EP2529341A2 - Installation et procédé d'optimisation du mode de fonctionnement d'un réseau de distribution - Google Patents

Installation et procédé d'optimisation du mode de fonctionnement d'un réseau de distribution

Info

Publication number
EP2529341A2
EP2529341A2 EP11716169A EP11716169A EP2529341A2 EP 2529341 A2 EP2529341 A2 EP 2529341A2 EP 11716169 A EP11716169 A EP 11716169A EP 11716169 A EP11716169 A EP 11716169A EP 2529341 A2 EP2529341 A2 EP 2529341A2
Authority
EP
European Patent Office
Prior art keywords
network
optimization
water
model
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
EP11716169A
Other languages
German (de)
English (en)
Inventor
Frederik Blank
Markus Gauder
Werner A. Schmidt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Technology AG
Original Assignee
ABB Technology AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Technology AG filed Critical ABB Technology AG
Publication of EP2529341A2 publication Critical patent/EP2529341A2/fr
Ceased legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Definitions

  • the invention relates to an arrangement for optimizing the operation of a supply network, in particular a water network comprising a control system for controlling elements of a respective supply network, in particular a water network, and a processing unit with simulation environment for creating a simulation model of the respective network.
  • the invention also relates to a method for optimizing the operation of a supply network, in particular a water network, in which a previously mentioned arrangement is used.
  • CONFIRMATION COPY Simulation models including the calculation of pressures, flows, flow velocities, tank levels, parameters of the
  • Hydraulic simulations are also used for the planning of certain scenarios. In particular, they become more short-lived for simulations
  • Simulation models are calibrated by feeding in particular measured values from field measurements at continuous intervals and making adjustments to model parameters. This is intended to represent the characteristic behavior of the real network. Furthermore, changes in the network configuration and topology of the water network must be made regularly
  • Simulation model are entered.
  • the aim of the calibration is to adapt the theoretical model to the real network.
  • the determination is based on an objective function, the spatial structure of the respective network, mathematical systems of equations, physical and operational
  • Scheduling or scheduling update is required, usually no way past an installation or installation of a new system, which in addition to possibilities of simulation and the implementation of
  • a disadvantage here is that investments already made can not be maintained and an additional level of effort and resources is required to set up a new, enhanced modeling system. Furthermore, new experience in dealing with the new network modeling system has to be gathered, which usually results in a loss of efficiency.
  • the invention is therefore based on the object to provide an arrangement and a method with which the technical operation of a particular
  • Water network can be easily and efficiently optimized with comparatively little effort.
  • Water supply network thus comprises a control system for driving elements of a supply network or network, in particular
  • Water network or water supply network and several
  • Water network or supply network and an optimization unit with optimization environment (7) which receives data exported from the simulation environment (4) as well as additional data and based on the exported data and
  • said arrangement is characterized by a plurality of processing units having a simulation environment and a
  • optimization environment which optimization environment receives data and / or information and ancillary data exported by the simulation environment based on the exported data and / or information and
  • Network simulations and optimizations play a key role.
  • the use of these methods provides a better insight into the current status of the respective network, in particular a water network. This is because additional information is generated, with accessibility already being available
  • Simulation models which are the level of nodes - for example, branch, distribution and withdrawal points - a supply network, in particular
  • Network modeling systems namely one with and one without the functionality of optimization.
  • the second network modeling system needs no simulation and can therefore be trimmed down.
  • the effort can be reduced and, in particular, costs can be saved by supplementing or retrofitting known or existing arrangements with an optimization environment.
  • the optimization environment determines schedules and setpoints for the actuators or elements in the respective network, in particular the respective water network. These schedules and setpoints are in the
  • optimization environment optimized taking into account a variety of data and information as well as boundary conditions based on an objective function and existing boundary conditions.
  • a supply network and in particular a water network or a
  • the data exported from the simulation environment describe the spatial structure of the respective network, in particular of the water network, as well as its functional elements.
  • the respective water network can be reliably displayed.
  • Boundary conditions such as prices for energy and / or water and / or gas and / or availability, or other data and information.
  • the optimization of the driving or operating mode can be updated by the current entry of additional data.
  • the arrangement has at least one data memory. Especially for collecting historical data.
  • the control system can read out measured or determined or detected values from the respective data memory in a time-dependent manner and / or write them into the data memory. It is conceivable that the additional data are read from the data memory.
  • the arrangement has a prediction unit
  • the arrangement ' advantageously a
  • the operator can therefore always access the driving or deployment plans, specifications and / or setpoints for the controllable elements of the respective network, in particular the water network.
  • the arrangement described here for optimizing the driving or operating mode of networks or supply networks, in particular of water networks allows the respective network to operate in a manner in which containers or reservoirs are filled in and / or as required, that is to say in particular if the available supply is the greatest, that is to say the least or the costs to be paid or the expenditure to be paid are the least, in particular if electricity and treated water are the cheapest and / or in large quantities are available ,,, and / or at which the
  • Pressure levels in the lines to be adapted to the current and future expected demand are realized concretely by determining, in particular calculating, time-variable setpoint series, namely driving or deployment plans, for all controllable elements in the network, in particular in the water network. These include, for example, nodes of the respective network, in particular the water network, which are not controllable.
