EP1682686A1 - Dual phase steel strip suitable for galvanizing - Google Patents

Dual phase steel strip suitable for galvanizing

Info

Publication number
EP1682686A1
EP1682686A1 EP04752656A EP04752656A EP1682686A1 EP 1682686 A1 EP1682686 A1 EP 1682686A1 EP 04752656 A EP04752656 A EP 04752656A EP 04752656 A EP04752656 A EP 04752656A EP 1682686 A1 EP1682686 A1 EP 1682686A1
Authority
EP
European Patent Office
Prior art keywords
strip
temperature
steel
max
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP04752656A
Other languages
German (de)
French (fr)
Other versions
EP1682686A4 (en
EP1682686B1 (en
Inventor
David P. Hoydick
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
UEC Technologies LLC
Original Assignee
UEC Technologies LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from PCT/US2003/035095 external-priority patent/WO2004048634A1/en
Application filed by UEC Technologies LLC filed Critical UEC Technologies LLC
Priority to PL04752656T priority Critical patent/PL1682686T3/en
Publication of EP1682686A1 publication Critical patent/EP1682686A1/en
Publication of EP1682686A4 publication Critical patent/EP1682686A4/en
Application granted granted Critical
Publication of EP1682686B1 publication Critical patent/EP1682686B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • C21D1/185Hardening; Quenching with or without subsequent tempering from an intercritical temperature
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/52Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for wires; for strips ; for rods of unlimited length
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/02Pretreatment of the material to be coated, e.g. for coating on selected surface areas
    • C23C2/022Pretreatment of the material to be coated, e.g. for coating on selected surface areas by heating
    • C23C2/0224Two or more thermal pretreatments
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/04Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
    • C23C2/06Zinc or cadmium or alloys based thereon
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/26After-treatment
    • C23C2/28Thermal after-treatment, e.g. treatment in oil bath
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/26After-treatment
    • C23C2/28Thermal after-treatment, e.g. treatment in oil bath
    • C23C2/29Cooling or quenching
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D2211/00Microstructure comprising significant phases
    • C21D2211/005Ferrite
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D2211/00Microstructure comprising significant phases
    • C21D2211/008Martensite
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/02Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips
    • C21D8/0278Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of plates or strips involving a particular surface treatment

