidating mixture including mostly calcium carbonate and gypsum, on the one hand we may obtain a high degree of fixing of the rebuiltrib 310 to theplaster layer 300 and/or to the existing part (and not crumbled)of therib 310, and on the other the mixture determines, after its solidification, a narrowing of the width of therib 310 which, consequently, decouples/detaches itself from the external surfaces of thelaths 210 thereby making the mechanical anchoring structure 1 independent from the plaster-holdingtimber frame 200. - The method further comprises the steps of forming at least one hole, preferably a
blind hole 5 on theribs 310 preferably in correspondence of the predetermined fixing point (Figure 17 ), and preferably of injecting a certain amount of consolidating resin in thehole 5 so as to increase both the hardness of the part ofrib 310a which surrounds thehole 5, and the elasticity of part itself 310a (Figure 18 ). The Applicant has found that by injecting into thehole 5, 1-4 milliliters consolidating of resin, preferably 3 milliliters of acrylic or vinyl resin, one may obtain a considerable increase in the hardness and elasticity of the portion ofrib 310a subject to the anchor. The consolidating resin injected into thehole 5, thanks to its composition, is absorbed by the portion ofrib 310a in particular by the render sub-layer, which surrounds thehole 5 by determining the localized increase of hardness and elasticity of the portion. - The method may further include the step of injecting the fixing mixture into the hole 5 (
Figure 19 ) and insert the anchoringstem 3 of theanchoring device 2 into thehole 5 in such a way that it is embedded/drowned in the fixing mixture, contextually putting the supportingbeam 4 leaning on the laths 210 (Figure 20 ). The fixing mixture preferably comprises calcium carbonate and/or gypsum, an acrylic or vinyl resin and it is enriched with oxygen. The Applicant has found that by enriching the fixing mixture with oxygen there is the achievement of a major increase in the number of air macromolecules present in the structure of the mixture which confers to the latter a high elasticity. - With reference to
Figures 1, 2 and 3 , in accordance to one embodiment, the dimensions of the anchoringstem 3, in particular its diameter and length may be varied depending of the physical and mechanical characteristics of the plaster to be anchored, i.e. the thickness of the layer ofplaster 300, the height of theribs 310, and the weight of the portion of theplaster layer 300 that the anchoringelement 2 must support. - According to one exemplary embodiment, the diameter of the anchoring
stem 3 may be roughly between about 0.1 mm and 0.3 mm, preferably 0.2 mm, while its length may be between about 1 and 5 cm, preferably 3 cm. It should be however understood that the size of thehole 5 must be such as to accommodate the stem ofanchor 3. - Preferably the
hole 5 may have a diameter comprised between about 1 mm and 5 mm, preferably 3 mm. - Laboratory tests carried out by the Applicant have shown that one
anchoring stem 3 having a diameter of 0.1 mm is designed to support a layer of plaster weighing 20 kg, while an anchoringstem 3 withdiameter 0,3 mm is designed to support a layer of plaster weighing roughly 30 kg. - It should be understood that, the number and distribution of the fixing points on the upper surface of the
ceiling 100 may vary depending on the intensity of the vibrations to be damped down, and on the distribution of the weight of theplaster layer 300 to be consolidated. Laboratory tests carried out by the Applicant proved that the number of fixing points and thus the number ofanchor members 2 used per square meter may be between about 20 and 60 elements/ m2. - The mechanical anchoring structure 1, in addition to being extremely simple and inexpensive to put in place, it makes the whole operation of anchoring completely reversible, and enables not to affect the fresco in any way, differently from what happens in the known solutions in which it is made use of a consolidating resin. It should be understood that anchoring is preferably made on the render sub-layer without causing weaken on the other plaster sub-layers.
