EP2111309B1 - Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips - Google Patents
Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips Download PDFInfo
- Publication number
- EP2111309B1 EP2111309B1 EP08707621A EP08707621A EP2111309B1 EP 2111309 B1 EP2111309 B1 EP 2111309B1 EP 08707621 A EP08707621 A EP 08707621A EP 08707621 A EP08707621 A EP 08707621A EP 2111309 B1 EP2111309 B1 EP 2111309B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- rolling
- phase
- phases
- duration
- sum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Revoked
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B39/00—Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B39/00—Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B39/004—Transverse moving
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D8/00—Modifying the physical properties by deformation combined with, or followed by, heat treatment
- C21D8/02—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D8/00—Modifying the physical properties by deformation combined with, or followed by, heat treatment
- C21D8/02—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
- C21D8/0221—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips characterised by the working steps
- C21D8/0226—Hot rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/22—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
- B21B1/30—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process
- B21B1/32—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process in reversing single stand mills, e.g. with intermediate storage reels for accumulating work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2201/00—Special rolling modes
- B21B2201/06—Thermomechanical rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B39/00—Arrangements for moving, supporting, or positioning work, or controlling its movement, combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B39/02—Feeding or supporting work; Braking or tensioning arrangements, e.g. threading arrangements
- B21B39/12—Arrangement or installation of roller tables in relation to a roll stand
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B45/00—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B45/02—Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
- B21B45/0203—Cooling
- B21B45/0209—Cooling devices, e.g. using gaseous coolants
- B21B45/0215—Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
- B21B45/0218—Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes for strips, sheets, or plates
Definitions
- the invention relates to the general field of thermo-mechanical controlled rolling of metal slabs to plates or strips in a rolling mill, in particular to a technique known as interleaving and an apparatus for performing that technique.
- Document GB 139694 A A discloses a method according to the preamble of claim 1.
- Thermo-mechanical controlled rolling involves the rolling of metal-slabs, plates or strips at specific temperatures in order to achieve specific metallurgical microstructures and mechanical properties. It typically involves two or more rolling phases. Between two successive rolling phases the plates or strips are allowed to cool down during a cooling phase to the specific temperature which is desired for the next rolling phase. For example, when two rolling phases are performed first a number of passes are rolled at a high temperature during the first rolling phase, and then the obtained plate or strip is allowed to cool down to a specific temperature in a cooling phase before the second rolling phase starts. Analogously, in three phase rolling two cooling phases take place, a first one between rolling phase 1 and rolling phase 2, and a second one between rolling phase 2 and rolling phase 3.
- the interleaving technique is employed. It consists in concurrently processing more than one metal slab, plate or strip in the rolling mill.
- the interleave depth is a characteristic parameter for thermo-mechanical controlled rolling according to interleaving technique.
- a special rolling pattern is applied on each slab of the batch to be processed.
- the rolling pattern is the sequence and duration of all rolling phases and cooling phases which are applied when processing a slab to a plate or strip.
- Such a rolling pattern comprises at least two rolling phases, and cooling phases between successive rolling phases.
- interleave depth is defined as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of the longest rolling phase down to a whole number.
- interleave depth is defined as the integer number of the obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of a rolling phase down to a whole number.
- the smallest value is 1.95.
- 1.95 rounded down to a whole number is 1.
- the interleave depth is 1. If the smallest value is a whole number the integer number defining the interleave depth is equal to that whole number.
- the interleave depth is defined as the integer number which is the quotient of the duration of the cooling phase and the duration of a rolling phase rounded down to a whole number.
- FIGs 1- 6 Such a technique is illustrated in Figures 1- 6 for two phase rolling of plates with an interleave depth of two on a simplified plan view of a single stand rolling mill.
- a first slab to be rolled is heated in the furnace 1 and then discharged onto the roller table 2 and transported to the rolling mill stand 3 where a number of reversing rolling passes are carried out until its rolling phase 1 is completed.
- the thereby obtained plate 5 is then moved down the roller table 4 to a storage position 6 where plate 5 is stored during its cooling phase.
- Figure 1 shows plate 5 in storage position 6.
- Figure 5 illustrates the situation after the penultimate rolling pass of rolling phase 2 of plate 5.
- Figure 6 illustrates the situation after the last pass of plate 5.
- a disadvantage of storing plates during their cooling phases on the same roller tables that are used for rolling is the additional length of the roller tables, and of the building housing the roller tables, that is required in comparison to thermo-mechanical rolling without interleaving technique.
- the interleave depth is two and the roller table 2 on the entry side of the rolling mill stand 3 needs to have at least a length which is equal to twice the length of plates after rolling phase 1 plus the length of a plate after the penultimate pass of rolling phase 2.
- the roller table 4 on the exit side of the rolling mill stand 3 needs to have a length which is at least equal to the larger one of the two following two values: three times the length of plates after rolling phase 1, length of plates after rolling phase 2.
- interleave depth can be up to twelve or even more.
- the roller table on the entry side of a rolling mill stand would need to have at least a length which is equal to twelve times the length of the plates after rolling phase 1 plus the length of the plate on the penultimate pass of rolling phase 2.
- GB1396946 discloses side-shift roller table sections which can be moved transversely out of the rolling line.
- a plate is positioned on one of the side-shift roller tables and then moved transversely off-line into a storage position.
- This transverse movement of the side-shift roller table either brings a cooled plate ready for the next rolling phase into the rolling line or it brings an empty side-shift roller table back into the rolling line. Since the plates are not stored in a row but side by side, the required length of roller tables and building is significantly reduced. However, to cope with an interleave depth of twelve would require twelve side-shifting roller tables which would take up a very large transverse area that would not fit into a standard rolling mill building.
- Another known solution to the problem of storing large numbers of plates during their cooling phases is to use one or more storing roller tables which run parallel with the mill line roller tables and moving-equipment to move plates between the mill line and the holding line. After rolling phase 1 is finished a moving-equipment moves the plates onto the storing roller tables. When the cooling period is finished the plate is moved back into the mill line for rolling phase 2.
- a storing roller table parallel to the mill-line roller table would still need to be around 120 metres long.
- To use two or more storing tables with moving-equipment in order to shorten the required length of each individual additional table would increase the complexity of the equipment and need more transverse space.
- Figure 7 schematically shows the timing diagram of the rolling pattern of an example of a two phase rolling prior art interleaving method with interleave depth two and equal duration of the rolling phases, the cooling phase being twice as long as a rolling phase, on a rolling mill with one rolling mill stand.
- a timing diagram depicts the chronological relation of the rolling phases and cooling phases applied on different slabs and the plates or strips derived from these slabs.
- the processed batch contains 6 slabs which yield plates 1-6.
- rolling phase 1 starts within a period of time equal to twice the duration of a rolling phase.
- a period of time which is the sum of the durations of rolling phase 1, of the cooling phase, and of rolling phase 2, elapses until rolling phase 1 of the fourth slab starts.
- the furnace discharge pattern of Figure 7 consists of three discharges at intervals of the duration of a rolling phase followed by a gap of the duration of four rolling phases during which no slabs are discharged and then another three slab discharges at intervals of the duration of a rolling phase.
- the furnace discharge pattern would consist of thirteen slab discharges at intervals of the duration of a rolling phase followed by a gap of the duration of fourteen rolling phases.
- the object of the present invention is to provide a method and an apparatus for thermo-mechanical controlled rolling by interleaving technique which permit the application of a more even furnace discharge pattern and require less space and equipment than the prior art.
- thermo-mechanical controlled rolling a batch of metal slabs to plates or strips on a rolling mill comprising at least one rolling mill stand according to a rolling pattern comprising at least two rolling phases of at least one rolling pass and cooling phases between successive rolling phases, which rolling pattern is applied on each slab of the batch, characterized in that , during rolling the batch, on at least one rolling mill stand it occurs several times that a rolling phase applied to one slab or plate or strip is succeeded by a different rolling phase applied on another slab or plate or strip, and that for two successively rolled slabs the time gap between the starts of their rolling phases 1 is always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern.
- This method permits the application of a furnace discharge pattern that is more even than in the prior art.
- the time gap between the starts of rolling phases 1 of two consecutively rolled slabs is at least once equal to the sum of the duration of all rolling phases and all cooling phases of the rolling pattern when batches larger than the rolling pattern's interleave depth are processed. Since the time gap between starts of rolling phases 1 for consecutively rolled slabs governs the discharge of slabs from the furnace, a smaller time gap permits a more even furnace discharge pattern.
- the interleave depth of the method's rolling pattern being defined for rolling patterns with unequal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of the longest rolling phase down to a whole number, and for rolling patterns with equal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of a rolling phase down to a whole number.
- the number of rolling phases is two, namely rolling phase 1 and rolling phase 2, which are separated by one cooling phase.
- thermo-mechanical controlled rolling methods with rolling patterns with an even numbered interleave depth and equal durations of the rolling phases where the duration of the cooling phase is equal to the sum of
- thermo-mechanical controlled rolling methods with rolling patterns with an even numbered interleave depth and unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- thermo-mechanical controlled rolling methods with rolling patterns with an uneven numbered interleave depth and equal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- thermo-mechanical controlled rolling methods with rolling patterns with an uneven numbered interleave depth and unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- thermo-mechanical controlled rolling methods with rolling patterns with equal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- the whole number is the integer of the quotient of cooling phase duration and duration of one rolling phase.
