EP1681407B1 - A method for manufacturing a building by using a frame element, a frame element and tightening and locking pieces for a frame element - Google Patents
A method for manufacturing a building by using a frame element, a frame element and tightening and locking pieces for a frame element Download PDFInfo
- Publication number
- EP1681407B1 EP1681407B1 EP06396002.5A EP06396002A EP1681407B1 EP 1681407 B1 EP1681407 B1 EP 1681407B1 EP 06396002 A EP06396002 A EP 06396002A EP 1681407 B1 EP1681407 B1 EP 1681407B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- frame element
- frame
- joists
- metal profile
- tightening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/29—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
- E04C3/292—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being wood and metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/38—Arched girders or portal frames
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/04—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
- E04G17/042—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements being tensioned by threaded elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/04—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
- E04G17/045—Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements being tensioned by wedge-shaped elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
- E04B2/8647—Walls made by casting, pouring, or tamping in situ made in permanent forms with ties going through the forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
- E04B2002/8688—Scaffoldings or removable supports therefor
Definitions
- the invention relates to a method to manufacture a building using a multi-purpose frame element, and to a frame element, whereby the frame element is formed of two metal profile joists at a distance from each other and, two wooden beams installed between them to adjust the distance, and two pieces meant for the mutual tightening and locking of the frame elements.
- frame element Previously known as frame element are elements according to the above preamble, the assembly of which is secured with binding and tightening bars among themselves, which for instance by means of the threaded portions in the bar heads can, on using nuts, be rotated among themselves so that the wooden beams remain between the said profiles.
- These elements have been used as frame of concrete forms, whereby they have been repeatedly dismantled and assembled. This kind of frequent dismantling and assembling of such a frame element is complicated and also slow. Accordingly the use of elements comes into question especially when they need not to be dismantled and reassembled. The elements are thus installed and dismantled as a whole. This causes a disadvantage, since the elements must be transported and stored as quite great pieces, whereby they take much space.
- the construction includes separate bars, the length of which must be changed if the length of the element varies. Changes of length must be done keeping bars of different length in store.
- the bars including nuts are easily loosed and the bars can easily get twisted within the construction industry.
- Known frame elements are best suited to support sheet forms used in concrete form, when the formed supporting wall is vertical.
- EP0202927 describes a multi-purpose frame element according to the preamble of claim 5 and a method of manufacturing a house using said frame according to claim 1.
- a new frame element according to claim 5 is developed and by means of it a manufacturing method according to claim 1 of a building to be made, thanks to which a remarkable improvement of frame element dismantling, assembling and diversification of use is achieved.
- Characteristic of the manufacturing method of a building using a versatile frame element according to the invention is that the formed frame element is at first used as support frame for the needs of the building industry, as support frame of the casting mould of a foundation and then it is removed and erected to form a portion of the building most properly of the wall frame of the same building.
- Characteristic of the manufacturing method of a building, by using a versatile frame element according to the invention is that the length of the frame element is adjusted by means of a chosen length of the wooden beams and said wooden beams are attached to the metal profiles by means of a tightening and locking and locking organ, which is fitted to twine both around the wooden beam and in its longitudinal direction and to twine around a binding part included in the metal profile beam and that the formed frame is used as support frame for the needs of the building industry, as support frame of the casting mould of a foundation as frame element of a wall or, for instance, a bearing element.
- Characteristic of the frame element of the invention is that each wooden beam is tightened by means of a stretching member between said metal joists, which is fitted to twine both around the wooden beam and in its longitudinal direction and around the attaching part included in the metal profile beam.
- Characteristic of the tightening and locking pieces is that the locking pieces are formed of two pieces of different length placed mutually within each other, both of them having a crooked form fitted behind the edge of the metal profile lath so that the crooked form of the one piece is placed behind the edge of the first element lath of elements one after another and that the crooked form of the other piece is placed behind the edge of the second element lath, the smaller piece inside the piece movable inside the other piece in order to compensate the variation of distance between the laths, and that for locking of the pieces it is possible to strike a wedge-like part between them.