- Furthermore, the mechanical anchoring realized on the
ribs 310 by the anchoringmembers 2 allows to dampen the vibrations transmitted to theplaster layer 300 by the plaster-holdingtimber frame 310. In fact, differently from the known techniques in which the consolidating resin completely sticks and unites the plaster to the framework creating a unique body therefore making them both subject to the same vibration, the anchoringmembers 2 made in accordance with the presente invention remain leaning on thelaths 210 and, consequently, is able to move smoothly on themselves thus reducing the vibration transmitted to the anchoredrib 310. - Also thanks to the achievement of a controlled decohesion of the ribs from the
plaster holding frame 200, and to the use of the consolidating mixture and of the fixing mixture conferring greater elasticity and hardness to therib portion 16, the micro-grinding of therib 310 is significantly reduced. - With reference to
Figures 1, 2 and 3 , the Applicant has also found that preferably by interposing ashock absorbing element 6 between thesupport beam 4 of each anchoringdevice 3 and the upper surface of thelath 210, it is possible to lower a great deal of the vibrations transmitted fromtimber frame 200 to theplaster layer 300. In accordance with one example, theshock absorbing element 5 may include, for example, a cylindrical spring or an annular rubber bearing or anti-vibrating neoprene or any similar material fitting in the anchoringstem 3. - With reference to
Figure 5 , the Applicant has also found that preferably by interposing a reticular structure or supporting net orgrid 7 between the support beams 4 of theanchorage elements 2, and the upper surface 220b of the plaster holdingtimber frame 200, the structural elasticity of theceiling 100 is further increased, and consequently the capacity of the same to withstand mechanical stress caused by high intensity vibrations. For this purpose, the Applicant has realized a different embodiment shown inFigures 5 and 6 , in which the mechanical anchoring structure 1 comprises theflat grid 7 which is arranged leaning/resting on theupper surface 200b of theplaster holding timber 200. In accordance with one exemplary embodiment, the upper end of the anchoringstem 3 is put inside an opening in thegrid 7 in such a way as to stick out at least partially above the grid itself, while thesupport beam 4 is coupled to the upper end of thestem 3 and is disposed resting on the upper face of thegrid 7. - It should be understood that the
grid 7 increases the elasticity of the mechanical anchoring structure 1 as well as the ability to maintain the anchored layer ofplaster 300 even in case of high vibrations. In fact, it should be understood that thanks to its reticular mail, the net orgrid 7 is able to make slight shifts on the upper surface 220b of the plaster holdingtimber frame 200 and simultaneously enables the ends of the anchoring stems 3 to shift freely a few millimeters within the openings of thegrid 7 and enables thebeams 4 to slide a few millimeter or the surface 220b of the grid. Therefore in the case of major vibration, thanks to the combining of theanchoring members 2 to thegrid 7, the anchoring structure 1 shows an elastic behavior which allows to dampen the vibrations transmitted from theframe 200, while ensuring a stable anchoring of theplaster layer 300 below. - In accordance with one embodiment illustrated in
Figure 6 , thegrid 7 may be preferably shaped so as to present one or more transversal sections to the longitudinal axis A, shaped as an inverted V forming cross channels for ventilation/air passage designed to increase, on the one hand, the degree of transpiration of theplaster layer 300 and of thelaths 210, and on the other hand, the carrying capacity of the anchoring structure 1. In accordance with one exemplary embodiment thegrid 7 may be made in metallic or plastic material such as polyvinyl-acrylate and/or glass fiber and/or carbon fiber or similar. According to one exemplary embodiment thegrid 7 may be metallic and correspond, for example, to the one called "Pernevometal" (registered trademark), made by Logitec System SRL. - In accordance with one embodiment shown in
Figures 5 and 6 , the mechanical anchoring structure 1 may comprises preferably although not necessarily a layer ofcarbonate mortar 9 made mostly by calcium carbonate, gypsum and an acrylic resin. Themortar layer 9 extends on the upper surface of thegrid 7 of predetermined thickness, and is permanently fixed to the latter or to theribs 310, if present, through the openings in thegrid 7 itself. - In accordance with one embodiment shown in
Figures 5 and 6 , the mechanical anchoring structure 1 may also comprise preferably although not necessarily at least one net or mesh 10 of elastic and flexible material, for example of elastomeric material, which may be embedded within the layer ofcarbonate mortar 9, if the latter is present, and is arranged on a flat surface substantially parallel to themetal grid 7. The Applicant has found that the use of themesh 10 in elastic and flexible material, also gives a certain elasticity to the layer ofcarbonate mortar 9 and, consequently, increases the overall elasticity of the mechanical anchoring structure 1. - The method for consolidating the anchoring of the