- the whole number is the integer of the quotient of cooling phase duration and duration of the longest rolling phase.
- thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of the durations of both rolling phases, or a whole number times that sum
- rolling phase 1 is performed as often as rolling phase 2.
- the whole number is the integer of the quotient of cooling phase duration and the sum of the durations of both rolling phases, i.e. in mathematical terms
- thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of
- the amount of rolling phases 1 performed is equal to the amount of rolling phases 2 performed plus 1 or minus 1.
- the whole number is the integer of the quotient of cooling phase duration and the sum of the durations of both rolling phases and the duration of either rolling phase 1 or rolling phase 2, i.e. in mathematical terms
- the number of rolling phases is three, namely rolling phase 1, rolling phase 2 and rolling phase 3, rolling phase 1 and rolling phase 2 being separated by cooling phase 1, and rolling phase 2 and rolling phase 3 being separated by cooling phase 2.
- thermo-mechanical controlled rolling methods with rolling patterns where the duration of cooling phase 1 is equal to the sum of
- the maximum time gap between the starts of their rolling phases 1 is up to the sum of the durations of the three rolling phases plus the greater of remainder time 1 and remainder time 2.
- the whole number A is the integer of the quotient of the duration of cooling phase 1 and the sum of the durations of all three rolling phases
- the whole number B is the integer of the quotient of the duration of cooling phase 2 and the sum of the durations of all three rolling phases.
- thermo-mechanical controlled rolling methods with rolling patterns where the duration of cooling phase 1 is equal to the sum of
- the whole number C is the integer of the quotient of the duration of cooling phase 1 and the sum of the durations of all three rolling phase plus the duration of rolling phase 3
- the whole number D is the integer of the quotient of the duration of cooling phase 2 and the sum of the durations of all three rolling phases plus the duration of rolling phase 1.
- thermo-mechanical controlled rolling methods that during rolling the batch, from after completion of rolling the first plate or strip of the batch until the beginning of rolling phase 3 of the last plate or strip of the batch, a rolling phase 1 is always succeeded by a rolling phase 2, and a rolling phase 2 is always succeeded by a rolling phase 3, and a rolling phase 3 is always succeeded by a rolling phase 1.
- This pattern makes a very even furnace discharge pattern possible.
- thermo-mechanical controlled rolling methods that during rolling the batch, from after completion of rolling the first plate or strip of the batch until the beginning of rolling phase 3 of the last plate or strip of the batch, a rolling phase 1 is always succeeded by a rolling phase 3, and a rolling phase 3 is always succeeded by a rolling phase 2, and a rolling phase 2 is always succeeded by a rolling phase 1.
- This pattern makes a very even furnace discharge pattern possible.
- thermo-mechanical controlled rolling methods that during a period of time equal to the duration of a cooling phase 1 rolling phase 1, rolling phase 2 and rolling phase 3 are performed equally often.
- rolling phase 2 and rolling phase 3 are performed unequally often. More preferably, during a period of time equal to the duration of a cooling phase 1 the number of rolling phases 3 performed is greater than the number of rolling phases 1 performed and greater than the number of rolling phases 2 performed, and during a period of time equal to the duration of cooling phase 2 the number of rolling phases 1 performed is greater than the number of rolling phases 2 performed and greater than the number of rolling phases 3 performed.
- the resulting plates or strips are transferred from a rolling line of the rolling mill to a storage position outside the rolling line by at least one moving-equipment, and afterwards are transferred from the storage position to the rolling line after completion of the cooling phase by the moving equipment.
- the batch during rolling the batch it occurs at least once that while one plate or strip is transferred to its storage position or to the rolling line another plate or strip is simultaneously transferred to the rolling line or to its storage position by the same moving-equipment.
- an apparatus for thermo-mechanical controlled rolling comprising at least one rolling mill stand, a rolling line, storage positions outside the rolling line, and at least one moving-equipment for moving plates or strips from the rolling line to the storage positions, characterized in that the number of storage positions is half of the interleave depth of the performed rolling pattern rounded up to a whole number.
- the moving-equipment may be for example a side-shift roller table, lifting roller tables or cranes.
- the storage positions may be situated for example on one or more side-shift roller tables, lifting roller tables, or storing roller tables which may be parallel to the rolling line. In case of several parallel storing roller tables these may be staggered.
- At least one moving-equipment can simultaneously transfer one plate or strip to the rolling line or to a storage position and another plate or strip to a storage position or the rolling line.
- Figure 7 shows two rolling phases and one cooling phase.
- the sequence of rolling phase 1 and rolling phase 2 is 1-1-1-2-2-2-1-1-1-2-2-2.
- the time gap between the starts of the rolling phases 1 of two successively rolled slabs is not always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern.
- the time gap is equal to the sum of the duration of the two rolling phases and the cooling phase of the rolling pattern.
- Figure 8 shows a simplified plan view of a rolling mill apparatus for thermo-mechanical controlled rolling with one rolling mill stand 3, a rolling line consisting of the roller tables 2 and 4, a furnace 1 for heating the slabs prior to rolling, and two side-shift roller tables 10 and 11 which are located on the exit side of the rolling mill stand 3 in roller table 4.
- Each side-shift roller table can moved between two positions.
- Figure 8 shows the moment when the first slab of the batch to be processed has finished rolling phase 1 and the resulting plate 12 is transported onto side-shift roller table 10 which is in its down position. After that, side-shift roller table 10 is moved into its up position, thereby removing plate 12 from the rolling line and transferring it into its storage position.
- Figure 9 shows plate 12 in its storage position.
- side-shift roller table 11 is moved into its up position, thereby removing plate 13 from the rolling line and transferring it into its storage position.
- Figure 11 shows plate 12 in its storage position.
- Figure 12 shows plate 14 on side-shift roller table 10 in its up position.
- side-shift roller table 10 is moved in its down position, thereby removing plate 14 from the rolling line and transferring it into its storage position, and simultaneously transferring plate 12 from its storage position to the rolling line.
- Figure 13 shows plates 12 and 14 on side-shift roller table 10 in its down position.
- FIG 14 shows plate 12 after completion of its rolling phase 2.
- plate 12 clears the rolling mill rolling phase 1 starts for a fourth slab 15, which is also shown in Figure 14 , resulting in plate 16.
- plate 16 completes phase 1 rolling it is moved to side-shift roller table 11 which is in its up position.
- Figure 15 shows plate 16 on side-shift roller table 11 in its up position.
- side-shift roller table 11 is moved in its down position, thereby removing plate 16 from the rolling line and transferring it into its storage position, and simultaneously transferring plate 13 from its storage position to the rolling line.
- Figure 16 shows plates 13 and 16 on side-shift roller table 11 in its down position. Then, rolling phase 2 begins for plate 13.
- Figure 17 shows the timing diagram of the rolling pattern described in Figures 8 - 16 .
- Figure 18 shows the timing diagram of a prior art rolling pattern for an interleave depth of four .
- Figure 17 shows two rolling phases and one cooling phase.
- the sequence of rolling phase 1 and rolling phase 2 is 1-1-1-2-1-2-1-2-1-2-2-2. Hence, it occurs 7 times that one type of rolling phase is succeeded by another type of rolling phase.
- the time gap between the starts of the rolling phases 1 of two successively rolled slabs is always smaller than the sum of the duration of rolling phase 1, rolling phase 2 and the cooling phase of the rolling pattern.
- Figure 18 shows two rolling phases and one cooling phase.
- the sequence of rolling phase 1 and rolling phase 2 is 1-1-1-1-1-2-2-2-2-2-1.
- the time gap between the starts of the rolling phases 1 of two successively rolled slabs is not always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern.
- the time gap is equal to the sum of the duration of the two rolling phases and the cooling phase of the rolling pattern.
- the invention as outlined in Figures 8 - 17 allows a more even furnace discharge pattern, since after the completion, i.e. the end, of a rolling phase 1 of one slab a new slab starts its rolling phase 1 always after a period of time which is equal to the duration of one rolling phase.
- the furnace discharge pattern can be even, too.
- the first five rolling phases 1 start one after another without time gap between the end of rolling phase 1 of one slab and the start of rolling phase 1 of the successively rolled slab, followed by a long time gap between start of rolling phase 1 of the fifth slab and start of rolling phase 1 of the sixth slab. That long time gap lasts for a time period which is equal to the sum of the durations of all rolling phases and the cooling phase.
- the advantage of the present invention is that compared to the prior art it provides a possibility to use more even furnace discharge patterns, to reduce the number of storage positions needed, and to reduce the number of movements of the moving-equipment which transfers plates from the rolling line to storage positions and back.
- Figures 8 - 17 refer to a two phase rolling pattern on a rolling mill with one mill stand with interleave depth four
- the abovementioned advantages can also be achieved for rolling patterns with more rolling phases, and for rolling patterns with different interleave depths, and for rolling mills with more than one mill stand.
- An inventive two phase rolling pattern with an interleave depth of 3 and rolling phases of equal length is illustrated in the timing diagram of Figure 19 .
- the maximum time gap between starts of successive rolling phases 1 is a time period equal to the duration of three rolling phases, whereas in the interleaving pattern of the prior art for an interleave depth of 3 the maximum time gap would be equal to equal to the duration of five rolling phases.