  • controllable elements include in particular selected
  • Operational boundary conditions include, for example, energy resources, in particular with regard to energy costs, which are provided in real time and / or future expected consumption values, in particular with regard to expected costs, thus as realistic as possible or optimal
  • a calibrated simulation model is required and / or provided in order to obtain both the spatial structure of the supply network and in particular of the respective water network as well as simulated values.
  • Processing unit a microprocessor, microcomputer PLC, ASIC, personal computer or the like.
  • the various processing units can be integrated into the control system and / or implemented.
  • the object mentioned at the outset is also achieved by a method for optimizing the operation of a supply network, in particular a water network, in which an arrangement of the type described hereinbefore is used, data and / or information and additional data exported by the optimization environment being received by the simulation environment and based on the exported data and additional data optimized driving or deployment plans for the control of controllable elements of the respective network, in particular the respective water network, are determined.
  • the exported data describe the spatial structure of the respective network, in particular of the water network, as well as its elements.
  • the respective water network of a field can be reliably mapped.
  • the additional data is the objective function of
  • Boundary conditions such as prices for energy and / or water and / or gas and / or availability, or other data and information.
  • the optimization of the driving or operating mode can be updated by the current entry of additional data.
  • historical data is recorded and / or stored on at least one data store provided and set up for this purpose.
  • measured and / or determined and / or detected values can be read from the respective data memory in a time-dependent manner and / or written to the data memory. It is conceivable that also the additional data are read from the data memory.
  • a prediction of the consumption of, in particular, water or gas or oil is carried out. This can do that
  • driving or deployment plans can be visualized or visualized, for example, on a display device and / or a user interface, so that the operator is in the position at all times on the driving or deployment plans, specifications and / or desired values for the controllable
  • the method described here for optimizing the driving or operating mode of networks or supply networks, in particular of water networks allows the respective network to be operated in a manner in which containers or reservoirs are filled up in terms of resources and / or requirements, ie in particular if the available supply is the greatest, that is, the least or the least cost to be paid or the outlay to be made, in particular if electricity and treated water are the cheapest and / or in are available in large quantities, and / or in which the
  • Pressure levels in the lines to be adapted to the current and future expected demand are realized concretely by determining, in particular calculating, time-variable setpoint series, namely driving or deployment plans, for all controllable elements in the network, in particular in the water network. These include, for example, nodes of the respective network, in particular the water network, which are not controllable.
  • controllable elements include in particular selected
  • Operational boundary conditions include, for example, energy resources, in particular with regard to energy costs, which are provided in real time and / or future expected consumption values, in particular with regard to expected costs, thus as realistic as possible or optimal
  • Consumption data and thus prices or costs for electricity and / or raw water or treated water can be taken into account in the optimization, a time perspective of several hours, especially 24 hours, set up.
  • a calibrated simulation model is used to obtain both the spatial structure of the supply network and in particular of the respective water network as well as simulated values.
  • hydraulic network simulation model which represents the physical supply network, in particular the water network in particular by means of rivers, pressures, tank and / or reservoir levels, demands and losses.
  • an optimization model is derived using advanced model reduction and system identification techniques.
  • Target function defined, which describes the elements to be optimized.
  • the main advantage of the invention described here lies in their flexibility.
  • the functionality of the optimization can be offered to all customers who have a network modeling system that has no optimization function. This is an essential distinguishing criterion for control systems and / or automation systems and has great potential with regard to retrofitting.
  • Fig. 1 is a schematic view of an arrangement for optimizing the driving ⁇ or operation of water networks, the exchange of Data and information between individual devices of the arrangement is shown by arrows, and
  • Fig. 2 is a schematic view of the structure of the functionality of
  • Water network according to Fig. 1 allows the calculation of the optimal driving or deployment plans of the active elements of the water network.
  • the elements include in particular pumps, control valves and reservoir tank.
  • the arrangement for optimizing the operation of a supply network or network essentially comprises a control system 1 for controlling elements of a supply network and / or water network and a plurality of processing units, wherein at least one simulation unit 10 with
  • Simulation environment 4 exported data and additional data receives and based on the exported data and additional data optimized flow charts for the control of the elements of the respective network or network, in particular the respective water network or supply network, determines, provided and used.
  • FIG. 1 The arrangement of FIG. 1 allows the formation of an independent
  • Control system 1 implemented.
  • Results of the optimization in particular time series of desired values or timetables, are used directly for controlling the controllable elements which are connected to the control system 1 or are in communication connection.
  • results are visualized within the control system environment 1 for the information of the operator and / or in a data memory for historical data 2, in the Also referred to as historical data storage, or stored in an information management system.
  • the dashed line surrounds an already installed arrangement.
  • This arrangement comprises the guidance system 1, the historical data memory 2, a forecasting unit 3 for predicting the consumption of water and a
  • the control system 1 transmits control commands and schedules in the schematically illustrated field 6, in which the water network is located with its controllable elements. From field 6 to the control system 1, measured values are transmitted which indicate the status of the water network.
