EP1989336B1 - Reactor intended for titanium production - Google Patents

Reactor intended for titanium production Download PDF

Info

Publication number
EP1989336B1
EP1989336B1 EP06742216A EP06742216A EP1989336B1 EP 1989336 B1 EP1989336 B1 EP 1989336B1 EP 06742216 A EP06742216 A EP 06742216A EP 06742216 A EP06742216 A EP 06742216A EP 1989336 B1 EP1989336 B1 EP 1989336B1
Authority
EP
European Patent Office
Prior art keywords
melting
reactor
titanium
section
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP06742216A
Other languages
German (de)
French (fr)
Other versions
EP1989336A1 (en
Inventor
Jaroslav Vladik
Oleg Lysytchuk
Miroslav Sotornik
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP1989336A1 publication Critical patent/EP1989336A1/en
Application granted granted Critical
Publication of EP1989336B1 publication Critical patent/EP1989336B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B4/00Electrothermal treatment of ores or metallurgical products for obtaining metals or alloys
    • C22B4/08Apparatus
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B34/00Obtaining refractory metals
    • C22B34/10Obtaining titanium, zirconium or hafnium
    • C22B34/12Obtaining titanium or titanium compounds from ores or scrap by metallurgical processing; preparation of titanium compounds from other titanium compounds see C01G23/00 - C01G23/08
    • C22B34/1263Obtaining titanium or titanium compounds from ores or scrap by metallurgical processing; preparation of titanium compounds from other titanium compounds see C01G23/00 - C01G23/08 obtaining metallic titanium from titanium compounds, e.g. by reduction
    • C22B34/1268Obtaining titanium or titanium compounds from ores or scrap by metallurgical processing; preparation of titanium compounds from other titanium compounds see C01G23/00 - C01G23/08 obtaining metallic titanium from titanium compounds, e.g. by reduction using alkali or alkaline-earth metals or amalgams
    • C22B34/1272Obtaining titanium or titanium compounds from ores or scrap by metallurgical processing; preparation of titanium compounds from other titanium compounds see C01G23/00 - C01G23/08 obtaining metallic titanium from titanium compounds, e.g. by reduction using alkali or alkaline-earth metals or amalgams reduction of titanium halides, e.g. Kroll process
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22BPRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
    • C22B34/00Obtaining refractory metals
    • C22B34/10Obtaining titanium, zirconium or hafnium
    • C22B34/12Obtaining titanium or titanium compounds from ores or scrap by metallurgical processing; preparation of titanium compounds from other titanium compounds see C01G23/00 - C01G23/08
    • C22B34/1295Refining, melting, remelting, working up of titanium
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B3/00Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces
    • F27B3/04Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces of multiple-hearth type; of multiple-chamber type; Combinations of hearth-type furnaces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/16Introducing a fluid jet or current into the charge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/18Charging particulate material using a fluid carrier
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D7/00Forming, maintaining, or circulating atmospheres in heating chambers
    • F27D7/02Supplying steam, vapour, gases, or liquids

