EP2070813A2 - Method and system for the removal of platforms at sea - Google Patents

Method and system for the removal of platforms at sea Download PDF

Info

Publication number
EP2070813A2
EP2070813A2 EP08075925A EP08075925A EP2070813A2 EP 2070813 A2 EP2070813 A2 EP 2070813A2 EP 08075925 A EP08075925 A EP 08075925A EP 08075925 A EP08075925 A EP 08075925A EP 2070813 A2 EP2070813 A2 EP 2070813A2
Authority
EP
European Patent Office
Prior art keywords
vessel
platform
beams
support structure
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP08075925A
Other languages
German (de)
French (fr)
Other versions
EP2070813A3 (en
Inventor
Jan-Willem Ouwehand
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heerema Marine Contractors Nederland BV
Original Assignee
Heerema Marine Contractors Nederland BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heerema Marine Contractors Nederland BV filed Critical Heerema Marine Contractors Nederland BV
Publication of EP2070813A2 publication Critical patent/EP2070813A2/en
Publication of EP2070813A3 publication Critical patent/EP2070813A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0052Removal or dismantling of offshore structures from their offshore location

Definitions

  • the present invention relates to a method and system for removing a part of a platform at sea, the platform resting on a seabed.
  • US2003/0108392 discloses a system for removing decks from offshore structures. A drawback of this system is that it requires two barges, which is expensive and cumbersome during transport.
  • GB2165188 discloses a method for installing and removing an upper part of a platform (called deck module) at sea from a leg assembly of the platform.
  • a disadvantage of the system of GB2165188 is that it comprises a support frame 20 (comprising of girders 51) which is integral with the deck module itself, see Figure 2 and page 1, lines 78-80 of GB2165188 .
  • the support frame 20 is essential to the system, and hence the system of GB2165188 can only by used for removing deck modules having such a support frame 20. Since most existing platforms do not have such a support frame 20, the value of the system of GB2165188 is limited in practice.
  • a disadvantage of the system of GB2165188 is further that it requires barges which extend to a substantial height above the water surface, in order to remove the deck module from the leg assembly. This is due to the fact that for safety reasons, the deck module is located at a substantial height above the water line, and consequently the support structure 20 is also located at a substantial height above the water line.
  • WO98/24980 discloses a system for lifting a sea-going structure.
  • One drawback of this system is that it requires two vessels, which is expensive and cumbersome during transport.
  • Another drawback of this system is that it is difficult to unload the sea-going structure from the vessels once it is lifted with the vessels.
  • At least one of the objects is achieved in a method of removing an upper part of a platform which rests on a seabed and which extends above the waterline, the platform comprising legs which extend upwards from the seabed, the method comprising the subsequent steps of:
  • the method is simple because the support structure is connected directly to the upper part of the platform.
  • the connection may be effected by welding the support structure to the platform.
  • Other types of connections such as bolting or using special coupling members are also possible.
  • the method can be dedicated to removing platforms, and thus can be made free of any requirements or equipment relating to installing such a platform. This further specialization allows a simplification of the system, in contrast with complex systems of the
  • the method may also be used to remove the lower part of the platform or to remove the entire platform at once.
  • the support structure is not fixed to the vessel prior to the moving of the vessel to a position at the platform.
  • the support structure is handed over to the platform in order to eliminate movement of the barge caused by waves and or wind. This can be achieved for instance by laying the support structure into supports connected to the piles before the vessel arrived, or by means of winch wires lowered from the platform deck.
  • the vessel is then ballasted down so that the support beams come free of the barge and can be welded to the platform legs without interference from movement of the vessel during the welding.
  • the vessel After connection of the support beams, the vessel is positioned and de-ballasted until the barge deck makes contact again with the support beams. The vessel is de-ballasted to an extent that the barge presses onto the support beams and thereby movement of the barge is minimized. Then the support beams are welded to the vessel deck.
  • the moment of contact between the vessel and the support beams is critical. Measures may be taken in order to minimize the impact between the structures. For instance shock absorbers may be used. Alternatively a hydraulic system may be used, that can pull the vessel towards the support beam.
  • positioning the vessel between the legs of the platform is performed prior to connecting the connection ends to the legs of the platform.
  • the vessel which has an important function in positioning the support beams.
  • the beams of the support structure are connected to the legs of the platform when the vessel is not present.
  • the vessel may pre-position the support beams and be removed during the connecting of the connection ends to the legs.
  • the vessel may not be involved at all in the connecting of the beams to the legs of the platform.
  • the support beams may be positioned by a crane on the platform itself and the vessel is positioned between the legs of the vessel only after the support structure is connected to the legs.
  • the support structure rests on the deck of the vessel and extends substantially horizontally.
  • the hull of the vessel will generally be elongate and can also be referred to as a mono-hull.
  • the support structure comprises a hydraulic system for raising the one or more beams including the platform relative to the vessel, the method comprising raising the upper part of the platform relative to the vessel by the hydraulic system while at the same time deballasting the vessel.
  • the method comprises:
  • the provisional or preliminary support means may be a ridge, collar or other projection on the legs of the platform on which the support structure is placed and comes to rest.
  • the method comprises:
  • the upper part of the platform is simply rolled off the vessel.
  • the present invention further relates to a system for removing an upper part of a platform which rests on a seabed and which extends above the waterline, the platform comprising legs which extend upwards from the seabed, the system comprising:
  • the present invention also relates to a support structure for use in the method of claim 1 or for use in the system of claim 10.
  • the present invention further relates to a vessel for use in the method of claim 1 or for use in the system of claim 10.
  • the present invention further relates to a docking station for unloading the platform from the vessel, the docking station comprising a bay for the vessel and support members positioned around the bay, the support members being configured to support the support beams of the support structure, thereby allowing the unloading method of:
  • FIGS 1 a and 1 b show the system of GB2165188 and discloses a vessel 70.
  • the platform (or jacket structure) is built with a specific future removal method in mind.
