EP2052119A2 - Shelter, method for providing a wall or a panel with a bullet-proof and/or splinter-proof layer, and shelter, vehicle, vessel or aircraft provided with a wall or a panel manufactured according to this method - Google Patents
Shelter, method for providing a wall or a panel with a bullet-proof and/or splinter-proof layer, and shelter, vehicle, vessel or aircraft provided with a wall or a panel manufactured according to this methodInfo
- Publication number
- EP2052119A2 EP2052119A2 EP07793877A EP07793877A EP2052119A2 EP 2052119 A2 EP2052119 A2 EP 2052119A2 EP 07793877 A EP07793877 A EP 07793877A EP 07793877 A EP07793877 A EP 07793877A EP 2052119 A2 EP2052119 A2 EP 2052119A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- wall
- shelter
- proof
- splinter
- bullet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 206010041662 Splinter Diseases 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 title claims description 12
- 229910052751 metal Inorganic materials 0.000 claims abstract description 29
- 239000002184 metal Substances 0.000 claims abstract description 29
- 239000000463 material Substances 0.000 claims abstract description 12
- 229920003235 aromatic polyamide Polymers 0.000 claims description 14
- 229920005830 Polyurethane Foam Polymers 0.000 claims description 12
- 239000011496 polyurethane foam Substances 0.000 claims description 12
- 239000004744 fabric Substances 0.000 claims description 11
- 239000011490 mineral wool Substances 0.000 claims description 9
- 239000003822 epoxy resin Substances 0.000 claims description 6
- 229920000647 polyepoxide Polymers 0.000 claims description 6
- 239000004411 aluminium Substances 0.000 description 18
- 229910052782 aluminium Inorganic materials 0.000 description 18
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 18
- 238000009413 insulation Methods 0.000 description 14
- 238000003466 welding Methods 0.000 description 7
- 230000002349 favourable effect Effects 0.000 description 5
- 229910000838 Al alloy Inorganic materials 0.000 description 4
- 239000004760 aramid Substances 0.000 description 4
- 241000233866 Fungi Species 0.000 description 2
- 230000002411 adverse Effects 0.000 description 2
- 230000005494 condensation Effects 0.000 description 2
- 238000009833 condensation Methods 0.000 description 2
- 230000004308 accommodation Effects 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 230000001627 detrimental effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000002538 fungal effect Effects 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000003647 oxidation Effects 0.000 description 1
- 238000007254 oxidation reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/02—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
- E04C2/26—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
- E04C2/284—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
- E04C2/292—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and sheet metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/04—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against air-raid or other war-like actions
- E04H9/06—Structures arranged in or forming part of buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/04—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against air-raid or other war-like actions
- E04H9/10—Independent shelters; Arrangement of independent splinter-proof walls
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41H—ARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
- F41H5/00—Armour; Armour plates
- F41H5/02—Plate construction
- F41H5/04—Plate construction composed of more than one layer
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41H—ARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
- F41H5/00—Armour; Armour plates
- F41H5/02—Plate construction
- F41H5/04—Plate construction composed of more than one layer
- F41H5/0414—Layered armour containing ceramic material
- F41H5/0421—Ceramic layers in combination with metal layers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41H—ARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
- F41H5/00—Armour; Armour plates
- F41H5/02—Plate construction
- F41H5/04—Plate construction composed of more than one layer
- F41H5/0442—Layered armour containing metal
- F41H5/0457—Metal layers in combination with additional layers made of fibres, fabrics or plastics
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F41—WEAPONS
- F41H—ARMOUR; ARMOURED TURRETS; ARMOURED OR ARMED VEHICLES; MEANS OF ATTACK OR DEFENCE, e.g. CAMOUFLAGE, IN GENERAL
- F41H5/00—Armour; Armour plates
- F41H5/24—Armour; Armour plates for stationary use, e.g. fortifications ; Shelters; Guard Booths
Definitions
- Shelter method for providing a wall or a panel with a bullet-proof and/or splinter-proof layer, and shelter, vehicle, vessel or aircraft provided with a wall or a panel manufactured according to this method
- the invention relates to a shelter comprising an outer wall of metal plate, an inner wall of metal plate and a heat-insulating layer between the outer wall and the inner wall, provided with at least one opening.
