EP1541442A1 - Method of actual information about deviations in a published schedule - Google Patents

Method of actual information about deviations in a published schedule Download PDF

Info

Publication number
EP1541442A1
EP1541442A1 EP03360138A EP03360138A EP1541442A1 EP 1541442 A1 EP1541442 A1 EP 1541442A1 EP 03360138 A EP03360138 A EP 03360138A EP 03360138 A EP03360138 A EP 03360138A EP 1541442 A1 EP1541442 A1 EP 1541442A1
Authority
EP
European Patent Office
Prior art keywords
timetable
train
schedule
day
forecast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP03360138A
Other languages
German (de)
French (fr)
Other versions
EP1541442B1 (en
Inventor
Detlef Daase
Hans-Peter Jürgen Huber
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alcatel Lucent SAS
Original Assignee
Alcatel CIT SA
Alcatel SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34486514&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP1541442(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Alcatel CIT SA, Alcatel SA filed Critical Alcatel CIT SA
Priority to EP03360138A priority Critical patent/EP1541442B1/en
Priority to AT03360138T priority patent/ATE318744T1/en
Priority to DE50302522T priority patent/DE50302522D1/en
Publication of EP1541442A1 publication Critical patent/EP1541442A1/en
Application granted granted Critical
Publication of EP1541442B1 publication Critical patent/EP1541442B1/en
Anticipated expiration legal-status Critical
Revoked legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • B61L27/12Preparing schedules

