EP2075392B1 - Élément préfabriqué en béton - Google Patents

Élément préfabriqué en béton Download PDF

Info

Publication number
EP2075392B1
EP2075392B1 EP20070124059 EP07124059A EP2075392B1 EP 2075392 B1 EP2075392 B1 EP 2075392B1 EP 20070124059 EP20070124059 EP 20070124059 EP 07124059 A EP07124059 A EP 07124059A EP 2075392 B1 EP2075392 B1 EP 2075392B1
Authority
EP
European Patent Office
Prior art keywords
floor element
lifting tool
upright
reinforcing wire
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP20070124059
Other languages
German (de)
English (en)
Other versions
EP2075392A1 (fr
Inventor
Luc Plas
Luc François
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PREFACO NV
Original Assignee
ECHO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ECHO filed Critical ECHO
Priority to EP20070124059 priority Critical patent/EP2075392B1/fr
Publication of EP2075392A1 publication Critical patent/EP2075392A1/fr
Application granted granted Critical
Publication of EP2075392B1 publication Critical patent/EP2075392B1/fr
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/044Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/04Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
    • E04B5/043Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement having elongated hollow cores
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • E04G21/145Means in or on the elements for connecting same to handling apparatus specific for hollow plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2002/001Mechanical features of panels
    • E04C2002/002Panels with integrated lifting means, e.g. with hoisting lugs

