EP1746370B1 - Heiz- und/oder Kühleinheit - Google Patents

Heiz- und/oder Kühleinheit Download PDF

Info

Publication number
EP1746370B1
EP1746370B1 EP20060116924 EP06116924A EP1746370B1 EP 1746370 B1 EP1746370 B1 EP 1746370B1 EP 20060116924 EP20060116924 EP 20060116924 EP 06116924 A EP06116924 A EP 06116924A EP 1746370 B1 EP1746370 B1 EP 1746370B1
Authority
EP
European Patent Office
Prior art keywords
exchanger
circuit
heating
heat
cooling unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP20060116924
Other languages
English (en)
French (fr)
Other versions
EP1746370A3 (de
EP1746370A2 (de
Inventor
Severino Veggian
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Blue Box Group SRL
Original Assignee
Blue Box Group SRL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Blue Box Group SRL filed Critical Blue Box Group SRL
Publication of EP1746370A2 publication Critical patent/EP1746370A2/de
Publication of EP1746370A3 publication Critical patent/EP1746370A3/de
Application granted granted Critical
Publication of EP1746370B1 publication Critical patent/EP1746370B1/de
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B29/00Combined heating and refrigeration systems, e.g. operating alternately or simultaneously
    • F25B29/003Combined heating and refrigeration systems, e.g. operating alternately or simultaneously of the compression type system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/02Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating liquids, e.g. brine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02741Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one four-way valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B40/00Subcoolers, desuperheaters or superheaters
    • F25B40/04Desuperheaters