Definitions

  • the invention relates to a method for timely information about deviations from a published timetable, in particular annual or periodical timetable, where at least one schedule is generated for the day, the current one Operating position of a traffic-based or scheduled flight traffic system, in particular railway system, including temporary delays and Disposition decisions is determined and from the at least one Timetable for the day and the current operating situation a forecast for the future Operating position is determined.
  • a transport company especially a railway company, must Operators, passengers and other transport companies, including port relationships exist ("business partners") inform when which Trains where to go and where are the connections between the trains.
  • Timetable documentation describes an application-related part of the overall timetable. Examples of timetable documents are the driver's book timetable and the departure board in the station. The publication is only in large Intervals. For example, the departure board is published twice a year, namely as a summer and winter timetable document. A timetable exists from all train runs, in the spatial and temporal scope of the timetable and the connections from train number to train number in the office (e.g., train station).
  • a train run consists of the Train number, the track clearly unique track of the train, a sequence of times relative to points (e.g., railway signals) on the route of this Train (space-time coordinates) and physical train data for the travel time calculation, like mass of the train, stopping power, etc ..
  • a timetable is due to short-term planned events, such as construction with diversions, or due to unplanned events, such as technical faults, Weather influences, delays and reactions to them Events (Dispo-decisions) not to keep as he originally was published.
  • the control center is the BZ 2000 operating center of Deutsche Bahn AG.
  • the train traffic is constantly monitored, deviations from the dispatching schedule recognized and calculated as a forecast into the future (forecast timetable).
  • the scheduling schedule Contains a train run for every train number, which consists of a daily scheduled timetable is determined and / or a train run from a daily operating schedule is determined, all changed train runs, if any, and all MRP decisions, if available. Furthermore, he can train runs under construction (for new train numbers) included. From this, new train runs of the daily schedule can be found or the daily operating schedule.
  • the MRP timetable contains copies of existing train journeys for which Dispo decisions are tried and calculated, without these in the Active operation can be implemented. From such a copy can by decision The dispatcher will become a changed train run.
  • the forecast timetable contains redundant to the scheduling schedule for each train number a train run determined from a daily scheduled schedule and / or a train run determined from a daily operating schedule, as well as all predicted train runs, if any. Furthermore is included Train running as it was actually driven, i. all actual messages for the train run.
  • a disadvantage of the aforementioned method is that they are too expensive and too are slow.
  • the information is not available to all recipients at the same time. Customers and business partners will be informed late, if at all.
  • the object of the invention is to provide a method with which everyone is entitled Interested parties as soon as possible about the deviations that concern you can be informed in the train timetable.
  • This object is achieved according to the invention by a method of the beginning mentioned above, in which at least one schedule for the day, the current operating situation and the prognosis at least a current timetable document is generated.
  • the timetable document may consist of a schedule for the day, preferably a roadmap that already takes account of scheduling decisions, and the current operating situation are generated, with a forecast from the current Operating position, which is included in the timetable document.
  • a simple implementation of the procedure results when the timetable document from a known Dispo timetable for the day and an known forecast timetable for the day (the two together one off the current operating situation contain certain forecast) is generated.
  • On Process "recalculate train run” makes the forecast for a given Train run (after a delay or in case of a disposition) by recalculated this train run.
  • the newly calculated train run comes as train run_ "changed” in the dispatching schedule or as a train run "forecast” in the Forecast timetable.
  • the forecast generated from the current operating situation consists of all trains “forecast", trains “changed” and the train runs "SOLL", for which there were no deviations, i. from the MRP and Forecast Timetable together.
  • prognosis An overall picture of the future train runs (“prognosis") can be based on the concept of BZ 2000 only from the dispatching schedule and forecast timetable be determined together. For the determination of a current timetable document Both schedules must therefore be considered.
  • a single schedule is generated for the day, only those Contains data (in terms of time, content), which are necessary for the prognosis of Trains from now on, waiving functionalities, for a timetable document are not necessary.
  • a timetable will be below referred to as Best-Forecast-Timetable.
  • the best-forecasting timetable contains only information about the future, except a reference train run for each train number, during the scheduling and forecasting schedule Contain past, present and future of train runs. The reference train run is completely taken over. To avoid deviations (e.g. "Exit train No.
  • a train run "Beste_Prognose” contains only the not yet worn Part (future) of a train run.
  • the advantage of the Best-Forecast Roadmap is that it provides the targeted, Consistent, simultaneous and rapid dissemination of information about deviations published timetable documents by inventive current timetable documents, whenever a change has occurred, which relates to a timetable according to the invention prepared.
  • a Best-Forecast-Roadmap exists, only this one roadmap has to be considered because it is generated from the scheduling and forecasting timetables and just as updated as this one.
  • the prognosis can be outside the Scheduling and forecasting schedules are carried out in a process "recalculate train run". An update of the scheduling and / or forecasting timetable and therefore, there is no need to wait for associated databases.
  • the best-forecast timetable can be included with each train number: as a reference train a train run determined from a daily scheduled schedule and / or a train run determined from a daily operating schedule; the most recent i. last calculated modified train run "Best Forecast”. Older predicted train runs "Best Forecast” for the same train number are deleted, making the best-forecast timetable a train number contains only the reference train and the most recent train run "Best Forecast”.
  • the train run "Best Forecast” corresponds to one based on a Dispo decision changed train run "changed" in the dispatching schedule or one newly calculated train run "Forecast” in the forecast timetable.
  • the most recent train run "Best Forecast” contains only data about the still not worn part of the train run. The history of how a train drove can not be deduced from the best-forecast timetable. A best-forecast train run is less detailed than the corresponding modified train run or forecasted run of the scheduling or forecasting schedule.
  • an individually configurable timetable document be extracted from the at least one schedule for the day, in particular the best-forecast timetable.
  • the individual timetable document updated in a timely manner.
  • This individual current timetable document preferably has the following properties:
  • This "view” is individually configurable, for example by default a time window, by spatial limitation or the specification of train types, like Intercity or Intercity Express. This means that the customer the information (subscriber) itself - without collusion or negotiation - the Filter criteria determined according to own information need.
  • the information about train runs and connections are taken from the best-forecast timetable.
  • the best-forecasting timetable is updated constantly. The information obsolete no longer as a conventional timetable, because The timetable document is automatically updated as soon as possible is, for example, at the moment of the occurrence of a delay or a dispositive change.
  • the configurability means for example, that a transport company can specify which employees automatically which information automatically get as individual timetable document. Only the information is included distributes the really individual interested.
  • the information recipient can from a variety of electronic formats, electronic distribution media, Select languages (German, English, ...) freely.
  • the ongoing operation can Easier coordinated with other transport companies and business partners become. The service for the customer is significantly improved.
  • the method according to the invention can be used for any traffic system that there is a published roadmap that can not be kept with certainty is where a running comparison of moving traffic (IST) with the current valid schedule for the day (TARGET) takes place, and where the infrastructure and optionally the speed behavior of the vehicles is known. Thus, a prognosis -optional with Fahrzeitmony- possible. If that Speed behavior of the vehicles is known, then the driving time calculation by using the reserve times possible.
  • IST moving traffic
  • TARGET current valid schedule for the day
  • the timetable document can be subscribed. This means that everyone only that gets what he needs, as long as he wants. This results in a big one Application diversity. It will be informed exactly those by a one-time or periodic subscription have expressed their interest and for that meet the requirements.
  • the timetable pad is generated electronically and is electronically in front. It can be generated in any number of languages, formats and media, be transformed and transported.
  • the lifetime is independent of an official timetable period. The update and distribution takes place for earliest possible time. In particular, it can be provided that the distribution not once at the beginning of the timetable period, but always then, when a change of the best-forecasting schedule has occurred, the the corresponding individual current timetable document concerns.
  • Each individual individual timetable document can be assigned: one or more interested parties to whom the individual timetable document has been sent will be one or more formats, media and languages in which the individual timetable document is distributed, a destination for the electronic Distribution of the timetable underlay, e.g. Mobile phone number and a Client and invoice recipient.
  • the railway administration can frequently require individual timetable documents as a template for accepting and modifying for Make available.
  • the lifetime of an individual timetable is independent of fixed Validity periods, such as winter or summer timetable.
  • the Timetable documents can be generated, modified or deleted at any time.
  • the updating of the individual timetable is advantageously event-driven. Events in this sense are deviations from the planned So in particular delay, rerouting or a change of the station driving order (BFO). These deviations are caused by a constant Monitoring the operating situation of the traffic system recognized. Further Events are interventions in the timetable for the day by a human Dispatchers or an automatic conflict resolution or scheduling system.
  • An update of an individual timetable document takes place at these Events only if an individual timetable of change is affected. If an individual timetable document is affected, then it is done the update immediately. The subscriber will only receive an updated one individual timetable, if there is a change according to his selected filter criteria.
  • a fast distribution directly from the source of the information to the end recipient the information can be ensured. It will be all subscribers quasi-informed at the same time. After each update of the daily timetable, especially the best-forecast timetable, will be redistributed. The Distribution takes place electronically instead of slowly calling people.
  • the distribution of the individual timetable document takes place with Each update of the best-forecast timetable concerning the individual timetable.
  • the distribution can be particularly electronic done quickly.
  • the distribution may be, for example, as text (in various Languages) via mobile phones as SMS, via fax, e-mail, telex, Chat or as text and graphics on the Internet.
  • the Distribution as an automatic voice message ("automatic voice message") over Mobile, landline, train radio or distributed directly via station speakers become.
  • connections to other systems are possible, so the current timetable documentation can be transferred to other systems.
  • These other systems For example, subscriber master data and booked train journeys as a train-flow filter, connection filter with no overhead for the subscriber to hand over.
  • connections to work planning systems are conceivable. For example, for a train attendant who is assigned to the train 4711 on day X. is, automatically an individual timetable document for exactly this train and subscribed to the day. Furthermore, the passing on of individual timetable documents conceivable for passenger information systems.
  • the individual timetable document can, for example, via a mobile phone booked and / or paid.
  • the creation and subscription of individual Timetable documents are also available via the Internet or intranet of the a transport company conceivable.
  • the distribution of individual timetable documents can be controlled by subject to the transport company.
  • the distribution of Individual timetable documents are selectively or completely shut down, e.g. in nuclear waste transports or military trains.
  • the inventive method in particular the generation of a current Timetable documentation, updating, configuration and distribution of the Timetable documents may be in a computer program or software be implemented.
  • Each train attendant receives all updates during his service the train of his train including all (lost) connections running as Text via SMS on his mobile phone. He can get this information via on-board speakers pass on to its passengers.
  • the train run of his train the filter on the basis of which the individual timetable document is created. The individual timetable document of the train conductor will only be updated when changes are made to the best-forecast timetable that tracks the train of his turn.
  • An individual timetable document can be used, for example, if a passenger every Monday - Friday in the period between 15:00 and 18:00 o'clock with a train of the train genus ICE or IC from Braunschweig to Berlin wants to drive. To waste no time, he wants to know about current Departure times (delays) and track changes of the filtered out for him Trains currently be informed via SMS on his cell phone.
  • the dispatcher at the emergency terminal may check all train passes through his IP as Receive text by fax or mobile.
  • the setting of the routes is significant, as the scheduling schedule for the day operational, i. e. Driveways must be provided and train rides must be done.
  • the scheduling schedule represents the desired Operational quality for this day.
  • Interlockings must be connected to a dispositive control system that train journeys are made as scheduled in the timetable for the day is provided.
  • train location messages train no., Location, time, optional direction of travel
  • actual messages the current state (also delays) to know and thus to be able to plan.
  • Every signal box has an interlocking district in which it sets switches and signals.
  • a signal box includes one or more stations.
  • the station tracks for transit or stop, the times for arrival, departure, transit and the operational conditions can the dispatcher on the signal box for every train ride put the right roads in good time and missteps prevent. It can be provided that the daily train station timetable daily before the beginning of the production day from the dispatching schedule for the day (in BZ 2000) or the timetable for the day is calculated to be day specific Deviations from the annual timetable, for example due to construction sites, which are already incorporated in these roadmaps.
  • the daytime train station timetable will be sent to the Dispatcher distributed on the signal box.
  • the distribution takes place in the simplest Case as text, for example by teletype or fax, in the more complex case electronically to the tabular edition on a timetable monitor.
  • the dispatcher can provide an individual Order the timetable document to update the daily train timetable becomes. It can also be provided that the daily train station timetable based on an individual timetable document. How to get new Times or track changes as a result of Dispo decisions note all concerned dispatcher.
  • the update can be used to prevent misdirections as well as with the first creation. This is an interlocking to current Dispo decisions a dispositive control system connected so that by the control system caused mishaps are prevented.
  • the daytime train station schedule can be tabulated to the dispatcher Form will be output on a timetable monitor. It is the daytime train station timetable expands to include room for information on actual Times and or actual used railways for departure, arrival or Transit of trains (IST information). This information is provided by the Dispatcher after each departure, arrival, transit in the daily train station timetable added to the timetable monitor.
  • the monitor has to an interactive user interface on.
  • the supplements are transmitted electronically back to the operations control center and incorporated into the forecast timetable. There they serve as a basis for disposition decisions.
  • this variant of the method is the Transmission of train location messages characterized by the fact that the Format and data structure of the record on easy editing in the Control center and adapted to easy familiarization with the forecast timetable are, for example, by specifying the (database) key values for the Data record from the SOLL part of the daily train station timetable. That is then Especially easy if the interactive user interface of a Timetable Monitors Extensions in Day Station Timetable (Table) for this provides IST information.
  • the record can be on one or more any electronic media, single or redundant (signal tech safe), are sent back to the control center, for example twice: once via UMTS mobile radio and once via telephone cable.
  • the Returns can be encrypted and / or authenticated (Electronic) Authenticated Identification of the sender). she goes especially fast, if no slow bus system is used.
  • these IST details can be added to the daily train timetable Information for later statistical evaluation, for example "traveler behavior" as a reason for delay, to be supplemented.
  • the advantage of the method is that all interlockings with manual operation by dispatcher, regardless of design and equipment, with short time horizon, without development, test, maintenance of a drawbar (ZL) - Systems and a control center and therefore with low effort for the Signaling industry are connected to the disposable control technology can. At the same time, existing investments in old carousels are protected.
  • ZL drawbar
  • the "connection” comprises two directions, namely from the control technology (e.g. BZ 2000) to the signal boxes and a feedback from the signal boxes to Control technology.
  • the first direction is the prior art by telephoning and a steering plan interface (in the control center) realized. According to the invention the first direction is through a current timetable document and / or realized a daytime train schedule.
  • the second direction will be realized in the prior art by a message image interface (in the Control Center). According to the invention for a feedback with monitor solution intended.
  • the security gap - errors due to inconsistencies in configuration data can be closed.
  • Incorrect information in the Un-Bruhofs-Fahrplan e.g. due to configuration errors in the control center, the Detect dispatcher.
  • the dispatcher can quickly with clarify the dispatcher in the control system by telephone and thus faulty lines prevent, because not (possibly inconsistent) configuration data in Computer system "Zuglenkung" or project planning data in the Operations center determine which routes for a particular train but a human expert, who is on site anyway (Driving diene conductor).
  • the control center learns the current operating situation. This leads e.g. in case of delays to a new forecast.
  • the forecast is (a) template for Grouping decisions.
  • the MRP decisions or new forecast lead to new daily train station timetables adapted to the new operating situation. Daily train station timetables allow the new operational will in the control center to consistently implement quickly and across signal box boundaries.
  • a comparable cycle is according to the prior art only for (relatively few) Interlockings possible with the train steering and train number notification system are equipped (so-called sub-centers). Such interlockings / subcentrals are via a control center (steering plan and message screen interface) connected to the control center (BZ 2000).
  • the main advantage The feedback with monitor solution is that by doing that this feedback for all interlockings with manual operation by the Dispatcher, regardless of design and equipment, allows all Signal boxes (not only the sub-centers) can be connected to the control center.
  • a control center such as BZ 2000, a much larger sphere of activity, namely virtually the entire route network including Maufflen instead only a few sub-centers predominantly on busy main lines.
  • FIG. 1 shows as a central element a best-prognosis schedule 1 to which the parameters reference train, reference port, best-forecast train run and best-prognosis port are fed by a device 2 for guiding and updating the best-prognosis schedule 1 ,
  • a schedule for day 3 and the forecast timetable for day 4 are included in device 2.
  • the device 2 continues to receive the recalculated in the device 5 train run.
  • the device 6 introduces other changes in the timetable for day 3.
  • the device 7 which is fed to the best-prognosis schedule 1 and which is activated by the device 2, the timetable documents affected by a change of the best-prognosis timetable 1 are identified.
  • the identified timetable documents are recreated and distributed based on the best-prognosis timetable 1 in the device 8 .
  • the best-prognosis schedule 1 only information is supplied, which are interesting for the determination of current timetable documents 9 . In particular, no route information, signal information and the exact route of a train are transmitted.
  • the individual timetable documents 9 can be subscribed by subscribers 10 . For this purpose, a registration is required, which is indicated by the device 11 .
  • the subscriber 10 sets in the device 12 filter criteria for his individual timetable document 9. As a result, the timetable document 9 is configured.
  • the individual timetable document 9 of a subscriber 10 is subscribed.
  • Updated timetable documents 9 are forwarded by the device 8 to various subscribers such as operating personnel 14 , business partners 15 , passengers 16 or passenger information systems 17 .
  • the aforementioned devices 2, 5, 6, 7, 8, 11, 12, and 13 may be configured as processes in a computer program or software.
  • FIG. 2 indicates the integration of the method according to the invention into an existing concept of an operating center.
  • the bold arrows 20, 21, 22 indicate new interfaces via which information of a scheduling schedule 3 for one day, a forecasting schedule 4 for one day and newly calculated train runs into the device for guiding and initializing the best prognosis schedule. Timetable to be initiated. Due to error messages supplied via arrow 25 , the device 26 is re-scheduled. This is usually done by a route dispatcher or Glaslenker, which changes trains in advance through disposition decisions, in order to avoid delays and disruptions as well as possible conflicts, to minimize delays and to keep connections. The basis for his decision is the graphically displayed target train runs, forecast train runs and train runs which have been changed on the basis of already taken disposition decisions.
  • a train run in the device 27a can be redetermined starting from the dispatching schedule 3 (train run "changed”). If a deviation of a train from the desired train run is detected in the device 28 , a new train run (train run "forecast”) is likewise determined in the device 27b and fed to the forecast timetable 4. The train runs "Forecast” and “Run” are added to the best-forecast timetable as the "Best Forecast” train run. A train number is the current train run "Best Forecast”. A detected in the device 28 deviation is also passed to the device 26. Starting from the dispatching schedule 3, the setting instructions per sub-center 30 are determined in the device 29 per train run.
  • a steering plan 31 is created for the next 8 hours, which is distributed by the device 32 .
  • the steering plan 31 is deposited for each train and for each Huawei signal, which route is to be set with which slip path when approaching this train.
  • the train control plan 31 includes wait conditions and order controls on specified signals.
  • the train control system generates 31 control commands from the steering plan and sends them to the signal box for execution. This relieves the dispatcher of routine work.
  • the steering plans 31 are buffered and distributed with a preview of a few hours to the sub-centers 30.
  • the sub-centers 30 are connected to the infrastructure, ie switches, signals, free-reporting systems and the like. In conjunction, which in turn affect the trains 35 .
  • Faults are routed from the sub-centers 30 to the building design 36 and to the scheduling facility 37.
  • scheduling decisions are forwarded by telephone 38 to the operating personnel 39.
  • Passengers 40 and business partners 41 are not informed directly. This can be improved by the illustrated in Fig. 1 method by the individual timetable documents are created and passed on electronically.
  • FIG. 3 shows the daily initialization of daily train station schedules. From the daily scheduled timetable 50 and the daily operating timetable 51, the determination of which is explained in connection with FIG. 5, a daily station timetable 53 is determined in the device 52 for each Wermeldestelle.
  • the daytime train schedule 53 contains information such as connection, train number, track, time (departure, transit, arrival).
  • it is determined in the device 52 of the sections of the route 54, which is distributed by the device 55 as well as the day station schedules the interlocking 56th
  • the impetus for distributing the daily train station timetables is the process 52.
  • the dispatcher 57 can set the correct routes in good time.
  • the updating of the daily train station timetables is carried out according to FIG. 4 , when a train run in the device 60 is recalculated. This enters the scheduling schedule 3 and the forecast timetable 4. Due to the changed train run and the forecast of the train run, the affected daily train station timetables are determined in the device 61 . The daytime train schedule 53 is recalculated in the device 62 and redistributed by the device 55 to the affected interlockings 56.
  • Fig. 5 shows a first alternative of the daily Clearaufrüstung a signal box. 56.
  • a published scheduled timetable 66 which is generally valid for 6 months, is determined.
  • a daily target schedule 50 is determined for each day.
  • Parallel to the scheduled periodic schedule 66 there is an internal periodic operating schedule 67 , which is also generally valid for 6 months.
  • the daily operating schedule 51 is determined for each day.
  • the scheduling schedule 3 is determined. From this, in turn, the daily train schedule 53 can be determined.
  • the daily station schedule 53 becomes directly from the daytime schedule 50 and the daily service schedule 51, the deviations from the annual schedule, for example, due to construction 65 contains determined.
  • Fig. 7 shows a representation of how parallel to the train steering system 70, a steering plan 31, which is routed to a sub-center 30, and a daytime train schedule 53, is given to a simple interlocking 56.
  • the train control 70 in the sub-center 30 are transmitted the train number, the route and the parking conditions.
  • the sub-center 30 comprises a computer-assisted train steering system 70, an electronic interlocking 71 and a computer-aided train number notification system 72 .
  • FIG. 8 substantially corresponds to FIG. 7 except that the update of the steering plan 31 and the daytime train schedule 53 is shown. If a delay is reported by a sub-central 30 or a simple interlocking 56, the forecast timetable 4 is updated. Then the affected tags station timetables 53 are brought up to date and transmitted to the affected simple interlockings 56. This can be done for example by an individual current timetable. If a dispatching decision 75 is made, this is included in the scheduling schedule 3. Subsequently, the affected steering plan 31 and the affected daily train station timetable 53 are updated and passed on to the affected sub-centers 30 and interlockings 56, respectively.
  • the work of the Dispatcher is facilitated when provided with an interactive user interface 79 created on the basis of the daytime train schedule.
  • This user interface 79 is shown in FIG .
  • Each Buchmeldestelle (station) of the signal box is accessible via a tab 80 , eg "Bahnhof_1".
  • a rider 80 of a Switzerlandmeldestelle in the near future, an action is pending, automatically highlighted by the system.
  • Final data records processed by the operator / dispatcher, transferred to the control center and acknowledged from there, are automatically removed from the display by the system.
  • the user interface 79 contains the categories train number 81, "train from” 82, "train to” 83 and track 84. From this recognizes the dispatcher in the knowledge of the operating conditions, which routes he must ask. From the field "Halt?" He recognizes whether a train arrives, departs or passes.
  • the "TIME TIME” field 86 shows the time published in the timetable.
  • the "Forecast TIME” field 87 contains the last forecast reported by the control center. At it the dispatcher recognizes, when he must put the driveways.
  • the present line 88 represents the current time on the Y axis.
  • the table scrolls automatically as time progresses, for example, sorted by the last forecast time.
  • the function key "now” 89 the current system time (radio clock) is entered in a simultaneously selected field (ACTUAL TIME) 90 . This is done, for example, via a touch screen of a timetable monitor and two-finger operation.
  • ACTUAL TIME ACTUAL TIME
  • a function key "Delay" 91 is provided to justify the delay for a single train or for a collective reasoning for all trains that have a common path within a period of time and that are late because of the same reason (eg "railway embankment burns").
  • the justification is entered in box 92 .
  • the interactive user interface 79 is only sensitive to entries for the present and the past.
  • the presented user interface 79 fully supports the local specialist in the reason of delays.
  • the delay minutes do not have to can be typed in more manually, but are automatically turned off by the system the difference between the target time and the actual time.
  • On through the function key "Delay" 91 menu allows quick assignment of Justifications for records. Records with delays / justifications can be forwarded to a statistic system in the control center. records With unreasonable delays can automatically from the control center sent to the dispatcher for subsequent substantiation become.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Alarm Systems (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

To give up-to-date information on deviations from published timetables, especially with railway traffic, at least a timetable of the day is produced as a best prognosis timetable (1) and especially from a disposition timetable (3) and a prognosis timetable (4). At least one current timetable document (9) is produced from the best prognosis, which is configured individually and updated when a timetable change occurs for the day. The current timetable document is passed to a distribution center (8) to be available for operating personnel (14), railway business partners (15), passengers (16), information displays (17), etc.

Description

Stand der TechnikState of the art

Die Erfindung betrifft ein Verfahren zur zeitnahen Information über Abweichungen von einem veröffentlichten Fahrplan, insbesondere Jahres- oder Periodenfahrplan, bei dem mindestens ein Fahrplan für den Tag erzeugt wird, die aktuelle Betriebslage eines fahr- oder flugplangebundenen Verkehrssystems, insbesondere Eisenbahnsystems, einschließlich momentaner Verspätungen und Dispositionsentscheidungen bestimmt wird und aus dem mindestens einen Fahrplan für den Tag und der aktuellen Betriebslage eine Prognose für die zukünftige Betriebslage ermittelt wird. The invention relates to a method for timely information about deviations from a published timetable, in particular annual or periodical timetable, where at least one schedule is generated for the day, the current one Operating position of a traffic-based or scheduled flight traffic system, in particular Railway system, including temporary delays and Disposition decisions is determined and from the at least one Timetable for the day and the current operating situation a forecast for the future Operating position is determined.