  • the deck module 16 of the platform is provided with a horizontal beam 51.
  • support members 76a are provided at the underside of the beam 51 via which the deck module 16 is removably supported by the leg construction of the platform via support points 24a. This combination of features allows the removal vessel 70 to move between the legs of the jacket.
  • Lifting means 56 are provided which engage with outwardly projecting ends of the beams 51. The deck module 16 is subsequently lifted integrally from the support positions 24a.
  • the method and system of GB2165188 can only be used for platforms which are specifically designed and constructed to be removed with this system. If the platform does not have a beam 51 with outwardly projecting ends or if the platform does not have support points 24 which allow a disconnection of the deck module from the jacket legs, the system of GB2165188 does not work or works only at high costs. See page 1, lines 78-80 of GB2165188 which disclose that the support frame is integral with the deck module. Since most existing platforms do not have such a support frame, the value of the system of GB2165188 is limited in practice.
  • a further disadvantage of the system of GB2165188 is that the deck module including the beams 51 generally is located at a substantial distance above the mean sea level water line in order to stay clear of storm waves. This distance is generally a design requirement for safety purposes of platforms. In that case, the lifting means 56 also need to be provided high above the water line, which is complicated and disadvantageous.
  • FIGS. 1 a and 1 b may need a substantial length in order to reach the girders 51.
  • Figures 2 , 3 and 4 show an embodiment of the platform removal system according to the invention.
  • a vessel or barge 2 is provided having skid means 33 on the deck 46.
  • the barge 2 is substantially elongate and the skid means 33 extend in the longitudinal direction of the barge 2.
  • the skid means 33 may be rails or tracks or simply a path defined on deck 46. Alternatively or additionally, deck supports 33 may be provided.
  • the jacket structure or platform 1 which is to be removed rests on the seabed (not shown) on legs 5.
  • the platform 1 comprises a top module or deck module 6 which is located above the water line 8.
  • the barge 2 has a width 62 which is smaller than the distance 64 between two legs 5 of the platform 1, allowing the barge 2 to be positioned between the legs 5 of the platform 1.
  • the removal system further comprises a support structure 30 comprising one or more beams 31.
  • the beams 31 have ends 32 which are connected to the legs 5 of the platform.
  • the beams 31 are configured to rest on the skid means 33 and are supported in such a way that they can move relative to the barge 2 by sliding or rolling.
  • the vertical distance between the beam 31 and the underside 44 of the deck module 6 may be substantial.
  • the beam 31 may be located substantially below a nominal wave height, whereas the deck 42 and in particular the underside 44 of the deck module 6 is located at a substantial height above the nominal wave height Hs. This feature allows the platform removal system to be relatively low.
  • FIG 3 a front view of the removal system is shown, the barge 2 carrying the upper part of the platform.
  • the beams 31 are connected to the legs 5 at connection points 32.
  • Figure 4 shows the system from the side.
  • the skid means 33 may extend beyond the hull of the barge 2 for easy roll-off or skid-off of the support structure 3 with the upper part of the platform from the barge 2.
  • Figure 5a shows a first step in a method for removing the upper part 11 of a platform 1.
  • Hang-off provisions or support members 4 are connected to the legs 5.
  • the support members 4 may be steel beams or collars which are welded to the legs 5 of the platform 1. This step may be executed prior to the arrival of the barge 2.
  • Figure 5b shows a next step wherein the barge 2 arrives with the beams 31 supported on the deck 46.
  • the beams 31 may be uncoupled from the barge 2.
  • the barge 2 is positioned such that the beams 31 come to rest on the support members 4.
  • the barge 2 is ballasted by filling ballast compartments in order to lower the barge 2 relative to the beams 31.
  • the beams 31 come loose from the barge 2 and are now fully supported by the support members 4.
  • the beams 31 can now be fixed to the legs 5.
  • the beams 31 are lifted relative to the barge 2and placed on support members 4.
  • the barge 2 may not be present during installation of the beams 31 on the support members 4.
  • a crane vessel installs the beams 31, or the beams may be installed by the workers on the platform 1 itself, without the use of an additional vessel.
  • Figure 5d shows that in a next step, the barge 2 is positioned such that the beams 31 engage the skid means 33 on the deck 46.
  • the barge 2 will be deballasted by emptying the ballast compartments 7.
  • connection means extend upwards from the deck 46 of the barge 2 and form a connection between the deck 46 and the beams 31.
  • Figure 5e shows that in a next step, the legs 5 of the platform are cut, such that the platform 1 is divided in an upper part 11 and a lower part 12.
  • the drawing shows that the legs are cut above the water line, alternatively this can be done beneath the water line.
  • Figure 5f shows how in a next step, the barge 22 lifts the upper part 11 from the lower part 12 via the beams 31. This may be performed by further deballasting the barge 2.
  • a further hydraulic lifting system 34 may be provided on deck 46, which may be operated simultaneously with the deballasting. The hydraulic lifting system 34 is configured to move the beams 31 upward relative to the deck and to lower the beams 31 relative to the deck 46.
  • Figure 5g shows a situation in which the upper part 2 is completely removed and the lower part 12 remains behind.
  • the lower part 12 may be removed separately.
  • Figure 6 shows an alternative embodiment, in which carriages 80 are used to unload the upper part 11 of the platform from the barge 2.
  • the upper part may be positioned on the carriages directly after removal from the lower part of the platform, but it is also possible that the upper part is placed on the carriages when the barge arrives at the unloading location.
  • Hydraulic lifting means 34 may be present for lifting the upper part 11 from the deck 46 and onto the carriages 80. The present invention relates to the following clauses:

Abstract

The present invention relates tot a method of removing an upper part of a platform which rests on a seabed and which extends above the waterline, the platform comprising legs which extend upwards from the seabed, the method comprising the subsequent steps of:
- providing a vessel comprising a single hull, the hull defining a contour of the vessel when viewed from above;
- providing a support structure which is configured to rest on the vessel, the support structure comprising one or more beams, the one or more beams having connection ends that are constructed to extend outside the contour of the hull on opposite sides of the vessel, the connection ends configured to be connected to the legs of the platform;
- positioning the vessel between the legs of the platform;
- connecting the connection ends to the legs of the platform;
- disconnecting the upper part of the platform from the lower part;
- lifting the upper part of the platform from the lower part by the vessel via the support structure;
- moving the vessel and the upper part of the platform away from the lower part of the platform.
The present invention further relates to a system for carrying out the method.

