EP2545221A1 - "l" shape universal structural elements and methods of its use - Google Patents
"l" shape universal structural elements and methods of its useInfo
- Publication number
- EP2545221A1 EP2545221A1 EP10754809.1A EP10754809A EP2545221A1 EP 2545221 A1 EP2545221 A1 EP 2545221A1 EP 10754809 A EP10754809 A EP 10754809A EP 2545221 A1 EP2545221 A1 EP 2545221A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- elements
- storage
- defense
- shape
- methods
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/102—Permanently installed raisable dykes
Definitions
- the subject invention includes, generally speaking, in the construction area, and more accurately to the hydraulic engineering constructions and application of structursl blocks, and specifically refers to the structural element for errectable and permanent barriers.
- the subject invention is classified and defined with the basic classification symbol E02B 3/06, by which are marked harbor moles, piers, quays; quay walls, groynes, breakwaters, as well by secondary symbol, E02D 17/00 which relates to making embankments.
- the invention in addition to the protection of the defended spaces, achieve also the regulation of the river flow, so the invention can be marked by the following secondary classification symbols E02B 3/02, which refers to the lining of riverbanks, and E02D 17/20, which define the secure stabilization of slopes or inclines of embankments.
- block contains the front side made as inwardly brocken concave surface and a back side made as outwardly brocken convex surface, whereby the body of the block contains one or more cross channels as the water throughgoing passage next to the base. Since the lateral sides are made as complementary, such blocks can be easily assembled and make the defensive foundation which protects the coast. Turning over of blocks is disabled by its stacking so that the blocks faces eachother, whereby the blocks are practically mutually interlocked on the place so that each block support neighbouring blocks in resisting the compression effect of water.
- the essence of the invention is that the hidraulic building element, according to the author's idea, re'alized as a universal, mobile, easy to built in, reinforced concrete structure made as mutually perpendicular parallelepiped formed segments integrally connected, so that their cross section has the appearance of latin letter "L" shape .
- a watertight barrier like on the existing facilities for passive defense against floods, so on the other places where previously there were no defensive lines.
- the novelty of the invention is reflected in the fact that in the lateral sides of constructive elements, according to the invention, are realized longitudinal grooves in which, when setting up the block into security position, are inserted foamed rubber gaskets, which accomplished effectively sealing and protection from the breaking of water through the ensembles between adjacent elements and between base elements and the stand on which it is placed.
- the novelty of the invention is also in that the subject constructive element has tubular openings for insertion of steel pins, by which are made necessary additional fixing to the foundation, preventing sliding and shearing or the elements connections one to each other.
- the subject constructive element has tubular openings for insertion of steel pins, by which are made necessary additional fixing to the foundation, preventing sliding and shearing or the elements connections one to each other.
- the advantage of the subject invention is represented with fact that the "L" shape shape elements are stored in the open. If are made well and properly, are inert to atmospheric influences, and in case of damage may be easily replaced.
- the novelty of the invention is also represented by the fact that the storage of the elements in the line of defense is forming a new urban facilities which are giving to the stored elements a new active function.
- the area where these new urban facilities are formed is enriched with new content and a new feature of stored elements is suitable for river banks and city quays.
- the novelty of the invention is also the fact that the author has invented a series of technical solutions in linear storage of elements built in passive defense structures realized so that they always are at the scene of their application, and that there are unobservable.
- Significant advantage is also, that the application of the invention does not disturb the existing aesthetic features of city quays and embankments.
- the essence of the invention is reflected also in a series of constructive solutions of concentrated storing a number of elements close by the defense line or directly on the line of defense, whereby the storage solution completely customized to the terms of strict aesthetic requirements for coastal areas and significantly improve them aesthetically and make them more dignified.
- the novelty of the invention is also the effective applicability of constructive, "L" shape elements for the quick formation of waterproof barriers also on the other flat surfaces such as asphalt roads, concrete plateaux, or on the previously prepared earth courts, and even on the under-prepared surfaces.
- This allows establishment of corrective mobile lines of defense on the roads, streets and other areas, when the need arises, and where formation of a defensive line was not previously been planned.
- large floods such are in most cases a second and third line of defense.
- Such additional measures include: use of long steel wedges; fitting the double horizontal and vertical gaskets; use of naylon foils; placing additional loads on the short segment of the elements (sacks fulfilled with earth or sand, various concrete elements, other near at hand objects, etc.).