Ein Verkehrsunternehmen, insbesondere ein Eisenbahnunternehmen, muss Betriebspersonal, Fahrgäste und andere Verkehrsunternehmen, zu denen Anschlussbeziehungen bestehen ("Geschäftspartner") informieren, wann welche Züge wohin abfahren und wo welche Anschlüsse zwischen den Zügen gelten.A transport company, especially a railway company, must Operators, passengers and other transport companies, including port relationships exist ("business partners") inform when which Trains where to go and where are the connections between the trains.

Diese Information geschieht über veröffentlichte Fahrplanunterlagen. Eine Fahrplanunterlage beschreibt anwendungsbezogen einen Teil des Gesamtfahrplans. Beispiele für Fahrplanunterlagen sind der Buchfahrplan des Lokführers und die Abfahrtstafel im Bahnhof. Die Veröffentlichung erfolgt nur in großen Zeitabständen. Die Abfahrtstafel wird beispielsweise zweimal pro Jahr veröffentlicht, nämlich als Sommer- und Winterfahrplanunterlage. Ein Fahrplan besteht aus allen Zugläufen, die im räumlichen und zeitlichen Gültigkeitsbereich des Fahrplans vorkommen und den Anschlüssen von Zugnummer nach Zugnummer in der Betriebsstelle (z.B. Bahnhof). Ein Zuglauf besteht dabei aus der Zugnummer, dem spurplangenau eindeutigen Laufweg des Zuges, einer Folge von Zeiten relativ zu Punkten (z.B. Eisenbahnsignalen) auf dem Laufweg dieses Zuges (Raum-Zeit-Koordinaten) und physikalischen Zugdaten für die Fahrzeitrechnung, wie Masse des Zuges, Bremsvermögen, etc.. Optional kann ein Zuglauf Bedingungen zum Weiterfahren an bestimmten Eisenbahnsignalen oder eine Kennzeichnung als "außergewöhnliche Sendung" umfassen.This information is provided via published timetable documents. A Timetable documentation describes an application-related part of the overall timetable. Examples of timetable documents are the driver's book timetable and the departure board in the station. The publication is only in large Intervals. For example, the departure board is published twice a year, namely as a summer and winter timetable document. A timetable exists from all train runs, in the spatial and temporal scope of the timetable and the connections from train number to train number in the office (e.g., train station). A train run consists of the Train number, the track clearly unique track of the train, a sequence of times relative to points (e.g., railway signals) on the route of this Train (space-time coordinates) and physical train data for the travel time calculation, like mass of the train, stopping power, etc .. Optionally, a train run Conditions to continue on certain railway signals or include an "exceptional consignment" mark.

Ein Fahrplan ist aufgrund kurzfristig geplanter Ereignisse, wie Baumaßnahmen mit Umleitungen, oder aufgrund ungeplanter Ereignisse, wie technischen Störungen, Wettereinflüsse, Verspätungen sowie aufgrund von Reaktionen auf diese Ereignisse (Dispo-Entscheidungen) nicht so zu halten, wie er ursprünglich veröffentlich wurde.A timetable is due to short-term planned events, such as construction with diversions, or due to unplanned events, such as technical faults, Weather influences, delays and reactions to them Events (Dispo-decisions) not to keep as he originally was published.

Es ist bekannt, beispielsweise in einer Leitzentrale, für jeden Tag einen Fahrplan, einen so genannten Dispo-Fahrplan abzuleiten. Ein Beispiels für eine Leitzentrale ist die Betriebszentrale BZ 2000 der Deutschen Bahn AG. Der Zugverkehr wird ständig beobachtet, Abweichungen vom Dispo-Fahrplan erkannt und als Prognose in die Zukunft gerechnet (Prognose-Fahrplan). Der Dispo-Fahrplan enthält zu jeder Zugnummer einen Zuglauf, der aus einem Tages-Soll-Fahrplan ermittelt ist und/oder einen Zuglauf, der aus einem Tages-Betriebs-Fahrplan ermittelt ist, alle geänderten Zugläufe, falls vorhanden, und alle Dispo-Entscheidungen, falls vorhanden. Weiterhin kann er Zugläufe unter Konstruktion (für neue Zugnummern) enthalten. Daraus können neue Zugläufe des Tages-Soll-Fahrplans oder des Tages-Betriebs-Fahrplans entstehen. Ferner kann der Dispo-Fahrplan Kopien von bestehenden Zugläufen enthalten, für die Dispo-Entscheidungen probiert und ausgerechnet werden, ohne dass diese im Wirkbetrieb umgesetzt werden. Aus einer solchen Kopie kann durch Entscheidung des Disponenten ein geänderter Zuglauf werden.It is well known, for example in a control center, for every day a timetable, to derive a so-called dispatching schedule. An example of one The control center is the BZ 2000 operating center of Deutsche Bahn AG. The train traffic is constantly monitored, deviations from the dispatching schedule recognized and calculated as a forecast into the future (forecast timetable). The scheduling schedule Contains a train run for every train number, which consists of a daily scheduled timetable is determined and / or a train run from a daily operating schedule is determined, all changed train runs, if any, and all MRP decisions, if available. Furthermore, he can train runs under construction (for new train numbers) included. From this, new train runs of the daily schedule can be found or the daily operating schedule. Furthermore, can the MRP timetable contains copies of existing train journeys for which Dispo decisions are tried and calculated, without these in the Active operation can be implemented. From such a copy can by decision The dispatcher will become a changed train run.

Der Prognose-Fahrplan enthält redundant zum Dispo-Fahrplan zu jeder Zugnummer einen Zuglauf, der aus einem Tages-Soll-Fahrplan ermittelt ist und/oder einen Zuglauf, der aus einem Tages-Betriebs-Fahrplan ermittelt ist, sowie alle prognostizierten Zugläufe, falls vorhanden. Weiterhin ist enthalten ein Zuglauf, wie tatsächlich gefahren wurde, d.h. alle IST-Meldungen zum Zuglauf.The forecast timetable contains redundant to the scheduling schedule for each train number a train run determined from a daily scheduled schedule and / or a train run determined from a daily operating schedule, as well as all predicted train runs, if any. Furthermore is included Train running as it was actually driven, i. all actual messages for the train run.

Zum Dispo-Fahrplan und zum Prognose-Fahrplan gibt es keine Fahrplanunterlage. Änderungen eines Zuglaufs, sowie bei Anschlüssen, werden von einem Streckendisponenten in der Betriebszentrale den direkt betroffenen Betriebsangehörigen, z.B. Fahrdienstleitern, per Telefon oder Zugfunk, bekannt gegeben.There is no timetable document for the dispatching schedule and the forecast timetable. Changes to a train run, as well as at connections, are from a Route dispatchers in the operations center to the directly affected employees, e.g. Dispatchers, by telephone or train radio, announced.

Zusätzlich kann eine automatische Information über Änderungen nur bei Dispo-Entscheidungen eines Disponenten/Zuglenkers und ausschließlich an das Computersystem Zuglenkung erfolgen. Menschen werden auf diesem Weg nicht direkt informiert.In addition, automatic information about changes can only be made during scheduling decisions of a dispatcher / train driver and exclusively to the Computer system train steering done. People will be on this path not directly informed.

Nachteilig an den vorgenannten Verfahren ist, dass sie zu aufwendig und zu langsam sind. Die Information ist nicht gleichzeitig für alle Empfänger vorhanden. Kunden und Geschäftspartner werden, wenn überhaupt, dann spät informiert.A disadvantage of the aforementioned method is that they are too expensive and too are slow. The information is not available to all recipients at the same time. Customers and business partners will be informed late, if at all.

Im Bereich der Deutschen Bahn gibt es noch etliche Einzellösungen für besonders wichtige Bahnhöfe oder Geschäftspartner. Beispielsweise hat die Ansagerin für den Bahnhof Frankfurt/Flughafen über Datenfernverbindung den Streckenspiegel aus der Betriebszentrale (BZ) Frankfurt als Informationsquelle aufgeschaltet. Die DB Reise & Touristik hat lesenden Zugriff auf das Dispositionssystem LeiDis-N der Netzleitzentrale in Frankfurt und die Österreichische Bundesbahn (ÖBB) erhält für den Orient-Express ab Stuttgart Vormeldungen im UIC-Format (UIC=Internationales Normierungsgremium für das Eisenbahnwesen). Diese Einzellösungen sind nicht generell anwendbar und teilweise sehr aufwändig.In the area of Deutsche Bahn, there are still several individual solutions for special important railway stations or business partners. For example, the announcer has for the station Frankfurt / airport over data remote connection the track mirror from the central office (BZ) Frankfurt as a source of information. DB Reise & Touristik has read access to the dispatching system LeiDis-N of the network control center in Frankfurt and the Austrian Federal Railways (ÖBB) receives for the Orient Express from Stuttgart UIC format (UIC = international standardization body for the railways). These individual solutions are not generally applicable and sometimes very consuming.

Aufgabe der ErfindungObject of the invention

Aufgabe der Erfindung ist es, ein Verfahren bereit zu stellen, mit dem alle berechtigt Interessierten möglichst schnell über die Sie selbst betreffenden Abweichungen im Zugfahrplan informiert werden können.The object of the invention is to provide a method with which everyone is entitled Interested parties as soon as possible about the deviations that concern you can be informed in the train timetable.

In einem weiteren Aspekt ist es Aufgabe der Erfindung, ein Verfahren zur Rückkopplung von den Stellwerken zur Leittechnik bereit zu stellen, damit die Leitzentrale die aktuelle Betriebslage erfährt, als Grundlage für Prognose und Dispo-Entscheidungen.In another aspect, it is an object of the invention to provide a method of feedback from the signal boxes to the control technology to provide the control center the current operating situation learns, as basis for prognosis and Grouping decisions.

Gegenstand der ErfindungSubject of the invention

Gelöst wird diese Aufgabe erfindungsgemäß durch ein Verfahren der eingangs genannten Art, bei dem aus dem mindestens einen Fahrplan für den Tag, der aktuellen Betriebslage und der Prognose zumindest eine aktuelle Fahrplanunterlage generiert wird.This object is achieved according to the invention by a method of the beginning mentioned above, in which at least one schedule for the day, the current operating situation and the prognosis at least a current timetable document is generated.

Die Fahrplanunterlage kann aus einem Fahrplan für den Tag, vorzugsweise einem Fahrplan, der Dispositionsentscheidungen bereits berücksichtigt, und der aktuellen Betriebslage erzeugt werden, wobei eine Prognose aus der aktuellen Betriebslage ermittelt werden kann, die in die Fahrplanunterlage eingeht.The timetable document may consist of a schedule for the day, preferably a roadmap that already takes account of scheduling decisions, and the current operating situation are generated, with a forecast from the current Operating position, which is included in the timetable document.

Eine einfache Durchführung des Verfahrens ergibt sich, wenn die Fahrplanunterlage aus einem an sich bekannten Dispo-Fahrplan für den Tag und einem an sich bekannten Prognose-Fahrplan für den Tag (die beide zusammen eine aus der aktuellen Betriebslage bestimmte Prognose enthalten) generiert wird. Ein Prozess "Zuglauf neu berechnen" macht die Prognose für einen bestimmten Zuglauf (nach einer Verspätung oder bei einer Dispo-Maßnahme), indem er diesen Zuglauf neu berechnet. Der neu berechnete Zuglauf kommt als Zuglauf_"geändert" in den Dispo-Fahrplan bzw. als Zuglauf "Prognose" in den Prognose-Fahrplan. Die aus der aktuellen Betriebslage generierte Prognose besteht aus allen Zugläufen "Prognose", Zugläufen "geändert" und den Zugläufen "SOLL", zu denen es keine Abweichungen gab, d.h. aus dem Dispo- und Prognose-Fahrplan zusammen. Bei mehreren neu berechneten Zugläufen ("geändert" oder "Prognose") zur gleichen Zugnummer gilt nur der zuletzt errechnete. Die IST-Meldungen gemäß der aktuellen Betriebslage stoßen bei Verspätungen die Prognose an.A simple implementation of the procedure results when the timetable document from a known Dispo timetable for the day and an known forecast timetable for the day (the two together one off the current operating situation contain certain forecast) is generated. On Process "recalculate train run" makes the forecast for a given Train run (after a delay or in case of a disposition) by recalculated this train run. The newly calculated train run comes as train run_ "changed" in the dispatching schedule or as a train run "forecast" in the Forecast timetable. The forecast generated from the current operating situation consists of all trains "forecast", trains "changed" and the train runs "SOLL", for which there were no deviations, i. from the MRP and Forecast Timetable together. For several recalculated train runs ("changed") or "Forecast") for the same train number, only the last calculated one is valid. The actual messages according to the current operating situation encounter delays the forecast.

Ein Gesamtbild der zukünftigen Zugläufe ("Prognose") kann bei Anlehnung an das Konzept der BZ 2000 nur aus dem Dispo-Fahrplan und Prognose-Fahrplan zusammen ermittelt werden. Für die Ermittlung einer aktuellen Fahrplanunterlage müssen daher beide Fahrpläne betrachtet werden.An overall picture of the future train runs ("prognosis") can be based on the concept of BZ 2000 only from the dispatching schedule and forecast timetable be determined together. For the determination of a current timetable document Both schedules must therefore be considered.