plaster layer 300 to the plaster holdingtimber frame 200 based on the example shown inFigures 5 and 6 comprises the following steps. Preferably but not necessarily, the method may involve the step of removing the portions of crumbling plaster belonging to theribs 310 from theembrasures 220. Preferably but not necessarily, the method may include the step of filling the empty spaces present in theembrasures 220, caused by the disintegration of theribs 310, with the consolidating mixture, in order to rebuild or complete the crumblingribs 310 within theembrasures 220. The method may further comprise the step of formingholes 5 on theribs 310 in correspondence of the predetermined fixing points. - In accordance with one embodiment, the method may further comprises the steps of:
- injecting preferably a given quantity of consolidating resin 15 in the
hole 5 so as to increase both the hardness of the portion ofrib 310a surrounding thehole 5, and the elasticity of the portion of rib 301a; - disposing the
m grid 7 leaning on the upper surface 220b of the plaster holdingtimber frame 200; - injecting the mixture into the
holes 5; - inserting the anchoring stems 3 of the
anchoring elements 2 in the correspondingblind holes 5 in order to immerse them in the mixture; - coupling the support beams 4 to the anchoring stems 3 so as to arrange them leaning on the upper major surface of the
metal grid 7; - producing the layer of
carbonate mortar 9 onto themetal grid 7 drowning simultaneously theflexible mesh 10 of elastomeric material, in the layer ofcarbonate mortar 9. - According to a different embodiment shown in
Figures 7, 8 and 9 , the anchoringelement 2 of the mechanical anchoring structure 1 comprises ascrew 12 in which the anchoring threadedstem 3 screwed to anut 13 trapped in thehole 5 and preferably ahead 12a (corresponding to the support portion) arranged outside of thehole 5 and is structured/dimensioned so as to be put leaning on thelaths 210, preferably through the interposition of thecushioning element 6 according to the example shown inFigure 7 , or by the interposition of thegrid 7 according to the example shown inFigure 8 . - In accordance with one embodiment illustrated in
Figure 9 , thescrew 12 may be arranged in a manner such as to present thehead 12a or at least the threadedstem 4 trapped inside thehole 5, and thenut 13 disposed outside thehole 5 and shaped to be disposed in the support laths 210, preferably through the interposition of the cushioningmember 6, similarly to the example shown inFigure 7 , or through the interposition of thegrid 7 according to the example shown inFigure 9 . The Applicant has found that using ascrew 12 and anut 13 it is possible, from one side, to adjust the traction force imparted on therib 310, and consequently on theplaster layer 300, and the other to detach the anchoring mechanical structure 1 from theplaster layer 300 in a quick, simple, and extremely cheap way. - In accordance with one embodiment illustrated in
figure 10 , an end of the anchoring stem of the threadedstem 4 extends outside from the mouth of thehole 5 and is sliding inserted inside of an striker element, i.e. a washer, which is preferably arranged in abutment/rest on the layer ofcarbonate mortar 9, if the latter is present, i.e. on the upper surface 220b of the plaster holdingtimber frame 200, whereas a first elastic damper element corresponding for example to a spring is fitted in the anchoringstem 4 between thehead 12a of thescrew 12 and thewasher 14 and is designed to elastically oppose the movement of thehead 12a toward thewasher 14, i.e. the anchoring stem toward down under the action of the weight of theplaster layer 300. - The Applicant has found that using an
elastic damper element 16 arranged between thehead 12a and thewasher 14 allows to further increase the damping of vibrations that plaster holdingtimber frame 200 transmits to theplaster layer 300. - The Applicant has further found that first
elastic damper element 16 allows to detect/determine based on of its compression a critical condition indicating a possible detachment of theplaster layer 300 from plaster holdingtimber frame 200. In one embodiment the critical condition may be detected/determined when the distance between thehead 12a and thewasher 14 is preferably lower or equal to D1. - The Applicant has found that it is possible to regulate/control the damping degree/level of the
plaster layer 300 and signal the critical condition, by calibrating the elastic constant spring of thespring 16. - To the aim of improving the signaling of the critical condition, the first
elastic damper element 16 may be provided with annular colored portions, which, during the spring compression, superimpose one to another in order to highlight a prefixed color such that reaching of critical condition is signaled. - In accordance with one example illustrated in
Figures12 e 13element 2 corresponding to thescrew 12, differs from anchoringelement 2 of the embodiment illustrated inFigures 10 e 11 , because it comprises a secondelastic damper element 19, i.e. a spring, which is fitted in the portion of anchoringstem 14 which is in turn inserted in thehole 5 and is arranged between thenut 13 and thewasher 14. - The Applicant has found that combined using of the first 16 and second elastic damper elements 15 further increase the damping of vibrations that plaster holding
