EP1592167A2 - Systeme und Verfahren zur Optimierung der Zugangsbereitstellung und Planung der Kapazität in einem IP-Netzen - Google Patents
Systeme und Verfahren zur Optimierung der Zugangsbereitstellung und Planung der Kapazität in einem IP-Netzen Download PDFInfo
- Publication number
- EP1592167A2 EP1592167A2 EP05103344A EP05103344A EP1592167A2 EP 1592167 A2 EP1592167 A2 EP 1592167A2 EP 05103344 A EP05103344 A EP 05103344A EP 05103344 A EP05103344 A EP 05103344A EP 1592167 A2 EP1592167 A2 EP 1592167A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- node
- cost
- alternate
- demand
- customer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 61
- 230000008859 change Effects 0.000 claims abstract description 35
- 238000012544 monitoring process Methods 0.000 claims abstract description 9
- 230000005574 cross-species transmission Effects 0.000 claims description 49
- 238000012217 deletion Methods 0.000 claims description 6
- 230000037430 deletion Effects 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 230000003213 activating effect Effects 0.000 claims 1
- 230000006870 function Effects 0.000 description 16
- 230000007246 mechanism Effects 0.000 description 8
- 230000008569 process Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 238000012937 correction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 239000000969 carrier Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/14—Network analysis or design
- H04L41/147—Network analysis or design for predicting network behaviour
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0202—Market predictions or forecasting for commercial activities
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/28—Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
- H04L12/2854—Wide area networks, e.g. public data networks
- H04L12/2856—Access arrangements, e.g. Internet access
Definitions
- IP backbone networks consist of sets of nodes which are connected by high-speed links. These nodes route traffic through the network and also connect the customer premise to the IP network.
- the network shown in Figure 1 includes nodes NODE 1, NODE 2, and NODE 3, and the customer premise CUST A.
- the cost of access from the customer premise to the node is significant portion of the service cost. This cost is a function of the distance between the customer premise and the node.
- each customer premise is connected to the node nearest to his location, termed "the planned node.” Therefore, nodes are typically geographically distributed so that the aggregate access cost from all the customer premises is minimized.
- ATMs asynchronous transfer modes
- FSS frame relay service
- GSM gigabit and fast Ethernet
- each node consists of a number of access routers with various types of ports connected to one or two backbone routers, which links the node to backbone routers of other nodes.
- Figure 2 which includes NODE 1, NODE 2, NODE 3.
- Each type of port can only be used for the specific access mechanism and speed for which it is designed.
- the quantity of each port type at each node should match customer demand.
- the determination of the demand is tedious because it must be forecast for each port type independently by a time series forecast. If the demand for a particular port type turns out to be higher than the forecasted value, the demand cannot be accommodated by another port type, even if the node has plenty of excess capacity in other types of ports.
- the customer premise is connected to the next nearest node that has the desired port, "the alternate node.” Such a connection is termed “a mis-homed connection.” If and when the planned node has available capacity, the connection between the alternate node and the customer premise is terminated, and the customer premise is connected to the planned node. Connection to the planned node is termed "re-homing.”
- re-homing is very expensive. Re-homing involves building a circuit from the customer premise to the planned node, going through the test and turn up process, and disconnecting the connection between the customer premise and the alternate node. Typically, a dedicated team needs to focus on finding mis-homed connections, and re-homing customer premises to their planned nodes. Also, mis-homed connections are costly since a customer only pays for the access circuit from his premise to the nearest node. Thus, a company needs to absorb the cost of providing access to a sub-optimal node, i.e. an alternate node.
- Another disadvantage of current provisioning processes is that they are prone to cascading effects. That is, when a node gets more customer requests than it can accommodate, the excess demand spills over to a neighbouring node. Unless that neighbouring node has opposite forecast error, i.e. greater capacity than the demand, a capacity shortage is created at such node, and the excess demand spills over to still other nodes.
- a further disadvantage of current provisioning processes is that it increases the exception routes, thereby making the network inefficient. All customers connecting to one router get the address space for their network from the same IP address block. In this way, a router can advertise just one block for all the customer networks.
- the provisioning system has a choice. It can assign addresses either from the router by which the circuit is getting connected, or from the destination router after the re-home. In either case, exception routes need to be advertised when customer network is connected to the router with different IP address block. Such advertising requires valuable resources.
- the present invention is a method and apparatus for avoiding demand forecast errors in a network topology model by continuously monitoring and controlling the port capacity at individual nodes of the model.
- the invention changes the strategy from dealing with the forecast errors to proactively planning and correcting such errors. Correction of errors are preferably made before they result in mis-homed customer connections.
- the present invention is a method for avoiding demand forecast errors in a network topology model having a plurality of nodes.
- the quantity of a particular type of port at a node is continuously monitored and controlled.
- the steps of the method follows.
- the actual quantity of a particular port type at a node is determined.
- a forecast of the quantity of the port type required at the node is determined for a forecast period.
- the forecast period is the length of time required to change the quantity of the ports at the node, or a function thereof.
- the forecast quantity is calculated based on previous months' data.
- a threshold value to generate alerts is set.
- the threshold value is a function of the forecast period.
- the node is then monitored for any forecast change.
- the difference between the forecast quantity and the actual quantity of ports at the node is calculated. If the difference is greater than the threshold value, then an alert is generated. Preferably, the alert is associated with recipient information, and forwarded to a user, thereby avoiding demand forecast errors.
- the present invention includes an article of manufacture for avoiding demand forecast errors in a network topology model wherein the article continuously monitors and controls the quantity of a port at nodes.
- the article includes a machine readable medium containing one or more programs which when executed implement the methods of the invention.
