EP1871656B1 - Method and building system for manufacturing a floating structure - Google Patents
Method and building system for manufacturing a floating structure Download PDFInfo
- Publication number
- EP1871656B1 EP1871656B1 EP06725930A EP06725930A EP1871656B1 EP 1871656 B1 EP1871656 B1 EP 1871656B1 EP 06725930 A EP06725930 A EP 06725930A EP 06725930 A EP06725930 A EP 06725930A EP 1871656 B1 EP1871656 B1 EP 1871656B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- units
- cabin
- engineering
- unit
- floating structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B29/00—Accommodation for crew or passengers not otherwise provided for
- B63B29/02—Cabins or other living spaces; Construction or arrangement thereof
- B63B29/025—Modular or prefabricated cabins
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B29/00—Accommodation for crew or passengers not otherwise provided for
- B63B29/02—Cabins or other living spaces; Construction or arrangement thereof
Definitions
- the present invention relates to a method in accordance with the preamble of claim 1 of manufacturing a floating structure, for instance a watercraft, in which method a hull part for the floating structure is formed, it is provided with deck structures or similar support structures, and space units to be installed between said deck structures or similar support structures are prefabricated.
- DE1808781A1 discloses a solution, where the sanitary cabins, i.e. WC and shower units, of two adjacent cabin units are interconnected and can be transferred and installed as one pre-fumished unit.
- the cabin spaces related to these sanitary units are, instead, built on site onboard the watercraft around the sanitary cabins.
- an essential part of the manufacturing and installation of the cabins is, according to this solution, still performed onboard.
- FI20030352 An example of the former is disclosed in FI20030352 , where the upper parts of the cabin units are lifted so that they are located between the deck beams, and the lead-ins of various pipes and cables are arranged individually on each deck in a suitable manner so that the number of through-holes in the deck beams can be minimised, whereby the deck beams may be made lower without compromising on their strength properties.
- WO2004/041633A1 an example is disclosed in the above-mentioned WO2004/041633A1 . In an arrangement according thereto every second deck may completely be omitted.
- a purpose of the present invention is to provide a novel solution, by means of which the prefabrication and outfitting of cabin units may to an increasing extent be moved to better circumstances on plant, and thus to further minimise the installation work carried out on watercrafts, often in hard conditions.
- a purpose is also to enable the lowering of the deck height or the centre of gravity of watercrafts as well as to improve the utilisation of cabin units and the spaces related thereto. Further, a purpose is to improve the use of materials and to simplify and speed up the installation of cabin units onboard the watercraft.
- space units are manufactured comprising engineering units and room units so that an engineering unit interconnected with a room unit makes a cabin unit.
- the engineering unit is provided at least with WC-equipment and a passage to its respective room unit.
- the engineering units of two adjacent cabin units are prefabricated and connected to one another to form an engineering unit pair and the thus accomplished engineering unit pair is transferred to and installed in its place on a floating structure.
- Engineering unit pairs are arranged successively within the deck structure so that they abut onto a cabin corridor and define the width of the cabin units facing the cabin corridor.
- the floating structure is provided with a number of vertical support elements, such as stanchions, to be installed between the deck structures preferably prior to the installation of the engineering units.
- an engineering unit pair may be provided with various common elements, the coupling means of each individual cabin may be mounted in advance and the unit may also be equipped with elements for the immediate environment of the cabin units.
- an engineering unit pair is easier to transfer to and install in its place between the stanchions than an entire cabin unit. This, among other things, enables the changing of the mutual distances related to deck beams and their vertical support elements so that the deck height can be reduced and/or space utilisation improved.
- the room units for the engineering unit pair are prefabricated and transferred into their places preferably as one unit and connected to the engineering unit pair as well as to the deck structures or similar support structures of the floating structure.
- the room units may thus also be furnished in advance and provided for instance with a window and/or a balcony, if required.
- the cabin units are preferably arranged in rows within the deck structure so that a corridor is formed between the rows.
- the deck beams or the like included in the deck structure may preferably be supported by said vertical support elements at two different points on different sides of the corridor. Due to the accomplished additional support, the deck beam itself may be made lower, without compromising on the strength properties, than in a traditional arrangement, where the deck beam is supported only at one point.
- said vertical support elements are preferably installed so that they are located between an engineering unit and a room unit, when they are installed in place.
- the engineering units of an engineering unit pair are equipped with a recess in the wall for said vertical support element.
- the vertical support elements are most preferably mounted in advance prior to the installation of space units. In principle it is, as well, possible to install them or a part of them also afterwards, e.g. after a part of the cabin units has already been brought onto the watercraft, in which case they are welded onto the deck structure and deck beams. This might, however, result in damages to the cabin unit as well as in a higher fire safety risk.
- the installation of support elements also delays the outfitting work carried out onboard.
- the engineering units of an engineering unit pair may preferably be equipped with a common partition, which tends to reduce the weight of the structure.
- Other elements possibly shared by adjacent cabin units are e.g. an air-conditioning unit.
- the engineering units of an engineering unit pair are equipped with a passage to their respective room units and with an entrance door from the cabin corridor to a cabin unit. Then the engineering unit preferably defines the width of the entire cabin unit facing the cabin corridor.
