EP2534311B1 - Method for the construction of a concrete capping beam made from capping-beam segments - Google Patents

Method for the construction of a concrete capping beam made from capping-beam segments Download PDF

Info

Publication number
EP2534311B1
EP2534311B1 EP11705448.6A EP11705448A EP2534311B1 EP 2534311 B1 EP2534311 B1 EP 2534311B1 EP 11705448 A EP11705448 A EP 11705448A EP 2534311 B1 EP2534311 B1 EP 2534311B1
Authority
EP
European Patent Office
Prior art keywords
sheet
cross
pile wall
shell structure
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP11705448.6A
Other languages
German (de)
French (fr)
Other versions
EP2534311A1 (en
Inventor
Johan Wens
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Algemene Aannemingen Van Laere NV
Original Assignee
Algemene Aannemingen Van Laere NV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Algemene Aannemingen Van Laere NV filed Critical Algemene Aannemingen Van Laere NV
Publication of EP2534311A1 publication Critical patent/EP2534311A1/en
Application granted granted Critical
Publication of EP2534311B1 publication Critical patent/EP2534311B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/066Quays
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Revetment (AREA)

Description

  • The invention is related to the construction of a concrete cross beam from cross-beam segments on a sheet-pile wall to form a quay wall, with an application of the cross-beam-forming material in pieces or segments with an intermittent pattern.
  • Quay walls are retaining structures for ships to berth. For its protection, the quay wall, is equipped with a cross beam, which cross beam partly extends into the water. In general, the pillar can also be equipped with bollards to moor ships and if need be with fenders to absorb shocks. In literature, cross beams can also be referred to as gantry girder or ridgepole.
  • Prior art shows us two important methods for manufacturing such cross beams, namely by means of protection walls or by the use of prefabricated elements. In case of important water depths, protection walls are unsuitable and uneconomic. Prefabricated elements give rise for corrosion of the front wall and further modifications are expensive or no longer possible.
  • A method according to the preamble of claim 1 is furthermore known from EP 0011895 A1 .
  • The invention aims to solve these problems and thereto provides a method according to claim 1, for the forming of a cross beam at a sheet-pile wall in order to get a quay wall, in which the complete cross beam is composed by cross-beam segments. The sheet-pile wall partly extends over the water surface and preferably, it is composed of tubular poles or H-sections with sheet piles in between. Subsequently, cross-beam-forming material is applied against the sheet-pile wall by means of a shell structure shoring up against the sheet-pile wall. This shell structure is pressed against the sheet-pile wall from the water side and subsequently equipped with a curing cross beam material. It goes without saying that for a good sealing, the shell structure and the sheet-pile wall are necessary. For this purpose, this shell structure is executed at least partially of equal form with the sheet-pile wall. By fixing a shell structure from the waterfront against the sheet-pile wall by means of a pontoon or barge, equipment such as cranes and alike on the land side become unnecessary.
  • The cross-beam segments are applied to the sheet-pile wall in an intermittent pattern. Intermittent pattern means that a next cross-beam segment is not mounted directly on a foregoing cross-beam segment, but that between the cross-beam segments, a free length is left for a cross-beam segment that is preferable slightly smaller than the length of the shell structure. Between the two previously fixed cross-beam segments, subsequently another cross-beam segment is applied. In a preferred embodiment, the cross-beam segments are applied in an odd pattern 1, 3, 5 etc. and then subsequently the further even cross-beam segments, namely 2, 4 etc. which are placed between the cross-beam segments 1 and 3, 3 and 5 etc.
  • A method according to the invention for mounting a cross-beam to a sheet-pile wall for obtaining a quay wall, wherein the cross beam is composed of cross-beam segments comprises first placing a sheet-pile wall in the water, which partially extends above the water surface and preferably is compiled from tubular poles and sheet piles mounted between the tubular poles in a regular pattern, after which cross-beam forming material is applied against the sheet-pile wall by means of a shell structure which supports against the sheet-pile wall, mounting the cross-beam segments according to an intermittent pattern to form a full cross beam.
  • In order to procure an adequate seal between the sheet-pile wall and the shell structure, the shell structure is first pressed against the sheet-pile wall, preferably by means of a pontoon, after which the shell structure is already temporarily firmly mounted to the sheet-pile wall, before it is provided with curing cross-beam material. For this purpose, the shell structure is preferably equipped with anchoring legs, which are adjustable in length, and which extend from the shell structure to their position against the sheet-pile wall. These legs are fixed to the quay wall with heavy axes via vertical sections (through the wall of tubular poles) or with lateral welds against the tubular pole.