- two side shift table would suffice whereas for a prior art rolling pattern three side shift tables would be necessary.
- Figure 20 shows a prior art timing diagram for a two phase rolling pattern with different durations of the rolling phases and interleave depth 1. In that rolling pattern it takes a period of time equal to eight times the duration of rolling phase 1 to produce 2 plates, and during that time the mill is only rolling for a period of time equal to six times the duration of rolling phase 1.
- Figure 21 shows a timing diagram for an inventive rolling pattern with the same durations of the rolling phases and the cooling phase, and thereby the same interleave depth, as the prior art rolling pattern of Figure 20 .
- inventive pattern of Figure 21 after rolling phase 2 of the first plate has been completed, the mill is operating without pause and 1 plate is produced after thrice the duration of rolling phase 1. The throughput is therefore 33% greater than is achieved by the pattern shown in Figure 20 .
- FIG. 22 and 23 A similar improvement in throughput is illustrated by Figures 22 and 23 for a two phase rolling pattern with interleave depth 3.
- the duration of the cooling phase is 6 times the duration of rolling phase 1 and the duration of rolling phase 2 is twice the duration of rolling phase 1.
- the prior art rolling pattern illustrated in Figure 22 four plates are produced in a period of time equal to 15 times the duration of rolling phase 1, and during that time the mill is operating for a period of time equal to 12 times the duration of rolling phase 1.
- the inventive rolling pattern illustrated in Figure 23 the mill operates continuously after the first two plates and one plate is produced after thrice the duration of rolling phase 1.
- Figure 24 shows a three phase rolling pattern with equal durations of the rolling phases, different durations of the cooling phases and interleave depth 2.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Physics & Mathematics (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Metal Rolling (AREA)
- Control Of Metal Rolling (AREA)
- Pressure Welding/Diffusion-Bonding (AREA)
- Laminated Bodies (AREA)
Abstract
Description
- The invention relates to the general field of thermo-mechanical controlled rolling of metal slabs to plates or strips in a rolling mill, in particular to a technique known as interleaving and an apparatus for performing that technique. Document
GB 139694 A claim 1. - Thermo-mechanical controlled rolling involves the rolling of metal-slabs, plates or strips at specific temperatures in order to achieve specific metallurgical microstructures and mechanical properties. It typically involves two or more rolling phases. Between two successive rolling phases the plates or strips are allowed to cool down during a cooling phase to the specific temperature which is desired for the next rolling phase. For example, when two rolling phases are performed first a number of passes are rolled at a high temperature during the first rolling phase, and then the obtained plate or strip is allowed to cool down to a specific temperature in a cooling phase before the second rolling phase starts. Analogously, in three phase rolling two cooling phases take place, a first one between rolling
phase 1 and rollingphase 2, and a second one between rollingphase 2 and rollingphase 3. - To increase a thermo-mechanical controlled rolling mill's throughput the interleaving technique is employed. It consists in concurrently processing more than one metal slab, plate or strip in the rolling mill.
- When no interleaving technique is employed in thermo-mechanical controlled rolling, the rolling of a plate or strip has to be completed, i.e. the plate or strip has to have passed all rolling phases, before rolling of another, new slab can start. While a plate or strip cools down between two rolling phases during a cooling phase the rolling mill is completely idle. Contrary to that, according to the interleaving technique rolling of new slabs already starts while a plate or strip previously subjected to rolling
phase 1 cools down during a cooling phase. Thereby, the rolling mill is not always completely idle during the cooling phases of one plate or strip since it is processing other plates or strips meanwhile. Hence, the rolling mill's throughput is considerably enhanced by application of the interleaving technique. The interleave depth is a characteristic parameter for thermo-mechanical controlled rolling according to interleaving technique. In order to obtain a special product by thermo-mechanical rolling via interleaving technique, a special rolling pattern is applied on each slab of the batch to be processed. The rolling pattern is the sequence and duration of all rolling phases and cooling phases which are applied when processing a slab to a plate or strip. Such a rolling pattern comprises at least two rolling phases, and cooling phases between successive rolling phases. For rolling patterns with unequal durations of the rolling phases interleave depth is defined as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of the longest rolling phase down to a whole number. For rolling patterns with equal durations of the rolling phases interleave depth is defined as the integer number of the obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of a rolling phase down to a whole number. - For example, in a group of values consisting of 2.30, 1.98 and 1.95 the smallest value is 1.95. 1.95 rounded down to a whole number is 1. Hence, the interleave depth is 1. If the smallest value is a whole number the integer number defining the interleave depth is equal to that whole number.
- For example, for two phase rolling with equal durations of the rolling phases the interleave depth is defined as the integer number which is the quotient of the duration of the cooling phase and the duration of a rolling phase rounded down to a whole number.
- In the most common method for interleaving the plates or strips are stored during their cooling phases on the same roller tables that are used for rolling.
- Such a technique is illustrated in
Figures 1- 6 for two phase rolling of plates with an interleave depth of two on a simplified plan view of a single stand rolling mill. A first slab to be rolled is heated in thefurnace 1 and then discharged onto the roller table 2 and transported to the rollingmill stand 3 where a number of reversing rolling passes are carried out until itsrolling phase 1 is completed. The thereby obtainedplate 5 is then moved down the roller table 4 to astorage position 6 whereplate 5 is stored during its cooling phase.Figure 1 showsplate 5 instorage position 6. - Then a second slab is discharged from the
furnace 1 and rolled in the same way as the first slab until itsrolling phase 1 is completed. The thereby obtainedplate 7 is then moved down the roller table 4 to astorage position 8 whereplate 7 is stored during its cooling phase.Figure 2 showsplate 7 instorage position 8. - Then a third slab is discharged from the
furnace 1 and rolled until itsrolling phase 1 is completed to yieldplate 9.Figure 3 showsplate 9 after completion ofrolling phase 1. Then all three plates are transported by the roller tables 4 and 2 back to the entry side ofrolling mill stand 3 and rollingphase 2 with a number of reversing rolling passes starts forplate 5.Figure 4 shows the position ofplates phase 2 starts forplate 5. -
Figure 5 illustrates the situation after the penultimate rolling pass of rollingphase 2 ofplate 5.Figure 6 illustrates the situation after the last pass ofplate 5. - A disadvantage of storing plates during their cooling phases on the same roller tables that are used for rolling is the additional length of the roller tables, and of the building housing the roller tables, that is required in comparison to thermo-mechanical rolling without interleaving technique. In the example illustrated in
Figure 5 the interleave depth is two and the roller table 2 on the entry side of the rollingmill stand 3 needs to have at least a length which is equal to twice the length of plates after rollingphase 1 plus the length of a plate after the penultimate pass ofrolling phase 2. The roller table 4 on the exit side of therolling mill stand 3 needs to have a length which is at least equal to the larger one of the two following two values: three times the length of plates after rollingphase 1, length of plates after rollingphase 2. - Modern plate grades often require very long cooling times, hence interleave depth can be up to twelve or even more. In analogy with the example shown in
Figures 1-6 , for an interleave depth of twelve the roller table on the entry side of a rolling mill stand would need to have at least a length which is equal to twelve times the length of the plates after rollingphase 1 plus the length of the plate on the penultimate pass ofrolling phase 2. With a plate length of about ten metres after rollingphase 1, of up to 48 metres after the penultimate pass ofrolling phase 2 ,and of up to 50 metres after rollingphase 2, handling an interleave depth of twelve would require a roller table length of approximately 170 metres on the entry side and of 120 metres on the exit side of a rolling mill stand, while about 50 metres on each side would be sufficient when thermo-mechanical controlled rolling is performed without interleaving technique. - A solution to store plates during their cooling phases in a shorter overall length of a rolling mill is shown in
GB1396946 - Another known solution to the problem of storing large numbers of plates during their cooling phases is to use one or more storing roller tables which run parallel with the mill line roller tables and moving-equipment to move plates between the mill line and the holding line. After rolling
phase 1 is finished a moving-equipment moves the plates onto the storing roller tables. When the cooling period is finished the plate is moved back into the mill line forrolling phase 2. - However, to handle an interleave depth of twelve according to the example described above, a storing roller table parallel to the mill-line roller table would still need to be around 120 metres long. To use two or more storing tables with moving-equipment in order to shorten the required length of each individual additional table would increase the complexity of the equipment and need more transverse space.
- Another known solution to the he problem of storing large numbers of plates during their cooling phases is to lift the plates up above the mill line roller table. This works similarly to the use of the side-shift roller tables, except that the movement is vertical instead of horizontal. Again, to handle large interleave depths would increase the complexity of the necessary equipment as well as the dimensions of rolling mill's housing.
- Another disadvantage of the interleaving methods of the prior art is that their furnace discharge pattern of slabs is not ideal.