Definitions

  • Dual phase galvanized steel strip is made utilizing a thermal profile involving a two-tiered isothermal soaking and holding sequence.
  • the strip is at a temperature close to that of the molten metal when it enters the coating bath.
  • a cold rolled steel sheet is used as the base for hot dip galvanizing, the steel sheet having a particular composition which is said to be beneficial for the formation, under the conditions of the process, of a microstructure composed mainly of ferrite and martensite.
  • the Omiya et al patent describes a galvanized dual phase product.
  • a dual phase galvanized steel sheet is made by soaking the cold rolled steel sheet at a temperature of 780°C (1436°F) or above, typically for 10 to 40 seconds, and then cooling it at a rate of at least 5°C per second, more commonly 20-40°C per second, before entering the galvanizing bath, which is at a temperature of 460°C (860°F).
  • the steel, according to the Omiya et al patent, should have a composition as follows, in weight percent:
  • the plated sheet may be heated prior to cooling, in an alloying procedure (often called galvannealing) after metal coating but prior to the final cooling.
  • galvannealing an alloying procedure
  • the soak temperature of (Ac ⁇ +45°F) to 1425°F, usually 1340-1420°F must be coupled with a subsequent substantially isothermal heat treatment, termed the holding step, in the range of 850-920°F (454-493°C).
  • the holding step the sheet is maintained at 850-920°F (454-493°C), sometimes herein expressed as 885°F ⁇ 35°F, for a period of 20 to 100 seconds, before cooling to room (ambient) temperature.
  • Cooling to ambient temperature should be conducted at a rate of at least 5°C per second. It is important to note, once again, that the Omiya et al patent says nothing about a holding step at any temperature or for any time in their thermal process. Furthermore, my work has shown that if a steel as defined in the Omiya et al patent is soaked within Omiya's defined, higher, soaking range (for example 1475°F) and further processed through a thermal cycle including a holding step as described herein (850-920F), the resultant steel will not achieve the desired predominantly ferrite-martensite microstructure but will contain a significant amount of bainite and or pearlite. I express the lower temperature limit of the soak step as "Ac 1 +45°F, but at least 1340°F (727°C)", because virtually all steels of Composition A will have an Aci of at least l295°F.
  • the steel sheet should have a composition similar to that of the Omiya et al patent: Carbon: 0.02-0.20 Aluminum: 0.010-0.150 Titanium: 0.01 max Silicon: 0.04 max Phosphorous: 0.060 max Sulfur: 0.Q30 max Manganese: 1.5-2.40 Chromium: 0.03-1.50 Molybdenum:0.03-1.50 with the provisos that the amounts of manganese, chromium and molybdenum should have the relationship: Mn + 6Cr + 10 Mo: at least 3.5%
  • the silicon content may be as much as 0.5%, and, preferably, carbon content is 0.03-0.12% although the Omiya et al carbon range may also be used.
  • This composition, as modified, may be referred to hereafter as Composition A.
  • my invention is a method of making a dual phase steel sheet comprising soaking a steel sheet at a temperature of in the range from Ac ⁇ +45°F, but at least 1340°F (727°C), to A C ⁇ +135°F, but no more than 1425°F (775°C), for a period of 20 to 90 seconds, cooling the sheet at a rate no lower than l°C/second to a temperature of 454-493 °C, and holding the sheet at temperatures in the range of 850-920°F (454-493°C) for a period of 20 to 100 seconds.
  • the holding step may be prior to the hot dip or may begin with the hot dip, as the galvanizing pot will be at a temperature also in the range 454-493°C (850-920°F).
  • the sheet can be cooled to ambient temperature at a rate of at least 5°C/second.
  • the sheet may be galvannealed in the conventional manner - that is, the sheet is heated for about 5-20 seconds to a temperature usually no higher than about 960°F and then cooled at a rate of at least 5°C/second.
  • My galvannealed and galvanized thermal cycles are shown for comparison in Figure 6.
  • the actual hot dip step is conducted more or less conventionally - that is, the steel is contacted with the molten galvanizing metal for about 5 seconds; while a shorter time may suffice in some cases, a considerably longer time may be used but may not be expected to result in an improved result.
  • the steel strip is generally about 0.7 mm thick to about 2.5 mm thick, and the coating will typically be about lO ⁇ m.
  • the coated steel may be either cooled to ambient temperature as described elsewhere herein or conventionally galvannealed, as described above. When the above protocol is followed, a product having a microstructure comprising mainly ferrite and martensite will be obtained.
  • my invention comprises feeding a cold rolled coil of steel strip of Composition A to a heating zone in the galvanizing line, passing the strip through a heating zone continuously to heat the strip to within the range of A +45°F, but at least 1340°F (727°C), to A C ⁇ +135°F, but no more than 1425°F (775°C), passing the strip through a soaking zone to maintain the strip within the range of A ⁇ +45°F, but at least 1340°F (727°C), to A +135°F, but no more than 1425°F (775°C), for a period of 20 to 90 seconds, passing the strip through a cooling zone to cool the strip at a rate greater than l°C/second, discontinuing cooling the strip when the temperature of the strip has been reduced to a temperature in the range 885°F ⁇ 35°F, but also ⁇ 30 degrees F of the temperature of the galvanizing