  • This invention does not comprise a quay wall consisting of a sheet-pile wall on which cross-beam segments are applied according this method.
  • This invention does not comprise either a shell structure for the forming of the cross-beam segments at a sheet-pile wall consisting of an upper partial structure of a formwork construction provided with a back wall, two sidewalls and a floor suitable for receiving the cross-beam forming curing material and a lower partial construction for supporting the shell structure on the sheet-pile wall.
  • In a preferred embodiment the shell structure suitable for the forming and mounting of cross-beam segments to a sheet-pile wall consists of two box-shaped partial constructions, namely an upper partial construction suitable to receive a cross-beam forming curing material and a lower partial construction for the supporting and temporary fixing of the shell structure on the sheet-pile wall.
  • The support of the shell structure is obtained by means of a specific substructure, in order to achieve an almost watertight seal.
  • Preferably, the floor of the lower partial construction is provided with an open floor edge which is of equal form to the sheet-pile wall. For this purpose, the sheet-pile wall has to be built according to a precise and regular pattern. Preferably made from among each other parallel tubular poles, between which a sheet-pile wall is provided. The shell structure is preferably provided with projecting and mainly among each other parallel sections with legs that are adjustable in length. These legs are extended up to their position against the sheet-pile wall, and that preferably via vertical sections and heavy axes led through the wall of tubular poles, in order to already establish a temporary fixed connection of the shell structure to the sheet-pile wall.
  • The shell structure can be such that under the floor of the upper partial construction in the lower partial construction mutual parallel profiles are mounted, provided with anchor legs that are adjustable in length.
  • Preferably the shell structure suitable for the forming and mounting of cross-beam segments to a sheet-pile wall, consists of two box-shaped partial constructions, namely an upper partial construction suitable to receive a cross-beam forming curing material and a lower partial construction for the supporting and temporary fixing of the shell structure on the sheet-pile wall.
  • Preferably, the shell structure is provided with a seal joint on its edge, where this edge is foreseen to support at the sheet-pile wall, whereas the seal joint, in cross-sectional view, has a triangular shape. It has been established that such a shape offers advantages with regard to the sealing capacity.
  • In order to be able to realise the intermittent pattern with one and the same shell structure, the latter is provided with removable panels mounted in the sidewalls of the upper partial construction. Preferably the removable panel is attached in the open corner of each sidewall. Preferably the panel is of square or rectangular shape.
  • For an easy movement of the shell structure, it is provided with pairs of provisions for the forks of a forklift, and the corresponding forklift is provided on the pontoon.
  • Finally, the invention does not comprise a pontoon for the moving of the shell structure on the water, for which the pontoon is provided with a counterweight at one side and of one or more forklifts with forks on the other side.
  • A preferred embodiment of the invention is further discussed in detail below using drawings, in which the preferred embodiments of the invention are shown and in which is shown:
    • Fig. 1A perspective and partial split view of the combination of a sheet-pile wall, the shell structure and the pontoon, that can be used in the method according to the invention;
    • Fig. 2 Top view of Fig. 1;
    • Fig. 3 Cross-sectional view of a pontoon with a shell structure lifted by the forks of the forklifts,
    • Fig. 4 Schematic cross-sectional view of a shell structure, that can be used in the method according to the invention;
    • Fig. 5 Perspective view of a shell structure, that can be used in the method according to the invention;
    • Fig. 6a and 6b Detail of a preferred embodiment of the legs adjustable in length, the vertical sections and the connection through a tubular pole;
    • Fig. 7 Perspective view of a preferred embodiment of a seal,
    • Fig. 8 Perspective view of a pontoon,
    • Fig. 9 Perspective view of an intermittent pattern of the cross-beam segments in order to obtain a cross beam; and
    • Fig. 10 Views of a floor shuttering.