  • the control system 1 reads values measured from the data memory for historical data 2 in a time-dependent manner and writes measured values into the historical data memory 2 in a time-dependent manner.
  • the control system 1 receives predicted values of the consumption of water from the prediction unit 3 and supplies measured consumption values to the
  • the control system 1 receives simulated results from the simulation unit 10 or the simulation environment 4 and delivers values measured in real time to the simulation unit or the simulation environment 4.
  • the simulation environment 4 itself can not perform an optimization function.
  • An optimization unit and optimization environment 7, to which the already installed arrangement is supplemented, supplies optimized guidance or operational plans to the control system 1 and receives values simulated by the control system 1, measured values, status of the water network and cost structures for a current and / or future water and / or electricity consumption.
  • the optimization environment 7 receives from the simulation environment 4 - or the relevant units - exported data, namely characteristic features of the elements of the water network.
  • Optimization environment 7 also receives a simulation model 5 or a spatial structure from the simulation environment 4.
  • the optimization environment 7 receives as additional data a target function, operational and / or physical
  • Boundary conditions and maintenance information include, for example, prices and / or cost structures for energy and / or water.
  • a simulation environment 4 is at least partially integrated into the control system 1, if this is not yet available.
  • the simulation unit 10 or simulation environment 4 is configured such that it measures values measured in real time from the control system 1 or from a
  • the simulation unit 10 Read data storage with historical data 2.
  • the simulation unit 10 is
  • Simulation environment 4 is further configured in such a way that simulated results can be written into the "historical" data memory 2. This realizes an “online simulation environment”, online in this context meaning that the simulation is based on real-time data.
  • the spatial structure (topology) of the hydraulic simulation model 5 as well as the real parameters of all elements (pumps, lines, etc.) of the network simulation system are exported to the optimization environment 7. It is assumed here that the spatial structure of the hydraulic simulation model 5 correctly contains all the elements of the field 6 of the water network or plant as well as their real parameters. It is further believed that the results of the hydraulic simulation model 5 correctly represent the real water network by means of flows, pressures, and reservoir or reservoir levels. Furthermore, the specific properties of different types of pumps and valves as well as electrical and mechanical performance potentials are stored or read from external sources.
  • This step can be either manual or in
  • Boundary conditions are set. In the control system existing field measurements and / or simulated values of non-measured nodes of the respective water network, expenses for electricity, expenses for treated water
  • Status information and other information needed for optimization is obtained through a connection to the control system 1 or to the historical data memory 2.
  • the aforementioned data may be configured individually or in combination as additional data.
  • the prediction water consumption prediction unit 3 calculates the future demands based on the information available in the historical data memory 2.
  • Simulation model is set up, and represents the behavior of the water network in the best possible way, an algorithm and solver or solver 9 is used, which solves the objective function of the optimization.
  • the objective function of the optimization was in addition to the operational
  • the resulting from the optimization driving or deployment plans are in the one data memory, in particular the historical data memory 2 and in the
  • Transfer control system 1 The new Setpoints are (i) sent directly to the controllable elements in field 6 and / or (ii) visualized on a user interface using as
  • the optimization and driving or application planning takes into account variable real-time status information.
  • this optimization function can not be performed by the network simulation system already in use. Consequently, a change in the network modeling system does not affect the optimization as long as the export of the model and the connection to the control system 1 or the data memory 2 is possible.
  • Network modeling system be avoided. Once the optimization function is fully integrated with the control system 1, results are immediately accessible in the operating environment. It is possible to access all facilities of the control system 1, such as the presentation of time histories, reporting or reporting or information management.
  • the control system-based implementation may advantageously provide a timing chain.
  • This control chain may have an operator interaction whereby accepted optimized schedules for pumps, control valves, tanks and reservoirs may be accepted.
  • the control system-based implementation may advantageously provide a closed-loop control.
  • This closed control loop can realize an immediate transfer of newly determined setpoint values into the field 6 by the control system 1 and / or the at least one processing unit.
  • a network modeling system has a simulation environment 4 with a simulation device 10.
  • the simulation environment 4 is a simulation environment 4 with a simulation device 10.
  • the simulation environment 4 is a simulation environment 4 with a simulation device 10.
  • Simulation model 5 generated.
  • the network modeling system exports
  • Network model as an exported file in a standard format, preferably in XML format, to the optimization environment 7.
  • a simplistic optimization model is generated by an algorithm executable by means of program code means from the simulation model with the inclusion of necessary additional input parameters and the respective one with a solver or solver Optimization model 8 solved.
  • Optimization model is automated or semi-automated.
  • Simplified model in this context means that the number of existing model nodes and model equations is reduced, so that the optimization problem generated by the optimization model can still be solved sufficiently quickly.
  • a computer program product for execution on a correspondingly equipped data processing device which has the features of the method according to the invention leads to a particular embodiment of the inventive device.
  • a computer program product in particular a computer program stored on a data carrier, which has the features of the method according to the invention, is therefore expressly included in the disclosure content of the present application.
  • the present invention also includes any combinations of preferred embodiments and features or refinements, unless they are mutually exclusive.
  • Prediction unit for predicting the demand simulation environment

