EP2546418B1 - Method for providing a foundation for a mass located at height - Google Patents
Method for providing a foundation for a mass located at height Download PDFInfo
- Publication number
- EP2546418B1 EP2546418B1 EP12175860.1A EP12175860A EP2546418B1 EP 2546418 B1 EP2546418 B1 EP 2546418B1 EP 12175860 A EP12175860 A EP 12175860A EP 2546418 B1 EP2546418 B1 EP 2546418B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- piles
- positioning frame
- positioning
- foundation
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 68
- 238000005553 drilling Methods 0.000 claims description 19
- 238000004873 anchoring Methods 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 239000000463 material Substances 0.000 description 4
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 238000013519 translation Methods 0.000 description 2
- 230000014616 translation Effects 0.000 description 2
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000005404 monopole Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000003381 stabilizer Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/04—Guide devices; Guide frames
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0091—Offshore structures for wind turbines
Definitions
- the invention relates to a method for providing a foundation for a mass located at height, comprising the jacket of a wind turbine or a jetty, wherein the foundation comprises a quantity of piles driven into a bottom in a geometric pattern.
- the invention will be elucidated hereinbelow with reference to an offshore wind turbine.
- the reference to a wind turbine in no way implies that the invention is limited to the use in the context of such a wind turbine.
- the method can likewise be applied on a jetty.
- the support structure of a wind turbine normally has a slender design, for instance in the form of a tube or pillar. This pillar structure has to be coupled to a foundation in the bottom.
- offshore wind turbines which are placed in relatively shallow water, it is possible to make use of one mast extending from the machinery housing of the wind turbine to the foundation.
- the support structure of an offshore wind turbine can also comprise a tubular upper part and a lower part in the form of a lattice structure, also referred to as a jacket.
- a large part of the jacket extends underwater, where the jacket finds support on a bottom, in many cases the underwater bottom.
- a known method for providing a foundation for a mass located at height comprises of providing an offshore platform in the vicinity of the location provided for the foundation, determining the location for each pile, subsequently manipulating each pile using a lifting crane present on the platform and driving each pile into the bottom.
- the jacket is arranged on the foundation formed by the quantity of piles by arranging legs of the jacket in the piles (also referred to as pin piling) or, in an alternative method, around the piles (also referred to as sleeve piling).
- the piles are adapted in both cases to be able to receive the legs of the jacket, for instance by providing hollow piles (pin piling) or hollow legs of the jacket (sleeve piling).
- the invention has for its object to provide a method for providing a foundation for a mass located at height which is more efficient than the known method, i.e. takes less time than the known method.
- the method according to the invention allows a foundation to be provided in the form of a number of piles arranged in a geometric pattern in less time than known heretofore.
- the positioning frame Once the positioning frame has been placed in the correct position (in relation to the anticipated position of the quantity of piles), it requires no further repositioning as is often necessary in the prior art because the positioning frame, due to its own weight, causes friction with the bottom, and more particularly via base plates (21a, 21b, 21c) arranged on the underside of the positioning frame. Because the positioning frame is placed into the position of use via the guiding means and the lifting means, and these lifting means can be chosen in accordance with the requirements and conditions on site, an optimum positioning of the frame is possible.
- the positioning frame is brought into the position of use by lowering the frame via the lifting means.
- the position of the frame in the position of use is not determined particularly accurately here, for instance in view of the often rough conditions at sea.
- the method according to the invention therefore comprises of positioning and/or orienting the positioning frame to the position of use by means of separate positioning means.
- Such positioning means allow displacement of the positioning frame in its entirety to the desired position of use.
- the positioning means are adapted here such that they enable at least translations of the positioning frame relative to the bottom surface, particularly in a plane running more or less parallel to the bottom surface (referred to below as a horizontal plane), and preferably also rotations relative to the bottom surface.
- Rotations of the frame relative to the bottom surface can here comprise rotations around an axis running substantially perpendicularly of the bottom surface, but also rotations around an axis lying in a horizontal plane or in a plane varying from a horizontal plane.
- the method according to the invention makes it possible to increase the accuracy of positioning of the positioning frame relative to the bottom (and so also relative to the desired positions of the foundation piles) to variations in the horizontal plane of a maximum of 10 cm, preferably a maximum of 5 cm.
- This accuracy is unprecedented for a structure with the dimensions of a positioning frame and provides a great advantage because, due to the more accurate positioning of the positioning frame, a more accurate positioning of all foundation piles to be provided in the bottom is also achieved in one operation.
- the positioning means are adapted only to displace the positioning frame in a horizontal plane and to rotate it about an axis running substantially perpendicularly of this plane.
- the position of use of the positioning frame corresponds to a position in which the positioning frame, and in particular the guide sleeves thereof, is ready to receive the piles.
- the position of use is preferably located at a position in the vicinity of the bottom, and more preferably at a position in which the positioning frame substantially rests on the bottom.
- the positioning frame can be moved along and under the guidance of the spud poles by any means known to the skilled person. It is thus possible for instance to suspend the positioning frame from a number of traction cables, wherein the cables can be varied in length by for instance winches arranged on the work deck of the platform. The cable length can be shortened or lengthened using the winches, wherein the positioning frame is respectively lifted or lowered.
- the positioning frame is further provided with means for guiding the positioning frame along the spud poles of an offshore platform from a high position in the immediate vicinity of the work deck of the platform to a lower position, optionally onto or into the immediate vicinity of the bottom.
- the guide means are preferably adapted such that they can guide the positioning frame along the spud poles of the platform so that the positioning frame is aligned substantially horizontally in the lower position. This can for instance take place by suspending the positioning frame by means of three, and preferably by means of four cables, wherein each cable can be varied in length independently of the other cables by winches. This is particularly important in the case of a bottom which is not wholly flat.
- the positioning frame preferably comprises a lattice structure with a number of guide sleeves which are disposed spaced apart at the corner points thereof and which are connected by tubular lattice elements.
- the dimensions of the positioning frame in the plane are in principle larger than the dimensions out of the plane, wherein the direction out of the plane corresponds to a direction parallel to the lifting or lowering direction of the positioning frame.
- the guide sleeves are adapted to receive and guide the piles for driving into the bottom, and preferably comprise cylindrical casings, the longitudinal axis of which runs parallel to the direction of the positioning frame out of the plane.
- the guide sleeves are arranged in a geometric pattern, this pattern corresponding to the desired geometric pattern of the foundation piles.
- the tubular lattice elements extending between the guide sleeves ensure that guide sleeves remain substantially in their position during lifting and lowering of the positioning frame.
- the positioning frame is adapted to define a specific geometric pattern of the foundation piles. It is however also possible to make the positioning frame geometrically adaptable, for instance by providing the positioning frame with lattice elements adjustable in length and/or by providing the positioning frame with nodes which mutually connect lattice elements and allow adjustment of the angle between lattice elements. Such an embodiment allows realization of different geometric patterns of the foundation piles.
- a method in which the positioning frame is positioned and/or oriented by engaging the frame with a remotely operated robot vehicle (ROV).
- ROV remotely operated robot vehicle
- a more accurate positioning is achieved in yet another embodiment according to the invention which provides a method according to claim 1, in which the positioning frame is positioned and/or oriented by engaging the frame with traction cables provided with anchors, and/or an embodiment which provides a method in which the positioning frame is positioned and/or oriented by providing the frame with an assembly of manoeuvrable thrusters.
- Suitable are for instance azimuth thrusters comprising a propeller accommodated in a housing.
- the housing is rotatable here so that the positioning frame can be oriented during displacement and displaced in this orientation. If desired, use can also be made of a rudder or other steering gear for orienting purposes.
- a number of traction cables are connected on one side to the positioning frame and connected on the other side by means of the anchors to the bottom or other anchoring point.
- the positioning frame can be displaced relative to the anchoring points by changing the free length of the traction cables, for instance by means of winches.
- the above stated embodiments all have the advantage that the positioning of the positioning frame relative to the bottom can take place independently of the platform, which enables corrections of the position, wherein translations in the horizontal plane and possible rotations of the positioning frame relative to the underwater bottom are all possible.
- a preferred embodiment of the method according to the invention comprises of establishing the position of at least one pile and positioning the positioning frame such that at least one of the guide sleeves of the positioning frame is aligned with the position of the pile, in other words is located directly above said pile position.