Definitions

  • the present invention relates to a prefabricated concrete element comprising a first and a second upright longitudinal side, a first and a second upright transversal side, at least a first lower reinforcing wire which extends in longitudinal direction of the prefabricated floor element and is provided in a lower part of the prefabricated floor element, and a lifting tool to permit lifting the prefabricated floor element, the lifting tool being at least partly embedded in the concrete and being accessible from outside to permit cooperation with a lifting device, the lifting tool comprising an upright section which extends in height and longitudinal direction of the prefabricated floor element, wherein the upright section of the lifting tool comprises at least one application point for cooperation with the lifting device, according to the preamble of the first claim.
  • Prefabricated concrete elements are frequently used in self supporting floor and ceiling construction.
  • the floor or ceiling is built by placing a number of prefabricated concrete elements with their upright longitudinal sides against each other and with their mounting edges on supporting construction parts, such as walls and beams.
  • the grooves between the elements are filled with concrete to provide a continuous layer.
  • a covering or finishing layer may be put on top of and/or against the lower face of the prefabricated concrete elements.
  • the floor elements are usually not produced in situ at the construction site where they are needed, but are rather prefabricated by a supplier in large amounts. From there the floor elements are transported to the different construction sites for further use. On the construction site itself, the concrete elements also have to be lifted in order to permit positioning where required. The concrete elements thus have to be lifted a number of times. Because of the high weight of the prefabricated concrete elements and from an economical point of view, it is important that the lifting may be carried out using an appropriate lifting device. Thereby it is essential that the lifting is carried out safely and that risks at falling of an element during lifting are minimized.
  • EP-A-1344877 describes a method for fitting a hoisting hook in a prefabricated concrete element by using filling concrete, the prefabricated concrete element comprising one or more channels.
  • a passage is made in the still fresh concrete to one or more of the channels in the concrete element, shortly after the forming of the prefabricated concrete element.
  • a concrete-like material ('filling concrete') is poured or pressed, via the passage, in the part of the channel located adjacent the passage.
  • the hoisting hook is placed in this uncured filling concrete and is fixed in the concrete element when the filing concrete hardens.
  • the safety of the lifting of the prefabricated floor element is strongly dependent on the quality of the filling concrete.
  • the hoisting hook is turned out the concrete element and the concrete element falls down.
  • BE-A-1016424 describes a prefabricated floor element comprising an embedded lifting hook with an inverted U-shaped loop section, the legs of which extend mainly parallel to the upright longitudinal sides of the floor element.
  • the end part of each of the legs of the U-shaped loop section transfers into a cross leg, which extends more or less perpendicular to the upright plane defined by the loop section.
  • the cross legs point in opposite direction from the upright plane defined by the loop section.
  • the lifting hook is mounted to a reinforcing wire of the floor element in such a way that at least part of the cross legs is situated beneath the reinforcing wire, with the purpose of counteracting upward movement of the lifting hook.
  • the mounting of the lifting hook to the reinforcing wire is done by receiving the reinforcing wire within the free space of the inverted U, moving the lifting hook along the reinforcing wire towards its position and then rotating the lifting hook over 90°. Because the reinforcing wire abuts against opposite sides of the inverted U and the cross legs point in opposite direction from the loop section, movement of the lifting hook in cross direction of the floor element in the course of a lifting operation is counteracted. To minimize the risk to torsion of the lifting hook and movement of the lifting hook in longitudinal direction of the floor element in the course of a lifting operation, the lifting hook is fastened to the reinforcing wire.
  • This fastening is usually done by means of a separate glue connection and/or a separate clamp connection, which may cause damage of the at least one reinforcing wire.
  • concrete is poured to form the prefabricated floor element.
  • the lifting hook may be accessed from outside through an opening provided in the prefabricated floor element during or after production.
  • EP-A-1555100 discloses a lifting loop comprising a central part in the shape of an inverted U which defines a lifting ring which protrudes from the top surface of a concrete floor element and which extends in longitudinal direction of the floor element.
  • U-shaped fixing brackets are provided, which extend in opposite directions from the central part and in cross direction of the floor element.
  • the lifting loop is mounted to a reinforcement cable of the concrete floor element in such a way the fixing brackets are positioned beneath the reinforcement cable and between the opposite lower sends of the central part, so that the lifting ring and the reinforcement cable extend in the same plane.
  • This mounting may only be done by rotating the lifting loop about a vertical axis, after the reinforcing cable has been received in the U-shaped space of the central part. Upward movement and movement in transverse direction of the concrete element is limited. However, mounting of the lifting loop to the reinforcement cable does not limit movement of the lifting loop in longitudinal direction of the concrete element, nor does it limit torsion. In order to further limit movement of the lifting loop during casting of the concrete, it is necessary to apply additional means or acts to block or fix the lifting loop. This is done by exercising a pressure on the reinforcement cable on which the lifting loops are mounted.
  • FR2897627A describes a lifting tool having a lower space for receiving a first lower reinforcing wire.
  • the lower space is formed by a cut-out from a horizontal part of the lifting tool.
  • the lower space does not extend along the whole length of the upright section in longitudinal direction of the prefabricated element.