Vorteilhafterweise wird ein einziger Fahrplan für den Tag generiert, der nur diejenigen Daten (zeitlich, inhaltlich) enthält, die notwendig sind zur Prognose von Zugläufen ab dem jetzigen Zeitpunkt, unter Verzicht auf Funktionalitäten, die für eine Fahrplanunterlage nicht notwendig sind. Ein solcher Fahrplan wird im Folgenden als Beste-Prognose-Fahrplan bezeichnet. Der Beste-Prognose-Fahrplan enthält also nur Informationen betreffend die Zukunft, mit Ausnahme eines Referenz-Zuglaufs für jede Zugnummer, während der Dispo- und Prognose-Fahrplan Vergangenheit, Gegenwart und Zukunft von Zugläufen enthalten. Der Referenz-Zuglauf wird vollständig übernommen. Um Abweichungen (z.B. "Abfahrt Zug-Nr. 4711 von Gleis 3 statt Gleis 1") in die aktuelle Fahrplanunterlage schreiben zu können und an den Endabnehmer der aktuellen Fahrplanunterlage zu verteilen, muss der ursprünglich veröffentlichte Zuglauf (als Referenz-Zuglauf) bekannt sein und mit dem Zuglauf "Beste Prognose" verglichen werden. Ein Zuglauf "Beste_Prognose" enthält nur den noch nicht abgefahrenen Teil (Zukunft) eines Zuglaufs.Advantageously, a single schedule is generated for the day, only those Contains data (in terms of time, content), which are necessary for the prognosis of Trains from now on, waiving functionalities, for a timetable document are not necessary. Such a timetable will be below referred to as Best-Forecast-Timetable. The best-forecasting timetable contains only information about the future, except a reference train run for each train number, during the scheduling and forecasting schedule Contain past, present and future of train runs. The reference train run is completely taken over. To avoid deviations (e.g. "Exit train No. 4711 from track 3 instead of track 1") into the current timetable to be able to write and to the end user of the current timetable document distribute the originally published train run (as a reference train run) be known and compared with the train run "Best Forecast" become. A train run "Beste_Prognose" contains only the not yet worn Part (future) of a train run.

Der Vorteil des Beste-Prognose-Fahrplans besteht darin, dass er die gezielte, konsistente, gleichzeitige und schnelle Verbreitung von Informationen über Abweichungen von veröffentlichten Fahrplanunterlagen durch erfindungsgemäße aktuelle Fahrplanunterlagen, immer dann, wenn eine Änderung eingetreten ist, die eine erfindungsgemäße Fahrplanunterlage betrifft, vorbereitet. Wenn ein Beste-Prognose-Fahrplan besteht, muss nur dieser eine Fahrplan betrachtet werden, da er aus dem Dispo-Fahrplan und dem Prognose-Fahrplan erzeugt ist und genauso aktualisiert ist, wie diese. Die Prognose kann außerhalb des Dispo- und Prognose-Fahrplans erfolgen, in einem Prozess "Zuglauf neu berechnen". Eine Aktualisierung der Dispo- und/oder Prognose-Fahrplans und zugeordneter Datenbanken muss daher nicht abgewartet werden.The advantage of the Best-Forecast Roadmap is that it provides the targeted, Consistent, simultaneous and rapid dissemination of information about deviations published timetable documents by inventive current timetable documents, whenever a change has occurred, which relates to a timetable according to the invention prepared. When a Best-Forecast-Roadmap exists, only this one roadmap has to be considered because it is generated from the scheduling and forecasting timetables and just as updated as this one. The prognosis can be outside the Scheduling and forecasting schedules are carried out in a process "recalculate train run". An update of the scheduling and / or forecasting timetable and therefore, there is no need to wait for associated databases.

Der Beste-Prognose-Fahrplan kann zu jeder Zugnummer enthalten: als Referenzzuglauf einen Zuglauf, der aus einem Tages-Soll-Fahrplan ermittelt ist und/oder einen Zuglauf, der aus einem Tages-Betriebs-Fahrplan ermittelt ist; den aktuellsten d.h. zuletzt errechneten geänderten Zuglauf "Beste-Prognose". Ältere prognostizierte Zugläufe "Beste-Prognose" zur gleichen Zugnummer werden gelöscht, so dass der Beste-Prognose-Fahrplan zu einer Zugnummer nur den Referenzzuglauf und den aktuellsten Zuglauf "Beste-Prognose" enthält. Der Zuglauf "Beste Prognose" entspricht einem aufgrund einer Dispo-Entscheidung geänderten Zuglauf "geändert" im Dispo-Fahrplan oder einem neu berechneten Zuglauf "Prognose" im Prognose-Fahrplan.The best-forecast timetable can be included with each train number: as a reference train a train run determined from a daily scheduled schedule and / or a train run determined from a daily operating schedule; the most recent i. last calculated modified train run "Best Forecast". Older predicted train runs "Best Forecast" for the same train number are deleted, making the best-forecast timetable a train number contains only the reference train and the most recent train run "Best Forecast". The train run "Best Forecast" corresponds to one based on a Dispo decision changed train run "changed" in the dispatching schedule or one newly calculated train run "Forecast" in the forecast timetable.

Der aktuellste Zuglauf "Beste-Prognose" enthält nur noch Daten über den noch nicht abgefahrenen Teil des Zuglaufs. Die Historie, wie ein Zug gefahren ist, lässt sich aus dem Beste-Prognose-Fahrplan nicht mehr ableiten. Ein Beste-Prognose-Zuglauf ist weniger detailliert als der entsprechende geänderte Zuglauf oder prognostizierte Zuglauf des Dispo- bzw. Prognosefahrplans.The most recent train run "Best Forecast" contains only data about the still not worn part of the train run. The history of how a train drove can not be deduced from the best-forecast timetable. A best-forecast train run is less detailed than the corresponding modified train run or forecasted run of the scheduling or forecasting schedule.

Informationen über Dispo-Entscheidungen, Wartebedingungen, Zugreihenfolgeregelung, Kennzeichnung als außergewöhnliche Sendung und physikalische Zugdaten für die Fahrzeitrechnung müssen in einem Beste-Prognose-Zuglauf nicht enthalten sein, wodurch die Datenmenge verringert wird.Information about scheduling decisions, waiting conditions, train sequence control, Marking as an exceptional consignment and physical Train data for driving time calculation must be in a best-forecasted train run not included, which reduces the amount of data.

Für den Beste-Prognose-Zuglauf können Angaben zum Laufweg des Zuges auf Angaben der Bahnhofsgleise reduziert werden, um das Datenvolumen klein zu halten. Aus dem gleichen Grund können Weg-Zeit-Koordinaten für Streckenblocksignale entfallen.For the best-forecasting train run, information on the route of the train can be found Details of the station tracks can be reduced to small the data volume hold. For the same reason, path-time coordinates can be used for link block signals omitted.

Vorteilhafterweise führt jede neue Dispo-Entscheidung und jede neue Verspätung zum frühest möglichen Zeitpunkt zu einer Aktualisierung des Beste-Prognose-Fahrplans und nachfolgend zur Aktualisierung der aktuellen Fahrplanunterlagen. Wegen einem deutlich geringeren Datenvolumen geht die Aktualisierung des Beste-Prognose-Fahrplans schneller als die Aktualisierung des Dispo- und Prognose-Fahrplans.Advantageously, each new Dispo decision and each new delay at the earliest possible time to update the Best-Forecast Timetable and below to update the current one Timetable documents. Because of a significantly lower data volume is the Update the best-forecasting schedule faster than the update the scheduling and forecasting schedule.

Vorzugsweise kann aus dem mindestens einen Fahrplan für den Tag, insbesondere dem Beste-Prognose-Fahrplan, eine individuell konfigurierbare Fahrplanunterlage extrahiert werden. Vorteilhafterweise wird die individuelle Fahrplanunterlage zeitnah aktualisiert. Diese individuelle aktuelle Fahrplanunterlage weist vorzugsweise folgende Eigenschaften auf:Preferably, from the at least one schedule for the day, in particular the best-forecast timetable, an individually configurable timetable document be extracted. Advantageously, the individual timetable document updated in a timely manner. This individual current timetable document preferably has the following properties:

Sie ist ein Ausschnitt aus bzw. ein "View" auf mindestens einen Tagesfahrplan, insbesondere auf einen Beste-Prognose-Fahrplan, der eigenständig gepflegt wird. Dieser "View" ist individuell konfigurierbar, beispielsweise durch Vorgabe eines Zeitfensters, durch räumliche Begrenzung oder die Vorgabe von Zuggattungen, wie Intercity oder Intercity Express. Dies bedeutet, dass der Abnehmer der Information (Abonnent) selbst - ohne Absprachen oder Verhandlungen - die Filterkriterien nach eigenem Informationsbedürfnis bestimmt. Die Informationen über Zugläufe und Anschlüsse werden aus dem Beste-Prognose-Fahrplan entnommen. Der Beste-Prognose-Fahrplan, wird laufend aktualisiert. Die Information veraltet nicht mehr wie bei einer herkömmlichen Fahrplanunterlage, weil zum frühest möglichen Zeitpunkt die Fahrplanunterlage automatisch aktualisiert wird, beispielsweise im Moment des Entstehens einer Verspätung oder einer dispositiven Änderung.It is a part of or a "view" on at least one daily timetable, in particular, on a best-forecasting timetable, maintained independently becomes. This "view" is individually configurable, for example by default a time window, by spatial limitation or the specification of train types, like Intercity or Intercity Express. This means that the customer the information (subscriber) itself - without collusion or negotiation - the Filter criteria determined according to own information need. The information about train runs and connections are taken from the best-forecast timetable. The best-forecasting timetable, is updated constantly. The information obsolete no longer as a conventional timetable, because The timetable document is automatically updated as soon as possible is, for example, at the moment of the occurrence of a delay or a dispositive change.

Die Konfigurierbarkeit bedeutet beispielsweise, dass ein Verkehrsunternehmen festlegen kann, welche Mitarbeiter automatisch welche Informationen automatisch als individuelle Fahrplanunterlage bekommen. Dabei wird nur die Information verteilt die wirklich individuell interessiert. Der Informationsempfänger kann aus einer Vielfalt von elektronischen Formaten, elektronischen Verteilmedien, Sprachen (Deutsch, Englisch, ...) frei auswählen. Der laufende Betrieb kann leichter mit anderen Verkehrsunternehmen und Geschäftspartnern abgestimmt werden. Der Service für den Kunden wird erheblich verbessert.The configurability means, for example, that a transport company can specify which employees automatically which information automatically get as individual timetable document. Only the information is included distributes the really individual interested. The information recipient can from a variety of electronic formats, electronic distribution media, Select languages (German, English, ...) freely. The ongoing operation can Easier coordinated with other transport companies and business partners become. The service for the customer is significantly improved.

Das erfindungsgemäße Verfahren ist für jedes Verkehrssystem einsetzbar, bei dem es einen veröffentlichten Fahrplan gibt, der nicht mit Sicherheit einzuhalten ist, bei dem ein laufender Vergleich des fahrenden Verkehrs (IST) mit dem aktuell gültigen Fahrplan für den Tag (SOLL) stattfindet, und bei dem die Infrastruktur und optional das Geschwindigkeitsverhalten der Fahrzeuge bekannt ist. Damit ist eine Prognose -optional mit Fahrzeitrechnung- möglich. Wenn das Geschwindigkeitsverhalten der Fahrzeuge bekannt ist, dann ist die Fahrzeitrechnung unter Aufbrauchen der Reservezeiten möglich.The method according to the invention can be used for any traffic system that there is a published roadmap that can not be kept with certainty is where a running comparison of moving traffic (IST) with the current valid schedule for the day (TARGET) takes place, and where the infrastructure and optionally the speed behavior of the vehicles is known. Thus, a prognosis -optional with Fahrzeitrechnung- possible. If that Speed behavior of the vehicles is known, then the driving time calculation by using the reserve times possible.

Die Fahrplanunterlage kann abonnierbar sein. Dies bedeutet, dass jeder nur das bekommt, was er braucht, solange er will. Daraus ergibt sich eine große Anwendungsvielfalt. Es werden genau diejenigen informiert, die durch ein einmaliges oder periodisches Abonnement ihr Interesse bekundet haben und dafür die Voraussetzungen erfüllen.The timetable document can be subscribed. This means that everyone only that gets what he needs, as long as he wants. This results in a big one Application diversity. It will be informed exactly those by a one-time or periodic subscription have expressed their interest and for that meet the requirements.

Bevorzugt wird die Fahrplanunterlage elektronisch erzeugt und liegt elektronisch vor. Sie kann in beliebig vielen Sprachen, Formaten und Medien erzeugt, transformiert und transportiert werden. Die Lebensdauer ist unabhängig von einer offiziellen Fahrplanperiode. Die Aktualisierung und Verteilung erfolgt zum frühest möglichen Zeitpunkt. Insbesondere kann vorgesehen sein, dass die Verteilung nicht einmalig zu Beginn der Fahrplanperiode erfolgt, sondern immer dann, wenn eine Änderung des Beste-Prognose-Fahrplans eingetreten ist, die die entsprechende individuelle aktuelle Fahrplanunterlage betrifft.Preferably, the timetable pad is generated electronically and is electronically in front. It can be generated in any number of languages, formats and media, be transformed and transported. The lifetime is independent of an official timetable period. The update and distribution takes place for earliest possible time. In particular, it can be provided that the distribution not once at the beginning of the timetable period, but always then, when a change of the best-forecasting schedule has occurred, the the corresponding individual current timetable document concerns.