- the arranging of a first pile through the at least one guide sleeve fixes the positioning frame. In such a position the guide sleeves for the other piles will automatically be located in their correct positions because their relative positions are determined by the geometric design of the positioning frame. A position determination for each individual pile is hereby no longer necessary.
- the guide sleeves of the positioning frame are adapted to receive and guide piles when they are carried into the bottom.
- the guide sleeves preferably have a diameter which is at least as large as the cross-section of the piles.
- use is preferably made of guide sleeves, the inner surface of which is provided along at least a portion of the length of the guide sleeves with support ribs for the piles.
- the piles are preferably driven so far through the guide sleeves that the top of the piles extends further than the underside of said portion (provided with support ribs) of the length of the guide sleeves.
- the method according to the invention is preferably characterized in that the foundation piles are arranged in the bottom by being driven into the bottom by the action of hydraulic or pneumatic hammer devices, vibrating hammer devices and/or oscillators. Such devices can be disposed on the floating device or on another floating device located in the vicinity. More preferred is a method in which the piles are driven into the bottom further than said portion (provided with support ribs) by the follower of a pneumatic hammer.
- a pneumatic hammer with follower is per se known to the skilled person.
- Another embodiment of the invention relates to a method according to claim 1, in which the arranging of the piles in the bottom is performed by drilling the foundation piles, and/or shafts in which the foundation piles are arranged, into the underwater bottom by means of drilling means.
- the drilling is performed by means of reverse circulation drilling ( figure 15 ) by pre-drilling with a casing ( figure 14 ) and/or by rock-socketing.
- a method comprising the step of removing the positioning frame once the piles have been arranged in the bottom, wherein the removal of the positioning frame is performed by lifting thereof with guiding by the spud poles from the lower position to the high position in the vicinity of the work deck of the platform.
- the invention further relates to a method for installing on a foundation a mass located at height, such as the jacket of a wind turbine or a jetty, wherein the foundation comprises a number of piles arranged by means of the above described method in a bottom, with the features of claim 1, the method comprising of arranging legs of the mass located at height into or around the piles.
- a method is more preferably provided comprising of anchoring the legs to the piles by means of grouting.
- the method according to the invention can be applied to provide a foundation of the above described type, the method is preferably applied on a bottom located underwater.
- the method according to the invention is further particularly suitable for cylindrical (hollow) foundation piles with a length of more than 20 m, more preferably at least 25 m and most preferably at least 30 m, and a weight of 20 to 150 tonnes, more preferably of 40 to 130 tonnes and most preferably of 50 to 110 tonnes.
- the guide sleeves preferably have a height (the dimension in the longitudinal direction of the guide sleeves) of at least 1 m, more preferably at least 3 m and most preferably at least 5 m, in order to further be able to guarantee the desired guiding function and vertical alignment of the foundation piles.
- a positioning frame is provided, which frame is adapted to provide a foundation for a mass located at height, such as the jacket of a wind turbine or a jetty, wherein the foundation comprises a number of piles driven into a bottom in a geometric pattern, which positioning frame comprises a number of mutually connected guide sleeves arranged in a geometric pattern and adapted to receive and guide a pile to be driven into the bottom, in addition to means for positioning and/or orienting the positioning frame, the means comprising an assembly of manoeuvrable thrusters.
- Shown with reference to figure 1 is a device that can be used in the method according to the invention in the form of a positioning frame 1 which comprises at the corner points four cylindrical guide sleeves (2a, 2b, 2c, 2d) adapted to receive and guide a pile.
- Guide sleeves (2a, 2b, 2c, 2d) are rigidly connected to each other by side lattices (3a, 3b, 3c, 3d) which are constructed from a relatively large number of tubular structural elements (4a, 4b, 4c, 4d).
- Cross braces (5a, 5b, 5c, 5d) connect the side lattices (3a, 3b, 3c, 3d) to a central connecting plate 6, whereby the lattice gains structural stiffness.
- Additional lattice elements such as as frame 3e, can be added in order to build up sufficient stiffness. All elements (2, 3, 4, 5) and connecting plate 6 define the positioning frame 1.
- the upper parts of side lattices (3a, 3b, 3c, 3d) are advantageously provided with a peripheral catwalk 9 for easy access and inspection.
- Guide sleeves (2a, 2b, 2c, 2d) are held in a fixed position relative to each other by the side lattices (3a, 3b, 3c, 3d) and the cross braces (5a, 5b, 5c, 5d), this such that guide sleeves (2a, 2b, 2c, 2d) are arranged in a geometric pattern, this pattern being in the embodiment shown in figure 1 a square with a side of about 20 m. Any other geometric pattern is however possible, such as a triangular pattern for instance.
- Each guide sleeve (2a, 2b, 2c, 2d) comprises a cylindrical peripheral wall (23a, 23b, 23c, 23d) which is supported by a base plate (21a, 21b, 21c, 21d) and with which positioning frame 1 can find support on the bottom.
- the inner surface of each guide sleeve (2a, 2b, 2c, 2d) is provided along a portion of the length of the guide sleeve with support ribs (22a, 22b, 22c, 22d) for supporting a pile when it moves through the guide sleeve.
- the dimensions of guide sleeves (2a, 2b, 2c, 2d) can be selected within wide limits, but have in the shown embodiment a height of about 6 m.
- Support ribs (22a, 22b, 22c, 22d) extend through a distance of about 3 m as measured from the upper edge of guide sleeves (2a, 2b, 2c, 2d), whereby the lower portion of the inner surface is without support ribs over about 3 m (and so has a larger diameter).
- Positioning frame 1 can further be provided with means for guiding positioning frame 1 along the spud poles of an offshore platform shown in figure 2 .
- these means comprise a structure with two U-shaped end forks (8a, 8b) which are fixedly connected to the rest of positioning frame 1 by means of tubular elements.
- Positioning frame 1 is positioned relative to platform 10 such that a spud pole (13a, 13b, 13c, 13d) of platform 10 is partially received in the space between the outer legs (9a, 10a, 9b, 10b) of the U-shaped end forks (8a, 8b), the space being large enough to be able to receive a spud pole.
- Positioning frame 1 can in this way be guided downward and/or upward along the spud pole(s).
- the means for guiding the positioning frame 1 along spud poles (13a, 13b, 13c, 13d) of the platform also comprise lifting means, such as winches 15 provided on the work deck of platform 10.
- FIG 2 A jack-up platform 10 adapted to be used in a method according to the invention is shown in figure 2 .
- Jack-up platform 10 comprises substantially a work deck 11 and four spud pole jacks (12a, 12b, 12c, 12d) at the corner points of work deck 11.
- Each jack (12a, 12b, 12c, 12d) operates a spud pole (13a, 13b, 13c, 13d) which can be lowered in the vertical direction 14 until the relevant spud pole finds support on bottom 30 ( figure 6 ).
- Work deck 11 is provided with winches 15 over which run cables which are connected to positioning frame 1. Using winches 15 the positioning frame 1 can be raised or lowered in the vertical direction 14.
- Platform 10 is further provided with two circular openings or moon pools (16a, 16b) which provide access to the water present under work deck 11 and which have a diameter which is large enough for passage of a foundation pile.
- Platform 10 thus carries the positioning frame 1, which in the shown preferred embodiment is provided on the underside of platform 10 in a rest position in the immediate vicinity of work deck 11 of platform 10.
- the assembly of platform 10 and positioning frame 1 is positioned such that moon pool 16b is vertically aligned with guide sleeve 2c, indicated in figure 2 with broken line 17.
- FIG 3 an embodiment of a method not according to the invention is shown, which method is characterized by providing a floating device 60 provided with lifting means in the form of lifting crane 18.
- Floating device 60 can for instance comprise a vessel, a platform, a pontoon or number of pontoons, and may or may not be independently driven.
- Positioning frame 1 with the shown mutually connected guide sleeves (2b, 2c) arranged in a geometric pattern is lowered via lifting crane 18 and hoisting cables 61 onto the underwater bottom 30 into a position of use in which the frame 1 finds stable support due to the relatively wide base plates (21a, 21b, 21c, 21d) and its own weight.
- FIG 4 shows another embodiment not according to the invention, in which floating device 60 comprises a platform 10 which supports by means of shown spud poles (13b, 13c) on the underwater bottom.