- the advantage of the invention is that the frame elements can be stored up and transported in a small space. Wooden joists need no storing at all, as they can be cut to size from timber available on building site. When for binding the element a packing band is used, it will in no way restrict the length of the element. The packing band is easily mechanically tightened and locked. Likewise, the removal of it is quickly done cutting the band with clippers.
- the metal profile joists that come to the element ends are most suitably two joists side by side bound together, between of which a gap remains.
- the elements can be used in any position ever and can be easily bound as extension of each other. As to its length an element made 2,4 m, long is for instance, after having functioned as casting mould, also suitable installed vertically as the frame of a building.
- Figure 1 shows a frame element according to the invention, the one end of which is shown partly.
- the frame element has in both ends a metal profile joist 1 and wooden beams 2 placed between them
- the metal profile joists are formed of two L-profiles side by side, which are bound together by means of a welded binding piece 4. Then between L-profiles a space remains for stretching band 3, by means of which wooden beams are tightened between the profiles.
- the shape of attaching piece 4 is most suitably round, whereby no sharp fold will be formed in band 3.
- the stretching of band centres the wooden beam in regard to attaching piece 4.
- the breadth of wooden beam 2 is chosen so that it fits just between profile joists 1.
- Profile joists 1 are furnished with necessary holes for other bindings that may possibly happen.
- Figure 2 shows the joint of two horizontal frame elements, where for the locking of joint a mechanically tightened jaw device 8 is used. Between the elements an intermediate wooden piece 7 is placed so that attaching pieces 4 would not be bearing.
- the frame elements in figure 2 are formed to support a concrete mould.
- Insulating plate 6 works as concrete mould, which is supported by means of planks 5 connected to the frame element, for instance by means of hooks shot in the element. Insulation plate 6 must not necessarily be tied and no holes made in, it stays in place due to concrete mass cast against it. Moulds are elements removed, when the cast has hardened. Insulation plates that have worked as casting surface are to suitable part left in place. Removable insulating plates are for instance used as frost insulation of the building, whereby, inspected as a whole, from the casting moulds no waste at all is left over.
- Figure 3 shows a frame element with measures most suitably 1200 x 2400 (mm).
- Figure 4 shows a frame element erected on the foundation, whereby it can immediately, after having been freed from the foundation casting, be moved to work as a wall frame.
- Metal profile joists 1 work as bottom and top joists.
- the roof truss construction of the building to be formed is easily attached to the metal top beam.
- the metal bottom beam is for instance attached to weatherproofed timber placed on the foundation surface.
- Attaching with band according to the invention facilitates remarkably the dismantling and assembly of the frame elements.
- the frame stays reliably in its rectangular form.
- the assembly of the of the element can of course be secured, for instance with a stretching resisting band, which is attached diagonally or in diagonal direction on the other side or on both sides of the element.
- the frame element can be re-circulated on the building site, if it is not dismantled in between, If it is dismantled in between, as waste go only the stretching bands.
- the wooden beams but they endure many dismantles and assemblies quite well.
- Figure 5 shows a tightened locking of two successive elements, where by means of two locking pieces 15 and 16, and by means of wedge 11 hit between them, the successive elements are bound and locked so that they become bound among themselves from metal profile joists 1.
- both locking pieces 15 and 16 there is a portion placed behind the edge of metal profile joist 1, which is best illustrated in figure 6 .
- the distance of metal profile joists 1 can change, and in spite of that, locking pieces 15, 16 can be fixed in place.
- figure 5 shows stretching member 9, which connects the elements on both sides of the mould, and which in the casting space is protected with a tube 10.
- the casting space is a space between insulating plates 6.
- Stretching member 9 is locked against locking pieces 15 and 16 leaning on them, using for instance flange 12, through which the end of the stretching member the is running is taken through bushing 13.
- the bushing has a side screw 14, with which the bushing is fixed to stretching member 9.
- Stretching is made also without stretching member 9.
- vertical bar 17 in piece 15 ensures the pieces 15 and 16 remaining mutually within each other. The way of locking is cannot in any way turn the metal profile joists 1 but only press them against each other.
- Figures 6 and 7 show locking pieces 15 ad 16, which are not part of the invention.