  • the prefabricated concrete element according to this invention is characterized in that the upright section of the lifting tool comprises first receiving means comprising a lower space for receiving the first lower reinforcing wire, in that the lower space is delimited by at least an upper and a lower member and a first upright member which first upright member is provided to limit movement of the lifting tool in a first transverse direction of the prefabricated floor element, and in that the lifting tool further comprises a cross member which is connected to the upright section and which comprises a second upright member which is provided to limit movement of the lifting tool in a second transverse direction of the prefabricated floor element opposite to the first transverse direction.
  • the lifting tool of the present invention mainly takes the form of a lifting hook.
  • the lifting tool of the present invention contains parts which extend in height, longitudinal and transversal direction of the prefabricated floor element, the lifting tool can stand on its own. After mounting of the lifting tool to the first lower reinforcing wire, it is thus not necessary to hold or fix the lifting tool to the reinforcing wires in order to maintain it in the position in which it is to be incorporated in the prefabricated floor element.
  • the concrete may immediately be poured and cast. It is hereby not necessary to apply additional fastening to fix the lifting tool in its position. Movement of the lifting tool is sufficiently limited by the mounting itself. This results in a prefabricated floor element with improved strength and load bearing capacity, because the risk to damaging the first lower reinforcing wire is minimized.
  • the lower space of the first receiving means is delimited by a first upright member, which limits movement of the lifting tool in a first transverse direction of the prefabricated floor element.
  • the cross member comprises a second upright member which limits movement of the lifting tool in a second transverse direction of the prefabricated floor element opposite the first transverse direction. Because the second upright member of the cross member and the first upright member of the upright section are adapted to act in opposite directions, the risk to movement of the lifting tool in transverse direction of the prefabricated floor element is limited.
  • Limitation of movement may for example be achieved on the one hand by the presence of a recess in the upright section of the lifting tool which faces the cross member, and on the other hand by bending an end part of the cross member in order to define a gap, the opening of which faces the upright section.
  • Mounting of the lifting tool to the first lower reinforcing wire further limits movement of the lifting tool in longitudinal direction of the prefabricated floor element and limits the risk to torsion of the lifting tool, i.e. rotation in a plane perpendicular to the plane defined by the upright section of the lifting tool. Movement of the lifting tool in longitudinal direction of the prefabricated floor element is counteracted because of the occurrence of friction between the first lower reinforcing wire and the first receiving means.
  • the prefabricated floor element is lifted with a lifting device which is provided to cooperate with an application point provided in the upright section.
  • the lifting tool is mounted to a first and a second lower reinforcing wire, with the purpose of obtaining an optimum reduction of the risk to torsion and movement of the lifting tool in transverse, height and longitudinal direction of the prefabricated floor element.
  • any forces or strains occurring within the lifting means during lifting may be transferred to the first and second reinforcing wire and to the cross member and may be thus absorbed within a larger part of the prefabricated floor element. As a result, the risk to wearing or breaking of the reinforcing wire following lifting is reduced.
  • the mounting to a first and a second lower reinforcing wire provides for additional security during lifting.
  • the lifting tool is still connected to the other reinforcing wire.
  • the lifting tool extends in longitudinal, height and transverse direction of the prefabricated floor element, the contact surface between the lifting tool and the concrete is increased, as a result of which any forces exerted to the lifting tool may be transferred to a large part of the prefabricated floor element.
  • the first receiving means are designed in a way they exert a clamping action on the first reinforcing wire.
  • the connecting member of the cross member is preferably designed to exert a clamping action on the second reinforcing wire as well.
  • the first receiving means and the connecting member are designed in a way they exert a clamping action on the first, respectively the second reinforcing wire. More preferably the fixation forces exerted by the first receiving means and the connecting member on respectively the first and the second lower reinforcing wire point towards each other.
  • the preferred embodiment of the prefabricated concrete floor element 1 of the present invention shown in figure 1 is a beam shaped element comprising opposite upright longitudinal sides 2, 3 and opposite upright transversal sides 4, 5.
  • the floor element 1 is made of concrete and comprises at least a first 6 and a second 7 lower reinforcing wire which extend in longitudinal direction of the floor element 1, which are spaced apart from each other and are provided in a lower part of the floor element 1. Usually, the floor element will contain further spaced apart lower reinforcing wires.
  • the prefabricated floor element 1 comprises a lifting tool 9.
  • the lifting tool 9 is at least partly embedded in the concrete and is accessible from outside to permit cooperation with a lifting device.
  • the lifting tool 9 comprises an upright section 10 which extends in height and longitudinal direction of the prefabricated floor element 1 and at least one cross member 17 which extends in transverse direction of the prefabricated floor element 1.
  • any means considered suitable by the person skilled in the art may be provided to provide access from outside to the lifting tool 9.
  • Access to the lifting tool 9 from outside may for instance be provided by means of a hole in the prefabricated floor element 1 as is shown on figure 1 at the position of the upright section 10 and the application point 11.
  • the holes may be provided in the upright longitudinal sides 2, 3, or in the top face or in both the upright longitudinal sides 2, 3 and the top face of the floor element 1.