- the successively installed engineering units preferably form the wall of the cabin corridor, whereby the engineering unit pair may be further equipped with a pre-installed furnishing wall facing the cabin corridor and a common service space opening to the cabin corridor.
- the wall of the cabin corridor is preferably equipped with a service door to the service space.
- the engineering units and the ceiling structure integrated with them are preferably made lower than the room units in the vertical direction, whereby the space above the engineering units and/or the ceiling structure of the corridor is available for instance for leading in and coupling the pipes, conduits and cables of the heating, ventilation and air conditioning systems with the cabin units individually on each deck. Accordingly, the room units may be made higher and their ceiling may be provided, in a manner known per se, with foldable beds etc.
- the present invention also relates to a building system according to claim 12 and a floating structure according to claim 23 with respective dependent claims.
- Fig. 1 Traditionally, the transfer and installation of cabin units onto a watercraft or the like is carried out in the way shown in Fig. 1 . Accordingly, prefabricated self-supporting cabin units 1' provided with a WC unit 1'a and an entrance door 1'b are brought one by one, as shown by the arrows, between the watercraft's outboard structure 2', inner support structure 3' and the vertical stanchions 5' of deck beams 4', into their places on the deck 19' of the watercraft. Conventionally, only every second deck beam 4' is supported by a stanchion 5' in order to facilitate the installation of the cabin units 1'.
- decks on the watercraft there may be, as known per se, several decks on the watercraft and they are supported by means of said parts 2', 3', 4' and 5', and in addition, deck beams in the longitudinal direction of the watercraft, which are placed transversely with respect to the deck beams 4', as shown in the figures, are used.
- deck beams in the longitudinal direction of the watercraft which are placed transversely with respect to the deck beams 4', as shown in the figures, are used.
- the rest of the watercraft's structure is not shown in detail, as it is not as such relevant to the application of the invention.
- the cabin units 1' are installed in rows on the deck 19' so that a cabin corridor 6' is formed between them and the pitch of the cabin units is determined by said deck beams 4' and on the other hand, by the stanchions 5'.
- the cabin unit 1' is adapted into the outboard structure 2' by means of a lining 7'. Every cabin unit 1' is then coupled separately with the systems of the watercraft, e.g. the heating, ventilation and air conditioning systems, which are not for the sake of clarity shown here separately.
- the aim is to provide these various couplings by utilising, if possible, the service space 10', known per se, arranged between the cabin units.
- the ceiling of the cabin units may be brought into its place at the same time or it may be mounted separately between the deck beams 4'.
- the lining of the cabin units on the corridors side is carried out on site by installing furnishing walls and ceiling boards as well as other technical equipment required by the corridor, e.g. lighting and air conditioning (not shown in detail), between the cabin units and the cabin corridor.
- the linings 7' against the watercraft's outboard structure 2', possible balcony assemblies etc. are provided.
- Fig. 2 illustrates the differences between an old and new installation method and system.
- the upper part of the figure shows the old method, whereby the module pitch parallel with deck beams is determined by the position of the stanchion 5'.
- the lower part of the figure which is according to the invention, shows that a cabin unit 1 is for prefabrication and installation divided into separate engineering units 9 and room units 8, whereby the stanchions 5 have been mounted on the deck 19 so that they may be placed between the engineering unit 9 and the room unit 8 and not in conjunction with the cabin corridor 6 between the cabin unit rows, as was the case earlier.
- the module pitch has thus changed and the deck beam 4 is supported at two points by the stanchion 5.
- the deck beam 4 may be made lower without compromising on the strength of the support, as the span is shortened as well.
- the engineering units 9 according to the invention are made lower, whereby the space above them may be used for leading the pipes 15 and cables 16 of various systems into the cabin units 1 on each deck, as is shown in more detail in FIG. 6 .
- the room unit 8 may be made higher, whereby the extra room may advantageously be used e.g. for installing so-called Deck Pullman beds 17.
- a ceiling dome provided with decorations 18 the ceiling surface of the room unit.
- the deck height may by means of the lower deck beams be reduced as well, whereby the centre of gravity of the watercraft can be lowered.
- the number of decks may be increased, whereby more cabin units can be provided on the watercraft and thus the passenger capacity increased.
- Fig. 3 shows the basic idea according to the invention of joining together and prefabricating the engineering units 9 of two adjacent cabin units to form an engineering unit pair 12, which is then transported and moved to its place between stanchions 5, as is shown by the arrow.
- both engineering units 9 of the engineering unit pair 12 comprise a WC-unit 9a, corridor door 9b, passage 9c to the room unit of the cabin unit and a recess 9d for the stanchion 5.
- the engineering units 9 have a common partition 9e.
- the engineering unit pair 12 is also provided with a service space 10, in which accessories and equipment related to the cabin units, such as pipes, cables and conduits for coupling the units to the systems of the watercraft and/or to make them a part of the relevant systems, may be installed.
- the cabin units may also have e.g. a common air conditioning unit, which is connected to the engineering unit pair 12.