  • In the construction of a quay wall 3, according to the invention, first a sheet-pile wall 2 is placed between the landside 5 and the waterside 4. Such a sheet-pile wall is preferably erected in vertical position according to a regular pattern of tubular poles 8 and fixed to the sheet piles 9 that are situated between the tubular poles 8. Such sheet-pile walls 2 are known from the prior art and they provide an almost watertight barrier between the landside 5 and the waterside 4. Subsequently, anchor piles 36 can be firmly fixed which normally extend above the sheet-pile wall 2. Firstly a partial soil supplement can be carried out on the landside behind the sheet-pile wall 2. Against this sheet-pile wall 2 and partially floating on the water, a shell structure 13 is pressed. The shell structure 13 serves as a temporary and reusable working and boxing platform for the cross-beam segments 1a. The shell structure 13 consists of two partial constructions, namely an upper partial construction 14 and a lower partial construction 15. The upper partial construction 14 is provided with a floor 16 with a floor edge 17 on which a formwork 11 and the cross-beam forming material 10 is provided for. The lower partial construction 15 provides for a substantially watertight connection with the sheet-pile wall 2. For this purpose, the subfloor 32 is provided with the subfloor edge 33. This subfloor edge 33 is provided as form matching to the sheet-pile wall 2. A pontoon 30 is provided with a counterweight 31 and forklifts 29 push - in operational condition - the shell structure 13 against the sheet-pile wall 2 and are able to finely position the floating shell structure as well in the vertical as also in the horizontal direction, as it is known from the operation of forklifts.
  • The upper partial construction 14 is executed in a box-shaped form and wider than the lower partial construction 15. The upper partial construction 14 mainly serves as workspace. Both partial constructions are executed in a box-shaped form and are each provided with a back wall 22a, 22b; two sidewalls 23a, 23a' and 24a, 24a' and a floor 16 and 32.
  • At the top, the lower partial construction 15 is bounded by the floor 16 of the upper partial construction 14 and on its underside by a subfloor edge 33 of a form executed as form matching with the sheet-pile wall. This lower partial construction 15 is used as a functional unit for support and seal for the shell structure 13 against the sheet-pile wall 2. Anchoring legs 19 are provided parallel to and just under the floor 17 of the upper partial construction 14. These anchoring legs 19 can be adjusted in length and extend from the shell structure 13 up to their position against the sheet-pile wall 2. These legs 19 are fixed in vertical sections 18 to the quay wall 3 by means of heavy axes 20 led through the wall made of tubular poles 8 with side weldings against the tubular pole 8. In a preferred embodiment of the invention, there are two anchoring legs 19 per tubular pole 8 provided for in a mirror symmetric manner on or in the wall of the tubular pole. In some places, they are preferably welded to the tubular poles 8. For these purpose, the ends of the legs 19 are provided with a vertical section 18 and a stop 34. The distance calculations which are carried out in advance provide a specific length for each leg 19 so that afterwards, only minimal adjustments are necessary.
  • The entire circumference of the lower partial construction 15, there were a watertight seal is desired, is provided with a sealing profile 24. In a preferred embodiment, this sealing profile 24 is triangular in cross-sectional view. The rubber joint 24 has a triangular profile with a total thickness of about 30 cm. This large thickness is necessary to be able to connect anywhere on the sheet-pile wall 2, taking into account the possible tolerances in the longitudinal and traverse sense. The rubber profile is both bonded and mechanically fixed in a UPN profile that consequently must follow the form of the sheet-pile wall 2, thus it is partially lobately bent.
  • After the shell structure 13 is suspended on the sheet-pile wall 2 by means of anchorage of the anchoring legs 19 to the tubular poles 8, this shell structure 13 is pumped empty. Subsequently, the upper partial construction 14 is provided with curing cross-beam material 10 in a formwork 11 provided of a specific floor shuttering 34. The floor shuttering 34 is executed as form matching with the sheet-pile wall. Between the floor 16 and the slab formwork, possibly a lifting element 35 can be provided for. It goes without saying that the position and height of the cross-beam segment 1a to be applied must be very exact. The curing cross-beam material is normally made of armoured 12 concrete.
  • As an example, the shell structure 13 is constructed from a steel framework with a length of about 24m, a height of 6.00m and a maximum width of 5.20m. The steel framework is made from standard sections and panels of, for example, 6mm in thickness.
  • The upper wider partial construction 14 is the workspace with space for a cross-beam segment 1a, the slab formwork 11, the staff and further necessary material.
  • The lower partial construction 15 should only be accessible in possible cases of emergency or for the control of the anchoring legs 19, the rubber joints 24 and the slab formwork 11. This lower part 15 also provides the necessary driving horizontal water pressure in order to press in the rubber joints 24 at the bottom without further help of mechanical fasteners and with minimal intervention from divers. Besides the two access points to the lower level of the ends, there is an extra access point 37 placed centrally through an oblique tube provided with steps. In the shell structure, there is a removable floor shuttering 34 with plastic sheeting onto which the concrete cross-beam 1a can be placed and which can be adjusted in height and in transverse direction by jacks via a lifting element 35. This floor shuttering 11 is constructed from six modules.