  • the holes will usually be provided by removing part of the concrete during or after production of the floor element.
  • the lifting tool will preferably be positioned substantially central of the top face of the prefabricated floor element and the hole to access the lifting tool is positioned accordingly in the top face of the prefabricated floor element.
  • the lifting tools are preferably provided in the vicinity of the longitudinal 2, 3 or transversal 4, 5 upright sides of the floor element. Access to the lifting tool 9 may also be provided by having the lifting tool 9 protruding from the top face and/or upright sides 2, 3, 4, 5 of the prefabricated floor element 1.
  • the upright section 10 of the lifting tool 9 may have any form considered suitable by the person skilled in the art, as long as it extends in height direction of the prefabricated floor element 1, comprises at least one application point 11 for cooperation with the lifting device to permit lifting of the prefabricated floor element 1 and comprises first receiving means 12 for receiving a first lower reinforcing wire 6.
  • the upright section also extends in longitudinal direction. With extending in height direction is understood that the upright section may run parallel to the upright sides of the floor elements or extend under an angle with respect thereto. With extending in longitudinal direction of the floor element is understood that the upright section of the lifting tool may run parallel with one or more of the reinforcing wire, the upright longitudinal sides, or extend under an angle with respect thereto.
  • the application point 11 is accessible from outside the prefabricated floor element 1, for instance through an opening in the upright section 10 of the lifting tool 9, or by having part of the lifting tool 9 protruding from the top face, bottom face or side face of the floor element, but any other suitable way may be chosen as well.
  • the upright section 10 takes the form of a plate which extends in longitudinal and height direction of the floor element 1, which has a limited thickness in transverse direction of the prefabricated floor element, as is shown in figure 2B .
  • the plate may have any form considered suitable by the person skilled in the art, and may for instance be rectangular, square or round or any other suitable shape.
  • the upright section 10 has the shape of an inverted U as is shown in figure 2A , 2C and 2D .
  • the inverted U may be made in one piece as is shown in figure 2A or may comprise a first 23 and a second 24 upright part which are spaced from each other in transverse direction of the prefabricated floor element 1 as is shown in figure 2C and 2D.
  • Figure 2C and 2D further show that the first lower reinforcing wire may be received between the first 23 and the second 24 upright part of the upright section 10.
  • the upright section 10 comprises first receiving means 12 with a lower space 13 in a lower part of the upright section for receiving the first lower reinforcing wire 6.
  • the lower space 13 is delimited by at least an upper 14 and lower 15 member which limit upward and downward movement of the lifting tool 9 and by at least a first upright member 16 which limits movement of the lifting tool 9 in a first transverse direction of the prefabricated floor element 1.
  • the upper member 14 of the lower space 13 may be provided by a part of the upright section 10 or may form part of the upright section 10 as is shown on figures 2A and 2B , or it may be provided by an additional member 21 which is moveable in height direction of the upright section 10 as is shown in figure 2C , or by a cross member 17 as is shown in figure 2D .
  • the lower space 13 is formed by at least one recess in the upright section 10, as is shown in figure 2A .
  • the at least one recess is delimited by an upper 14 and lower 15 member, which may for example take the shape of an upper and lower wall, and by at least a first upright member 16 which limits movement of the lifting tool 9 in a first transverse direction of the prefabricated floor element 1.
  • the at least one recess extends along the whole length of the upright section 10 in longitudinal direction of the prefabricated floor element 1.
  • the recess may take the form of two or more recesses ( fig. 2A ) or of one single recess for example provided in one leg of the inverted U.
  • the recesses are preferably provided on opposite sides of the upright section 10 taken in longitudinal direction of the floor element, whereby both recesses are provided for receiving the first lower reinforcing wire 6 and whereby both recesses are delimited by an upper 14, lower 15 and first upright member 16 which limits movement of the lifting tool 9 in a first transversal direction of the prefabricated floor element 1.
  • the recess will usually be provided in a lower region of the upright section, but this may vary with the dimensions of the lifting tool.
  • the lower space 13 is formed by bending a lower part of the upright section 10 in a way an upper 14, lower 15 and first upright wall 16 is formed, as is shown on figure 2B .
  • the lower part of the upright section 10 may be bent along part of its length, but extends along its whole length in longitudinal direction of the prefabricated floor element 1.
  • the lower space 13 may for example have a circular cross section.
  • part of the lower space 13 is provided by an additional lower member 21, which is moveable in height direction of the upright section, as is shown in figure 2C .
  • the additional lower member may comprise an upper and lower member, which are moveable independently from each other.
  • the moveability of the additional lower member 21 has the advantage that lower reinforcing wires with varying diameters may be received within the lower space.
  • the additional lower member 21 may for example take the shape of a ring which receives in it the first 23 and second 24 upright part of the upright section 10, whereby the first 23 upright part forms the first upright member 16 of the lower space 13.
  • the lower member 15 of the lower space 13 may be formed by the lower member of the additional member 21 or by the lower part of the upright section 10, connecting the first 23 and second 24 upright part.
  • the upper member 14 is formed by an upper wall of the additional lower member.
  • the upper member 14 of the lower space 13 is provided by a cross member, as is shown in figure 2D .
  • the first lower reinforcing wire is received between the first 23 and second 24 upright part of the upright section 10, whereby the first 23 or the second 24 upright part forms the first upright member 16 of the lower space 13.