- the engineering unit pair 12 may preferably be in advance provided with a furnishing wall 11 to be adapted to the cabin corridor 6. This may be preferably provided also with technical equipment for the corridor, such as the installation of fire fighting equipment, lighting, communication system etc.
- the engineering unit pairs 12 for the cabin units at least within a certain area on a particular deck of the watercraft are transferred to and installed in their places between the stanchions 5. Between the successively installed engineering unit pairs 12 remains a cabin corridor 6.
- the room units 8 for the already installed engineering unit pairs 12 are transferred to and installed in their places.
- the room units may be transferred one by one, but preferably in pairs, as shown by the arrows, since the pitch of the stanchions 5 and the selected tolerances make this possible.
- the room units 8 may also be made unequal in size, if so desired.
- the prefabrication degree of the room units may be chosen, if required, so that the room units are provided e.g. with furniture, a window, balcony etc. already prior to the transfer of the room units into their places, if so desired or required by the situation.
- the engineering units are preferably outfitted as completely as possible in advance in order to minimise the installation work carried out onboard the watercraft.
- the engineering unit is provided in advance preferably at least with sanitary facilities, a service space with equipment and technical couplings for the cabin unit.
- the engineering units can in principle also be installed so that they are not actually located between the stanchions, but the stanchions remain between the engineering unit pair and the room units in the cabin unit's centre section.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Bridges Or Land Bridges (AREA)
- Residential Or Office Buildings (AREA)
- Tents Or Canopies (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
- The present invention relates to a method in accordance with the preamble of
claim 1 of manufacturing a floating structure, for instance a watercraft, in which method a hull part for the floating structure is formed, it is provided with deck structures or similar support structures, and space units to be installed between said deck structures or similar support structures are prefabricated. - Various ways of installing cabin units into a watercraft or the like are known from prior art. Originally, the cabin units were mainly assembled on site.
DE1808781A1 discloses a solution, where the sanitary cabins, i.e. WC and shower units, of two adjacent cabin units are interconnected and can be transferred and installed as one pre-fumished unit. The cabin spaces related to these sanitary units are, instead, built on site onboard the watercraft around the sanitary cabins. Thus, an essential part of the manufacturing and installation of the cabins is, according to this solution, still performed onboard. - Later on, more or less prefabricated self-supporting cabin units have been introduced, whereby the cabin units have been transported from the manufacturing plant to the site and moved aboard the watercraft to be finished and coupled with the various systems, such as heating, ventilation and air conditioning systems, of the watercraft. Previously known solutions are for instance the installation of a so-called bottomless cabin unit disclosed in
US4528928 , and the one disclosed inUS4959933 , where the dimensions of the cabin unit can be reduced for transport and transfer to the mounting site. - The general trend is to try to avoid additional installation work on the watercraft itself in uncomfortable circumstances and to move most of the prefabrication of cabin units and cabin equipment as well as of the installation work to plant conditions. Consequently, it has been realized that also the integration of elements included in the immediate environment of cabin units may as well be carried out, as required, in conjunction with the prefabrication of cabin units. Thus, it has been possible to equip cabin units e.g. with balconies and/or elements facing the cabin corridor, as is disclosed e.g. in
W02004/041633A1 . - On one hand there is a general tendency related to watercrafts, i.e. to reduce the weight of the watercraft and/or to lower its centre of gravity, whereby the stability of the watercraft can be improved and it is possible to manage with less propulsion power. On the other hand, this gives also the opportunity to increase the number of decks and thereby the number of cabins and the passenger capacity. The reduced weight may be accomplished by shortening the distance between the decks on the watercraft and/or by decreasing their number. An example of the former is disclosed in
, where the upper parts of the cabin units are lifted so that they are located between the deck beams, and the lead-ins of various pipes and cables are arranged individually on each deck in a suitable manner so that the number of through-holes in the deck beams can be minimised, whereby the deck beams may be made lower without compromising on their strength properties. As for the latter, an example is disclosed in the above-mentionedFI20030352 WO2004/041633A1 . In an arrangement according thereto every second deck may completely be omitted. - A purpose of the present invention is to provide a novel solution, by means of which the prefabrication and outfitting of cabin units may to an increasing extent be moved to better circumstances on plant, and thus to further minimise the installation work carried out on watercrafts, often in hard conditions. A purpose is also to enable the lowering of the deck height or the centre of gravity of watercrafts as well as to improve the utilisation of cabin units and the spaces related thereto. Further, a purpose is to improve the use of materials and to simplify and speed up the installation of cabin units onboard the watercraft.
- The purposes of the invention can be achieved in the manner disclosed in
claim 1 and more precisely in the other claims. In the method according to the invention, space units are manufactured comprising engineering units and room units so that an engineering unit interconnected with a room unit makes a cabin unit. The engineering unit is provided at least with WC-equipment and a passage to its respective room unit. The engineering units of two adjacent cabin units are prefabricated and connected to one another to form an engineering unit pair and the thus accomplished engineering unit pair is transferred to and installed in its place on a floating structure. Engineering unit pairs are arranged successively within the deck structure so that they abut onto a cabin corridor and define the width of the cabin units facing the cabin corridor. In addition, the floating structure is provided with a number of vertical support elements, such as stanchions, to be installed between the deck structures preferably prior to the installation of the engineering units. - According to the invention, by joining the engineering units of adjacent cabin units together to form an engineering unit pair it is possible to move the prefabrication and installation work to a considerable extent to better conditions on manufacturing plants. The engineering unit pair may be provided with various common elements, the coupling means of each individual cabin may be mounted in advance and the unit may also be equipped with elements for the immediate environment of the cabin units. Moreover, an engineering unit pair is easier to transfer to and install in its place between the stanchions than an entire cabin unit. This, among other things, enables the changing of the mutual distances related to deck beams and their vertical support elements so that the deck height can be reduced and/or space utilisation improved.