- Positioning frame 1 is lowered via lifting crane 18 and hoisting cables 61 onto the underwater bottom 30 into the position of use, wherein the lowering of positioning frame 1 therefore takes place independently of the spud poles.
- positioning frame 1 is positioned and/or oriented by engaging the frame 1 with a remotely operated robot vehicle 62, also referred to as a Remote Operated Vehicle or ROV, provided with a drive 63 and manipulators 64 which can engage on parts of positioning frame 1.
- a remotely operated robot vehicle 62 also referred to as a Remote Operated Vehicle or ROV
- ROV Remote Operated Vehicle
- positioning frame 1 is positioned and/or oriented by engaging the frame 1 with traction cables 66 which are provided with anchors 65 and connected to positioning frame 1.
- traction cables 66 which are provided with anchors 65 and connected to positioning frame 1.
- the frame 1 can be accurately positioned by taking in and/or paying out the traction cables 66 by means of winches 15.
- Positioning frame 1 can be guided here along the spud poles of platform 10 as well as independently of the spud poles.
- Positioning frame 1 is positioned and/or oriented here by providing frame 1 with an assembly of manoeuvrable thrusters 67 which are able to drive positioning frame 1 in a chosen direction, this depending on the direction in which the manoeuvrable thrusters 67 are oriented. Positioning frame 1 can be guided here along the spud poles of platform 10 as well as independently of the spud poles.
- foundation piles 40 are arranged in bottom 30 through guide sleeves (2a, 2b, 2c, 2d) of positioning frame 1 in the position of use.
- FIG 8 A possible embodiment is shown in figure 8 . It is noted that in the shown embodiment positioning frame 1 is situated in front of spud pole 13b of platform 10, therefore separately of platform 10, and has thus been lowered independently of the spud poles onto bottom 30, has particularly been positioned by one of the other above described methods, preferably by means of a positioning frame 1 provided with thrusters. As shown, a pile lining tube 41 can be picked up by lifting crane 18 and placed in moon pool 16b of the platform above the desired position 33 of the first pile. Should position 33 be located adjacently of the platform, this step is then not necessary.
- a pile 40 is picked up by lifting crane 18 from a storage rack 42 located on platform 10 and lowered until the underside of pile 40 is situated at the level 43, this level being close to the level of the bottom (see figure 10 ).
- pile 40 Once pile 40 has been correctly aligned with guide sleeve 2c, the pile is lowered further until it is partially received in tube 2c. The pile is then carried further under its own weight into the underwater bottom 30, during which process the pile is guided through guide sleeve 2c as shown in figure 10 . As shown in figure 12 , pile 40 is then driven into bottom 30 until the top of pile 40 has penetrated further into guide sleeve 2c than the portion provided with support ribs. Pile 40 can be driven into bottom 30 by means of a pneumatic hammer 44 as shown in figure 12 , although there are other embodiments which can be equally suitable or even more suitable.
- FIG 13 an embodiment is shown in which the arranging of piles 40 in bottom 30 is performed by drilling the foundation piles 40, and/or shafts in which the foundation piles 40 are arranged, into the underwater bottom 30 by means of drilling means.
- platform 10 is provided with a crane 18 to which is attached a drill string 68 of the bottom hole assembly type.
- Drill string 68 is lowered by lifting crane 18 into a guide sleeve or casing 69 which has been placed in bottom 30 by an oscillator 691.
- This method is particularly suitable for harder bottoms 30 consisting for instance of a rock-bed 301 with a layer 302 of weathered rock thereabove.
- Guide casing 69 is preferably arranged as far as the rock-bed 301.
- another embodiment comprises drilling means 70 with an underwater part suspended by means of a lifting plate 75 from suspension means in the form of a cable 71.
- drilling means 70 can be carried underwater until they come into contact with the guide sleeves, such as guide sleeve 2b, and can be connected thereto.
- the control of drill head 73 and the like takes place with control means 76 which are situated above water and comprise, among other parts, a power source 76a, a compressor 76b and pumps (not shown) for developing hydraulic pressure, in addition to electronics (not shown).
- the control means are located on a floating device, for instance pontoon 77.
- Drilling means 70 are electrically connected to control means 76 by means of electric cables 78. Material drilled out of the underwater bottom 30 by drill head 73 can be discharged via a discharge conduit 79 to which a discharge pipe or hose (not shown) is connected if desired.
- Drilling means 70 comprise a drill string 162 arranged in a guide sleeve 2.
- Guide sleeve 2 supports at its underside 21 on underwater bottom 30, whereby a substantially water-impermeable seal can be obtained.
- Guide sleeve 2 is sufficiently large to provide space for drill string 162.
- Drill string 162 comprises a number of drill pipes 162a mutually connected by means of flanges. The hollow drill pipes 162a together form a central cavity 86.
- Drill string 162 is provided on the underside with a drill head 73 with cutting tools 88, for instance in the form of cutting discs.
- drill string 162 is preferably provided with a number of stabilizers 89 which are arranged distributed in axial direction and which support against the inner wall of guide sleeve 2.
- stabilizers 89 which are arranged distributed in axial direction and which support against the inner wall of guide sleeve 2.
- the shown preferred variant also comprises means for injecting air under pressure into the hollow drill string 162 at the position of drill head 73.
- These means comprise feed lines 84 which are arranged on drill string 162 and which are connected at the one outer end to compressor 76 and which debouch at the other outer end into cavity 86 of drill string 162 via air inlet valves 83.
- Air supplied under pressure through lines 84 enters flow 90 via air inlet valves 83 and thus supports the flow 90.
- Drilling means 70 can be further provided with one or more nozzles (not shown) for injecting a fluid, preferably water, under pressure into underwater bottom 30 at the position of drill head 73.
- Drill string 162 and/or guide sleeve 2 and/or drill head 73 are provided for this purpose with conduits (not shown) for feeding the fluid to the nozzles.
- the nozzles are preferably mounted on drill head 73 and suitable for emitting water under a first pressure of at least 200 bar, more preferably at least 350 bar, still more preferably at least 500 bar and most preferably at least 650 bar.
- positioning frame 1 can optionally be removed. If desired, the position of piles 40 and/or the vertical position of the top of each of the piles 40 can be checked prior to removal of positioning frame 1 by optical means suitable for the purpose, such as cameras, for the purpose of checking and inspecting the whole operation.
- a jacket 150 of a wind turbine 151 can be placed on the foundation realized as described above. This can take place for instance by arranging legs 152 of jacket 150 in or around piles 40 and anchoring the legs 152 to piles 40 by means of grouting.
- the method and positioning frame according to the invention allow a pile foundation to be provided in efficient manner wherein it is not necessary to displace the platform regularly for each pile, whereby much time is gained compared to the known method.
- the invented method is less dependent on weather conditions and requires in principle no extensive inspection operations underwater, for instance by robots and/or divers.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
- Foundations (AREA)
Description
- The invention relates to a method for providing a foundation for a mass located at height, comprising the jacket of a wind turbine or a jetty, wherein the foundation comprises a quantity of piles driven into a bottom in a geometric pattern.
- The invention will be elucidated hereinbelow with reference to an offshore wind turbine. The reference to a wind turbine in no way implies that the invention is limited to the use in the context of such a wind turbine. The method can likewise be applied on a jetty. The support structure of a wind turbine normally has a slender design, for instance in the form of a tube or pillar. This pillar structure has to be coupled to a foundation in the bottom. For offshore wind turbines, which are placed in relatively shallow water, it is possible to make use of one mast extending from the machinery housing of the wind turbine to the foundation. In addition to such a mono-pole construction, the support structure of an offshore wind turbine can also comprise a tubular upper part and a lower part in the form of a lattice structure, also referred to as a jacket. A large part of the jacket extends underwater, where the jacket finds support on a bottom, in many cases the underwater bottom.