- the invention provides a system for avoiding demand forecast errors in networks wherein the system continuously monitors and controls the quantity of a particular type of port at a node.
- the system comprises a user interface, an analytical module, an alert engine, and an alert distributor.
- the system is configured via the user interface.
- the configuration comprises setting a forecast period for a port type at the nodes of interest, and setting a threshold value to generate alerts.
- the analytical module monitors the node for a potential forecast change.
- the alert engine is activated by the analytical module if the module detects a forecast change. When the engine is alerted, the engine computes the difference between the forecast quantity and the actual quantity of ports at the node. If the difference is greater than the threshold value, then the engine generates an alert.
- the alert distributor receives the alert.
- the distributor associates the alert with recipient information and forwards the alert and recipient information to a contact manager module.
- the invention is a method of providing a customer premise which is connected to a planned node that has an unmet demand for a desired port type with that port type by efficiently temporarily connecting the customer premise to an alternate node with the desired type of port, i.e. an optimal alternate node.
- the optimal alternative node is selected by a method comprising calculating a "total access cost" for each of a plurality of alternate nodes.
- the "total access cost' is the sum of a "first access cost” and a "second access cost.”
- the node which has one of the lowest “total access costs” is selected as the optimal node.
- the customer is redirected to the optimal alternate node.
- the "first access cost" is calculated for each of a plurality of alternate nodes that are nearby the planned node.
- the cost is a function of the distance between the customer premise and an alternate node.
- the "second access cost” is a function of the probability that the alternate node would not be able to accommodate demand from the customer premise.
- the “second access cost” is determined the method that follows. Several factors are required to be determined in this method. A “time for re-home” is calculated. The “time for re-home” is the forecasted time required for the planned node to be provided with the desired port type. A “probability for spillover” during the "time for re-home" for each alternate node is determined.
- the forecasted demand for each alternate node as if the customer premise had been directed to the alternate node, designated as "alternate node with customer”; determining the forecasted demand for each alternate node as if the customer premise had not been directed to the alternate node, designated as "alternate node without customer”; and determining the actual capacity at each alternate node.
- the "probability for spillover” for each alternate node is calculated by the following formula: ⁇ ("alternate node with customer") minus (the actual capacity at alternate node) ⁇ divided by ("alternate node without customer”).
- the "cost of spillover" for each alternate node is determined.
- the “cost of spill-over” is calculated by multiplying the distance between the alternate node and the "spill-over alternate node” with the cost per mile.
- the “second access cost” is the product of the "probability of spill-over” and the "cost of spill-over.”
- the first and second access costs are added to provide a total access cost for each of the plurality of alternate nodes.
- the customer is redirected to the alternate node which provides the lowest total access cost.
- the present invention includes an article of manufacture for providing a customer premise which is connected to a planned node that has an unmet demand for a desired port type with that port type by efficiently temporarily connecting the customer premise to an alternate node with the desired type of port.
- the article includes a machine readable medium containing one or more programs which when executed implement the operation.
- the invention is a method for determining whether it is cost effective to re-home a customer, wherein the customer demand was redirected from a planned node to an alternate node.
- a "cost of re-home" is provided. This cost comprises the cost of directing the customer demand to the planned node and the cost of adding of new ports to the planned node. Also, a "total access cost" is provided for the alternate node to which the customer was redirected.
- this cost is the sum of a first access cost, wherein the first access cost is a function of the distance between the customer and the alternate node, and a second access cost, wherein the second access cost is a function of the probability that the alternate node would not be able to accommodate demand from the customer premise.
- the difference between the "cost of re-home" and the "total access cost” is compared with a re-home threshold value.
- the re-home threshold value is a monetary value, or a function of a such a value, preferably set by a user. An alert is generated if the comparison indicates that it is cost effective to re-home the customer.
- the invention includes an article of manufacture for determining whether it is cost effective to re-home a customer, wherein the customer demand was redirected from a planned node to an alternate node.
- the article includes a machine readable medium containing one or more programs which when executed implement the operation.
- Figure 1 is a diagram of a Network Map.
- Figure 2 is a diagram of a Node Detail Map.
- the present invention addresses the problem of demand forecast errors in network topology models, such as an internet protocol (IP) backbone networks, by proactively planning and correcting such errors.
- IP internet protocol
- IP backbone networks comprise sets of nodes which are connected by high-speed links. These nodes route traffic through the network and also act as connection points to the customer premise (i.e. the customer). Customers access the network via various different access mechanisms and speeds. To accommodate various access mechanisms and speeds, each node has a number of access routers with various types of ports connected to one or two backbone routers, which links the node to backbone routers of other nodes.
- the quantity of each port type at each node should equal the customer demand at that node.
- the quantity of a port type at a node is referred to as the actual capacity ( or simply, capacity) of the node for that port type.
- the circumstance wherein the customer demand does not equal the capacity at the node is referred to as a demand forecast error.
- One embodiment of the invention is a method for avoiding demand forecast errors in a network topology model which has a plurality of nodes.
- the quantity of a selected port type at individual nodes is continuously monitored and controlled.
- all the nodes of the network are monitored and controlled simultaneously.
- only particular sets of nodes may be monitored.
- Users of the invention include, for example, network administrators, network service providers and provisioning tool vendors.
- relevant parameters are provided by the user, or obtained from a network topology server or database.
- One of the parameters is the actual capacity of the selected port type at a node of interest.
- Another parameter is a forecast of the quantity of that port demanded at the node, i.e . the demand forecast or the forecast capacity.
- the initial demand forecast can be a number which is computed or is set by a user.
- the initial demand forecast is determined from historical data of the demand for the port type at the node, e.g. , from the data base of past customer orders.
- An additional parameter is a forecast period for the ports at the node.
- the forecast period a function of the length of time required to add new ports to the node.
