US20090033516A1
(en)
*
|
2007-08-02 |
2009-02-05 |
Schlumberger Technology Corporation |
Instrumented wellbore tools and methods
|
US9181796B2
(en)
|
2011-01-21 |
2015-11-10 |
Schlumberger Technology Corporation |
Downhole sand control apparatus and method with tool position sensor
|
AU2012391060B2
(en)
*
|
2012-09-26 |
2017-02-02 |
Halliburton Energy Services, Inc. |
Method of placing distributed pressure gauges across screens
|
US10138707B2
(en)
|
2012-11-13 |
2018-11-27 |
Exxonmobil Upstream Research Company |
Method for remediating a screen-out during well completion
|
US10392902B2
(en)
*
|
2012-11-21 |
2019-08-27 |
Schlumberger Technology Corporation |
Downhole tool anchoring system
|
WO2014100275A1
(fr)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Télémétrie de fond de trou filaire et sans fil au moyen d'un appareil de diagraphie
|
US10480308B2
(en)
|
2012-12-19 |
2019-11-19 |
Exxonmobil Upstream Research Company |
Apparatus and method for monitoring fluid flow in a wellbore using acoustic signals
|
WO2014100274A1
(fr)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Appareil et procédé de détection de la géométrie des fractures par télémétrie acoustique
|
US20150300159A1
(en)
|
2012-12-19 |
2015-10-22 |
David A. Stiles |
Apparatus and Method for Evaluating Cement Integrity in a Wellbore Using Acoustic Telemetry
|
US9759062B2
(en)
|
2012-12-19 |
2017-09-12 |
Exxonmobil Upstream Research Company |
Telemetry system for wireless electro-acoustical transmission of data along a wellbore
|
WO2014100276A1
(fr)
|
2012-12-19 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Transmission électro-acoustique de données le long d'un puits de forage
|
WO2014099206A1
(fr)
|
2012-12-21 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Ensemble de régulation d'écoulement pour des opérations de fond de trou, systèmes et procédés comprenant ces derniers
|
CA2894495C
(fr)
|
2012-12-21 |
2017-01-10 |
Exxonmobil Upstream Research Company |
Ensembles de regulation de debit pour operations en fond de puits et systemes et procedes comprenant lesdits ensembles de regulation de debit
|
WO2014099207A1
(fr)
|
2012-12-21 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Dispositifs d'étanchéité de fond de trou tels que des bouchons de fluide, systèmes et procédés comprenant ces derniers
|
WO2014099208A1
(fr)
|
2012-12-21 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Système et procédés de stimulation d'une formation souterraine multi-zone
|
CN103061746B
(zh)
*
|
2013-01-08 |
2015-10-28 |
中国石油天然气集团公司 |
油气井井下套管串分布式光缆全程在线应力检测装置
|
BR112015015553A2
(pt)
*
|
2013-01-28 |
2017-07-11 |
Halliburton Energy Services Inc |
fluido de monitoramento e método para fluidos de monitoramento em um poço penetrante de uma formação subterrânea
|
US9234408B2
(en)
*
|
2013-02-21 |
2016-01-12 |
Halliburton Energy Services, Inc. |
Systems and methods for optimized well creation in a shale formation
|
US9664037B2
(en)
|
2013-03-07 |
2017-05-30 |
Evolution Engineering Inc. |
Detection of downhole data telemetry signals
|
US9494018B2
(en)
*
|
2013-09-16 |
2016-11-15 |
Baker Hughes Incorporated |
Sand control crossover tool with mud pulse telemetry position
|
WO2015080754A1
(fr)
*
|
2013-11-26 |
2015-06-04 |
Exxonmobil Upstream Research Company |
Vannes de détente de criblage actionnées à distance et systèmes et procédés les comprenant
|
US9416653B2
(en)
|
2013-12-18 |
2016-08-16 |
Baker Hughes Incorporated |
Completion systems with a bi-directional telemetry system
|
US9790762B2
(en)
|
2014-02-28 |
2017-10-17 |
Exxonmobil Upstream Research Company |
Corrodible wellbore plugs and systems and methods including the same
|
WO2016028414A1
(fr)
|
2014-08-21 |
2016-02-25 |
Exxonmobil Upstream Research Company |
Dispositif de réglage de débit bidirectionnel destiné à faciliter les traitements de stimulation dans une formation souterraine
|
US10508536B2
(en)
|
2014-09-12 |
2019-12-17 |
Exxonmobil Upstream Research Company |
Discrete wellbore devices, hydrocarbon wells including a downhole communication network and the discrete wellbore devices and systems and methods including the same