  • the galvanizing bath is typically at about 870°F (850-920°F), and may be located at the beginning of the holding zone, or near the end of the hold zone, or anywhere else in the holding zone, or immediately after it. Residence time in the bath is normally 3-6 seconds, but may vary somewhat, particularly on the high side, perhaps up to 10 seconds. As indicated above, after the steel is dipped into and removed from the zinc bath, the sheet can be heated in the conventional way prior to cooling to room temperature to form a galvanneal coating, if desired.
  • Samples of steel sheet were processed, with various "soak" temperatures according to the general thermal cycle depicted in Figure 1 - one set of samples followed the illustrated curve with a 35 second "hold” at 880°F and the other set of samples were held at 880°F for 70 seconds.
  • the samples were cold rolled steel of composition A as described above - in particular, the carbon was 0.67, Mn was 1.81, Cr was 0.18 and Mo was 0.19, all in weight percent.
  • the other elemental ingredients were typical of low carbon, Al killed steel. Soak temperatures were varied in increments of 20°F within the range of 1330 to 1510°F. After cooling, the mechanical properties and microstructures of the modified samples were determined.
  • UTS Ultimate tensile strength
  • a goal of Example 1 was to achieve a predominantly ferrite-martensite microstructure.
  • the yield ratio i.e. the ratio of yield strength to ultimate tensile strength, is an indication whether or not a dual phase ferrite-martensite microstructure is present.
  • a ferrite-martensite microstructure is indicated when the yield ratio is 0.5 or less. If the yield ratio is greater than about 0.5, a significant volume fraction of other deleterious constituents such as bainite, pearlite, and/or Fe C may be expected in the microstructure.
  • Figure 3 shows the yield ratio as a function of soak temperature for both the 35 and 70 second holding zones for the samples.
  • the necessary annealing range for ferrite-martensite microstructures is from about 1350 to 1430°F.
  • Table 1 summarizes the relationships between the thermal process, yield ratio and microstructural constituents for this example at the different soak temperature regimes.
  • Example 2 A different cold rolled sheet steel of Composition A was subjected to the same set of thermal cycles a described in Example 1 and shown in Figure 1. This steel also lay within the stated composition range, in this case specifically containing the following, in weight percent: 0.12%C, 1.96%Mn, 0.24%Cr, and 0.18%Mo, and the balance of the composition typical for a low carbon Al-killed steel. Once again, the mechanical properties of the material were measured. The effect of soak temperature on yield ratio for this steel for the 70 second holding sequence at 880°F is shown in Figure 4. This curve exhibits a shape similar to the curves in Figure 3, with metallographic analyses revealing identical metallogical phenomena occurring at the different soak temperature regimes as in the previous example. Also as demonstrated in the previous example, the annealing soak temperature range necessary for a predominantly ferrite-martensite microstructure to be obtained is from about 1350 to 1425°F when a hold step is conducted at about 880°F.
  • a third cold-rolled steel of Composition A was processed according to the set of thermal cycles shown in Figure 1.
  • This steel contained, in weight percent, 0.076C, 1.89 Mn, O.lOCr, 0.094 Mo, and 0.34 Si, the balance of which is typical for a low carbon steel.
  • Figure 5 shows the yield ratio of this material as a function of soak temperature for the holding time of 70 seconds.
  • the soak temperature range necessary for dual phase production depends on the specific steel composition - that is, it should lie within the range from Ac ⁇ +45°F, but at least 1340°F (727°C), to A C ⁇ +135°F, but no more than 1425°F (775°C) when a holding step in the vicinity of 880° (885°F ⁇ 35°F) is present in the thermal cycle.
  • Table 2
  • Table 3 shows the resultant mechanical properties of two additional steels having carbon contents lower than shown previously. They were processed as described in Figure 1 utilizing the individual soak temperatures of 1365, 1400, and 1475°F, respectively and a hold time of 70 seconds at 880°F. Also shown within the table are the expected necessary soak temperature ranges for dual phase steel production for each steel as calculated from A d as described in Example 3. Note that for the 1365 and 1400°F soak temperatures, which reside within the desired soak temperature range for both respective steels, low yield ratios characteristic of ferrite-martensite microstructures are observed. Furthermore, for the steels soaked at 1475°F, which is outside the range present invention, the yield ratio is significantly higher due to the presence of bainite in the microstructure. Table 3
  • Table 3a displays data collected in a manner similar to that of Table 3 :
  • my invention includes the use of a soak temperature in the range of Ac ⁇ +45°F to Ac ⁇ +135°F for the defined compositions, without caps.
  • steels 1 through 4 were soaked within the soaking range of the invention and exhibited the expected yield ratio of less than 0.5.
  • Metallographic examination revealed the presence of ferrite martensite microstructures for steels 1 through 4 with martensite contents of about 15%.
  • Steel 5 was processed outside of the preferred soaking range and exhibited a relatively high yield ratio of about 0.61.
  • Metallographic analysis showed a bainite content of 11% in this material. Similar results have been shown for galvanize as well as galvanneal processing.
  • the hold temperature may be within the range of 850-940°F (that is, 895°F ⁇ 45°F), and need not be limited to 850-920°F as previously stated.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Heat Treatment Of Sheet Steel (AREA)
  • Coating With Molten Metal (AREA)