  • the second upright member 19 is formed by one of the two teeth of the cross member.
  • the lower member 15 of the lower space 13 is formed by the lower part of the upright section 10, connecting the first 23 and second 24 upright part.
  • transverse direction is understood to include transverse direction of the floor element or the lifting tool or a direction which extends under an angle with respect to the transverse direction of the floor element or the lifting tool.
  • the cross member may be provided to fix the position of the first lower reinforcing wire, as is shown in figure 2D which embodiment does not fall within the scope of the claims, and/or the second lower reinforcing wire, as is shown in figures 2A-2C .
  • the cross member 17 comprises a connecting member 18 for connection to the second lower reinforcing wire 7.
  • the connecting member 18 comprises a second upright member 19, which limits movement of the lifting tool 9 in a second transversal direction opposite to the first transversal direction.
  • the cross member 17 may have any form considered suitable by the person skilled in the art, as long as it extends in transverse direction of the floor element and comprises a second upright member, which limits movement of the lifting tool in a second transverse direction of the prefabricated floor element opposite to the first transverse direction.
  • the cross member may be provided to receive the first lower reinforcing wire, as is shown in figure 2D , or the second lower reinforcing wire, as is shown in figures 2A-2C .
  • the cross member as shown in figure 2D extends in height and transverse direction of the prefabricated floor element, whereby the transverse direction may run parallel to the upright transversal sides of the prefabricated floor element or may extend under an angle with respect to the upright transversal sides of the floor element.
  • the cross member as is shown in figure 2D comprises two teeth, with an opening in between.
  • the first lower reinforcing wire is received within the opening.
  • An upper edge of the opening functions as an upper member 14 of the lower space 13, hereby limiting movement of the lifting tool in upward direction.
  • Preferably the upper edge of the opening is just above the first lower reinforcing wire, resulting in an optimum reduction of risk to movement of the lifting tool in downward direction.
  • the two teeth extend on opposite sides of the first lower reinforcing wire and provide a stable lifting tool.
  • One of the two teeth functions as the second upright member, which limits movement of the first reinforcing wire in a second transversal direction of the prefabricated floor element.
  • the two teeth preferably comprise plastic caps (not shown) at the bottom.
  • the caps are preferably adjustable in height. This has the advantage that the cross member can be adjusted in such a way that the upper edge of the opening is just above the first lower reinforcing wire, providing in an optimal reduction of the movement of the lifting tool in downward direction.
  • the cross member as shown in figures 2A-2C extends in a horizontal plane, substantially parallel to the bottom of the prefabricated floor element.
  • the cross member may extend along part of the length of the upright section 10 in longitudinal direction of the prefabricated floor element 1 as is shown in figure 2A , but it may also extend along the whole length of the upright section 10 in longitudinal direction of the prefabricated floor element 1 as is shown in figure 2B .
  • the lifting tool 9 preferably comprises two or more cross members 17.
  • a lifting tool with a cross member 17 which extends along the whole length of the upright section 10 or a lifting tool which comprises two or more cross members 17 are preferred because they provide a more stable lifting tool 9 and enlarge the contact surface between the lifting tool 9 and the concrete and thus the transfer of forces within a larger part of the prefabricated floor element 1.
  • the cross member 17 may be made in one piece with the upright section 10 as is shown in figures 2B and 2C .
  • the cross member 17 and the upright section 10 may also be made in two separate pieces which may be connected to each other with any suitable connection means known to the person skilled in the art, for instance by means of a screw or by means of cooperating positioning means, for instance a cooperating tongue and groove.
  • the connecting member 18 is formed by bending an end part of the cross member 17 in a way a gap 20 is formed for receiving the second lower reinforcing wire 7.
  • the gap 20 is at least delimited by a second upright member 19, as is shown in figures 2A, 2B and 2C .
  • the end part of the cross member 17 may be bent upwards or downwards.
  • the end part 18, 19 is preferably provided to exert a clamping action to the reinforcing wire received within the gap 20.
  • the first receiving means 12 and/or the connecting member 18 are arranged in a way to exert a clamping action on respectively the first lower reinforcing wire 6, and/or the second reinforcing wire 7.
  • the lifting tool is connected to a first and a second lower reinforcing wire
  • both the first receiving means 12 and the connecting member 18 are arranged to exert a clamping action on respectively the first lower reinforcing wire 6 and the second reinforcing wire 7.
  • the space 13 between the upper 14 and lower 15 member of the first receiving means 12 is equal to or somewhat smaller than the thickness of the first reinforcing wire 6.
  • the space 13 may be formed by at least one recess in the upright section 10, by bending a lower part of the upright section 10, by providing the upright section 10 with an additional member 21, or by a cross member which is connected to the upright section, or by any other means thought suitable by the person skilled in the art.
  • an additional member 21 is used to form the lower space 13
  • the upper 14 and lower 15 wall of the additional member 21 are preferably moveable with respect to each other so that they can clamp the first lower reinforcing wire 6 between them.
  • the height of the recess is preferably equal to or somewhat smaller than the thickness of the first lower reinforcing wire 6.
  • Another possibility is to provide the upright section 10 of the lifting tool 9 with a first and a second recess on opposite longitudinal sides of the upright section 10, each of the recesses being delimited by at least an upper 14 and lower 15 wall defining a lower space 13 for receiving the first reinforcing wire 6.