Description

    Field of the invention
  • The present invention relates to a method and system for removing a part of a platform at sea, the platform resting on a seabed.
  • Methods for removing such platforms are known in the field of the art. It is widely known that platforms at sea, for instance in the oil and gas industry, have a certain life span, after which they are to be decommissioned and removed. This removal process often is a costly, complicated and sometimes dangerous operation. There is a general need in the field of the art for cost-effective, simple, and safe methods for removing such platforms.
  • Prior art
  • US2003/0108392 discloses a system for removing decks from offshore structures. A drawback of this system is that it requires two barges, which is expensive and cumbersome during transport.
  • GB2165188 discloses a method for installing and removing an upper part of a platform (called deck module) at sea from a leg assembly of the platform.
  • A disadvantage of the system of GB2165188 is that it comprises a support frame 20 (comprising of girders 51) which is integral with the deck module itself, see Figure 2 and page 1, lines 78-80 of GB2165188 . The support frame 20 is essential to the system, and hence the system of GB2165188 can only by used for removing deck modules having such a support frame 20. Since most existing platforms do not have such a support frame 20, the value of the system of GB2165188 is limited in practice.
  • A disadvantage of the system of GB2165188 is further that it requires barges which extend to a substantial height above the water surface, in order to remove the deck module from the leg assembly. This is due to the fact that for safety reasons, the deck module is located at a substantial height above the water line, and consequently the support structure 20 is also located at a substantial height above the water line.
  • WO98/24980 discloses a system for lifting a sea-going structure. One drawback of this system is that it requires two vessels, which is expensive and cumbersome during transport. Another drawback of this system is that it is difficult to unload the sea-going structure from the vessels once it is lifted with the vessels.
  • Object of the invention
  • It is an object of the invention to provide an alternative method and device for removing an upper part of a platform which rests on a seabed.
  • It is an object of the present invention to provide a method and device suffering less from at least one of the drawbacks mentioned above.
  • It is an object of the invention to provide a simple, cost-effective and reliable method and device for removing an upper part of a platform which rests on a seabed.
  • At least one of the objects is achieved in a method of removing an upper part of a platform which rests on a seabed and which extends above the waterline, the platform comprising legs which extend upwards from the seabed, the method comprising the subsequent steps of:
    • providing a vessel comprising a single hull, the hull defining a contour of the vessel when viewed from above;
    • providing a support structure which is configured to rest on the vessel, the support structure comprising one or more beams, the one or more beams having connection ends that are constructed to extend outside the contour of the hull on opposite sides of the vessel, the connection ends configured to be connected to the legs of the platform;
    • positioning the vessel between the legs of the platform;
    • connecting the connection ends to the legs of the platform;
    • disconnecting the upper part of the platform from the lower part;
    • lifting the upper part of the platform from the lower part by the vessel via the support structure;
    • moving the vessel and the upper part of the platform away from the lower part of the platform.
  • The method is simple because the support structure is connected directly to the upper part of the platform. The connection may be effected by welding the support structure to the platform. Other types of connections such as bolting or using special coupling members are also possible.
  • The method can be dedicated to removing platforms, and thus can be made free of any requirements or equipment relating to installing such a platform. This further specialization allows a simplification of the system, in contrast with complex systems of the
  • prior art.
  • The method may also be used to remove the lower part of the platform or to remove the entire platform at once.
  • Generally, the support structure is not fixed to the vessel prior to the moving of the vessel to a position at the platform. Once the vessel is in position, the support structure is handed over to the platform in order to eliminate movement of the barge caused by waves and or wind. This can be achieved for instance by laying the support structure into supports connected to the piles before the vessel arrived, or by means of winch wires lowered from the platform deck. The vessel is then ballasted down so that the support beams come free of the barge and can be welded to the platform legs without interference from movement of the vessel during the welding.
  • After connection of the support beams, the vessel is positioned and de-ballasted until the barge deck makes contact again with the support beams. The vessel is de-ballasted to an extent that the barge presses onto the support beams and thereby movement of the barge is minimized. Then the support beams are welded to the vessel deck.
  • The moment of contact between the vessel and the support beams is critical. Measures may be taken in order to minimize the impact between the structures. For instance shock absorbers may be used. Alternatively a hydraulic system may be used, that can pull the vessel towards the support beam.
  • Generally, positioning the vessel between the legs of the platform is performed prior to connecting the connection ends to the legs of the platform. In this case, it is the vessel which has an important function in positioning the support beams. However, it is also possible that the beams of the support structure are connected to the legs of the platform when the vessel is not present. The vessel may pre-position the support beams and be removed during the connecting of the connection ends to the legs. Alternatively, the vessel may not be involved at all in the connecting of the beams to the legs of the platform. In this case, the support beams may be positioned by a crane on the platform itself and the vessel is positioned between the legs of the vessel only after the support structure is connected to the legs.
  • Generally, the support structure rests on the deck of the vessel and extends substantially horizontally.
  • The hull of the vessel will generally be elongate and can also be referred to as a mono-hull.
  • In an advantageous embodiment, the support structure comprises a hydraulic system for raising the one or more beams including the platform relative to the vessel, the method comprising raising the upper part of the platform relative to the vessel by the hydraulic system while at the same time deballasting the vessel. In this way, the duration of the time period in which the upper part and the lower part of the platform are so close together that they are at risk of collision stays relatively short. In an aspect of the invention, the method comprises:
    • positioning the one or more beams of the support structure in a target position wherein the connection ends engage the legs;