|
US9951596B2
(en)
|
2014-10-16 |
2018-04-24 |
Exxonmobil Uptream Research Company |
Sliding sleeve for stimulating a horizontal wellbore, and method for completing a wellbore
|
US10301913B2
(en)
|
2014-12-31 |
2019-05-28 |
Halliburton Energy Services, Inc. |
Optimizing running operations
|
WO2016108893A1
(fr)
*
|
2014-12-31 |
2016-07-07 |
Halliburton Energy Services, Inc. |
Optimisation d'opérations de complétion
|
US10253599B2
(en)
|
2014-12-31 |
2019-04-09 |
Halliburton Energy Services, Inc. |
Optimizing stimulation and fluid management operations
|
US9863222B2
(en)
|
2015-01-19 |
2018-01-09 |
Exxonmobil Upstream Research Company |
System and method for monitoring fluid flow in a wellbore using acoustic telemetry
|
US10408047B2
(en)
|
2015-01-26 |
2019-09-10 |
Exxonmobil Upstream Research Company |
Real-time well surveillance using a wireless network and an in-wellbore tool
|
DE112015006309T5
(de)
|
2015-05-14 |
2017-11-30 |
Halliburton Energy Services, Inc. |
Untertageumschaltung von Bohrlochvermessungswerkzeugen
|
JP2016220709A
(ja)
*
|
2015-05-26 |
2016-12-28 |
オムロンヘルスケア株式会社 |
運動支援装置、運動支援方法、及び運動支援プログラム
|
US10316646B2
(en)
*
|
2015-06-30 |
2019-06-11 |
Halliburton Energy Services, Inc. |
Position tracking for proppant conveying strings
|
US20170159419A1
(en)
|
2015-12-02 |
2017-06-08 |
Randy C. Tolman |
Selective Stimulation Ports, Wellbore Tubulars That Include Selective Stimulation Ports, And Methods Of Operating The Same
|
US10196886B2
(en)
|
2015-12-02 |
2019-02-05 |
Exxonmobil Upstream Research Company |
Select-fire, downhole shockwave generation devices, hydrocarbon wells that include the shockwave generation devices, and methods of utilizing the same
|
US10309195B2
(en)
|
2015-12-04 |
2019-06-04 |
Exxonmobil Upstream Research Company |
Selective stimulation ports including sealing device retainers and methods of utilizing the same
|
RU2620824C1
(ru)
*
|
2015-12-22 |
2017-05-30 |
Мурад Давлетович Валеев |
Устройство для последовательного отбора нефти и воды из скважины
|
US11530606B2
(en)
|
2016-04-07 |
2022-12-20 |
Bp Exploration Operating Company Limited |
Detecting downhole sand ingress locations
|
EP3670830B1
(fr)
|
2016-04-07 |
2021-08-11 |
BP Exploration Operating Company Limited |
Détection d'événements de fond de trou à l'aide de caractéristiques de domaine de fréquence acoustique
|
US10415376B2
(en)
|
2016-08-30 |
2019-09-17 |
Exxonmobil Upstream Research Company |
Dual transducer communications node for downhole acoustic wireless networks and method employing same
|
US10526888B2
(en)
|
2016-08-30 |
2020-01-07 |
Exxonmobil Upstream Research Company |
Downhole multiphase flow sensing methods
|
US10590759B2
(en)
|
2016-08-30 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Zonal isolation devices including sensing and wireless telemetry and methods of utilizing the same
|
US10697287B2
(en)
|
2016-08-30 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Plunger lift monitoring via a downhole wireless network field
|
US10364669B2
(en)
|
2016-08-30 |
2019-07-30 |
Exxonmobil Upstream Research Company |
Methods of acoustically communicating and wells that utilize the methods
|
US10465505B2
(en)
|
2016-08-30 |
2019-11-05 |
Exxonmobil Upstream Research Company |
Reservoir formation characterization using a downhole wireless network
|
US10344583B2
(en)
|
2016-08-30 |
2019-07-09 |
Exxonmobil Upstream Research Company |
Acoustic housing for tubulars
|
US11828172B2
(en)
|
2016-08-30 |
2023-11-28 |
ExxonMobil Technology and Engineering Company |
Communication networks, relay nodes for communication networks, and methods of transmitting data among a plurality of relay nodes
|
EP3583296B1
(fr)
|
2017-03-31 |
2021-07-21 |
BP Exploration Operating Company Limited |
Surveillance de puits et de surcharge à l'aide de capteurs acoustiques distribués
|
AU2018321150A1
(en)
|
2017-08-23 |
2020-03-12 |
Bp Exploration Operating Company Limited |
Detecting downhole sand ingress locations
|
EP3695099A2
(fr)
|
2017-10-11 |
2020-08-19 |
BP Exploration Operating Company Limited |
Détection d'événements à l'aide de caractéristiques acoustiques de domaine fréquentiel