- Methods for providing an offshore foundation with piles are known for instance from
US5244312 A ,CA1042673 A andEP2067915 A2 . - A known method for providing a foundation for a mass located at height, such as the jacket of a wind turbine, comprises of providing an offshore platform in the vicinity of the location provided for the foundation, determining the location for each pile, subsequently manipulating each pile using a lifting crane present on the platform and driving each pile into the bottom. Once all the piles have been arranged in the bottom in the desired geometric pattern, thus forming the foundation, the jacket is arranged on the foundation formed by the quantity of piles by arranging legs of the jacket in the piles (also referred to as pin piling) or, in an alternative method, around the piles (also referred to as sleeve piling). The piles are adapted in both cases to be able to receive the legs of the jacket, for instance by providing hollow piles (pin piling) or hollow legs of the jacket (sleeve piling).
- The above described operations of the known method are time-consuming and can in a typical case take at least 5 to 7 days.
- The invention has for its object to provide a method for providing a foundation for a mass located at height which is more efficient than the known method, i.e. takes less time than the known method.
- This object is achieved according to the invention by a method according to
claim 1. - The method according to the invention allows a foundation to be provided in the form of a number of piles arranged in a geometric pattern in less time than known heretofore.
- Once the positioning frame has been placed in the correct position (in relation to the anticipated position of the quantity of piles), it requires no further repositioning as is often necessary in the prior art because the positioning frame, due to its own weight, causes friction with the bottom, and more particularly via base plates (21a, 21b, 21c) arranged on the underside of the positioning frame. Because the positioning frame is placed into the position of use via the guiding means and the lifting means, and these lifting means can be chosen in accordance with the requirements and conditions on site, an optimum positioning of the frame is possible.
- The positioning frame is brought into the position of use by lowering the frame via the lifting means. The position of the frame in the position of use is not determined particularly accurately here, for instance in view of the often rough conditions at sea.
- The method according to the invention therefore comprises of positioning and/or orienting the positioning frame to the position of use by means of separate positioning means. Such positioning means allow displacement of the positioning frame in its entirety to the desired position of use. The positioning means are adapted here such that they enable at least translations of the positioning frame relative to the bottom surface, particularly in a plane running more or less parallel to the bottom surface (referred to below as a horizontal plane), and preferably also rotations relative to the bottom surface. Rotations of the frame relative to the bottom surface can here comprise rotations around an axis running substantially perpendicularly of the bottom surface, but also rotations around an axis lying in a horizontal plane or in a plane varying from a horizontal plane. The method according to the invention makes it possible to increase the accuracy of positioning of the positioning frame relative to the bottom (and so also relative to the desired positions of the foundation piles) to variations in the horizontal plane of a maximum of 10 cm, preferably a maximum of 5 cm. This accuracy is unprecedented for a structure with the dimensions of a positioning frame and provides a great advantage because, due to the more accurate positioning of the positioning frame, a more accurate positioning of all foundation piles to be provided in the bottom is also achieved in one operation.
- In an embodiment of the method which is simple, and for this reason reliable, the positioning means are adapted only to displace the positioning frame in a horizontal plane and to rotate it about an axis running substantially perpendicularly of this plane.
- It is possible to position and/or orient the positioning frame by moving the frame along the spud poles of a jack-up platform. Because the position of the positioning frame is determined by the position of the platform, and this latter is not greatly affected by current and wind forces, this is also the case for the positioning frame. The use of the positioning frame also allows accurate positioning of the quantity of piles in only one operation. The position of use of the positioning frame corresponds to a position in which the positioning frame, and in particular the guide sleeves thereof, is ready to receive the piles. The position of use is preferably located at a position in the vicinity of the bottom, and more preferably at a position in which the positioning frame substantially rests on the bottom.
- The positioning frame can be moved along and under the guidance of the spud poles by any means known to the skilled person. It is thus possible for instance to suspend the positioning frame from a number of traction cables, wherein the cables can be varied in length by for instance winches arranged on the work deck of the platform. The cable length can be shortened or lengthened using the winches, wherein the positioning frame is respectively lifted or lowered. In a preferred embodiment of the method according to the invention the positioning frame is further provided with means for guiding the positioning frame along the spud poles of an offshore platform from a high position in the immediate vicinity of the work deck of the platform to a lower position, optionally onto or into the immediate vicinity of the bottom. The guide means are preferably adapted such that they can guide the positioning frame along the spud poles of the platform so that the positioning frame is aligned substantially horizontally in the lower position. This can for instance take place by suspending the positioning frame by means of three, and preferably by means of four cables, wherein each cable can be varied in length independently of the other cables by winches. This is particularly important in the case of a bottom which is not wholly flat.
- The positioning frame preferably comprises a lattice structure with a number of guide sleeves which are disposed spaced apart at the corner points thereof and which are connected by tubular lattice elements. The dimensions of the positioning frame in the plane are in principle larger than the dimensions out of the plane, wherein the direction out of the plane corresponds to a direction parallel to the lifting or lowering direction of the positioning frame. The guide sleeves are adapted to receive and guide the piles for driving into the bottom, and preferably comprise cylindrical casings, the longitudinal axis of which runs parallel to the direction of the positioning frame out of the plane. The guide sleeves are arranged in a geometric pattern, this pattern corresponding to the desired geometric pattern of the foundation piles. The tubular lattice elements extending between the guide sleeves ensure that guide sleeves remain substantially in their position during lifting and lowering of the positioning frame. In the present embodiment the positioning frame is adapted to define a specific geometric pattern of the foundation piles. It is however also possible to make the positioning frame geometrically adaptable, for instance by providing the positioning frame with lattice elements adjustable in length and/or by providing the positioning frame with nodes which mutually connect lattice elements and allow adjustment of the angle between lattice elements. Such an embodiment allows realization of different geometric patterns of the foundation piles.
- Although making use of the spud poles of a platform as positioning means for the positioning frame has certain advantages, a further positioning is no longer possible in the position of use, except in the height.
- In an embodiment according to the invention a method is provided in which the positioning frame is positioned and/or oriented by engaging the frame with a remotely operated robot vehicle (ROV). A more flexible positioning can be achieved with this embodiment of the method.
- A more accurate positioning is achieved in yet another embodiment according to the invention which provides a method according to
claim 1, in which the positioning frame is positioned and/or oriented by engaging the frame with traction cables provided with anchors, and/or an embodiment which provides a method in which the positioning frame is positioned and/or oriented by providing the frame with an assembly of manoeuvrable thrusters. - Suitable are for instance azimuth thrusters comprising a propeller accommodated in a housing. The housing is rotatable here so that the positioning frame can be oriented during displacement and displaced in this orientation. If desired, use can also be made of a rudder or other steering gear for orienting purposes.
- In the embodiment in which anchors and traction cables are applied, a number of traction cables are connected on one side to the positioning frame and connected on the other side by means of the anchors to the bottom or other anchoring point. The positioning frame can be displaced relative to the anchoring points by changing the free length of the traction cables, for instance by means of winches.
- The above stated embodiments all have the advantage that the positioning of the positioning frame relative to the bottom can take place independently of the platform, which enables corrections of the position, wherein translations in the horizontal plane and possible rotations of the positioning frame relative to the underwater bottom are all possible.
- A preferred embodiment of the method according to the invention comprises of establishing the position of at least one pile and positioning the positioning frame such that at least one of the guide sleeves of the positioning frame is aligned with the position of the pile, in other words is located directly above said pile position. The arranging of a first pile through the at least one guide sleeve fixes the positioning frame. In such a position the guide sleeves for the other piles will automatically be located in their correct positions because their relative positions are determined by the geometric design of the positioning frame. A position determination for each individual pile is hereby no longer necessary.
- The guide sleeves of the positioning frame are adapted to receive and guide piles when they are carried into the bottom. In order to be able to receive the piles the guide sleeves preferably have a diameter which is at least as large as the cross-section of the piles. In order to enable adequate support of the piles use is preferably made of guide sleeves, the inner surface of which is provided along at least a portion of the length of the guide sleeves with support ribs for the piles. In order to enable easy removal of the positioning frame once the piles have been arranged in the bottom, the piles are preferably driven so far through the guide sleeves that the top of the piles extends further than the underside of said portion (provided with support ribs) of the length of the guide sleeves.
- The method according to the invention is preferably characterized in that the foundation piles are arranged in the bottom by being driven into the bottom by the action of hydraulic or pneumatic hammer devices, vibrating hammer devices and/or oscillators. Such devices can be disposed on the floating device or on another floating device located in the vicinity. More preferred is a method in which the piles are driven into the bottom further than said portion (provided with support ribs) by the follower of a pneumatic hammer. A pneumatic hammer with follower is per se known to the skilled person.