Definitions

  • the invention comes within the scope of metallurgy of nonferrous metals and deals with the reactor construction that is intended for one-stage processing of titanium tetrachloride with use of natrium or magnesium.
  • reactors There are known the constructions of reactors described in patent specifications US 2004/0103791 , GB 1202581 or GB 1429333 comprising a variety of reaction zones into which a reduction gas is introduced. These reactors produce titanium dioxide; however, they cannot be used to produce pure titanium.
  • Specification GB 1260021 describes continual processing of titanic iron ore with use of hydrochlorid acid in the equipment containing two or more arranged in cascades and mutually connected reactors which comprise mixing devices. The temperature in each of the reactor vessels is produced as a result of exothermic reactions of titanium chloride and is stabilized by regulation of flow of reagents passing through the equipment. Titanium dioxide is produced by hydrolysis after final solid suspension extraction is performed.
  • the reactor is destined for primary processing of titanic iron ore into TiCl 4 with subsequent TiO 2 production and does not refer to the production of pure titanium.
  • Fabrication of pyrogenic TiO 2 with finely dispersed particles is described in patent specification GB 1187864 , where the reaction of gaseous TiCl 4 with oxygen is used to produce a gas mixture containing TiO 2 , which is consequently subjected to electrical field generated by electrodes and located in the reactor chamber at temperatures from 400 to 800°C. Said electrical field prevents accretion forming on the walls of reactor. After cooling the mixture down TiO 2 is separated either mechanically or with use of electrostatic dust extraction.
  • Construction of the reactor producing titanium is referred to in patent specification GB 814181 , describing continual processing of TiCl 4 vapours in the presence of alkaline substances or alkaline earth metals, dissolved in a melt containing halides or other metals, the reaction vessel being designed so that its construction prevents unmelted reduction metal from coming into contact with TiO 2 vapours. Titanium formed in the reaction chamber settles down at the bottom and can be released as a suspension in a salt melt or can be pulled out as a cooled block of salt containing titanium. Weak point of this equipment is low manufacturing capacity and the fact that final product is not pure titanium but just a suspension in a salt melt or a cooled block of salt containing titanium.
  • a reactor as defined in claim 1 intended for titanium production, comprising a body whose tubular jacket is cooled by a refrigerant and which is equipped with melting electrodes and comprises other systems designed to introduce gaseous medium containing titanium, to introduce liquid reduction agent and fluxing agents and to discharge by-pass products and to collect finished titanium.
  • Subject matter of the invention consists in division of the interior of the reactor into two sections, namely reduction and melting ones, divided one from another with use of a barrier equipped with a by pass aperture, where the melting section comprises a melting chamber including main melting electrodes and a hopper for introducing fluxing agents; and where the reduction section comprises a reaction chamber into which reaction channels open being directed from mixing chambers; and comprises channels for delivering gaseous titanium-content medium being open into the reaction channels in their upper part and at the same time comprises a funnel chamber delivering the liquid reduction agent being connected with the reaction channels.
  • reaction channels are introduced into the reaction chamber in an upward manner, at an angle and symmetrically one against another, and in a convenient version they decline at an angle of 30-60° with respect to horizontal plane and they have a rectangular section.
  • the melting section is equipped with an outlet pipe designed for releasing vapour and a siphon outlet terminated with a melting pan designed to discharge condensed liquid portion and clinker as by-pass products of the productions.
  • hearth crystallizers arranged at the bottom part of the melting chamber which are equipped with drawing devices intended to catch and pull out cooled titanium ingots, or the melting section can be equipped with a discharging unit connected to the melting chamber through an outlet opening and a siphon outlet comprising auxiliary melting electrodes and opening into a discharging channel.
  • the new invention's efficiency is based on the fact that due to kinetic energy of the high-speed gasflow blown through the reaction channels and reaction chamber the regime of turbulent diffusion arises, which significantly favours practically immediate proceeding of pyrometallurgical reactions taking place at high rates and allowing material to melt quickly, thus the typical weak point of metallurgical equipment (converter, reflex furnaces) mutual interaction between final products and reagents is eliminated.
  • the apparatus has quite a simple design and at the same time it exhibits unusually high manufacturing productivity; another advantage is that all magnesium introduced into the reduction section is almost restlessly utilized.
  • the rate of reactions taking place at high temperatures is controlled through the transport speed regulation which means that speed of introducing reagents into reactor and speed of releasing products from the reaction zone influence the speed of reaction.