Definitions

  • the present invention relates to a heating cooling unit.
  • the heating cooling unit object of the present invention in general relates to the field of conditioning systems, and more specifically to the field of systems to be installed on the building roofs, commonly called roof top systems.
  • the unit is suitable for meeting all the heating and cooling requirements normally present in the various rooms of a building for industrial, commercial and/or residential use.
  • the thermal requirements of a building essentially consist in heating the rooms in the cold season, in cooling the same in the hot season and in producing hot water for sanitary use.
  • thermo-hydraulic system provided with boiler that also ensures the production of sanitary water
  • cooling is obtained separately through a conditioning system, which normally consists of a chiller.
  • heating and cooling are preferably obtained by a single heating cooling system.
  • the system is based on a steam compression refrigeration circuit and can operate with cycle reversal as heat pump in the cold season and as chiller in the hot season.
  • the heating cooling unit respectively produces hot water or cold water for heating or cooling the various rooms of the building through localised devices, such as fan coils, or through distributed devices, such as floor or wall systems.
  • the production of hot sanitary water is carried out by a specially provided boiler.
  • a heating cooling unit suitable for alternately operating as heat pump and as a chiller is described, for example, in US patent 5088296 and in US patent 4909041 .
  • the heating cooling systems currently available on the market therefore exhibit the disadvantage of being little flexible from the operating point of view and of not allowing an integrated management of the thermal requirements of a building, with consequent disadvantages from the point of view of the overall energy efficiency.
  • the object of the present invention is to overcome the disadvantages of the mentioned prior art by providing a heating cooling unit which should allow an integrated management of the thermal requirements of a building or of a group of buildings.
  • a further object of the present invention is to provide a heating cooling unit which should allow recovering part of the heat of condensation for pre-heating hot sanitary water.
  • a further object of the present invention is to provide a heating cooling unit which should allow concurrently meeting cooling and heating requirements.
  • a further object of the present invention is to provide a heating cooling unit which should be constructively easy to make and operatively totally reliable.
  • FIG. 1 shows a diagram of the heating cooling unit according to the present invention, in accordance with a first and a second plant configuration
  • FIG. 2 shows the diagram of a refrigeration circuit used in the heating cooling unit of Figure 1 made in accordance with the first plant configuration
  • FIG. 3 shows the diagram of a refrigeration circuit used in the heating cooling unit of Figure 1 made in accordance with the second plant configuration
  • FIG. 4 shows the diagram of the heating cooling unit according to the present invention made in accordance with a third plant configuration
  • FIG. 5 shows the diagram of a refrigeration circuit used in the heating cooling unit shown in Figure 4 .
  • reference numeral 1 globally denotes the heating cooling unit according to the invention.
  • the heating cooling unit 1 is suitable for meeting all the heating and cooling requirements present in the different rooms of a building for commercial and/or residential use.
  • the heating cooling unit 1 is capable of concurrently meeting both the thermal requirements of rooms with large cubic volumes by generating conditioned air flows, and the thermal requirements of rooms with low cubic volume by feeding localised thermal devices, such as fan coils, or distributed devices, such as floor or wall systems.
  • Unit 1 further allows the production of hot water for sanitary use through a recovery of the energy that is dissipated during the operation of unit 1 itself.
  • the heating cooling unit 1 is a roof top system, that is, intended to be installed on the roof of a building. To this end, unit 1 is provided with a supporting structure (not shown in the figures) with a box shape, having an aluminium frame, a steel base and multilayer thermal insulation panels, inside which there are arranged all the operating elements of the same heating cooling unit 1.
  • the operating elements of the heating cooling unit 1 are: an air treatment station 10; a refrigeration circuit 20a, 20b, or 20c for producing a heat load and a cool load; a first and a second hydraulic circuit 30 and 40 suitable for thermally connecting the air treatment station 10 and the refrigeration circuit; a hot sanitary water production circuit 50; and a heat integration circuit 60.
  • the air treatment station 10 is suitable for generating an air flow for conditioning the main rooms of the building. To this end, station 10 is provided with special connections for the ducts conveying the air flow to the various rooms. Station 10 is capable of ensuring all the treatments normally envisaged for an air flow, that is, cooling, heating, filtering, dehumidification and humidification. In particular, it is provided with heat exchange means 11 and 12 which are suitable for regulating the temperature of said air flow and are thermally connected to the refrigeration circuit through the two hydraulic circuits 30 and 40.
  • such heat exchange means comprise a main heat exchanger 11 and a secondary heat exchanger 12, which is located downstream of the main one 11 relative to the air flow moving direction.
  • Both exchangers 11 and 12 are of the finned battery type.
  • the refrigeration circuit 20a, 20b, or 20c operates according to a steam compression cycle and is susceptible of generating a heat load for meeting the heating requirements and a cool load for meeting the cooling requirements.
  • the refrigeration circuit may be sided by the heat integration circuit 60 to meet especially high heating requirements and/or to produce hot sanitary water. Typically, this can happen in the cold season when especially low external temperatures can impair the refrigeration circuit.
  • Steam compression refrigeration cycle herein means a refrigeration cycle intended for transferring heat from a cold source to a hot source continuously treating a refrigerating fluid through an evaporation stage, a compression stage, a condensation stage and finally, a lamination stage.
  • Such cycle is carried out in a closed circuit provided with an evaporator, a compressor, a condenser, and lamination means, connected to one another in series.
  • the refrigeration circuit 20a, 20b, or 20c which shall be described in more detail hereinafter, uses as refrigerating fluid (coolant), for example, R407C or R410 (or any other "ecological" refrigerating fluid) and is provided with a first and a third heat exchanger 21a, b, c and 23a, b, c (preferably of the plate type) for exchanging heat respectively with the two hydraulic circuits 30 and 40, and is provided with a second heat exchanger 22a, b, c (preferably of the finned battery type) for exchanging heat directly with the external environment.
  • refrigerating fluid for example, R407C or R410 (or any other "ecological" refrigerating fluid) and is provided with a first and a third heat exchanger 21a, b, c and 23a, b, c (preferably of the plate type) for exchanging heat respectively with the two hydraulic circuits 30 and 40, and is provided with a second heat exchanger 22a, b, c
  • the refrigeration circuit is structured for operating without cycle reversal, whereas in other configurations, the refrigeration circuit is structured for operating with cycle reversal.
  • Cycle reversal means the possibility of operating the refrigeration circuit alternately as a chiller in the hot season for carrying out a heat transfer from the building to the external environment, and as a heat pump in the cold season for carrying out, instead, a heat transfer from the external environment to the building.
  • the first and the second hydraulic circuit 30 and 40 are suitable for thermally connecting, by a thermal carrier fluid circulating therein (preferably water), the refrigeration circuit 20a, 20b, or 20c with the heat exchange means 11 and 12 of the air treatment station 10.
  • a thermal carrier fluid circulating therein preferably water
  • the refrigeration circuit 20a, 20b, or 20c with the heat exchange means 11 and 12 of the air treatment station 10.
  • These two circuits 30 and 40 allow transferring the heat load and/or the cool load generated by the refrigeration circuit to the air flow that is treated in the air treatment station 10 so as to regulate the temperature of the latter.