Jeder (Mensch, Organisation), der bestimmte finanzielle, formale und technische Kriterien erfüllt, kann derartige individuelle Fahrplanunterlagen anlegen und abonnieren. Das kann sowohl ein Mitarbeiter des Verkehrsunternehmens, z.B. Zugbegleiter, sein, als auch ein Reisender oder ein anderes Verkehrsunternehmen, das Ab- oder Zubringerlinien betreibt.Everyone (human, organization), the specific financial, formal and technical Met criteria can create such individual timetable documents and subscribe. This can be both an employee of the transport company, e.g. Train conductor, his, as well as a traveler or another transport company, operating the drop or feeder lines.

Zu jeder einzelnen individuellen Fahrplanunterlage können zugeordnet sein: ein oder mehrere Interessenten, denen die individuelle Fahrplanunterlage zugestellt wird, ein oder mehrere Formate, Medien und Sprachen in denen die individuelle Fahrplanunterlage verteilt wird, eine Zielangabe für die elektronische Verteilung der Fahrplanunterlage, z.B. Mobilfunk-Telefonnummer und ein Auftraggeber und Rechnungsempfänger.Each individual individual timetable document can be assigned: one or more interested parties to whom the individual timetable document has been sent will be one or more formats, media and languages in which the individual timetable document is distributed, a destination for the electronic Distribution of the timetable underlay, e.g. Mobile phone number and a Client and invoice recipient.

Um das Anlegen von individuellen Fahrplanunterlagen technisch zu erleichtern, kann die Eisenbahnverwaltung besonders häufig benötigte individuelle Fahrplanunterlagen als Vorlage (Template) zum Übernehmen und Modifizieren zur Verfügung stellen.To facilitate the creation of individual timetable documents technically, the railway administration can frequently require individual timetable documents as a template for accepting and modifying for Make available.

Die Lebenszeit einer individuellen Fahrplanunterlage ist unabhängig von festen Gültigkeitsperioden, wie beispielsweise Winter- oder Sommerfahrplan. Die Fahrplanunterlagen können jederzeit erzeugt, modifiziert oder gelöscht werden.The lifetime of an individual timetable is independent of fixed Validity periods, such as winter or summer timetable. The Timetable documents can be generated, modified or deleted at any time.

Die Aktualisierung der individuellen Fahrplanunterlage ist vorteilhafterweise ereignis-getrieben. Ereignisse in diesem Sinne sind Abweichungen vom Geplanten, also insbesondere Verspätung, Umleitung oder eine Änderung der Bahnhofs-Fahr-Ordnung (BFO). Diese Abweichungen werden durch eine ständige Überwachung der Betriebslage des Verkehrsstreckensystems erkannt. Weitere Ereignisse sind Eingriffe in den Fahrplan für den Tag durch einen menschlichen Disponenten oder ein automatisches Konfliktlösungs- oder Dispositionssystem.The updating of the individual timetable is advantageously event-driven. Events in this sense are deviations from the planned So in particular delay, rerouting or a change of the station driving order (BFO). These deviations are caused by a constant Monitoring the operating situation of the traffic system recognized. Further Events are interventions in the timetable for the day by a human Dispatchers or an automatic conflict resolution or scheduling system.

Eine Aktualisierung einer individuellen Fahrplanunterlage erfolgt bei diesen Ereignissen immer nur dann, wenn eine individuelle Fahrplanunterlage von Änderung betroffen ist. Ist eine individuelle Fahrplanunterlage betroffen, dann erfolgt die Aktualisierung sofort. Der Abonnent bekommt also nur dann eine aktualisierte individuelle Fahrplanunterlage, wenn ihn eine Änderung gemäß seiner gewählten Filterkriterien betrifft.An update of an individual timetable document takes place at these Events only if an individual timetable of change is affected. If an individual timetable document is affected, then it is done the update immediately. The subscriber will only receive an updated one individual timetable, if there is a change according to his selected filter criteria.

Eine schnelle Verteilung direkt vom Entstehungsort der Information zum End-Empfänger der Information kann sichergestellt werden. Es werden alle Abonnenten quasi-gleichzeitig informiert. Nach jeder Aktualisierung des Tagesfahrplans, insbesondere des Beste-Prognose-Fahrplans, wird erneut verteilt. Die Verteilung erfolgt elektronisch statt durch langsam telefonierende Menschen.A fast distribution directly from the source of the information to the end recipient the information can be ensured. It will be all subscribers quasi-informed at the same time. After each update of the daily timetable, especially the best-forecast timetable, will be redistributed. The Distribution takes place electronically instead of slowly calling people.

Vorteilhafterweise erfolgt die Verteilung der individuellen Fahrplanunterlage mit jeder die individuelle Fahrplanunterlage betreffenden Aktualisierung des Beste-Prognose-Fahrplans. Die Verteilung kann mit elektronischen Mitteln besonders schnell erfolgen. Die Verteilung kann beispielsweise als Text (in verschiedenen Sprachen) über Mobiltelefone als SMS, über Telefax, E-Mail, Fernschreiber, Telegraph oder als Text und Graphik im Internet erfolgen. Alternativ kann die Verteilung als automatische Sprachnachricht ("automatic voice message") über Mobilfunk, Festnetz, Zugfunk oder direkt über Bahnhofs-Lautsprecher verteilt werden.Advantageously, the distribution of the individual timetable document takes place with Each update of the best-forecast timetable concerning the individual timetable. The distribution can be particularly electronic done quickly. The distribution may be, for example, as text (in various Languages) via mobile phones as SMS, via fax, e-mail, telex, Telegraph or as text and graphics on the Internet. Alternatively, the Distribution as an automatic voice message ("automatic voice message") over Mobile, landline, train radio or distributed directly via station speakers become.

Anschlüsse zu anderen Systemen sind möglich, so dass die aktuelle Fahrplanunterlage zu anderen Systemen übertragen werden kann. Diese anderen Systeme können beispielsweise Abonnenten-Stammdaten sowie gebuchte Zugfahrten als Zuglauf-Filter, Anschluss-Filter ohne Aufwand für den Abonnenten übergeben. Weiterhin sind Anschlüsse zu Arbeitsplanungssystemen denkbar. Beispielsweise wird für einen Zugbegleiter, der am Tag X für den Zug 4711 eingeteilt ist, automatisch eine individuelle Fahrplanunterlage für genau diesen Zug und Tag abonniert. Weiterhin ist das Weiterreichen von individuellen Fahrplanunterlagen an Fahrgast-Informations-Systeme denkbar.Connections to other systems are possible, so the current timetable documentation can be transferred to other systems. These other systems For example, subscriber master data and booked train journeys as a train-flow filter, connection filter with no overhead for the subscriber to hand over. Furthermore, connections to work planning systems are conceivable. For example, for a train attendant who is assigned to the train 4711 on day X. is, automatically an individual timetable document for exactly this train and subscribed to the day. Furthermore, the passing on of individual timetable documents conceivable for passenger information systems.

Die individuelle Fahrplanunterlage kann beispielsweise über ein Mobiltelefon gebucht und/oder bezahlt werden. Das Anlegen und Abonnement von individuellen Fahrplanunterlagen ist zudem über das Internet oder Intranet der über eine Verkehrsgesellschaft denkbar.The individual timetable document can, for example, via a mobile phone booked and / or paid. The creation and subscription of individual Timetable documents are also available via the Internet or intranet of the a transport company conceivable.

Die Verteilung von individuellen Fahrplanunterlagen kann der Kontrolle durch das Verkehrsunternehmen unterliegen. Insbesondere kann die Verteilung von individuellen Fahrplanunterlagen selektiv oder ganz abgeschaltet werden, z.B. bei Atommülltransporten oder Militärzügen.The distribution of individual timetable documents can be controlled by subject to the transport company. In particular, the distribution of Individual timetable documents are selectively or completely shut down, e.g. in nuclear waste transports or military trains.

Das erfindungsgemäße Verfahren, insbesondere die Generierung einer aktuellen Fahrplanunterlage, die Aktualisierung, Konfiguration und Verteilung der Fahrplanunterlagen kann in einem Computerprogramm oder einer Software implementiert sein.The inventive method, in particular the generation of a current Timetable documentation, updating, configuration and distribution of the Timetable documents may be in a computer program or software be implemented.

Im Folgenden werden einige Anwendungsbeispiele für das erfindungsgemäße Verfahren und die erfindungsgemäße individuelle Fahrplanunterlage gegeben:In the following some application examples for the invention Method and the individual timetable according to the invention given:

Jeder Zugbegleiter bekommt während seiner Dienstzeit alle Aktualisierungen des Zuglaufs seines Zuges inklusive aller (verlorenen) Anschlüsse laufend als Text per SMS auf sein Mobiltelefon. Er kann diese Information über Bordlautsprecher an seine Fahrgäste weitergeben. Dabei ist der Zuglauf seines Zugs der Filter, aufgrund dessen die individuelle Fahrplanunterlage erstellt wird. Die individuelle Fahrplanunterlage des Zugbegleiters wird nur dann aktualisiert, wenn Änderungen des Beste-Prognose-Fahrplans erfolgen, die den Zuglauf seines Zuges betreffen.Each train attendant receives all updates during his service the train of his train including all (lost) connections running as Text via SMS on his mobile phone. He can get this information via on-board speakers pass on to its passengers. Here is the train run of his train the filter on the basis of which the individual timetable document is created. The individual timetable document of the train conductor will only be updated when changes are made to the best-forecast timetable that tracks the train of his turn.

Eine individuelle Fahrplanunterlage kann beispielsweise zum Einsatz kommen, wenn ein Fahrgast jeden Montag - Freitag in der Zeit zwischen 15:00 Uhr und 18:00 Uhr mit einem Zug der Zuggattung ICE oder IC von Braunschweig nach Berlin fahren möchte. Um keine Zeit zu verschwenden, will er über aktuelle Abfahrtszeiten (Verspätungen) und Gleisänderungen der für ihn herausgefilterten Züge aktuell per SMS auf sein Handy informiert werden.An individual timetable document can be used, for example, if a passenger every Monday - Friday in the period between 15:00 and 18:00 o'clock with a train of the train genus ICE or IC from Braunschweig to Berlin wants to drive. To waste no time, he wants to know about current Departure times (delays) and track changes of the filtered out for him Trains currently be informed via SMS on his cell phone.

Weiterhin ist es denkbar, dass alle Gleisverlegungen in der Zugmeldestelle als elektronische Sprachnachricht ("automatic voice message") automatisch auf den betroffenen Bahnsteiglautsprechern ausgegeben werden. Furthermore, it is conceivable that all track laying in the Zugmeldestelle as electronic voice message ("automatic voice message") automatically be issued to the affected platform speakers.

In einer wegen Bauarbeiten vorübergehend bemannten Unterzentrale (UZ) kann der Fahrdienstleiter am Notbedienplatz alle Zugläufe durch seine UZ als Text per Fax oder über Mobilfunk erhalten.In a sub-center (UZ) temporarily manned due to construction work the dispatcher at the emergency terminal may check all train passes through his IP as Receive text by fax or mobile.

Ein weiteres Beispiel besteht darin, dass alle Zugläufe und Anschlüsse, die einen Bahnhof im eigenen Bedienbereich eines (Nebenstrecken)-Stellwerks betreffen, das nicht über das Computersystem "Zuglenkung" an die Leitzentrale angeschlossen ist, dem Fahrdienstleiter als Text über Fernschreiber auf das Stellwerk gesendet werden. Der Fahrdienstleiter liest die individuelle Fahrplanunterlage und stellt danach seine Fahrstrassen.Another example is that all train runs and connections that have a Station in the own operating area of a (Nebenstrecken) -Stellwerks that does not involve the computer system "train control" to the control center connected to the dispatcher as text via telegraph on the Signal box will be sent. The dispatcher reads the individual timetable document and then put his routes.

Das Stellen der Fahrstraßen ist bedeutsam, da der Dispo-Fahrplan für den Tag betrieblich umgesetzt werden muss, d.h. Fahrstraßen müssen gestellt und Zugfahrten müssen durchgeführt werden. Der Dispo-Fahrplan repräsentiert die angestrebte Betriebsqualität für diesen Tag.The setting of the routes is significant, as the scheduling schedule for the day operational, i. e. Driveways must be provided and train rides must be done. The scheduling schedule represents the desired Operational quality for this day.

Stellwerke müssen dabei so an ein dispositives Leitsystem angeschlossen werden, dass Zugfahrten so durchgeführt werden, wie es im Fahrplan für den Tag vorgesehen ist.Interlockings must be connected to a dispositive control system that train journeys are made as scheduled in the timetable for the day is provided.

Es müssen laufend Zugstandortmeldungen (Zug-Nr., Ort, Zeit, optional Fahrtrichtung) aus den Stellwerken in die Leitzentrale übertragen werden ("Ist-Meldungen") um dort stellwerks-übergreifend den aktuellen Stand (auch Verspätungen) zu kennen und damit disponieren zu können. Jedes Stellwerk hat einen Stellwerksbezirk, in dem es Weichen und Signale stellt. Ein Stellwerk umfasst einen oder mehrere Bahnhöfe.There must be continuous train location messages (train no., Location, time, optional direction of travel) from the signal boxes to the control center ("actual messages") around there interdepartmentally the current state (also delays) to know and thus to be able to plan. Every signal box has an interlocking district in which it sets switches and signals. A signal box includes one or more stations.

