EP2672038A2 - Seismisches Gebäudeverstärkungssystem - Google Patents
Seismisches Gebäudeverstärkungssystem Download PDFInfo
- Publication number
- EP2672038A2 EP2672038A2 EP13169294.9A EP13169294A EP2672038A2 EP 2672038 A2 EP2672038 A2 EP 2672038A2 EP 13169294 A EP13169294 A EP 13169294A EP 2672038 A2 EP2672038 A2 EP 2672038A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- walls
- laminated timber
- cross laminated
- massive cross
- fact
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005728 strengthening Methods 0.000 title claims abstract description 34
- 239000003292 glue Substances 0.000 claims abstract description 9
- 238000004873 anchoring Methods 0.000 claims abstract description 7
- 238000010079 rubber tapping Methods 0.000 claims abstract description 7
- 239000002023 wood Substances 0.000 claims abstract description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 241000446313 Lamella Species 0.000 claims description 2
- 239000004566 building material Substances 0.000 claims description 2
- 150000002118 epoxides Chemical class 0.000 claims 1
- 230000007704 transition Effects 0.000 claims 1
- 238000009413 insulation Methods 0.000 description 8
- 238000010276 construction Methods 0.000 description 7
- 230000007812 deficiency Effects 0.000 description 6
- 239000004567 concrete Substances 0.000 description 5
- 238000005192 partition Methods 0.000 description 4
- 238000005253 cladding Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000003822 epoxy resin Substances 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 229920000647 polyepoxide Polymers 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000032798 delamination Effects 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000003475 lamination Methods 0.000 description 1
- 238000009420 retrofitting Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/027—Preventive constructional measures against earthquake damage in existing buildings
Definitions
- the subject of the invention is a system for seismic strengthening of buildings, or to be more specific, a system for seismic strengthening of walls and connecting of floor planes of existing buildings with massive cross laminated timber panels, which also includes an insulation effect.
- the invention belongs to E04G23/02 and to E04H9/02 and, additionally, to E04B1/74.
- the technical problem solved by this invention is seismic and energy retrofit of existing buildings that were not built to withstand seismic loads.
- the retrofit is performed with cross laminated timber panels, which are used to strengthen the walls and floor planes of timber, stone, masonry and concrete buildings with the aim to withstand horizontal forces caused by an earthquake or strong wind and at the same time to ensure a higher thermal insulation of buildings.
- the technical problem is resolved with a seismic strengthening system whose main feature is that it is conceived as a cladding from massive cross laminated timber panels that can be used to confine all load bearing and partition walls from the outer and/or inner sides of existing buildings regardless of the building material.
- the massive cross laminated timber panels serve as strengthening panels that due to their structure also serve as a thermal insulation of the building.
- Various implementations of massive plates are possible and are glued to the walls and additionally connected with bolts.
- the building seismic strengthening system is made from massive cross laminated timber panels 3 with which the walls 1 of an existing building are cladded from the outer and/or inner side.
- the massive cross laminated timber panels 3 are attached to the walls with a layer of glue 4 and additionally fixed with connections, namely anchor bolts 5 in the presented feasibility example, and self-tapping wood screws 11.
- the openings 7 for the existing windows and doors in walls 1 of an existing building are cut out of the massive cross laminated timber panels 3 and/or encircled with them so that they are left uncovered.
- some doors and windows in the walls 1 of an existing building can also be covered with massive cross laminated timber panels 3.
- the massive cross laminated timber panels 3 are interconnected with flat steel ties 6, typically at around each floor structure 2 area.
- the massive cross laminated timber plates 3 are placed onto the walls 1 of the masonry building. This is shown in Fig. 1 .
- the massive cross laminated timber plates 3 can also be used to clad and strengthen walls 1 made from concrete, timber or any other material, which can be used for this purpose, or a combination of materials, with or without an insulation layer and/or a façade.
- the walls 1 in the appurtenant storeys of an existing building can be strengthened with a monolithic massive cross laminated timber plate 3 that completely and in one piece covers the inner and/or outer side of an individual wall 1.
- the openings 7 for existing doors and/or windows in wall 1 are cut out of the massive cross laminated timber panel 3, which runs from the foundation 8 and partially over the edge of the floor structure 2, in advance.
- the monolithic massive cross laminated timber panels 3 are attached to the walls 1 and floor structures 2 with a layer of glue 4 and additionally connected with anchoring bolts 5 placed over their surface at a certain spacing.