- The room units for the engineering unit pair are prefabricated and transferred into their places preferably as one unit and connected to the engineering unit pair as well as to the deck structures or similar support structures of the floating structure. The room units may thus also be furnished in advance and provided for instance with a window and/or a balcony, if required.
- In the practical installation work preferably at least the majority of the engineering unit pairs of the cabin units of a particular deck structure are transferred to and installed first in their places on the floating structure and thereafter the respective room units are transferred to and installed in their places to provide cabin units. Further, the cabin units are preferably arranged in rows within the deck structure so that a corridor is formed between the rows. Then the deck beams or the like included in the deck structure may preferably be supported by said vertical support elements at two different points on different sides of the corridor. Due to the accomplished additional support, the deck beam itself may be made lower, without compromising on the strength properties, than in a traditional arrangement, where the deck beam is supported only at one point. By changing the heights of deck beams and by changes in the clear span it is possible to affect also the natural frequencies of the structure and thereby the various vibrations and shakings, which is an important factor from the viewpoint of travelling comfort.
- In practise, said vertical support elements are preferably installed so that they are located between an engineering unit and a room unit, when they are installed in place. For this purpose, the engineering units of an engineering unit pair are equipped with a recess in the wall for said vertical support element. This is advantageous in terms of space utilisation and does not disturb the installation of space units prefabricated according to the invention. The vertical support elements are most preferably mounted in advance prior to the installation of space units. In principle it is, as well, possible to install them or a part of them also afterwards, e.g. after a part of the cabin units has already been brought onto the watercraft, in which case they are welded onto the deck structure and deck beams. This might, however, result in damages to the cabin unit as well as in a higher fire safety risk. The installation of support elements also delays the outfitting work carried out onboard.
- The engineering units of an engineering unit pair may preferably be equipped with a common partition, which tends to reduce the weight of the structure. Other elements possibly shared by adjacent cabin units are e.g. an air-conditioning unit. In addition, the engineering units of an engineering unit pair are equipped with a passage to their respective room units and with an entrance door from the cabin corridor to a cabin unit. Then the engineering unit preferably defines the width of the entire cabin unit facing the cabin corridor. Thus at the same time, the successively installed engineering units preferably form the wall of the cabin corridor, whereby the engineering unit pair may be further equipped with a pre-installed furnishing wall facing the cabin corridor and a common service space opening to the cabin corridor. In the service space it is possible to install various kind of equipment for coupling a cabin unit and/or the cabin corridor with the different systems of the floating structure, such as the air conditioning, electrical supply, water supply, and grey and black water discharge system, and for providing vertical lead-ins for these systems, as required. Then, the wall of the cabin corridor is preferably equipped with a service door to the service space. By these measures the items in the cabin unit requiring service may be installed in advance so that they are easily accessible and the service may be performed from the service space, whereby there is no need to use the other spaces of the cabin unit separately for this purpose.
- The engineering units and the ceiling structure integrated with them are preferably made lower than the room units in the vertical direction, whereby the space above the engineering units and/or the ceiling structure of the corridor is available for instance for leading in and coupling the pipes, conduits and cables of the heating, ventilation and air conditioning systems with the cabin units individually on each deck. Accordingly, the room units may be made higher and their ceiling may be provided, in a manner known per se, with foldable beds etc.