timber frame 200 transmits to theplaster layer 300. - In accordance with an embodiment illustrated in
Figure 14 , the anchoring portion of the anchoringmember 2 comprises a first segment/portion 20 of at least one metal wire inserted in thehole 5 and embedded in the latter preferably by means of the fixing mixture, whereas the support portion of the anchoringmember 2 comprises a second segment/portion 21 of the same thin metal wire. - In accordance with one exemplary embodiment, the second segment/
portion 21 extends upon thewooden laths 210 and connect the first segment/portion 20 of two ormore anchoring members 2. - In accordance with one exemplary embodiment, the first 20 and second segments/
portions 21 of a number of anchoringmembers 2 may be parts of a single wire and are obtained by folding said metal wire in more points in order to be inserted in thehole 5. In accordance with one exemplary embodiment an free end of the first segment/portion 20 arranged outside from the hole may be substantially shaped as an eyelet, whereas the second segments/portions 21 is partially inserted in the eyelet. - In accordance with one exemplary embodiment illustrated in
Figure 14 , the mechanical structure of anchoring 1 comprises theflexible mesh 10 interposed between the second segments/portions 21 of the wires and theupper surface 200b of theplaster holding timber 200. - In accordance with one possible exemplary embodiment illustrated in
Figure 14 , the mechanical structure of anchoring 1 further preferably comprise a thin layer ofcarbonate mortar 9, which extends upon theflexible mesh 10 to embed the latter, such that an elastic and stable connection is provided. - The Applicant has found that by using a thin steel wire, a simple and cheaper anchoring mechanical structure is obtained, imperceptible to see and thus not aesthetically degrading, wherein the vibration are reduced and at the same time anchoring in the ceiling presenting a thin plaster layer is assured.
- In accordance with one embodiment illustrated in
Figures 21-23 , the mechanical structure of anchoring 1 may comprise one or moreblind holes 5, which instead of being made in theribs 310, as disclosed in the several embodiments illustrated inFigures 1-20 , are made in thewooden laths 210 and each of them presents a first portion, which extends inside of therib 310 and a second portion which protrudes under therib 310 and extends in theplaster layer 300 beneath. - In accordance with one embodiment illustrated in
Figures 21, 22 and 23 , the anchoring portion of the anchoringmember 2 is inserted in theblind hole 5 and is assigned/set such that it extends at least partially inside the second portion of theblind hole 5 made in theplaster layer 300, whereas support portion of the anchoringmember 2 which is outer of the first portion of theblind hole 5 extends upon theupper surface 200b of theplaster holding timber 200 to be lean on the latter. - In accordance with one embodiment, the anchoring portion of the anchoring
member 2 may be further made integral with theplaster layer 300 inside of the second portion of thehole 5, by the fixing mixture in the analog manner of the embodiments disclosed above. - It should be understood that as illustrated in
figures 21-23 , the embodiment of the mechanical structure of anchoring 1 illustrated inFigure 21 (wherein it is used thehole 5 made in the laths 210), may be extended to a any of embodiments disclosed above and illustrated in the Figures from 1 to 20, wherein, depending on the embodiment, it is used an anchoring threadedstem 3, and/or agrid 7, and/or the layer ofcarbonate mortar 9, and/or thescrew 12, and/or the metallic connecting wire (illustrated inFigure 14 ). - In accordance with one embodiment not illustrated, the anchoring
members 2 may be conveniently connected one to the other by one or more profiled preferably straight and preferably made in flexible material, which are arranged rests on the upper surface (300a) facing the plaster-holding timber frame (200). - The advantages of the mechanical structure of anchoring are evident.
- First of all, the anchoring mechanical structure assures fixing of high loaded, i.e. heavy plaster layer to the plaster-holding timber frame also when it is subjected to external vibrations/mechanical stress, granting an high security for people inside the buildings.
- Moreover, differently from the known techniques using consolidating liquid resin, anchoring mechanical structure made according to the present invention allows transpiration of the fresco that does not deteriorate. Moreover the anchoring mechanical structure is reversible, i.e. is uncoupled from the plaster layer at any instant and allows therefore to recover and/or remove the plaster layer from the ceiling.
- Moreover, the anchoring mechanical structure is cheaper to be made and being very simple it may be quickly installed from not-skilled operators.
- While the present invention has been described with reference to the particular embodiments shown in the figures, it should be noted that the present invention is not limited to the specific embodiments illustrated and described herein; on the contrary, further variants of the embodiments described herein fall within the scope of the present invention, which is defined in the claims.