Abstract

Dual phase steel sheet is made using a time/temperature cycle including a soak at about AC1+45°F to AC1+135°F and a hold at 850-940F, where the steel has the composition in weight percent, carbon: 0.02-0.20; aluminum: 0.010-0.150; titanium: 0.01 max; silicon: 0.5 max; phosphorous: 0.060 max; sulfur: 0.030 max; manganese: 0.8-2.40; chromium: 0.03-1.50; molybdenum: 0. 03 -1.50; with the provisos that the amounts of manganese, chromium and molybdenum have the relationship: (Mn + 6Cr + 10 Mo) = at least 3.5%. The sheet is preferably in the form of a strip suitable for coating in a continuous galvanizing or galvannealing line, and the product is predominantly ferrite and martensite. The strip may be galvanized or galvannealed at a temperature within thirty degrees F of the temperature of the bath.

Description

Dual Phase Steel Strip Suitable for Galvanizing
Technical Field
Dual phase galvanized steel strip is made utilizing a thermal profile involving a two-tiered isothermal soaking and holding sequence. The strip is at a temperature close to that of the molten metal when it enters the coating bath.
Background of the Invention
Prior to the present invention, the galvanizing procedure whereby steel strip is both heat treated and metal coated has become well known and highly developed. Generally a cold rolled steel sheet is heated into the intercritical regime (between ACΪ and Ac3) to form some austenite and then cooled in a manner that some of the austenite is transformed into martensite, resulting in a microstructure of ferrite and martensite. Alloying elements such as Mn, Si, Cr and Mo are in the steel to aid in martensite formation. Various particular procedures have been followed to accomplish this, one of which is described in Omiya et al US Patent 6,312,536. In the Omiya et al patent, a cold rolled steel sheet is used as the base for hot dip galvanizing, the steel sheet having a particular composition which is said to be beneficial for the formation, under the conditions of the process, of a microstructure composed mainly of ferrite and martensite. The Omiya et al patent describes a galvanized dual phase product.
According to the Omiya et al patent, a dual phase galvanized steel sheet is made by soaking the cold rolled steel sheet at a temperature of 780°C (1436°F) or above, typically for 10 to 40 seconds, and then cooling it at a rate of at least 5°C per second, more commonly 20-40°C per second, before entering the galvanizing bath, which is at a temperature of 460°C (860°F). The steel, according to the Omiya et al patent, should have a composition as follows, in weight percent:
Carbon: 0.02-0.20 Aluminum: 0.010-0.150 Titanium: 0.01 max Silicon: 0.04 max Phosphorous: 0.060 max Sulfur: 0.030 max Manganese: 1.5-2.40 Chromium: 0.03-1.50 Molybdenum:0.03-1.50 with the provisos that the amounts of manganese, chromium and molybdenum should have the relationship: 3Mn + 6Cr + Mo: 8.1% max, and Mn + 6Cr + 10 Mo: at least 3.5%
The Omiya et al patent is very clear that an initial heat-treating (soaking) step is conducted at a temperature of at least 780°C (1436°F). See column 5, lines 64- 67; col 6, lines 2-4: "In order to obtain the desired microstructure and achieve stable formability, it is necessary to heat the steel sheet at 780°C or above, which is higher than the Aci point by about 50°C. ... Heating should be continued for more than 10 seconds so as to obtain the desired microstructure of ferrite + austenite." The process description then goes on to say the steel sheet is cooled to the plating bath temperature (usually 440-470°C, or 824-878°F) at an average cooling rate greater than l°C/second, and run through the plating bath. After plating, cooling at a rate of at least 5°C/second will achieve the desired microstructure of predominantly ferrite and martensite. Optionally, the plated sheet may be heated prior to cooling, in an alloying procedure (often called galvannealing) after metal coating but prior to the final cooling. Omiya et al clearly do not appreciate that it is possible to achieve a dual phase product without the high temperatures of their soaking step, or that a particular holding step following a lower temperature soak can facilitate the desired microstructure formation.
Summary of the Invention
I have found, contrary to the above quoted recitation in the Omiya et al patent, that not only is it not necessary to maintain the initial heat treatment temperature at 780°C (1436°F) or higher, but that the desired dual phase microstructure can be achieved by maintaining the temperature during an initial heat treatment (soaking) in the range from ACι+45°F, but at least 1340°F (727°C), to ACι+135°F, but no more than 1425°F (775°C). One does not need to maintain the temperature at 780°C or higher, contrary to the Omiya et al patent, provided the rest of my procedure is followed. For convenience hereafter, my initial heat treatment will be referred to as the "soak." However, my process does not rely only on a lower temperature for the soak as compared to Omiya et al; rather, the soak temperature of (Acι+45°F) to 1425°F, usually 1340-1420°F, must be coupled with a subsequent substantially isothermal heat treatment, termed the holding step, in the range of 850-920°F (454-493°C). In the holding step, the sheet is maintained at 850-920°F (454-493°C), sometimes herein expressed as 885°F±35°F, for a period of 20 to 100 seconds, before cooling to room (ambient) temperature. Cooling to ambient temperature should be conducted at a rate of at least 5°C per second. It is important to note, once again, that the Omiya et al patent says nothing about a holding step at any temperature or for any time in their thermal process. Furthermore, my work has shown that if a steel as defined in the Omiya et al patent is soaked within Omiya's defined, higher, soaking range (for example 1475°F) and further processed through a thermal cycle including a holding step as described herein (850-920F), the resultant steel will not achieve the desired predominantly ferrite-martensite microstructure but will contain a significant amount of bainite and or pearlite. I express the lower temperature limit of the soak step as "Ac1+45°F, but at least 1340°F (727°C)", because virtually all steels of Composition A will have an Aci of at least l295°F.
The steel sheet should have a composition similar to that of the Omiya et al patent: Carbon: 0.02-0.20 Aluminum: 0.010-0.150 Titanium: 0.01 max Silicon: 0.04 max Phosphorous: 0.060 max Sulfur: 0.Q30 max Manganese: 1.5-2.40 Chromium: 0.03-1.50 Molybdenum:0.03-1.50 with the provisos that the amounts of manganese, chromium and molybdenum should have the relationship: Mn + 6Cr + 10 Mo: at least 3.5% For my purposes, the silicon content may be as much as 0.5%, and, preferably, carbon content is 0.03-0.12% although the Omiya et al carbon range may also be used. This composition, as modified, may be referred to hereafter as Composition A.