- the forecast period can be the length of time required to add new ports to the node.
- a node is monitored for a forecast change for the selected port type.
- An example of a forecast change is the addition or deletion of customer assignments at the node of interest.
- Another example of a forecast change is the addition or deletion of a selected port type at the node. If a forecast change is detected, the demand forecast is updated, i.e. recomputed.
- the difference between the updated demand forecast at the node and the actual capacity is calculated.
- the difference is illustrated as the subtraction of the actual capacity from the demand forecast.
- a skilled artisan would know how to adjust the methods of the invention wherein the difference is calculated as the subtraction of the demand forecast from the actual capacity.
- the difference between the demand forecast and the actual capacity determines whether an alert is generated. That is, an alert is generated if the difference between these two parameters is deemed to be at a value which indicates that ports need to be added in order to meet demand at a node within the forecast period.
- the difference between the demand forecast and the actual capacity is compared to a threshold value.
- the threshold value is a function of the length of the forecast period. For example, if the capacity at the node can be increased quickly, then the threshold value ( t ) could be set at a relatively high value. That is, a greater difference between the demand forecast and the actual capacity is tolerated. For example, t can be set so that an alert is only sent if the difference is greater than three. Or similarly, an alert is not be sent if the difference is less than four. Thus, for instance, if the demand forecast is set at thirteen and the actual capacity of the port is ten, then the difference (i.e. three) is compared with t. In this case, an alert would not be generated.
- t could be set at a relatively low value. For example, t could be set so that an alert is sent if the difference is greater than zero. Or similarly, an alert is not sent if the difference is less than one.
- the difference i.e. three
- the difference is compared with t . In this case, an alert would be generated.
- the threshold value can be set by a user. As shown above, the threshold value can specify an upper bound, or specify a lower bound.
- the alert is associated with reports.
- Reports can include various types of information.
- the information can include: a listing of the nodes in the network, the type of the ports at each node, the actual quantity of each type of port at each node, the forecasted quantity of ports at each node, a list of all nodes with T1 capacity for less than a month, and combinations thereof.
- the alert and reports are forwarded to the user.
- the information in such reports can be used to reconfigure topology in order to avoid demand forecast errors.
- Reconfiguration can comprise adding a port to a low capacity node. For example, port-containing cards can be physically transferred from a node which has a very high excess capacity to a node with unmet demand.
- Reconfiguration can also comprise transferring customer assignments from a node with unmet demand to a node with excess capacity.
- Information obtained from the methods of the invention i.e. identification of nodes with excess capacity and related information
- nodes with excess capacity are good candidates to which excess demand can be directed.
- the information is stored for future reference.
- the method is embodied in a system that comprises an user interface, analytic module, an alert engine, and an alert distributor.
- a user interface is the junction between the user and the system.
- An interface is a set of commands or menus through which a user communicates with the system.
- the present invention preferably uses a HTML-based user interface.
- the interface can be command-driven or menu-driven. In a command-driven interface commands are entered by the user. In a menu-driven interface a user selects command choices from various menus displayed on the screen.
- the interface is a graphical user interface.
- the interface of the present system enables a user to configure the system.
- a user can set various parameters here, such as, for example, forecast periods for particular ports at particular nodes, and the various threshold values.
- the actual capacity of a port type at selected nodes, and their forecast capacities can also be set here. However, if a system has access to inventory and a past order databases, such capacities are preferably calculated by the system.
- the interface Preferably, the interface generates reports. Examples of reports are described above.
- the system can be configured so that users receive reports via their preferred method, such as, for example, e-mail, voice call, pager, etc.
- the system can continuously place forecast results into a database.
- the analytical module monitors nodes for potential forecast changes. Examples of situations that qualify as potential forecast changes are the change of customer assignments at a node, or a change in the capacity at the node, as described above.
- the analytical module works with the user defined value of the forecast period.
- the analytic module computes a time series forecast of the number of ports needed for the forecast period. If the analytic module detects a forecast change, the alert engine is activated.
- the analytical module is embodied in a software program that computes various analytical functions, such as, for example, time series forecasts. Examples of other functions of an analytical module include computation of regression, variance, T-test etc. Examples of software packages which compute such functions include SAS and SPlus. An analytical module can interface with these modules to calculate these functions.
- the alert engine computes the difference between the actual capacity of ports at the node and the forecast capacity, as described above. The engine then compares the difference with the user-defined threshold value. If the difference is greater than the threshold value, then the engine generates an alert, as described above.
- an alert contains the information about, for example, the location of the port, the type of port, and the actual and forecasted capacities of the ports at that location, as described above.
- the alert engine is embodied in a software module.
- the engine uses rules based programming, such as, for example, JESS or Jrules, to make the decisions regarding alerts.
- rules based programming such as, for example, JESS or Jrules
- the rules can also be coded in a general purpose programming language such as Java, C or C++.
- the alert is then passed to the alert distributor.
- the distributor associates the alert with recipient information.
- the distributor can map the alert to a group of recipients via their preferred method of receiving alerts. Mapping can be based on any attribute of the alert. For example, a simple rule could be "send all alerts for node X to A" or "send the alerts with the forecast exceeding the capacity by X% to B and C over phone from 9AM to 5PM and over e-mail from 5PM to 9AM.”
- Methods of receiving the alerts include, for example, e-mail, voice call, pager, etc.
- the alert distributor is embodied in a software module in the system.
- the distributor maintains a list of users and their and their preferred time and mode of notification. These preferences can be set using a graphical user interface.
- the distributor finds the users subscribed to such alert and sends the information to the contact manger with their preferences.
- the contact manager is a system module that formats the communication in the preferred mode.