-
Figure 7 schematically shows the timing diagram of the rolling pattern of an example of a two phase rolling prior art interleaving method with interleave depth two and equal duration of the rolling phases, the cooling phase being twice as long as a rolling phase, on a rolling mill with one rolling mill stand. A timing diagram depicts the chronological relation of the rolling phases and cooling phases applied on different slabs and the plates or strips derived from these slabs. - The processed batch contains 6 slabs which yield plates 1-6. According to the rolling pattern in
Figure 7 for the first threeslabs rolling phase 1 starts within a period of time equal to twice the duration of a rolling phase. After the start of the third slab's rolling phase 1 a period of time, which is the sum of the durations of rollingphase 1, of the cooling phase, and of rollingphase 2, elapses until rollingphase 1 of the fourth slab starts. - That means that the furnace has to discharge the first three slabs within a short period of time, and then has to wait a long time until the next three slabs are discharged within a short period of time. Hence, the furnace discharge pattern of
Figure 7 consists of three discharges at intervals of the duration of a rolling phase followed by a gap of the duration of four rolling phases during which no slabs are discharged and then another three slab discharges at intervals of the duration of a rolling phase. In the case of an interleave depth of twelve and equal durations of the rolling phases the furnace discharge pattern would consist of thirteen slab discharges at intervals of the duration of a rolling phase followed by a gap of the duration of fourteen rolling phases. - The discharge of a large group of slabs at short intervals followed by a long gap causes problems with the slab temperature control and the furnace temperature control. Due to an irregular, uneven furnace discharge pattern some slabs will stay longer in the furnace than others, uneven staying times causing different temperatures for different slabs and thereby affecting metallurgy and yield negatively.
- The object of the present invention is to provide a method and an apparatus for thermo-mechanical controlled rolling by interleaving technique which permit the application of a more even furnace discharge pattern and require less space and equipment than the prior art.
- This object is solved by a method for thermo-mechanical controlled rolling a batch of metal slabs to plates or strips on a rolling mill comprising at least one rolling mill stand according to a rolling pattern comprising at least two rolling phases of at least one rolling pass and cooling phases between successive rolling phases, which rolling pattern is applied on each slab of the batch, characterized in that, during rolling the batch, on at least one rolling mill stand it occurs several times that a rolling phase applied to one slab or plate or strip is succeeded by a different rolling phase applied on another slab or plate or strip, and that for two successively rolled slabs the time gap between the starts of their rolling
phases 1 is always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern. - This method permits the application of a furnace discharge pattern that is more even than in the prior art. As can be seen in
Figure 7 , in the prior art the time gap between the starts of rollingphases 1 of two consecutively rolled slabs is at least once equal to the sum of the duration of all rolling phases and all cooling phases of the rolling pattern when batches larger than the rolling pattern's interleave depth are processed. Since the time gap between starts of rollingphases 1 for consecutively rolled slabs governs the discharge of slabs from the furnace, a smaller time gap permits a more even furnace discharge pattern. - Preferably, after the first rolling phase of the first slab of the batch has been completed until the beginning of the last rolling phase of the last plate or strip there is always at least one other plate or strip in its cooling phase.
- More preferably, this is the case for batches larger than interleave depth plus one, the interleave depth of the method's rolling pattern,
being defined
for rolling patterns with unequal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of the longest rolling phase down to a whole number, and
for rolling patterns with equal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of a rolling phase down to a whole number. - In an embodiment of the invention the number of rolling phases is two, namely rolling
phase 1 and rollingphase 2, which are separated by one cooling phase. - It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with an even numbered interleave depth and equal durations of the rolling phases where the duration of the cooling phase is equal to the sum of
- a whole number times the duration of a rolling phase
- and a remainder time,
-
- Tg ... maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Drp ... duration rolling phase
- Rt ... remainder time
- Cpd ... cooling phase duration
- Wn ... whole number, which is the integer of (Cpd/Drp)
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with an even numbered interleave depth and unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- a whole number times the duration of the longest rolling phase
- and a remainder time,
-
- Tg ... maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Dlp ... duration longest rolling phase
- Rt ... remainder time
- Cpd ... cooling phase duration
- Wn ... whole number, which is the integer of (Cpd/Dlp)
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with an uneven numbered interleave depth and equal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- a whole number times the duration of a rolling phase
- and a remainder time,
-
- Tg ... maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Drp ... duration rolling phase
- Rt ... remainder time
- Cpd ... cooling phase duration
- Wn ... whole number, which is the integer of (Cpd/Drp)
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with an uneven numbered interleave depth and unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- a whole number times the duration of the longest rolling phase
- and a remainder time,
-
- Tg ... maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Dlp ... duration longest rolling phase
- Rt ... remainder time
- Cpd ... cooling phase duration
- Wn ... whole number, which is the integer of (Cpd/Dlp)
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for two-phase thermo-mechanical controlled rolling methods with rolling patterns with equal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- a whole number times the duration of a rolling phase
- and a remainder time,
- In this case the whole number is the integer of the quotient of cooling phase duration and duration of one rolling phase.
-
- Int ... interval at which rolling
phase 1 alternates with rollingphase 2 during rolling the batch - Id ... interleave depth
- Drp ... duration rolling phase
- Rt ... remainder time
- Cpd ... cooling phase duration
- Wn ... whole number, which is the integer of (Cpd/Drp)
- For two-phase thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases, where the duration of the cooling phase is equal to the sum of
- a whole number times the duration of the longest rolling phase
- and a remainder time,
- In this case the whole number is the integer of the quotient of cooling phase duration and duration of the longest rolling phase.
-
- Int ... interval at which rolling
phase 1 alternates with rollingphase 2 during rolling the batch - Id ... interleave depth
- Dlp ... duration longest rolling phase
- Rt ... remainder time
- Cpd ... cooling phase duration
- Wn ... whole number, which is the integer of (Cpd/Drp)
- For two-phase thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of the durations of both rolling phases, or a whole number times that sum,
- it is preferred that, after completion of rolling the first plate or strip of the batch, during a period of time equal to the duration of the cooling
phase rolling phase 1 is performed as often as rollingphase 2. - In this case the whole number is the integer of the quotient of cooling phase duration and the sum of the durations of both rolling phases, i.e. in mathematical terms
- Drp1 ...
duration rolling phase 1 - Drp2 ...
duration rolling phase 2 - Cpd ... cooling phase duration
- Wn ... whole number, which is the integer of (Cpd/(Drp1+ Drp2))
- For two-phase thermo-mechanical controlled rolling methods with rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of
- the durations of both rolling phases
- and the duration of either rolling
phase 1 or rollingphase 2, - it is preferred that during the duration of the cooling phase the amount of rolling
phases 1 performed is equal to the amount of rollingphases 2 performedplus 1 orminus 1. - In this case the whole number is the integer of the quotient of cooling phase duration and the sum of the durations of both rolling phases and the duration of either rolling
phase 1 or rollingphase 2, i.e. in mathematical terms - Drp1 ...
duration rolling phase 1 - Drp2 ...
duration rolling phase 2 - Cpd ... cooling phase duration
- Wn ... whole number, which is the integer of
- In another embodiment of the invention the number of rolling phases is three, namely rolling
phase 1, rollingphase 2 and rollingphase 3, rollingphase 1 and rollingphase 2 being separated by coolingphase 1, and rollingphase 2 and rollingphase 3 being separated by coolingphase 2. - It is preferred for three-phase thermo-mechanical controlled rolling methods with rolling patterns where the duration of
cooling phase 1 is equal to the sum of - a whole number A times the sum of the durations of the three rolling phases
- and a
remainder time 1,
and where the duration ofcooling phase 2 is equal to the sum of - a whole number B times the sum of the durations of the three rolling phases
- and a
remainder time 2, - that for successively rolled slabs the maximum time gap between the starts of their rolling
phases 1 is up to the sum of the durations of the three rolling phases plus the greater ofremainder time 1 andremainder time 2. - In this case the whole number A is the integer of the quotient of the duration of
cooling phase 1 and the sum of the durations of all three rolling phases, and the whole number B is the integer of the quotient of the duration ofcooling phase 2 and the sum of the durations of all three rolling phases. -
- Tg ... maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Drp1 ...
duration rolling phase 1 - Drp2 ...
duration rolling phase 2 - Drp3 ...
duration rolling phase 3 - Rt1 ...
remainder time 1 - Rt2 ...
remainder time 2 - Cpd1 ... duration of
cooling phase 1 - Cpd2 ... duration of
cooling phase 2 - Sdr ... sum of the durations of all three rolling phases, (Drp1 + Drp2 + Drp3)
- WnA ... whole number A, which is the integer of (Cpd1/Sdr)
- WnB ... whole number B, which is the integer of (Cpd2/Sdr)
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for three-phase thermo-mechanical controlled rolling methods with rolling patterns where the duration of
cooling phase 1 is equal to the sum of - a whole number C times the sum of
- the durations of the three rolling phases
- and the duration of rolling
phase 3,
- and a
remainder time 3,
and where the duration ofcooling phase 2 is equal to the sum of - a whole number D times the sum of
- the durations of the three rolling phases
- and the duration of rolling
phase 1,
- and a
remainder time 4, - In this case the whole number C is the integer of the quotient of the duration of
cooling phase 1 and the sum of the durations of all three rolling phase plus the duration of rollingphase 3, and the whole number D is the integer of the quotient of the duration ofcooling phase 2 and the sum of the durations of all three rolling phases plus the duration of rollingphase 1. - Expressed in mathematical terms this is:
- Tg ≤ Sdr + (the greater of Rt1 and Rt2)
- Tg ... maximum time gap between the starts of rolling
phases 1 of successively rolled slabs - Drp1 ...
duration rolling phase 1 - Drp2 ...
duration rolling phase 2 - Drp3 ...
duration rolling phase 3 - Rt3 ...
remainder time 3 - Rt4 ...
remainder time 4 - Cpd1 ... duration of
cooling phase 1 - Cpd2 ... duration of
cooling phase 2 - Sdr ... sum of the durations of all three rolling phases, (Drp1 + Drp2 + Drp3)
- WnC ... whole number C, which is the integer of (Cpd1/(Sdr + Drp3))
- WnD ... whole number D, which is the integer of (Cpd2/(Sdr + Drp1))
- By limiting the maximum time gap between the starts of the rolling phases 1 of successively rolled slabs to this value a more even furnace discharge pattern becomes possible.