Thus my invention is a method of making a dual phase steel sheet comprising soaking a steel sheet at a temperature of in the range from Acι+45°F, but at least 1340°F (727°C), to ACι+135°F, but no more than 1425°F (775°C), for a period of 20 to 90 seconds, cooling the sheet at a rate no lower than l°C/second to a temperature of 454-493 °C, and holding the sheet at temperatures in the range of 850-920°F (454-493°C) for a period of 20 to 100 seconds. The holding step may be prior to the hot dip or may begin with the hot dip, as the galvanizing pot will be at a temperature also in the range 454-493°C (850-920°F). Immediately after the holding step, whether or not the sheet is galvanized, the sheet can be cooled to ambient temperature at a rate of at least 5°C/second. Alternatively, after the sheet is coated, the sheet may be galvannealed in the conventional manner - that is, the sheet is heated for about 5-20 seconds to a temperature usually no higher than about 960°F and then cooled at a rate of at least 5°C/second. My galvannealed and galvanized thermal cycles are shown for comparison in Figure 6.
The actual hot dip step is conducted more or less conventionally - that is, the steel is contacted with the molten galvanizing metal for about 5 seconds; while a shorter time may suffice in some cases, a considerably longer time may be used but may not be expected to result in an improved result. The steel strip is generally about 0.7 mm thick to about 2.5 mm thick, and the coating will typically be about lOμm. After the holding and coating step, the coated steel may be either cooled to ambient temperature as described elsewhere herein or conventionally galvannealed, as described above. When the above protocol is followed, a product having a microstructure comprising mainly ferrite and martensite will be obtained.
Commercially, it is common to perform hot dip galvainizing substantially continuously by using coils of steel strip, typically from 1000 to 6000 feet long. My invention permits more convenient control over the process not only because the soak step takes place at a lower temperature, but also because the strip may be more readily kept at the same temperature as the hot dip vessel entering and leaving it, with little concern about significant heat transfer occurring between steel strip and zinc pot that could heat up the molten zinc and limit production.
As applied specifically to a continuous steel strip galvanizing line, which includes a strip feeding facility and a galvanizing bath, my invention comprises feeding a cold rolled coil of steel strip of Composition A to a heating zone in the galvanizing line, passing the strip through a heating zone continuously to heat the strip to within the range of A +45°F, but at least 1340°F (727°C), to ACι+135°F, but no more than 1425°F (775°C), passing the strip through a soaking zone to maintain the strip within the range of A ι+45°F, but at least 1340°F (727°C), to A +135°F, but no more than 1425°F (775°C), for a period of 20 to 90 seconds, passing the strip through a cooling zone to cool the strip at a rate greater than l°C/second, discontinuing cooling the strip when the temperature of the strip has been reduced to a temperature in the range 885°F±35°F, but also ± 30 degrees F of the temperature of the galvanizing bath, (preferably within 20 degrees F ± the temperature of the bath, and more preferably within 10 degrees F ± the temperature of the bath), holding the strip within 30 degrees F of the temperature of the galvanizing bath (again preferably within 20 degrees F ± the temperature of the bath, and more preferably within 10 degrees F ± the temperature of the bath) for a period of 20 to 100 seconds, passing the strip through the galvanizing bath, optionally galvannealing the coated strip, and cooling the strip to ambient temperature. The galvanizing bath is typically at about 870°F (850-920°F), and may be located at the beginning of the holding zone, or near the end of the hold zone, or anywhere else in the holding zone, or immediately after it. Residence time in the bath is normally 3-6 seconds, but may vary somewhat, particularly on the high side, perhaps up to 10 seconds. As indicated above, after the steel is dipped into and removed from the zinc bath, the sheet can be heated in the conventional way prior to cooling to room temperature to form a galvanneal coating, if desired.
Example 1
Samples of steel sheet were processed, with various "soak" temperatures according to the general thermal cycle depicted in Figure 1 - one set of samples followed the illustrated curve with a 35 second "hold" at 880°F and the other set of samples were held at 880°F for 70 seconds. The samples were cold rolled steel of composition A as described above - in particular, the carbon was 0.67, Mn was 1.81, Cr was 0.18 and Mo was 0.19, all in weight percent. The other elemental ingredients were typical of low carbon, Al killed steel. Soak temperatures were varied in increments of 20°F within the range of 1330 to 1510°F. After cooling, the mechanical properties and microstructures of the modified samples were determined. Ultimate tensile strength ("UTS") of the resulting products as a function of soak temperature and hold time is shown in Figure 2. For this particular material, a minimum UTS of 600 MPa was the target and was achieved over a range of soak temperatures from about 1350°F to 1450°F for both hold times.
A goal of Example 1 was to achieve a predominantly ferrite-martensite microstructure. The yield ratio, i.e. the ratio of yield strength to ultimate tensile strength, is an indication whether or not a dual phase ferrite-martensite microstructure is present. When processed as in Example 1, a ferrite-martensite microstructure is indicated when the yield ratio is 0.5 or less. If the yield ratio is greater than about 0.5, a significant volume fraction of other deleterious constituents such as bainite, pearlite, and/or Fe C may be expected in the microstructure. Figure 3 shows the yield ratio as a function of soak temperature for both the 35 and 70 second holding zones for the samples. Note that a very low yield ratio of about 0.45 is achieved over a range of temperatures for both curves from about 1350-1430°F, indicating optimum dual phase properties over this soak temperature range. Metallographic analyses of the samples performed on steels soaked within this 1350-1430°F soak range confirmed a ferrite-martensite microstructure. Quantitative metallography using point counting techniques revealed martensite contents of 14.5 and 13.5% respectively, for the steel soaked at 1390 and held at 880°F for 70 and 35 seconds, respectively, with no other constituents observed in the microstructure. (The images were constructed using the Lepera etching technique for which ferrite appears light gray, martensite white, and such as pearlite and bainite appearing black). For soak temperatures below about 1350°F, as expected, iron carbide (Fe3C) remains in the microstructure due to insufficient carbide dissolution which results in limited martensite formation during cooling.
Unexpected, however, is the appearance of bainite in the microstructure when soak temperatures get above about 1430°F. For example, metallographic analyses reveal a bainite content of 8.5% for the steel soaked at 1510°F and held at 880°F for 70 seconds. These results contrast strongly with Omiya. According to Omiya, it is in this soak temperature range, i.e. necessarily above 1436°F, that a ferrite- martensite microstructure should be expected. My work indicates that a significant amount of bainite is present in the microstructure when the annealing soak temperature is in the Omiya recommended range and a hold zone in the vicinity of 880°F is present in the thermal process. For the particular steel used in this example, the necessary annealing range for ferrite-martensite microstructures is from about 1350 to 1430°F. Table 1 summarizes the relationships between the thermal process, yield ratio and microstructural constituents for this example at the different soak temperature regimes.