- The present invention also relates to a building system according to
claim 12 and a floating structure according to claim 23 with respective dependent claims. - In the following the invention is described by way of example with reference to the attached drawings, in which
-
Figure 1 illustrates the traditional way to install cabin units on a watercraft or a similar floating structure; -
Figure 2 shows a side view of the differences between a traditional prior art solution and the technical solution according to the invention and the impact of these on the mutual distances between the support structures, i.e. on the module pitch; -
Figures 3 - 5 show, step by step, how the space units are installed and assembled in place on a floating structure in order to provide cabin units according to the invention; and -
Figure 6 shows the structure of the cabin area assembled and installed according to the invention seen from above. - Traditionally, the transfer and installation of cabin units onto a watercraft or the like is carried out in the way shown in
Fig. 1 . Accordingly, prefabricated self-supporting cabin units 1' provided with a WC unit 1'a and an entrance door 1'b are brought one by one, as shown by the arrows, between the watercraft's outboard structure 2', inner support structure 3' and the vertical stanchions 5' of deck beams 4', into their places on the deck 19' of the watercraft. Conventionally, only every second deck beam 4' is supported by a stanchion 5' in order to facilitate the installation of the cabin units 1'. There may be, as known per se, several decks on the watercraft and they are supported by means of said parts 2', 3', 4' and 5', and in addition, deck beams in the longitudinal direction of the watercraft, which are placed transversely with respect to the deck beams 4', as shown in the figures, are used. The rest of the watercraft's structure is not shown in detail, as it is not as such relevant to the application of the invention. - The cabin units 1' are installed in rows on the deck 19' so that a cabin corridor 6' is formed between them and the pitch of the cabin units is determined by said deck beams 4' and on the other hand, by the stanchions 5'. The cabin unit 1' is adapted into the outboard structure 2' by means of a lining 7'. Every cabin unit 1' is then coupled separately with the systems of the watercraft, e.g. the heating, ventilation and air conditioning systems, which are not for the sake of clarity shown here separately. The aim is to provide these various couplings by utilising, if possible, the service space 10', known per se, arranged between the cabin units. The ceiling of the cabin units may be brought into its place at the same time or it may be mounted separately between the deck beams 4'. Further, the lining of the cabin units on the corridors side is carried out on site by installing furnishing walls and ceiling boards as well as other technical equipment required by the corridor, e.g. lighting and air conditioning (not shown in detail), between the cabin units and the cabin corridor. In addition, the linings 7' against the watercraft's outboard structure 2', possible balcony assemblies etc. are provided.
-
Fig. 2 illustrates the differences between an old and new installation method and system. The upper part of the figure shows the old method, whereby the module pitch parallel with deck beams is determined by the position of the stanchion 5'. The lower part of the figure, which is according to the invention, shows that acabin unit 1 is for prefabrication and installation divided intoseparate engineering units 9 androom units 8, whereby thestanchions 5 have been mounted on thedeck 19 so that they may be placed between theengineering unit 9 and theroom unit 8 and not in conjunction with thecabin corridor 6 between the cabin unit rows, as was the case earlier. The module pitch has thus changed and thedeck beam 4 is supported at two points by thestanchion 5. Consequently, thedeck beam 4 may be made lower without compromising on the strength of the support, as the span is shortened as well. Moreover, theengineering units 9 according to the invention are made lower, whereby the space above them may be used for leading thepipes 15 andcables 16 of various systems into thecabin units 1 on each deck, as is shown in more detail inFIG. 6 . Accordingly, theroom unit 8 may be made higher, whereby the extra room may advantageously be used e.g. for installing so-calledDeck Pullman beds 17. In addition, for instance a ceiling dome provided withdecorations 18 the ceiling surface of the room unit. If, on the other hand, there is no need to heighten theroom units 8, the deck height may by means of the lower deck beams be reduced as well, whereby the centre of gravity of the watercraft can be lowered. Alternatively, the number of decks may be increased, whereby more cabin units can be provided on the watercraft and thus the passenger capacity increased. -
Fig. 3 shows the basic idea according to the invention of joining together and prefabricating theengineering units 9 of two adjacent cabin units to form anengineering unit pair 12, which is then transported and moved to its place betweenstanchions 5, as is shown by the arrow. As illustrated inFIG. 3 , bothengineering units 9 of theengineering unit pair 12 comprise a WC-unit 9a,corridor door 9b,passage 9c to the room unit of the cabin unit and arecess 9d for thestanchion 5. In addition, theengineering units 9 have acommon partition 9e. Theengineering unit pair 12 is also provided with aservice space 10, in which accessories and equipment related to the cabin units, such as pipes, cables and conduits for coupling the units to the systems of the watercraft and/or to make them a part of the relevant systems, may be installed. The cabin units may also have e.g. a common air conditioning unit, which is connected to theengineering unit pair 12. Further, theengineering unit pair 12 may preferably be in advance provided with afurnishing wall 11 to be adapted to thecabin corridor 6. This may be preferably provided also with technical equipment for the corridor, such as the installation of fire fighting equipment, lighting, communication system etc. - As shown in
Fig. 4 , the engineering unit pairs 12 for the cabin units at least within a certain area on a particular deck of the watercraft are transferred to and installed in their places between thestanchions 5. Between the successively installed engineering unit pairs 12 remains acabin corridor 6. Naturally, the basic idea according to the invention may as well be applicable in a case, where only one cabin unit row abuts onto thecabin corridor 6. After this, theroom units 8 for the already installed engineering unit pairs 12 are transferred to and installed in their places. The room units may be transferred one by one, but preferably in pairs, as shown by the arrows, since the pitch of thestanchions 5 and the selected tolerances make this possible. Independently of the embodiment shown in the figures, theroom units 8 may also be made unequal in size, if so desired. - Further measures to be taken in the installation area will be provided in the manner shown in
FIG. 5 so that theroom units 8 for eachengineering unit pair 12 are provided withlinings 7 against theoutboard structure 2, the joiningpoints 13 of the units' wall elements are finished, and thetechnical couplings 14 on the boundary surface between theroom unit 8 and theengineering unit 9 are provided. Subsequently, the ceiling structures of thecabin corridor 6 as well as thepipes 15,cables 16 etc. to be arranged on top of them and on top of thespace 20 above the engineering units are installed, as is described in the foregoing and shown inFIG. 6 . On the other hand, an effort can made to install this equipment in place already before the components of the cabin units are brought in, whereby the installation thereof is easier. The sidewalls of thecabin corridor 6 are provided by installingfurnishing walls 11 onto eachengineering unit pair 12, as is described earlier on. - The invention is not limited to the above-described embodiments, but several modifications are conceivable in the scope of the appended claims. The prefabrication degree of the room units, among other things, may be chosen, if required, so that the room units are provided e.g. with furniture, a window, balcony etc. already prior to the transfer of the room units into their places, if so desired or required by the situation. Similarly, the engineering units are preferably outfitted as completely as possible in advance in order to minimise the installation work carried out onboard the watercraft. Thus, the engineering unit is provided in advance preferably at least with sanitary facilities, a service space with equipment and technical couplings for the cabin unit. Further, the engineering units can in principle also be installed so that they are not actually located between the stanchions, but the stanchions remain between the engineering unit pair and the room units in the cabin unit's centre section.