- Another embodiment of the invention relates to a method according to
claim 1, in which the arranging of the piles in the bottom is performed by drilling the foundation piles, and/or shafts in which the foundation piles are arranged, into the underwater bottom by means of drilling means. - In yet another embodiment of the method according to the invention the drilling is performed by means of reverse circulation drilling (
figure 15 ) by pre-drilling with a casing (figure 14 ) and/or by rock-socketing. - In another aspect of the invention a method is provided comprising the step of removing the positioning frame once the piles have been arranged in the bottom, wherein the removal of the positioning frame is performed by lifting thereof with guiding by the spud poles from the lower position to the high position in the vicinity of the work deck of the platform.
- The invention further relates to a method for installing on a foundation a mass located at height, such as the jacket of a wind turbine or a jetty, wherein the foundation comprises a number of piles arranged by means of the above described method in a bottom, with the features of
claim 1, the method comprising of arranging legs of the mass located at height into or around the piles. A method is more preferably provided comprising of anchoring the legs to the piles by means of grouting. - Although the method according to the invention can be applied to provide a foundation of the above described type, the method is preferably applied on a bottom located underwater.
- The method according to the invention is further particularly suitable for cylindrical (hollow) foundation piles with a length of more than 20 m, more preferably at least 25 m and most preferably at least 30 m, and a weight of 20 to 150 tonnes, more preferably of 40 to 130 tonnes and most preferably of 50 to 110 tonnes.
- The guide sleeves preferably have a height (the dimension in the longitudinal direction of the guide sleeves) of at least 1 m, more preferably at least 3 m and most preferably at least 5 m, in order to further be able to guarantee the desired guiding function and vertical alignment of the foundation piles.
- In yet another aspect which is not part of the invention a positioning frame is provided, which frame is adapted to provide a foundation for a mass located at height, such as the jacket of a wind turbine or a jetty, wherein the foundation comprises a number of piles driven into a bottom in a geometric pattern, which positioning frame comprises a number of mutually connected guide sleeves arranged in a geometric pattern and adapted to receive and guide a pile to be driven into the bottom, in addition to means for positioning and/or orienting the positioning frame, the means comprising an assembly of manoeuvrable thrusters.
- The invention will now be elucidated in more detail with reference to the drawings, without otherwise being limited thereto. In the figures:
-
Fig. 1 shows a schematic perspective view of an embodiment of the positioning frame which can be used in the method according to the invention; -
Fig. 2 shows a schematic perspective view of an embodiment of the jack-up platform adapted to be used in the method according to the invention; -
Fig. 3-7 show schematic side views of a number of embodiments of method steps for lowering the positioning frame; -
Fig. 8-13 show schematic side views of a number of embodiments of method steps for arranging the piles in the bottom through the guide sleeves of the positioning frame in the position of use; -
Fig. 14 shows a schematic side view of a drilling device applied in an embodiment of the method according to the invention; -
Fig. 15 shows a schematic side view of a rotating drill head equipped with nozzles of a drilling device applied in an embodiment of the method according to the invention; and -
Fig. 16 shows schematically a jacket of a wind turbine placed according to the invention on a foundation of piles. - Shown with reference to
figure 1 is a device that can be used in the method according to the invention in the form of apositioning frame 1 which comprises at the corner points four cylindrical guide sleeves (2a, 2b, 2c, 2d) adapted to receive and guide a pile. Guide sleeves (2a, 2b, 2c, 2d) are rigidly connected to each other by side lattices (3a, 3b, 3c, 3d) which are constructed from a relatively large number of tubular structural elements (4a, 4b, 4c, 4d). Cross braces (5a, 5b, 5c, 5d) connect the side lattices (3a, 3b, 3c, 3d) to a central connectingplate 6, whereby the lattice gains structural stiffness. Additional lattice elements, such as asframe 3e, can be added in order to build up sufficient stiffness. All elements (2, 3, 4, 5) and connectingplate 6 define thepositioning frame 1. The upper parts of side lattices (3a, 3b, 3c, 3d) are advantageously provided with aperipheral catwalk 9 for easy access and inspection. Guide sleeves (2a, 2b, 2c, 2d) are held in a fixed position relative to each other by the side lattices (3a, 3b, 3c, 3d) and the cross braces (5a, 5b, 5c, 5d), this such that guide sleeves (2a, 2b, 2c, 2d) are arranged in a geometric pattern, this pattern being in the embodiment shown infigure 1 a square with a side of about 20 m. Any other geometric pattern is however possible, such as a triangular pattern for instance. - Each guide sleeve (2a, 2b, 2c, 2d) comprises a cylindrical peripheral wall (23a, 23b, 23c, 23d) which is supported by a base plate (21a, 21b, 21c, 21d) and with which
positioning frame 1 can find support on the bottom. The inner surface of each guide sleeve (2a, 2b, 2c, 2d) is provided along a portion of the length of the guide sleeve with support ribs (22a, 22b, 22c, 22d) for supporting a pile when it moves through the guide sleeve. The dimensions of guide sleeves (2a, 2b, 2c, 2d) can be selected within wide limits, but have in the shown embodiment a height of about 6 m. Support ribs (22a, 22b, 22c, 22d) extend through a distance of about 3 m as measured from the upper edge of guide sleeves (2a, 2b, 2c, 2d), whereby the lower portion of the inner surface is without support ribs over about 3 m (and so has a larger diameter). -
Positioning frame 1 can further be provided with means for guidingpositioning frame 1 along the spud poles of an offshore platform shown infigure 2 . In the embodiment shown infigure 1 these means comprise a structure with two U-shaped end forks (8a, 8b) which are fixedly connected to the rest ofpositioning frame 1 by means of tubular elements.Positioning frame 1 is positioned relative toplatform 10 such that a spud pole (13a, 13b, 13c, 13d) ofplatform 10 is partially received in the space between the outer legs (9a, 10a, 9b, 10b) of the U-shaped end forks (8a, 8b), the space being large enough to be able to receive a spud pole.Positioning frame 1 can in this way be guided downward and/or upward along the spud pole(s). The means for guiding thepositioning frame 1 along spud poles (13a, 13b, 13c, 13d) of the platform also comprise lifting means, such aswinches 15 provided on the work deck ofplatform 10. - A jack-up
platform 10 adapted to be used in a method according to the invention is shown infigure 2 . For reasons of clarity a number of structures, such as a lifting crane 18 (seefigures 3-9 ), normally present on a jack-up platform are omitted from the figure. Jack-upplatform 10 comprises substantially awork deck 11 and four spud pole jacks (12a, 12b, 12c, 12d) at the corner points ofwork deck 11. Each jack (12a, 12b, 12c, 12d) operates a spud pole (13a, 13b, 13c, 13d) which can be lowered in thevertical direction 14 until the relevant spud pole finds support on bottom 30 (figure 6 ).Work deck 11 is provided withwinches 15 over which run cables which are connected topositioning frame 1. Usingwinches 15 thepositioning frame 1 can be raised or lowered in thevertical direction 14.Platform 10 is further provided with two circular openings or moon pools (16a, 16b) which provide access to the water present underwork deck 11 and which have a diameter which is large enough for passage of a foundation pile.Platform 10 thus carries thepositioning frame 1, which in the shown preferred embodiment is provided on the underside ofplatform 10 in a rest position in the immediate vicinity ofwork deck 11 ofplatform 10. The assembly ofplatform 10 andpositioning frame 1 is positioned such thatmoon pool 16b is vertically aligned withguide sleeve 2c, indicated infigure 2 withbroken line 17. - The above described embodiment can advantageously be applied in the invented method, but a number of other preferred embodiments are nevertheless described below which have other or more advantages in determined aspects.