  • the thermal carrier fluid circulating in the two hydraulic circuits 30 and 40 can be cold or hot according to the operating conditions of unit 1.
  • the two hydraulic circuits 30 and 40 can feed the thermal carrier fluid circulating therein to external conditioning devices (fan coils, floor or wall systems) located in the secondary rooms of the building.
  • external conditioning devices fan coils, floor or wall systems located in the secondary rooms of the building.
  • at least one between the two hydraulic circuits 30 and 40 is provided with a tank 31, 41 for allowing the storage of the thermal carrier fluid, with a delivery header 32, 42 for allowing the fluid bleeding and with a return header 33, 43 for allowing the return of the fluid itself into the circuit.
  • the hot sanitary water production circuit 50 is intended for being hydraulically connected to a water distribution network of the building and is thermally connected to one of the two hydraulic circuits 30 and 40. This circuit 50 allows partly or fully absorbing the heat load generated by the refrigeration circuit 20 in all the operating situations wherein such load is not used for conditioning the rooms and would therefore be alternatively dissipated in the environment outside the building.
  • total, “complete” or “integral transfer” of the heat load means the transfer of the heat load share available for the exchange, excluding (of course) that absorbed by all the unavoidable energy dissipations.
  • the hot sanitary water production circuit 50 comprises a pre-heating exchanger 51 and a heating exchanger 52 connected to each other in series. These two exchangers 51 and 52 preferably are of the plate type for dimension and weight reasons. Circuit 50 can be further provided with a third tank 53 for the storage of the hot sanitary water produced.
  • the heat integration circuit 60 is provided with a boiler 63 and is thermally connected, through two parallel branches, respectively to one of the two hydraulic circuits 30 and 40 and to the hot sanitary water production circuit 50.
  • This circuit 60 allows integrating the heat load of the refrigeration circuit 20a, 20b, or 20c in heating respectively the sanitary water and the thermal carrier fluid circulating in the two hydraulic circuits 30 and 40.
  • boiler 63 is of the condensation type (high efficiency) and is provided with a gas burner. The features of a condensation boiler are well known to a man skilled in the art and therefore shall not be described in detail.
  • the plant structure of the heating cooling unit 1 can be suitably calibrated on the specific thermal requirements of a building by choosing among different configurations the one that most suits the specific case.
  • the heating cooling unit 1 can be structured with plant configurations capable of meeting at the same time both heating requirements and cooling requirements. In these cases, the heating cooling unit 1 is more complex to the detriment of the weight and dimensions thereof. For buildings that over the year exhibit substantially even thermal requirements in all the rooms and that do not need concurrent cooling and heating capabilities, the heating cooling unit 1 can instead be structured with less complex plant configurations, which are characterised by smaller dimensions and lower weights.
  • the heating cooling unit 1 is structured for meeting cooling requirements or heating requirements.
  • unit 1 can produce hot sanitary water by actuating a partial recovery of the heat load generated by the refrigeration circuit 20a. Such recovery can only be carried out when unit 1 is operating in cooling mode.
  • the refrigeration circuit 20a illustrated in detail in Figure 2 , is structured for operating with cycle reversal, that is, for operating in chiller mode or in heat pump mode, and to this end it is provided with a four way valve 24a for managing the coolant circulation.
  • Circuit 20a comprises one or more compressors 25a arranged in parallel, lamination means 26a, a first 21a and a second heat exchanger 22a, susceptible of alternately operating as condenser and as evaporator, and a third exchanger 23a susceptible of operating as desuperheater.
  • the first exchanger 21a and the third exchanger 23a are both of the plate type and are thermally connected respectively to the first and the second hydraulic circuit 30 and 40.
  • the second exchanger 22a is of the finned battery type and is installed in the air treatment station 10.
  • the third exchanger 23a is located downstream of compressors 25a and is suitable for transferring only a part of the heat load to the second hydraulic circuit 40, cooling the coolant without condensing it, that is, operating in desuperheating mode. For this reason, the third exchanger 23a has a size, and therefore a weight and overall dimensions, smaller than those of the first exchanger 21a.
  • the transfer of the heat load or of the cool load from the refrigeration circuit 20a to the air treatment station 10 and to the external conditioning devices is carried out by the first hydraulic circuit 30, which as already said is thermally connected to the first exchanger 21a of the refrigeration circuit 20a.
  • the transfer of the heat load from the refrigeration circuit 20a to the air flow for post-heating and/or to the hot sanitary water for the pre-heating is instead carried out by the second hydraulic circuit 40, which as already said is thermally connected to the third exchanger 23a of the refrigeration circuit 20a.
  • the first hydraulic circuit 30 thermally connects the first heat exchanger 21a of the refrigeration circuit 20a to the main exchanger 11 of the air treatment station 10 for heating or cooling the air flow according to whether the first heat exchanger 21a operates as condenser or as evaporator.
  • the first hydraulic circuit 30 can also feed the above conditioning devices external to unit 1 and to this end it is provided with a first tank 31 for the storage of the thermal carrier fluid, as well as a first delivery header 32 and a first return header 33 for the thermal carrier fluid circulation outside the heating cooling unit 1.
  • the first tank 31 is located downstream of the first heat exchanger 21a.
  • the air flow conditioning for the main rooms of the building can be carried out as an alternative to the feeding of the conditioning devices installed in the secondary rooms.
  • the first circuit 30 is provided with a first by-pass 36 for excluding the main exchanger 11 of the air treatment station 10 from the circulation.
  • the opening the first by-pass 36 is regulated by a second three way valve 37 based on the temperature values that the air flow exhibits in input to and output from the air treatment station 10. It is understood that the second three way valve 37 can be used for regulating the inflow of thermal carrier fluid to the main exchanger 11 by a flow rate modulation.
  • the second hydraulic circuit 40 thermally connects the third exchanger 23a of the refrigeration circuit 20a, which operates as desuperheater, respectively to the secondary exchanger 12 of the air treatment station 10 for post-heating the air flow and to the pre-heating exchanger 51 of the hot sanitary water production circuit 50 for pre-heating the sanitary water.
  • the post-heating of the air flow and the pre-heating of the sanitary water can only be carried out when the refrigeration circuit 20a operates in the chiller mode, that is, when the first exchanger 21a operates as evaporator.
  • the second hydraulic circuit 40 is thermally connected to the pre-heating exchanger 51 through a closed circuit 44 which develops in parallel from a specially provided header 44a.
  • the post-heating of the air flow is preferably carried out as an alternative to the heat recovery for the production of hot sanitary water.
  • the second circuit 40 is provided with a second by-pass 46 for excluding the secondary exchanger 12 of the air treatment station 10 from the circulation.
  • the opening the second by-pass 46 is regulated by a third three way valve 47 based on the temperature values that the air flow exhibits in input to and output from the air treatment station 10. It is understood that the third three way valve 47 can be used for regulating the inflow of thermal carrier fluid to the secondary exchanger 12 by a flow rate modulation.
  • the heat integration circuit 60 uses water as circulating fluid and is hydraulically connected to the first tank 31 of the first hydraulic circuit 30 by a first branch 61 and to the heating exchanger 52 of the hot sanitary water production circuit 50 by a second branch 62. The latter is connected in parallel to the first branch 61.
  • the inflow of hot water coming from boiler 63 into the first branch 61 can be carried out as an alternative to the inflow into the second branch 62 and is regulated by a first three way valve 64 which is located at the point where the first and the second branch 61 and 62 join into the main circuit 60. It is understood that the inflow of hot water into the first branch 61 can be regulated by the first three way valve 64 so that is concurrent to the inflow into the second branch 62.