- an alert distributor forwards the alert and the recipient information to a user, the user can use the information to make decisions regarding reconfiguration of the network topology.
- Reconfiguration preferably avoids forecast errors which may result in mis-homed customer connections. For example, recipients of these alerts can either move any excess capacity to the deficient node or order new cards.
- Correction of forecast errors are preferably made according to the present invention before they result in mis-homed customer connections.
- demand at a location can suddenly change due to an unanticipated event.
- An example of such an event took place after the sudden disclosure of accounting irregularities at WorldCom.
- WorldCom customers sought new carriers which resulted in a sudden increase in demand at various nodes of their competitors, such as AT&T.
- Time series forecasts of node capacity based solely on historical data did not catch such an unanticipated event.
- the present invention provides methods to efficiently deal with such unanticipated events.
- a method of determining an optimal alternate node, which contains a desired type of port is provided.
- a customer premise which is connected to a planned node that has an unmet demand for a desired port type, is provided with that port type by efficiently temporarily connecting the customer premise to an alternate node with such port type.
- the optimal alternate node is selected by a method comprising assigning a "total access cost" to each of a plurality of nodes within the network topology.
- the "total access cost” is the sum of a "first access cost” and a "second access cost” for each of the nodes.
- a first access cost is assigned to each of a plurality of alternate nodes that are nearby the planned node.
- the cost is a function of the distance between the customer premise and the alternate node.
- the first access cost can be calculated by multiplying the physical distance between the customer premise and an alternate node with the appropriate cost per mile in the tariff tables (e.g., tariff 9 and tariff 11).
- the cost per mile is based on whether the connection is interstate or intra-state, as is known in the art.
- Each node in a network is the planned node for a customer. Accordingly, an alternate node for a first customer is the planned node for a second customer.
- the planned node for each customer should accommodate the demands of its customer. However, if a first customer is redirected to the planned node of a second customer, then the planned node of the second customer has both the demand of the first customer and the second customer. If the planned node of the second customer cannot accommodate such a demand, the demand would spillover to yet another node, i.e. to the planned node of a third customer. For the purposes of this specification, such a node is termed "spillover node.”
- a second access cost is assigned to each of the plurality of alternate nodes.
- the second access cost is based on the probability of not fulfilling a second customer's demand at his planned node due to the first customer being re-directed to such node.
- the second access cost is based on the probability that the first customer's alternate node may not be able to accommodate all its expected demand.
- time for re-home the time period required to reestablish the connection of the first customer back to his planned node. This period is the forecasted time required for the planned node to be provided with the desired port type. That is, the "time for re-home" depends on the forecasted availability of the desired port type at the first customer's planned node. Availability depends on when the user is planning to install new ports at the planned node, or when the demand is expected to decrease at the planned node.
- the "probability of spillover” is the probability that while the first customer is connected to an alternate node, the demand from this alternate node would spillover to the second customer's alternate node. (In other words, the "probability of spillover” is the probability that the demand from the second customer's planned node would spillover to the "spillover node" during the "time for re-home.")
- the "probability of spillover” is calculated for the plurality of alternate nodes.
- the forecasted demand for the alternate node has to be determined as if the customer premise had already been directed to the alternate node. That is, the demand forecast at a first customer's alternate node after the first customer has been redirected to the alternate node is determined. This factor is designated as the "alternate node with customer.” Also, the forecasted demand for the alternate node has to be determined before the customer premise is directed to the alternate node. This factor is designated as the "alternate node without customer.” Additionally, the actual capacity at each alternate node has to be determined.
- the "cost of spillover” is calculated by determining the distance between the alternate node and the "spillover node” wherein the "spillover node” is the alternate node of the alternate node. This distance is multiplied by the cost per mile.
- the second access cost for each of the plurality of alternate nodes is the product of the "probability of spillover" and the "cost of spillover.”
- node B is an alternate node for planned node A. Assume that it takes a month to add new ports at A and re-home the connection. Thus, in this case, connecting the customer to B takes up a port at B for a month. Assume that before the customer is connected to B, the demand forecast for B for a month is 10 and its capacity is 8. Thus, potentially, two orders may have to be back-hauled to an alternate node of B. Once the customer is connected to B (i.e. spillover from A), the demand forecast for B is 11. The probability of spillover of the alternate node to its alternate node (i.e.
- the alternate node of B) when the customer is connected to the alternate node is calculated by the following formula: (demand forecast at B after demand at A is redirected to B - actual capacity at the alternate node) divided by (demand forecast at B before demand at A is redirected to B). Then the cost of spillover of B to its alternate node when the demand from A is redirected to B is calculated by the following formula: (probability of spillover) ⁇ ⁇ (distance between B and its alternate node) ⁇ (cost per mile) ⁇ . In the present example the calculation is as follows: (3/10) ⁇ ⁇ distance between the alternate node and its nearest alternate) ⁇ (cost per mile) ⁇ .
- the optimal alternate node is the node which has one of the lowest “total access costs.”
- the optimal alternate node is the node whose "total access cost" is within the bottom ten percent in value, more preferably is within the bottom five percent in value, and most preferably with the lowest "total access cost.”
- a component can be added to the above described system to perform this selection of the optimal alternative node, i.e. the alternate node component. The first customer can be redirected to the optimal alternate node.
- Each node in the network can be evaluated for suitability as the optimal alternate node.
- the number of nodes that are evaluated is limited to a configurable number in a systematic manner.
- the alternate nodes for each planned node can be ranked according to their distance from the planned node; and then the nearest nodes are evaluated first.
- Such a ranking of the alternate nodes for each planned node can be stored in a database.
- the capacity of the planned node of the customer may increase to the point that the planned node may once again be able to accommodate the customer.