  • the reactor comprises a shaped body 1, whose tubular jacket consists of the reduction section 2 and the melting section 3 , which are divided one from another with a barrier 4 equipped with a by pass aperture 41 creating a temperature divide between the two zones, when the temperature in the reduction section 2 amounts to about 650°C and the temperature in the melting section can range from 1500 to 1750°C.
  • the tubular jacket of the body 1 is cooled by a cooling agent; for example a mixture of nitrites and nitrates KNO 3 , NaNO 3 and NaNO 2 , being introduced and drawn off through the cooling pipeline 101 .
  • the reduction section 2 comprises a reaction chamber 21 into which reaction channels 22 open in an upward manner, at an angle and situated symmetrically one against another; the channels for delivering gaseous titanium-content medium 24 , e.g. gaseous TiCl 4 , being open into the reaction channels in their upper part and at the same time the funnel 25 delivering the liquid reduction agent, e.g. magnesium or natrium, equipped with funnel mouthing 26 , being connected with the reaction channels.
  • the reaction channels 22 have longitudinal, preferably rectangular section; they decline at an angle of 30-60° with respect to horizontal plane and they are designed so that optimum operating figures are as follows: - velocity of gasflow in channels 50-300 m/s - specific consumption of refining gas melt 0.5-3 kg/m
  • the melting section 3 comprises the melting chamber 31 , where the sets of main melting electrodes 5 are situated, and which is at its upper part equipped with a charging hopper 32 designed to introduce fluxing agents, for example CaF 2 , and also with purging nozzles 34 designed to introduce and release argon intended for establishing inert atmosphere during melting processes.
  • a charging hopper 32 designed to introduce fluxing agents, for example CaF 2
  • purging nozzles 34 designed to introduce and release argon intended for establishing inert atmosphere during melting processes.
  • hearth crystallizers 33 are arranged which are equipped with drawing devices 6 intended to catch and pull out the cooled titanium ingots.
  • the melting section 3 is further equipped with an outlet pipeline 35 intended to discharge MgCl 2 vapours and sidewardly educed siphon outlet 36 terminated with a pan 37 designed to discharge condensed liquid portion of MgCl 2 and the clinker.
  • the whole reactor Prior to starting manufacturing process the whole reactor is purged with argon; the gas being introduced into the inner space of the reactor through the nozzles 34 until there is no atmosphere containing oxygen present within the reactor.
  • the drawing devices 6 are pulled up into the upper position and the cold titanium ingots 7 are located into the hearth crystallizers 33 as a first charge in order to allow further continuous drawing the titanium ingots 7 out of the melting section 31 during routine operation.
  • the pyrometallurgical reactions are accelerated in the reaction chamber 21 where the gasflows from the reaction channels 22 containing drops of liquid magnesium, remains of gaseous TiCl 4 and titanium particles encounter each other.
  • the velocity is increased due to strong turbulence taking place within the flow of gas and melt, the latter being disaggregated into small drops with size of about 50-400 ⁇ m and foam with active highly developed heterogeneous surface.
  • the solid titanium particles and MgCl 2 melt are discharged from the reaction chamber 21 through the by pass aperture 41 between the dividing barrier 4 and the jacket 1 to the melting section 3 .
  • Approximately half of the MgCl 2 vapour is continuously discharged from the melting chamber 31 through the outlet pipeline 35 and the rest of MgCl 2 condensates and is discharged as a liquid, which means it is casted through the siphon outlet 36 with use of pan 37 .
  • the manufacturing process proceeds in the melting section 3 particularly in the melting chamber 31 into which the solid material intended for melting including fluxing agents, e.g. CaF 2 , is charged through the hopper 32 , and where the main melting electrodes 5 are located.
  • the electrodes 5 are connected to the alternating current supply (not shown in the picture) and dived into the melt of salt MgCl 2 and the clinker.
  • the melt including suspended solid titanium particles is heated up to 1500-1750°C and melted titanium settles down at the bottom part of the melting chamber 31 where it melts on the ingots 7 and after cooling, and depending on the level of solid structure formation, it is discharged from the reactor by the drawing devices 6 and subsequently it is cut by laser cutting tools (not shown in the picture).
  • a protective layer of molten slag 9 consisting of titanium particles, MgCl 2 and titanium chlorides, is formed on the inner surface of the cooled jacket of the melting section 3 and on the cooled barrier 4 .
  • the present layer 9 ensures a long term operation of the reactor without need for special refractory lining.
  • the layer is about 3-50cm thick, 10-20cm on average, depending on the heat flow and heat output of the reactor.
  • the described construction of the reactor is not the only possible technical solution of the invention, but as it is shown on picture 4 , in case periodical or continuous liquid titanium discharge is required, it is possible to replace the hearth crystallizers 33 with a discharging section 8 connected through the outlet opening 38 in the melting section 3 and comprising a siphon discharge 81 in which the auxiliary melting electrodes 82 are located and which opens into the discharging channel 83.
  • the reactor comprising constructional features presented in the invention can be used in metallurgy of nonferrous metals for the purposes of titanium production.