Table 1
Example 2 A different cold rolled sheet steel of Composition A was subjected to the same set of thermal cycles a described in Example 1 and shown in Figure 1. This steel also lay within the stated composition range, in this case specifically containing the following, in weight percent: 0.12%C, 1.96%Mn, 0.24%Cr, and 0.18%Mo, and the balance of the composition typical for a low carbon Al-killed steel. Once again, the mechanical properties of the material were measured. The effect of soak temperature on yield ratio for this steel for the 70 second holding sequence at 880°F is shown in Figure 4. This curve exhibits a shape similar to the curves in Figure 3, with metallographic analyses revealing identical metallogical phenomena occurring at the different soak temperature regimes as in the previous example. Also as demonstrated in the previous example, the annealing soak temperature range necessary for a predominantly ferrite-martensite microstructure to be obtained is from about 1350 to 1425°F when a hold step is conducted at about 880°F.
Example 3
As in the previous two examples, a third cold-rolled steel of Composition A was processed according to the set of thermal cycles shown in Figure 1. This steel contained, in weight percent, 0.076C, 1.89 Mn, O.lOCr, 0.094 Mo, and 0.34 Si, the balance of which is typical for a low carbon steel. After annealing as in the other examples, the mechanical properties and resultant microstructures were again determined. Figure 5 shows the yield ratio of this material as a function of soak temperature for the holding time of 70 seconds. Once again, a curve having a shape similar to the previous examples is observed, with a precise annealing range over which the dual phase ferrite-martensite microstructure is achieved. However, note that the curve appears to be shifted to the right about 30°F as compared to the previous examples. This is due to the fact that the Acl temperature is higher for this steel as compared to the steels in the previous two examples due to the higher silicon. Table 2 shows the necessary soak temperature range for ferrite-martensite formation for each of the steels along with their respective Acl temperature according to Andrews. The preferred annealing range appears to be a function of the Acl temperature as shown. Generically, based on this information, the soak temperature range necessary for dual phase production depends on the specific steel composition - that is, it should lie within the range from Acι+45°F, but at least 1340°F (727°C), to ACι+135°F, but no more than 1425°F (775°C) when a holding step in the vicinity of 880° (885°F±35°F) is present in the thermal cycle. Table 2
* Annealing Range for Ferrite-Martensite (degrees Fahrenheit) ** Necessary Annealing Range for Dual Phase Steel with respect to Acl.
Example 4
Table 3 shows the resultant mechanical properties of two additional steels having carbon contents lower than shown previously. They were processed as described in Figure 1 utilizing the individual soak temperatures of 1365, 1400, and 1475°F, respectively and a hold time of 70 seconds at 880°F. Also shown within the table are the expected necessary soak temperature ranges for dual phase steel production for each steel as calculated from Ad as described in Example 3. Note that for the 1365 and 1400°F soak temperatures, which reside within the desired soak temperature range for both respective steels, low yield ratios characteristic of ferrite-martensite microstructures are observed. Furthermore, for the steels soaked at 1475°F, which is outside the range present invention, the yield ratio is significantly higher due to the presence of bainite in the microstructure. Table 3
Additional data has been obtained which shows that manganese contents of less than 1.5% may be used within my invention. Table 3a displays data collected in a manner similar to that of Table 3 :
Table 3 a
It will be seen from Table 3a that yield ratios no greater than 0.5 are obtainable with steel of this composition using a soak temperature of 1400 but not with a soak temperature of 1500°F. Accordingly, contrary to my previous findings, it is not necessary to place absolute limits on the soak temperature range as expressed in the phrase "AC1+45°F, but at least 1340°F (727°C), to AC1+135°F, but no more than 1425°F (775°C)." Instead, the soak range may be defined as "A +45°F to Acι+135°F." My invention therefore includes the use of a steel composition as recited above but wherein the manganese content may range from 0.8 - 2.4 weight percent as well as the previously stated range of 1.5 - 2.4 weight percent. In addition, my invention includes the use of a soak temperature in the range of Acι+45°F to Acι+135°F for the defined compositions, without caps. It should be understood that I use the term Acl in the conventional manner, according to Andrews: Acl (celsius) = 723-10.7(Mn)-16.9(Ni) +29.1(Si)+16.9(Cr) + 290(As) + 6.38(W), where each of the elements is expressed in terms of weight percentages in the steel. For my purposes, the result is converted to Fahrenheit. Also, the elements not listed in the steel I use may possibly be present in negligible amounts but may be ignored for purposes of Aci calculation.
Example 5
The previous examples were based on laboratory work, but mill trials have also taken place that have verified the aforementioned thermal processing scheme for the production of both hot-dipped galvanized and galvannealed dual phase steel product. Table 4 shows the results of mill trials for galvannealed steel. Note that the steels shown in the table have virtually the same composition and thus similar A temperatures. From the Ad temperature, the expected soak temperature range for dual phase formation is calculated to be about 1350 to 1440°F. Furthermore, in terms of processing, hold temperatures and times are fairly consistent among the steels and the annealing (soak) temperature is the main processing variable difference between the materials. The mechanical properties are also shown in the table along with corresponding yield ratios. Note that steels 1 through 4 were soaked within the soaking range of the invention and exhibited the expected yield ratio of less than 0.5. Metallographic examination revealed the presence of ferrite martensite microstructures for steels 1 through 4 with martensite contents of about 15%. Steel 5 was processed outside of the preferred soaking range and exhibited a relatively high yield ratio of about 0.61. Metallographic analysis showed a bainite content of 11% in this material. Similar results have been shown for galvanize as well as galvanneal processing.
Table 4
Supplemental laboratory work has shown that I need not be limited to a hold temperature of 920°F; rather, a hold temperature as high as 940°F may be used so long as the soak temperature is within the prescribed range of Acι+45°F to Acι+135°F. In table 5, where the Aα is 1304, the range is 1349 to 1439°F. Here, where a 910°F hold temperature is used instead of the 880°F hold temperature used in the majority of the previous examples, a soak temperature of 1500°F results in the undesirable yield ratio of 0.51 while a soak within the prescribed range, 1400°F, resulted in an acceptable ratio.
Table 5
Therefore, the hold temperature may be within the range of 850-940°F (that is, 895°F ±45°F), and need not be limited to 850-920°F as previously stated.