- Piece 15 has a bar 17 welded on it, which prevents piece 15 from turning out from piece 16 inside, when wedge 11 is hit in place and when tightening and locking are in function.
- the locking arrangement is suited for locking of elements one after another, when there are in the element edges metal profile laths 1 in the way shown in figures 1 , 2 and 5 .
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Joining Of Building Structures In Genera (AREA)
- Rod-Shaped Construction Members (AREA)
Description
- The invention relates to a method to manufacture a building using a multi-purpose frame element, and to a frame element, whereby the frame element is formed of two metal profile joists at a distance from each other and, two wooden beams installed between them to adjust the distance, and two pieces meant for the mutual tightening and locking of the frame elements.
- Previously known as frame element are elements according to the above preamble, the assembly of which is secured with binding and tightening bars among themselves, which for instance by means of the threaded portions in the bar heads can, on using nuts, be rotated among themselves so that the wooden beams remain between the said profiles. These elements have been used as frame of concrete forms, whereby they have been repeatedly dismantled and assembled. This kind of frequent dismantling and assembling of such a frame element is complicated and also slow. Accordingly the use of elements comes into question especially when they need not to be dismantled and reassembled. The elements are thus installed and dismantled as a whole. This causes a disadvantage, since the elements must be transported and stored as quite great pieces, whereby they take much space. The construction includes separate bars, the length of which must be changed if the length of the element varies. Changes of length must be done keeping bars of different length in store. The bars including nuts are easily loosed and the bars can easily get twisted within the construction industry. Known frame elements are best suited to support sheet forms used in concrete form, when the formed supporting wall is vertical.
-
EP0202927 describes a multi-purpose frame element according to the preamble ofclaim 5 and a method of manufacturing a house using said frame according toclaim 1. - In order to eliminate the above presented disadvantages a new frame element according to
claim 5 is developed and by means of it a manufacturing method according toclaim 1 of a building to be made, thanks to which a remarkable improvement of frame element dismantling, assembling and diversification of use is achieved. Characteristic of the manufacturing method of a building using a versatile frame element according to the invention is that the formed frame element is at first used as support frame for the needs of the building industry, as support frame of the casting mould of a foundation and then it is removed and erected to form a portion of the building most properly of the wall frame of the same building. - Characteristic of the manufacturing method of a building, by using a versatile frame element according to the invention, is that the length of the frame element is adjusted by means of a chosen length of the wooden beams and said wooden beams are attached to the metal profiles by means of a tightening and locking and locking organ, which is fitted to twine both around the wooden beam and in its longitudinal direction and to twine around a binding part included in the metal profile beam and that the formed frame is used as support frame for the needs of the building industry, as support frame of the casting mould of a foundation as frame element of a wall or, for instance, a bearing element.
- Characteristic of the frame element of the invention is that each wooden beam is tightened by means of a stretching member between said metal joists, which is fitted to twine both around the wooden beam and in its longitudinal direction and around the attaching part included in the metal profile beam.
- Characteristic of the tightening and locking pieces, which are not part of the invention, is that the locking pieces are formed of two pieces of different length placed mutually within each other, both of them having a crooked form fitted behind the edge of the metal profile lath so that the crooked form of the one piece is placed behind the edge of the first element lath of elements one after another and that the crooked form of the other piece is placed behind the edge of the second element lath, the smaller piece inside the piece movable inside the other piece in order to compensate the variation of distance between the laths, and that for locking of the pieces it is possible to strike a wedge-like part between them.
- The advantage of the invention is that the frame elements can be stored up and transported in a small space. Wooden joists need no storing at all, as they can be cut to size from timber available on building site. When for binding the element a packing band is used, it will in no way restrict the length of the element. The packing band is easily mechanically tightened and locked. Likewise, the removal of it is quickly done cutting the band with clippers. The metal profile joists that come to the element ends are most suitably two joists side by side bound together, between of which a gap remains. The elements can be used in any position ever and can be easily bound as extension of each other. As to its length an element made 2,4 m, long is for instance, after having functioned as casting mould, also suitable installed vertically as the frame of a building.