Abstract

The reactor primarily intended for titanium production, comprising a body (1) with the tubular jacket cooled by a cooling medium, which is equipped with melting electrodes (5) and which is adjusted for introduction of gaseous medium including titanium, for introduction of liquid reducing agent and for charging of fluxing agents, and further adjusted for discharge of by-pass products and produced titanium. The subject matter of the invention consists in the fact that the interior of the reactor is divided into the reduction section (2) and the melting section (3) divided by a barrier (4) with a by pass aperture (41), where the melting section (3) comprises the melting chamber (31) in which the sets of main melting electrodes (5) are located and which is in its upper part furnished with a hopper (32) designed for charging fluxing agents, and where the reduction section (2) comprises the reaction chamber (21) into which reaction channels open being directed from the mixing chambers (23); channels for delivering gaseous titanium-content medium (24) being open into the reaction channels in their upper part and at the same time the funnel chamber (25) delivering the liquid reduction agent being connected with the reaction channels.

Description

    Technical field
  • The invention comes within the scope of metallurgy of nonferrous metals and deals with the reactor construction that is intended for one-stage processing of titanium tetrachloride with use of natrium or magnesium.
  • Actual state of the art
  • There are a considerable number of various reactors and smelting furnaces destined for nonferrous metals production, whose construction depends on the type of ore being processed as well as on implemented technology and desired quality of the final product.
  • There are known the constructions of reactors described in patent specifications US 2004/0103791 , GB 1202581 or GB 1429333 comprising a variety of reaction zones into which a reduction gas is introduced. These reactors produce titanium dioxide; however, they cannot be used to produce pure titanium. Specification GB 1260021 describes continual processing of titanic iron ore with use of hydrochlorid acid in the equipment containing two or more arranged in cascades and mutually connected reactors which comprise mixing devices. The temperature in each of the reactor vessels is produced as a result of exothermic reactions of titanium chloride and is stabilized by regulation of flow of reagents passing through the equipment. Titanium dioxide is produced by hydrolysis after final solid suspension extraction is performed. This is to say that the reactor is destined for primary processing of titanic iron ore into TiCl4 with subsequent TiO2 production and does not refer to the production of pure titanium. Fabrication of pyrogenic TiO2 with finely dispersed particles is described in patent specification GB 1187864 , where the reaction of gaseous TiCl4 with oxygen is used to produce a gas mixture containing TiO2, which is consequently subjected to electrical field generated by electrodes and located in the reactor chamber at temperatures from 400 to 800°C. Said electrical field prevents accretion forming on the walls of reactor. After cooling the mixture down TiO2 is separated either mechanically or with use of electrostatic dust extraction.
  • Construction of the reactor producing titanium is referred to in patent specification GB 814181 , describing continual processing of TiCl4 vapours in the presence of alkaline substances or alkaline earth metals, dissolved in a melt containing halides or other metals, the reaction vessel being designed so that its construction prevents unmelted reduction metal from coming into contact with TiO2 vapours. Titanium formed in the reaction chamber settles down at the bottom and can be released as a suspension in a salt melt or can be pulled out as a cooled block of salt containing titanium. Weak point of this equipment is low manufacturing capacity and the fact that final product is not pure titanium but just a suspension in a salt melt or a cooled block of salt containing titanium.
  • Manufacturing of titanium from its halides is described in patent specification GB 717930 , where TiCl4 reacts with natrium in an inert atmosphere at temperature from 200°C up to melting temperature of NaCl, preferably from 480-620°C. During this process a non-sticky and non-coherent bed of reaction products is formed in the reactor and titanium is subsequently reduced. Prior to reaction the products can be heated up to more than 800°C in an inert atmosphere. NaCl can be precipitated with use of heating in the presence of water or 1% solution of H2SO4 or can vaporize in the inert atmosphere at temperatures exceeding melting temperature of titanium, which is subsequently casted. Weak point of this technical solution is that reactions of natrium and TiO2 are carried out in a regime of laminar diffusion which results in low effectiveness and manufacturing productivity.
  • Subject matter of the invention
  • The weak points mentioned above are eliminated by construction of a reactor as defined in claim 1, intended for titanium production, comprising a body whose tubular jacket is cooled by a refrigerant and which is equipped with melting electrodes and comprises other systems designed to introduce gaseous medium containing titanium, to introduce liquid reduction agent and fluxing agents and to discharge by-pass products and to collect finished titanium. Subject matter of the invention consists in division of the interior of the reactor into two sections, namely reduction and melting ones, divided one from another with use of a barrier equipped with a by pass aperture, where the melting section comprises a melting chamber including main melting electrodes and a hopper for introducing fluxing agents; and where the reduction section comprises a reaction chamber into which reaction channels open being directed from mixing chambers; and comprises channels for delivering gaseous titanium-content medium being open into the reaction channels in their upper part and at the same time comprises a funnel chamber delivering the liquid reduction agent being connected with the reaction channels.