  • In a preferred embodiment, a shell structure 13 is such that the width (br) of the lower partial construction 15 is smaller than the width (BR) of the upper partial construction 14, and is preferably smaller than half of the width BR of the upper partial construction 14.
  • In the shell structure 13, a floor shuttering 34 is provided as mentioned previously, positioned against the sheet-pile wall 2. This consists of six independently working modules 34a up to and including 34f. On the other side (waterside 4), there is a walking path 38 provided for the personnel, which is accessible from the mainland (landside 5) via gangways.
  • There are pumps for water reduction and leakage water placed on the lower part 15 of the shell structure 13. In this compartment, also welding can be done, and for safety reasons, adequate lighting is to be present. This area is always accessible from the ends of the shell structure 13. Because of the long escape routes, a central emergency exit has been chosen via an oblique tubular profile with steps. The pontoon 30 is for carrying and moving the shell structure 13 to another position and for pushing it against the sheet-pile wall 2. For this purpose, the pontoon 30 is equipped with two symmetrically arranged lifting frames which are executed as forklifts 29. In the first place, the pontoon 30 must have sufficient buoyancy in all situations. During the manipulation of the shell structure 13, also the cross slope will change due to an increased charge at the front side (landside 5). For this, the shell structure 13 is equipped with provisions for receiving the forks 28 of the forklifts 29.
  • In a preferred embodiment the shell structure is such that the shell structure is provided with at least one and preferably of two or more means 27 for the reception of the forks 28 of a forklift 29 of a pontoon 30.
  • In order to compensate this, a tilting frame is provided that can rotate by means of jacks. Then, in this tilting frame, a lifting frame (fork) is provided which in turn is able to move vertically by means of jacks. It is also possible to present the shell structure 13 at correct height and with the correct rotation in front of the sheet-pile wall 2, before fixing the elements against each other.
  • The pontoon itself is composed of floating containers (flexifloats) which are compiled to one pontoon. Behind it, there is also a smaller pontoon 31 which is connected to the latter by a steel frame. This way, a catamaran type is created that provides a stable structure. On the smallest pontoon 31, also a small crane is placed for the manipulation of small material and a yard container.
  • It active state, the floating pontoon 30 comes floating with the shell structure 13 on its forks 28. Subsequently, this shell structure 13 is fixed with the anchoring legs 19 to the sheet-pile wall 2. Then, water is pumped out of the shell structure 19. For the following steps, this pontoon 30 will provide for the repeated warping of the shell structure 13 and so a mobile crane is no longer needed. After the water has been pumped out, the floor shuttering 34 is adjusted to the correct height and a wall formwork is mounted. The pumps remain working constantly to be able to drain the infiltrating leakage water. The concrete cross-beam is then constructed from cross-beam segments 1a, which added in an intermittent way. First the odd segments 1a, 3a and then the intermediate segments 2a.
  • As an example for a quay wall 3 obtainable by a method according to the invention, this is built from cross-beam segments with a length of about 20m. Each segment consists of a sheet-pile wall of 6 tubular poles 8 and intermediate sheet piles 7. The cross beam 1 we get has a width of 4m and a height of about 3.5m. This cross-beam construction is anchored to the rear ground with anchor piles 36. The given dimensions are of course not limiting the invention.
  • The special aspect of this is that the cross-beam segments 1a,2a, 3a are executed alongside the waterside 4, from the water in an essentially watertight closed shell structure 13, which is suspended at the sheet-pile wall 2.
  • Moreover, this shell structure 13 is able to bear the full bulk weight of the curing cross-beam material 10, for example concrete, and consequently functions as a formwork at the same time. The cross-beam segments 1a, 3a are intermittently executed, during which preferably frequently one cross-beam segment 2a is skipped. Afterwards, the intermediate cross-beam segments are executed with a custom shell structure 13. The warping of the shell structure 13 to a next cross-beam segment is done with a floating pontoon 30.
  • For the intermediate segments 2a, the shell structure 13 is somewhat modified. At the open corner 26 of the sidewalls 25a on the upper partial construction 14, a removable panel 39 is mounted. For the cross-beam segments 2a, namely those that are mounted after the cross-beam segments 1a and 3a, the panels 39 are removed from the sidewalls. Thus it is possible to mount as well the first odd cross-beam segments 1a, 3a, etc. as also the intermediate even cross-beam segments with one single shell structure.