Im Laufe des Produktionstages müssen zentrale Dispo-Entscheidungen als Reaktion auf Verspätungen und Störungen dezentral, schnell und über Stellwerksgrenzen hinweg konsistent umgesetzt werden. Dabei dürfen keine Fehlleitungen verursacht werden. Der Fahrdienstleiter kann unterstützt werden, indem ein Tages-Bahnhofs-Fahrplan generiert wird. Er enthält alle Angaben, die ein Fahrdienstleiter braucht, um in seinem Bahnhof für jeden Zug die richtigen Fahrstraßen zur rechten Zeit zu stellen. Pro Bahnhof sieht der Tages-Bahnhofs-Fahrplan plakativ so aus:

  • Zug-Nr, Zug-von, Zug-nach, Halt/Durchfahrt an Gleis, Ankunftszeit, Abfahrtszeit
  • Anschluß halten: von Zug-Nr, Gleis, Ankunftszeit, nach Zug-Nr, Gleis, Abfahrtszeit
  • In the course of the production day, centralized scheduling decisions must be implemented consistently in response to delays and disruptions, decentralized, fast and across the boundaries of the signal box. In doing so, no faulty lines may be caused. The dispatcher can be assisted by generating a daytime train schedule. It contains all the information needed by a dispatcher to set the right routes at the right time for each train in his station. The daily train station timetable looks strikingly like this:
  • Train no, train-from, train-to, stop / passage to track, arrival time, departure time
  • Keep in touch: from train no, track, arrival time, to train no, track, departure time
  • In Kenntnis des Ausgangsbahnhofs des Zuglaufs (Einfahrt der Zugmeldestelle), des Zielbahnhofs des Zuglaufs (Ausfahrt der Zugmeldestelle), der Bahnhofsgleise für Durchfahrt oder Halt, der Zeiten für Ankunft, Abfahrt, Durchfahrt und der betrieblichen Verhältnisse kann der Fahrdienstleiter auf dem Stellwerk für jede Zugfahrt die richtigen Fahrstrassen rechtzeitig stellen und dabei Fehlleitungen verhindern. Dabei kann vorgesehen sein, dass der Tages-Bahnhofs-Fahrplan täglich vor Beginn des Produktionstages aus dem Dispo-Fahrplan für den Tag (in BZ 2000) oder dem Fahrplan für den Tag errechnet wird, um tagesspezifische Abweichungen vom Jahresfahrplan, beispielsweise durch Baustellen, die in diesen Fahrplänen bereits eingearbeitet sind, zu berücksichtigen.In knowledge of the starting station of the train run (entry of the Zugmeldestelle), of the destination station of the train run (exit of the Zugmeldestelle), the station tracks for transit or stop, the times for arrival, departure, transit and the operational conditions can the dispatcher on the signal box for every train ride put the right roads in good time and missteps prevent. It can be provided that the daily train station timetable daily before the beginning of the production day from the dispatching schedule for the day (in BZ 2000) or the timetable for the day is calculated to be day specific Deviations from the annual timetable, for example due to construction sites, which are already incorporated in these roadmaps.

    Vor Beginn des Produktionstages wird der Tages-Bahnhofs-Fahrplan an den Fahrdienstleiter auf dem Stellwerk verteilt. Die Verteilung erfolgt in einfachsten Fall als Text, beispielsweise per Fernschreiber oder Fax, im komplexeren Fall elektronisch zur tabellarischen Ausgabe auf einem Fahrplan-Monitor. Wenn in der Betriebszentrale im Laufe des Produktionstages durch den Disponenten Dispo-Entscheidungen getroffen werden, so werden die von der Dispo-Entscheidungen betroffenen Tages-Bahnhofs-Fahrpläne ermittelt, neu berechnet und erneut verteilt. Alternativ können die Fahrdienstleiter eine individuelle Fahrplanunterlage bestellen, anhand derer der Tages-Bahnhofs-Fahrplan aktualisiert wird. Es kann auch vorgesehen sein, dass der Tages-Bahnhofs-Fahrplan auf einer individuellen Fahrplanunterlage basiert. So gelangen neue Zeiten oder Gleisänderungen als Folge von Dispo-Entscheidungen zur Kenntnis aller betroffenen Fahrdienstleiter. Damit können in der Betriebszentrale zentral getroffene Dispo-Entscheidungen über Stellwerksgrenzen hinweg konsistent (Betriebsqualität) umgesetzt werden. (Neuberechnung des gesamten Zuglaufs bis Ende des Laufs in der Betriebszentrale). Lenkpläne werden dabei bei reinen Zeitänderungen nicht aktualisiert. Die Umsetzung von Lenkplänen hängt nur von Bedingungen (und Projektierungsdaten), nicht jedoch von Zeiten ab. Ein Verfahren zur Erstellung eines Tages-Bahnhofs-Fahrplans und die Verwendung eines Tages-Bahnhofs-Fahrplans wird auch als eigenständige Erfindung gesehen.Before the start of the production day, the daytime train station timetable will be sent to the Dispatcher distributed on the signal box. The distribution takes place in the simplest Case as text, for example by teletype or fax, in the more complex case electronically to the tabular edition on a timetable monitor. When in the control center during the production day by the dispatcher Dispo decisions are made, so are those of the disposition decisions determined daily train station timetables, recalculated and redistributed. Alternatively, the dispatcher can provide an individual Order the timetable document to update the daily train timetable becomes. It can also be provided that the daily train station timetable based on an individual timetable document. How to get new Times or track changes as a result of Dispo decisions note all concerned dispatcher. This can be centrally located in the operations center the same takes place consistently across inter-company boundaries (Quality of operation) are implemented. (Recalculation of the entire train run until the end of the run in the operations center). Steering plans are doing pure Time changes not updated. The implementation of steering plans only hangs conditions (and engineering data), but not times. On Procedure for creating a daily train station timetable and use A daytime train schedule is also seen as an independent invention.

    Mit der Aktualisierung können Fehlleitungen genauso verhindert werden wie mit der ersten Erstellung. Damit ist ein Stellwerk an aktuelle Dispo-Entscheidungen eines dispositiven Leitsystems so angeschlossen, dass durch das Leitsystem verursachte Fehlleitungen verhindert werden.The update can be used to prevent misdirections as well as with the first creation. This is an interlocking to current Dispo decisions a dispositive control system connected so that by the control system caused mishaps are prevented.

    Als Rückkopplung und um einen Prognose-Fahrplan und damit einen Beste-Prognose-Fahrplan bestimmen zu können, müssen Zugstandortmeldungen (Zug-Nr., Ort, Zeit) aus den Stellwerken in die Betriebsleitzentrale übertragen werden. Dazu kann der Tages-Bahnhofs-Fahrplan dem Fahrdienstleiter in tabellarischer Form auf einem Fahrplan-Monitor ausgegeben werden. Dabei ist der Tages-Bahnhofs-Fahrplan erweitert um Raum für Angaben über tatsächliche Zeiten und oder tatsächliche benutzte Gleise für Abfahrt, Ankunft oder Durchfahrt von Zügen (IST-Angaben). Diese IST-Angaben werden durch den Fahrdienstleiter nach jeder Abfahrt, Ankunft, Durchfahrt im Tages-Bahnhofs-Fahrplan am Fahrplan-Monitor ergänzt. Vorteilhafterweise weist der Monitor dazu eine interaktive Benutzeroberfläche auf. Die Umsetzung der Rückkopplung von den Stellwerken zur Leittechnik unter Verwendung einer erweiterten Fahrplanunterlage wird als eigenständige Erfindung gesehen.As a feedback and a forecast timetable and thus a best-forecast timetable must be able to determine train location messages (Train no., Location, time) transferred from the signal boxes in the control center become. For this purpose, the daytime train station schedule can be tabulated to the dispatcher Form will be output on a timetable monitor. It is the daytime train station timetable expands to include room for information on actual Times and or actual used railways for departure, arrival or Transit of trains (IST information). This information is provided by the Dispatcher after each departure, arrival, transit in the daily train station timetable added to the timetable monitor. Advantageously, the monitor has to an interactive user interface on. The implementation of the feedback from the signal boxes to the control technology using an extended Timetable document is seen as an independent invention.

    Die Ergänzungen werden elektronisch an die Betriebsleitzentrale zurück übertragen und in den Prognose-Fahrplan eingearbeitet. Dort dienen sie als Grundlage für Dispo-Entscheidungen. Bei dieser Variante des Verfahrens ist die Übertragung von Zugstandortmeldungen dadurch charakterisiert, dass das Format und die Datenstruktur des Datensatzes auf leichte Bearbeitung in der Leitzentrale und auf leichte Einarbeitung in den Prognosefahrplan abgestimmt sind, beispielsweise durch Angabe der (Datenbank)-Schlüsselwerte für den Datensatz aus dem SOLL-Teil des Tages-Bahnhofs-Fahrplans. Das ist dann besonders leicht möglich, wenn die interaktive Benutzeroberfläche eines Fahrplan-Monitors Erweiterungen im Tages-Bahnhofs-Fahrplan (Tabelle) für diese IST-Angaben bereitstellt. Der Datensatz kann auf ein oder mehreren beliebigen elektronischen Medien, einzeln oder redundant (signaltechisch sicher), in die Leitzentrale zurückgesendet werden, beispielsweise doppelt: einmal über UMTS-Mobilfunk und einmal über Telefonkabel. Die Zurücksendung kann verschlüsselt werden und/oder mit Authentication ((Elektronisch) Beglaubigte Identifizierung des Senders) gesichert wird. Sie geht besonders schnell, wenn kein langsames Bussystem verwendet wird.The supplements are transmitted electronically back to the operations control center and incorporated into the forecast timetable. There they serve as a basis for disposition decisions. In this variant of the method is the Transmission of train location messages characterized by the fact that the Format and data structure of the record on easy editing in the Control center and adapted to easy familiarization with the forecast timetable are, for example, by specifying the (database) key values for the Data record from the SOLL part of the daily train station timetable. That is then Especially easy if the interactive user interface of a Timetable Monitors Extensions in Day Station Timetable (Table) for this provides IST information. The record can be on one or more any electronic media, single or redundant (signal tech safe), are sent back to the control center, for example twice: once via UMTS mobile radio and once via telephone cable. The Returns can be encrypted and / or authenticated (Electronic) Authenticated Identification of the sender). she goes especially fast, if no slow bus system is used.

    Optional können diese IST-Angaben im Tages-Bahnhofs-Fahrplan um weitere Angaben für spätere statistische Auswertung, beispielsweise "Reisenden-Verhalten" als Verspätungsbegründung, ergänzt werden.Optionally, these IST details can be added to the daily train timetable Information for later statistical evaluation, for example "traveler behavior" as a reason for delay, to be supplemented.

    Wenn in der Betriebszentrale durch Vergleich von eintreffenden Zugstandortmeldungen mit dem Fahrplan für den Tag eine neue Verspätung (Qualitätsmangel) erkannt wird, dann können alle von der Verspätung betroffenen Tages-Bahnhofs-Fahrpläne ermittelt, neu berechnet und erneut verteilt werden bzw. kann eine aktuelle Fahrplanunterlage zur Aktualisierung verschickt werden. Zur Behebung des Qualitätsmangels kann eine Dispo-Entscheidung getroffen werden. So gelangen neue Zeiten als Folge von Verspätungen (Neuberechnung des gesamten Zuglaufs bis Ende des Laufs in Betriebszentrale) zur Kenntnis aller betroffenen Fahrdienstleiter. When in the operations center by comparing incoming train location messages with the timetable for the day a new delay (quality defect) is detected, then all affected by the delay day-train station timetables determined, recalculated and redistributed A current timetable document can be sent for updating. to Resolving the quality defect can be made a Dispo decision. This gives new times as a result of delays (recalculation of the entire train run until the end of the run at the operations center) all concerned dispatcher.

    Der Vorteil des Verfahrens liegt darin, dass alle Stellwerke mit manueller Bedienung durch Fahrdienstleiter, ohne Rücksicht auf Bauform und Ausstattung, mit kurzem Zeithorizont, ohne Entwicklung, Test, Wartung eines Zuglenk (ZL) - Systems und einer Steuerzentrale und deshalb mit niedrigem Aufwand für die signaltechnische Industrie an die dispositive Leittechnik angeschlossen werden können. Dabei bleiben bestehende Investitionen in Altstellwerken geschützt.The advantage of the method is that all interlockings with manual operation by dispatcher, regardless of design and equipment, with short time horizon, without development, test, maintenance of a drawbar (ZL) - Systems and a control center and therefore with low effort for the Signaling industry are connected to the disposable control technology can. At the same time, existing investments in old carousels are protected.

    Das "Anschließen" umfasst zwei Richtungen, nämlich von der Leittechnik (z.B. BZ 2000) zu den Stellwerken und eine Rückkopplung von den Stellwerken zur Leittechnik. Die erste Richtung wird nach dem Stand der Technik durch Telefonieren und eine Lenkplanschnittstelle (in der Steuerzentrale) realisiert. Erfindungsgemäß wird die erste Richtung durch eine aktuelle Fahrplanunterlage und/oder einen Tages-Bahnhofs-Fahrplan realisiert. Die zweite Richtung wird nach dem Stand der Technik realisiert durch eine Meldebildschnittstelle (in der Steuerzentrale). Erfindungsgemäß ist dafür eine Rückkopplung mit Monitor-Lösung vorgesehen.The "connection" comprises two directions, namely from the control technology (e.g. BZ 2000) to the signal boxes and a feedback from the signal boxes to Control technology. The first direction is the prior art by telephoning and a steering plan interface (in the control center) realized. According to the invention the first direction is through a current timetable document and / or realized a daytime train schedule. The second direction will be realized in the prior art by a message image interface (in the Control Center). According to the invention for a feedback with monitor solution intended.