  • An embodiment of the invention is that reaction channels are introduced into the reaction chamber in an upward manner, at an angle and symmetrically one against another, and in a convenient version they decline at an angle of 30-60° with respect to horizontal plane and they have a rectangular section.
  • Subject matter of the invention is also the fact that the melting section is equipped with an outlet pipe designed for releasing vapour and a siphon outlet terminated with a melting pan designed to discharge condensed liquid portion and clinker as by-pass products of the productions.
  • In various modifications of the apparatus there can be hearth crystallizers arranged at the bottom part of the melting chamber which are equipped with drawing devices intended to catch and pull out cooled titanium ingots, or the melting section can be equipped with a discharging unit connected to the melting chamber through an outlet opening and a siphon outlet comprising auxiliary melting electrodes and opening into a discharging channel.
  • The new invention's efficiency is based on the fact that due to kinetic energy of the high-speed gasflow blown through the reaction channels and reaction chamber the regime of turbulent diffusion arises, which significantly favours practically immediate proceeding of pyrometallurgical reactions taking place at high rates and allowing material to melt quickly, thus the typical weak point of metallurgical equipment (converter, reflex furnaces) mutual interaction between final products and reagents is eliminated. The apparatus has quite a simple design and at the same time it exhibits unusually high manufacturing productivity; another advantage is that all magnesium introduced into the reduction section is almost restlessly utilized. The rate of reactions taking place at high temperatures is controlled through the transport speed regulation which means that speed of introducing reagents into reactor and speed of releasing products from the reaction zone influence the speed of reaction.
  • Enclosed drawings description
  • Actual examples of the present invention's versions are schematically displayed on the enclosed drawings, where
    • Fig. 1 features a longitudinal section of the basic version of the reactor
    • Fig. 2 features a horizontal projection of the reactor from fig.1
    • Fig. 3 features a transversal section of the reactor from picture 1 in a section plane A-A
    • Fig. 4 features a longitudinal section of the alternative modification of the reactor adjusted for releasing melted titanium
    Examples of the invention's construction
  • According to the invention the reactor comprises a shaped body 1, whose tubular jacket consists of the reduction section 2 and the melting section 3, which are divided one from another with a barrier 4 equipped with a by pass aperture 41 creating a temperature divide between the two zones, when the temperature in the reduction section 2 amounts to about 650°C and the temperature in the melting section can range from 1500 to 1750°C. The tubular jacket of the body 1 is cooled by a cooling agent; for example a mixture of nitrites and nitrates KNO3, NaNO3 and NaNO2, being introduced and drawn off through the cooling pipeline 101.
  • The reduction section 2 comprises a reaction chamber 21 into which reaction channels 22 open in an upward manner, at an angle and situated symmetrically one against another; the channels for delivering gaseous titanium-content medium 24, e.g. gaseous TiCl4, being open into the reaction channels in their upper part and at the same time the funnel 25 delivering the liquid reduction agent, e.g. magnesium or natrium, equipped with funnel mouthing 26, being connected with the reaction channels. The reaction channels 22 have longitudinal, preferably rectangular section; they decline at an angle of 30-60° with respect to horizontal plane and they are designed so that optimum operating figures are as follows:
    - velocity of gasflow in channels 50-300 m/s
    - specific consumption of refining gas melt 0.5-3 kg/m
  • The melting section 3 comprises the melting chamber 31, where the sets of main melting electrodes 5 are situated, and which is at its upper part equipped with a charging hopper 32 designed to introduce fluxing agents, for example CaF2, and also with purging nozzles 34 designed to introduce and release argon intended for establishing inert atmosphere during melting processes. At the bottom part of the melting chamber 31 hearth crystallizers 33 are arranged which are equipped with drawing devices 6 intended to catch and pull out the cooled titanium ingots. The melting section 3 is further equipped with an outlet pipeline 35 intended to discharge MgCl2 vapours and sidewardly educed siphon outlet 36 terminated with a pan 37 designed to discharge condensed liquid portion of MgCl2 and the clinker.
  • Prior to starting manufacturing process the whole reactor is purged with argon; the gas being introduced into the inner space of the reactor through the nozzles 34 until there is no atmosphere containing oxygen present within the reactor. The drawing devices 6 are pulled up into the upper position and the cold titanium ingots 7 are located into the hearth crystallizers 33 as a first charge in order to allow further continuous drawing the titanium ingots 7 out of the melting section 31 during routine operation.
  • In the line of manufacturing process gaseous TiCl4, pressurized to 0.5-15 KPa, is introduced into the reduction section 2 through the channels 24; and liquid magnesium, heated up to 550-750°C, being charged through the funnel unit 25 partially fills the reaction channels 22 that are at the same time purged with TiCl4. Thanks to its kinetic energy the flow of TiCl4 catches and carries away liquid magnesium and directly disaggregates it into a considerable quantity of small drops. The pyrometallurgical reactions of reduction take place practically immediately according to the following equation:

            2Mg + TiCl4 → Ti + 2MgCl2 + 85 kcal/mol

    and elementary titanium being produced from TiCl4 with use of liquid magnesium. The pyrometallurgical reactions are accelerated in the reaction chamber 21 where the gasflows from the reaction channels 22 containing drops of liquid magnesium, remains of gaseous TiCl4 and titanium particles encounter each other. The velocity is increased due to strong turbulence taking place within the flow of gas and melt, the latter being disaggregated into small drops with size of about 50-400 µm and foam with active highly developed heterogeneous surface. Thus essential and favourable conditions for fast course of reactions between portions of melt and refining gas are established and the reactions are finished very quickly when TiCl4 is practically immediately and fully reduced to pure titanium; the final products of the reactions being solid titanium particles and MgCl2 vapours. The solid titanium particles and MgCl2 melt are discharged from the reaction chamber 21 through the by pass aperture 41 between the dividing barrier 4 and the jacket 1 to the melting section 3. Approximately half of the MgCl2 vapour is continuously discharged from the melting chamber 31 through the outlet pipeline 35 and the rest of MgCl2 condensates and is discharged as a liquid, which means it is casted through the siphon outlet 36 with use of pan 37.
  • The manufacturing process proceeds in the melting section 3 particularly in the melting chamber 31 into which the solid material intended for melting including fluxing agents, e.g. CaF2, is charged through the hopper 32, and where the main melting electrodes 5 are located. The electrodes 5 are connected to the alternating current supply (not shown in the picture) and dived into the melt of salt MgCl2 and the clinker. With use of the main melting electrodes 5 the melt including suspended solid titanium particles is heated up to 1500-1750°C and melted titanium settles down at the bottom part of the melting chamber 31 where it melts on the ingots 7 and after cooling, and depending on the level of solid structure formation, it is discharged from the reactor by the drawing devices 6 and subsequently it is cut by laser cutting tools (not shown in the picture).
  • In normal operation mode a protective layer of molten slag 9, consisting of titanium particles, MgCl2 and titanium chlorides, is formed on the inner surface of the cooled jacket of the melting section 3 and on the cooled barrier 4. The present layer 9 ensures a long term operation of the reactor without need for special refractory lining. The layer is about 3-50cm thick, 10-20cm on average, depending on the heat flow and heat output of the reactor.
  • The described construction of the reactor is not the only possible technical solution of the invention, but as it is shown on picture 4, in case periodical or continuous liquid titanium discharge is required, it is possible to replace the hearth crystallizers 33 with a discharging section 8 connected through the outlet opening 38 in the melting section 3 and comprising a siphon discharge 81 in which the auxiliary melting electrodes 82 are located and which opens into the discharging channel 83.
  • Industrial applicability
  • The reactor comprising constructional features presented in the invention can be used in metallurgy of nonferrous metals for the purposes of titanium production.