- -storage of the subject elements shall be on the open spaces within the defensive line or in the warehouse located next to the defensive line, which can be easily incorporated within the existing architectural apearance of the space;
- Line-concentrated storage is represented by making a very different architectural solutions, buildings, urban complexes with the "L" shape elements along the future line of mobile defense, appropriate for the river banks, that such content ennobles.
- the storage coefficient Ks 3 to 20.
- - Figure 4 is a schematic view of the method for placing the element in the defensive position
- - Figure 5 a schematic view of a vertical cross-section of the quay wall with subject "L" shape element in the defensive position
- - Figure 8 is a schematic diagram of quay wall vertical cross-section with "L" shape element in the defensive position
- - Figure 9 is a schematic diagram of the third method of storage within the storage line of "L" shape elements stored at a high quay wall
- - Figure 10 is a schematic diagram of the "L" shape elements in the defensive position at the high quay wall;
- - Figure 11 is a schematic diagram of the stored "L" shape element in the promenade on the defense line against floods;
- - Figure 12 is a schematic diagram of the "L" shape element in the defensive position on the promenade
- FIG. 13 is a schematic diagram of the stored "L" shape element in the promenade on the defense line against floods, which is in the reconstruction, whereas the quay wall is annexed so that raises his top figured dimension to the required height;
- - Figure 14 is a schematic diagram of the elements in its defensive position in the reconstructed quay wall
- - Figure 15 is a schematic diagram of stored "L" shape element on the top of an land embankment so that the stored elements form a promenade or bicycle road;
- FIG. 17 ia a schematic diagram of storage "L" shape elements on the top of an land embankment within the the road on the embankment, so that the stored elements form a pavement or a promenade;
- - Figure 18 is a schematic diagram of the "L" shape elements in the defensive position on the asphalt road on the top of an land embankment
- - Figure 19 is a schematic diagram of storage "L" shape elements on the defended embankment slope
- - Figure 20 is a schematic diagram of the placing procedure whereeas "L" shape elements are set into the defensive position and preparing the places for posting on the top of a land embankment;
- - Figure 21 is a schematic diagram of the "L" shape elements in the defensive position;
- - Figure 22 is a schematic diagram of concentrated storage, in the form of "flakes” with an manipulative way around the storage;
- - Figure 23 is a schematic diagram of the concentrated storage, in the form of "cross” with manipulative way around the storage;
- - Figure 24 is a schematic diagram of concentrated line storage in double-row multisectional storage
- - Figure 25 is a schematic diagram of concentrated line storage in one-row onesectional storage
- - Figure 28 is a schematic diagram of the temporary pool of the "L" shape elements on the waterproof surface
- - Figure 29 is a temporary pool of "L" shape elements in the perspective view on the waterproof surface
- - Figure 30 is a schematic view of the cross-section through embankments made of "L" shape elements which is very stable and resistant to the effect of waves;
- - Figure 31 is an axonometric view of the embankment made of "L" shape elements
- - Figure 32 is a schematic diagram of the groove and the foam rubber seal - seals for the horizontal sealing between "L" shape elements and the substrate;
- - Figure 33 is a schematic diagram of the groove and the foam rubber seal - seals for the vertical sealing between the "L" shape elements;
- - Figure 34 is a schematic diagram of an device for additional sealing of places where leakage can occur through a mobile barrier.
- Defensive line formed by a series of dovetailed structural "L" shape elements, as it is seen in Figure 7, is planned primarily as an additional protection from flooding by forming mobile line of defense on the city quays, dams in the cities and outside cities, but also successfully may be applied on the other vulnerable places where a stable defensive line are not formed, for making supervised embankments, embankments of second and third defensive line or as a corrective solution, and where the conditions of its application are satisfied.
- Structural "L" shape element is realized as reinforced-concrete structure in form of a parallelepiped the vertical cross section of which has the appearance of latin letter "L" shape.
- the length of segment 2 of element is approximately twice the length of integrally realized, in relation to it, a perpendicular segment 3
- Both segments 2 and 3 of the element 1 have the appearance of narrow quadrilaterals and contain inside an appropriate reinforcing net 8. Free ends of this segment are flat vertical side edges 10 and 1 1.
- Along both lateral sides of segment 2, at equal distance from its rims, are realized along all its length straight grooves 4 of a shallow circular cross section.
- grooves are provided for the insertation of seals shown in the figures 32 and 33, preferably made of foam rubber or a similar waterproof material or material which, after absorption of water, increases its volume.
- seals shown in the figures 32 and 33 preferably made of foam rubber or a similar waterproof material or material which, after absorption of water, increases its volume.