Claims (15)
- An anchoring structure (1) designed to anchor a plaster layer (300) to a wooden plaster-holding timber frame (200) of a building ceiling (100); said plaster-holding timber frame (200) being structured so as to have slots (220); said plaster layer (300) being structured to have an upper surface (300a) facing the plaster-holding timber frame (200) and is shaped so as to slip/be at least partially inserted in the slots (220) to form anchoring ribs (310);
said anchoring structure (1) being characterized in comprising a plurality of mechanical anchoring members (2), which are structured to be firmly connected to the ribs (310) and/or to the plaster layer (300) at a plurality of fixing points placed on said upper surface (300a) of the plaster layer (300) itself, and extend over the plaster-holding timber frame (200) so as to rest on the upper surface (200b) of the plaster-holding timber frame (200);
said mechanical anchoring members (2) comprising anchoring portions (3)(20) designed to be firmly inserted in holes (5) which are made in the ribs (310) and/or in the plaster layer (300) in/near said fixing points;
said anchoring structure (1) further comprises a fixing mixture which is injected in the holes (5) to embed said anchoring portion inside the hole (5) to cause the anchoring member (2) to be fixed to the plaster layer (300). - An anchoring structure according to claim 1, wherein said anchoring member (2) further comprise a supporting portion (4)(21), which is shaped to be arranged essentially astride of at least a rib (310) and extends over the plaster-holding timber frame (200) so as to be arranged at least partially rest on the upper surface (200b) of the plaster-holding timber frame (200).
- An anchoring structure according to claims 1 or 2, wherein said supporting portion (4) and said anchoring portion (3) of said anchoring member (2) are connected to each other in a firm, yet easily removable manner.
- An anchoring structure according to any one of the preceding claims, comprising at least one supporting net or grid (7), which is arranged/interposed between said supporting portion (4) of said anchoring member (2) and the upper surface (200b) of said plaster-holding timber frame (200).
- An anchoring structure according to claim 4, wherein said supporting net or grid (7) has crosswise V-shaped segments which form air passage channels between the plaster layer (300) and the plaster-holding timber frame (200).
- An anchoring structure according to claim 4 or 5, comprising a calcium-carbonate-based carbonate layer (9), which extends over said supporting grid (7), and/or at least one mesh (10) made of flexible material, which extends parallel to said supporting grid (7) and isconnected to anchoding members (2).
- An anchoring structure according to any one of the previous claims, wherein a hole (5) is obtained through a lath (210) of said plaster-holding timber frame (200) at one said fixing point and at least partially extends in said plaster layer (300); said anchoring portion (3) of said anchoring member (2) is structured to be firmly inserted in said hole (5).
- A structure according to any one of the preceding claims from 2 to 7, wherein the anchoring portion (3) of said anchoring member (2) comprises an anchoring stem (3) inserted/engaged in said hole (5); said supporting portion of said anchoring member (2) comprises a supporting beam (4), which is connected to the anchoring stem (3) and extends in a direction locally essentially crosswise to the anchoring stem (3), and is structured to as to at least partially rest on the upper surface (200b) of the plaster-holding timber frame (200).
- A structure according to any one of the preceding claims, wherein said anchoring portion (3) of said anchoring member (2) comprises a stem having a first threaded end screwed to a nut (13), and/or a head (12a) which is firmly connected to a second end of said stem opposite to the first end; either said head (12a) or an inner portion of threaded stem or said nut (13) being firmly entrapped within said hole (5).
- A structure according to any of previous claims wherein the anchoring members (2) comprises at least an damper element (6) interposed between the support portion (4) and the upper surface (200b) of the plaster-holding timber frame (200).
- A structure according claim 9, wherein the anchoring member (2) comprises a first elastic damper element (16), which is fitted in the anchoring stem (3) so as to be arranged outside the hole (5) between either the first or the second end of the anchoring stem (3) itself and a striker member (14) supported by the upper surface (200b) of the plaster-holding timber frame (200).
- A structure according to claim 11, wherein the anchoring member (2) comprises a second elastic damper element (19), which is fitted in the anchoring stem (3) so as to be arranged inside the hole (5) between either the first or the second end of the anchoring stem (3) itself and said striker member (14) supported by the upper surface (200b) of plaster-holding timber frame (200).