Claims (7)

  1. A reactor primarily intended for titanium production, comprising a body (1) with a tubular jacket cooled by a cooling medium, the reactor being equipped with melting electrodes (5) and which is adjusted for introduction of gaseous medium including titanium, for introduction of liquid reducing agent and for charging of fluxing agents, and further adjusted for discharge of by-pass products and produced titanium, wherein the interior of the reactor is divided into a reduction section (2) and a melting section (3) divided by a barrier (4) with a by pass aperture (41), where the melting section (3) comprises a melting chamber (31) in which the sets of main melting electrodes (5) are located and which is in its upper part furnished with a hopper (32) designed for charging fluxing agents, and where the reduction section (2) comprises a reaction chamber (21) into which reaction channels (22) open being directed from mixing chambers (23); and comprises channels for delivering gaseous titanium-content medium (24) being open into reaction channels (22) in their upper part and at the same time comprises a funnel chamber (25) delivering a liquid reduction agent being connected with the reaction channels.
  2. The reactor as claimed in claim 1, wherein the reaction channels (22) open into the reaction chamber (21) in an upward manner and symmetrically situated one against another.
  3. The reactor as claimed in claims 1 or 2, wherein the reaction channels (22) decline at an angle of 30-60° with respect to horizontal plane.
  4. The reactor as claimed in any of claims 1, 2 and 3, wherein the reaction channels (22) have a longitudinal section.
  5. The reactor as claimed in any of claims 1, 2, 3 and 4, wherein the melting section (3) is equipped with a discharge pipeline (35) designed to discharge vapours and with a siphon outlet (36) terminated with a pan (37) designed to discharge condensed liquid portion and clinker as by-pass products of the production.
  6. The reactor as claimed in any of claims 1, 2, 3, 4 and 5 further comprising hearth crystallizers (33) arranged at the bottom part of the melting chamber (31), which are furnished with drawing devices (6) designed to catch and pull out cooled titanium ingots (7).
  7. The reactor as claimed in any of claims 1, 2, 3, 4, 5 and 6, wherein the melting section (3) comprises a discharging section (8) connected to the melting chamber (31) through an outlet opening (38) and the melting section (3) comprising a siphon discharge (81) in which auxiliary melting electrodes (82) are located and which opens into a discharging channel (83).
EP06742216A 2006-02-17 2006-05-15 Reactor intended for titanium production Not-in-force EP1989336B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CZ20060104A CZ300346B6 (en) 2006-02-17 2006-02-17 Reactor, particularly for manufacture of titanium
PCT/CZ2006/000032 WO2007093135A1 (en) 2006-02-17 2006-05-15 Reactor primarily intended for titanium production

Publications (2)

Publication Number Publication Date
EP1989336A1 EP1989336A1 (en) 2008-11-12
EP1989336B1 true EP1989336B1 (en) 2011-11-16

Family

ID=37075134

Family Applications (1)

Application Number Title Priority Date Filing Date
EP06742216A Not-in-force EP1989336B1 (en) 2006-02-17 2006-05-15 Reactor intended for titanium production

Country Status (4)