|
US10837276B2
(en)
|
2017-10-13 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along a drilling string
|
CN111201755B
(zh)
|
2017-10-13 |
2022-11-15 |
埃克森美孚上游研究公司 |
使用通信执行操作的方法和系统
|
US10697288B2
(en)
|
2017-10-13 |
2020-06-30 |
Exxonmobil Upstream Research Company |
Dual transducer communications node including piezo pre-tensioning for acoustic wireless networks and method employing same
|
US11035226B2
(en)
|
2017-10-13 |
2021-06-15 |
Exxomobil Upstream Research Company |
Method and system for performing operations with communications
|
WO2019074656A1
(fr)
|
2017-10-13 |
2019-04-18 |
Exxonmobil Upstream Research Company |
Procédé et système pour permettre des communications en utilisant le repliement
|
CN111201727B
(zh)
|
2017-10-13 |
2021-09-03 |
埃克森美孚上游研究公司 |
利用混合通信网络进行烃操作的方法和系统
|
US20190153857A1
(en)
*
|
2017-11-17 |
2019-05-23 |
Xiaohua Yi |
Method and System for Performing Hydrocarbon Operations using Communications Associated with Completions
|
US11203927B2
(en)
|
2017-11-17 |
2021-12-21 |
Exxonmobil Upstream Research Company |
Method and system for performing wireless ultrasonic communications along tubular members
|
US10690794B2
(en)
|
2017-11-17 |
2020-06-23 |
Exxonmobil Upstream Research Company |
Method and system for performing operations using communications for a hydrocarbon system
|
US10844708B2
(en)
|
2017-12-20 |
2020-11-24 |
Exxonmobil Upstream Research Company |
Energy efficient method of retrieving wireless networked sensor data
|
CN111542679A
(zh)
|
2017-12-29 |
2020-08-14 |
埃克森美孚上游研究公司 |
用于监视和优化储层增产操作的方法和系统
|
US11156081B2
(en)
|
2017-12-29 |
2021-10-26 |
Exxonmobil Upstream Research Company |
Methods and systems for operating and maintaining a downhole wireless network
|
WO2019156966A1
(fr)
|
2018-02-08 |
2019-08-15 |
Exxonmobil Upstream Research Company |
Procédés d'identification homologue de réseau et d'auto-organisation à l'aide de signatures tonales uniques et puits qui utilisent les procédés
|
US11268378B2
(en)
|
2018-02-09 |
2022-03-08 |
Exxonmobil Upstream Research Company |
Downhole wireless communication node and sensor/tools interface
|
SG11202006095SA
(en)
*
|
2018-03-23 |
2020-07-29 |
Halliburton Energy Services Inc |
Remote control flow path system for gravel packing
|
US10364659B1
(en)
|
2018-09-27 |
2019-07-30 |
Exxonmobil Upstream Research Company |
Methods and devices for restimulating a well completion
|
WO2020091775A1
(fr)
*
|
2018-10-31 |
2020-05-07 |
Halliburton Energy Services, Inc. |
Systèmes et procédés pour indiquer l'achèvement d'une opération de cimentation inverse
|
US11118431B2
(en)
*
|
2018-11-28 |
2021-09-14 |
Chevron U.S.A. Inc. |
Smart sand control service tool positioning
|
US20210389486A1
(en)
|
2018-11-29 |
2021-12-16 |
Bp Exploration Operating Company Limited |
DAS Data Processing to Identify Fluid Inflow Locations and Fluid Type
|
GB201820331D0
(en)
|
2018-12-13 |
2019-01-30 |
Bp Exploration Operating Co Ltd |
Distributed acoustic sensing autocalibration
|
US11952886B2
(en)
|
2018-12-19 |
2024-04-09 |
ExxonMobil Technology and Engineering Company |
Method and system for monitoring sand production through acoustic wireless sensor network
|
US11293280B2
(en)
|
2018-12-19 |
2022-04-05 |
Exxonmobil Upstream Research Company |
Method and system for monitoring post-stimulation operations through acoustic wireless sensor network
|
EP4045766A1
(fr)
|
2019-10-17 |
2022-08-24 |
Lytt Limited |
Caractérisation de débits entrants de fluide au moyen de mesures de das/dts hybrides
|
CA3154435C
(fr)
|
2019-10-17 |
2023-03-28 |
Lytt Limited |
Detection d'ecoulement entrant en utilisant de caracteristiques dts
|
WO2021093974A1
(fr)
|
2019-11-15 |
2021-05-20 |
Lytt Limited |
Systèmes et procédés d'améliorations du rabattement dans des puits
|
CA3180595A1
(fr)
|
2020-06-11 |
2021-12-16 |
Lytt Limited |
Systemes et procedes de caracterisation de flux de fluide souterrain
|
EP4168647A1
(fr)
|
2020-06-18 |
2023-04-26 |
Lytt Limited |
Formation de modèle d'événement à l'aide de données in situ
|
CN113187469B
(zh)
*
|
2021-05-08 |
2022-02-25 |
广州海洋地质调查局 |
一种建立上部完井管柱与下部完井管柱的通讯连接方法
|