- It is preferred for three-phase thermo-mechanical controlled rolling methods that during rolling the batch, from after completion of rolling the first plate or strip of the batch until the beginning of rolling
phase 3 of the last plate or strip of the batch,
arolling phase 1 is always succeeded by arolling phase 2, and arolling phase 2 is always succeeded by arolling phase 3, and arolling phase 3 is always succeeded by arolling phase 1. - This pattern makes a very even furnace discharge pattern possible.
- It is also preferred for three-phase thermo-mechanical controlled rolling methods that during rolling the batch, from after completion of rolling the first plate or strip of the batch until the beginning of rolling
phase 3 of the last plate or strip of the batch,
arolling phase 1 is always succeeded by arolling phase 3, and arolling phase 3 is always succeeded by arolling phase 2, and arolling phase 2 is always succeeded by arolling phase 1. - This pattern makes a very even furnace discharge pattern possible.
- It is preferred for three-phase thermo-mechanical controlled rolling methods that during a period of time equal to the duration of a
cooling phase 1
rollingphase 1, rollingphase 2 and rollingphase 3 are performed equally often. - In another preferred embodiment of three-phase thermo-mechanical controlled rolling methods during a period of time equal to the duration of a
cooling phase 1rolling phase 1, rollingphase 2 and rollingphase 3 are performed unequally often. More preferably, during a period of time equal to the duration of acooling phase 1 the number of rollingphases 3 performed is greater than the number of rollingphases 1 performed and greater than the number of rollingphases 2 performed, and during a period of time equal to the duration ofcooling phase 2 the number of rollingphases 1 performed is greater than the number of rollingphases 2 performed and greater than the number of rollingphases 3 performed. - It is further preferred that after completion of a rolling phase which is succeeded by a cooling phase the resulting plates or strips are transferred from a rolling line of the rolling mill to a storage position outside the rolling line by at least one moving-equipment, and afterwards are transferred from the storage position to the rolling line after completion of the cooling phase by the moving equipment.
- Since thereby the plates or strips do not remain on the rolling line during their cooling phases, the length of the rolling line required for performing the interleaving method is reduced.
- In an especially preferred embodiment, during rolling the batch it occurs at least once that while one plate or strip is transferred to its storage position or to the rolling line another plate or strip is simultaneously transferred to the rolling line or to its storage position by the same moving-equipment.
- In this case two plates or strips are transferred by one movement of the moving-equipment. Thereby, the required number of movements of the moving-equipment during rolling the batch is reduced, which results in less need for supervision as well as less wearing down. In addition, less moving-equipment is needed.
- The object of the invention is further solved by an apparatus for thermo-mechanical controlled rolling according to a method as claimed in
claims 1 to 22,
comprising at least one rolling mill stand, a rolling line, storage positions outside the rolling line, and at least one moving-equipment for moving plates or strips from the rolling line to the storage positions, characterized in that the number of storage positions is half of the interleave depth of the performed rolling pattern rounded up to a whole number. - Compared to the prior art, where the number of storage positions required for the rolling pattern of an interleaving method is equal to the interleave depth of the rolling pattern, according to the present invention less storage positions are necessary. This results in diminished need for space and maintenance and in a less complex apparatus for thermo-mechanical controlled rolling.
- The moving-equipment may be for example a side-shift roller table, lifting roller tables or cranes. The storage positions may be situated for example on one or more side-shift roller tables, lifting roller tables, or storing roller tables which may be parallel to the rolling line. In case of several parallel storing roller tables these may be staggered.
- In a preferred embodiment at least one moving-equipment can simultaneously transfer one plate or strip to the rolling line or to a storage position and another plate or strip to a storage position or the rolling line.
- This is for example the case for side-shift roller tables, which allow to transfer one plate or strip into the rolling line while simultaneously moving another plate or strip to a storage position.
- The invention will now be described solely by way of example and with reference to the accompanying drawings in which:
-
Figures 1-6 show the course of a prior art interleaving method for two phase rolling of with an interleave depth of two on a simplified plan view of a single stand rolling mill. -
Figure 7 schematically shows the timing diagram of the rolling pattern of an example of a two phase rolling prior art interleaving method with interleave depth two and equal duration of the rolling phases, the cooling phase being twice as long as a rolling phase, on a rolling mill with one rolling mill stand. -
Figures 8-16 refer to an embodiment of the invention and show a simplified plan view of a single stand rolling mill comprising 2 side-shift roller tables with two transverse positions during the performance of a two phase rolling method with an interleave depth of four and equal duration of the rolling phases. -
Figure 17 shows the timing diagram of the rolling pattern described inFigures 8 - 16 . -
Figure 18 shows the timing diagram of a prior art rolling pattern for an interleave depth of four. -
Figure 19 shows a timing diagram of a two phase rolling pattern according to the present invention with an interleave depth of 3 and rolling phases of equal length. -
Figure 20 shows a prior art timing diagram for a two phase rolling pattern with different durations of the rolling phases and interleavedepth 1. -
Figure 21 shows a timing diagram of a two phase rolling pattern according to the present invention with different durations of the rolling phases and interleavedepth 1. -
Figure 22 shows a timing diagram of a prior art two phase rolling pattern withinterleave depth 3 and different durations of the rolling phases. -
Figure 23 shows a timing diagram of a two phase rolling pattern according to the present invention withinterleave depth 3 and different durations of the rolling phases. -
Figure 24 shows a timing diagram of a three phase rolling pattern according to the present invention with different durations and interleavedepth 2. -
Figure 7 shows two rolling phases and one cooling phase. InFigure 7 the sequence of rollingphase 1 and rollingphase 2 is 1-1-1-2-2-2-1-1-1-2-2-2. Hence, while it occurs 3 times that one type of rolling phase is succeeded by another type of rolling phase, the time gap between the starts of the rolling phases 1 of two successively rolled slabs is not always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern. Between the start of rollingphase 1 ofslab number 3 and ofslab number 4 the time gap is equal to the sum of the duration of the two rolling phases and the cooling phase of the rolling pattern. -
Figure 8 shows a simplified plan view of a rolling mill apparatus for thermo-mechanical controlled rolling with onerolling mill stand 3, a rolling line consisting of the roller tables 2 and 4, afurnace 1 for heating the slabs prior to rolling, and two side-shift roller tables 10 and 11 which are located on the exit side of the rollingmill stand 3 in roller table 4. Each side-shift roller table can moved between two positions.Figure 8 shows the moment when the first slab of the batch to be processed has finished rollingphase 1 and the resultingplate 12 is transported onto side-shift roller table 10 which is in its down position. After that, side-shift roller table 10 is moved into its up position, thereby removingplate 12 from the rolling line and transferring it into its storage position.Figure 9 showsplate 12 in its storage position. When a period of time equal to the duration of one rolling phase has elapsed since the end of rollingphase 1 ofpilate 12, rollingphase 1 of a second slab starts. The resultingplate 13 is transported onto side-shift roller table 11 which is in its down position.Figure 10 showsplate 13 on side-shift roller table 11 in its down position. - After that, side-shift roller table 11 is moved into its up position, thereby removing