- In the following the invention is disclosed with the reference to the enclosed drawing, where
-
Figure 1 presents the end of the frame element diagonally seen. -
Figure 2 presents the joint of two frame elements diagonally seen from above. -
Figure 3 presents a complete frame element. -
Figure 4 presents a frame element erected. -
Figure 5 presents the binding of consecutive elements seen from above. -
Figure 6 presents loose locking pieces, which are not part of the invention. -
Figure 7 presents the locking pieces, which are not part of the invention, seen from the side. -
Figure 1 shows a frame element according to the invention, the one end of which is shown partly. The frame element has in both ends ametal profile joist 1 andwooden beams 2 placed between them The metal profile joists are formed of two L-profiles side by side, which are bound together by means of a weldedbinding piece 4. Then between L-profiles a space remains for stretchingband 3, by means of which wooden beams are tightened between the profiles. The shape of attachingpiece 4 is most suitably round, whereby no sharp fold will be formed inband 3. The stretching of band centres the wooden beam in regard to attachingpiece 4. The breadth ofwooden beam 2 is chosen so that it fits just betweenprofile joists 1.Profile joists 1 are furnished with necessary holes for other bindings that may possibly happen. -
Figure 2 shows the joint of two horizontal frame elements, where for the locking of joint a mechanically tightenedjaw device 8 is used. Between the elements an intermediatewooden piece 7 is placed so that attachingpieces 4 would not be bearing. The frame elements infigure 2 are formed to support a concrete mould.Insulating plate 6 works as concrete mould, which is supported by means ofplanks 5 connected to the frame element, for instance by means of hooks shot in the element.Insulation plate 6 must not necessarily be tied and no holes made in, it stays in place due to concrete mass cast against it. Moulds are elements removed, when the cast has hardened. Insulation plates that have worked as casting surface are to suitable part left in place. Removable insulating plates are for instance used as frost insulation of the building, whereby, inspected as a whole, from the casting moulds no waste at all is left over. -
Figure 3 shows a frame element with measures most suitably 1200 x 2400 (mm). As casting mould of a foundation it is usually mounted horizontally according tofigure 3 . If the mould must be higher, a corresponding one is placed on it.Figure 4 shows a frame element erected on the foundation, whereby it can immediately, after having been freed from the foundation casting, be moved to work as a wall frame. Metal profile joists 1 work as bottom and top joists. The roof truss construction of the building to be formed is easily attached to the metal top beam. The metal bottom beam is for instance attached to weatherproofed timber placed on the foundation surface. - Attaching with band according to the invention facilitates remarkably the dismantling and assembly of the frame elements. Already due to attaching with band the frame stays reliably in its rectangular form. The assembly of the of the element can of course be secured, for instance with a stretching resisting band, which is attached diagonally or in diagonal direction on the other side or on both sides of the element. On the whole, the frame element can be re-circulated on the building site, if it is not dismantled in between, If it is dismantled in between, as waste go only the stretching bands. Of course, in some stage as waste go also the wooden beams, but they endure many dismantles and assemblies quite well.
-
Figure 5 shows a tightened locking of two successive elements, where by means of two 15 and 16, and by means oflocking pieces wedge 11 hit between them, the successive elements are bound and locked so that they become bound among themselves frommetal profile joists 1. In both 15 and 16 there is a portion placed behind the edge oflocking pieces metal profile joist 1, which is best illustrated infigure 6 . The distance ofmetal profile joists 1 can change, and in spite of that, 15, 16 can be fixed in place. Further,locking pieces figure 5 shows stretching member 9, which connects the elements on both sides of the mould, and which in the casting space is protected with atube 10. The casting space is a space betweeninsulating plates 6. Stretching member 9 is locked against locking 15 and 16 leaning on them, using forpieces instance flange 12, through which the end of the stretching member the is running is taken throughbushing 13. The bushing has aside screw 14, with which the bushing is fixed to stretching member 9. On using stretching member 9 in connection with the locking pieces the, locking becomes completely ensured. Locking is made also without stretching member 9. Thenvertical bar 17 inpiece 15 ensures the 15 and 16 remaining mutually within each other. The way of locking is cannot in any way turn thepieces metal profile joists 1 but only press them against each other. -
Figures 6 and 7 show locking pieces 15ad 16, which are not part of the invention.Piece 15 has abar 17 welded on it, which preventspiece 15 from turning out frompiece 16 inside, whenwedge 11 is hit in place and when tightening and locking are in function. The locking arrangement is suited for locking of elements one after another, when there are in the element edgesmetal profile laths 1 in the way shown infigures 1 ,2 and5 .