- Referring to
figure 3 for instance, an embodiment of a method not according to the invention is shown, which method is characterized by providing a floatingdevice 60 provided with lifting means in the form of liftingcrane 18. Floatingdevice 60 can for instance comprise a vessel, a platform, a pontoon or number of pontoons, and may or may not be independently driven.Positioning frame 1 with the shown mutually connected guide sleeves (2b, 2c) arranged in a geometric pattern is lowered via liftingcrane 18 and hoistingcables 61 onto the underwater bottom 30 into a position of use in which theframe 1 finds stable support due to the relatively wide base plates (21a, 21b, 21c, 21d) and its own weight.Figure 4 shows another embodiment not according to the invention, in which floatingdevice 60 comprises aplatform 10 which supports by means of shown spud poles (13b, 13c) on the underwater bottom.Positioning frame 1 is lowered via liftingcrane 18 and hoistingcables 61 onto the underwater bottom 30 into the position of use, wherein the lowering ofpositioning frame 1 therefore takes place independently of the spud poles. - Referring to
figure 5 , yet another embodiment is shown in whichpositioning frame 1 is positioned and/or oriented by engaging theframe 1 with a remotely operatedrobot vehicle 62, also referred to as a Remote Operated Vehicle or ROV, provided with adrive 63 andmanipulators 64 which can engage on parts ofpositioning frame 1. - Referring to
figure 6 , yet another embodiment is shown in whichpositioning frame 1 is positioned and/or oriented by engaging theframe 1 withtraction cables 66 which are provided withanchors 65 and connected topositioning frame 1. By anchoring thetraction cables 66 in the bottom 30 usinganchors 65 theframe 1 can be accurately positioned by taking in and/or paying out thetraction cables 66 by means ofwinches 15.Positioning frame 1 can be guided here along the spud poles ofplatform 10 as well as independently of the spud poles. - Yet another highly advantageous embodiment is shown in
figure 7 .Positioning frame 1 is positioned and/or oriented here by providingframe 1 with an assembly ofmanoeuvrable thrusters 67 which are able to drivepositioning frame 1 in a chosen direction, this depending on the direction in which themanoeuvrable thrusters 67 are oriented.Positioning frame 1 can be guided here along the spud poles ofplatform 10 as well as independently of the spud poles. - Once
positioning frame 1 has been positioned on underwater bottom 30 as according to the above described embodiments, foundation piles 40 are arranged in bottom 30 through guide sleeves (2a, 2b, 2c, 2d) ofpositioning frame 1 in the position of use. - A possible embodiment is shown in
figure 8 . It is noted that in the shownembodiment positioning frame 1 is situated in front ofspud pole 13b ofplatform 10, therefore separately ofplatform 10, and has thus been lowered independently of the spud poles onto bottom 30, has particularly been positioned by one of the other above described methods, preferably by means of apositioning frame 1 provided with thrusters. As shown, apile lining tube 41 can be picked up by liftingcrane 18 and placed inmoon pool 16b of the platform above the desiredposition 33 of the first pile. Should position 33 be located adjacently of the platform, this step is then not necessary. - In a subsequent step of the method (see
figure 9 ) apile 40 is picked up by liftingcrane 18 from astorage rack 42 located onplatform 10 and lowered until the underside ofpile 40 is situated at thelevel 43, this level being close to the level of the bottom (seefigure 10 ). - Once
pile 40 has been correctly aligned withguide sleeve 2c, the pile is lowered further until it is partially received intube 2c. The pile is then carried further under its own weight into the underwater bottom 30, during which process the pile is guided throughguide sleeve 2c as shown infigure 10 . As shown infigure 12 ,pile 40 is then driven into bottom 30 until the top ofpile 40 has penetrated further intoguide sleeve 2c than the portion provided with support ribs.Pile 40 can be driven into bottom 30 by means of apneumatic hammer 44 as shown infigure 12 , although there are other embodiments which can be equally suitable or even more suitable. - Referring to
figure 13 , an embodiment is shown in which the arranging ofpiles 40 inbottom 30 is performed by drilling the foundation piles 40, and/or shafts in which the foundation piles 40 are arranged, into the underwater bottom 30 by means of drilling means. In the shownembodiment platform 10 is provided with acrane 18 to which is attached adrill string 68 of the bottom hole assembly type.Drill string 68 is lowered by liftingcrane 18 into a guide sleeve or casing 69 which has been placed in bottom 30 by anoscillator 691. This method is particularly suitable forharder bottoms 30 consisting for instance of a rock-bed 301 with alayer 302 of weathered rock thereabove.Guide casing 69 is preferably arranged as far as the rock-bed 301. - As shown in
figure 14 , another embodiment comprises drilling means 70 with an underwater part suspended by means of a liftingplate 75 from suspension means in the form of acable 71. Usingcable 71 drilling means 70 can be carried underwater until they come into contact with the guide sleeves, such asguide sleeve 2b, and can be connected thereto. The control ofdrill head 73 and the like takes place with control means 76 which are situated above water and comprise, among other parts, a power source 76a, a compressor 76b and pumps (not shown) for developing hydraulic pressure, in addition to electronics (not shown). The control means are located on a floating device, forinstance pontoon 77. Drilling means 70 are electrically connected to control means 76 by means ofelectric cables 78. Material drilled out of the underwater bottom 30 bydrill head 73 can be discharged via adischarge conduit 79 to which a discharge pipe or hose (not shown) is connected if desired. - Shown in more detail with reference to
figure 15 is a preferred embodiment of the drilling means 70 for drilling ashaft 80 inunderwater bottom 30. Drilling means 70 comprise adrill string 162 arranged in aguide sleeve 2.Guide sleeve 2 supports at itsunderside 21 on underwater bottom 30, whereby a substantially water-impermeable seal can be obtained.Guide sleeve 2 is sufficiently large to provide space fordrill string 162.Drill string 162 comprises a number ofdrill pipes 162a mutually connected by means of flanges. Thehollow drill pipes 162a together form acentral cavity 86.Drill string 162 is provided on the underside with adrill head 73 withcutting tools 88, for instance in the form of cutting discs. In order to avoid outward buckling ofdrill string 162 during drilling,drill string 162 is preferably provided with a number ofstabilizers 89 which are arranged distributed in axial direction and which support against the inner wall ofguide sleeve 2. Using drive means 76 thedrill string 162, and therefore drillhead 73, can be set into rotation inguide sleeve 2, whereby the underwater bottom 30 is crushed by the action of cuttingtools 88. - Because a water column is present in the space between the substantially coaxially disposed
guide sleeve 2 anddrill string 162, a pressure difference is created between the upper side and the underside ofdrill string 162, wherein the pressure is of course higher on the underside. Owing to this pressure difference and becauseguide sleeve 2 is open on the underside, so that a throughfeed is possible tocavity 86, water and dislodged bottom material flow via the underside intocavity 86. Anupward flow 90 is thus maintained incavity 86 ofdrill string 162, in which flow 30 dislodged bottom material is discharged to the top side ofdrill string 162, where it is discharged viadischarge conduit 79. - In order to further facilitate the discharge of dislodged bottom material through
cavity 86 ofdrill string 162, the shown preferred variant also comprises means for injecting air under pressure into thehollow drill string 162 at the position ofdrill head 73. These means comprisefeed lines 84 which are arranged ondrill string 162 and which are connected at the one outer end tocompressor 76 and which debouch at the other outer end intocavity 86 ofdrill string 162 viaair inlet valves 83. Air supplied under pressure through lines 84 (in the direction of arrows 82) entersflow 90 viaair inlet valves 83 and thus supports theflow 90. - Drilling means 70 can be further provided with one or more nozzles (not shown) for injecting a fluid, preferably water, under pressure into underwater bottom 30 at the position of
drill head 73.Drill string 162 and/or guidesleeve 2 and/ordrill head 73 are provided for this purpose with conduits (not shown) for feeding the fluid to the nozzles. The nozzles are preferably mounted ondrill head 73 and suitable for emitting water under a first pressure of at least 200 bar, more preferably at least 350 bar, still more preferably at least 500 bar and most preferably at least 650 bar. - The above described sequence of method steps is then repeated a number of times, depending on the desired number of foundation piles which must be arranged in bottom 30. Because guide sleeves (2a, 2b, 2c, 2d) of
positioning frame 1 are automatically situated in the correct positions, all piles can be driven in efficient manner into bottom 30 without losing time in determining the position for each individual pile. - Once all
piles 40 have been arranged in bottom 30,positioning frame 1 can optionally be removed. If desired, the position ofpiles 40 and/or the vertical position of the top of each of thepiles 40 can be checked prior to removal ofpositioning frame 1 by optical means suitable for the purpose, such as cameras, for the purpose of checking and inspecting the whole operation. - Referring to
figure 16 , ajacket 150 of awind turbine 151 can be placed on the foundation realized as described above. This can take place for instance by arranginglegs 152 ofjacket 150 in or around piles 40 and anchoring thelegs 152 topiles 40 by means of grouting. - The method and positioning frame according to the invention allow a pile foundation to be provided in efficient manner wherein it is not necessary to displace the platform regularly for each pile, whereby much time is gained compared to the known method. The invented method is less dependent on weather conditions and requires in principle no extensive inspection operations underwater, for instance by robots and/or divers.