Claims (21)
- A method of manufacturing a floating structure, for instance a watercraft, in which method a hull part for the floating structure is formed, it is provided with deck structures or similar support structures (19;2,3,4), and space units to be installed between said deck structures or similar support structures are prefabricated, characterised in that in the method space units are manufactured comprising engineering units (9) and room units (8) so that an engineering unit (9) interconnected with a room unit (8) forms a cabin unit (1), that the engineering unit (9) is provided at least with WC-equipment and a passage (9c) to its respective room unit (8), that the engineering units (9) of two adjacent cabin units (1) are prefabricated and connected to one another to form an engineering unit pair (12) and the thus accomplished engineering unit pair (12) is transferred to and installed in its place on the floating structure, that engineering unit pairs (12) are arranged successively within the deck structure (19) so that they abut onto a cabin corridor (6) and define the width of the cabin units (1) facing the cabin corridor (6), and that the floating structure is provided with a number of vertical support elements (5), such as stanchions, to be installed between the deck structures (19) preferably prior to the installation of the engineering units (9).
- A method according to claim 1, characterised in that the room units (8) for the engineering unit pair (12) are prefabricated and transferred into their places preferably as one unit and connected to the engineering unit pair (12) as well as to the deck structures or similar support structures (19;2,3) of the floating structure.
- A method according to claim 1 or 2, characterised in that at least the majority of the engineering unit pairs (12) of the cabin units (1) of a particular deck structure (19) are transferred to and installed first in their places on the floating structure and thereafter the respective room units (8) are transferred to and installed in their places to provide cabin units (1), and that the deck beams (4) or the like included in the deck structure (19) are supported by said vertical support elements (5) at two different points on different sides of the cabin corridor (6).
- A method according to anyone of the preceding claims, characterised in that said vertical support elements (5) are installed so that they are located between an engineering unit (9) and a room unit (8), when they are installed in place.
- A method according to anyone of the preceding claims, characterised in that the engineering units (9) of an engineering unit pair (12) are equipped with a recess (9d) in the wall for said vertical support element (5).
- A method according to anyone of the preceding claims, characterised in that the engineering units (9) of an engineering unit pair (12) are equipped with a common partition (9e).
- A method according to anyone of the preceding claims, characterised in that the engineering units (9) of an engineering unit pair (12) are equipped with an entrance door (9b) from the cabin corridor (6) to a cabin unit (1).
- A method according to anyone of claims 3 - 7, characterised in that the engineering unit pair (12) is equipped with a pre-installed furnishing wall (11) facing the cabin corridor (6).
- A method according to claim 3, characterised in that the engineering unit pair (12) is equipped with a common service space (10) opening to the cabin corridor (6), in which space it is possible to install various kind of equipment for coupling the cabin unit (1) and/or the cabin corridor (6) with the different systems of the floating structure, such as the air conditioning, electrical supply, water supply, and grey and black water discharge system, and for providing vertical lead-ins for these systems, as required.
- A method according to claim 9, characterised in that the wall of the cabin corridor (6) is equipped with a service door to the service space (10):
- A method according to anyone of the preceding claims, characterised in that the engineering units (9) and the ceiling structure integrated with them are made lower than the room units (8) in the vertical direction, whereby the space (20) above the engineering units (9) and/or the ceiling structure of the corridor is available for instance for leading in and coupling the pipes (15), conduits and cables (16) of the heating, ventilation and air conditioning systems with the cabin units (1) individually on each floor.
- A floating structure, for instance a watercraft, comprising a hull structure, which is provided with deck structures or similar support structures (19; 2, 3, 4), between which a number of prefabricated space units are installed, characterised in that cabin units (1) are formed of said space units comprising a room unit (8) and an engineering unit (9), which is provided at least with WC-equipment and a passage (9c) to its respective room unit (8), and being arranged adjacently so that the engineering units (9) of two adjacent cabin units (1) are joined together to form an engineering unit pair (12), which is provided at least with one common element and/or with one element serving both cabin units (1), that the engineering units (9) are arranged to abut onto the cabin corridor (6) and define the width of the cabin units (1) facing the cabin corridor (6), that the floating structure is provided with a number of vertical support elements (5), for instance stanchions, to be installed between the deck structures (19), and that the engineering unit pairs (12) are most preferably installed between said support elements (5).