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Feedback Control In General (AREA)
  • Flow Control (AREA)

Abstract

L'invention concerne une installation permettant d'optimiser le mode de fonctionnement d'un réseau de distribution, notamment d'un réseau de distribution d'eau, qui comprend un système de commande (1) pour assurer la commande des éléments d'un réseau de distribution d'eau et une unité de simulation (10) à environnement de simulation (4), pour établir un modèle de simulation (5) du réseau de distribution d'eau. L'invention vise à mettre au point une installation et un procédé permettant d'optimiser aisément, efficacement et avantageusement en termes de coûts et de manière fiable le mode de fonctionnement technique d'un réseau de distribution d'eau. L'invention se caractérise à cet effet par une unité d'optimisation à environnement d'optimisation (7) qui reçoit les données et les données additionnelles exportées par l'environnement de simulation, des schémas de déroulement optimisés étant établis, sur la base des données et des données additionnelles exportées, pour assurer la commande des éléments du réseau de distribution. L'invention fait également appel dans ce contexte à un procédé pour optimiser le mode de fonctionnement d'un réseau de distribution ou d'un réseau, notamment d'un réseau de distribution d'eau, selon lequel une installation mentionnée précédemment est utilisée, des données et des données additionnelles exportées par l'environnement de simulation (4) étant reçues par l'environnement d'optimisation (7) et des schémas de déroulement optimisés étant établis sur la base des données et des données additionnelles exportées, pour assurer la commande des éléments du réseau ou du réseau de distribution respectif.
EP11716169A 2010-01-27 2011-01-27 Installation et procédé d'optimisation du mode de fonctionnement d'un réseau de distribution Ceased EP2529341A2 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102010005955.2A DE102010005955B4 (de) 2010-01-27 2010-01-27 Anordnung und Verfahren zur Optimierung der Arbeitsweise eines Versorgungsnetzes
PCT/EP2011/000361 WO2011092012A2 (fr) 2010-01-27 2011-01-27 Installation et procédé d'optimisation du mode de fonctionnement d'un réseau de distribution