- the capacity of the planned node can be increased by the addition of one or more ports of the desired type to the planned node.
- a method for determining whether it is cost effective to add ports to a node in order to re-home a customer.
- the "cost of re-home” is provided, or calculated.
- the "cost of re-home” can be provided by a user.
- the "cost of re-home” includes the cost of building a new circuit, additional testing and turn-up costs and disconnecting the first circuit.
- the "cost of re-home” includes the addition of new ports to the planned node. Re-homing is cost effective only if the capacity at the planned node is at least one port greater than the forecasted demand at the planned node.
- the "total access cost" for redirecting the demand of a planned node to an alternate node, as defined above, is compared with the "cost of re-homing" the demand to the planned node.
- the difference between the "cost of re-home” and the “total access cost” is calculated.
- the difference is illustrated as the subtraction of the "total access cost” from the "cost of re-home.”
- a skilled artisan would know how to adjust the methods of the invention wherein the difference is calculated as the subtraction of the "cost of re-home” from the "total access cost.”
- the difference between the "cost of re-home" and the “total access cost” determines whether a re-home alert is generated. That is, a re-home alert is generated if the difference between these two parameters is deemed to be at a value which indicates that it is cost effective to add ports to the planned node.
- the re-home is forwarded to a user, as described above, who may reconfigure the network topology to effect the re-home.
- the difference between the "cost of re-home” and the "total access cost” is compared to a re-home threshold value.
- the re-home threshold value is a monetary value, or a function of a such a value.
- the re-home threshold value is set by a user. For example, if the user values re-homing despite a relatively high cost, then the threshold value could be set at a relatively high value. That is, a greater difference between the "cost of re-home” and the "total access cost” is tolerated.
- the re-home threshold value can be set so that a re-home alert is sent if the difference is greater than a relatively high monetary value.
- the threshold value could be set at a relatively low value. That is, a re-home alert to activate re-home is only sent if re-homing would be a relatively inexpensive exercise.
- the threshold value can be set by a user. As described above for the evaluation of the threshold for a forecast change, the re-home threshold value can specify an upper bound, or specify a lower bound.
- a component can be added to the above described system to perform this method of determining if re-homing is cost effective, i.e. the re-home component.
- a re-home alert passes through the alert distributor and reaches the recipient according to his preferences.
- the present invention includes a computer program product, which is a storage medium including instructions that can be used to program a computer to perform the methods of the invention.
- the storage medium can include, but is not limited to, any type of disk including floppy disks, optical discs, Compact Disk Read Only Memory (CD-ROMs), and magnetic disks, Read-Only Memory (ROMs), Random-Access Memory (RAMs), Electrically Programmable Read-Only Memory (EPROMs), Electrically Erasable Programmable Read-Only Memory (EEPROMs), magnetic or optical cards, or any type of media suitable for storing electronic instructions.
- the present invention includes programming for controlling both the hardware of the computer and for enabling the computer to interact with a human user.
- Such programming may include, but is not limited to, software for implementation of device drivers, operating systems, and user applications.
- Such computer readable media further includes programming or software instructions to direct the general purpose computer to perform tasks in accordance with the present invention. Appropriate software coding can readily be prepared by skilled programmers based on the teachings of the present disclosure, as will be apparent to those skilled in the software art.
- the invention can be implemented by combining the methods and systems into any kind of platform.
- the platform can be an Intel 80486 processor running DOS Version 6.0.
- the platform could also be UNIX machines on an Ethernet network.
- the methods and systems can be implemented by a continuous forecasting system in which the results are put into a database instead of emailing or calling the user.
- the present invention can be implemented using a conventional general purpose digital computer or microprocessor programmed according to the teachings of the present specification, as will be apparent to those skilled in the computer art.
- the invention may also be implemented by the preparation of application specific units, such as integrated circuits (ASIC) or by interconnecting an appropriate network of conventional circuit components, as will be readily apparent to those skilled in the art.
- ASIC integrated circuits
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Finance (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Economics (AREA)