Claims (8)
- A method to manufacture a house using a multi-purpose frame element, whereby the frame element is formed of two metal profile joists (1) at a distance from each other, and of wooden beams (2) installed between them to regulate their distance, by means of the length of which the length of frame elements is adjusted and said wooden beams (2) are bound to said metal profile joists by means of a tightening and locking stretching member (3), characterized in that said means of tightening and locking stretching member (3) is fitted to twine both around wooden beam (2) in its longitudinal direction and around an attaching part (4) included in said metal profile joist (1) and the formed frame element is first used as support frame for the needs of the building industry, as support frame of a casting mould of a foundation and then it is removed and erected in order to form a portion of wall frame of the building.
- A method according to claim 1, characterized in that as casting mould frame the element is placed so that the metal profile joists (1) will be vertical and as frame element of a wall said joists will be horizontal in the bottom and top edges of the element.
- A method according to claim 1, characterized in that using frame element , the casting mould frame, the plate structure working as surface, as plywood board or board of insulating material, is supported by the frame element.
- A method according to claim 1 or 3, characterized in that frame elements , placed side by side, are bound together with quick-pressing means (8, 11, 15, 16) pressing metal profile joists (1) against each other.
- A multi-purpose frame element for the needs of the building industry, which element is formed of two metal profile joists (1) at a distance from each other and of wooden beams (2) installed between them to regulate their distance, whereby each wooden beam (2) is tightened between said metal joists by means of a lockable stretching member (3), characterized in that said stretching member (3) is fitted to twine both around the wooden beam in its longitudinal direction and around an attaching part (4) included in the metal profile joist.
- A multi-purpose frame element according to claim 5, characterized in that the metal profile joist is formed of two profiles, most suitably L-profiles (1) connected to each other side by side by means of the attaching parts (4).
- A multi-purpose frame element according to claim 5, characterized in that the stretching member is a tightening and locking band (3), as a packing band.
- A multi-purpose frame element according to claim 5, characterized in that the attaching part (4) is a profile bar joining metal joists (1).
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FI20050042A FI117299B (en) | 2005-01-14 | 2005-01-14 | Process for making a building using frame elements, frame elements and clamping and locking pieces for frame elements |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP1681407A2 EP1681407A2 (en) | 2006-07-19 |
| EP1681407A3 EP1681407A3 (en) | 2013-06-26 |
| EP1681407B1 true EP1681407B1 (en) | 2016-07-20 |
Family
ID=34112595
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP06396002.5A Expired - Lifetime EP1681407B1 (en) | 2005-01-14 | 2006-01-13 | A method for manufacturing a building by using a frame element, a frame element and tightening and locking pieces for a frame element |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP1681407B1 (en) |
| FI (1) | FI117299B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8793950B2 (en) | 2009-12-29 | 2014-08-05 | Huber Engineered Woods, Llc | Apparatus for connecting framing components of a building to a foundation |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB8512893D0 (en) * | 1985-05-22 | 1985-06-26 | Rapid Metal Developments Ltd | Formwork panel |
| CA2225846A1 (en) * | 1998-03-10 | 1999-09-10 | Ross Wilson | The multi shed |
| US6488257B2 (en) * | 1999-12-13 | 2002-12-03 | Mcswain Gregory A. | Attach plate bracket for structural concrete forming |
-
2005
- 2005-01-14 FI FI20050042A patent/FI117299B/en active IP Right Grant
-
2006
- 2006-01-13 EP EP06396002.5A patent/EP1681407B1/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| FI20050042A0 (en) | 2005-01-14 |
| FI20050042L (en) | 2006-07-15 |
| FI117299B (en) | 2006-08-31 |
| EP1681407A3 (en) | 2013-06-26 |
| EP1681407A2 (en) | 2006-07-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US10907312B2 (en) | Road form work | |
| DE1807716A1 (en) | Prefabricated, transportable room element for the production of buildings | |
| EP2060694B1 (en) | Building wall element | |
| NO752838L (en) | ||
| AU2015200377A1 (en) | Stripping deck spacer, and stripping deck plate using thereof | |
| KR100516109B1 (en) | Sheeting frame of pier for building | |
| DE60026965T2 (en) | METHOD AND ARRANGEMENT FOR WOODEN SUPPORTS | |
| EP1681407A2 (en) | A method for manufacturing a building by using a frame element, a frame element and tightening and locking pieces for a frame element | |
