EP2395522A1 - Procédé de fabrication de noyaux de transformateurs, procédé de fabrication d'un transformateur doté de ce noyau et transformateur fabriqué conformément à ce procédé - Google Patents

Procédé de fabrication de noyaux de transformateurs, procédé de fabrication d'un transformateur doté de ce noyau et transformateur fabriqué conformément à ce procédé Download PDF

Info

Publication number
EP2395522A1
EP2395522A1 EP10005876A EP10005876A EP2395522A1 EP 2395522 A1 EP2395522 A1 EP 2395522A1 EP 10005876 A EP10005876 A EP 10005876A EP 10005876 A EP10005876 A EP 10005876A EP 2395522 A1 EP2395522 A1 EP 2395522A1
Authority
EP
European Patent Office
Prior art keywords
core
transformer
loops
cutting
ribbon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP10005876A
Other languages
German (de)
English (en)
Other versions
EP2395522B1 (fr
Inventor
Benjamin Weber
Jasmin Smajic
Martin Dr. rer. nat. Carlen
Lise Dr. Donzel
Stephane Dr. Schaal
Thorsten Steinmetz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Schweiz AG
Original Assignee
ABB Technology AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Technology AG filed Critical ABB Technology AG
Priority to EP10005876.7A priority Critical patent/EP2395522B1/fr
Priority to PCT/EP2011/002349 priority patent/WO2011154076A1/fr
Publication of EP2395522A1 publication Critical patent/EP2395522A1/fr
Application granted granted Critical
Publication of EP2395522B1 publication Critical patent/EP2395522B1/fr
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F41/00Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties
    • H01F41/02Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties for manufacturing cores, coils, or magnets
    • H01F41/0206Manufacturing of magnetic cores by mechanical means
    • H01F41/0213Manufacturing of magnetic circuits made from strip(s) or ribbon(s)
    • H01F41/0226Manufacturing of magnetic circuits made from strip(s) or ribbon(s) from amorphous ribbons
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F3/00Cores, Yokes, or armatures
    • H01F3/04Cores, Yokes, or armatures made from strips or ribbons