    Die Sicherheitslücke -Fehlleitungen durch Inkonsistenzen in Projektierungsdaten- kann geschlossen werden. Fehlerhafte Angaben im Tages-Bahnhofs-Fahrplan, z.B. durch Projektierungsfehler in der Betriebszentrale, kann der Fahrdienstleiter erkennen. Unklarheiten kann der Fahrdienstleiter schnell mit dem Disponenten in der Leittechnik telefonisch klären und damit Fehlleitungen verhindern, da nicht (möglicherweise inkonsistente) Projektierungsdaten in Computersystem "Zuglenkung" bzw. Projektierungsdaten in der Betriebszentrale bestimmen, welche Fahrstrassen für einen bestimmten Zug gestellt werden, sondern ein menschlicher Fachmann, der ohnehin vor Ort ist (Fahrdiensleiter).The security gap - errors due to inconsistencies in configuration data can be closed. Incorrect information in the Tages-Bahnhofs-Fahrplan, e.g. due to configuration errors in the control center, the Detect dispatcher. Ambiguities, the dispatcher can quickly with clarify the dispatcher in the control system by telephone and thus faulty lines prevent, because not (possibly inconsistent) configuration data in Computer system "Zuglenkung" or project planning data in the Operations center determine which routes for a particular train but a human expert, who is on site anyway (Driving diene conductor).

    Wenn Fahrdienstleiter an Nebenstrecken zentral ausgerechnete Informationen wie Verspätungen und Dispo-Entscheidungen genau für Ihren Stellwerksbereich bekommen, können sie lokal schnell Entscheidungen treffen, die sinnvoll zur Gesamtsituation passen.When dispatchers on side routes centrally calculated information such as delays and scheduling decisions exactly for your interlocking area They can quickly make decisions that make sense locally fit the overall situation.

    Im Folgenden sind nochmals die Vorteile der Erstellung von Tages-Fahrplänen für jeden Bahnhof zusammen gefasst. Es besteht eine große Sicherheit bzgl. Fehlleitungen und die Möglichkeit auch auf Stellwerken, die nicht über ein Computersystem "Zuglenkung" mit der Leitzentrale verbunden sind, bespielsweise auf Nebenstrecken, tagesspezifische zentrale Vorgaben über Stellwerksgrenzen hinweg konsistent und schnell umzusetzen (Betriebsqualität). Somit können alle Stellwerke, und nicht nur die mit Zuglenkung ausgestatteten Stellwerke, von der Leittechnik aus gesteuert werden. Der Wirkungskreis der Leitzentrale erweitert sich dadurch erheblich. Fahrdienstleiter werden frühzeitig informiert, was in ihrem Bereich auf sie zukommt. Die Lösung ist mit überschaubarem Entwicklungsaufwand und Zeithorizont einführbar. Das vorgestellte einfache und natürliche Verfahren zur Anbindung von Stellwerken bietet sich besonders bei einfachen Leitzentralen und für den öffentlicher Nahverkehr an.The following are the advantages of creating daily timetables put together for each station. There is a lot of security regarding Mishaps and the possibility also on signal boxes, which do not have a Computer system "Zuglenkung" are connected to the control center, recordable on secondary lines, day-specific central specifications Consistently and quickly implement interlocking boundaries (Operation quality). Thus, all interlockings, and not only those with Train control equipped interlockings, controlled by the control technology become. The sphere of activity of the control center is thus considerably expanded. Dispatchers are informed early on what's in their field on them due. The solution is with manageable development effort and Time horizon insertable. The presented simple and natural procedure for Connection of interlockings is particularly suitable for simple control centers and for public transport.

    Durch die Erweiterung des Tages-Bahnhofs-Fahrplans um Eintragemöglichkeiten (=zusätzliche Datenfelder) für tatsächlich gefahrene Zeiten ("IST-ZEIT") und optional statistische Daten, die durch den Fahrdienstleiter ausgefüllt werden, wobei er durch das System unterstützt wird (Monitor-Lösung, Touchscreen), wird eine Rückkopplung zur Leitzentrale erreicht. Diese Rückkopplung ermöglicht einen wie folgt charakterisierten Kreislauf:By the extension of the daily train station timetable to entry possibilities (= additional data fields) for actually driven times ("actual time") and optional statistical data to be filled in by the dispatcher, being supported by the system (monitor solution, touchscreen), a feedback to the control center is achieved. This feedback allows a cycle characterized as follows:

    Die Leitzentrale, z.B. BZ 2000, erfährt die aktuelle Betriebslage. Dies führt z.B. bei Verspätungen zu einer neuen Prognose. Die Prognose ist (eine) Vorlage für Dispo-Entscheidungen. Die Dispo-Entscheidungen oder neue Prognose führen zu neuen, an die neue Betriebslage angepasste, Tages-Bahnhofs-Fahrplänen. Tages-Bahnhofs-Fahrpläne erlauben das neue betrieblichen Wollen in der Leitzentrale schnell und über Stellwerksgrenzen hinweg konsistent umzusetzen. The control center, e.g. BZ 2000, learns the current operating situation. This leads e.g. in case of delays to a new forecast. The forecast is (a) template for Grouping decisions. The MRP decisions or new forecast lead to new daily train station timetables adapted to the new operating situation. Daily train station timetables allow the new operational will in the control center to consistently implement quickly and across signal box boundaries.

    Ein vergleichbarer Kreislauf ist nach dem Stand der Technik nur für (relativ wenige) Stellwerke möglich, die mit Zuglenkung und Zugnummermeldeanlage ausgestattet sind (sogenannte Unterzentralen). Derartige Stellwerke/Unterzentralen sind über eine Steuerzentrale (Lenkplan- und Meldebildschnittstelle) an die Leitzentrale (BZ 2000) angeschlossen. Der Haupt-Vorteil der Rückkopplung mit Monitor-Lösung besteht darin, dass dadurch, dass sie diese Rückkopplung für alle Stellwerke mit manueller Bedienung durch die Fahrdienstleiter, ohne Rücksicht auf Bauform und Ausstattung, ermöglicht, alle Stellwerke (nicht nur die Unterzentralen) an die Leitzentrale anschließbar sind. Damit hat eine Leitzentrale, wie z.B. BZ 2000, einen viel größeren Wirkungskreis, nämlich praktisch das gesamte Streckennetz inkl. Nebenstrecken, statt nur wenige Unterzentralen überwiegend an viel befahrenen Hauptstrecken.A comparable cycle is according to the prior art only for (relatively few) Interlockings possible with the train steering and train number notification system are equipped (so-called sub-centers). Such interlockings / subcentrals are via a control center (steering plan and message screen interface) connected to the control center (BZ 2000). The main advantage The feedback with monitor solution is that by doing that this feedback for all interlockings with manual operation by the Dispatcher, regardless of design and equipment, allows all Signal boxes (not only the sub-centers) can be connected to the control center. Thus, a control center, such as BZ 2000, a much larger sphere of activity, namely virtually the entire route network including Nebenstrecken instead only a few sub-centers predominantly on busy main lines.

    Weitere Merkmale und Vorteile der Erfindung ergeben sich aus der nachfolgenden Beschreibung von Ausführungsbeispielen der Erfindung, anhand der Figuren der Zeichnung, die erfindungswesentliche Einzelheiten zeigen, und aus den Ansprüchen. Die einzelnen Merkmale können je einzeln für sich oder zu mehreren in beliebiger Kombination bei einer Variante der Erfindung verwirklicht sein.Further features and advantages of the invention will become apparent from the following Description of embodiments of the invention, with reference to the figures the drawing show essential to the invention, and from the Claims. The individual features can be individually or individually realized in any combination in a variant of the invention his.

    Zeichnungdrawing

    Ausführungsbeispiele sind in der schematischen Zeichnung dargestellt und werden in der nachfolgenden Beschreibung erläutert. Es zeigt:

    Fig. 1
    eine schematische Darstellung zur Erläuterung des erfindungsgemäßen Verfahrens;
    Fig. 2
    eine schematische Darstellung zur Erläuterung, wie das erfindungsgemäße Verfahren in ein Verfahren des Standes der Technik eingebettet werden kann;
    Fig. 3
    eine schematische Darstellung der täglichen Initialisierung von Tages-Bahnhofs-Fahrplänen;
    Fig. 4
    eine Darstellung der Aktualisierung der Tages-Bahnhofs-Fahrpläne;
    Fig. 5
    eine Darstellung einer ersten Variante der Erstaufrüstung eines Stellwerks mit einem Tages-Bahnhofs-Fahrplans;
    Fig. 6
    eine Darstellung einer zweiten Variante der Erstaufrüstung eines Stellwerks mit einem Tages-Bahnhofs-Fahrplans;
    Fig. 7
    eine Darstellung der Zuglenkung mit Lenkplan und parallel dazu mit eine Tages-Bahnhofs-Fahrplan;
    Fig. 8
    eine Darstellung der Aktualisierung des Lenkplans und des Tages-Bahnhofs-Fahrplans;
    Fig. 9
    eine interaktive Bedienoberfläche für einen Fahrdienstleiter.
    Embodiments are illustrated in the schematic drawing and will be explained in the following description. It shows:
    Fig. 1
    a schematic representation for explaining the method according to the invention;
    Fig. 2
    a schematic representation for explaining how the inventive method can be embedded in a method of the prior art;
    Fig. 3
    a schematic representation of the daily initialization of daily train station schedules;
    Fig. 4
    a representation of the update of the daily train station timetables;
    Fig. 5
    a representation of a first variant of the initial upgrade of a signal box with a daytime train schedule;
    Fig. 6
    a representation of a second variant of the initial upgrade of a signal box with a daytime train schedule;
    Fig. 7
    a representation of the train steering with a steering plan and in parallel with a daily train station timetable;
    Fig. 8
    a representation of the update of the steering plan and the daytime train schedule;
    Fig. 9
    an interactive user interface for a dispatcher.

    Fig. 1 zeigt als zentrales Element einen Beste-Prognose-Fahrplan 1, dem von einer Einrichtung 2 zum Führen und Aktualisieren des Beste-Prognose-Fahrplans 1 die Parameter Referenzzuglauf, Referenzanschluss, Beste-Prognose-Zuglauf und Beste-Prognose-Anschluss zugeführt werden. In die Einrichtung 2 fließen ein Dispo-Fahrplan für den Tag 3 und der Prognosefahrplan für den Tag 4 ein. Die Einrichtung 2 erhält weiterhin den in der Einrichtung 5 neu berechneten Zuglauf. Weiterhin werden durch die Einrichtung 6, sonstige Änderungen in den Fahrplan für den Tag 3 eingebracht. In der Einrichtung 7, der der Beste-Prognose-Fahrplan 1 zugeführt ist und die durch die Einrichtung 2 aktiviert wird, werden die von einer Änderung des Beste-Prognose-Fahrplans 1 betroffenen Fahrplanunterlagen identifiziert. Die identifizierten Fahrplanunterlagen werden anhand des Beste-Prognose-Fahrplans 1 in der Einrichtung 8 neu erstellt und verteilt. Dem Beste-Prognose-Fahrplan 1 werden nur Informationen zugeführt, die für die Bestimmung von aktuellen Fahrplanunterlagen 9 interessant sind. Insbesondere werden keine Streckeninformationen, Signalinformationen und der genaue Laufweg eines Zuges übermittelt. Die individuellen Fahrplanunterlagen 9 können durch Abonnenten 10 abonniert werden. Dazu ist eine Registrierung erforderlich, was durch die Einrichtung 11 angedeutet ist. Der Abonnent 10 legt in der Einrichtung 12 Filterkriterien für seine individuelle Fahrplanunterlage 9 fest. Dadurch wird die Fahrplanunterlage 9 konfiguriert. Durch die Einrichtung 13 wird die individuelle Fahrplanunterlage 9 eines Abonnenten 10 abonniert. Von der Einrichtung 8 werden aktualisierte Fahrplanunterlagen 9 an verschiedene Abonnenten wie Betriebspersonal 14, Geschäftspartner 15, Fahrgäste 16 oder Fahrgast-Informationssysteme 17 weiter geleitet. Die vorgenannten Einrichtungen 2, 5, 6, 7, 8, 11, 12, und 13, können als Prozesse in einem Computerprogramm oder einer Software ausgebildet sein. 1 shows as a central element a best-prognosis schedule 1 to which the parameters reference train, reference port, best-forecast train run and best-prognosis port are fed by a device 2 for guiding and updating the best-prognosis schedule 1 , A schedule for day 3 and the forecast timetable for day 4 are included in device 2. The device 2 continues to receive the recalculated in the device 5 train run. Furthermore, the device 6 introduces other changes in the timetable for day 3. In the device 7 , which is fed to the best-prognosis schedule 1 and which is activated by the device 2, the timetable documents affected by a change of the best-prognosis timetable 1 are identified. The identified timetable documents are recreated and distributed based on the best-prognosis timetable 1 in the device 8 . The best-prognosis schedule 1 only information is supplied, which are interesting for the determination of current timetable documents 9 . In particular, no route information, signal information and the exact route of a train are transmitted. The individual timetable documents 9 can be subscribed by subscribers 10 . For this purpose, a registration is required, which is indicated by the device 11 . The subscriber 10 sets in the device 12 filter criteria for his individual timetable document 9. As a result, the timetable document 9 is configured. By the device 13, the individual timetable document 9 of a subscriber 10 is subscribed. Updated timetable documents 9 are forwarded by the device 8 to various subscribers such as operating personnel 14 , business partners 15 , passengers 16 or passenger information systems 17 . The aforementioned devices 2, 5, 6, 7, 8, 11, 12, and 13 may be configured as processes in a computer program or software.