plate 13 from the rolling line and transferring it into its storage position.Figure 11 showsplate 12 in its storage position. When a period of time equal to the duration of one rolling phase has elapsed since the end of rollingphase 1 ofplate 13, rollingphase 1 of a third slab starts. The resultingplate 14 is transported onto side-shift roller table 10 which is in its up position.Figure 12 showsplate 14 on side-shift roller table 10 in its up position. After that, side-shift roller table 10 is moved in its down position, thereby removingplate 14 from the rolling line and transferring it into its storage position, and simultaneously transferringplate 12 from its storage position to the rolling line.Figure 13 showsplates phase 2 starts forplate 12.Figure 14 showsplate 12 after completion of itsrolling phase 2. Whenplate 12 clears the rollingmill rolling phase 1 starts for afourth slab 15, which is also shown inFigure 14 , resulting inplate 16. Whenplate 16 completesphase 1 rolling it is moved to side-shift roller table 11 which is in its up position.Figure 15 showsplate 16 on side-shift roller table 11 in its up position. After that, side-shift roller table 11 is moved in its down position, thereby removingplate 16 from the rolling line and transferring it into its storage position, and simultaneously transferringplate 13 from its storage position to the rolling line.Figure 16 showsplates phase 2 begins forplate 13. - If the batch of metal slabs to be processed is larger than 4, another slab will start its
rolling phase 1 whenplate 13 clears the rolling mill, effectively repeating the situation which is shown inFigure 14 . The resulting plate would be processed in analogy toFigures 15 and 16 . Also for each further slab the pattern shown inFigures 14 to 16 would be repeated analogously. - In the example with an interleave depth of four outlined in
Figures 8 - 16 only two side-shift roller tables are required. -
Figure 17 shows the timing diagram of the rolling pattern described inFigures 8 - 16 . For comparison the timing diagram of a prior art rolling pattern for an interleave depth of four is shown inFigure 18 . -
Figure 17 shows two rolling phases and one cooling phase. InFigure 17 the sequence of rollingphase 1 and rollingphase 2 is 1-1-1-2-1-2-1-2-1-2-2-2. Hence, it occurs 7 times that one type of rolling phase is succeeded by another type of rolling phase. The time gap between the starts of the rolling phases 1 of two successively rolled slabs is always smaller than the sum of the duration of rollingphase 1, rollingphase 2 and the cooling phase of the rolling pattern. - According to
Figure 18 , for an interleave depth of four a total of four side-shift roller tables would be required to remove the first four plates from the rolling line before rollingphase 1 of the fifth slab starts. Hence, the present invention reduces the number of side-shift roller tables required.Figure 18 shows two rolling phases and one cooling phase. InFigure 18 the sequence of rollingphase 1 and rollingphase 2 is 1-1-1-1-1-2-2-2-2-2-1. Hence, while it occurs 2 times that one type of rolling phase is succeeded by another type of rolling phase, the time gap between the starts of the rolling phases 1 of two successively rolled slabs is not always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattern. Between the start of rollingphase 1 ofslab number 5 and ofslab number 6 the time gap is equal to the sum of the duration of the two rolling phases and the cooling phase of the rolling pattern. - In addition the invention as outlined in
Figures 8 - 17 reduces the number of side-shift movements that are required because all the side-shift movements after the first two simultaneously transfer one plate into a storage position and another plate back to the rolling line. In the prior art as shown inFigure 18 no such simultaneous transfer takes place. - In addition the invention as outlined in
Figures 8 - 17 allows a more even furnace discharge pattern, since after the completion, i.e. the end, of arolling phase 1 of one slab a new slab starts itsrolling phase 1 always after a period of time which is equal to the duration of one rolling phase. When the rolling phases 1 start evenly, the furnace discharge pattern can be even, too. In the prior art as shown inFigure 18 the first five rollingphases 1 start one after another without time gap between the end of rollingphase 1 of one slab and the start of rollingphase 1 of the successively rolled slab, followed by a long time gap between start of rollingphase 1 of the fifth slab and start of rollingphase 1 of the sixth slab. That long time gap lasts for a time period which is equal to the sum of the durations of all rolling phases and the cooling phase. - Hence, the advantage of the present invention is that compared to the prior art it provides a possibility to use more even furnace discharge patterns, to reduce the number of storage positions needed, and to reduce the number of movements of the moving-equipment which transfers plates from the rolling line to storage positions and back. While
Figures 8 - 17 refer to a two phase rolling pattern on a rolling mill with one mill stand with interleave depth four, the abovementioned advantages can also be achieved for rolling patterns with more rolling phases, and for rolling patterns with different interleave depths, and for rolling mills with more than one mill stand. - An inventive two phase rolling pattern with an interleave depth of 3 and rolling phases of equal length is illustrated in the timing diagram of
Figure 19 . The maximum time gap between starts of successive rolling phases 1 is a time period equal to the duration of three rolling phases, whereas in the interleaving pattern of the prior art for an interleave depth of 3 the maximum time gap would be equal to equal to the duration of five rolling phases. Furthermore, for the inventive rolling pattern two side shift table would suffice whereas for a prior art rolling pattern three side shift tables would be necessary. - Another advantage of the invention is illustrated by
Figures 20 and21 .Figure 20 shows a prior art timing diagram for a two phase rolling pattern with different durations of the rolling phases and interleavedepth 1. In that rolling pattern it takes a period of time equal to eight times the duration of rollingphase 1 to produce 2 plates, and during that time the mill is only rolling for a period of time equal to six times the duration of rollingphase 1. -
Figure 21 shows a timing diagram for an inventive rolling pattern with the same durations of the rolling phases and the cooling phase, and thereby the same interleave depth, as the prior art rolling pattern ofFigure 20 . With the inventive pattern ofFigure 21 , after rollingphase 2 of the first plate has been completed, the mill is operating without pause and 1 plate is produced after thrice the duration of rollingphase 1. The throughput is therefore 33% greater than is achieved by the pattern shown inFigure 20 . - In practice operation of the rolling mill without pause cannot be achieved because the cooling time is not necessarily an exact multiple of the duration of the rolling phases and some time is required to move the plates to and fro their storage positions.
- A similar improvement in throughput is illustrated by
Figures 22 and23 for a two phase rolling pattern withinterleave depth 3. In these figures the duration of the cooling phase is 6 times the duration of rollingphase 1 and the duration of rollingphase 2 is twice the duration of rollingphase 1. With the prior art rolling pattern illustrated inFigure 22 four plates are produced in a period of time equal to 15 times the duration of rollingphase 1, and during that time the mill is operating for a period of time equal to 12 times the duration of rollingphase 1. With the inventive rolling pattern illustrated inFigure 23 the mill operates continuously after the first two plates and one plate is produced after thrice the duration of rollingphase 1. -
Figure 24 shows a three phase rolling pattern with equal durations of the rolling phases, different durations of the cooling phases and interleavedepth 2. After the completion of rollingphase 3 of the first plate according to this rollingpattern 4 plates are produced in every period of time equal to 13 times the duration of a rolling phase. A conventional interleaving pattern of the prior art would produce 3 plates in every 11 periods so the interleaving pattern of the invention results in a 13% increase in throughput. - In
Figures 17 - 24 timing diagrams are only shown for small batches to be processed. If the batches were larger, the timing diagrams would continue in the same regular manner as shown for the small batches.
Claims (25)
- Method for thermo-mehanical controlled rolling a batch of metal slabs to plates or
strips on a rolling mill comprising et least one rolling mill stand according to a rolling patteRN comprising at least two rolling phases of at least one rolling pass and cooling phases between successive rolling phases, which rolling pattern is applied on each slab of the batch,
characterized in
that, during rolling the batch, on at least one rolling mill stand it occurs several times that a rolling phase applied to one slab or plate or strip is succeeded by a different rolling phase. applied on another slab or plate or strip on that rolling mill stand,
and that for two successively rolled slabs the time gap between the starts of their rolling phases 1 is always smaller than the sum of the duration of all rolling phases and all cooling phases of the rolling pattem, - Method according to claim 1, characterized in
that after the first rolling phase of the first slab of the batch has been completed. until the beginning of the last rolling phase of the last plate or strip there is always at teast one other plate or strip in its cooling phase. - Method according to claim 1 or 2, the interieave depth of the method's rolling pattern,
being defined
for rolling pattems with unequal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of the longest rolling phase down to a whole number, and
for rolling pattems with equal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of a ralling phase down to a whole number.