Claims (4)

  1. A method for mounting a cross-beam (1) to a sheet-pile wall (2) for obtaining a quay wall (3), wherein the cross beam (1) is composed of cross-beam segments (1 a, 2a, 3a, etc.), the method comprising of first placing a sheet-pile wall (2) in the water, which partially extends above the water surface and preferably is compiled from tubular poles (8) and sheet piles (9) mounted between the tubular poles in a regular pattern, after which cross-beam forming material (10) is applied against the sheet-pile wall (2) by means of a shell structure (13) which supports against the sheet-pile wall (12), characterized in that the cross-beam segments (1a, 2a, 3a, etc.) are mounted according to an intermittent pattern to form a full cross beam (1).
  2. Method according to claim 1, characterized in that the shell structure (13) is pushed against the sheet-pile wall (2) from the waterside (5) by means of a pontoon (30) floating on the water.
  3. Method according to claim 1 or 2, characterized in that the shell structure (13) is temporarily firmly mounted to the sheet-pile wall (2) before being provided with curing cross-beam material (10).
  4. Method according to claim 3, in which the fixation is obtained by anchoring legs (19) which are adjustable in length, which extend out of the shell structures (13) up to their position against the sheet-pile wall (2) and by vertical sections and heavy axes led through the sheet-pile wall (2) or with side weldings against the sheet-pile wall (2).
EP11705448.6A 2010-02-12 2011-02-14 Method for the construction of a concrete capping beam made from capping-beam segments Not-in-force EP2534311B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BE2010/0077A BE1019309A5 (en) 2010-02-12 2010-02-12 METHOD FOR BUILDING A CONCRETE KESP FROM KESP SEGMENTS AND A VESSEL CONSTRUCTION FOR THIS.
PCT/EP2011/000671 WO2011110271A1 (en) 2010-02-12 2011-02-14 Method for the construction of a concrete capping beam made from capping - beam segments and a shell structure therefor

Publications (2)

Publication Number Publication Date
EP2534311A1 EP2534311A1 (en) 2012-12-19
EP2534311B1 true EP2534311B1 (en) 2017-03-29

Family

ID=42666910

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11705448.6A Not-in-force EP2534311B1 (en) 2010-02-12 2011-02-14 Method for the construction of a concrete capping beam made from capping-beam segments

Country Status (3)