- Shelters of this type are frequently applied for generally temporary accommodation of persons, supplies or equipment.
- the shelters are often provided with an undercarriage with wheels, although they can for instance also be placed using a helicopter. They are then often placed in inhospitable areas with large temperature differences between day and night and with a high degree of humidity. Problems can then occur due to condensation, and more generally with moisture which, particularly at openings such as windows and doors, can penetrate into the heat-insulating layer and herein adversely affects the insulating value and results in fungal growth.
- the shelter according to the invention obviates this drawback and has the feature that a frame of the at least one opening connecting the inner wall and the outer wall is manufactured from metal plate, and that the frame is welded all around to the inner wall and to the outer wall. This achieves that the heat- insulating layer is hermetically sealed all around by metal plate.
- a favourable embodiment of the inventive shelter has the feature that the shelter has an at least substantially rectangular form and that the corners are formed by welded seams which connect parts of the inner wall or parts of the outer wall, so that the heat-insulating layer is also hermetically sealed by metal plate at the corners.
- a further favourable embodiment has the feature that the heat-insulating layer is manufactured from polyurethane foam, which on the one hand has very good heat-insulating properties and on the other contributes toward the mechanical strength of the shelter.
- a drawback of polyurethane foam is that it is not heat-resistant.
- the heat-insulating layer around an opening or close to a corner is therefore preferably provided with a recess, this recess being filled with a mineral wool so that welding can take place around an opening or close to a corner without the heat-insulating layer being damaged by the heat.
- a favourable embodiment therefore has the feature that a layer of bullet-proof and/or splinter-proof material is arranged between the outer wall and the heat-insulating layer.
- the bullet-proof and/or splinter-proof material preferably comprises aramid fibres, which combine a very high tensile strength with a low specific mass. A projectile striking the outer wall will in the first instance bend the outer wall.
- the underlying layer of heat-insulating material is here also compressed, and the aramid fibres are placed under strain of tension over a relatively large surface area.
- the aramid fibres are herein stretched, wherein they absorb energy.
- the bullet-proof and/or splinter-proof material preferably comprises 10-50 layers of fabric of aramid fibres, each for instance having a weight of 175 grams per square metre, this subject to the anticipated threat and the resulting demands being made of the shelter.
- a significant additional advantage of this embodiment is that the bullet-proof and/or splinter-proof material does not increase the thickness of the wall, or hardly so, since a possible increase in the wall thickness is detrimental to the volume of the shelter as the outer dimensions are generally fixed.
- a further favourable embodiment has the feature that the bullet-proof and/or splinter-proof material is glued against an inner side of the outer wall, preferably using an epoxy resin.
- the layer consisting of aramid fibres embedded in a layer of epoxy resin then moreover contributes toward the mechanical strength of the shelter.
- the invention also relates to a method for providing with a bullet-proof and/or splinter-proof layer a wall or a panel comprising at least a first metal plate, an insulating layer and a second metal plate.
- the inventive method has the feature that the bullet-proof and/or splinter-proof layer is arranged between the first metal plate and the insulating layer or between the second metal plate and the insulating layer.
- the wall or the panel In the position of use the wall or the panel is positioned here such that possible projectiles will strike on that side of the wall or the panel which is provided with the bullet-proof and/or splinter-proof layer.
- a favourable realization of the inventive method has the feature that 10 to 50 layers of fabric of aramid fibres are arranged as bullet-proof and/or splinter- proof layer.
- the layers of fabric are here preferably glued together and glued onto an inner side of the first metal plate or the second metal plate.
- the invention also relates to a shelter, vehicle, vessel or aircraft provided with a wall or a panel manufactured according to the method as specified in the foregoing paragraphs.