characterized in
that for batches larger than interleave depth plus one after the first rolling phase of the first siab of the batch has been completed until the beginning of the last rolling phase of the last plate or strip there is always at least one other plate or strip in its cooling phase. - Method according to any of claims 1 to 3, characterized in
that the number of rolling phases is two, namely rolling phase 1 and rolling phase 2, which are separated by one cooling phase. - Method according to claim 4, characterized in
that for rolling patterns with an even numbered interleave depth and equal durations of the rolling phases,
where the duration of the cooling phase is equal to the sum of- a whole number times the duration of a rolling phase- and a remainder time,for successively rolled slabs the maximum time gap between the starts of their rolling phases 1 is up to the sum of twice the duration of one rolling phase and the remainder time. - Method according to claim 4, characterized in
that, for rolling patterns with an even numbered interleave depth and unequal durations of the rolling phases,
where the duration of the cooling phase is equal to the sum of- a whole number times the duration of the longest rolling phase- and a remainder time,for successively rolled slabs the maximum time gap between the starts of their rolling phases 1 is up to the sum of twice the duration of the longest rolling phase and the remainder time. - Method according to claim 4, characterized in
that, for rolling patterns with an uneven numbered interleave depth and equal durations of the rolling phases,
where the duration of the cooling phase is equal to the sum of- a whole number times the duration of a rolling phase- and a remainder time,for successively rolled slabs the-maximum time gap between the starts of their rolling phases 1 is up to the sum of thrice the duration of one rolling phase and the remainder time. - Method according to claim 4, characterized in
that, for rolling patterns with an uneven numbered interleave depth and unequal durations of the rolling phases,
where the duration of the cooling phase is equal to the sum of- a whole number times the duration of the longest rolling phase- and a remainder time,for successively rolled slabs the maximum time gap between the starts of their rolling phases 1 is up to the sum of thrice the duration of the longest rolling phase and the remainder time. - Method according to any one of claims 4, 5 or 7, characterized in that after completion of rolling the first plate or strip of the batch
for rolling patterns with equal durations of the rolling phases,
where the duration of the cooling phase is equal to the sum of- a whole number times the duration of a rolling phase- and a remainder time,rolling phase 1 alternates with rolling phase 2 during rolling the batch at an interval which is up to the sum of interleave depth times duration of a rolling phase and the remainder time. - Method according to any one of claims 4, 6 and 8, characterized in that after completion of rolling the first plate or strip of the batch
for rolling patterns with unequal durations of the rolling phases,
where the duration of the cooling phase is equal to the sum of- a whole number times the duration of the longest rolling phase- and a remainder time,rolling phase 1 alternates with rolling phase 2 during rolling the batch at an interval which is up to the sum of interleave depth times duration of the longest rolling phase and the remainder time. - Method according to any one of claims 4, 6, 8 and 10, characterized in that, for rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of the durations of both rolling phases, or a whole number times that sum,
after completion of rolling the first plate or strip of the batch,
during a period of time equal to the duration of the cooling phase
rolling phase 1 is performed as often as rolling phase 2. - Method according to any one of claims 4, 6, 8 and 10, characterized in that, for rolling patterns with unequal durations of the rolling phases and a duration of the cooling phase that is equal to or longer than the sum of- the durations of both rolling phases- and the duration of either rolling phase 1 or rolling phase 2,
or a whole number times that sum,
during the duration of the cooling phase the amount of rolling phases 1 performed is equal to the amount of rolling phases 2 performed plus 1 or minus 1. - Method according to any of claims 1 to 3, characterised in
that the number of rolling phases is three, namely rolling phase 1, rolling phase 2 and rolling phase 3, rolling phase 1 and rolling phase 2 being separated by cooling phase 1, and rolling phase 2 and rolling phase 3 being separated by cooling phase 2. - Method according to claim 13, characterised in
that, for rolling patterns where the duration of cooling phase 1 is equal to the sum of- a whole number A times the sum of the durations of the three rolling phases- and a remainder time 1,and where the duration of cooling phase 2 is equal to the sum of- a whole number B times the sum of the durations of the three rolling phases- and a remainder time 2,for successively rolled slabs the maximum time gap between the starts of their rolling phases 1 is up to the sum of the durations of the three rolling phases plus the greater of remainder time 1 and remainder time 2. - Method according to claim 13, characterised in
that,
for rolling patterns where the duration of cooling phase 1 is equal to the sum of- a whole number C times the sumof the durations of the three rolling phases and the duration of rolling phase 3,- and a remainder time 3,and where the duration of cooling phase 2 is equal to the sum of- a whole number D times the sumof the durations of the three rolling phases and the duration of rolling phase 1,- and a remainder time 4,for successively rolled slabs the maximum time gap between the starts of their rolling phases 1 is up to the sum of the durations of the three rolling phases plus the greater of remainder time 3 and remainder time 4. - Method according to any one of claims 13 to 14, characterised in that during rolling the batch,
from after completion of rolling the first plate or strip of the batch until the beginning of rolling phase 3 of the last plate or strip of the batch,
a rolling phase 1 is always succeeded by a rolling phase 2, and a rolling phase 2 is always succeeded by a rolling phase 3, and a rolling phase 3 is always succeeded by a rolling phase 1. - Method according to claim 13 or 15, characterised in that during rolling the batch, from after completion of rolling the first plate or strip of the batch until the beginning of rolling phase 3 of the last plate or strip of the batch,
a rolling phase 1 is always succeeded by a rolling phase 3, and a rolling phase 3 is always succeeded by a rolling phase 2, and a rolling phase 2 is always succeeded by a rolling phase 1. - Method according to claim 14 or 16, characterized in
that during a period of time equal to the duration of a cooling phase 1 rolling phase 1, rolling phase 2 and rolling phase 3 are performed equally often. - Method according to any one of claims 15 or 17, characterized in that during a period of time equal to the duration of a cooling phase 1 rolling phase 1, rolling phase 2 and rolling phase 3 are performed unequally often.
- Method according to claim 19, characterized in
that during a period of time equal to the duration of a cooling phase 1 the number of rolling phases 3 performed is greater than the number of rolling phases 1 performed and greater than the number of rolling phases 2 performed,
and that during a a period of time equal to the duration of cooling phase 2 the number of rolling phases 1 performed is greater than the number of rolling phases 2 performed and greater than the number of rolling phases 3 performed. - Method according to any one of claims 1 to 20, characterized in that after completion of a rolling phase which is succeeded by a cooling phase the resulting plates or strips are transferred from a rolling line of the rolling mill to a storage position outside the rolling line by at least one moving-equipment, and afterwards are transferred from the storage position to the rolling line after completion of the cooling phase by the moving equipment.
- Method according to claim 21, characterized in
that during rolling the batch it occurs at least once that while one plate or strip is transferred to its storage position or to the rolling line another plate or strip is simultaneously transferred to the rolling line or to its storage position by the same moving-equipment. - Apparatus for thermo-mechanical controlled rolling according to a method as claimed in claims 1 to 22
comprising at least one rolling mill stand (3), a rolling line, storage positions (6,8) outside the rolling line, and at least one moving-equipment for moving plates or strips from the rolling line to the storage positions (6,8),
the interleave depth of the method's rolling pattem,
being defined
for rolling patterns with unequal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of the longest rolling phase down to a whole number, and
for rolling patterns with equal durations of the rolling phases as the integer number obtained by rounding the smallest value from the group of values consisting of the quotients of the durations of the cooling phases and the duration of a rolling phase down to a whole number,
characterized in
that the number of storage positions (6,8) is half of the interleave depth of the performed rolling pattern rounded up to a whole number. - Apparatus according to claim 23, characterized in
that at least one moving-equipment can simultaneously transfer one plate or strip to the rolling line or to a storage position (6,8) and another plate or strip to a storage position (6,8) or the rolling line. - Use of a method according to any one of claims 1 - 22 for thermo-mechanical controlled rolling a batch of metal slabs to plates or strips on a rolling mill comprising at least one rolling mill stand.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP08707621A EP2111309B1 (en) | 2007-02-16 | 2008-02-08 | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips |
PL08707621T PL2111309T3 (en) | 2007-02-16 | 2008-02-08 | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP07270012A EP1958711A1 (en) | 2007-02-16 | 2007-02-16 | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips |
EP08707621A EP2111309B1 (en) | 2007-02-16 | 2008-02-08 | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips |
PCT/EP2008/000976 WO2008098709A1 (en) | 2007-02-16 | 2008-02-08 | Method and apparatus for themo-mechanical controlled rolling of metal plates and strips |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2111309A1 EP2111309A1 (en) | 2009-10-28 |
EP2111309B1 true EP2111309B1 (en) | 2011-11-16 |
Family
ID=38098602
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07270012A Withdrawn EP1958711A1 (en) | 2007-02-16 | 2007-02-16 | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips |
EP08707621A Revoked EP2111309B1 (en) | 2007-02-16 | 2008-02-08 | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07270012A Withdrawn EP1958711A1 (en) | 2007-02-16 | 2007-02-16 | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips |
Country Status (10)
Country | Link |
---|---|
US (1) | US20100077823A1 (en) |
EP (2) | EP1958711A1 (en) |
JP (1) | JP2010517787A (en) |
KR (1) | KR101178348B1 (en) |
AT (1) | ATE533573T1 (en) |
BR (1) | BRPI0807923A2 (en) |
DK (1) | DK2111309T3 (en) |
PL (1) | PL2111309T3 (en) |
RU (1) | RU2434699C2 (en) |