Claims (12)
- Method for providing a foundation for a mass located at height, comprising a jacket (150) of a wind turbine (151) or a jetty, wherein the foundation comprises a number of piles (40) arranged in a bottom in a geometric pattern, the method comprising:- providing a floating device (60) provided with lifting means (18);- providing a positioning frame (1) comprising a number of mutually connected guide sleeves (2a,2b,2c,2d) arranged in a geometric pattern for the purpose of receiving the piles;- lowering the positioning frame (1) to the bottom (30) into a position of use via the lifting means;
and- arranging the piles (40) in the bottom through the guide sleeves (2a,2b,2c,2d) of the positioning frame (1) in the position of use, the method further comprising- positioning and/or orienting the positioning frame (1) to the position of use by means of positioning means (62,66,67) that translate the positioning frame (1) relative to the bottom surface in a horizontal plane running more or less parallel to the bottom surface. - Method according to claim 1, wherein the accuracy of positioning of the positioning frame (1) relative to the bottom (30) is within variations in the horizontal plane of a maximum of 10 cm.
- Method as claimed in claim 1, wherein the positioning frame (1) is positioned and/or oriented by engaging the frame with a remotely operated robot vehicle (ROV) (62).
- Method as claimed in claim 1 or 2 or 3, wherein the positioning frame is positioned and/or oriented by engaging the frame with traction cables (66) provided with anchors (65).
- Method as claimed in any of the claims 1-4, wherein the positioning frame is positioned and/or oriented by providing the frame with an assembly of manoeuvrable thrusters (67).
- Method as claimed in any of the foregoing claims, comprising of establishing the position of at least one pile (40) and positioning the positioning frame (1) such that at least one of the guide sleeves (2a,2b,2c,2d) of the positioning frame is aligned with the position of the pile.
- Method as claimed in any of the foregoing claims, wherein the inner surface of the guide sleeves (2a,2b,2c,2d) is provided along at least a portion of the length of the guide sleeves with support ribs (22a,22b,22c,22d) for the piles, and the piles are carried through the guide sleeves until the top of the piles extends further than the underside of said portion provided with support ribs of the length of the guide sleeves.
- Method as claimed in claim 7, wherein the piles are carried further than said portion, for instance by the follower of a pneumatic hammer (44).
- Method as claimed in any of the foregoing claims, wherein the arranging of the piles in the bottom is performed by driving the piles (40) into the bottom by the action of hydraulic hammer devices, vibrating hammer devices and/or oscillators.
- Method as claimed in any of the foregoing claims, wherein the arranging of the piles in the bottom is performed by drilling the foundation piles, and/or shafts (80) in which the foundation piles are arranged, into the underwater bottom by means of drilling means (70).
- Method as claimed in any of the foregoing claims, comprising the step of removing the positioning frame (1) once the piles (40) have been arranged in the bottom.
- Method for installing on a foundation a mass located at height, comprising a jacket (150) of a wind turbine (151) or a jetty, wherein the foundation comprises a number of piles arranged in a bottom by means of the method as claimed in any of the claims 1-10, the method comprising of arranging legs (152) of the mass located at height into or around the piles (40) and anchoring the legs (152) to the piles (40) by means of grouting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL12175860T PL2546418T3 (en) | 2011-07-11 | 2012-07-11 | Method for providing a foundation for a mass located at height |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BE2011/0445A BE1020071A5 (en) | 2011-07-11 | 2011-07-11 | METHOD FOR PROVIDING A FOUNDATION FOR A MASS FIXED AT HEIGHT AND A POSITIONING FRAME FOR CARRYING OUT THE METHOD. |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2546418A1 EP2546418A1 (en) | 2013-01-16 |
EP2546418B1 true EP2546418B1 (en) | 2020-05-27 |
Family
ID=46465150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP12175860.1A Active EP2546418B1 (en) | 2011-07-11 | 2012-07-11 | Method for providing a foundation for a mass located at height |
Country Status (7)
Country | Link |
---|---|
US (1) | US20130183101A1 (en) |
EP (1) | EP2546418B1 (en) |
AU (1) | AU2012204091B2 (en) |
BE (1) | BE1020071A5 (en) |
DK (1) | DK2546418T3 (en) |
LT (1) | LT2546418T (en) |
PL (1) | PL2546418T3 (en) |
Families Citing this family (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103422462B (en) * | 2013-08-20 | 2015-08-05 | 中国海洋石油总公司 | The harbour mounting process of test jacket |
DK3039192T3 (en) * | 2013-08-28 | 2017-11-20 | Mhi Vestas Offshore Wind As | PROCEDURE FOR INSTALLING A FOUNDATION FOR A OFFSHORE WINDOW MILL AND A TEMPLATE FOR USE HERE |
CN103953043A (en) * | 2014-05-05 | 2014-07-30 | 广东明阳风电产业集团有限公司 | Floating box type locating tool for piling offshore wind power foundation |
CN104563079B (en) * | 2014-12-30 | 2016-09-21 | 中国海洋石油总公司 | A kind of lifting auxiliary frame floating torr jacket installation for shallow water |
CN104912093B (en) * | 2015-06-12 | 2017-06-06 | 中国葛洲坝集团第五工程有限公司 | A kind of pile foundation in deep water positioning, the construction method of guide frame |
NL2016401B1 (en) * | 2016-03-09 | 2017-09-26 | Ihc Holland Ie Bv | Frame for guiding and supporting a foundation element, the frame comprising a plurality of guide mechanisms. |
JP6814627B2 (en) * | 2016-12-22 | 2021-01-20 | 鹿島建設株式会社 | Construction method of drainage channel, support structure of pipe with curved part in water |
TWI640673B (en) * | 2017-06-12 | 2018-11-11 | 財團法人船舶暨海洋產業研發中心 | Rotatable arm coupled pile guide frame |
TWI640672B (en) * | 2017-06-12 | 2018-11-11 | 財團法人船舶暨海洋產業研發中心 | Operating method of a rotatable arm coupled pile guide frame |
NL2019068B1 (en) * | 2017-06-14 | 2018-12-21 | Ihc Holland Ie Bv | A template and a method of using the template |
DE102018104329B4 (en) * | 2018-02-26 | 2022-09-29 | Overdick Gmbh & Co. Kg | Method for the foundation of a substation and substation with at least four piles |
CN108980532B (en) * | 2018-08-01 | 2024-05-10 | 中广核研究院有限公司 | Reactor support foundation arrangement |
US10865538B2 (en) | 2018-08-30 | 2020-12-15 | Exxonmobil Upstream Research Company | Integrated pile anchor reinforcement systems |
US10870965B2 (en) | 2018-08-30 | 2020-12-22 | Exxonmobil Upstream Research Company | Mat incorporated pile anchor reinforcement systems |
JP6586213B2 (en) * | 2018-10-29 | 2019-10-02 | 深田サルベージ建設株式会社 | Construction method of jacket structure |
NL2022173B1 (en) | 2018-12-11 | 2020-07-02 | Jumbo Maritime B V | Piling frame with cut-out |
CN109826196A (en) * | 2019-03-04 | 2019-05-31 | 中天科技集团海洋工程有限公司 | A kind of steady stake platform |
CN110468840A (en) * | 2019-09-16 | 2019-11-19 | 江苏亨通蓝德海洋工程有限公司 | A kind of negative pressure barrel type single pile pile gripper construction mechanism and its construction method |
CN110593337A (en) * | 2019-10-14 | 2019-12-20 | 中铁第四勘察设计院集团有限公司 | Underwater milling groove guiding and positioning device suitable for deepwater embedded foundation |
US20210340716A1 (en) * | 2020-04-29 | 2021-11-04 | Dylan Swenson | Alignment device and methods |
CN111560973B (en) * | 2020-05-28 | 2021-09-28 | 扬州市江都永坚有限公司 | Underwater pile-based multi-pile construction system |
CN111809615A (en) * | 2020-08-17 | 2020-10-23 | 上海两港市政工程有限公司 | Heavy pile machine load underpinning structure and construction method thereof |
CN112112186B (en) * | 2020-09-27 | 2022-02-22 | 上海振华重工(集团)股份有限公司 | Installation method of split jacket foundation on offshore converter station |
CN113152459B (en) * | 2021-02-06 | 2022-02-18 | 浙江水利水电学院 | Construction method of steel casing for ecological river channel foundation reinforcement |
KR102443891B1 (en) * | 2021-10-18 | 2022-09-16 | (주)대한엔지니어링 | Jig assembly for interpenetration of marine monopile and the interpenetration method using this |
CN114718097B (en) * | 2022-04-25 | 2023-09-22 | 中交第二航务工程局有限公司 | Quick positioning method for deepwater steel cofferdam or open caisson |