- Fig. 1 shows a side view of a possible embodiment of a shelter according to the invention
- Fig. 2A shows a cross-section of a possible embodiment of a frame of an opening in the shelter
- Fig. 2B shows a cross-section of an alternative frame of an opening in the shelter
- Fig. 2C shows a cross-section of a further alternative frame of an opening in the shelter
- Fig. 3A shows a cross-section of a possible embodiment of a corner of the shelter
- Fig. 3B shows a cross-section of an alternative embodiment of a corner of the shelter
- Fig. 4A shows a cross-section of a possible embodiment of an armoured wall part
- Fig. 4B shows a cross-section of this wall part close to a frame.
- Fig. 1 shows a side view of a possible embodiment of a shelter 1 according to the invention, consisting of an outer wall 2 of metal plate, for instance an aluminium alloy, an inner wall 3 of metal plate, for instance an aluminium alloy, having therebetween a thermal insulation layer 4, here consisting of polyurethane foam.
- a number of openings are arranged in shelter 1 , for instance a door opening 5 in which a door frame can be placed, a window opening 6 in which a window frame can be placed, and passage openings 7a, 7b, 7c, into which cable bushings can for instance be placed.
- shelters of this type are generally subjected to a number of environmental tests which take account of condensation, rotting, oxidation and the adverse effects of fungus.
- the frames of openings 5, 6, 7a, 7b, 7c likewise consist of metal plate and the frames are welded to outer wall 2 and inner wall 3.
- the corners in outer wall 2 and inner wall 3 are also welded where necessary, so that the entire surface of shelter 1 consists of metal plate which wholly encloses insulating layer 4. This effectively prevents rotting and fungus taking hold in shelter 1.
- An existing door frame, window frame and throughfeed panels can then be mounted in the frames of the openings.
- Fig. 2A shows a cross-section of a possible embodiment of a frame of an opening in the shelter. Visible are aluminium outer wall 2, aluminium inner wall 3 and thermal insulating layer 4, as well as a part of a frame 8, here consisting of aluminium plate which is welded to outer wall 2 and inner wall 3 with respective welded seams 9a, 9b. A frame 10 can then be welded or screwed onto frame 8 in a manner which is further self-evident.
- a recess 1 1 is provided around frame 8, this recess 1 1 being filled with rockwool 12. It is of course possible to manufacture the thermal insulation layer entirely from rock wool, although a significant advantage of polyurethane foam is that it mutually connects outer wall 2 and inner wall 3 and herein contributes to the mechanical strength of shelter 1.
- Fig. 2B shows a cross-section of an alternative frame of an opening in the shelter, with aluminium outer wall 2, aluminium inner wall 3 and thermal insulation layer 4, as well as a part of a frame 8, here consisting of aluminium plate which is welded to outer wall 2 and inner wall 3 using respective aluminium corner profiles 13a, 13b and with welded seams 9a, 9b, 9c, 9d.
- a recess 1 1 is provided around frame 8, this recess 1 1 being filled with rockwool 12.
- Fig. 2C shows a cross-section of a further alternative frame of an opening in the shelter, with aluminium outer wall 2, aluminium inner wall 3 and thermal insulation layer 4, as well as a part of a frame 8, here consisting of an aluminium U-profile 14 which is welded to outer wall 2 and inner wall 3 with respective welded seams 9a, 9b.
- a recess 11 is provided around frame 8, this recess 1 1 being filled with rockwool 12.
- Fig. 3A shows a cross-section of a possible embodiment of a corner of the shelter, with aluminium outer walls 2a,2b, aluminium inner walls 3a, 3b and thermal insulation layer 4. Aluminium outer walls 2a, 2b are welded together with a welded seam 15 and aluminium inner walls 3a, 3b with a welded seam 16. In order to prevent the thermal insulation layer 4 consisting of polyurethane foam being damaged during welding, a recess 17 is provided in the corner, this recess 17 being filled with rockwool 18.
- Fig. 3B shows a cross-section of an alternative embodiment of a corner of the shelter, with aluminium outer walls 2a, 2b, aluminium inner walls 3a, 3b and thermal insulation layer 4.
- Aluminium outer walls 2a, 2b are welded together with a corner profile 19a and welded seams 15a, 15b and aluminium inner walls 3a, 3b with a corner profile 19b and welded seams 16a, 16b.
- a recess 17 is provided in the corner, this recess 17 being filled with rockwool 18.