Definitions

  • the invention relates to a method for manufacture of a transformer core made of ferromagnetic material, such as amorphous metal or silicon iron, which is provided as a single ribbon layer or as multiple ribbon layers wound on a winding mandrel.
  • ferromagnetic material such as amorphous metal or silicon iron
  • a major component of a transformer is its core with the purpose of guiding the magnetic flux whereas the core usually consists of laminated steel laminations.
  • Transformers for use at power typically have cores made of high permeability silicon steel which has a permeability many times that of free space, and the core thus serves to greatly reduce the magnetizing current, and confine the flux to a path which closely couples the windings.
  • Each lamination is insulated from its neighbors by a thin non-conducting layer of insulation.
  • the transformer core causes energy losses due to hysteresis and eddy currents.
  • amorphous metal typically FeBSi alloy
  • Si-steel Si-steel
  • the manufacturing of the cores is labor intensive and costly. This ID presents an alternative manufacturing method which allows simplifying several of the manufacturing steps
  • a method of constructing a transformer having an amorphous steel core having a coil about a leg of the core wherein the core leg is formed to a cross section that more closely conforms to the configuration of the coil window of the coil that surrounds the core leg.
  • the core leg is formed of superposed strips of amorphous steel which are somewhat thicker in their central region than at their edges and which are squeezed together at their edges to form the conformal cross-section.
  • a transformer core is made by winding a strip of ferromagnetic material, such as amorphous metal or silicon iron, on a winding mandrel to form a first annulus and cutting once through this annulus to create a plurality of individual laminations which are then assembled in packets about a nesting mandrel of a smaller diameter than the winding mandrel to form a second annulus.
  • Each packet consists of a predetermined number of groups of laminations, with the ends of each lamination group lapping each other to form a lap joint.
  • each packet is arranged in staggered positions to create a repeating step-lap joint pattern confined within a predetermined joint region.
  • the invention provides an alternative manufacturing method which allows simplifying several of the manufacturing steps.
  • the claimed method is characterized by the following steps
  • laser cutting instead of mechanical cutting has been provided as well as the continuous winding of the ribbons of ferromagnetic material, such as amorphous metal or silicon iron, forming the core until the final shape has been achieved.
  • ferromagnetic material such as amorphous metal or silicon iron
  • the laser cutting device and the spooling mechanism may be manually operated, but preferably it is partly or fully automated which is advantageous for the handling with the spooling of the ribbon.
  • laser cutting is more reliable and more precise as to the trimming of the borders than the customary mechanical cutting, especially with regard to the surface quality of the respective cut line.
  • a further preferred provision is characterized in that the winding axis has a horizontal or vertical or any other direction.
  • either the core or the laser beam are being displaced, or the direction of the laser beam is being adjusted.
  • the laser beam is being displaced by one or several mirrors.
  • the single ribbon layers or bundles of layers can be wound at a time, i.e. simultaneously.
  • the winding process of the ribbon is being executed fully or partly by automatic equipment, though likewise manually operated equipment is applicable.
  • the winding axis can be provided to have horizontal or vertical direction or any other direction.
  • Evans cores which finally comprise three core legs, the outer loop can directly be wound on the two inner loops.
  • strips of different material can locally be inserted into the winding.
  • These inserts can be introduced between each ribbon layer respectively between any bundle of layers. The purpose of these inserts is to limit the depth of the cuts.
  • a preferred embodiment of the claimed invention concerning the positioning of the laser is characterized in that the laser is positioned below the core respectively the loop for cutting.
  • the ribbon layers are enabled to open up (unlace) by gravitational force.
  • the inserts can be displaced, and thus allowing a stepped butt configuration. Consequently the inserts can be made of amorphous metal, Si-steel, other metal foils or polymeric foils, whereas a preferred polymeric foil is made from PTFE.
  • the cuts are effected at the position of the inserts within the core. If any inserts are present in the core, such inserts are removed after effecting the cuts.
  • the individual layers advantageously weld together at the cut which simplifies the handling during re-lacing.
  • the wound core body is annealed for at least 1 ⁇ 2 hour at about 350°C in order to equalize the structure of the amorphous metal.
  • the annealing takes place when the core body is complete i.e. that the loop is still closed and not yet unlaced, i.e. opened.
  • the cutting of the core body is effected before the annealing procedure has been initiated. Due to laser cutting which is an ' essential feature of the invention it does no matter when the annealing procedure of the core takes place i.e. before or after cutting the loop.
  • the core is being annealed when it is unlaced in order to give access to the core legs which are formed by the long sides of the core.
  • the core legs including the lower part of the core which connects the core legs are coated with resin or a different polymeric material which provides as well mechanical stability as protection against mechanical wear.
  • the coating of the core legs is effected after annealing the core, i.e. after it has been annealed, and before it is unlaced, i.e. opened, in order to make then the core legs accessible for receiving the respective transformer coils.
  • the core After re-lacing the core i.e. closing the core the rest of the core is coated, too. At this stage, i.e. when the coating has been cured the core is ready for use as a transformer core.
  • an object of the invention is to disclose a new method for manufacture of a transformer using such a core as described before.
  • a method for manufacture of a transformer having a core made of amorphous metal as it has been illustrated before is characterized by the following steps
  • transformers having a core of amorphous metal With transformers having a core of amorphous metal the core and the coils are manufactured separately and then assembled. This requires that the core is opened for inserting the coils.
  • the core is provided for an annealing procedure which is executed after removing of the mandrel which is provided for manufacture of the core.
  • the transformer core which consists of a plurality of thin layers of foil to prevent the core from breaking down and losing its shape.
  • other devices are being provided to maintain the shape of the core such as supports, molds or clamps.
  • Fig. 1a to 1d four stages of manufacture of a core 10 for a transformer according to the state of the art whereas the core 10 of is made from single stacked layers of amorphous metal. All these figures are shown in lateral view.
  • Fig. 1 a shows a 1 st stage of the manufacturing process when the core has been finished.
  • This process is executed by ccutting of the amorphous ribbon to the appropriate length.
  • the cutting is done by a metal shears, which is a Guillotine-like device.
  • a bundle or a number of layers is cut simultaneously.
  • the outer layers of a core need to be longer than the inner layers. This requires permanent adjustments of the cutting length
  • Fig. 1b shows a 2 nd stage when the core has been opened respectively when the ' ribbons have been unlaced for forming core legs where coils are received. This unlacing of the single layers is usually done manually by means of mechanical equipment.
  • Fig. 1c a 3 rd stage of the conventional method has been shown where the core legs 12 receive the provided coils.
  • Fig. 2a shows a rectangular core loop 16 manufactured according to the invention and being formed by a nearly endless i.e. continuously wound ribbon (not shown in detail) of amorphous metal being supported by core supports 18 which keep the core in shape.
  • the positioning of the core 16 has been provided in that way that the cut for unlacing the ribbons and thus for opening the core 16 is effected from below.
  • a laser 22 is being provided whereas the laser provided for the cut is directing its beam 24 to the ribbons from below of the core 16 accordingly. Additionally locally, e.g. between each layer of the ribbons, some inserts 21 are being introduced in order to limit the depths of the cuts effected by the laser.
  • the core 16 according to Fig. 2b is being supported by a mandrel 26 which is to be removed when the cut of the ribbons has been finished in order to allow the core legs 20 of the core 16 receive the respective coils (not shown)
  • FIG. 3 a similar arrangement as shown in Fig. 2a is being displayed but here with an Evans core which comprises two neighboring cores being enveloped by a third core which is clasping the two cores commonly.
  • FIG. 4a a similar arrangement is shown as already in Fig. 2a but here with a trapezoidal core loop 28 on a trapezoidal mandrel 30 whereas the rest of the arrangement is the same as with that shown in Fig. 2a .
  • a laser 22 is positioned below of the core 28 and its beam 24 is directed to the lower front of the core 28 where the inserts 21 have been introduced between the layers of the ribbons as illustrated before.
  • Fig. 4b a staggered step-lap rectangular core loop 28 after re-lacing is shown.
  • the formerly cut parts of the core which corresponds to the base side in Fig. 4a i.e. the longer of both short sides, have been re-laced i.e. reunited and finally the upper and the lower short sides have the same length thus the core is rectangular.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Manufacturing Cores, Coils, And Magnets (AREA)
EP10005876.7A 2010-06-08 2010-06-08 Procédé de fabrication de noyaux de transformateurs, procédé de fabrication d'un transformateur doté de ce noyau Not-in-force EP2395522B1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP10005876.7A EP2395522B1 (fr) 2010-06-08 2010-06-08 Procédé de fabrication de noyaux de transformateurs, procédé de fabrication d'un transformateur doté de ce noyau
PCT/EP2011/002349 WO2011154076A1 (fr) 2010-06-08 2011-05-12 Procédé de fabrication de noyaux de transformateur, procédé de fabrication d'un transformateur doté dudit noyau et transformateur fabriqué selon ce procédé