- a layer of glue 4 suitable for the task is used.
- the walls 1 of the existing building can be cladded, conversely strengthened, from one or both sides, with massive cross laminated timber panels 3 made from several smaller pieces 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7 to 3.n of various shapes and dimensions. Together they form connecting areas 9 that are additionally connected on adjacent edges with self-tapping wood screws 11. Individual pieces 3.1 to 3.n of the massive cross laminated timber panel 3 are attached to wall 1 as in the feasibility example in Fig. 2 , namely with anchoring bolts 5.
- the advantage of the multi-piece assembly of the massive cross laminated timber panels 3 over before described monolithic one, is that cutting of openings 7 for the existing windows and doors is not necessary as the openings are formed during the cladding and attaching of pieces of massive cross laminated timber panels 3.1 to 3.n around window and door openings in walls 1 of an existing building. Above all the multi-piece assembly is easier if the massive cross laminated timber panels 3 are being attached to the inner side of walls 1. Smaller pieces 3.1 to 3.n are lighter and allow for an easier manipulation without the need for lifting equipment.
- different walls 1 can be cladded with massive cross laminated timber panels 3, both with monolithic and multi-piece assemblies combined, as shown in Fig. 2 and Fig. 3 .
- the connecting areas 9 in the floor structure 2 zones of an existing building are made in the same way as prescribed below.
- the connecting areas 9, where the massive cross laminated timber plates 3 attached to walls 1 in two adjacent stories connect, are preferentially covered along the perimeter of the floor structure 2 with a flat steel tie 6 with holes 12 that is attached to the adjacent connecting massive cross laminated timber panels 3 with self-tapping wood screws 11. Shear forces and bending moments are transferred via the flat steel ties 6 from higher to lower floors of an existing building.
- the massive cross laminated timber panels 3 are attached to the walls 1 of an existing building with a layer of glue 4 and additionally fastened with anchoring bolts 5 and washers 10. The described is presented in Fig. 4 .
- the walls 1 of existing buildings can be cladded and strengthened with massive cross laminated timber panels 3 that run from the foundation 8 to the roof of the building, or any other height, in one piece.
- the massive cross laminated timber panels 3 are tailored to the geometry of the existing building's envelope. Optimally, they are made from 3 to 7 or even more layers of cross laminated timber lamellas of arbitrary thickness where every layer runs perpendicularly to the two neighbouring ones.
- the necessary thickness of the massive cross laminated timber panels 3 is prescribed according to the static and seismic demands of the building.
- the panels need to be made [Z1] with a hydraulic system press.
- the massive cross laminated timber panels 3 can be attached to the walls 1 of an existing building from the outer and/or inner side in the same formerly prescribed manner.
- the layer of glue 4 is made of epoxide resin and added fillers with which we can fill larger deviations between the existing walls 1 of an existing building and massive cross laminated timber panels 3.
- An epoxy resin allowing for up to a few centimetre glue layer 4 is chosen.
- the openings 7 in massive cross laminated timber panels 3 can be cut out before their attachment onto the walls 1 of an existing building or they can be tailored to shape by assembling smaller pieces 3.1 to 3.n around the existing windows and doors in the wall 1. If using monolithic massive cross laminated timber panels 3, there is a possibility of a prior installation of builders' joinery into the openings 7, which shortens and simplifies the work on terrain and ensures a higher quality of individual part assembly.
- the massive cross laminated panels 3 are glued and bolted onto walls 1 of an existing building but not also into its foundation 8, hence leaving them undamaged and in their original shape.
- the massive cross laminated timber panels 3 attached to the walls 1 of an existing building have a relatively low mass the additional load on the foundation is minimal and can hence be neglected in practice.