- Fig. 4A shows a cross-section of a possible embodiment of an armoured wall part, consisting of an outer wall 2 of metal plate, for instance an aluminium alloy, an inner wall 3 of metal plate, for instance an aluminium alloy, having therebetween a thermal insulation layer 4, here consisting of polyurethane foam.
- a layer 20 consisting of bullet-proof and/or splinter-proof material, here consisting of a per se known fabric of aramid fibres, is arranged between outer wall 2 and thermal insulation layer 4.
- layer 20 comprises for instance 10-50 layers of aramid fabric, each having a weight of for instance 175 grams per square metre.
- aramid fabric For standard munitions it is generally possible to suffice with ten layers of aramid fabric, while thirty layers are generally sufficient for high-velocity munitions.
- the layers of aramid fabric are preferably embedded in an epoxy resin and in this way glued fixedly to the inner side of outer wall 2 so that the armour moreover makes a significant contribution toward the mechanical strength of shelter 1.
- Fig. 4B shows a cross-section of this wall part close to a frame 8.
- a recess 11 is provided all around frame 8, this recess 1 1 being filled with rockwool 12.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Business, Economics & Management (AREA)
- Ceramic Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Laminated Bodies (AREA)
- Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
- Building Environments (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL1032255A NL1032255C1 (en) | 2006-07-31 | 2006-07-31 | Shelter, a method for providing a bulletproof and / or anti-flaky layer with a wall or a panel and a shelter, vehicle, vessel or aircraft, provided with a wall or a panel, manufactured according to this method. |
PCT/NL2007/050376 WO2008016295A2 (en) | 2006-07-31 | 2007-07-27 | Shelter, method for providing a wall or a panel with a bullet-proof and/or splinter-proof layer, and shelter, vehicle, vessel or aircraft provided with a wall or a panel manufactured according to this method |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2052119A2 true EP2052119A2 (en) | 2009-04-29 |
EP2052119B1 EP2052119B1 (en) | 2011-06-22 |
Family
ID=38956407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07793877A Active EP2052119B1 (en) | 2006-07-31 | 2007-07-27 | Shelter, method for providing a wall or a panel with a bullet-proof and/or splinter-proof layer, and shelter, vehicle, vessel or aircraft provided with a wall or a panel manufactured according to this method |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP2052119B1 (en) |
AT (1) | ATE513965T1 (en) |
NL (1) | NL1032255C1 (en) |
WO (1) | WO2008016295A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3404677A1 (en) * | 2017-05-17 | 2018-11-21 | ABB Schweiz AG | Protection arrangement for an inductive device |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ATE557255T1 (en) | 2010-03-26 | 2012-05-15 | Abb Oy | OUTER CASE FOR ELECTRONIC EQUIPMENT AND METHOD FOR PROVIDING AN OUTER CASE FOR ELECTRONIC EQUIPMENT |
ITBA20100029A1 (en) * | 2010-07-12 | 2010-10-11 | Pantaleo Piumelli | COUNTER FRAMES, INSERTED IN PREFABRICATED CONCRETE OR STEEL AND POLYURETHANE PANELS, OF INDUSTRIAL BUILDINGS OR RESIDENTIAL BUILDINGS, SUITABLE TO STAY SLIDING DOORS WITH DISAPPEARING DOORS |
NL2017704B1 (en) * | 2016-11-02 | 2018-05-18 | Interdam Holding B V | Blast protection wall |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4731964A (en) * | 1986-04-14 | 1988-03-22 | Phillips Edward H | Steel shell building modules |
GB2380970B (en) * | 2001-10-15 | 2005-02-16 | Intelligent Engineering | Connector for structural sandwich plate members |
GB2399539B (en) * | 2003-03-18 | 2005-09-07 | Intelligent Engineering | Method for connecting structural sandwich plate members |
DE10350953A1 (en) * | 2003-10-30 | 2005-06-16 | Alcan Technology & Management Ag | Compound of composite materials |
-
2006
- 2006-07-31 NL NL1032255A patent/NL1032255C1/en not_active IP Right Cessation
-
2007
- 2007-07-27 AT AT07793877T patent/ATE513965T1/en not_active IP Right Cessation
- 2007-07-27 EP EP07793877A patent/EP2052119B1/en active Active
- 2007-07-27 WO PCT/NL2007/050376 patent/WO2008016295A2/en active Application Filing
Non-Patent Citations (1)
Title |
---|
See references of WO2008016295A2 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3404677A1 (en) * | 2017-05-17 | 2018-11-21 | ABB Schweiz AG | Protection arrangement for an inductive device |
Also Published As
Publication number | Publication date |
---|---|
WO2008016295A2 (en) | 2008-02-07 |
EP2052119B1 (en) | 2011-06-22 |
WO2008016295A3 (en) | 2008-04-03 |
ATE513965T1 (en) | 2011-07-15 |