Publications (1)

Publication Number Publication Date
EP2529341A2 true EP2529341A2 (fr) 2012-12-05

Family

ID=44194972

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11716169A Ceased EP2529341A2 (fr) 2010-01-27 2011-01-27 Installation et procédé d'optimisation du mode de fonctionnement d'un réseau de distribution

Country Status (10)

Country Link
US (1) US8725480B2 (fr)
EP (1) EP2529341A2 (fr)
CN (1) CN102713946B (fr)
AU (1) AU2011209158B2 (fr)
BR (1) BR112012018802A2 (fr)
CA (1) CA2788026A1 (fr)
DE (1) DE102010005955B4 (fr)
MX (1) MX2012008585A (fr)
WO (1) WO2011092012A2 (fr)
ZA (1) ZA201205648B (fr)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5908213B2 (ja) * 2011-02-28 2016-04-26 ブラザー工業株式会社 通信装置
WO2013026731A1 (fr) 2011-08-22 2013-02-28 Abb Technology Ag Système et procédé pour optimiser le fonctionnement d'un réseau d'eau
US20150185749A1 (en) * 2012-06-21 2015-07-02 Siemens Aktiengesellschaft Method for operating a supply network and supply network
US9147018B2 (en) * 2013-01-10 2015-09-29 General Electric Company Method and system for use in controlling a pressure vessel
US20150187025A1 (en) * 2014-01-01 2015-07-02 International Business Machines Corporation Optimization platform for water distribution networks
GB201402695D0 (en) * 2014-02-16 2014-04-02 Arscott David S System for optimising performance in a water network
US10120962B2 (en) 2014-09-02 2018-11-06 International Business Machines Corporation Posterior estimation of variables in water distribution networks
WO2016064721A1 (fr) * 2014-10-23 2016-04-28 3M Innovative Properties Company Systèmes et procédés pour identifier et adhérer à des contraintes fonctionnelles normatives dans des réseaux électriques
EP3056955B1 (fr) * 2015-02-11 2019-04-24 Siemens Aktiengesellschaft Procédé de planification et d'ingénierie, outil et système de logiciel pour une installation technique de processus
DE102018201550A1 (de) * 2018-02-01 2019-08-01 Siemens Aktiengesellschaft Verfahren und Vorrichtung zum Bestimmen einer Notwendigkeit eines Eingriffs auf ein Versorgungsnetz
US10915680B2 (en) * 2018-12-21 2021-02-09 Dassault Systemes Simulia Corp. Local control of design patterns on surfaces for enhanced physical properties
CN113126576B (zh) * 2019-12-31 2022-07-29 北京国双科技有限公司 集输系统能耗优化模型构建方法与集输系统能耗控制方法
CN115542776B (zh) * 2022-10-12 2024-04-16 沈阳飞机工业(集团)有限公司 无人机飞管系统仿真模型校准方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5873251A (en) * 1995-09-13 1999-02-23 Kabushiki Kaisha Toshiba Plant operation control system
WO2004084371A1 (fr) * 1998-08-31 2004-09-30 Kaoru Fujita Procede et appareil de commande d'optimisation de groupe electrogene
JP2006127079A (ja) * 2004-10-28 2006-05-18 Yamatake Corp 制御対象モデル生成装置および生成方法
AU2007211294B2 (en) * 2006-01-31 2012-05-10 Landmark Graphics Corporation Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator
DE102006034347A1 (de) * 2006-07-25 2008-01-31 Siemens Ag Verfahren und Vorrichtung zur Optimierung eines Anlagensystems

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
B. ULANICKI, P. L. M. BOUNDS, J. P. RANCE: "Using a GAMS modelling environment to solve network scheduling problems", MEASUREMENT + CONTROL, vol. 32, May 1999 (1999-05-01), pages 110 - 115, XP000896654 *
See also references of WO2011092012A2 *