| WO2003102317A1 (en) | Ferrocement permanent formwork | |
| DE19527676A1 (en) | Self-supporting building board for erecting a sloping roof | |
| JP2022028326A (en) | Beam bottom molding frame | |
| DE69610762T2 (en) | COMPOSITE PANEL DESIGN | |
| DE202006015693U1 (en) | Wood-concrete connecting unit for use in building construction, has slab and support units connected with each other by connection unit that is embedded in slab unit, where slab unit is made of concrete and support unit is made of wood | |
| EP1980676A2 (en) | Wood component with connecting or protecting element for setting the component in concrete or soil or connecting to other components | |
| KR100504362B1 (en) | Structure of matrix | |
| JP3347937B2 (en) | Method of assembling concrete formwork, formwork fixing tool used for this method, and positioning tool for level adjustment material | |
| DE921283C (en) | Construction element, in particular made of reinforced concrete, or auxiliary construction element made of another material with a joint that is resistant to bending, shear and torsion | |
| KR200362854Y1 (en) | Clamp for supporting a sheeting using in build structure | |
| KR200346435Y1 (en) | Truss Girder Attached Deck Plate Equiped with End Fixture | |
| NL2010981C2 (en) | METHOD FOR MANUFACTURING A CONSTRUCTION WORK, WITH THE METHOD OBTAINED FROM CONSTRUCTION AND A COMPOSITION OF COMPONENTS FOR CARRYING OUT THE METHOD. | |
| US2966008A (en) | Rectangular silo construction | |
| KR200271517Y1 (en) | Reinforcing device of forms for constructing buidings and a support thereof | |
| JP2877187B2 (en) | Decorative formwork panel | |
| KR200274915Y1 (en) | Support for reinforcing members of constructuring forms | |
| JP2002038500A (en) | Construction method for concrete structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04C 3/38 20060101ALI20130201BHEP Ipc: E04G 11/12 20060101ALI20130201BHEP Ipc: E04C 3/292 20060101ALI20130201BHEP Ipc: E04G 17/04 20060101AFI20130201BHEP |
|
| PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
| AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04C 3/292 20060101ALI20130523BHEP Ipc: E04G 17/04 20060101AFI20130523BHEP Ipc: E04G 11/12 20060101ALI20130523BHEP Ipc: E04C 3/38 20060101ALI20130523BHEP |
|
| 17P | Request for examination filed |
Effective date: 20131220 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602006049651 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: E04G0017040000 Ipc: E04B0002860000 |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04G 17/04 20060101ALI20160222BHEP Ipc: E04C 3/38 20060101ALI20160222BHEP Ipc: E04B 2/86 20060101AFI20160222BHEP Ipc: E04C 3/292 20060101ALI20160222BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20160309 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 814228 Country of ref document: AT Kind code of ref document: T Effective date: 20160815 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602006049651 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20160720 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 814228 Country of ref document: AT Kind code of ref document: T Effective date: 20160720 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 12 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161120 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161121 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161021 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602006049651 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20161020 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 |
|
| 26N | No opposition filed |
Effective date: 20170421 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170131 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170131 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170113 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 13 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170113 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20060113 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160720 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160720 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20200319 Year of fee payment: 15 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20200311 Year of fee payment: 15 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602006049651 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210131 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210803 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20230131 Year of fee payment: 18 Ref country code: GB Payment date: 20230131 Year of fee payment: 18 |
|
| REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20240113 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240113 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240113 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20240114 |