NL1032255C1 (en) | 2008-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7637073B2 (en) | Wall structure for protection from ballistic projectiles | |
US4567100A (en) | Forced entry and ballistic resistant laminar structure | |
CA2641317C (en) | Composite panels for blast and ballistic protection | |
EP2340345B1 (en) | High-energy impact absorbing polycarbonate mounting method | |
US9453362B2 (en) | Shelter curtain wall system | |
US11665874B2 (en) | Mission configurable shelter | |
CN109790737A (en) | Shellproof rolling door | |
US7806037B2 (en) | Blast protection system | |
EP2052119A2 (en) | Shelter, method for providing a wall or a panel with a bullet-proof and/or splinter-proof layer, and shelter, vehicle, vessel or aircraft provided with a wall or a panel manufactured according to this method | |
US20090282968A1 (en) | Anti-ballistic materials and process | |
US7520205B1 (en) | Anti-ballistic materials and process | |
CN109229273A (en) | Naval vessels protection partiting thermal insulation component and its laying method | |
CN105737675A (en) | High-performance bulletproof shelter | |
US20210055080A1 (en) | Composite door systems | |
EP2339105B1 (en) | Security door comprising an observation window | |
CN211950219U (en) | Wooden fire door that prevents compression of multilayer | |
US20090092443A1 (en) | Breach resistant composite barriers | |
KR102075104B1 (en) | Insulator integrated Light Stone Pannel Structure | |
CN206709696U (en) | A kind of fiberglass aramid fiber compound sandwich protective plate shellproof for compartment | |
CN213510292U (en) | Composite wooden fireproof door | |
CN213980517U (en) | Multifunctional low-energy-consumption passive single-opening fireproof anti-theft door | |
CN114673296A (en) | Square cabin large plate and square cabin | |
CN214821588U (en) | Financial institution explosion-proof glass | |
JP2017101505A (en) | Reinforced exterior material and protective structure for evacuation building | |
US12123685B2 (en) | Bullet resistant garage door assembly and kit therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20090302 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK RS |
|
17Q | First examination report despatched |
Effective date: 20100311 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: HR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602007015403 Country of ref document: DE Effective date: 20110811 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: T3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110923 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 |
|
REG | Reference to a national code |
Ref country code: EE Ref legal event code: FG4A Ref document number: E005955 Country of ref document: EE Effective date: 20110922 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111024 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111022 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110731 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110731 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20110922 |
|
26N | No opposition filed |
Effective date: 20120323 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602007015403 Country of ref document: DE Effective date: 20120323 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110727 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110922 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20111003 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110727 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110922 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110622 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20130731 Year of fee payment: 7 Ref country code: DE Payment date: 20130730 Year of fee payment: 7 Ref country code: EE Payment date: 20130726 Year of fee payment: 7 Ref country code: FI Payment date: 20130725 Year of fee payment: 7 Ref country code: NL Payment date: 20130722 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20130730 Year of fee payment: 7 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602007015403 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: V1 Effective date: 20150201 |
|
REG | Reference to a national code |
Ref country code: EE Ref legal event code: MM4A Ref document number: E005955 Country of ref document: EE Effective date: 20140731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150201 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602007015403 Country of ref document: DE Effective date: 20150203 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20150331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150203 Ref country code: EE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140731 Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140727 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140731 |