- the building seismic strengthening system according to the invention is above all useful for strengthening the walls 1 of existing buildings built in seismically active areas but not designed to withstand seismic loads. In case of a catastrophic earthquake the system allows minor damage to buildings but it prevents their collapse due to the fairly flexible strengthening cage formed by massive cross laminated timber panels 3 attached to the walls 1.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
HRP20180248TT HRP20180248T1 (hr) | 2012-06-06 | 2018-02-08 | Sustav seizmičnog ojačanja građevine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SI201200184A SI23678B (sl) | 2012-06-06 | 2012-06-06 | Sistem protipotresnega utrjevanja zgradb |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2672038A2 true EP2672038A2 (de) | 2013-12-11 |
EP2672038A3 EP2672038A3 (de) | 2014-06-25 |
EP2672038B1 EP2672038B1 (de) | 2017-11-15 |
Family
ID=46880828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13169294.9A Active EP2672038B1 (de) | 2012-06-06 | 2013-05-27 | Seismisches Gebäudeverstärkungssystem |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2672038B1 (de) |
HR (1) | HRP20180248T1 (de) |
SI (1) | SI23678B (de) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT201700024226A1 (it) * | 2017-03-03 | 2018-09-03 | Renzo Manganello | Sistema combinato di consolidamento statico e sismico e isolamento termico e acustico di pareti e di edifici esistenti e di nuova costruzione |
IT201800005726A1 (it) * | 2018-05-25 | 2019-11-25 | Modulo prefabbricato per la realizzazione o il consolidamento di costruzioni edilizie e metodo di realizzazione | |
CN113833306A (zh) * | 2021-10-22 | 2021-12-24 | 武汉楚天鼎盛建设有限公司 | 房屋墙体的加固装置及其施工工艺 |
IT202200006944A1 (it) * | 2022-04-07 | 2023-10-07 | Marlegno S R L Tecnologie Del Legno | Metodo di rinforzo antisismico di un edificio e rispettivo edificio |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09228658A (ja) | 1996-02-28 | 1997-09-02 | Kajima Corp | 木質系部材を用いた既存建物の耐震補強法 |
JP2009097165A (ja) | 2007-10-15 | 2009-05-07 | Ando Corp | 既存建物の外殻補強構造 |
JP2009174148A (ja) | 2008-01-22 | 2009-08-06 | Univ Of Ryukyus | コンクリート構造物の耐震補強構造および耐震補強方法 |
KR100989218B1 (ko) | 2010-08-10 | 2010-10-20 | 이정우 | 조적조 칸막이 벽의 내진보강방법 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0623182A4 (en) * | 1992-01-17 | 1996-05-22 | John J Heydon | Improved building structure and method of use. |
US6074149A (en) * | 1999-06-30 | 2000-06-13 | G. Lyle Habermehl | False threadscrew and screwstrip |
US20040071524A1 (en) * | 2002-10-11 | 2004-04-15 | Habermehl G. Lyle | Fastener with stepped head for composite decking |
JP2005126955A (ja) * | 2003-10-22 | 2005-05-19 | Nippon Steel Corp | 耐震補強構造および補強方法 |
JP2006125069A (ja) * | 2004-10-29 | 2006-05-18 | Tetsuo Fushimi | 木造建築物の耐震補強方法及びその耐震用補強板 |
CN101215930A (zh) * | 2008-01-02 | 2008-07-09 | 湖南大学 | 一种使用竹材加固墙体的方法 |
CN101863058B (zh) * | 2010-06-11 | 2012-01-04 | 德华兔宝宝装饰新材股份有限公司 | 一种新型集成材及其制作方法 |
-
2012
- 2012-06-06 SI SI201200184A patent/SI23678B/sl active Search and Examination
-
2013
- 2013-05-27 EP EP13169294.9A patent/EP2672038B1/de active Active
-
2018
- 2018-02-08 HR HRP20180248TT patent/HRP20180248T1/hr unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09228658A (ja) | 1996-02-28 | 1997-09-02 | Kajima Corp | 木質系部材を用いた既存建物の耐震補強法 |
JP2009097165A (ja) | 2007-10-15 | 2009-05-07 | Ando Corp | 既存建物の外殻補強構造 |
JP2009174148A (ja) | 2008-01-22 | 2009-08-06 | Univ Of Ryukyus | コンクリート構造物の耐震補強構造および耐震補強方法 |
KR100989218B1 (ko) | 2010-08-10 | 2010-10-20 | 이정우 | 조적조 칸막이 벽의 내진보강방법 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT201700024226A1 (it) * | 2017-03-03 | 2018-09-03 | Renzo Manganello | Sistema combinato di consolidamento statico e sismico e isolamento termico e acustico di pareti e di edifici esistenti e di nuova costruzione |
IT201800005726A1 (it) * | 2018-05-25 | 2019-11-25 | Modulo prefabbricato per la realizzazione o il consolidamento di costruzioni edilizie e metodo di realizzazione | |
CN113833306A (zh) * | 2021-10-22 | 2021-12-24 | 武汉楚天鼎盛建设有限公司 | 房屋墙体的加固装置及其施工工艺 |