    • supporting the one or more beams in their target positions by the platform via provisional or preliminary support means on the platform such that possible motions of the support vessel under influence of waves and wind do not affect or disturb the connecting of the one or more beams to the legs;
    • connecting the one ore more beams to the legs. Advantageously, the connecting of the support structure to the legs can take place without hindrance from movement of the vessel.
  • The provisional or preliminary support means may be a ridge, collar or other projection on the legs of the platform on which the support structure is placed and comes to rest. In an advantageous embodiment, the method comprises:
    • positioning the one or more beams of the support structure in a target position wherein the connection ends engage the legs;
    • supporting the one or more beams in their target positions by the platform via provisional or preliminary support means on the platform;
    • disconnecting the support structure from the vessel such that possible motions of the support vessel under influence of waves and wind do not affect or disturb the connecting of the one or more beams to the legs;
    • connecting the one ore more beams to the legs;
    • reconnecting the support structure to the vessel prior to the lifting of the upper part of the platform from the lower part of the platform.
      When the vessel is disconnected from the support structure, the connecting operation can be performed under relatively quiet circumstances. To this end, the vessel may be ballasted to a deeper draft or a hydraulic lift system may be operated to lower the support structure relative to the deck of the vessel, thereby gradually transferring the weight of the beams to the legs of the platform.
      In one aspect of the invention the support structure comprises one or more rails or skid tracks which rest on the vessel, wherein the beams of the support structure are movably arranged on the one or more rails or skid tracks via wheels or skid means, the method comprising rolling or skidding the one or more beams relative to the vessel for unloading the upper part of the platform from the vessel.
      This method allows very heavy platforms to be unloaded fro the vessel with relative ease.
      In another aspect, the method comprises removing the upper part of the platform from the vessel by
    • positioning one or more support carriages on the deck of the vessel,
    • disconnecting the one or more beams from either the vessel deck or the platform
    • lifting the upper part of the platform optionally including one or more beams from the deck
    • unloading the combination of support carriage, beams and upper part of the platform from the vessel.
  • Via the support carriages, the upper part of the platform is simply rolled off the vessel.
  • The present invention further relates to a system for removing an upper part of a platform which rests on a seabed and which extends above the waterline, the platform comprising legs which extend upwards from the seabed, the system comprising:
    • a vessel comprising a single hull, the hull defining a contour of the vessel when viewed from above;
    • a support structure which is configured to rest on the vessel, the support structure comprising one or more beams, the one or more beams having connection ends that are constructed to extend outside the contour of the hull on opposite sides of the vessel, the connection ends configured to be connected to the legs of the platform.
  • The present invention also relates to a support structure for use in the method of claim 1 or for use in the system of claim 10.
  • The present invention further relates to a vessel for use in the method of claim 1 or for use in the system of claim 10.
  • The present invention further relates to a docking station for unloading the platform from the vessel, the docking station comprising a bay for the vessel and support members positioned around the bay, the support members being configured to support the support beams of the support structure, thereby allowing the unloading method of:
    • positioning the vessel with the upper part of the platform in the docking station,
    • ballasting the vessel such that the vessel moves downward and the support beams engage the support members, thereby shifting the weight of the upper part of the platform from the vessel to the docking station via the one or more support beams;
    • removing the vessel from the docking station.
    Brief description of the Figures
    • Figure 1 shows a platform removal system according to the prior art;
    • Figure 2 shows an isometric view of an embodiment of the invention;
    • Figure 3 shows a front view of a platform removal system of the invention supporting an upper part of the platform;
    • Figure 4 shows a side view of a platform removal system of the invention carrying an upper part of the platform;
    • Figures 5a-5g show different steps in a platform removal method according to the invention; and
    • Figure 6 shows an isometric view of an alternative embodiment of the invention.
    Detailed description of the Figures
  • Figures 1 a and 1 b show the system of GB2165188 and discloses a vessel 70. The platform (or jacket structure) is built with a specific future removal method in mind. To this end, the deck module 16 of the platform is provided with a horizontal beam 51. Further, support members 76a are provided at the underside of the beam 51 via which the deck module 16 is removably supported by the leg construction of the platform via support points 24a. This combination of features allows the removal vessel 70 to move between the legs of the jacket. Lifting means 56 are provided which engage with outwardly projecting ends of the beams 51. The deck module 16 is subsequently lifted integrally from the support positions 24a.
  • As mentioned, the method and system of GB2165188 can only be used for platforms which are specifically designed and constructed to be removed with this system. If the platform does not have a beam 51 with outwardly projecting ends or if the platform does not have support points 24 which allow a disconnection of the deck module from the jacket legs, the system of GB2165188 does not work or works only at high costs. See page 1, lines 78-80 of GB2165188 which disclose that the support frame is integral with the deck module. Since most existing platforms do not have such a support frame, the value of the system of GB2165188 is limited in practice.
  • A further disadvantage of the system of GB2165188 is that the deck module including the beams 51 generally is located at a substantial distance above the mean sea level water line in order to stay clear of storm waves. This distance is generally a design requirement for safety purposes of platforms. In that case, the lifting means 56 also need to be provided high above the water line, which is complicated and disadvantageous.
  • In particular the strut assemblies 50 shown in Figures 1 a and 1 b may need a substantial length in order to reach the girders 51. Figures 2, 3 and 4 show an embodiment of the platform removal system according to the invention. A vessel or barge 2 is provided having skid means 33 on the deck 46. The barge 2 is substantially elongate and the skid means 33 extend in the longitudinal direction of the barge 2. The skid means 33 may be rails or tracks or simply a path defined on deck 46. Alternatively or additionally, deck supports 33 may be provided.