Country Link
EP (1) EP1989336B1 (en)
AT (1) ATE533868T1 (en)
CZ (1) CZ300346B6 (en)
WO (1) WO2007093135A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11150021B2 (en) 2011-04-07 2021-10-19 Ati Properties Llc Systems and methods for casting metallic materials
US9050650B2 (en) 2013-02-05 2015-06-09 Ati Properties, Inc. Tapered hearth

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB814181A (en) * 1955-12-31 1959-06-03 Mini Of Supply Improvements in or relating to the production of titanium
US2816828A (en) * 1956-06-20 1957-12-17 Nat Res Corp Method of producing refractory metals
US3549140A (en) * 1967-06-22 1970-12-22 Dal Y Ingersoll Apparatus for producing titanium and other reactive metals
JPH0747787B2 (en) * 1989-05-24 1995-05-24 株式会社エヌ・ケイ・アール Method for producing titanium powder or titanium composite powder
JP3821746B2 (en) * 2002-04-19 2006-09-13 新日本製鐵株式会社 Batch type sponge titanium manufacturing method
US6824585B2 (en) * 2002-12-03 2004-11-30 Adrian Joseph Low cost high speed titanium and its alloy production

Also Published As

Publication number Publication date
ATE533868T1 (en) 2011-12-15
CZ300346B6 (en) 2009-04-29
EP1989336A1 (en) 2008-11-12
CZ2006104A3 (en) 2007-08-29
WO2007093135A1 (en) 2007-08-23

Similar Documents

Publication Publication Date Title
Antony et al. Processes for production of high-purity metal powders
US4830665A (en) Process and unit for preparing alloyed and non-alloyed reactive metals by reduction
JP2002524656A (en) Direct smelting method
ITUA20163986A1 (en) METHOD AND EQUIPMENT FOR THE PRODUCTION OF CAST IRON, CAST IRON PRODUCED ACCORDING TO THAT METHOD
NL9002140A (en) CERAMIC MELTING METHOD AND LANCE FOR USE IN SUCH A METHOD.
UA122658C2 (en) SLAG FROM THE DIRECT MELTING INSTALLATION AND RAW MATERIAL
EP1989336B1 (en) Reactor intended for titanium production
JPH0394029A (en) Manufacture of fine aluminum particle alloy
JPH0147532B2 (en)
JP6498684B2 (en) Granulation of melted ferrochrome
US20160186291A1 (en) Continuous Ore Process and Apparatus Using Plasma
JPS621827A (en) Recovery of metal from lead alloy
NZ536770A (en) Method for fractional crystallisation of a metal
US4747872A (en) Process and apparatus for producing high purity iron
RU2146650C1 (en) Method of refining silicon and its alloys
US2825642A (en) Method of producing group iv-a metals
JP2000045008A (en) Production of reduced metal
EP2021518B1 (en) Method and device for chlorination of ore-bearing materials
US5651952A (en) Process for the production of litharge (PbO)
KR101821368B1 (en) Ladle including a turbulent generating part and chromium oxide reduction method using the ladle
JP4630031B2 (en) Methods for reducing and dissolving iron raw materials containing iron oxide
JP3969522B2 (en) Operation method of copper smelting furnace
JP7471946B2 (en) Manufacturing method of titanium ingot
WO1995010482A9 (en) PROCESS AND APPARATUS FOR THE PRODUCTION OF LITHARGE (PbO)
JP2007046116A (en) Furnace body of converter

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20080901

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

17Q First examination report despatched

Effective date: 20090114

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RTI1 Title (correction)

Free format text: REACTOR INTENDED FOR TITANIUM PRODUCTION

DAX Request for extension of the european patent (deleted)
GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602006025855

Country of ref document: DE

Effective date: 20120112

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20111116

LTIE Lt: invalidation of european patent or patent extension

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120316

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120217

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120316

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120216

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 533868

Country of ref document: AT

Kind code of ref document: T

Effective date: 20111116

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20120817

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602006025855

Country of ref document: DE

Effective date: 20120817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120531

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20120515

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120531

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20130131

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602006025855

Country of ref document: DE

Effective date: 20121201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120227

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120515

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120531

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120515

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20111116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120515

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060515