  • the thermal carrier fluid circulating into the first hydraulic circuit 30 is cold and the hot water coming from boiler 63 must never flow into the first branch 61 towards the first tank 31.
  • the heat integration circuit 60 can intervene only to integrate the pre-heating of the sanitary water carried out by the second hydraulic circuit 40.
  • the first three way valve 64 is therefore regulated so that the hot water coming from boiler 63 flows only into the second branch 62, towards the heating exchanger 52 of the hot sanitary water production circuit 50.
  • the thermal carrier fluid circulating into the first hydraulic circuit 30 is hot and the hot water coming from boiler 63 can flow also into the first branch 61.
  • the heat integration circuit 60 can intervene both to integrate the pre-heating of the sanitary water and to integrate the heating of the thermal carrier fluid of the first hydraulic circuit 30.
  • the heating of the thermal carrier fluid of the first hydraulic circuit 30 has priority over the heating of the sanitary water.
  • the opening of the first three way valve 64 is controlled by a temperature sensor 31t which is installed on the first tank 31 of the first circuit 30 and is suitable for sensing the temperature of the thermal carrier fluid contained into tank 31.
  • the first three way valve 64 allows the inflow of hot water into the second branch 62 towards the heating exchanger 52 only when sensor 31t senses a temperature of the thermal carrier fluid contained in tank 31 exceeding a predetermined threshold value.
  • the latter is set so that the thermal carrier fluid may ensure the heating of the air flow into the air treatment unit 10 and a suitable thermal feeding of the external conditioning devices.
  • the second branch 62 of the heat integration circuit 60 is provided with a third by-pass 66 for excluding the heating exchanger 52 from the circulation.
  • the opening of the third by-pass 66 is regulated by a fourth three way valve 67 based on the temperature value that the hot sanitary water exhibits in output from the heating exchanger 52.
  • the fourth three way valve 67 can be used for regulating the inflow of hot water coming from the boiler to the heating exchanger 52 by a flow rate modulation.
  • the opening of the above four three way valves 37, 47, 64 and 67 is coordinated by a logical control unit according to a predetermined operating logic based on the thermal requirements of the various building rooms.
  • the refrigeration circuit 20a is structured for operating with cycle reversal and to this end, it is provided with a four way valve 24a.
  • This valve connects four circuit lines to one another: a first line 28a which represents the delivery line of compressors 25a and wherein there is inserted the third exchanger (desuperheater) 23a; a second line 28b wherein there is inserted the second exchanger 22a; a third line 28c which represents the return line to compressors 25a; a fourth line 28d wherein there is inserted the first exchanger 21a.
  • the first exchanger 21a is connected to the second exchanger 22a by a fifth line 28e consisting of a first and a second branch 28e' and 28e" parallel to one another which join back the second exchanger 22a.
  • a third branch 28e' which connects to the second exchanger 22a by a distributor 29, branches from the second branch 28e".
  • Access to the third branch 28e'" is regulated by a first and a second solenoid valve 541 and 542 respectively inserted at the inlet of the third branch 28e'" and into the second branch 28e".
  • the lamination means 26a consist of a first thermostatic valve 26a', which is inserted into the second branch 28e" and allows the coolant flow only towards the first exchanger 21a, and of a second thermostatic valve 26a", which is inserted into the third branch 28e"' and allows the coolant flow only towards distributor 29.
  • a first and a second nonreturn valve 110 and 120 respectively inserted into the first branch 28e' and in the portion of the fifth line 28e which is comprised between the second exchanger 22a and the convergence point of the two branches 28e' and 28e".
  • the first exchanger 21a operates as evaporator and transfers the cool load (evaporation heat) to the thermal carrier fluid of the first hydraulic circuit 30, whereas the second exchanger 22a operates as condenser and dissipates the heat load (heat of condensation) to the external environment.
  • the third exchanger (desuperheater) 23a is upstream of the second exchanger 22a and can recover about 20% of the heat load transferring it to the thermal carrier fluid circulating into the second hydraulic circuit 40.
  • the residual 80% of the heat load is dissipated to the environment through the second exchanger 22a.
  • the four way valve 24a is regulated so that the coolant in output from the third exchanger (desuperheater) 23a proceeds towards the second exchanger 22a along the second line 28b.
  • the coolant gets into the second branch in parallel 28e" (deviated by the first nonreturn valve 110).
  • the first solenoid valve 541 is closed, whereas the second one 542 is open.
  • the coolant flows through the first thermostatic valve 26a' to reach the first exchanger 21a. From the latter, following the fourth line 28d, the coolant reaches the four way valve 24a and then returns to compressors 25a following the third line 28c.
  • the first exchanger 21a When the refrigeration circuit 20a operates as heat pump, typically in the cold season, the first exchanger 21a operates as condenser and transfers the heat load to the thermal carrier fluid of the first hydraulic circuit 30, whereas the second exchanger 22a operates as evaporator and transfers the cool load to the external environment.
  • the third exchanger (desuperheater) 23a In this operating mode, the third exchanger 23a is upstream of the first exchanger 21a. In this case, the heat load is used for heating the rooms and therefore cannot be used for producing hot sanitary water.
  • the third exchanger 23a is thus deactivated, interrupting the circulation of the thermal carrier fluid into the second hydraulic circuit 40.
  • the four way valve 24a is regulated so that the coolant in output from the third exchanger 23a (deactivated) proceeds towards the first exchanger 21a along the fourth line 28d.
  • the coolant gets into the first branch in parallel 28e' (deviated by the first thermostatic valve 26a') and proceeds through the second branch 28e" (deviated by the second nonreturn valve 120).
  • the second solenoid valve 542 is closed, whereas the first one 541 is open.
  • the coolant flows through the third branch 28e'" flowing through the second thermostatic valve 26a" and then enters into the second exchanger 22a through distributor 29. From the second exchanger 22a, following the second line 28d, the coolant reaches the four way valve 24a and then returns to compressors 25a following the third line 28c.
  • the heating cooling unit 1 is structured for meeting only cooling requirements or only heating requirements, similarly to what envisaged in the first configuration.
  • unit 1 can fully recover the heat load generated by the refrigeration circuit and, above all, it can carry out such recovery both when it is operating in heating (heat pump operating mode) and when it is operating in cooling (chiller operating mode).
  • the second configuration differs from the first one only in the refrigeration circuit, which is globally denoted with reference numeral 20b.
  • the remaining operating elements are totally similar to those envisaged in the first configuration and are illustrated in the same Figure 1 .
  • the description of this second configuration shall therefore focus on the refrigeration circuit 20b and shall highlight only the differences existing between the two configurations from an operating point of view. Elements in common between the two configurations shall therefore be referred to with the same alphanumerical references.
  • the refrigeration circuit 20b of this second configuration is suitable for operating with cycle reversal, that is, as chiller or as heat pump, and to this end, similarly to the first configuration, it is provided with a four way valve 24a.
  • Circuit 20b comprises one or more compressors 25a arranged in parallel, lamination means 26a, a first 21b and a second heat exchanger 22b, susceptible of alternately operating as condenser and as evaporator, and a third exchanger 23b which is susceptible of operating as condenser as an alternative to the first or second exchanger 21b and 22b.
  • the first exchanger and the third exchanger 21b and 22b are both of the plate type and are thermally connected respectively to the first and the second hydraulic circuit 30 and 40.