Also Published As

Publication number Publication date
DE102010005955B4 (de) 2020-03-05
ZA201205648B (en) 2013-04-24
CN102713946B (zh) 2016-03-09
CN102713946A (zh) 2012-10-03
US20120316852A1 (en) 2012-12-13
CA2788026A1 (fr) 2011-08-04
MX2012008585A (es) 2012-10-15
AU2011209158A1 (en) 2012-09-06
AU2011209158B2 (en) 2015-04-09
WO2011092012A2 (fr) 2011-08-04
WO2011092012A3 (fr) 2011-10-13
DE102010005955A1 (de) 2011-07-28
US8725480B2 (en) 2014-05-13
BR112012018802A2 (pt) 2016-05-03

Similar Documents

Publication Publication Date Title
DE102010005955B4 (de) Anordnung und Verfahren zur Optimierung der Arbeitsweise eines Versorgungsnetzes
EP2350757B1 (fr) Système et procédé de prise de decision optimisee pour un reseau d'alimentation en eau potable et/ou un entreprise de distribution d'eau
DE102015120446A1 (de) Verfahren und Systeme zur Verbesserung der Steuerung von Kraftwerksgeneratoreinheiten
DE112018001757T5 (de) Betriebs-/Wartungsmanagementverfahren, Programm und Betriebs-/Wartungsmanagementsystem
DE112012003487T5 (de) System und Verfahren zur Optimierung des Betriebs eines Wassernetzes
EP3450638A1 (fr) Commande d'un réseau de distribution d'eau
WO2012048808A1 (fr) Procédé et dispositif d'optimisation d'un processus de production
EP2726945A1 (fr) Dispositif de commande d'une installation, en vue de l'efficacité énergétique, et procédé associé
EP2971768B2 (fr) Développement d'un modèle supérieur pour contrôler et/ou surveiller un système de compresseurs
WO2008125171A1 (fr) Procédé pour l'optimisation, la planification et/ou le contrôle de développement systématiques d'un système
EP2795414B1 (fr) Planification automatisée d'une technique de gestion d'une installation technique
DE102018213862A1 (de) Verfahren zum Steuern eines Austauschs von Energie zwischen Energiesubsystemen zu angeglichenen Konditionen; Steuerungszentrale; Energiesystem; Computerprogramm sowie Speichermedium
DE19964498A1 (de) Verfahren und System zur Überwachung der verfügbaren Ressourcen in einem Herstellungsprozeß
DE10258655A1 (de) Verfahren und System zur dynamischen, modellbasierten Planung und Optimierung von Produktionsprozessen, sowie zur Ablaufplanerstellung
EP2778413B1 (fr) Entrée de schéma R&I pour un procédé de contrôle et/ou de surveillance d'un système de compresseurs
EP3719737A1 (fr) Processus de gestion de l'énergie assisté par ordinateur et système de gestion de l'énergie
WO2015010751A1 (fr) Automate programmable industriel
DE19510343C2 (de) Verfahren zur sequentiellen Vorsteuerung eines Prozesses
WO2019101345A1 (fr) Procédé et dispositif de planification d'une installation spécifique de la technologie des procédés industriels
EP4012514A1 (fr) Procédé de génération d'un plan opérationnel de commande des composants énergétiques d'une infrastructure de bâtiment
DE112020007149B4 (de) Zuordnungsunterstützungsprogramm, Zuordnungsunterstützungsvorrichtung, Zuordnungslernprogramm, Zuordnungslernvorrichtung und computerlesbares Speichermedium
DE102017219864A1 (de) Verfahren zur Diagnose wenigstens einer Automatisierungsanlage und System
EP3435321A1 (fr) Gestion d'énergie d'un bâtiment
CH719194A2 (de) Computerimplementiertes Verfahren zum Optimieren einer Gebäudeinfrastruktur.
DE102021201887A1 (de) System, Verfahren und Computerprogramm zur betriebswirtschaftlichen Optimierung eines Prozesses in einer Produktionsanlage, insbesondere einer Produktionsanlage der metallerzeugenden Industrie, der nicht-Eisen- oder Stahlindustrie oder der Vorlegierungsherstellung

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20120706

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20140718

REG Reference to a national code

Ref country code: DE

Ref legal event code: R003

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED

18R Application refused

Effective date: 20160908