  • the upper 14 and lower 15 wall may extend parallel to the lower surface of the prefabricated floor element 1, whereby the lower space 13 formed between the upper 14 and lower 15 wall is preferably equal to or somewhat smaller than the thickness of the first lower reinforcing wire 6.
  • the upper 14 and lower 15 walls make an angle with respect to the lower surface of the prefabricated floor element 1, whereby the lower and upper wall on one side of the upright section are bent towards respectively the lower and upper wall on the opposite side of the upright section, whereby the height of the lower space, formed by the lowest points of the upper walls and the highest points of the lower walls, is equal to or somewhat smaller than the thickness of the first lower reinforcing wire 6.
  • a cross member which extends in a plane substantially parallel to the transverse side of the prefabricated floor element and is connected to the upright section of the lifting tool, provides the upper member of the lower space of the first receiving means.
  • the first lower reinforcing wire may be clamped between the lower part of the upright section connecting the first 23 and second 24 upright part of the upright section 10, forming the lower member of the lower space, and the upper member 14 of the cross member 17.
  • the connecting member 18 is arranged in a way the connecting member 18 may clamp the second lower reinforcing wire 7. This may for instance be done by bending an end part of the cross member 17 in a way a gap 20 is formed for receiving the second lower reinforcing wire 7, the size of the gap 20 being equal to or somewhat smaller than the size of the second reinforcing wire 7.
  • any other means considered suitable by the person skilled in the art may be used.
  • the first upright member 16 and the second upright member 19 of the lower space 13 act in opposite transverse directions and thus limit movement of the lifting tool 9 either in the same direction or in opposite directions in transverse direction of the prefabricated floor element 1.
  • the opening of the lower space 13 defined by the recess in the upright section and the opening of the gap 20 defined by the connecting member 18 point towards each other, but they may equally point away from each other.
  • Mounting of the lifting tool 9 to the first lower reinforcing wire 6 limits movement of the lifting tool 9 in longitudinal direction of the prefabricated floor element 1, because of friction between the first receiving means 12 of the upright section 10 and the first lower reinforcing wire 6.
  • the lifting tool 9 is connected to a first and a second lower reinforcing wire, movement of the lifting tool 9 in longitudinal direction of the prefabricated floor element 1 is even more limited, because the cross member 17 is connected to the upright section 10 and the connecting member 18 of the cross member 17 is connected to the second lower reinforcing wire 7.
  • Movement of the connecting member 18 in longitudinal direction is limited because of the occurrence of friction between the connecting member 18 and the second lower reinforcing wire 7 on the one hand and, because of friction between the first receiving means 12 of the upright section 10 and the first lower reinforcing wire 6 on the other hand.
  • mounting the lifting tool 9 to the first lower reinforcing wire 6, limits movement of the lifting tool 9 in height, transverse and longitudinal direction of the prefabricated floor element 1 and limits torsion of the lifting tool 9. Therefore, after mounting the lifting tool 9 to the first lower reinforcing wire 6, the concrete may be immediately poured and cast. There is no need to establish an additional manual connection or apply additional acts during the further production of the prefabricated floor element in order to avoid movement of the lifting tool. In this way the production process of the prefabricated floor element 1 with embedded lifting tool 9 according to this invention may be done faster, compared to the ones used in the prior art. Furthermore, because the additional manual connection or acts may cause damage of the reinforcing wire, lifting of the prefabricated floor element 1 with an embedded lifting tool 9 according to this invention may be done in a more reliable way than compared to the prior art.
  • the prefabricated floor element 1 preferably also comprises an upper reinforcing wire 8 extending in longitudinal direction of the prefabricated floor element 1 and provided in an upper part of the prefabricated floor element 1.
  • the upright section 10 of the lifting tool 9 may be supported by the upper reinforcing wire 8.
  • This further improves the stability of the lifting tool 9 allowing the lifting tool to stand on his own without the need for any external means.
  • any forces or strains occurring within the lifting means during lifting may also be transferred to the upper reinforcing wire 8 and thus absorbed within a larger part of the prefabricated floor element 1.
  • the upright section 10 may comprise in an upper part, second receiving means for receiving the upper reinforcing wire 8 and improve positioning.
  • the second receiving means may be formed by a recess in the upper part of the upright section 10, by bending an upper part of the upright section 10 or by providing the upper part of the upright section 10 with an additional member or any other means considered suitable by the person skilled in the art.
  • the second receiving means are formed by a first 23 and a second 24 upright member of the upright section 10 which are spaced from each other in transverse direction of the prefabricated floor element 1, in a way they may receive the upper reinforcing wire 8 between them.
  • the second receiving means are delimited by a lower member and the upper reinforcing wire is provided on top of the lower member, because this provides for additional security during lifting of the prefabricated floor element 1. In this way, when the lower reinforcing wires 6, 7 would break during lifting of the prefabricated floor element 1, the lifting tool 9 is still connected to the upper reinforcing wire 8.
  • the lifting tool may be mounted to the first and second lower reinforcing wire in the following way.
  • the mounting is done by first sliding the first lower reinforcing wire into the lower space of the first receiving means provided in the upright section of the lifting tool and then connecting the connecting member of the cross member to the second lower reinforcing wire.
  • mounting may be done in an easier way compared to the prior art, as the lifting tool may immediately be positioned in its final position and no rotation of the lifting tool about a vertical axis needs to be carried out.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Claims (12)