- A structure according to any one of the previous claims, wherein said anchoring portion of said anchoring member (2) comprises a first segment/portion (20) of at least one metal wire engaged/inserted in said hole (5) and embedded in the latter by means of said fixing mixture, whereas the supporting portion of the anchoring members (2) comprises a second segment/portion (21) of a thin metal wire firmly connected to the first segment/portion (20).
- A structure according to claim 13, wherein the second segment (21) of the metal wire extends over the plaster-holding timber frame (200) and connects the first wire segments (20) of two or more anchoring members (2) to one another.
- A method for anchoring a plaster layer (300) to a wooden plaster-holding timber frame (200) of a building ceiling (100); said plaster-holding timber frame (300) being structured so as to have slots (220); said plaster layer coat (300) being structured to have an upper surface (300a) facing the plaster-holding timber frame (200) and shaped so as to slip/be inserted in the slots (220) to form anchoring ribs (310);
said method comprising the step of:arranging a plurality of mechanical anchoring members (2) resting on the upper surface (200b) of the plaster-holding timber frame (200), andfirmly connecting said mechanical anchoring members (2) to the plaster layer (300) at a plurality of fixing points placed on said upper surface (300a) of the plaster layer;said anchoring members (2) comprises an anchoring portion designed to be firmly coupled either to a rib (310) and/or to the plaster layer (300), and a supporting portion, which is shaped so as to extend on the upper surface (200b) of the plaster-holding timber frame (200) to be at least partially rest on the upper surface (200b) of the plaster-holding timber frame (200);said method being characterized in:making a blind hole (5) in the plaster layer (300) at a fixing point;injecting a given amount of strengthening resin (15) into the hole (5) so as to increase both the hardness and the elasticity of the plaster layer (300) which surrounds at least one segment of the hole (5);engaging the anchoring portion of the anchoring member (2) within the hole (5) so as to place the supporting portion resting on the plaster-holding timber frame (200);injecting a fixing mixture into said hole (5) so as to embed said anchoring portion of the anchoring member (2) in the hole (5) to make the anchoring member (2) integral with the plaster layer (300).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT000161A ITTV20120161A1 (en) | 2012-08-10 | 2012-08-10 | STRUCTURE AND METHOD FOR ANCHORING A PLASTER LAYER TO A WOODEN DOOR-PLASTER HOUSING OF A BUILDING CEILING |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2696009A1 true EP2696009A1 (en) | 2014-02-12 |
EP2696009B1 EP2696009B1 (en) | 2018-10-03 |
Family
ID=46982803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13180003.9A Active EP2696009B1 (en) | 2012-08-10 | 2013-08-09 | Anchoring structure and method of anchoring a frescoed plaster layer to a wooden plaster-holding timber frame of a building ceiling |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP2696009B1 (en) |
IT (1) | ITTV20120161A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT201600074430A1 (en) * | 2016-07-15 | 2018-01-15 | Walter Fiorin | ELASTIC ANCHORAGE SYSTEM TO CONSOLIDATE THE ANCHORING OF A PLASTER LAYER TO A STRUCTURE OF A BUILDING TUNING OF A BUILDING |
EP3492672A4 (en) * | 2016-07-29 | 2020-04-01 | Kogakuin University | Ceiling repair method and wall repair method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US733671A (en) * | 1903-05-02 | 1903-07-14 | Martin Murray | Ceiling-anchor. |
GB475347A (en) | 1936-02-17 | 1937-11-17 | Joseph Leslie Musgrave | Improvements in connection with the heating and cooling of buildings |
US2598984A (en) * | 1946-10-29 | 1952-06-03 | Frederick M Eslick | Reinforced plastic patch for walls |
US20070029025A1 (en) | 2005-08-02 | 2007-02-08 | Brennan Rory E | Compositions and Methods for Adhesion |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB710166A (en) * | 1952-04-21 | 1954-06-09 | British Plaster Board Ltd | Fixing means for use in mounting plaster, fibre and like boards in building structures |
US5697195A (en) * | 1995-03-07 | 1997-12-16 | Alabama Metal Industries Corporation | Plaster security barrier system |
DE19651989A1 (en) * | 1996-12-13 | 1998-06-18 | Paul Kramer | Structure of heat insulating wall |
-
2012
- 2012-08-10 IT IT000161A patent/ITTV20120161A1/en unknown
-
2013
- 2013-08-09 EP EP13180003.9A patent/EP2696009B1/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US733671A (en) * | 1903-05-02 | 1903-07-14 | Martin Murray | Ceiling-anchor. |
GB475347A (en) | 1936-02-17 | 1937-11-17 | Joseph Leslie Musgrave | Improvements in connection with the heating and cooling of buildings |
US2598984A (en) * | 1946-10-29 | 1952-06-03 | Frederick M Eslick | Reinforced plastic patch for walls |