  • the second exchanger 22b preferably is of the finned battery type and is installed in the air treatment station 10.
  • the third exchanger 23b must not carry out the desuperheating of the coolant only, but the complete condensing thereof, and therefore has a suitable size, with dimensions and weight comparable to those of the first exchanger 21b.
  • the refrigeration circuit 20b is structured differently from that of the first configuration and comprises a parallel line 200 wherein there is inserted the third exchanger 23b.
  • the third exchanger 23b can operate as an alternative to the other two exchangers 21b and 22b or it can be excluded from the circulation.
  • the refrigeration circuit 20b is substantially identical to the refrigeration circuit 20a of the first configuration and therefore, in the following description the same alphanumerical references shall be used for the elements in common.
  • the parallel line 200 branches from the first line 28a of circuit 20b in a point comprised between compressors 25a and the four way valve 24a and reconnects to the circuit at the first branch 28e' of the above fifth line 28e, downstream of the second exchanger 22b.
  • the coolant deviation towards the parallel line 200 or towards the four way valve 24a is regulated by a third and a fourth solenoid valve 310 and 320 respectively inserted at the input of the parallel line 200 and of the four way valve 24b.
  • the parallel line 200 is further provided, at the final end thereof, with a third nonreturn valve 130 which is inserted downstream of the third exchanger 23b.
  • the first exchanger 21b operates as evaporator and transfers the cool load (evaporation heat) to the thermal carrier fluid of the first hydraulic circuit 30.
  • the second and the third exchanger 22b and 23b both operate as condensers, alternating each other.
  • the heat load heat of condensation
  • the third exchanger 23b is activated, the heat load is integrally transferred to the thermal carrier fluid circulating into the second hydraulic circuit 40.
  • the third exchanger 23b can recover all the heat load for pre-heating the hot sanitary water and/or post-heating the air flow treated into the air treatment station 10.
  • the third exchanger 23b substantially has the same size as the first exchanger 21b to carry out a complete recovery of the heat load.
  • the pre-heating of the sanitary water can be carried out also concurrently to the post-heating of the air flow.
  • the coolant in output from compressors 25a finds the third solenoid valve 310 closed and the fourth one 320 open and is therefore deviated towards the four way valve 24a.
  • the latter is regulated so that the coolant proceeds towards the second exchanger 22b along the second line 28b.
  • the coolant gets into the second branch in parallel 28e".
  • the first solenoid valve 541 is closed, whereas the second one 542 is open.
  • the coolant flows through the first thermostatic valve 26a' and reaches the first exchanger 21b. From the latter, following the fourth line 28d, the coolant reaches the four way valve 24a and then returns to compressors 25a following the third line 28c.
  • the coolant in output from compressors 25a finds the first solenoid valve 310 open and the second one 320 closed and is therefore deviated into the parallel line 200.
  • the coolant flows into the first branch in parallel 28e' and then flows into the second branch in parallel 28e" (deviated by the first and the third nonreturn valve 110 and 130) to flow towards the first thermostatic valve 26a' and towards the first exchanger 21b.
  • the first exchanger 21b operates as condenser and transfers the heat load to the thermal carrier fluid of the first hydraulic circuit 30, whereas the second exchanger 22b operates as evaporator and transfers the cool load to the external environment.
  • the third exchanger 23b still operates as condenser, but as an alternative to the first exchanger 21b.
  • the heating of the thermal carrier fluid of the first hydraulic circuit 30 has priority over the heating of the sanitary water.
  • the coolant condensation can move from the first exchanger 21b to the third exchanger 23b when the temperature of the thermal carrier fluid, which is contained into the first tank 31 of the first hydraulic circuit 30, exceeds the above threshold temperature i.e when the thermal carrier fluid has such temperature as to ensure the heating of the air flow into the air treatment station 10 and a suitable thermal feeding of the external conditioning devices.
  • the coolant in output from compressors 25a finds the third solenoid valve 310 closed and the fourth one 320 open and is therefore deviated towards the four way valve 24a.
  • the latter is regulated so that the coolant proceeds towards the first exchanger 21b along the fourth line 28d.
  • the coolant gets into the first branch in parallel 28e" (deviated by the first thermostatic valve 26a') and proceeds through the second branch 28e" (deviated by the third and the second nonreturn valve 130 and 120).
  • the second solenoid valve 542 is closed, whereas the first one 541 is open.
  • the coolant flows through the third branch 28e'" flowing through the second thermostatic valve 26a" and then enters into the second exchanger 22b through distributor 29. From the second exchanger 22a, following the second line 28b, the coolant reaches the four way valve 24a and then returns to compressors 25a following the third line 28c.
  • the coolant in output from compressors 25a finds the first solenoid valve 310 open and the second one 320 closed and is therefore deviated into the parallel line 200.
  • the coolant flows into the first branch in parallel 28e', flows into the second branch in parallel 28e" (deviated by the first and the second nonreturn valve 110 and 120) and then into the third branch 28e'" to flow towards the first thermostatic valve 26a" and the second exchanger 22b.
  • the heating cooling unit 1 is capable of concurrently meeting cooling requirements and heating requirements of a building, totally recovering the heat load generated by the refrigeration circuit 20c in any operating situation.
  • the heating cooling unit 1 offers the highest operating flexibility. In fact, it can operate at the same time for cooling and for heating, or for cooling only and heating only. The production of hot sanitary water with recovery of the heat load can take place in all the three operating modes.
  • the refrigeration circuit 20c illustrated in detail in Figure 5 , unlike the other two configurations, operates without cycle reversal.
  • the refrigeration circuit 20c comprises one or more compressors 25a arranged in parallel, lamination means 26a, a first and a third heat exchanger 21c and 23c, susceptible of respectively operating only as evaporator and only as condenser, and a second exchanger 22c which is susceptible of operating as evaporator or as condenser as an alternative respectively to the first and the third exchanger 21c and 23c.
  • the third exchanger 23c has a size suitable for carrying out the coolant condensation.
  • the second exchanger 22c is of the finned battery type and is installed in the air treatment station 10.
  • the lamination means 26a comprise a first and a second thermostatic valve 26a' and 26a".
  • the first hydraulic circuit 30 is devoted only for transferring the cool load from the refrigeration circuit 20c to the air flow and/or to the external conditioning devices and therefore operates in cooling mode only. Therefore, the thermal carrier fluid circulating into the first hydraulic circuit 30 can only be cold.
  • the second hydraulic circuit 40 is devoted only for transferring the heat load from the refrigeration circuit 20c to the air flow and/or to the external conditioning devices and therefore operates in heating mode only.
  • the second hydraulic circuit 40 can also transfer the heat load to the sanitary water for pre-heating it. Therefore, in this third configuration, the thermal carrier fluid circulating into the second hydraulic circuit 40 can only be hot.
  • the first hydraulic circuit 30 thermally connects the first exchanger 21c (evaporator) of the refrigeration circuit 20c to the main exchanger 11 of the air treatment station 10 for allowing the air flow cooling.
  • the first hydraulic circuit 30 is provided with a first tank 31 for allowing the storage of the thermal carrier fluid, as well as with a first delivery header 32 and with a first return header 33 for allowing the circulation of the cold thermal carrier fluid outside the heating cooling unit 1.
  • the second hydraulic circuit 40 thermally connects the third exchanger 23c (condenser) of the refrigeration circuit 20c respectively to the secondary exchanger 12 of the air treatment station 10 for allowing the post-heating of the air flow and to the pre-heating exchanger 51 of the hot sanitary water production circuit 50 for allowing the pre-heating of the sanitary water.