- Accounting & Taxation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Data Mining & Analysis (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US832885 | 2004-04-27 | ||
US10/832,885 US7617303B2 (en) | 2004-04-27 | 2004-04-27 | Systems and method for optimizing access provisioning and capacity planning in IP networks |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1592167A2 true EP1592167A2 (de) | 2005-11-02 |
EP1592167A3 EP1592167A3 (de) | 2005-12-07 |
Family
ID=34939490
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP05103344A Withdrawn EP1592167A3 (de) | 2004-04-27 | 2005-04-25 | Systeme und Verfahren zur Optimierung der Zugangsbereitstellung und Planung der Kapazität in einem IP-Netzen |
Country Status (5)
Country | Link |
---|---|
US (1) | US7617303B2 (de) |
EP (1) | EP1592167A3 (de) |
JP (2) | JP4191164B2 (de) |
KR (1) | KR100774124B1 (de) |
CA (1) | CA2504003C (de) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007089765A2 (en) * | 2006-01-31 | 2007-08-09 | At & T Corp. | Method and apparatus for evaluating component costs in a communication network |
CN105847281A (zh) * | 2016-05-12 | 2016-08-10 | 中国联合网络通信集团有限公司 | 一种dns防御攻击的方法及系统 |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7586956B1 (en) * | 2004-11-05 | 2009-09-08 | Cisco Technology, Inc. | Intelligent event notification processing and delivery at a network switch |
US8510429B1 (en) * | 2006-01-19 | 2013-08-13 | Sprint Communications Company L.P. | Inventory modeling in a data storage infrastructure for a communication network |
US8260924B2 (en) * | 2006-05-03 | 2012-09-04 | Bluetie, Inc. | User load balancing systems and methods thereof |
US20070268294A1 (en) * | 2006-05-16 | 2007-11-22 | Stephen Troy Eagen | Apparatus and method for topology navigation and change awareness |
US8197317B2 (en) * | 2006-05-17 | 2012-06-12 | Bunge Limited | Methods and contests for estimating events or conditions |
US8197316B2 (en) * | 2006-05-17 | 2012-06-12 | Bunge Limited | Systems and user interactive screens for estimating events or conditions |
US8056082B2 (en) * | 2006-05-31 | 2011-11-08 | Bluetie, Inc. | Capacity management and predictive planning systems based on trended rate change of monitored factors and methods thereof |
US8102981B2 (en) * | 2006-06-02 | 2012-01-24 | Alcatel Lucent | Alerting for long duration sessions in communication networks |
US8332375B2 (en) | 2007-08-29 | 2012-12-11 | Nirvanix, Inc. | Method and system for moving requested files from one storage location to another |
US9363143B2 (en) * | 2008-03-27 | 2016-06-07 | International Business Machines Corporation | Selective computation using analytic functions |
US20090248722A1 (en) * | 2008-03-27 | 2009-10-01 | International Business Machines Corporation | Clustering analytic functions |
US8560544B2 (en) | 2010-09-15 | 2013-10-15 | International Business Machines Corporation | Clustering of analytic functions |
US20120158451A1 (en) * | 2010-12-16 | 2012-06-21 | International Business Machines Corporation | Dispatching Tasks in a Business Process Management System |
CN102098298B (zh) * | 2010-12-29 | 2014-07-30 | 福建星网锐捷网络有限公司 | 防止过滤资源耗尽的方法和网络接入设备 |
JP2013205905A (ja) * | 2012-03-27 | 2013-10-07 | Fujitsu Ltd | 演算処理装置及び演算処理装置の制御方法 |
CN103793425B (zh) * | 2012-10-31 | 2017-07-14 | 国际商业机器公司 | 用于分布式系统的数据处理方法及装置 |
US9110661B2 (en) * | 2012-12-28 | 2015-08-18 | International Business Machines Corporation | Mobile device offloading task to a peer device and receiving a completed task when energy level is below a threshold level |
US9141920B2 (en) * | 2013-05-17 | 2015-09-22 | International Business Machines Corporation | Project modeling using iterative variable defect forecasts |
US10019756B2 (en) | 2014-03-31 | 2018-07-10 | Mastercard International Incorporated | Systems and methods for throttling transaction processing based on constrained sub-systems |
US10257269B2 (en) * | 2015-06-23 | 2019-04-09 | Intel Corporation | Selectively disabling operation of hardware components based on network changes |
CN109155022A (zh) | 2016-05-20 | 2019-01-04 | 凯思比有限公司 | 用于监视、控制和优化经由容器交付给客户的液体饮料产品的流量的分销网络 |
US11763281B2 (en) | 2016-05-20 | 2023-09-19 | KegSpeed, LLC | Radio transmitter device for use in method and system for monitoring, controlling and optimizing flow of products |
EP3297227B1 (de) * | 2016-09-14 | 2020-07-22 | Deutsche Telekom AG | Verfahren zum routen in einem kommunikationsnetzwerk, kommunikationsnetzwerk, programm und computerprogrammprodukt |
CN107379987B (zh) * | 2017-07-10 | 2019-11-12 | 多维新创(北京)技术有限公司 | 新能源汽车的定制方法及装置 |
US11252036B1 (en) * | 2021-06-10 | 2022-02-15 | Bank Of America Corporation | System for evaluating and tuning resources for anticipated demands |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5937042A (en) * | 1996-03-19 | 1999-08-10 | Mci Communications Corporation | Method and system for rehome optimization |
EP1065827A1 (de) * | 1999-06-29 | 2001-01-03 | Lucent Technologies Inc. | Verfahren und Vorrichtung zur Feststellung von Service Abweichungen in transaktionsorientierten Netzwerken |
EP1113620A1 (de) * | 1999-12-30 | 2001-07-04 | AT&T Corp. | Tragbare integrierte IP-Vorrichtung |
US6446123B1 (en) * | 1999-03-31 | 2002-09-03 | Nortel Networks Limited | Tool for monitoring health of networks |
US20030088671A1 (en) * | 2001-11-02 | 2003-05-08 | Netvmg, Inc. | System and method to provide routing control of information over data networks |
WO2003084133A1 (en) * | 2002-03-29 | 2003-10-09 | Network Genomics, Inc. | Forward looking infrastructure re-provisioning |