  • The jacket structure or platform 1 which is to be removed rests on the seabed (not shown) on legs 5. The platform 1 comprises a top module or deck module 6 which is located above the water line 8. The barge 2 has a width 62 which is smaller than the distance 64 between two legs 5 of the platform 1, allowing the barge 2 to be positioned between the legs 5 of the platform 1.
  • The removal system further comprises a support structure 30 comprising one or more beams 31. The beams 31 have ends 32 which are connected to the legs 5 of the platform. The beams 31 are configured to rest on the skid means 33 and are supported in such a way that they can move relative to the barge 2 by sliding or rolling.
  • The vertical distance between the beam 31 and the underside 44 of the deck module 6 may be substantial. The beam 31 may be located substantially below a nominal wave height, whereas the deck 42 and in particular the underside 44 of the deck module 6 is located at a substantial height above the nominal wave height Hs. This feature allows the platform removal system to be relatively low.
  • In figure 3 a front view of the removal system is shown, the barge 2 carrying the upper part of the platform. The beams 31 are connected to the legs 5 at connection points 32. Figure 4 shows the system from the side. The skid means 33 may extend beyond the hull of the barge 2 for easy roll-off or skid-off of the support structure 3 with the upper part of the platform from the barge 2.
  • Figure 5a shows a first step in a method for removing the upper part 11 of a platform 1. Hang-off provisions or support members 4 are connected to the legs 5. The support members 4 may be steel beams or collars which are welded to the legs 5 of the platform 1. This step may be executed prior to the arrival of the barge 2.
  • Figure 5b shows a next step wherein the barge 2 arrives with the beams 31 supported on the deck 46. The beams 31 may be uncoupled from the barge 2. The barge 2 is positioned such that the beams 31 come to rest on the support members 4. Subsequently, the barge 2 is ballasted by filling ballast compartments in order to lower the barge 2 relative to the beams 31. The beams 31 come loose from the barge 2 and are now fully supported by the support members 4. The beams 31 can now be fixed to the legs 5.
  • It is also possible that the beams 31 are lifted relative to the barge 2and placed on support members 4. In an alternative variant, the barge 2 may not be present during installation of the beams 31 on the support members 4. In this case, a crane vessel installs the beams 31, or the beams may be installed by the workers on the platform 1 itself, without the use of an additional vessel.
  • In figure 5c, it is shown that in a next step the ends 32 of the beams 31 are connected to the legs 5 of the platform 1. Welding is a suitable way of making the connection.
  • Figure 5d shows that in a next step, the barge 2 is positioned such that the beams 31 engage the skid means 33 on the deck 46. Generally, the barge 2 will be deballasted by emptying the ballast compartments 7. However, it is also possible that connection means extend upwards from the deck 46 of the barge 2 and form a connection between the deck 46 and the beams 31.
  • Figure 5e shows that in a next step, the legs 5 of the platform are cut, such that the platform 1 is divided in an upper part 11 and a lower part 12. Although the drawing shows that the legs are cut above the water line, alternatively this can be done beneath the water line.
  • Figure 5f shows how in a next step, the barge 22 lifts the upper part 11 from the lower part 12 via the beams 31. This may be performed by further deballasting the barge 2. In order to accelerate this step, a further hydraulic lifting system 34 may be provided on deck 46, which may be operated simultaneously with the deballasting. The hydraulic lifting system 34 is configured to move the beams 31 upward relative to the deck and to lower the beams 31 relative to the deck 46.
  • Figure 5g shows a situation in which the upper part 2 is completely removed and the lower part 12 remains behind. The lower part 12 may be removed separately.
  • Figure 6 shows an alternative embodiment, in which carriages 80 are used to unload the upper part 11 of the platform from the barge 2. The upper part may be positioned on the carriages directly after removal from the lower part of the platform, but it is also possible that the upper part is placed on the carriages when the barge arrives at the unloading location. Hydraulic lifting means 34 may be present for lifting the upper part 11 from the deck 46 and onto the carriages 80. The present invention relates to the following clauses:
    1. 1. Method of removing an upper part of a platform which rests on a seabed and which extends above the waterline, the platform comprising legs which extend upwards from the seabed, the method comprising the subsequent steps of:
      • providing a vessel comprising a single hull, the hull defining a contour of the vessel when viewed from above;
      • providing a support structure which is configured to rest on the vessel, the support structure comprising one or more beams, the one or more beams having connection ends that are constructed to extend outside the contour of the hull on opposite sides of the vessel, the connection ends configured to be connected to the legs of the platform;
      • positioning the vessel between the legs of the platform;
      • connecting the connection ends to the legs of the platform;
      • disconnecting the upper part of the platform from the lower part;
      • lifting the upper part of the platform from the lower part by the vessel via the support structure;
      • moving the vessel and the upper part of the platform away from the lower part of the platform.
    2. 2. Method of clause 1, the vessel further comprising a ballast system for varying the draft of the vessel, the method comprising:
      • ballasting the vessel to a deep draft when positioned between the legs of the vessel
      • lifting the upper part of the platform by deballasting the vessel.
    3. 3. The method of clause 1, wherein the support structure comprises a hydraulic system for raising the one or more beams including the platform relative to the vessel, the method comprising raising the upper part of the platform relative to the vessel by the hydraulic system, optionally while at the same time deballasting the vessel.
    4. 4. The method of clause 1, comprising pre-assembling the support structure prior to the removal operation in order to fit the support structure to the size and shape of the platform which is to be removed.
    5. 5. Method of clause 1, comprising:
      • positioning the one or more beams of the support structure in a target position wherein the connection ends engage the legs;
      • supporting the one or more beams in their target positions by the platform via provisional or preliminary support means on the platform such that possible motions of the support vessel under influence of waves and wind do not affect or disturb the connecting of the one or more beams to the legs;
      • connecting the one ore more beams to the legs.
    6. 6. Method of clause 1, comprising:
      • positioning the one or more beams of the support structure in a target position wherein the connection ends engage the legs;
      • supporting the one or more beams in their target positions by the platform via provisional or preliminary support means on the platform;
      • disconnecting the support structure from the vessel such that possible motions of the support vessel under influence of waves and wind do not affect or disturb the connecting of the one or more beams to the legs;;