CN114657991B (en) * | 2022-04-26 | 2024-03-12 | 中交路桥建设有限公司 | Floating type steel pipe pile inserting and driving positioning device and application method thereof |
CN115897578A (en) * | 2022-10-28 | 2023-04-04 | 中交第三航务工程局有限公司 | Underwater pile sinking positioning system for foundation steel pipe piles of deepwater four-pile jacket |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1042673A (en) * | 1974-10-09 | 1978-11-21 | Joseph A. Burkhardt | Method of installing a subsea structure and recovering the structure from the sea floor |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB205470A (en) * | 1922-10-14 | 1923-11-29 | Zeiss Carl | Improvements in iris-diaphragms |
US2651181A (en) * | 1948-08-20 | 1953-09-08 | Pure Oil Co | Floating telescopic piling template |
US4102144A (en) * | 1977-05-31 | 1978-07-25 | Global Marine, Inc. | Method and apparatus for protecting offshore structures against forces from moving ice sheets |
GB2054710A (en) * | 1979-05-25 | 1981-02-18 | Cjb Bearl & Wright Ltd | Levelling seabed templates |
US4408932A (en) * | 1980-12-30 | 1983-10-11 | Armco Inc. | Subsea template levelling system and method |
US4669918A (en) * | 1986-02-04 | 1987-06-02 | Riles William G | Offshore platform construction including preinstallation of pilings |
US4739840A (en) * | 1986-12-01 | 1988-04-26 | Shell Offshore Inc. | Method and apparatus for protecting a shallow water well |
US4740107A (en) * | 1986-12-01 | 1988-04-26 | Barnett & Casbarian, Inc. | Method and apparatus for protecting a shallow-water well |
US4932811A (en) * | 1989-06-08 | 1990-06-12 | Robert Folding | Well head conductor and/or caisson support system |
US5244312A (en) * | 1991-12-29 | 1993-09-14 | Conoco Inc. | Pile supported drilling template |
BR9303646A (en) * | 1993-08-31 | 1995-04-25 | Petroleo Brasileiro Sa | Foundation system for tilt leg platforms |
US6299385B1 (en) * | 1999-08-04 | 2001-10-09 | Paragon Engineering Services Incorporated | Mini-jacket and method for installation using caisson |
US6474416B2 (en) * | 2001-01-10 | 2002-11-05 | Kvaerner Oilfield Products | Remotely installed pressure containing closure |
GB0204987D0 (en) * | 2002-03-04 | 2002-04-17 | Fast Frames Uk Ltd | Pile driving |
US6935262B2 (en) * | 2004-01-28 | 2005-08-30 | Itrec B.V. | Method for lowering an object to an underwater installation site using an ROV |
GB0507549D0 (en) * | 2005-04-14 | 2005-05-18 | Fast Frames Uk Ltd | Method and apparatus for driving a pile into underwater substrates |
EP2067915A2 (en) * | 2007-12-04 | 2009-06-10 | WeserWind GmbH | Grid structure for an offshore construction, in particular an offshore wind energy converter |
-
2011
- 2011-07-11 BE BE2011/0445A patent/BE1020071A5/en not_active IP Right Cessation
-
2012
- 2012-07-11 DK DK12175860.1T patent/DK2546418T3/en active
- 2012-07-11 EP EP12175860.1A patent/EP2546418B1/en active Active
- 2012-07-11 PL PL12175860T patent/PL2546418T3/en unknown
- 2012-07-11 US US13/546,375 patent/US20130183101A1/en not_active Abandoned
- 2012-07-11 AU AU2012204091A patent/AU2012204091B2/en active Active
- 2012-07-11 LT LTEP12175860.1T patent/LT2546418T/en unknown
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1042673A (en) * | 1974-10-09 | 1978-11-21 | Joseph A. Burkhardt | Method of installing a subsea structure and recovering the structure from the sea floor |
Also Published As
Publication number | Publication date |
---|---|
PL2546418T3 (en) | 2020-12-14 |
AU2012204091A1 (en) | 2013-01-31 |
BE1020071A5 (en) | 2013-04-02 |
US20130183101A1 (en) | 2013-07-18 |
EP2546418A1 (en) | 2013-01-16 |
DK2546418T3 (en) | 2020-08-10 |
AU2012204091B2 (en) | 2015-10-29 |
LT2546418T (en) | 2020-09-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2546418B1 (en) | Method for providing a foundation for a mass located at height | |
EP3039192B1 (en) | Method of installing a foundation for an offshore wind turbine and a template for use herein | |
EP2492401B1 (en) | Device for manufacturing a foundation for a mass located at height, associated method and assembly of the device and a jack-up platform | |
JP5774158B2 (en) | Installation of submerged support structure | |
EP2354321B1 (en) | Method of providing a foundation for an elevated mass, and assembly of a jack-up platform and a framed template for carrying out the method. | |
US8926226B2 (en) | Device for manufacturing a foundation for a mass located at height, associated method and assembly of the device and a jack-up platform | |
EP2574698B1 (en) | Method and device for driving a multiplicity of piles into a seabed | |
KR20120114906A (en) | Guide apparatus for adaptively drilling in various figures and conditions of ground | |
CN111962505A (en) | Double-pile-casing positioning structure of collimation pile, double-pile-casing device, collimation pile and construction method | |
KR101087161B1 (en) | Guide apparatus for adaptively drilling in various figures and conditions of ground | |
EP2913439B1 (en) | Device and method for arranging foundation piles in an underwater bottom | |
CN202969333U (en) | Steel truss rock-socketed wharf structure | |
CN212335995U (en) | Collimating pile double-pile-casing positioning structure, double-pile-casing device and collimating pile | |
EP2871285B1 (en) | Device and method for performing well interventions offshore | |
CN109469080B (en) | Underwater rock-socketed steel sheet pile cofferdam structure and construction method thereof | |
US4100754A (en) | Method and apparatus for installing pipes in off-shore locations | |
JP6586213B2 (en) | Construction method of jacket structure | |
CN219508568U (en) | Deep water stable pile positioning frame | |
US4415045A (en) | Offshore drilling of large diameter holes in rock formations |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
17P | Request for examination filed |
Effective date: 20130716 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
17Q | First examination report despatched |
Effective date: 20160602 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20191218 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: DEME OFFSHORE HOLDING N.V. |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: DEME OFFSHORE BE N.V. |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602012070306 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1274677 Country of ref document: AT Kind code of ref document: T Effective date: 20200615 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20200806 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: EE Ref legal event code: FG4A Ref document number: E019635 Country of ref document: EE Effective date: 20200805 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200928 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200927 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200828 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200827 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200827 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1274677 Country of ref document: AT Kind code of ref document: T Effective date: 20200527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602012070306 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20200827 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200731 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200711 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200727 |
|
26N | No opposition filed |
Effective date: 20210302 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200711 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200827 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230526 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LT Payment date: 20230620 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20230621 Year of fee payment: 12 Ref country code: NL Payment date: 20230726 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: EE Payment date: 20230703 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20230727 Year of fee payment: 12 Ref country code: DK Payment date: 20230727 Year of fee payment: 12 Ref country code: DE Payment date: 20230727 Year of fee payment: 12 Ref country code: BE Payment date: 20230727 Year of fee payment: 12 |
|