- Groove 5 is straight in all its length and is also of a shallow circular cross section, and is used for insertion of foam rubber or of a similar sealing material.
- Besides groove 5 is the same parallel groove 6 which is a spare groove for additional sealing.
- Figures 32 and 33 shows two forms of gaskets - seals made of foam rubber for primary sealing. They are set at the time of installation in the specified grooves 4, 5 and 6.
- "L" shape element 1 is positioned by its groove 5 on the horizontal gasket 26.
- Vertical gasket 27 is positioned at the moment element 1 is aproaching to the him adjacent element 1.
- "L" shape element is sufficiently heavy to effectively deform gaskets 26 and 27 and impress them into the ruggedness in the surface and thus achieve effective sealing.
- Gaskets 26 and 27 have the form of tubes for horizontal sealing or double connected hose 27 for the vertical sealing. This form enable deformability and elasticity.
- the Figure 34 shows the device and method of additional sealing.
- the device consists of a plastic tube 28 which upper end exceeds into funnel 29, while the lower end is finnished by arch 30 bented at an angle approximately 30 degrees, which is realized in such a way that when the tube is in verticall position next to the wall, tube opening 28 will lean against the wall, respectivelly to the vertical side of the element 1
- the length of tube 28 should be greater than the height of the wall.
- sealing device When the leakage on a joint is observed, the sealing device is brought and set in a place of leak, and then into the tube 28 is poured a sealing material.
- sealing materials usually are used a sand, gravel, earth, and the best is a clinker - ash.
- Sealing material 31 sunk through the tube 28 to the leakage site.
- water take it with and seal the leakage place. From the speed of water stream formed near the gap, depends the size of particles that the stream will carry with to seal the gap. So, first will be caught both, large and small particles, and on the gap will be stopped just large ones. Then, with the reduction of the speed of stream, on the gap opening will be deposited smaller and smaller particles as the gap does not close.
- Static stability of the "L" shape element 1 are calculated to turnover, ie rotation the element around the edge of a small segment under the influence of the water force i.e moment made by this force to which resist the weight of element i.e the elements moment of stability.
- the second condition for the element stability is the stability to shearing the element along the ground. Shearing of element along the ground is caused by the shearing force of water, and to it resists the friction force.
- the friction force depends on the elements weight and of the coefficient of friction.
- the weight of element 1 is determined and known, but the coefficient of friction is very changeable and as a factor of stability of a "L" shape element in the terms of flood defense, uncertain category.
- the ratio of moments of the weight stability of the element and of turnover moment by water force is a stability coefficient to turnover.
- the dimensions of the wall may be reduced, and thus its weight. This is important in the first place because of the manipulations with the elements when assembling and disassembling a wall, and then because of the cost of the elements. In the case lighter elements are used, in extreme conditions their additional loading by sacks is applied. Element is universal, but the dimensions are checked depending of the load to which will be displayed. If the elements are designed for a particular place, then the dimensions of the elements are determined according to the needs of that particular place.
- elements must additionaly be secured against the shearing. Therefore, on the base are anticipated the openings through which steel pins are mounted to engage shear forces of the water and transferre them to the surface.
- pins 9 it is possible, depending on the evaluation of ground foundation condition and of the water level, loading the element by sand sacks or by ranging sand sacks in raw besides elements additionaly to increase shearing strength.
- Ill - Line concentrated storage is a type of the concentrated storage of elements on the defense line, where to the elements is given another temporary utility function appropriate to the section of defense line.
- the figures 1 to 21 show the first of three described types of storage - linear storage. How it may be seen on the figures 1, 2 and 3, shown is a technical solution of the formation of mobile defense line in a stable defense line of the city where there is quay wall 13 that meets the requirements for protection of 1% VV. Using the "L" elements achieved is the protection against high waters with return period of 0.1% VV. The specificity of this variant solution is that it do not need special storage area for the storing of elements 1, since these are stored on the site of the future assembly, in the city quay 13 on its undefended side.
- element 1 Internal side of element 1 is forming passable foot-path 14 on the undefended quay wall, next to the edge beams 15 and slope of embankment 16 On the defended side of the quay wall 13 is formed the walking foot-path 17 which is not disruptive and is used as machinery circulation track during assembling the mobile defense line. By hooking up and raising, element 1 is placed in the defensive position on a flat surface of quay wall 13.
- Figures 9 and 10 is shown a specific case of storage.
- the "L" element 1 on the high quay wall 13 which has a passable foot-path 17 and 14 on the both sides.