      • connecting the one ore more beams to the legs;
      • reconnecting the support structure to the vessel prior to the lifting of the upper part of the platform from the lower part of the platform.
    7. 7. Method of clause 1, wherein the beams are releasably arranged on the vessel such that the upper part of the platform and the support structure connected to it can be unloaded from the vessel by moving the beams relative to the vessel, the method comprising:
      • moving the combination of the vessel and the upper part of the platform to a target location, and
      • unloading the upper part of the platform from the vessel by moving the beams and the upper part away from the vessel.
    8. 8. The method of clause 1, comprising unloading the upper part of the platform from the vessel by moving the one or more beams including the upper part of the support structure substantially horizontally relative to the vessel.
    9. 9. The method of clause 3, wherein the support structure comprises one or more rails or skid tracks which rest on the vessel, wherein the beams of the support structure are movably arranged on the one or more rails or skid tracks via wheels or skid means, the method comprising rolling or skidding the one or more beams relative to the vessel for unloading the upper part of the platform from the vessel.
    10. 10. The method of clause 1, comprising removing the upper part of the platform from the vessel by
      • positioning one or more support carriages on the deck of the vessel,
      • disconnecting the one or more beams from either the vessel deck or the platform
      • lifting the upper part of the platform optionally including one or more beams from the deck
      • unloading the combination of support carriage, beams and upper part of the platform from the vessel.
    11. 11. The method of clause 1, comprising unloading the upper part of the platform by moving the support structure and the upper part of the platform in a longitudinal direction of the vessel.
    12. 12. The method of clause 1, comprising unloading the upper part of the platform by moving the upper part of the platform in a transversal direction of the vessel.
    13. 13. The method of clause 1, comprising unloading the upper part of the platform by providing a docking station comprising a bay for the vessel and supports member positioned around the bay , the support members being configured to support the support beams of the support structure, the method comprising:
      • positioning the vessel with the upper part of the platform in the docking station,
      • ballasting the vessel such that the vessel moves downward and the support beams engage the support members, thereby shifting the weight of the upper part of the platform from the vessel to the docking station;
      • removing the vessel from the docking station.
    14. 14. A system for removing an upper part of a platform which rests on a seabed and which extends above the waterline, the platform comprising legs which extend upwards from the seabed, the system comprising:
      • a vessel comprising a single hull, the hull defining a contour of the vessel when viewed from above;
      • a support structure which rests on the vessel, the support structure comprising one or more beams, the one or more beams having connection ends that extend outside the contour of the hull on opposite sides of the vessel, the connection ends configured to be connected to the legs of the platform.
    15. 15. The system of clause 14, the vessel further comprising a ballast system for varying the draft of the vessel.
    16. 16. The system of clause 14, wherein the one or more beams are movable in a substantially horizontal direction relative to the vessel.
    17. 17. The system of clause 14, wherein the support structure comprises a hydraulic system which rests on the vessel and is configured to raise the one or more beams including the platform relative to the vessel.
    18. 18. The system of clause 14, wherein the support structure comprises one or more beams having connection ends which project substantially horizontally away from the vessel, a central part of the beam resting on the vessel, such that the connection ends meet the legs of the platform for connection with the legs when the vessel is positioned between the legs of the upper part for the platform.
    19. 19. The system of clause 14, wherein the connection ends of the support structure extend on opposite sides of the vessel, one end of a first beam being configured to be connected to a first leg of the platform, and the opposite end of the first beam being configured to be connected to a second leg of the platform.
    20. 20. The system of clause 14, wherein the one or more beams are releasably arranged on the vessel such that the one or more beams are unloadable at a target location from the vessel together with the upper part of the platform.
    21. 21. The system of clause 14, wherein the support structure comprises one or more rails or skid tracks which rest on the vessel, wherein the beams of the support structure are movably arranged on the one or more rails or skid tracks via wheels or skid means, such that the one or more beams may be rolled or skidded in a substantially horizontal direction relative to the vessel for unloading the one or more beams and the upper part of the platform from the vessel.
    22. 22. The system of clause 14, wherein the support structure comprises one or more support carriages which rest on the deck of the vessel, the support carriages configured to carry the beams including the upper part of the platform, the support carriages further configured to move substantially horizontally relative to the deck for unloading the upper part of the platform from the vessel.
    23. 23. The system of clause 14, wherein the support structure comprises one or more rails or skid tracks which rest on the vessel, and wherein the rails or skid tracks extend in a longitudinal direction of the vessel.
    24. 24. The system of clause 14, further comprising provisional or preliminary support means constructed to support the one or more support beams in a target position on the platform such that possible motions of the support vessel under influence of waves and wind do not affect or disturb the connecting of the one or more beams to the legs.
    25. 25. A support structure for use in the method of clause 1 or for use in the system of clause 14.
    26. 26. A vessel for use in the method of clause 1 or for use in the system of clause 13.
    27. 27. A docking station for unloading the platform from the vessel, the docking station comprising a bay for the vessel and support members positioned around the bay, the support members being configured to support the support beams of the support structure, thereby allowing the unloading method of:
      • positioning the vessel with the upper part of the platform in the docking station,
      • ballasting the vessel such that the vessel moves downward and the support beams engage the support members, thereby shifting the weight of the upper part of the platform from the vessel to the docking station via the one or more support beams;
      • removing the vessel from the docking station.
  • It will be obvious to a person skilled in the art that numerous changes in the details and the arrangement of the parts may be varied over considerable range without departing from the spirit of the invention and the scope of the claims.