  1. Élément de plancher préfabriqué (1) en béton comprenant un premier (2) et un deuxième (3) côté longitudinal vertical, un premier (4) et un deuxième (5) côté transversal vertical, au moins un premier (6) câble de renforcement inférieur qui s'étend dans la direction longitudinale de l'élément de plancher préfabriqué et est prévu dans une partie inférieure de l'élément de plancher préfabriqué, et un outil de levage (9) pour permettre de soulever l'élément de plancher préfabriqué, l'outil de levage (9) étant au moins en partie incorporé dans le béton et étant accessible de l'extérieur pour permettre la coopération avec un dispositif de levage, l'outil de levage (9) comprenant une section verticale (10) qui s'étend dans la direction en hauteur et longitudinale de l'élément de plancher préfabriqué, dans lequel la section verticale (10) de l'outil de levage comprend au moins un point d'application (11) pour coopérer avec le dispositif de levage, dans lequel la section verticale (10) de l'outil de levage comprend des premiers moyens de réception (12) comprenant un espace inférieur (13) pour recevoir le premier câble de renforcement inférieur (6), dans lequel l'espace inférieur (13) est délimité par au moins un membre supérieur (14) et un membre inférieur (15) et un premier membre vertical (16), lequel premier membre vertical est prévu pour limiter les mouvements de l'outil de levage (9) dans une première direction transversale de l'élément de plancher préfabriqué, dans lequel l'outil de levage (9) comprend en outre un élément transversal (17) qui est relié à la section verticale (10) et qui comprend un deuxième membre vertical qui est prévu pour limiter les mouvements de l'outil de levage (9) dans une deuxième direction transversale de l'élément de plancher préfabriqué opposée à la première direction transversale, l'outil de levage contenant des pièces qui s'étendent dans la direction en hauteur, longitudinale et transversale de l'élément de plancher préfabriqué de sorte que l'outil de levage se tient debout tout seul de sorte qu'après montage de l'outil de levage sur le premier câble de renforcement inférieur, il n'est pas nécessaire de tenir ou de fixer l'outil de levage sur les câbles de renforcement afin de le maintenir dans la position dans laquelle il est à incorporer dans l'élément de plancher préfabriqué, dans lequel le membre transversal (17) comprend un membre de liaison (18) relié au deuxième câble de renforcement inférieur (7) s'étendant dans la direction longitudinale de l'élément de plancher préfabriqué, caractérisé en ce que l'espace inférieur s'étend le long de toute la longueur de la section verticale dans la direction longitudinale de l'élément préfabriqué.
  2. Élément préfabriqué en béton selon la revendication 1, caractérisé en ce que les premiers moyens de réception (132) sont agencés pour exercer une action de serrage sur le premier câble de renforcement inférieur (6).
  3. Élément préfabriqué en béton selon l'une quelconque des revendications 1 - 2, caractérisé en ce que l'élément de plancher préfabriqué comprend un câble de renforcement supérieur (8) s'étendant dans la direction longitudinale de l'élément de plancher préfabriqué et prévu dans une partie supérieure de l'élément de plancher préfabriqué et en ce que la section verticale (10) est supportée par le câble de renforcement supérieur (8).
  4. Élément préfabriqué en béton selon l'une quelconque des revendications 1 - 3, caractérisé en ce que la section verticale (10) comprend une première (23) et une deuxième (24) partie verticale qui sont espacées l'une de l'autre dans la direction transversale de l'élément de plancher préfabriqué pour recevoir entre elles le premier câble de renforcement inférieur (6).
  5. Élément préfabriqué en béton selon l'une quelconque des revendications 1 - 4, caractérisé en ce que le membre de liaison (18) est agencé pour exercer une action de serrage sur le deuxième câble de renforcement inférieur (7).
  6. Élément préfabriqué en béton selon l'une quelconque des revendications 1 - 5, caractérisé en ce que les premiers éléments de réception (12) sont formés par au moins un évidement inférieur dans la section verticale pour fournir l'espace inférieur (13) pour recevoir le premier câble de renforcement inférieur (6).
  7. Élément préfabriqué en béton selon l'une quelconque des revendications 1 - 5, caractérisé en ce que les premiers éléments de réception (12) sont formés par pliage d'une partie inférieure de la section verticale pour fournir l'espace inférieur (13) pour recevoir le premier câble de renforcement inférieur (6).
  8. Élément préfabriqué en béton selon l'une quelconque des revendications 1 - 5, caractérisé en ce que la section verticale (10) comprend une première (23) et une deuxième (24) partie verticale qui sont espacées l'une de l'autre dans la direction transversale de l'élément de plancher préfabriqué.
  9. Élément préfabriqué en béton selon la revendication 8, caractérisé en ce que la section verticale (10) de l'outil de levage (9) comprend un membre additionnel (21) qui est mobile dans la direction en hauteur de la section verticale (10), pour fournir le membre supérieur (14) de l'espace inférieur (13) pour recevoir le premier câble de renforcement inférieur (6).
  10. Élément préfabriqué en béton selon l'une quelconque des revendications 1 - 9, caractérisé en ce qu'une partie d'extrémité du membre transversal (17) est pliée pour fournir un creux (20) pour recevoir le deuxième câble de renforcement inférieur (7).
  11. Élément préfabriqué en béton selon l'une quelconque des revendications 3 - 10, caractérisé en ce que la section verticale (10) comprend dans une partie supérieure des deuxièmes moyens de réception pour recevoir le câble de renforcement supérieur (8).
  12. Outil de levage (9) pour soulever un élément de plancher préfabriqué (1), comprenant une section verticale (10) s'étendant dans la direction en hauteur et longitudinale de l'élément de plancher préfabriqué (1), la section verticale (10) comprenant au moins un point d'application (11) pour la coopération avec un dispositif de levage, dans lequel la section verticale (10) comprend en outre des premiers moyens de réception (12), dans lequel les premiers moyens de réception (12) comprennent un espace inférieur (13) pour recevoir un premier câble de renforcement inférieur (6) de l'élément de plancher préfabriqué (1), le premier câble de renforcement inférieur (6) s'étendant dans la direction longitudinale de l'élément de plancher préfabriqué, dans lequel l'espace inférieur (13) est délimité par au moins un membre supérieur (14) un membre inférieur (15) et un premier membre vertical (16), le premier membre vertical (16) limitant les mouvements de l'outil de levage dans une première direction transversale de l'élément de plancher préfabriqué (1), dans lequel l'outil de levage (9) comprend en outre un membre transversal (17) qui s'étend dans la direction transversale de l'élément de plancher préfabriqué (1) et est relié à la section verticale (10), l'élément transversal (17) comprenant un deuxième membre vertical (19), le deuxième membre vertical (19) limitant les mouvements de l'outil de levage (9) dans une deuxième direction transversale de l'élément de plancher préfabriqué (1) opposée à la première direction transversale, l'outil de levage contenant des pièces qui s'étendent dans la direction en hauteur, longitudinale et transversale de l'élément de plancher préfabriqué de sorte que l'outil de levage se tient debout tout seul de sorte qu'après montage de l'outil de levage sur le premier câble de renforcement inférieur, il n'est pas nécessaire de tenir ou de fixer l'outil de levage sur les câbles de renforcement afin de le maintenir dans la position dans laquelle il est à incorporer dans l'élément de plancher préfabriqué, dans lequel le membre transversal (17) comprend un membre de liaison (18) pour la liaison à un deuxième câble de renforcement inférieur (7) s'étendant dans la direction longitudinale de l'élément de plancher préfabriqué, caractérisé en ce que l'espace inférieur s'étend le long de toute la longueur de la section verticale dans la direction longitudinale de l'élément préfabriqué.
EP20070124059 2007-12-24 2007-12-24 Élément préfabriqué en béton Not-in-force EP2075392B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP20070124059 EP2075392B1 (fr) 2007-12-24 2007-12-24 Élément préfabriqué en béton