- A floating structure according to claim 12, characterised in that the cabin units (1) are arranged in rows within the deck structure (19) so that a cabin corridor (6) is formed between the rows, and that the deck beams (4) or the like included in the deck structure (19) are supported by said vertical support elements (5) at two different points on different sides of the cabin corridor (6).
- A floating structure according to claim 12 or 13, characterised in that said vertical support elements (5) are located between an engineering unit (9) and a room unit (8).
- A floating structure according to anyone of claims 12 - 14, characterised in that the engineering units (9) of the engineering unit pair (12) are equipped with a recess (9d) in the wall for said vertical support element (5).
- A floating structure according to anyone of claims 12 - 15, characterised in that the engineering units (9) of the engineering unit pair (12) are equipped with a common partition (9e).
- A floating structure according to anyone of claims 12 - 16, characterised in that the engineering units (9) of the engineering unit pair (12) are equipped an entrance door (9b) from the cabin corridor (6) to a cabin unit (1).
- A floating structure according to anyone of claims 12 - 17, characterised in that the engineering unit pair is equipped with a pre-installed furnishing wall facing the cabin corridor.
- A floating structure according to anyone of claims 12 - 18, characterised in that the engineering unit pair (12) is equipped with a common service space (10) opening to the cabin corridor (6), in which space various kind of equipment for coupling a cabin unit (1) and/or the cabin corridor (6) with the different systems of the floating structure, such as the air conditioning, electrical supply, water supply and grey and black water discharge system, are installed.
- A floating structure according to claim 19, characterised in that the wall of the cabin corridor (6) is equipped with a service door (11a) to the service space (10).
- A floating structure according to anyone of the claims 12 - 20, characterised in that the engineering units (9) and the ceiling structure integrated with them are lower than the room units in the vertical direction, and that the space (20) above the engineering units and/or the ceiling structure of the corridor is equipped for instance with pipes (15), conduits and cables (16) of the heating, ventilation and air conditioning systems for connecting these systems with the cabin units (1) individually on each floor.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FI20055185A FI121992B (en) | 2005-04-21 | 2005-04-21 | Process and building system for the manufacture of a floating structure |
| PCT/FI2006/050155 WO2006111614A1 (en) | 2005-04-21 | 2006-04-20 | Method and building system for manufacturing a floating structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP1871656A1 EP1871656A1 (en) | 2008-01-02 |
| EP1871656B1 true EP1871656B1 (en) | 2009-06-03 |
Family
ID=34508184
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP06725930A Expired - Lifetime EP1871656B1 (en) | 2005-04-21 | 2006-04-20 | Method and building system for manufacturing a floating structure |
Country Status (9)
| Country | Link |
|---|---|
| US (1) | US20080121160A1 (en) |
| EP (1) | EP1871656B1 (en) |
| JP (1) | JP4980340B2 (en) |
| KR (1) | KR101283799B1 (en) |
| CN (1) | CN101238028B (en) |
| AT (1) | ATE432870T1 (en) |
| DE (1) | DE602006007117D1 (en) |
| FI (1) | FI121992B (en) |
| WO (1) | WO2006111614A1 (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7683745B2 (en) | 2006-07-28 | 2010-03-23 | Cooper Technologies Company | Ground fault circuit interrupter device |
| DE102013200863A1 (en) * | 2013-01-21 | 2014-07-24 | Andreas Wolz | Method for assembling a prefabricated deck |
| CN106628012A (en) * | 2016-12-29 | 2017-05-10 | 上海船舶工艺研究所 | Modularized ship cabin and manufacturing and installing method thereof |
| CN107672750A (en) * | 2017-09-19 | 2018-02-09 | 中国船舶工业集团公司第七0八研究所 | A kind of frame-type main cabin polycrystalline substance |
| CN109606551A (en) * | 2018-11-13 | 2019-04-12 | 广东绅威游艇有限公司 | A kind of modularization yacht and assemble method |
| CN110254646A (en) * | 2019-06-20 | 2019-09-20 | 中船黄埔文冲船舶有限公司 | Built-up boat hygienic device |
| IT202100018707A1 (en) * | 2021-07-15 | 2023-01-15 | Rascala S R L | METHOD FOR ASSEMBLING CABS |
| CN115107954B (en) * | 2022-07-18 | 2023-12-26 | 中船黄埔文冲船舶有限公司 | Marine floating fire-resistant deck's mounting structure |
| EP4605297A1 (en) * | 2022-10-20 | 2025-08-27 | Royal Caribbean Cruises Ltd. | Modular ship cabins |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE1808781A1 (en) * | 1968-11-14 | 1970-07-02 | Weser Ag | Device for assembling prefabricated toilet units on ship decks |
| FI62984C (en) * | 1980-10-24 | 1987-02-17 | Waertsilae Oy Ab | Cabin element system in ships. |
| JPS615825A (en) * | 1984-06-20 | 1986-01-11 | 日本鋼管株式会社 | Double shower unit for ship |
| SE456331B (en) * | 1985-04-26 | 1988-09-26 | Acci Handelsbolag | ROOM UNIT, SPECIFICALLY CABIN OR COTTAGE BY VESSEL |
| FI75127C (en) * | 1985-11-28 | 1989-08-28 | Waertsilae Oy Ab | Room unit for lake device |
| JPS62164928A (en) * | 1986-01-13 | 1987-07-21 | 三菱重工業株式会社 | Dwelling unit capable of freely dividing room |
| FI84999C (en) * | 1986-02-11 | 1992-02-25 | Masa Yards Oy | Ship Construction |
| FI78036C (en) * | 1987-05-27 | 1989-06-12 | Waertsilae Meriteollisuus | ANORDNING FOER HYTTELEMENT. |