EP1401146A1 (de) * | 2002-09-23 | 2004-03-24 | Alcatel | Vorrichtung und Verfahren zur Planung der Konfiguration eines Telekommunikationsnetzwerkes mittels Vorhersage des Wandels |
US6738625B1 (en) * | 2000-05-11 | 2004-05-18 | Telefonaktiebolaget Lm Ericsson (Publ) | Rehoming and resource sharing in communications networks |
Family Cites Families (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04114532A (ja) | 1990-09-04 | 1992-04-15 | Nippon Telegr & Teleph Corp <Ntt> | ネットワークシステム自動構築・再構築方式 |
JPH066351A (ja) | 1992-06-18 | 1994-01-14 | Nippon Telegr & Teleph Corp <Ntt> | 需要予測システム |
JP3672341B2 (ja) | 1993-07-21 | 2005-07-20 | 富士通株式会社 | 通信網分離設計方式とその管理方式 |
US5631897A (en) * | 1993-10-01 | 1997-05-20 | Nec America, Inc. | Apparatus and method for incorporating a large number of destinations over circuit-switched wide area network connections |
US5764736A (en) * | 1995-07-20 | 1998-06-09 | National Semiconductor Corporation | Method for switching between a data communication session and a voice communication session |
JPH10229393A (ja) | 1997-02-14 | 1998-08-25 | Nippon Telegr & Teleph Corp <Ntt> | 伝送路網設計方法及び装置 |
JPH1174934A (ja) * | 1997-08-29 | 1999-03-16 | Oki Electric Ind Co Ltd | ルーティング方法、ネットワークノード及び通信システム |
US6230200B1 (en) * | 1997-09-08 | 2001-05-08 | Emc Corporation | Dynamic modeling for resource allocation in a file server |
US6463062B1 (en) * | 1997-11-19 | 2002-10-08 | At&T Corp. | Integrating switching and facility networks using ATM |
US6574587B2 (en) * | 1998-02-27 | 2003-06-03 | Mci Communications Corporation | System and method for extracting and forecasting computing resource data such as CPU consumption using autoregressive methodology |
US6282267B1 (en) * | 1998-03-26 | 2001-08-28 | Bell Atlantic Network Services, Inc. | Network planning traffic measurement program |
US6640278B1 (en) * | 1999-03-25 | 2003-10-28 | Dell Products L.P. | Method for configuration and management of storage resources in a storage network |
US6661788B2 (en) * | 1999-05-14 | 2003-12-09 | Nortel Networks Limited | Multicast scheduling for a network device |
JP2001007844A (ja) * | 1999-06-24 | 2001-01-12 | Canon Inc | ネットワークステータスサーバ及び情報配信システム、及びその制御方法、及びその制御プログラムを格納した記憶媒体 |
US6384833B1 (en) * | 1999-08-10 | 2002-05-07 | International Business Machines Corporation | Method and parallelizing geometric processing in a graphics rendering pipeline |
US6611726B1 (en) * | 1999-09-17 | 2003-08-26 | Carl E. Crosswhite | Method for determining optimal time series forecasting parameters |
US6647415B1 (en) * | 1999-09-30 | 2003-11-11 | Hewlett-Packard Development Company, L.P. | Disk storage with transparent overflow to network storage |
JP2001109638A (ja) * | 1999-10-06 | 2001-04-20 | Nec Corp | 推定伸長率に基づくトランザクション負荷分散方法及び方式並びにコンピュータ可読記録媒体 |
WO2002001395A1 (en) * | 2000-06-27 | 2002-01-03 | Ubs Ag | Method and system for providing distributed functionality and data analysis system utilizing same |
US6766430B2 (en) * | 2000-07-06 | 2004-07-20 | Hitachi, Ltd. | Data reallocation among storage systems |
US7219124B2 (en) * | 2000-08-01 | 2007-05-15 | Qwest Communications International Inc. | Provisioning system and method for auto-discovering customer premises equipment in activating xDSL |
US6973622B1 (en) | 2000-09-25 | 2005-12-06 | Wireless Valley Communications, Inc. | System and method for design, tracking, measurement, prediction and optimization of data communication networks |
JP4408002B2 (ja) | 2000-12-22 | 2010-02-03 | 三菱電機株式会社 | ネットワーク管理システム |
US6769054B1 (en) * | 2001-02-26 | 2004-07-27 | Emc Corporation | System and method for preparation of workload data for replaying in a data storage environment |
JP3698073B2 (ja) * | 2001-06-13 | 2005-09-21 | 日本電信電話株式会社 | サーバ選択装置、方法、プログラム及び該プログラムを記録した記録媒体 |
US20030079018A1 (en) * | 2001-09-28 | 2003-04-24 | Lolayekar Santosh C. | Load balancing in a storage network |
US7076036B1 (en) * | 2001-10-17 | 2006-07-11 | Sprint Communications Company L.P. | Traffic and capacity modeling process |
JP3842624B2 (ja) * | 2001-11-16 | 2006-11-08 | 日本電信電話株式会社 | 経路情報収集方法、装置、およびプログラム |
US20030135609A1 (en) * | 2002-01-16 | 2003-07-17 | Sun Microsystems, Inc. | Method, system, and program for determining a modification of a system resource configuration |
US20040044600A1 (en) * | 2002-08-27 | 2004-03-04 | Chu Hao-Hua | Cost management for a distributed computing environment |
US7640342B1 (en) * | 2002-09-27 | 2009-12-29 | Emc Corporation | System and method for determining configuration of one or more data storage systems |
US7356452B1 (en) * | 2002-09-27 | 2008-04-08 | Emc Corporation | System and method for simulating performance of one or more data storage systems |
WO2005008439A2 (en) * | 2003-07-11 | 2005-01-27 | Computer Associates Think, Inc. | San/storage self-healing/capacity planning system and method |
US7076393B2 (en) * | 2003-10-03 | 2006-07-11 | Verizon Services Corp. | Methods and apparatus for testing dynamic network firewalls |
US7421734B2 (en) * | 2003-10-03 | 2008-09-02 | Verizon Services Corp. | Network firewall test methods and apparatus |
-
2004
- 2004-04-27 US US10/832,885 patent/US7617303B2/en not_active Expired - Fee Related
-
2005
- 2005-04-06 CA CA2504003A patent/CA2504003C/en not_active Expired - Fee Related
- 2005-04-25 EP EP05103344A patent/EP1592167A3/de not_active Withdrawn
- 2005-04-27 KR KR1020050035002A patent/KR100774124B1/ko not_active IP Right Cessation