WO (1) | WO2008098709A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013160162A1 (en) | 2012-04-26 | 2013-10-31 | Siemens Aktiengesellschaft | Thermomechanical rolling of an aluminium plate |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104718170A (en) | 2012-09-04 | 2015-06-17 | Ocv智识资本有限责任公司 | Dispersion of carbon enhanced reinforcement fibers in aqueous or non-aqueous media |
AT514079B1 (en) * | 2013-05-21 | 2014-10-15 | Siemens Vai Metals Tech Gmbh | Method and device for rapid removal of heavy plates from a rolling mill |
ITUD20130127A1 (en) * | 2013-10-04 | 2015-04-05 | Danieli Off Mecc | STEEL PLANT FOR THE PRODUCTION OF LONG METAL PRODUCTS AND ITS PRODUCTION METHOD |
CN112387791B (en) * | 2020-12-03 | 2022-11-18 | 北京首钢自动化信息技术有限公司 | Method and system for determining rolling temperature of cold-rolled strip steel |
CN115090669A (en) * | 2022-05-07 | 2022-09-23 | 江苏沙钢集团淮钢特钢股份有限公司 | Efficient bar controlled rolling method |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2137915B2 (en) * | 1971-07-23 | 1979-10-04 | Mannesmann Ag, 4000 Duesseldorf | Rolling mill for rolling out slabs |
JPS5939405A (en) * | 1982-08-30 | 1984-03-03 | Sumitomo Metal Ind Ltd | Rolling line for thick plate |
JPS5961504A (en) * | 1982-09-30 | 1984-04-07 | Nippon Kokan Kk <Nkk> | Rolling method of thick plate |
JPS60180604A (en) * | 1984-02-28 | 1985-09-14 | Sumitomo Metal Ind Ltd | Rolling method of thick steel plate |
US5235840A (en) * | 1991-12-23 | 1993-08-17 | Hot Rolling Consultants, Ltd. | Process to control scale growth and minimize roll wear |
DE19725434C2 (en) * | 1997-06-16 | 1999-08-19 | Schloemann Siemag Ag | Process for rolling hot wide strip in a CSP plant |
US6185972B1 (en) * | 1999-03-11 | 2001-02-13 | Morgan Construction Company | Rolling mill finishing section |
JP4151298B2 (en) * | 2002-04-08 | 2008-09-17 | Jfeスチール株式会社 | How to determine rolling procedure |
DE102005052815A1 (en) * | 2004-12-18 | 2006-06-29 | Sms Demag Ag | Device for producing metallic goods by rolling |
-
2007
- 2007-02-16 EP EP07270012A patent/EP1958711A1/en not_active Withdrawn
-
2008
- 2008-02-08 JP JP2009549371A patent/JP2010517787A/en active Pending
- 2008-02-08 BR BRPI0807923-4A2A patent/BRPI0807923A2/en not_active IP Right Cessation
- 2008-02-08 US US12/527,495 patent/US20100077823A1/en not_active Abandoned
- 2008-02-08 RU RU2009134523/02A patent/RU2434699C2/en not_active IP Right Cessation
- 2008-02-08 KR KR1020097019186A patent/KR101178348B1/en not_active IP Right Cessation
- 2008-02-08 PL PL08707621T patent/PL2111309T3/en unknown
- 2008-02-08 AT AT08707621T patent/ATE533573T1/en active
- 2008-02-08 WO PCT/EP2008/000976 patent/WO2008098709A1/en active Application Filing
- 2008-02-08 EP EP08707621A patent/EP2111309B1/en not_active Revoked
- 2008-02-08 DK DK08707621.2T patent/DK2111309T3/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013160162A1 (en) | 2012-04-26 | 2013-10-31 | Siemens Aktiengesellschaft | Thermomechanical rolling of an aluminium plate |
US10131979B2 (en) | 2012-04-26 | 2018-11-20 | Primetals Technologies Germany Gmbh | Thermomechanical rolling of an aluminum plate |
Also Published As
Publication number | Publication date |
---|---|
EP1958711A1 (en) | 2008-08-20 |
KR20090111348A (en) | 2009-10-26 |
ATE533573T1 (en) | 2011-12-15 |
JP2010517787A (en) | 2010-05-27 |
RU2434699C2 (en) | 2011-11-27 |
EP2111309A1 (en) | 2009-10-28 |
KR101178348B1 (en) | 2012-08-29 |
WO2008098709A1 (en) | 2008-08-21 |
US20100077823A1 (en) | 2010-04-01 |
BRPI0807923A2 (en) | 2014-06-24 |
PL2111309T3 (en) | 2012-03-30 |
RU2009134523A (en) | 2011-03-27 |
DK2111309T3 (en) | 2012-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2111309B1 (en) | Method and apparatus for thermo-mechanical controlled rolling of metal plates and strips | |
RU2372158C2 (en) | Method and process line to fabricate metal strips from copper or copper alloys | |
CN109226257B (en) | Method for rolling plate by steckel mill and production line thereof | |
KR101456765B1 (en) | Hot-rolled steel sheet manufacturing method and manufacturing device | |
EP2710159B1 (en) | Method and device for preparing steel milled goods before hot rolling | |
RU2008121977A (en) | METHOD AND LINE OF CLEAR ROLLING FOR HOT ROLLING OF SOURCE MATERIAL | |
WO2007090455A1 (en) | Roller hearth furnace for heating and/or temperature equalisation of steel or steel alloy continuous cast products and arrangement thereof before a hot strip final rolling mill | |
CN108906888A (en) | Stainless-steel cold-rolling strip production equipment | |
KR100475693B1 (en) | Rolling method from initial rolled member to finished rolled member | |
JP3686700B2 (en) | Method and equipment for producing hot wide strips | |
US3852989A (en) | Method of apparatus for cooling high-temperature metal bars | |
RU2310529C2 (en) | Endless rolling method of steel billet produced at casting speed of billet and having cross section in the form of thin slab and continuous casting machine for performing the method | |
US10131979B2 (en) | Thermomechanical rolling of an aluminum plate | |
EP3632582B1 (en) | Process for multi-mode manufacturing of metal strips and plates | |
EP1641573B1 (en) | Device for producing a hot-rolled thermal strip, especially made of strip-type continuous casting material | |
JP2005095926A (en) | Continuous casting and hot-rolling apparatus, and continuous casting and hot-rolling method | |
CN101631630A (en) | The hot mechanical controlled rolling method and the device of metallic plate and band | |
JPS5976615A (en) | Method and device for descaling steel material in low pressure | |
RU2736759C1 (en) | Device and method for replacement of guide blocks in machine for continuous casting of workpieces | |
RU2254183C2 (en) | Rolling mill for making thin hot rolled strip | |
RU60697U1 (en) | METHOD THROUGH THICK FURNACE | |
SU1152673A1 (en) | Method of hot rolling of plate steel | |
JP3015336B2 (en) | Furnace operation method of heating furnace in alternating rolling system | |
JP2014180675A (en) | Extraction order determination supporting method for steel raw material, production method for steel material, and extraction order determination supporting apparatus for steel raw material | |
JPH08174021A (en) | Rolling method in hot rolling process with plural heating furnaces |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20090703 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
DAX | Request for extension of the european patent (deleted) | ||
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS VAI METALS TECHNOLOGIES LTD. |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602008011411 Country of ref document: DE Effective date: 20120216 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20111116 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 |
|
REG | Reference to a national code |
Ref country code: PL Ref legal event code: T3 |
|
LTIE | Lt: invalidation of european patent or patent extension |
Effective date: 20111116 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120216 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120316 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120316 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120217 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20120222 Year of fee payment: 5 |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120216 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20120420 Year of fee payment: 5 |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
26 | Opposition filed |
Opponent name: AG DER DILLINGER HUETTENWERKE / SALZGITTER MANNESM Effective date: 20120713 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 533573 Country of ref document: AT Kind code of ref document: T Effective date: 20111116 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
26 | Opposition filed |
Opponent name: SMS SIEMAG AG Effective date: 20120816 Opponent name: AG DER DILLINGER HUETTENWERKE / SALZGITTER MANNESM Effective date: 20120713 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120229 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 602008011411 Country of ref document: DE Effective date: 20120713 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120229 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120229 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PLAF | Information modified related to communication of a notice of opposition and request to file observations + time limit |
Free format text: ORIGINAL CODE: EPIDOSCOBS2 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120208 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20120227 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20130218 Year of fee payment: 6 Ref country code: FR Payment date: 20130301 Year of fee payment: 6 Ref country code: GB Payment date: 20130213 Year of fee payment: 6 Ref country code: SE Payment date: 20130211 Year of fee payment: 6 Ref country code: FI Payment date: 20130213 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20130125 Year of fee payment: 6 |
|
PLAK | Information related to reply of patent proprietor to notice(s) of opposition modified |
Free format text: ORIGINAL CODE: EPIDOSCOBS3 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602008011411 Country of ref document: DE Representative=s name: MAIER, DANIEL OLIVER, DIPL.-ING. UNIV., DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602008011411 Country of ref document: DE Representative=s name: MAIER, DANIEL OLIVER, DIPL.-ING. UNIV., DE Effective date: 20130925 Ref country code: DE Ref legal event code: R081 Ref document number: 602008011411 Country of ref document: DE Owner name: SIEMENS PLC., GB Free format text: FORMER OWNER: SIEMENS VAI METALS TECHNOLOGIES LTD., SHEFFIELD, GB Effective date: 20130925 Ref country code: DE Ref legal event code: R081 Ref document number: 602008011411 Country of ref document: DE Owner name: SIEMENS PLC., GB Free format text: FORMER OWNER: SIEMENS VAI METALS TECHNOLOGIES LTD., SHEFFIELD, GB Effective date: 20120126 Ref country code: DE Ref legal event code: R081 Ref document number: 602008011411 Country of ref document: DE Owner name: SIEMENS PLC., FRIMLEY, GB Free format text: FORMER OWNER: SIEMENS VAI METALS TECHNOLOGIES LTD., SHEFFIELD, YORKSHIRE, GB Effective date: 20130925 Ref country code: DE Ref legal event code: R081 Ref document number: 602008011411 Country of ref document: DE Owner name: SIEMENS PLC., FRIMLEY, GB Free format text: FORMER OWNER: SIEMENS VAI METALS TECHNOLOGIES LTD., SHEFFIELD, YORKSHIRE, GB Effective date: 20120126 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602008011411 Country of ref document: DE Effective date: 20130903 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130903 |
|
RDAF | Communication despatched that patent is revoked |
Free format text: ORIGINAL CODE: EPIDOSNREV1 |
|
RDAD | Information modified related to despatch of communication that patent is revoked |
Free format text: ORIGINAL CODE: EPIDOSCREV1 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111116 |
|
RDAG | Patent revoked |
Free format text: ORIGINAL CODE: 0009271 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT REVOKED |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120208 |
|
27W | Patent revoked |
Effective date: 20140215 |
|
GBPR | Gb: patent revoked under art. 102 of the ep convention designating the uk as contracting state |
Effective date: 20140215 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20080208 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: ECNC |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: ECNC |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: ECNC |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140208 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: ECNC |