| EP0731020A1 (en) * | 1995-03-08 | 1996-09-11 | A.T.I.S.A. Aero Termica Italiana S.p.A. | Prefabricated cubicle for sanitary facilities, in particular in the cabins of ships, or the like |
| US6016636A (en) * | 1998-06-04 | 2000-01-25 | Hopeman Brothers Marine Interiors Llc | Modular ship's cabin and method of installation |
| FI20020588A7 (en) * | 2002-03-27 | 2003-09-28 | Kvaerner Masa Yards Oy | System and method in a watercraft or other structure |
| FI20022243A0 (en) * | 2002-12-20 | 2002-12-20 | Piikkioe Works Oy | Method and arrangement for modifying a room unit to be installed on a ship |
| FI116971B (en) * | 2003-03-07 | 2006-04-28 | Aker Finnyards Oy | Procedure and cab deck arrangement for a large passenger ship |
-
2005
- 2005-04-21 FI FI20055185A patent/FI121992B/en active IP Right Grant
-
2006
- 2006-04-20 CN CN2006800128634A patent/CN101238028B/en not_active Expired - Lifetime
- 2006-04-20 AT AT06725930T patent/ATE432870T1/en not_active IP Right Cessation
- 2006-04-20 KR KR1020077026986A patent/KR101283799B1/en not_active Expired - Lifetime
- 2006-04-20 WO PCT/FI2006/050155 patent/WO2006111614A1/en not_active Ceased
- 2006-04-20 EP EP06725930A patent/EP1871656B1/en not_active Expired - Lifetime
- 2006-04-20 JP JP2008507106A patent/JP4980340B2/en not_active Expired - Lifetime
- 2006-04-20 US US11/912,012 patent/US20080121160A1/en not_active Abandoned
- 2006-04-20 DE DE602006007117T patent/DE602006007117D1/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| CN101238028B (en) | 2010-06-16 |
| FI20055185A0 (en) | 2005-04-21 |
| US20080121160A1 (en) | 2008-05-29 |
| JP4980340B2 (en) | 2012-07-18 |
| KR101283799B1 (en) | 2013-07-08 |
| JP2008536754A (en) | 2008-09-11 |
| CN101238028A (en) | 2008-08-06 |
| WO2006111614A1 (en) | 2006-10-26 |
| EP1871656A1 (en) | 2008-01-02 |
| DE602006007117D1 (en) | 2009-07-16 |
| FI121992B (en) | 2011-07-15 |
| KR20080003907A (en) | 2008-01-08 |
| FI20055185L (en) | 2006-10-22 |
| ATE432870T1 (en) | 2009-06-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA1295193C (en) | Cabin unit arrangement | |
| KR101372982B1 (en) | Marine partition module | |
| FI84999C (en) | Ship Construction | |
| NO338691B1 (en) | Space distribution, ship, building and method for making a space distribution | |
| US6260496B1 (en) | Prefabricated cabin for a ship, and a method of installing such cabins in a ship | |
| US20080121160A1 (en) | Method and Building System for Manufacture a Floating Structure | |
| KR101078097B1 (en) | Method and cabin deck arrangement in a large passenger vessel | |
| US7047897B2 (en) | System and method in water-craft | |
| CN100402372C (en) | Method and system for installing prefabricated housing units on a boat or other watercraft | |
| KR101066308B1 (en) | Floating structure including prefabricated room unit, production method thereof, prefabricated room unit and forming method thereof | |
| EP4146532B1 (en) | Pleasure craft having an improved deck construction | |
| EP4726127A1 (en) | Modular industrial construction system for the construction of slabs and lightweight roofs |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20071024 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: HR |
|
| 17Q | First examination report despatched |
Effective date: 20080508 |
|
| RAX | Requested extension states of the european patent have changed |
Extension state: HR Payment date: 20071024 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: STX FINLAND CRUISE OY |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: HR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REF | Corresponds to: |
Ref document number: 602006007117 Country of ref document: DE Date of ref document: 20090716 Kind code of ref document: P |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 |
|
| NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090903 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20091003 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090914 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090903 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20091003 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 |
|
| 26N | No opposition filed |
Effective date: 20100304 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090904 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100430 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20100420 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100420 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100430 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100430 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100420 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100420 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20091204 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090603 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 10 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: CD Owner name: MEYER TURKU OY, FI Effective date: 20160202 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 11 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 12 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 13 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 18 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20250423 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20250418 Year of fee payment: 20 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20250417 Year of fee payment: 20 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R071 Ref document number: 602006007117 Country of ref document: DE |