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP10005876.7A EP2395522B1 (fr) 2010-06-08 2010-06-08 Procédé de fabrication de noyaux de transformateurs, procédé de fabrication d'un transformateur doté de ce noyau

Publications (2)

Publication Number Publication Date
EP2395522A1 true EP2395522A1 (fr) 2011-12-14
EP2395522B1 EP2395522B1 (fr) 2017-08-09

Family

ID=43009340

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10005876.7A Not-in-force EP2395522B1 (fr) 2010-06-08 2010-06-08 Procédé de fabrication de noyaux de transformateurs, procédé de fabrication d'un transformateur doté de ce noyau

Country Status (2)

Country Link
EP (1) EP2395522B1 (fr)
WO (1) WO2011154076A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107316739A (zh) * 2017-06-19 2017-11-03 广东紫光电气有限公司 一种开口折叠式变压器铁芯制备方法
CN107658125A (zh) * 2016-07-25 2018-02-02 株式会社村田制作所 粉尘对策装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4709471A (en) * 1986-08-15 1987-12-01 Westinghouse Electric Corp. Method of making a magnetic core
US4814736A (en) 1986-03-13 1989-03-21 General Electric Company Wound transformer core
EP0357357A1 (fr) 1988-08-29 1990-03-07 General Electric Company Dispositif avec noyau et bobine pour un transformateur avec un noyau en acier amorphe ainsi que procédé pour la fabrication du dispositif
US4972168A (en) * 1989-01-03 1990-11-20 Abb Power T & D Company, Inc. Transformers and cores for transformers
US20020194723A1 (en) * 1999-10-23 2002-12-26 Jinxing Shen Method for producing a tape