Country Link
EP (1) EP2534311B1 (en)
BE (1) BE1019309A5 (en)
WO (1) WO2011110271A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767141B (en) * 2012-07-27 2014-04-16 中铁十一局集团有限公司 Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork
JP6283571B2 (en) * 2014-05-30 2018-02-21 若築建設株式会社 Fixing work box
CN104099894B (en) * 2014-07-23 2016-02-24 中交一航局第五工程有限公司 A kind of without anchor deep-cement sheet-pile wharf
JP7126889B2 (en) * 2018-07-13 2022-08-29 株式会社横河Nsエンジニアリング Steel wall and its construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB697810A (en) * 1950-10-06 1953-09-30 Moritz Kloenne Improvements in cranes, more especially floating cranes, with variable counter-weights
FR1235895A (en) * 1958-09-20 1960-07-08 Blivers Baugesellschaft M B H suspended scaffolding for concrete structures
BE872225A (en) * 1978-11-22 1979-03-16 Blende Remi De FORMWORK SUPPORT FOR CASTING CONCRETE ON PROFILED VAPOR BOARDS
BE1005308A3 (en) * 1991-09-18 1993-06-22 Gen Coatings Device for waterproofing a caisson.
EP0930408A1 (en) * 1998-01-16 1999-07-21 Domesle Stahlverschalungs- GmbH Formwork for casting corbelled out concrete elements

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
BE1019309A5 (en) 2012-05-08
EP2534311A1 (en) 2012-12-19
WO2011110271A1 (en) 2011-09-15

Similar Documents

Publication Publication Date Title
EP2534311B1 (en) Method for the construction of a concrete capping beam made from capping-beam segments
JP2011231466A (en) Retaining wall earth-retaining structure and method of installing the same
JP6630105B2 (en) Connecting structure of floating body for floating pier
JP4550534B2 (en) Building basic structure
JP3345598B2 (en) Waste landfill stock equipment
CN205296206U (en) Tower cane foundation
KR20090049731A (en) Elevator pit structure
CN211815980U (en) High-pile beam-slab wharf structure
CN209873857U (en) Cantilever buttress unloading plate combined retaining wall structure
JP5853415B2 (en) Reinforcement structure and construction method for floating structures, reinforcement structure for bridges
CN109823970B (en) Steel structure transportation method for bridge construction
CN213836527U (en) Auxiliary installation device for high-pile wharf berthing component
CN206529788U (en) Offshore wind turbine foundation single-column adheres to assembled berthing structure
CN110656576A (en) Pier structure and construction method thereof
CN110789679A (en) Movable type ascending ladder frame for welding cushion blocks of supporting box of cabin cover of container ship
CN210684645U (en) Template structure is used in construction of concrete plank road
JP7313022B1 (en) Site elevation method and raised site structure
CN212743431U (en) Construction pumping platform
CN218175730U (en) Novel high-pile wharf structure
CN214423126U (en) Steel temporary bridge for high-pile wharf construction
CN218405082U (en) Local-disengaging bearing platform construction support
CN217629375U (en) Binhe landscape plank road with ecological elasticity is improved
RU2119004C1 (en) Berthing structure
ES2317594T3 (en) PROCEDURE FOR THE CONSTRUCTION OF A SPRING INSTALLATION AND SPRING INSTALLATION.
RU122663U1 (en) SUPPORT SHORE

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20120912

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20160616

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602011036419

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: E02D0027020000

Ipc: E02D0005020000

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20161026

RIC1 Information provided on ipc code assigned before grant

Ipc: E02B 3/06 20060101ALI20161017BHEP

Ipc: E02D 5/02 20060101AFI20161017BHEP

Ipc: E04G 13/06 20060101ALI20161017BHEP

Ipc: E04G 13/04 20060101ALI20161017BHEP

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 879891

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170415

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602011036419

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170629

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170630

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 879891

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170329

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170629

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170731

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170729

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602011036419

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

26N No opposition filed

Effective date: 20180103

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602011036419

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20180301

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180214

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180228

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180228

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180214

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20181031

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180301

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180901

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180214

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180214

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180228

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180214

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110214

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170329

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170329