IT202200006944A1 (it) * | 2022-04-07 | 2023-10-07 | Marlegno S R L Tecnologie Del Legno | Metodo di rinforzo antisismico di un edificio e rispettivo edificio |
Also Published As
Publication number | Publication date |
---|---|
EP2672038A3 (de) | 2014-06-25 |
SI23678A (sl) | 2012-09-28 |
SI23678B (sl) | 2021-10-29 |
EP2672038B1 (de) | 2017-11-15 |
HRP20180248T1 (hr) | 2018-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101245618A (zh) | 两边连接组合钢板剪力墙 | |
CN203412140U (zh) | 一种双层轻钢龙骨隔音墙 | |
CN104763085B (zh) | 装配整体式预应力双t楼板框架结构及其施工方法 | |
CN103321328A (zh) | 一种双层轻钢龙骨隔音墙及其施工方法 | |
CN103437463A (zh) | 预制装配轻钢耐火承重组合墙体结构 | |
EP2672038B1 (de) | Seismisches Gebäudeverstärkungssystem | |
CN110593449B (zh) | 一种装配式轻质竖条板式承重墙结构及其施工方法 | |
CN106988452A (zh) | 一种与装配式钢框架配套的工业化eps模块墙板体系 | |
CN204475580U (zh) | 墙板组件及全装配式房屋 | |
CN110593397A (zh) | 一种多层装配式板式建筑 | |
CN111622383B (zh) | 一种自复位混凝土框架结构钢板耗能填充墙及其装配方法 | |
CN110748076B (zh) | 预应力钢管桁架外挂墙板及使用该墙板制作安装的墙体 | |
CN219386748U (zh) | 装配式带框格叶板双夹层保温五层复合混凝土剪力墙板 | |
CN107355027B (zh) | 一种型钢砼剪力墙拼装型空间模块化结构体系及施工方法 | |
CN107460968B (zh) | 带铅管-粗砂消能减震键的夹心保温一字形复合墙体的制作作法 | |
KR101190547B1 (ko) | 라멘조 건축물용 내진 보강 구조물 및 이를 이용한 라멘조 건축물의 내진 보강 공법 | |
CN214034053U (zh) | 一种加强蒸压加气混凝土板建筑结构系统 | |
CN205348439U (zh) | 一种防火抗爆板 | |
CN115162814A (zh) | 框架波纹钢板剪力墙建筑 | |
CN211200814U (zh) | 一种装配式轻质竖条板式承重墙结构 | |
CN211200692U (zh) | 一种多层装配式板式建筑 | |
CN102926459B (zh) | 组合式房屋 | |
CN206800635U (zh) | 一种大板装配式房屋 | |
RU68025U1 (ru) | Многослойная стена | |
CN115949160B (zh) | 装配式内外叶板双夹层保温五层复合剪力墙板及作法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04H 9/02 20060101ALI20140516BHEP Ipc: E04H 9/08 20060101ALI20140516BHEP Ipc: E04G 23/02 20060101AFI20140516BHEP |
|
17P | Request for examination filed |
Effective date: 20150105 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
17Q | First examination report despatched |
Effective date: 20160509 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170602 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: GB Ref legal event code: FG4D Ref country code: AT Ref legal event code: REF Ref document number: 946436 Country of ref document: AT Kind code of ref document: T Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013029369 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: TUEP Ref document number: P20180248 Country of ref document: HR |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: T1PR Ref document number: P20180248 Country of ref document: HR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 946436 Country of ref document: AT Kind code of ref document: T Effective date: 20171115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180215 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180215 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180216 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013029369 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20180817 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20180527 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180527 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20180248 Country of ref document: HR Payment date: 20190520 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130527 |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20180248 Country of ref document: HR Payment date: 20200520 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171115 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171115 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180315 |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20180248 Country of ref document: HR Payment date: 20210519 Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20180248 Country of ref document: HR Payment date: 20220517 Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20180248 Country of ref document: HR Payment date: 20230515 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20230323 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20180248 Country of ref document: HR Payment date: 20240522 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: HR Payment date: 20240522 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20240531 Year of fee payment: 12 |