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP20070124059 EP2075392B1 (fr) 2007-12-24 2007-12-24 Élément préfabriqué en béton

Publications (2)

Publication Number Publication Date
EP2075392A1 EP2075392A1 (fr) 2009-07-01
EP2075392B1 true EP2075392B1 (fr) 2015-03-18

Family

ID=39364041

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20070124059 Not-in-force EP2075392B1 (fr) 2007-12-24 2007-12-24 Élément préfabriqué en béton

Country Status (1)

Country Link
EP (1) EP2075392B1 (fr)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2495902B (en) * 2011-09-05 2017-10-18 Hoesch Building Systems Ltd Security panel
NO341267B1 (no) * 2014-08-04 2017-10-02 Svein Berg Holding As Bygningselement, bygning omfattende et eller flere bygningselementer og fremgangsmåte for sammenføyning av bygningselementer og bærende elementer
FR3068962B1 (fr) * 2017-07-13 2019-07-26 Marcel Arteon Ancre dynamique et evolutive de levage d’un element de construction, notamment de faible epaisseur, multiconfigurations et multi forces
CN111622408B (zh) * 2020-04-21 2021-11-16 上海二十冶建设有限公司 一种使用圆柱形模芯的空心楼盖及配套装填装置
GB2600748B (en) * 2020-11-09 2023-03-08 Sapphire Balconies Ltd Balcony developments

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3904772C1 (fr) * 1989-02-17 1990-06-13 Unistrut Europe Plc, Bedford, Gb
US5242249A (en) * 1991-08-12 1993-09-07 Mmi Products Pre-cast panel lifting insert
US6230447B1 (en) * 2000-07-06 2001-05-15 George E. Pribyl Lifting anchor for prefabricated concrete panels
NZ520149A (en) * 2002-07-12 2003-01-31 Reinforced Concrete Pipes Pty Anchoring device
FR2865228B1 (fr) 2004-01-15 2006-03-24 Soprel Procede de fabrication de dalles alveolees en beton precontraint equipees de boucles de levage et de manutention ainsi que dalles obtenues suite a la mise en oeuvre de ce procede
BE1016424A6 (nl) * 2005-01-24 2006-10-03 Echo Hijshaak voor het opnemen van een geprefabriceerd betonelement.
FR2897627B1 (fr) 2006-02-21 2008-04-18 Jacques Gauvrit Ancre d'arrimage destinee a equiper une plaque de beton

Also Published As

Publication number Publication date
EP2075392A1 (fr) 2009-07-01

Similar Documents

Publication Publication Date Title
EP2075392B1 (fr) Élément préfabriqué en béton
EP2347067A1 (fr) Dispositif et procede de levage pour elements en beton
EP2181224A1 (fr) Poutres perfectionnées pour renforcer le béton et procédé pour les relier à des piliers afin de fournir une continuité d'une baie à une autre
KR101471393B1 (ko) 교량받침용 앵커소켓 구조물
RU2541000C2 (ru) Способ закрепления подъемной петли на бетонном элементе, полученном способом литья в скользящую опалубку, и опора для подъемной петли
EP2037058B1 (fr) Élément de plancher doté d'outil de levage
KR20060037137A (ko) 건축용 서포트의 간격유지장치
RU2554364C2 (ru) Опорное устройство анкера для подъема бетонных элементов
KR100762404B1 (ko) 철근받침대
CN210562997U (zh) 一种预制柱组件
KR101298399B1 (ko) 철근받침구조체
KR20110058051A (ko) 콘크리트 레벨 규준틀 겸용 타설용 발판
KR101378070B1 (ko) 철판 소요량을 최소화하는 연결부 제작방법 및, 이에 따라 제조된 연결부를 구비하는 보
CN201433342Y (zh) 一种t梁底腹板钢筋绑扎胎具
CN207878798U (zh) 一种多功能钢筋保护层控制装置
EP3134586B1 (fr) Dispositif et procédé d'ancrage d'un élément en porte-à-faux à une construction
KR101705202B1 (ko) 폭 조절이 용이한 유헤드 어셈블리
WO2010036129A1 (fr) Systeme de crochets pour unites de construction a base de ciment
KR20170057063A (ko) 분리 독립형 펀칭전단 보강재 및 이를 이용한 기초판의 내력 증가 시공방법
US6180046B1 (en) Method and apparatus for casting wire reinforced members utilizing members for positioning and supporting the wire reinforcements
CN218911499U (zh) 一种施工电梯基础装置
EP1757754A2 (fr) Clavette en plastique renforcée latéralement avec du métal pour planches de coffrage
CN208280021U (zh) 一种爬模施工可移动钢筋绑扎平台
KR20030060362A (ko) 교량받침과 이의 설치방법
CN221235064U (zh) 一种预制梁板钢筋吊装施工装置

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK

AKX Designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

17P Request for examination filed

Effective date: 20100317

RBV Designated contracting states (corrected)

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20100412

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20140306

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20141113

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 716691

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150415

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: PREFACO NV

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602007040658

Country of ref document: DE

Effective date: 20150430

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20150318

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20150318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 716691

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150318

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150619

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150720

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150718

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602007040658

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

26N No opposition filed

Effective date: 20151221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151231

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602007040658

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151224

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20151224

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20160831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151231

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151231

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160701

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151224

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151224

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20071224

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150318