Claims (15)

  1. Method of removing an upper part of a platform which rests on a seabed and which extends above the waterline, the platform comprising legs which extend upwards from the seabed, the method comprising the subsequent steps of:
    - providing a vessel comprising a single hull, the hull defining a contour of the vessel when viewed from above;
    - providing a support structure which is configured to rest on the vessel, the support structure comprising one or more beams, the one or more beams having connection ends that are constructed to extend outside the contour of the hull on opposite sides of the vessel, the connection ends configured to be connected to the legs of the platform;
    - positioning the vessel between the legs of the platform;
    - connecting the connection ends to the legs of the platform;
    - disconnecting the upper part of the platform from the lower part;
    - lifting the upper part of the platform from the lower part by the vessel via the support structure;
    - moving the vessel and the upper part of the platform away from the lower part of the platform.
  2. Method of claim 1, the vessel further comprising a ballast system for varying the draft of the vessel, the method comprising:
    - ballasting the vessel to a deep draft when positioned between the legs of the vessel
    - lifting the upper part of the platform by deballasting the vessel.
  3. The method of claim 1 or 2, wherein the support structure comprises a hydraulic system for raising the one or more beams including the platform relative to the vessel, the method comprising raising the upper part of the platform relative to the vessel by the hydraulic system, optionally while at the same time deballasting the vessel.
  4. Method of any of claims 1-3, comprising:
    - positioning the one or more beams of the support structure in a target position wherein the connection ends engage the legs;
    - supporting the one or more beams in their target positions by the platform via provisional or preliminary support means on the platform;
    - disconnecting the support structure from the vessel such that possible motions of the support vessel under influence of waves and wind do not affect or disturb the connecting of the one or more beams to the legs;;
    - connecting the one ore more beams to the legs;
    - reconnecting the support structure to the vessel prior to the lifting of the upper part of the platform from the lower part of the platform.
  5. Method of any of claims 1-4, wherein the beams are releasably arranged on the vessel such that the upper part of the platform and the support structure connected to it can be unloaded from the vessel by moving the beams relative to the vessel, the method comprising:
    - moving the combination of the vessel and the upper part of the platform to a target location, and
    - unloading the upper part of the platform from the vessel by moving the beams and the upper part away from the vessel, and/or comprising unloading the upper part of the platform from the vessel by moving the one or more beams including the upper part of the support structure substantially horizontally relative to the vessel, and/or
    wherein the support structure comprises one or more rails or skid tracks which rest on the vessel, wherein the beams of the support structure are movably arranged on the one or more rails or skid tracks via wheels or skid means, the method comprising rolling or skidding the one or more beams relative to the vessel for unloading the upper part of the platform from the vessel.
  6. The method of any of claims 1-5, comprising removing the upper part of the platform from the vessel by
    - positioning one or more support carriages on the deck of the vessel,
    - disconnecting the one or more beams from either the vessel deck or the platform
    - lifting the upper part of the platform optionally including one or more beams from the deck
    - unloading the combination of support carriage, beams and upper part of the platform from the vessel.
  7. The method of any of claims 1-6, comprising unloading the upper part of the platform by moving the support structure and the upper part of the platform in a longitudinal direction of the vessel, and/or comprising unloading the upper part of the platform by moving the upper part of the platform in a transversal direction of the vessel.
  8. A system for removing an upper part of a platform which rests on a seabed and which extends above the waterline, the platform comprising legs which extend upwards from the seabed, the system comprising:
    - a vessel comprising a single hull, the hull defining a contour of the vessel when viewed from above;
    - a support structure which rests on the vessel, the support structure comprising one or more beams, the one or more beams having connection ends that extend outside the contour of the hull on opposite sides of the vessel, the connection ends configured to be connected to the legs of the platform.
  9. The system of claim 8, wherein the one or more beams are movable in a substantially horizontal direction relative to the vessel, and/or wherein the support structure comprises a hydraulic system which rests on the vessel and is configured to raise the one or more beams including the platform relative to the vessel.
  10. The system of claim 8 or 9, wherein the support structure comprises one or more beams having connection ends which project substantially horizontally away from the vessel, a central part of the beam resting on the vessel, such that the connection ends meet the legs of the platform for connection with the legs when the vessel is positioned between the legs of the upper part for the platform, and/or wherein the connection ends of the support structure extend on opposite sides of the vessel, one end of a first beam being configured to be connected to a first leg of the platform, and the opposite end of the first beam being configured to be connected to a second leg of the platform, and/or
    wherein the one or more beams are releasably arranged on the vessel such that the one or more beams are unloadable at a target location from the vessel together with the upper part of the platform.
  11. The system of any of claims 8-10, wherein the support structure comprises one or more rails or skid tracks which rest on the vessel, wherein the beams of the support structure are movably arranged on the one or more rails or skid tracks via wheels or skid means, such that the one or more beams may be rolled or skidded in a substantially horizontal direction relative to the vessel for unloading the one or more beams and the upper part of the platform from the vessel, and/or wherein the support structure comprises one or more support carriages which rest on the deck of the vessel, the support carriages configured to carry the beams including the upper part of the platform, the support carriages further configured to move substantially horizontally relative to the deck for unloading the upper part of the platform from the vessel, and/or
    wherein the support structure comprises one or more rails or skid tracks which rest on the vessel, and wherein the rails or skid tracks extend in a longitudinal direction of the vessel.
  12. The system of any of claims 8-11, further comprising provisional or preliminary support means constructed to support the one or more support beams in a target position on the platform such that possible motions of the support vessel under influence of waves and wind do not affect or disturb the connecting of the one or more beams to the legs.
  13. A support structure for use in the method of claim 1 or for use in the system of claim 8.
  14. A vessel for use in the method of claim 1 or for use in the system of claim 8.
  15. A docking station for unloading the platform from the vessel, the docking station comprising a bay for the vessel and support members positioned around the bay, the support members being configured to support the support beams of the support structure, thereby allowing the unloading method of:
    - positioning the vessel with the upper part of the platform in the docking station,
    - ballasting the vessel such that the vessel moves downward and the support beams engage the support members, thereby shifting the weight of the upper part of the platform from the vessel to the docking station via the one or more support beams;
    - removing the vessel from the docking station.
EP08075925A 2007-12-10 2008-12-09 Method and system for the removal of platforms at sea Withdrawn EP2070813A3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US1257007P 2007-12-10 2007-12-10