  • the second circuit 40 is provided with a second tank 41 for allowing the storage of the thermal carrier fluid, as well as with a second delivery header 42 and with a second return header 43 for allowing the circulation of the hot thermal carrier fluid outside the heating cooling unit 1.
  • the second hydraulic circuit 40 can thermally connect the third exchanger 23c of the refrigeration circuit 20c to the main exchanger 11 of the air treatment station 10 for allowing the air flow heating.
  • the air flow heating must be carried out in the main exchanger 11 of the air treatment station 10, since it is provided with a larger heat exchange surface than the secondary exchanger 12.
  • the second hydraulic circuit 40 is hydraulically connected to the first hydraulic circuit 30 by means of a delivery by-pass 45a and by means of a return by-pass 45b, respectively upstream and downstream of the main exchanger 11 of the air treatment station 10.
  • Access to the delivery by-pass 45a and to the return by-pass 45b is respectively regulated by a first three way valve 451 and by a second three way valve 452.
  • the air flow conditioning for the main rooms of the building can be carried out also as an alternative to the feeding of the conditioning devices installed in the secondary rooms.
  • the first circuit 30 is provided with a first by-pass 36 for excluding the main exchanger 11 of the air treatment station 10 from the circulation.
  • the opening the first by-pass 36 is regulated by a third three way valve 37 based on the temperature values that the air flow exhibits in input to and output from the air treatment station 10.
  • the second circuit 40 is provided with a second by-pass 46 for excluding the secondary exchanger 12 of the air treatment station 10 from the circulation.
  • the opening the second by-pass 46 is regulated by a fourth three way valve 47 based on the temperature values that the air flow exhibits in input to and output from the air treatment station 10.
  • third and the fourth three way valve 37 and 47 can be used for regulating the inflow of thermal carrier fluid to the main exchanger 11 and to the secondary exchanger 12 by a flow rate modulation.
  • the heat integration circuit 60 is hydraulically connected by a first branch 61 to the second tank 41 of the second hydraulic circuit 40, and not to the first tank 31 of the first circuit 30 anymore.
  • the heat integration circuit 60 is further hydraulically connected to the heating exchanger 52 of the hot sanitary water production circuit 50 by a second branch 62, which is connected in parallel to the first one. Access to the second branch 62 is regulated by a fifth three way valve 455 located at the inlet of the second branch 62 itself.
  • the opening of the above five three way valves 451, 452, 37, 47 and 455 is coordinated by a logical control unit according to a predetermined operating logic based on the thermal requirements of the various building rooms.
  • the refrigeration circuit 20c is structured for operating without cycle reversal.
  • the refrigeration circuit 20c consists of a main loop 400, wherein there are inserted in series the first exchanger 21c (evaporator), compressors 25a, the third exchanger 23c (condenser) and the first thermostatic valve 26a', and of a secondary loop 500, which can be excluded from the circulation and wherein there are inserted the second heat exchanger 22c (condenser or evaporator) and the second thermostatic valve 26a".
  • the secondary loop 500 comprises a first branch 510, which develops in parallel to the main loop 400 downstream of the third exchanger 23c, a by-pass 520, which connects the first branch 510 directly to the compressor intake, and a second branch 530, which is connected to the second exchanger 22c by a distributor 29 and which allows excluding the first thermostatic valve 26a' and the first exchanger 21c from the circulation.
  • the second thermostatic valve 26a" is inserted in this second branch 530.
  • access to the first branch 510 is regulated by a first solenoid valve 511 inserted just after the inlet of the first branch 510 and by a second solenoid valve 512 inserted in the main loop 400.
  • the first branch 510 is provided with a nonreturn valve 513 arranged in the proximity of the point at which the first branch 510 reconnects to the main loop 400.
  • Access to by-pass 520 is regulated by a third solenoid valve 521 inserted in the by-pass itself.
  • Access to the second branch 530 is regulated by a fourth solenoid valve 531, which is inserted just after the inlet of the second branch, and by a fifth solenoid valve 541, which is inserted in the main loop upstream of the first thermostatic valve 26a'.
  • the coolant circulates only in the main loop 400.
  • the secondary loop 500 is excluded from the circulation and the second exchanger 22c is deactivated.
  • This operating mode occurs not only in the intermediates seasons, when there may be rooms in the building with opposite thermal requirements, but also in the hot season, when even if the thermal requirements of all the rooms in a building are even, in any case there may be the need of producing hot sanitary water and thus the possibility of recovering the heat load with a pre-heating, or the need of regulating the temperature of the conditioned air flow with a post-heating.
  • the third heat exchanger 23c is deactivated interrupting the circulation of the thermal carrier fluid in the second hydraulic circuit 40.
  • the heat load heat of condensation
  • the coolant in output from compressors 25a flows through the third exchanger 23c (deactivated).
  • the first solenoid valve 511 is open, whereas the second solenoid valve 512 is closed, so that the coolant flows into the first branch 510 of the secondary loop 500.
  • the coolant After dissipating the heat load to the environment through the second exchanger 22c, the coolant returns into the main loop 500 for flowing towards the first thermostatic valve 26a' and the first exchanger 21c (evaporator).
  • the third and the fourth solenoid valve 521 and 531 are closed and access to by-pass 520 and to the second branch 520 of the secondary loop 500 is therefore prevented.
  • the heating cooling unit 1 When the heating cooling unit 1 operates in heating only, for example during the cold season, the cool load cannot be used and must be yielded to the external environment. In this case, the first heat exchanger 21c is excluded from the circulation and the evaporation stage of the refrigeration cycle is carried out in the second heat exchanger 22c.
  • the coolant in output from compressors 25a yields the heat load to the thermal carrier fluid of the second hydraulic circuit 30 into the third exchanger 23c (condenser).
  • the first solenoid valve 511 is closed, whereas the second solenoid valve 512 is open.
  • the coolant continues to flow into the main loop 400 until it meets with the second branch 530 of the secondary loop 500.
  • the fourth solenoid valve 531 is open, whereas the fifth solenoid valve 541 is closed.
  • the coolant can thus flow through the second thermostatic valve 26a" and get into the second exchanger 22c (evaporator) thanks to distributor 29.
  • the coolant flows through the by-pass 520 and then returns to compressors 25a.
  • the heating cooling unit 1 cannot concurrently meet heating and cooling requirements of the building rooms. Moreover, the heat load recovery for the production of hot sanitary water is partial and limited to some special operating situations. However, unit 1 is less complex and heavy and is easier to install on a building roof. In fact, the third heat exchanger 23a has a reduced size with reduction of the overall dimensions and of the weight and the second circuit is not provided with tank and with the two headers for feeding the conditioning devices external to unit 1.
  • the heating cooling unit 1 cannot concurrently meet heating and cooling requirements of the building rooms, but the heat load recovery for the production of hot sanitary water is total and can be carried out in a greater number of operating situations.
  • unit 1 is slightly more complex and heavy, in particular due to the fact that the third heat exchanger 23b has a larger size for allowing a total recovery of the heat load and the refrigeration circuit 20b consequently is more complex.
  • the heating cooling unit 1 can meet any thermal requirements with the possibility of recovering the heat load in any operating situation.
  • unit 1 is more complex from a plant point of view, but especially heavier than the other two configurations. This can make its installation more difficult.
  • both hydraulic circuits are provided with tank and with the two headers for feeding the conditioning devices external to unit 1.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Other Air-Conditioning Systems (AREA)
  • Central Heating Systems (AREA)