Claims

Claims
1. Method of making an incipient dual phase steel sheet, wherein said steel sheet has the composition, in weight percent, carbon: 0.02-0.20; aluminum: 0.010- 0.150; titanium: 0.01 max; silicon: 0.5 max; phosphorous: 0.060 max; sulfur: 0.030 max; manganese: 0.8-2.40; chromium: 0.03-1.50; molybdenum:0.03- 1.50; with the provisos that the amounts of manganese, chromium and molybdenum have the relationship: (Mn + 6Cr + 10 Mo) = at least 3.5%, comprising soaking said steel sheet for 20 to 90 seconds at a temperature within the range of Acι+45°F, to Acι+135°F, cooling said steel sheet at a rate of at least 1°C per second to a temperature in the range 850-940°F, and holding said steel sheet in the range 850-940°F for 20 to 100 seconds.
2. Method of claim 1 wherein said steel sheet is a steel strip and said method is conducted continuously on a steel strip of at least 1000 feet.
3. Method of claim 1 including coating said steel sheet in a vessel of molten galvanizing metal at a temperature in the range 850-940°F before, during, or immediately after said holding.
4. Method of claim 3 wherein the temperature of said steel sheet during said coating is maintained within ± 20°F of the molten metal temperature to minimize heat transfer between said steel strip and said molten metal.
5. Method of claim 1 followed by cooling said steel sheet to ambient temperature at a rate of at least 5°C per second, and wherein said dual phase is manifested thereafter in a microstructure predominantly of ferrite and martensite.
6. Method of claim 1 including galvannealing said steel sheet and cooling the steel sheet coated thereby at a rate of at least 5°C per second, and wherein said dual phase is manifested thereafter in a microstructure predominantly of ferrite and martensite.
7. Method of claim 1 wherein the carbon content of said steel is 0.03-0.12%. 8. Method of substantially continuously galvanizing steel strip in a galvanizing line including a galvanizing bath, comprising feeding a coil of steel strip having the composition, in weight percent, carbon: 0.02-0.20; aluminum: 0.010-0.150; titanium: 0.01 max; silicon: 0.5 max; phosphorous: 0.060 max; sulfur: 0.030 max; manganese: 0.
8-2.40; chromium: 0.03-1.50; molybdenum:0.03-1.50; with the provisos that the amounts of manganese, chromium and molybdenum have the relationship (Mn + 6Cr + 10 Mo) at least 3.5%, to a heating zone in said galvanizing line, passing said strip through a heating zone continuously to heat said strip to 1340-1425°F, passing said strip through a soaking zone to maintain said strip within the range of 1340-1425°F for a period of 20 to 90 seconds, passing said strip through a cooling zone to cool said strip at a rate greater than 1°C per second, discontinuing cooling said strip when the temperature of said strip has been reduced to a temperature ± 30 degrees F of the temperature of said galvanizing bath, holding said strip at a temperature between 850-940°F and within 30 degrees F of the temperature of said galvanizing bath for a period of 20 to 100 seconds, passing said strip through said galvanizing bath, and cooling said strip to ambient temperature.
9. Method of claim 8 wherein the residence time of said strip in said galvanizing bath is 3-6 seconds.
10. Method of claim 8 wherein said cooling in said cooling zone is conducted at 5 to 40 degrees F per second.
11. Method of claim 8 wherein said strip enters said galvanizing bath at a temperature within 20 degrees F of the temperature of said galvanizing bath.
12. Method of claim 8 wherein said strip is passed into said galvanizing bath immediately on discontinuing said cooling.
13. Method of claim 8 wherein said strip is passed into said galvanizing bath near the end of said period of 20 to 100 seconds.
14. Method of claim 8 whereby the galvanized steel strip so made has a predominantly ferrite-martensite microstructure containing less than 5% other morphological constituents.
15. Method of claim 8 wherein the carbon content of said steel strip is 0.03-0.12 weight percent.
16. Method of claim 8 wherein said steel strip is galvannealed prior to cooling to ambient temperature.
17. Method of making a galvanized steel strip having a predominantly martensite and ferrite microstructure, wherein said steel has the ingredients, in weight percent, carbon: 0.02-0.20; aluminum: 0.010-0.150; titanium: 0.01 max; silicon: 0.5 max; phosphorous: 0.060 max; sulfur: 0.030 max; manganese: 0.8- 2.40; chromium: 0.03-1.50; molybdenum:0.03-l.50, comprising soaking said steel strip at Acι+45°F, to Acι+135°F, for at least 20 seconds, cooling said strip at a rate of at least 1°C per second, passing said strip through a galvanizing vessel for a residence time therein of 2-9 seconds to coat said strip at any time while holding said strip at 895°F ±45°F for 20 to 100 seconds, and cooling the strip so coated to ambient temperature.
18. Method of claim 17 including galvannealing said strip prior to cooling to ambient temperature.
19. Method of claim 17 wherein said strip is within 30°F of the temperature of the galvanizing vessel during said residence time therein.
20. Method of claim 17 wherein said strip is within 20°F of the temperature of the galvanizing vessel during said residence time therein.
EP04752656.1A 2003-11-04 2004-05-17 Dual phase steel strip suitable for galvanizing Expired - Lifetime EP1682686B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL04752656T PL1682686T3 (en) 2003-11-04 2004-05-17 Dual phase steel strip suitable for galvanizing

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
PCT/US2003/035095 WO2004048634A1 (en) 2002-11-26 2003-11-04 Method for the production of dual phase sheet steel
PCT/US2004/015675 WO2005047550A1 (en) 2003-11-04 2004-05-17 Dual phase steel strip suitable for galvanizing

Publications (3)

Publication Number Publication Date
EP1682686A1 true EP1682686A1 (en) 2006-07-26
EP1682686A4 EP1682686A4 (en) 2007-06-27
EP1682686B1 EP1682686B1 (en) 2014-11-12

Family

ID=34589294

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04752656.1A Expired - Lifetime EP1682686B1 (en) 2003-11-04 2004-05-17 Dual phase steel strip suitable for galvanizing

Country Status (6)

Country Link
EP (1) EP1682686B1 (en)
AU (1) AU2004289949B2 (en)
CA (1) CA2544382C (en)
ES (1) ES2530066T3 (en)
PL (2) PL210446B3 (en)
WO (1) WO2005047550A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5223360B2 (en) * 2007-03-22 2013-06-26 Jfeスチール株式会社 High-strength hot-dip galvanized steel sheet with excellent formability and method for producing the same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6312536B1 (en) * 1999-05-28 2001-11-06 Kabushiki Kaisha Kobe Seiko Sho Hot-dip galvanized steel sheet and production thereof
US6440584B1 (en) * 2000-01-24 2002-08-27 Nkk Corporation Hot-dip galvanized steel sheet and method for producing the same
US6586117B2 (en) * 2001-10-19 2003-07-01 Sumitomo Metal Industries, Ltd. Steel sheet having excellent workability and shape accuracy and a method for its manufacture
EP1338667A1 (en) * 2000-11-28 2003-08-27 Kawasaki Steel Corporation Composite structure type high tensile strength steel plate, plated plate of composite structure type high tensile strength steel and method for their production
WO2004048634A1 (en) * 2002-11-26 2004-06-10 Uec Technologies, Llc Method for the production of dual phase sheet steel