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4814736A (en) 1986-03-13 1989-03-21 General Electric Company Wound transformer core
US4709471A (en) * 1986-08-15 1987-12-01 Westinghouse Electric Corp. Method of making a magnetic core
EP0357357A1 (fr) 1988-08-29 1990-03-07 General Electric Company Dispositif avec noyau et bobine pour un transformateur avec un noyau en acier amorphe ainsi que procédé pour la fabrication du dispositif
US4972168A (en) * 1989-01-03 1990-11-20 Abb Power T & D Company, Inc. Transformers and cores for transformers
US20020194723A1 (en) * 1999-10-23 2002-12-26 Jinxing Shen Method for producing a tape

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107658125A (zh) * 2016-07-25 2018-02-02 株式会社村田制作所 粉尘对策装置
CN107658125B (zh) * 2016-07-25 2020-04-28 株式会社村田制作所 粉尘对策装置
CN107316739A (zh) * 2017-06-19 2017-11-03 广东紫光电气有限公司 一种开口折叠式变压器铁芯制备方法

Also Published As

Publication number Publication date
WO2011154076A1 (fr) 2011-12-15
EP2395522B1 (fr) 2017-08-09

Similar Documents

Publication Publication Date Title
US9343210B2 (en) Three-phase magnetic cores for magnetic induction devices and methods for manufacturing them
EP1005698B1 (fr) Noyau de transformateur segmente
EP3101667B1 (fr) Noyau enroulé et procédé de fabrication de noyau enroulé
JP5820387B2 (ja) 電気変圧器組立体
EP2859564B1 (fr) Noyau à trois étages pour transformateur non linéaire
KR101867947B1 (ko) 비결정질 금속으로 만들어진 삼각형 변압기 코어의 제조 방법
US6473961B1 (en) Method of manufacturing magnetic cores for power transformers
EP0310813A1 (fr) Noyau revêtu avec joints de bout décalés les uns par rapport aux autres en forme d'escalier
US2960756A (en) Method of making magnetic cores
EP2395522B1 (fr) Procédé de fabrication de noyaux de transformateurs, procédé de fabrication d'un transformateur doté de ce noyau
CN103026435B (zh) 电抗器装置
US2588173A (en) Method of making magnetic cores
US20150380148A1 (en) Methods and systems for forming amorphous metal transformer cores
US20150364239A1 (en) Forming amorphous metal transformer cores
US3164889A (en) Method of making a magnetic core
WO2023218101A1 (fr) Procédé et dispositif de fabrication d'un noyau toroïdal enroulé en bande
US3074038A (en) Magnetic core
US20160133367A1 (en) Methods and systems for fabricating amorphous ribbon assembly components for stacked transformer cores
JPS63216316A (ja) 巻鉄心変圧器の製造方法
JPH04103621U (ja) 巻鉄心
MXPA00001783A (en) Segmented transformer core

Legal Events

Date Code Title Description
AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME RS

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20120605

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: ABB SCHWEIZ AG

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170117

RIN1 Information on inventor provided before grant (corrected)

Inventor name: WEBER, BENJAMIN

Inventor name: STEINMETZ, THORSTEN

Inventor name: CARLEN, MARTIN, DR. RER. NAT.

Inventor name: DONZEL, LISE, DR.

Inventor name: SMAJIC, JASMIN

Inventor name: SCHAAL, STEPHANE, DR.

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 917652

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170815

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602010044193

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20170809

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 917652

Country of ref document: AT

Kind code of ref document: T

Effective date: 20170809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171109

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171109

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171110

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171209

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602010044193

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20180511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602010044193

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180608

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180630

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180630

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180608

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190101

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180608

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180630

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180630

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180608

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20100608

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170809

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20170809