US20070029025A1 (en) | 2005-08-02 | 2007-02-08 | Brennan Rory E | Compositions and Methods for Adhesion |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT201600074430A1 (en) * | 2016-07-15 | 2018-01-15 | Walter Fiorin | ELASTIC ANCHORAGE SYSTEM TO CONSOLIDATE THE ANCHORING OF A PLASTER LAYER TO A STRUCTURE OF A BUILDING TUNING OF A BUILDING |
EP3269897A1 (en) | 2016-07-15 | 2018-01-17 | Walter Fiorin | Elastic anchoring of plaster layers |
EP3492672A4 (en) * | 2016-07-29 | 2020-04-01 | Kogakuin University | Ceiling repair method and wall repair method |
Also Published As
Publication number | Publication date |
---|---|
EP2696009B1 (en) | 2018-10-03 |
ITTV20120161A1 (en) | 2014-02-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9297176B2 (en) | System and method for retrofitting walls with retaining ties | |
US9447574B2 (en) | Concrete anchor | |
CA2539321C (en) | Carrier tile consisting of film-like plastic | |
US8359793B2 (en) | Earthquake force absorption system | |
KR101026106B1 (en) | Junction structure of installation frame for seismic control damper and it's junction method | |
CA2357834C (en) | Thin prestressed concrete panel and apparatus for making the same | |
EP2696009B1 (en) | Anchoring structure and method of anchoring a frescoed plaster layer to a wooden plaster-holding timber frame of a building ceiling | |
JP2013083104A (en) | Composite floor structure, fire resistant structure and construction method of composite floor structure | |
CA2678452A1 (en) | Device for anchoring concrete to an insulating panel and form employing the device | |
JP5384310B2 (en) | Fall bridge prevention device | |
Cimellaro et al. | Introspection on improper seismic retrofit of Basilica Santa Maria di Collemaggio after 2009 Italian earthquake | |
DE102010025135A1 (en) | Facade anchor for height-adjustable fastening of thermally insulated facade during building construction, has connecting link made of material with low heat conductance and high compression strength and designed as thick-walled plate | |
CN107869270B (en) | Shockproof building | |
Dizhur et al. | Observations from the 2010/2011 canterbury earthquakes and subsequent experimental pull-out test program of wall-to-diaphragm adhesive connections | |
JP6814656B2 (en) | Installation method of precast members, temporary retainer | |
DE102010015262B4 (en) | Facade anchoring and method for producing a facade anchoring | |
JP5727579B2 (en) | Construction method of multi-expansion permanent anchor | |
KR20140147186A (en) | The buoyancy protection device of hollow former using elasticity or rotation | |
JP6731728B2 (en) | Precast concrete components with stone tip for structural members | |
CN109322680B (en) | Supporting lining and preventing and controlling method | |
KR101323162B1 (en) | The fixing device of fabric sheet form | |
Zavalis et al. | Experimental investigation of pull out strength of flexible ties in thin brick veneer layer | |
KR20100005578U (en) | Block for the ground reinforcement structure | |
EP3269897B1 (en) | Elastic anchoring of plaster layers | |
CZ33629U1 (en) | A preparation for stabilizing cross and spherical arches against dynamic effects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20140812 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04G 23/02 20060101AFI20180212BHEP Ipc: E04F 13/02 20060101ALI20180212BHEP Ipc: E04F 13/04 20060101ALI20180212BHEP |
|
INTG | Intention to grant announced |
Effective date: 20180315 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1048758 Country of ref document: AT Kind code of ref document: T Effective date: 20181015 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Ref country code: DE Ref legal event code: R096 Ref document number: 602013044394 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: BOHEST AG, CH |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20181003 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1048758 Country of ref document: AT Kind code of ref document: T Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190203 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190103 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190103 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190203 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190104 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013044394 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
26N | No opposition filed |
Effective date: 20190704 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190809 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190809 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190831 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20200824 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20200821 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130809 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210831 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210831 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20220826 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20230831 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602013044394 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240301 |