Claims (13)

  1. Heiz- und Kühleinheit, die dazu bestimmt ist, den thermischen Bedarf eines Gebäudes zu decken und die eine kastenförmige Tragkonstruktion umfasst, die dazu bestimmt ist, auf die Bedachung dieses Gebäudes montiert zu werden und in deren Inneren Folgendes enthalten ist:
    - eine zentrale Luftaufbereitungsanlage (10) zum Aufbereiten eines zur Klimatisierung von einem oder mehreren Haupträumen des Gebäudes bestimmten Luftstroms, wobei die zentrale Luftaufbereitungsanlage (10) Wärmetauschmittel (11; 12) umfasst, die geeignet sind, die Temperatur dieses Luftstroms zu regulieren;
    - ein gemäß einem Dampfverdichtungszyklus arbeitender Kühlkreislauf (20a; 20b; 20c), der fähig ist, eine von einer Verflüssigungsstufe erzeugte Wärmelast und eine von einer Verdampfungsstufe erzeugte Kühllast bereitzustellen; dadurch gekennzeichnet, dass sie ferner Folgendes umfasst:
    - einen ersten (30) und einen zweiten Flüssigkeitskreislauf (40), die geeignet sind, den Kühlkreislauf (20) mit Hilfe einer in ihnen umlaufenden Wärmeträgerflüssigkeit mit den Wärmetauschmitteln (11; 12) der zentralen Luftaufbereitungsanlage (10) thermisch zu verbinden, um die Temperatur des Luftstroms mit Hilfe der Wärmelast und/oder der Kühllast zu regulieren, die von dem Kühlkreislauf (20) bereitgestellt werden, wobei mindestens einer der zwei Flüssigkeitskreisläufe (30; 40) mit einem Behälter (31; 41) zum Ermöglichen der Speicherung dieser Wärmeträgerflüssigkeit sowie mit einem Vorlaufsammler (32; 42) und einem Rücklaufsammler (33; 43) zum Ermöglichen des Umlaufs dieser Wärmeträgerflüssigkeit außerhalb der Heiz- und Kühleinheit (1) und der Versorgung der in Nebenräumen des Gebäudes aufgestellten Klimatisierungseinrichtungen versehen ist;
    - einen Kreislauf (50) für die Erzeugung von warmem Sanitärwasser, der thermisch mit einem der zwei Flüssigkeitskreisläufe (30) und (40) verbunden ist, um die Wärmelast des Kühlkreislaufs (20a; 20b; 20c) zum Teil aufzunehmen, und der dazu bestimmt ist, mit einer Flüssigkeitsverbindung an ein Wasserverteilungsnetz des Gebäudes angeschlossen zu werden; und
    einen mit einem Kessel (63) versehenen thermischen Ergänzungskreislauf (60), der parallel zu einem der zwei Flüssigkeitskreisläufe (30; 40) und zum Kreislauf (50) für die Erzeugung von warmem Sanitärwasser thermisch angeschlossen werden kann, um beim Heizen die Wärmelast des Kühlkreislaufs (20) der Wärmeträgerflüssigkeit beziehungsweise des Sanitärwassers zu ergänzen.
  2. Heiz- und Kühleinheit nach Anspruch 1, bei der die Wärmetauschmittel (11; 12) der zentralen Luftaufbereitungsanlage (10) einen Hauptwärmetauscher (11) und einen Sekundärwärmetauscher (12) umfassen, der bezogen auf die Bewegungsrichtung des Luftstroms nach dem Hauptwärmetauscher (11) angeordnet ist, und bei welcher der Kreislauf (50) für die Erzeugung von warmem Sanitärwasser einen Vorheizwärmetauscher (51) und einen Heizwärmetauscher (52) umfasst, die in Reihe miteinander verbunden sind.
  3. Heiz- und Kühleinheit nach Anspruch 2, bei der:
    - der Kühlkreislauf (20a) geeignet ist, mit Zyklusumkehr zu arbeiten, und ein 4-Wege-Ventil (24a), mindestens einen Kompressor (25a), Expansionsmittel (26a), einen ersten (21a) und einen zweiten Wärmetauscher (22a), die alternativ als Verflüssiger und als Verdampfer arbeiten können, und einen dritten Wärmetauscher (23a) umfasst, der stromabwärts von dem mindestens einen Kompressor (25a) angeordnet ist und als Enthitzer arbeiten kann;
    - der erste Flüssigkeitskreislauf (30) geeignet ist, den ersten Wärmetauscher (21a) des Kühlkreislaufs (20a) mit dem Hauptwärmetauscher (11) der zentralen Luftaufbereitungsanlage (10) zum Erwärmen oder Kühlen des Luftstroms in Abhängigkeit davon thermisch zu verbinden, ob der erste Wärmetauscher (21a) als Verflüssiger oder als Verdampfer arbeitet, wobei dieser erste Kreislauf (30) mit einem ersten Behälter (31) sowie mit einem ersten Vorlaufsammler (32) und einem ersten Rücklaufsammler (33) versehen ist;
    - der zweite Flüssigkeitskreislauf (40) den dritten Wärmetauscher (23a) des Kühlkreislaufs (20a) mit dem Sekundärwärmetauscher (12) der zentralen Luftaufbereitungsanlage (10) zum Nachwärmen des Luftstroms beziehungsweise mit dem Vorheizwärmetauscher (51) des Kreislaufs (50) für die Erzeugung von warmem Sanitärwasser zum Vorwärmen des Sanitärwassers thermisch verbinden kann; und
    - der thermische Ergänzungskreislauf (60) mit dem ersten Behälter (31) des ersten Flüssigkeitskreislaufs (30) durch eine erste Abzweigung (61) und mit dem Heizwärmetauscher (52) des Kreislaufs (50) für die Erzeugung von warmem Sanitärwasser durch eine parallel mit der ersten verbundene zweite Abzweigung (62) mit einer Flüssigkeitsverbindung verbunden ist.
  4. Heiz- und Kühleinheit nach Anspruch 3, bei welcher der dritte Wärmetauscher (23a) aktiv ist, wenn der erste Wärmetauscher (21a) als Verdampfer arbeitet und der zweite Wärmetauscher (22a) als Verflüssiger arbeitet.
  5. Heiz- und Kühleinheit nach Anspruch 2, bei der:
    - der Kühlkreislauf (20b) geeignet ist, mit Zyklusumkehr zu arbeiten, und ein 4-Wege-Ventil (24a), mindestens einen Kompressor (25a), Expansionsmittel (26a), einen ersten (21b) und einen zweiten Wärmetauscher (22b), die alternativ als Verflüssiger und als Verdampfer arbeiten können, und einen dritten Wärmetauscher (23b) umfasst, der alternativ zum ersten (21b) oder zweiten Wärmetauscher (22b) als Verflüssiger arbeiten kann;
    - der erste Flüssigkeitskreislauf (30) geeignet ist, den ersten Wärmetauscher (21b) des Kühlkreislaufs (20b) mit dem Hauptwärmetauscher (11) der zentralen Luftaufbereitungsanlage (10) zum Erwärmen oder Kühlen des Luftstroms in Abhängigkeit davon thermisch zu verbinden, ob der erste Wärmetauscher (21b) als Verflüssiger oder als Verdampfer arbeitet, wobei dieser erste Kreislauf (30) mit einem ersten Behälter (31) sowie mit einem ersten Vorlaufsammler (32) und einem ersten Rücklaufsammler (33) versehen ist;
    - der zweite Flüssigkeitskreislauf (40) den dritten Wärmetauscher (23b) des Kühlkreislaufs (20b) mit dem Sekundärwärmetauscher (12) der zentralen Luftaufbereitungsanlage (10) zum Nachwärmen des Luftstroms beziehungsweise mit dem Vorheizwärmetauscher (51) des Kreislaufs (50) für die Erzeugung von warmem Sanitärwasser zum Vorwärmen des Sanitärwassers thermisch verbinden kann; und
    - der thermische Ergänzungskreislauf (60) mit dem ersten Behälter (31) des ersten Flüssigkeitskreislaufs (30) durch eine erste Abzweigung (61) und mit dem Heizwärmetauscher (52) des Kreislaufs (50) für die Erzeugung von warmem Sanitärwasser durch eine parallel mit der ersten verbundene zweite Abzweigung (62) mit einer Flüssigkeitsverbindung verbunden ist.
  6. Heiz- und Kühleinheit nach Anspruch 3 oder 5, bei welcher der zweite Flüssigkeitskreislauf (40) mit einem Sammler (44a) versehen und mit dem Vorheizwärmetauscher (51) durch einen parallelen Kreislauf (44) thermisch verbunden ist, der von diesem Sammler (44a) abgeht.
  7. Heiz- und Kühleinheit nach Anspruch 3 oder 5, bei welcher der erste Behälter (31) des ersten Flüssigkeitskreislaufs (30) stromabwärts des ersten Wärmetauschers (21a; 21b) angeordnet ist.
  8. Heiz- und Kühleinheit nach Anspruch 3 oder 5, bei welcher der erste Behälter (31) des ersten Flüssigkeitskreislaufs (30) mit einem Temperatursensor (31t) versehen ist, der die Temperatur der im ersten Behälter (31) enthaltenen Wärmeträgerflüssigkeit beurteilen kann, und bei welcher der thermische Ergänzungskreislauf (60) Wasser als umlaufende Flüssigkeit verwendet und mit einem ersten 3-Wege-Ventil (64) versehen ist, das den Zufluss dieser vom Kessel (63) kommenden umlaufenden Flüssigkeit entweder zur ersten Abzweigung (61) oder zur zweiten Abzweigung (62) regelt, wobei das Öffnen dieses ersten 3-Wege-Ventils (64) in Abhängigkeit von dem von dem Sensor (31t) gemessenen Temperaturwert gesteuert wird.
  9. Heiz- und Kühleinheit nach Anspruch 2, bei der:
    - der Kühlkreislauf (20c) mindestens einen Kompressor (25a), Expansionsmittel (26a), einen ersten (21c) und einen dritten Wärmetauscher (23c), die als Verdampfer beziehungsweise als Verflüssiger arbeiten können, und einen zweiten Wärmetauscher (22c) umfasst, der alternativ zum ersten (21c) beziehungsweise zum dritten Wärmetauscher (23c) als Verdampfer oder als Verflüssiger arbeiten kann;
    - der erste Flüssigkeitskreislauf (30) den ersten Wärmetauscher (21c) des Kühlkreislaufs (20c) mit dem Hauptwärmetauscher (11) der zentralen Luftaufbereitungsanlage (10) thermisch verbinden kann, um den Luftstrom zu kühlen, wobei der erste Kreislauf (30) mit einem ersten Behälter (31) sowie mit einem ersten Vorlaufsammler (32) und einem ersten Rücklaufsammler (33) versehen ist;
    - der zweite Flüssigkeitskreislauf (40) mit einem zweiten Behälter (41) sowie mit einem zweiten Vorlaufsammler (42) und einem zweiten Rücklaufsammler (43) versehen ist und den dritten Wärmetauscher (23c) des Kühlkreislaufs (20c) mit dem Sekundärwärmetauscher (12) der zentralen Luftaufbereitungsanlage (10) zum Nachwärmen des Luftstroms beziehungsweise mit dem Vorheizwärmetauscher (51) des Kreislaufs (50) für die Erzeugung von warmem Sanitärwasser zum Vorwärmen des Sanitärwassers thermisch verbinden kann, wobei dieser zweite Flüssigkeitskreislauf (40) fähig ist, sich durch einen Vorlauf-Bypass (45a) und einen Rücklauf-Bypass (45b) mit einer Flüssigkeitsverbindung mit dem ersten Flüssigkeitskreislauf (30) zu verbinden, um den dritten Wärmetauscher (23c) des Kühlkreislaufs (20c) mit dem Hauptwärmetauscher (12) der zentralen Luftaufbereitungsanlage (10) thermisch zu verbinden, um den Luftstrom erwärmen zu können;
    - der thermische Ergänzungskreislauf (60) durch eine erste Abzweigung (61) mit dem zweiten Behälter (41) des zweiten Flüssigkeitskreislaufs (40) und durch eine parallel mit der ersten verbundene zweite Abzweigung (62) mit dem Heizwärmetauscher (52) des Kreislaufs (50) für die Erzeugung von warmem Sanitärwasser mit einer Flüssigkeitsverbindung verbunden ist.
  10. Heiz- und Kühleinheit nach Anspruch 9, bei welcher der zweite Flüssigkeitskreislauf (40) mit dem Vorheizwärmetauscher (51) durch einen parallelen Kreislauf (44) thermisch verbunden ist, der von dem zweiten Behälter (41) abgeht.
  11. Heiz- und Kühleinheit nach Anspruch 3, 5 oder 9, bei welcher der zweite Wärmetauscher (22a; 22b; 22c) des Kühlkreislaufs (20a; 20b; 20c) ein Wärmetauscher mit Rippenrohrbündel und in die zentrale Luftaufbereitungsanlage (10) für den Wärmetausch mit der Außenluft des Gebäudes eingebaut ist.
  12. Heiz- und Kühleinheit nach Anspruch 3, 5 oder 9, bei welcher der erste (21a; 21b; 21c) und der dritte Wärmetauscher (23a; 23b; 23c) des Kühlkreislaufs (20a; 20b; 20c) Plattenwärmetauscher sind.
  13. Heiz- und Kühleinheit nach einem der vorherigen Ansprüche, bei welcher der Kreislauf (50) für die Erzeugung von warmem Sanitärwasser mit einem dritten Behälter (53) zum Speichern dieses warmen Sanitärwassers versehen ist.
EP20060116924 2005-07-18 2006-07-10 Heiz- und/oder Kühleinheit Not-in-force EP1746370B1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ITPD20050223 ITPD20050223A1 (it) 2005-07-18 2005-07-18 Unita' termofrigorifera