- 2005-04-27 JP JP2005128924A patent/JP4191164B2/ja not_active Expired - Fee Related
-
2008
- 2008-05-13 JP JP2008126299A patent/JP4606481B2/ja not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5937042A (en) * | 1996-03-19 | 1999-08-10 | Mci Communications Corporation | Method and system for rehome optimization |
US6446123B1 (en) * | 1999-03-31 | 2002-09-03 | Nortel Networks Limited | Tool for monitoring health of networks |
EP1065827A1 (de) * | 1999-06-29 | 2001-01-03 | Lucent Technologies Inc. | Verfahren und Vorrichtung zur Feststellung von Service Abweichungen in transaktionsorientierten Netzwerken |
EP1113620A1 (de) * | 1999-12-30 | 2001-07-04 | AT&T Corp. | Tragbare integrierte IP-Vorrichtung |
US6738625B1 (en) * | 2000-05-11 | 2004-05-18 | Telefonaktiebolaget Lm Ericsson (Publ) | Rehoming and resource sharing in communications networks |
US20030088671A1 (en) * | 2001-11-02 | 2003-05-08 | Netvmg, Inc. | System and method to provide routing control of information over data networks |
WO2003084133A1 (en) * | 2002-03-29 | 2003-10-09 | Network Genomics, Inc. | Forward looking infrastructure re-provisioning |
EP1401146A1 (de) * | 2002-09-23 | 2004-03-24 | Alcatel | Vorrichtung und Verfahren zur Planung der Konfiguration eines Telekommunikationsnetzwerkes mittels Vorhersage des Wandels |
Non-Patent Citations (1)
Title |
---|
ABLEY ISC B BLACK LAYER8 NETWORKS V GILL AOL TIME WARNER J: "Goals for IPv6 Site-Multihoming Architectures draft-ietf-multi6-multihoming-requirements -07" IETF STANDARD-WORKING-DRAFT, INTERNET ENGINEERING TASK FORCE, IETF, CH, vol. multi6, no. 7, 13 June 2003 (2003-06-13), XP015002839 ISSN: 0000-0004 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007089765A2 (en) * | 2006-01-31 | 2007-08-09 | At & T Corp. | Method and apparatus for evaluating component costs in a communication network |
WO2007089765A3 (en) * | 2006-01-31 | 2007-09-27 | At & T Corp | Method and apparatus for evaluating component costs in a communication network |
US7664038B2 (en) | 2006-01-31 | 2010-02-16 | At&T Corp. | Method and apparatus for evaluating component costs in a communication network |
US8259608B2 (en) | 2006-01-31 | 2012-09-04 | At&T Intellectual Property Ii, L.P. | Method and apparatus for evaluating component costs in a communication network |
US9224108B2 (en) | 2006-01-31 | 2015-12-29 | At&T Intellectual Property Ii, L.P. | Method and apparatus for evaluating component costs in a communication network |
CN105847281A (zh) * | 2016-05-12 | 2016-08-10 | 中国联合网络通信集团有限公司 | 一种dns防御攻击的方法及系统 |
CN105847281B (zh) * | 2016-05-12 | 2019-02-19 | 中国联合网络通信集团有限公司 | 一种dns防御攻击的方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
JP4606481B2 (ja) | 2011-01-05 |
JP2008193751A (ja) | 2008-08-21 |
JP2005318605A (ja) | 2005-11-10 |
KR100774124B1 (ko) | 2007-11-07 |
KR20060047517A (ko) | 2006-05-18 |
CA2504003A1 (en) | 2005-10-27 |
EP1592167A3 (de) | 2005-12-07 |
US20050240466A1 (en) | 2005-10-27 |
US7617303B2 (en) | 2009-11-10 |
JP4191164B2 (ja) | 2008-12-03 |
CA2504003C (en) | 2010-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2504003C (en) | Systems and methods for optimizing access provisioning and capacity planning in ip networks | |
US8443079B2 (en) | Mixed integer programming model for minimizing leased access network costs | |
US7461145B2 (en) | Generating metrics for networked devices | |
US6226273B1 (en) | Communications network management | |
US7554930B2 (en) | Internet route deaggregation and route selection preferencing | |
EP3329639B1 (de) | Netzwerkfunktionsvirtualisierung | |
US20070094381A1 (en) | Methods and systems for developing a capacity management plan for implementing a network service in a data network | |
US20040249939A1 (en) | Methods and apparatus for dynamic and optimal server set selection | |
US20110047293A1 (en) | Application network communication method and apparatus | |
US8676971B2 (en) | Method, system and computer program product for providing ethernet VLAN capacity requirement estimation | |
US20130073740A1 (en) | Application network communication | |
Antevski et al. | Resource orchestration of 5G transport networks for vertical industries | |
US7962650B2 (en) | Dynamic component placement in an event-driven component-oriented network data processing system | |
CN1330124C (zh) | 虚拟化网络资源的方法和装置 | |
US20050066036A1 (en) | Methods, systems and computer program products for facilitating the design and analysis of virtual networks based on total hub value | |
US20130339528A1 (en) | Application allocation in datacenters | |
US20090180388A1 (en) | Dynamic multi-objective grid resources access | |
JP2017143366A (ja) | ネットワーク構成レコメンド装置、ネットワーク構成レコメンド方法およびプログラム | |
US20100046397A1 (en) | Method, system and computer program product for facilitating the design and assignment of ethernet vlans | |
US7509373B2 (en) | Methods for providing communications services | |
CN112825045A (zh) | 支付请求处理方法、系统和存储介质 | |
JP3755939B2 (ja) | 通信回線の割当て配置決定支援システム | |
JP2021158406A (ja) | コントロールノード決定方法と装置およびプログラム | |
JPH07115477A (ja) | サービスオーダオペレーションシステム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR LV MK YU |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR LV MK YU |
|
17P | Request for examination filed |
Effective date: 20060511 |
|
AKX | Designation fees paid |
Designated state(s): DE FR GB |
|
17Q | First examination report despatched |
Effective date: 20070925 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20100327 |