Publications (2)

Publication Number Publication Date
EP2070813A2 true EP2070813A2 (en) 2009-06-17
EP2070813A3 EP2070813A3 (en) 2010-11-03

Family

ID=40482001

Family Applications (1)

Application Number Title Priority Date Filing Date
EP08075925A Withdrawn EP2070813A3 (en) 2007-12-10 2008-12-09 Method and system for the removal of platforms at sea

Country Status (2)

Country Link
US (1) US20090148241A1 (en)
EP (1) EP2070813A3 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2006407C2 (en) * 2011-03-16 2012-09-18 Heerema Marine Contractors Nl Method for removing a hydrocarbon production platform from sea.

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8708604B2 (en) * 2011-09-20 2014-04-29 Technip France Quick release system for topsides float-over installation on offshore platforms
CN103469775B (en) * 2013-09-05 2015-07-08 中交第二航务工程局有限公司 Multi-functional overwater movable lift-type work platform
CN107084784B (en) * 2016-12-21 2019-08-23 中国船舶重工集团公司第七一0研究所 A kind of four body ship type underwater measurement platform of movable lifting
CN113353202B (en) * 2020-03-04 2022-11-29 中国电建集团华东勘测设计研究院有限公司 Floating-supporting type installation structure and method for offshore converter station
CN113513005B (en) * 2021-04-22 2022-08-26 杜同 Offshore floating island
CN115158594A (en) * 2022-08-18 2022-10-11 上海外高桥造船有限公司 Stern entry platform and mounting method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2165188A (en) 1985-06-05 1986-04-09 Heerema Engineering Installation and removal vessel
WO1998024980A1 (en) 1996-12-03 1998-06-11 Allseas Group S.A. A device and method for lifting a sea-going structure, for instance a drilling platform
US20030108392A1 (en) 2000-01-17 2003-06-12 Mccarthy Vincent George Removal of decks from offshore structures

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7710267A (en) * 1977-09-19 1979-03-21 Ir Arie Van Der Landen METHOD OF BUILDING A MARINE CONSTRUCTION AND FOR BUILDING AND TRANSPORTING THE SUPERSTRUCTURE THEREOF, AND VESSEL USING THEREOF.
FR2405182A1 (en) * 1977-10-04 1979-05-04 Metalliques Entrepr Cie Fse PROCESS AND EQUIPMENT FOR PLACING ON COLUMNS ANCHORED TO THE BOTTOM, FROM A TRANSPORTER VESSEL, LOADS, PLATFORMS OR SIMILAR, FOR INSTALLATIONS OFF THE COAST
US5037241A (en) * 1990-03-29 1991-08-06 Exxon Production Research Company Method and apparatus for setting a superstructure onto an offshore platform
US5553977A (en) * 1994-12-16 1996-09-10 Northrop Grumman Corporation Off-shore platform construction, and method for transferring loads
FR2779754B1 (en) * 1998-06-12 2000-08-25 Technip Geoproduction DEVICE FOR TRANSPORTING AND LAYING A BRIDGE OF AN OIL PLATFORM FOR EXPLOITATION AT SEA
NO313130B1 (en) * 1999-06-07 2002-08-19 Mpu Entpr As Device for positioning and lifting a marine structure, especially a platform tire
US6719495B2 (en) * 2000-06-21 2004-04-13 Jon E. Khachaturian Articulated multiple buoy marine platform apparatus and method of installation
US6871609B2 (en) * 2002-08-30 2005-03-29 Itrec B.V. Multipurpose tower for monohull

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2165188A (en) 1985-06-05 1986-04-09 Heerema Engineering Installation and removal vessel
WO1998024980A1 (en) 1996-12-03 1998-06-11 Allseas Group S.A. A device and method for lifting a sea-going structure, for instance a drilling platform
US20030108392A1 (en) 2000-01-17 2003-06-12 Mccarthy Vincent George Removal of decks from offshore structures

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2006407C2 (en) * 2011-03-16 2012-09-18 Heerema Marine Contractors Nl Method for removing a hydrocarbon production platform from sea.
EP2500259A1 (en) * 2011-03-16 2012-09-19 Heerema Marine Contractors Nederland B.V. Method for removing a hydrocarbon production platform from sea
US9109406B2 (en) 2011-03-16 2015-08-18 Heerema Marine Contractors Nederland Se Method for removing a hydrocarbon production platform from sea

Also Published As

Publication number Publication date
EP2070813A3 (en) 2010-11-03
US20090148241A1 (en) 2009-06-11

Similar Documents

Publication Publication Date Title
EP2070813A2 (en) Method and system for the removal of platforms at sea
EP2559614B1 (en) Vessel and method for removal and/or installation of at least a part of a sea platform
KR101341763B1 (en) Preloading to reduce loads and save steel on topsides and grillage of catamaran systems
GB2174648A (en) Installation and removal vessel
EP1560748A1 (en) Offshore deployment of extendable draft platforms
US6736571B2 (en) Removal of decks from offshore structures
CN111039169A (en) Ship equipment module hoisting method
CN105692449A (en) Method for spud leg lengthening and folding of self-elevating drilling platform
US6540441B1 (en) Transporter for installation or removal of an offshore platform and a method for removal of an offshore platform
US20140072371A1 (en) Platform deck installation and removal method and apparatus
US11560205B2 (en) Lifting system for a floating vessel
KR101721706B1 (en) Device for transporting and placing a bridge of an offshore oil rig for sea operation onto a floating or stationary structure
TWI342852B (en) A method of constructing a semi-submersible rig using dry dock mating
WO2002004287A1 (en) Installation and removal of decks on and from offshore structures
WO2020161340A1 (en) Structure and method for decommissioning an offshore platform
EP3867138B1 (en) Combination of heavy lift vessel and floating appendage structure
EP1129258B1 (en) Offshore structure
CN116142418A (en) Ship docking support system and launching method
US20100186650A1 (en) Preloading to reduce loads and save steel on topsides and grillage of catamaran systems
JPH09272690A (en) Installation method and temporary bearer for installation of crane and the like
AU2080000A (en) Offshore deck installation
CN117425594A (en) Floating manufacturing device and method for building floating structure
KR20140031037A (en) Barge and load-out method using the same
WO2014011057A1 (en) Method and device for transfer of a load
AU2010216203A1 (en) Skid shoe assembly for loading and transporting large structures

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA MK RS

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA MK RS

RIC1 Information provided on ipc code assigned before grant

Ipc: B63B 35/00 20060101AFI20100930BHEP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R108

AKY No designation fees paid
REG Reference to a national code

Ref country code: DE

Ref legal event code: R108

Effective date: 20110701

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20110504