- the "L” element 1 is fixed by pins 9 in the first as well in the second position.
- FIGS 11 and 12 show the manner of line storage of "L" element 1 in the level of foot-path 17 in the formed lines of mobile defense.
- This method of storage and application of the element 1 is convenient because it is possible to move on to the undefended side of "L” element as well because it is in place of lean the element 1 on the mole can be advantageously resolve the groundwork filtering stability in mobile defense line. From the enclosed figures is visible that the element 1 is stored in the hole near the end of defended embankment so that its end 2 is immersed in the sand 19, while the longer end 3 is placed on groundwork 20, where its upper edge is on the level of foot-path 17.
- FIG. 15 and 16 dam is with earth crown 21 and with statically and filtrationally prepared line 24, and element 1 is stored on a solid foundation 22 and poured with sand 19.
- Mobile defense line is formed by errection of element 1 and placing the same into the defensive position.
- Second case is shawn on the figures 17 and 18 where is storage of element 1 made in the form of sidewalk next to the asphalt roadway 23 in the crown 21 of the embankment on the defended side, on the foundation 22, covered with sand 19.
- the dam 21 is filtrationally protected by the structure 24 from breaking of water through the construction of the roadway 23.
- the "L" element 1 is placed in a protective position so that a shorter side 2 sets on the end of the asphalt roadway 23, whereas the long edge 3 is in the same plane with the back of the defensive structures 24.
- FIGs 19, 20 and 21 is shown the storage of "L" elements 1 on the defended slope of trapezoidal dam with clay crown 21.
- a defensive structure 24 of the mobile line In preparation for making a mobile defensive line of the "L” elements on the crown of the earth embankment, filtrationally and statically is arranged a defensive structure 24 of the mobile line. Defended slopes of the defensive dam 21 near the major rivers in our country are made of sand so the storage of elements 1 is easy. Drawing out the elements 1 is done with the mechanization moving on the crown 21 of the embankment and placing them in a defensive position. Around the "L" element 1 in the defensive position is compressed the removed earth 25.
- FIG 22 shown is concentrated storage in the flake form storage space.
- This storage represents the efficiency of the concentrated form of storage. It stores a large number of elements in a small space. In addition, it is by its form adapted to the possibility that simultaneously, from each of the storage spur, can be independently taken the element and loaded on the transportation means.
- the elements may be placed in the bottom level of the ground, partially buried in the ground or completely buried. Around the storage is manipulative way, and access to the storage should be from the more directions. Rapidity of taking the elements from storage depends on the needs, and accordingly is arranged the storage, traffic regulation. Rapidity of taking the elements is essential when there is a time shortness for the formation of mobile defense line.
- the diameter of the circle of shown storage is 2R ⁇ 17.5 m, its area is about 240 m2 and stored is 250 elements. If the elements are of 2 m length, this correspond to 500 m of the defensive line.
- Figure 23 is shown a concentrated storage in the form of an cross.
- This storage has similar features as the previously described storage and is also suitable for the quick simultaneous taking the four elements from storage, ie. with four machines to taking the elements.
- the circle diameter of the shown storage is 2R ⁇ 20.5 m and stored is 240 elements. If the elements are of 2 m length, this will correspond to 480 m of the defensive line.
- Figure 24 is shown a concentrated multiple chambers linear two-rowed storage. It allows simultaneous downloading of elements from each of chambers.
- the storage according to this example of invention can be realized with its bottom in the ground level, partially or completely interred.
- This type of storage is suitable to be placed near the defensive line with a fences of enclosed public spaces or buildings, near by of some municipal buildings located near the banks of the river, and the space around them is finitely used to urban needs (for sewage systems suction pump stations -CS) or near the road used for downloading the elements. It is possible to place it in the dividing island between the roadway track that goes along with the defensive line, if around there do not exist other more suitable places.
- Such storage according to the requirements of other relevant institutions, may be interred either partially or completely, which gives to it excellent storage facilities near the line of defense. Fast download of elements is important in case the time shortage available for the formation of mobile line of defense.
- linear concentrated storage There exist a third type of storage also, which is indicated as linear concentrated storage.
- This type of storage represent a unique approach to organization of mobile defense against flood.
- a defensive line for the defense against floods temporarily are given other functionality. They are used for formation of various architectural elements within the defense line zone or in the defense line. Because of the imperative that these elements are on the defense line, the adoption of this concept, revive the banks of rivers and encourages the development of contents that were previously developed in other places.