Publications (3)

Publication Number Publication Date
EP1746370A2 EP1746370A2 (de) 2007-01-24
EP1746370A3 EP1746370A3 (de) 2008-07-30
EP1746370B1 true EP1746370B1 (de) 2012-08-29

Family

ID=37114320

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20060116924 Not-in-force EP1746370B1 (de) 2005-07-18 2006-07-10 Heiz- und/oder Kühleinheit

Country Status (2)

Country Link
EP (1) EP1746370B1 (de)
IT (1) ITPD20050223A1 (de)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130256423A1 (en) 2011-11-18 2013-10-03 Richard G. Lord Heating System Including A Refrigerant Boiler

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4111259A (en) * 1976-03-12 1978-09-05 Ecosol, Ltd. Energy conservation system
US4199955A (en) * 1976-10-27 1980-04-29 Sun-Econ, Inc. Heat extraction or reclamation apparatus for refrigerating and air conditioning systems
US4457358A (en) * 1981-03-31 1984-07-03 Engineering Design And Management Inc. Heating and cooling system
US4513580A (en) * 1982-10-21 1985-04-30 Cooper Donald C Combined refrigeration and heating circuits
US4909041A (en) * 1984-07-27 1990-03-20 Uhr Corporation Residential heating, cooling and energy management system
US4633676A (en) * 1984-11-19 1987-01-06 Dittell Edward W Cooling and heating apparatus
AU1399988A (en) * 1987-11-03 1989-06-01 Edward W. Dittell Heat energy storage and transfer apparatus
JPH02150672A (ja) 1988-11-30 1990-06-08 Toshiba Corp 空気調和機
DE10142779A1 (de) * 2001-08-31 2003-03-27 Viessmann Werke Kg Kompaktheizgerät

Also Published As

Publication number Publication date
EP1746370A3 (de) 2008-07-30
ITPD20050223A1 (it) 2007-01-19
EP1746370A2 (de) 2007-01-24

Similar Documents

Publication Publication Date Title
JP6644154B2 (ja) 空気調和装置
CN102239372B (zh) 用于提供蒸汽压缩循环的系统及控制蒸汽压缩循环的方法
US9885504B2 (en) Heat pump with water heating
US8844517B2 (en) Solar hot water and recovery system
KR100734904B1 (ko) 냉난방 겸용 히트펌프 시스템
US20140338389A1 (en) Vapor compression system with thermal energy storage
KR200411589Y1 (ko) 냉난방 겸용 히트펌프 시스템
AU2016253585B2 (en) Solar hot water and recovery system
ES2326275T3 (es) Dispositivo para la aportacion y/o sustraccion de calor a al menos un receptor.
US20090139255A1 (en) Device for increasing the heat output and energy storage in a heat pump
US8794015B1 (en) Air to liquid heat exchange system for ground source heat pump system
US10429101B2 (en) Modular two phase loop distributed HVACandR system
GB2109106A (en) Air conditioning system and method
US8245949B2 (en) Energy conservation system for using heat from air conditioning units to heat water supply lines
EP1746370B1 (de) Heiz- und/oder Kühleinheit
CN210832212U (zh) 使用室外空气热交换器调节气温、湿度及水温的调控系统
US11493227B2 (en) Switching flow water source heater chiller
KR100540362B1 (ko) 히트펌프를 구비한 냉난방 급탕시스템
CN213630742U (zh) 全联供热泵除湿热水机组
JP2009168256A (ja) 複合型空調システム
RU2609266C2 (ru) Система теплохладоснабжения
WO2007043952A1 (en) Heat exchanger device
KR101016717B1 (ko) 3중 효용의 히트펌프 시스템
KR101627659B1 (ko) 하이브리드 히트펌프 보일러 시스템
KR101464520B1 (ko) 실외기가 일체형으로 구성된 하이브리드형 냉난방기

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK YU

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

17P Request for examination filed

Effective date: 20090126

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BLUE BOX GROUP S.R.L.

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 573274

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120915

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602006031697

Country of ref document: DE

Effective date: 20121025

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 573274

Country of ref document: AT

Kind code of ref document: T

Effective date: 20120829

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20120829

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

Effective date: 20120829

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121231

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121210

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20121129

26N No opposition filed

Effective date: 20130530

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602006031697

Country of ref document: DE

Effective date: 20130530

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20130710

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602006031697

Country of ref document: DE

Effective date: 20140201

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20140331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130710

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140201

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130731

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130710

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20120829

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130710

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20060710

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20170721

Year of fee payment: 12

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180710