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4473414A (en) * 1980-03-31 1984-09-25 Kawasaki Steel Corporation High tensile strength cold rolled steel sheets and high tensile strength hot-dip galvanized steel sheets
KR100441413B1 (en) * 1999-02-22 2004-07-27 신닛뽄세이테쯔 카부시키카이샤 High strength galvanized steel plate excellent in adhesion of plated metal and formability in press working and high strength alloy galvanized steel plate and method for production thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6312536B1 (en) * 1999-05-28 2001-11-06 Kabushiki Kaisha Kobe Seiko Sho Hot-dip galvanized steel sheet and production thereof
US6440584B1 (en) * 2000-01-24 2002-08-27 Nkk Corporation Hot-dip galvanized steel sheet and method for producing the same
EP1338667A1 (en) * 2000-11-28 2003-08-27 Kawasaki Steel Corporation Composite structure type high tensile strength steel plate, plated plate of composite structure type high tensile strength steel and method for their production
US6586117B2 (en) * 2001-10-19 2003-07-01 Sumitomo Metal Industries, Ltd. Steel sheet having excellent workability and shape accuracy and a method for its manufacture
WO2004048634A1 (en) * 2002-11-26 2004-06-10 Uec Technologies, Llc Method for the production of dual phase sheet steel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of WO2005047550A1 *

Also Published As

Publication number Publication date
PL1682686T3 (en) 2015-04-30
AU2004289949A1 (en) 2005-05-26
CA2544382C (en) 2010-04-06
PL379761A1 (en) 2006-11-13
EP1682686A4 (en) 2007-06-27
AU2004289949B2 (en) 2011-04-28
PL210446B3 (en) 2012-01-31
CA2544382A1 (en) 2005-05-26
EP1682686B1 (en) 2014-11-12
ES2530066T3 (en) 2015-02-26
WO2005047550A1 (en) 2005-05-26

Similar Documents

Publication Publication Date Title
US6811624B2 (en) Method for production of dual phase sheet steel
CA3115028C (en) Cold rolled and heat-treated steel sheet and method of manufacturing the same
CA2954135C (en) Method for manufacturing a high-strength steel sheet and sheet obtained by the method
JP7220714B2 (en) Cold-rolled annealed steel sheet and its manufacturing method
CA2954132C (en) Method for manufacturing a high strength steel sheet having improved formability and sheet obtained
JP7220715B2 (en) Cold-rolled annealed steel sheet and its manufacturing method
US20110223441A1 (en) Very high mechanical strength steel and method for producing a sheet of this steel coated with zinc or zinc alloy
CA2954146A1 (en) Method for producing a high strength coated steel sheet having improved strength, ductility and formability
WO2016001705A1 (en) Method for manufacturing a high strength steel sheet having improved formability and ductility and sheet obtained
US7311789B2 (en) Dual phase steel strip suitable for galvanizing
EP3164519A2 (en) Method for producing a high strength coated steel sheet having improved strength, formability and obtained sheet
AU2004289949B2 (en) Dual phase steel strip suitable for galvanizing
WO2023129088A2 (en) High strength, iron-zinc alloy (galvanil) coated steel sheet and production method for the automotive industry
CA3149331A1 (en) High ductility zinc-coated steel sheet products
JPH0734135A (en) Production of high strength galvannealed steel sheet for high working excellent in plating adhesion
JPH06248349A (en) Production of high-strength hot-dip galvannealed steel sheet for high working having excellent plating adhesion

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20060512

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20070531

RIC1 Information provided on ipc code assigned before grant

Ipc: C21D 6/00 20060101AFI20050601BHEP

Ipc: C23C 2/06 20060101ALI20070524BHEP

17Q First examination report despatched

Effective date: 20100924

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20140530

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 695815

Country of ref document: AT

Kind code of ref document: T

Effective date: 20141115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602004046123

Country of ref document: DE

Effective date: 20141224

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2530066

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20150226

REG Reference to a national code

Ref country code: NL

Ref legal event code: VDEP

Effective date: 20141112

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 695815

Country of ref document: AT

Kind code of ref document: T

Effective date: 20141112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150312

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

REG Reference to a national code

Ref country code: SK

Ref legal event code: T3

Ref document number: E 18017

Country of ref document: SK

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150213

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

REG Reference to a national code

Ref country code: HU

Ref legal event code: AG4A

Ref document number: E023388

Country of ref document: HU

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602004046123

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20150813

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R082

Ref document number: 602004046123

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150517

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150531

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150531

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 13

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 14

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20170519

Year of fee payment: 14

Ref country code: SK

Payment date: 20170519

Year of fee payment: 14

Ref country code: FR

Payment date: 20170525

Year of fee payment: 14

Ref country code: RO

Payment date: 20170522

Year of fee payment: 14

Ref country code: DE

Payment date: 20170530

Year of fee payment: 14

Ref country code: GB

Payment date: 20170530

Year of fee payment: 14

Ref country code: IE

Payment date: 20170530

Year of fee payment: 14

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20170601

Year of fee payment: 14

Ref country code: PL

Payment date: 20170518

Year of fee payment: 14

Ref country code: IT

Payment date: 20170524

Year of fee payment: 14

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141112

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: HU

Payment date: 20170524

Year of fee payment: 14

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602004046123

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180517

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180517

Ref country code: HU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180518

Ref country code: SK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180517

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180517

REG Reference to a national code

Ref country code: SK

Ref legal event code: MM4A

Ref document number: E 18017

Country of ref document: SK

Effective date: 20180517

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180517

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20181201

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180517

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180517

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20190913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180518

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180517