- the pools are generally in open space, although not necessarily. There can be one or more pools. Number of elements causes a form of pool, and a form define usable area. Waterproofiness depends on the waterprofiness of the ground foundation. Upon termination of the needs, elements are removed, stored and area of the pool is returns the original application.
- the author has particularly designed application of "L” elements for making prefabricated embankments, the static of which is very stable and flexible.
- the “L” elements in the embankments are set laid.
- the embankments can easily be founded, also under the water.
- the whoL” elements have step-shaped cross-section and form a slope on the protected inclination of embankments according to the characteristics of basic materials, oscillations of the water, the size of waves and other local conditions. They are especially suitable for use in locations vulnerable by effects of waves.
- the space formed by "L” element is filled with local material. If the filling materials are fine-grained and liable to leaching, the inner side has to be, before filling with material, coated by geotextile. This ensures filtrational stability of the structure.
- the Figures 30 and 31 shows an example of cross-sectional assembly of the embankment formed from the "L" elements. Often exists the need for the protection of banks from wave actions especially in the rivers and accumulation lakes or for the reconstruction of previously made, but damaged embankments.
- the first of displayed embankments is showing the three levels, and given is also the axonometric view to embankment with two levels.
- the embankment can have as many levels as needed. Height and width of each level is determined according to the needs and conditions. Except using the "L" elements which are brought to the bank, the embankment can be made using local materials. Obtained are embankment structures, the static and filtration of which is very stable and resistant to the effects of waves caused by wind. The embankment structure is elastic and suitable for foundion under heavy conditions. The quickness for the embankment making is also significant. This gives to these embankments the expressive advantage over thr rigid stable objects.
- the invention is suitable for the mass production. Its use is recommended in all places (urban and outside of cities) where there is necessary to achieve protection.
- Mobile defense line is formed in a planned and prepared line for a mobile defense. Forming a defense line is implemented by the Service for the flood protection. Within the overall preparations, performed are the technical preparations and the preparation of performers. During the technical preparations accurately and even visibly are marked the previously defined lines of mobile defense. Then on the previously arranged foundation are placed the elements which form the mobile line of defense. The aim of such procedure is that during the first assembly, should be developed the most appropriate technology for making the mobile line of defense, to detect all the problems and to eliminate them, and to rehearse the teams and especially train the people who would later indenpendently manage the making of mobile defense lines.
- the element is made as "L" profile, and therefore can be used and placed in the side within the embankment structures and in the supporting walls, where a protective height is something less than in the flood defense, but therefore the stability of the building is increased.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Ocean & Marine Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Revetment (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Reinforcement Elements For Buildings (AREA)
- Retaining Walls (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Road Paving Structures (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RS20090396A RS52531B (en) | 2009-09-09 | 2009-09-09 | Multipurpose hydro construction "l" element and its application |
PCT/RS2010/000008 WO2011031177A1 (en) | 2009-09-09 | 2010-07-01 | "l" shape universal structural elements and methods of its use |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2545221A1 true EP2545221A1 (en) | 2013-01-16 |
EP2545221B1 EP2545221B1 (en) | 2018-01-31 |
Family
ID=43430630
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10754809.1A Not-in-force EP2545221B1 (en) | 2009-09-09 | 2010-07-01 | "l" shape universal structural elements and methods of its use |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2545221B1 (en) |
RS (1) | RS52531B (en) |
WO (1) | WO2011031177A1 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
HUP1300644A2 (en) * | 2013-11-08 | 2015-05-28 | Jozsef Szabo | Structural arrangement and method for stabilizing earthworks and formations |
CN108265672B (en) * | 2018-02-08 | 2019-12-13 | 泉州台商投资区镕逸科技有限公司 | Scour protection water conservancy dykes and dams that can reduce construction material in a large number and practice thrift cost |
CN109024472B (en) * | 2018-07-17 | 2020-11-03 | 王长华 | Water retaining wall for hydraulic engineering |
CN112554204B (en) * | 2020-12-04 | 2021-07-20 | 中煤江南建设发展集团有限公司 | Reinforced foundation pit supporting assembly beneficial to drainage |
US20220228356A1 (en) * | 2021-01-21 | 2022-07-21 | Arcadis U.S., Inc. | Actionable stormwater services platform |
US11761161B2 (en) * | 2021-07-22 | 2023-09-19 | Precast Concrete Concepts, LLC. | Retaining wall extension systems and methods |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR776756A (en) * | 1933-10-21 | 1935-02-04 | Reinforced cement wall for rough roads | |
CA744126A (en) | 1961-11-13 | 1966-10-11 | R. Svee Hallbjorn | Block for making protecting covers on slopes of moles and breakwaters |
US3488964A (en) | 1967-11-27 | 1970-01-13 | Giken Kogyo Kk | Concrete block |
YU41891B (en) | 1979-10-29 | 1988-02-29 | Nenad Marasovic | Construcion three-leg element for protecting construction buildings from the action of water waves |
DE20219584U1 (en) * | 2002-12-18 | 2003-08-07 | Zieger, Egon, 68794 Oberhausen-Rheinhausen | Modular floodwater protection has hollow cellular base units and stacking upper units to form a sealed wall |
GB0310329D0 (en) * | 2003-05-06 | 2003-06-11 | Aqua Barrier Internat Ltd | Liquid barrier assembly and connector therefor |
DE202004009848U1 (en) * | 2004-02-14 | 2005-03-10 | Hahn, Georg | Flood protection system has prefabricated concrete sections which interlock to form a barrier |
DE102005006507A1 (en) * | 2005-02-14 | 2006-08-31 | Thomas Diepold | Mobile water retaining and piping system for protection against high tide or flooding uses water, water mix or other fluid or fluid mix to achieve coutnerweight to water pressure against it |
DE202007003224U1 (en) * | 2007-02-26 | 2007-09-06 | Fishman, Igor | Protection wall for flood protection |
-
2009
- 2009-09-09 RS RS20090396A patent/RS52531B/en unknown
-
2010
- 2010-07-01 EP EP10754809.1A patent/EP2545221B1/en not_active Not-in-force
- 2010-07-01 WO PCT/RS2010/000008 patent/WO2011031177A1/en active Application Filing
Non-Patent Citations (1)
Title |
---|
See references of WO2011031177A1 * |
Also Published As
Publication number | Publication date |
---|---|
RS20090396A (en) | 2011-04-30 |
EP2545221B1 (en) | 2018-01-31 |
RS52531B (en) | 2013-04-30 |
WO2011031177A1 (en) | 2011-03-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7651298B2 (en) | Flood levee and barrier module and system | |
US7708495B1 (en) | Levee system | |
US8177457B2 (en) | Pipeline protection and levee module system | |
EP2545221B1 (en) | "l" shape universal structural elements and methods of its use | |
US8448279B2 (en) | Ecologically-sound waterway culvert restoration | |
CN106836275A (en) | Landscape eco-friendly retaining wall for rapidly protecting tillite slope and implementation method | |
JP2012057441A (en) | Rainwater storage tank and rainwater storage tank filling structure | |
Anderson | Amphibious Architecture Living with a Rising Bay | |
CN110485366B (en) | Space-saving interlocking dock type ecological retaining wall structure and construction method thereof | |
RU2525405C1 (en) | Method to strengthen slope with geocellular geosynthetic material | |
JP2011214252A (en) | Structure for reinforcing embankment | |
US20110033242A1 (en) | Modular-unit floodwall system | |
US20080219772A1 (en) | Berm System | |
CN205062744U (en) | Half gravity type two -stage view anti -flood wall on half cantilever | |
CN210887089U (en) | Space-saving interlocking dock type ecological retaining wall structure | |
CN209816577U (en) | Coastal soft soil foundation riverside embankment widening structure | |
RU2288986C2 (en) | Construction of earth roadbed | |
CN211571777U (en) | Retaining wall structure for civil construction | |
Negro et al. | Crown walls in mass and reinforced concrete: The way to aesthetics in maritime works | |
CN213448054U (en) | Soft soil foundation has thrust to encircle anti pushing and excavation supporting integrated configuration | |
RU2776903C1 (en) | Sheet pile | |
CN110565588B (en) | Vertical interlocking ecological building block | |
RU77615U1 (en) | CROSSING THE ROAD THROUGH WATERWATERS | |
CN107630440B (en) | Flower stand type flood control dam and construction method thereof | |
Haider et al. | RECONSTRUCTION OF LLANGOLLEN CANAL. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20120724 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
17Q | First examination report despatched |
Effective date: 20160301 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20170221 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 967509 Country of ref document: AT Kind code of ref document: T Effective date: 20180215 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602010048351 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180131 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 967509 Country of ref document: AT Kind code of ref document: T Effective date: 20180131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180430 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180531 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180430 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180501 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602010048351 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20181102 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20180701 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180701 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180731 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180731 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180731 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180701 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180701 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180701 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20100701 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180131 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180131 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20200728 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602010048351 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220201 |