    In der Fig. 2 ist die Integration des erfindungsgemäßen Verfahrens in ein bestehendes Konzept einer Betriebszentrale angedeutet. Durch die fetten Pfeile 20, 21, 22 sind neue Schnittstellen angedeutet, über die Informationen eines Dispo-Fahrplans 3 für einen Tag, eines Prognose-Fahrplans 4 für einen Tag und neu berechnete Zugläufe in die Einrichtung zum Führen und Initialisieren des Beste-Prognose-Fahrplans eingeleitet werden. Aufgrund von über Pfeil 25 zugeführten Störungsmeldungen wird in der Einrichtung 26 neu disponiert. Dies geschieht in der Regel durch einen Streckendisponenten oder Zuglenker, der vorausschauend Zugläufe durch Dispo-Entscheidungen ändert, um trotz Verspätungen und Störungen möglichst gut Konflikte zu vermeiden, Verspätungen zu minimieren und Anschlüsse zu halten. Als Entscheidungsgrundlage dienen ihm die graphisch angezeigten Soll-Zugläufe, Prognose-Zugläufe und Zugläufe die aufgrund bereits getroffener Dispo-Entscheidungen geändert worden sind. Ausgehend von einer Dispo-Entscheidung kann ein Zuglauf in der Einrichtung 27a ausgehend vom Dispo-Fahrplan 3 neu bestimmt werden (Zuglauf "geändert"). Wird in der Einrichtung 28 eine Abweichung eines Zuges vom Soll-Zuglauf erkannt, wird in der Einrichtung 27b ebenfalls ein neuer Zuglauf (Zuglauf "Prognose") bestimmt und dem Prognosefahrplan 4 zugeführt. Die Zugläufe Zuglauf "Prognose" und Zuglauf "geändert" werden als Zuglauf "Beste-Prognose" in den Beste-Prognose-Fahrplan übernommen. Zu einer Zugnummer gilt der aktuellste Zuglauf "Beste-Prognose". Eine in der Einrichtung 28 erkannte Abweichung wird ebenfalls an die Einrichtung 26 übergeben. Ausgehend vom Dispo-Fahrplan 3 werden in der Einrichtung 29 pro Zuglauf die Stellanweisungen pro Unterzentrale 30 ermittelt. Daraus wird ein Lenkplan 31 für die nächsten 8 Stunden erstellt, der durch die Einrichtung 32 verteilt wird. Im Lenkplan 31 ist für jeden Zug und für jedes Zuglenk-Signal hinterlegt, welche Fahrstraße mit welchem Durchrutschweg beim Heranrücken dieses Zuges zu stellen ist. Optional enthält der Lenkplan 31 für einen Zug Wartebedingungen und Reihenfolgeregelungen an festgelegten Signalen. Das System Zuglenkung generiert aus dem Lenkplan 31 Stellkommandos und gibt diese an das Stellwerk zur Ausführung. Damit wird der Fahrdienstleiter von Routinearbeiten entlastet. In der Einrichtung 33 werden die Lenkpläne 31 gepuffert und mit einer Vorschau von einigen Stunden an die Unterzentralen 30 verteilt. Die Unterzentralen 30 stehen mit der Infrastruktur, d.h. Weichen, Signalen, Freimeldeanlagen und dgl. in Verbindung, die wiederum die Züge 35 beeinflussen. Störungen werden von den Unterzentralen 30 an die Bauplanung 36 und an die Einrichtung 37 für das Erstellen eines Fahrplans geleitet. Im Stand der Technik werden Dispositionsentscheidungen per Telefon 38 an das Betriebspersonal 39 weitergegeben. Fahrgäste 40 und Geschäftspartner 41 werden nicht direkt informiert. Dies kann durch das in Fig. 1 veranschaulichte Verfahren verbessert werden, indem die individuellen Fahrplanunterlagen erstellt und elektronisch weiter gegeben werden. FIG. 2 indicates the integration of the method according to the invention into an existing concept of an operating center. The bold arrows 20, 21, 22 indicate new interfaces via which information of a scheduling schedule 3 for one day, a forecasting schedule 4 for one day and newly calculated train runs into the device for guiding and initializing the best prognosis schedule. Timetable to be initiated. Due to error messages supplied via arrow 25 , the device 26 is re-scheduled. This is usually done by a route dispatcher or Zuglenker, which changes trains in advance through disposition decisions, in order to avoid delays and disruptions as well as possible conflicts, to minimize delays and to keep connections. The basis for his decision is the graphically displayed target train runs, forecast train runs and train runs which have been changed on the basis of already taken disposition decisions. Based on a Dispo decision a train run in the device 27a can be redetermined starting from the dispatching schedule 3 (train run "changed"). If a deviation of a train from the desired train run is detected in the device 28 , a new train run (train run "forecast") is likewise determined in the device 27b and fed to the forecast timetable 4. The train runs "Forecast" and "Run" are added to the best-forecast timetable as the "Best Forecast" train run. A train number is the current train run "Best Forecast". A detected in the device 28 deviation is also passed to the device 26. Starting from the dispatching schedule 3, the setting instructions per sub-center 30 are determined in the device 29 per train run. From this, a steering plan 31 is created for the next 8 hours, which is distributed by the device 32 . In the steering plan 31 is deposited for each train and for each Zuglenk signal, which route is to be set with which slip path when approaching this train. Optionally, the train control plan 31 includes wait conditions and order controls on specified signals. The train control system generates 31 control commands from the steering plan and sends them to the signal box for execution. This relieves the dispatcher of routine work. In the device 33 , the steering plans 31 are buffered and distributed with a preview of a few hours to the sub-centers 30. The sub-centers 30 are connected to the infrastructure, ie switches, signals, free-reporting systems and the like. In conjunction, which in turn affect the trains 35 . Faults are routed from the sub-centers 30 to the building design 36 and to the scheduling facility 37. In the state of the art, scheduling decisions are forwarded by telephone 38 to the operating personnel 39. Passengers 40 and business partners 41 are not informed directly. This can be improved by the illustrated in Fig. 1 method by the individual timetable documents are created and passed on electronically.

    In der Fig. 3 ist die tägliche Initialisierung von Tages-Bahnhofs-Fahrplänen dargestellt. Aus dem Tages-Soll-Fahrplan 50 und dem Tages-Betriebs-Fahrplan 51, deren Ermittlung in Zusammenhang mit Fig. 5 erläutert wird, wird in der Einrichtung 52 für jede Zugmeldestelle ein Tages-Bahnhofs-Fahrplan 53 ermittelt. Der Tages-Bahnhofs-Fahrplan 53 enthält Informationen wie Anschluss, Zugnummer, Gleis, Zeit (Abfahrt, Durchfahrt, Ankunft). Außerdem wird in der Einrichtung 52 der Zuglauf 54 ermittelt, der durch die Einrichtung 55 ebenso wie die Tages-Bahnhofsfahrpläne an die Stellwerke 56 verteilt wird. Den Anstoß für das Verteilen der Tages-Bahnhofs-Fahrpläne gibt der Prozess 52. Im Stellwerk 56 kann der Fahrdienstleiter 57 die richtigen Fahrstraßen rechtzeitig stellen. FIG. 3 shows the daily initialization of daily train station schedules. From the daily scheduled timetable 50 and the daily operating timetable 51, the determination of which is explained in connection with FIG. 5, a daily station timetable 53 is determined in the device 52 for each Zugmeldestelle. The daytime train schedule 53 contains information such as connection, train number, track, time (departure, transit, arrival). In addition, it is determined in the device 52 of the sections of the route 54, which is distributed by the device 55 as well as the day station schedules the interlocking 56th The impetus for distributing the daily train station timetables is the process 52. In the signal box 56, the dispatcher 57 can set the correct routes in good time.

    Die Aktualisierung der Tages-Bahnhofs-Fahrpläne erfolgt gemäß Fig. 4, wenn ein Zuglauf in der Einrichtung 60 neu berechnet wird. Dies geht in den Dispo-Fahrplan 3 und den Prognosefahrplan 4 ein. Aufgrund des geänderten Zuglaufs und der Prognose des Zuglaufs werden in der Einrichtung 61 die betroffenen Tages-Bahnhofs-Fahrpläne ermittelt. Der Tages-Bahnhofs-Fahrplan 53 wird in der Einrichtung 62 neu berechnet und durch die Einrichtung 55 an die betroffenen Stellwerke 56 neu verteilt.The updating of the daily train station timetables is carried out according to FIG. 4 , when a train run in the device 60 is recalculated. This enters the scheduling schedule 3 and the forecast timetable 4. Due to the changed train run and the forecast of the train run, the affected daily train station timetables are determined in the device 61 . The daytime train schedule 53 is recalculated in the device 62 and redistributed by the device 55 to the affected interlockings 56.

    Fig. 5 zeigt eine erste Alternative der täglichen Erstaufrüstung eines Stellwerks. 56. Aus dem Jahresfahrplan 65 wird ein veröffentlichter Perioden-Soll-Fahrplan 66, der in der Regel 6 Monate gilt, ermittelt. Daraus wird für jeden Tag ein Tages-Soll-Fahrplan 50 ermittelt. Parallel zu dem Perioden-Soll-Fahrplan 66 existiert ein interner Perioden-Betriebs-Fahrplan 67, der ebenfalls in der Regel 6 Monate gilt. Aus dem Perioden-Betriebs-Fahrplan 67, der beispielsweise durch Baustellen bedingte Abweichungen vom Jahresfahrplan 65 enthält, wird für jeden Tag der Tages-Betriebs-Fahrplan 51 ermittelt. Aus dem Tages-Soll-Fahrplan 50 und dem Tages-Betriebs-Fahrplan 51 wird der Dispo-Fahrplan 3 ermittelt. Hieraus lässt sich wiederum der Tages-Bahnhofs-Fahrplan 53 ermitteln. Fig. 5 shows a first alternative of the daily Erstaufrüstung a signal box. 56. From the annual timetable 65 , a published scheduled timetable 66 , which is generally valid for 6 months, is determined. From this, a daily target schedule 50 is determined for each day. Parallel to the scheduled periodic schedule 66, there is an internal periodic operating schedule 67 , which is also generally valid for 6 months. From the period operating schedule 67, which contains, for example, due to construction sites deviations from the annual schedule 65, the daily operating schedule 51 is determined for each day. From the daily schedule 50 and the daily operating schedule 51, the scheduling schedule 3 is determined. From this, in turn, the daily train schedule 53 can be determined.

    Bei einer zweiten Alternative der Erstaufrüstung eines Stellwerks 56, die in Fig. 6 gezeigt ist, wird der Tages-Bahnhofsfahrplan 53 direkt aus dem Tages-Soll-Fahrplan 50 und dem Tages-Betriebs-Fahrplan 51, der beispielsweise durch Baustellen bedingte Abweichungen vom Jahresfahrplan 65 enthält, ermittelt.In a second alternative of initial upgrade of a signal box 56 shown in FIG. 6 , the daily station schedule 53 becomes directly from the daytime schedule 50 and the daily service schedule 51, the deviations from the annual schedule, for example, due to construction 65 contains determined.

    Fig. 7 zeigt eine Darstellung, wie parallel der Zuglenkung 70 ein Lenkplan 31, der an eine Unterzentrale 30 geleitet wird, und ein Tages-Bahnhofs-Fahrplan 53, an ein einfaches Stellwerk 56 gegeben wird. Der Zuglenkung 70 in der Unterzentrale 30 werden die Zugnummer, die Fahrstraße und die Stellbedingungen übermittelt. Die Unterzentrale 30 umfasst eine computergestützte Zuglenkung 70, ein elektronisches Stellwerk 71 und eine computergestützte Zugnummermeldeanlage 72. Fig. 7 shows a representation of how parallel to the train steering system 70, a steering plan 31, which is routed to a sub-center 30, and a daytime train schedule 53, is given to a simple interlocking 56. The train control 70 in the sub-center 30 are transmitted the train number, the route and the parking conditions. The sub-center 30 comprises a computer-assisted train steering system 70, an electronic interlocking 71 and a computer-aided train number notification system 72 .

    Fig. 8 entspricht im Wesentlichen der Fig. 7, außer dass die Aktualisierung der Lenkplans 31 und des Tages-Bahnhofs-Fahrplans 53 dargestellt ist. Wird durch eine Unterzentrale 30 oder ein einfaches Stellwerk 56 eine Verspätung gemeldet, wird der Prognose-Fahrplan 4 aktualisiert. Daraufhin werden die betroffenen Tags-Bahnhofs-Fahrpläne 53 auf den neuesten Stand gebracht und an die betroffenen einfachen Stellwerke 56 übermittelt. Dies kann beispielsweise durch eine individuelle aktuelle Fahrplanunterlage geschehen. Wird eine Dispo-Entscheidung 75 getroffen, so geht dies in den Dispo-Fahrplan 3 ein. Daraufhin werden der betroffene Lenkplan 31 und der betroffene Tages-Bahnhofs-Fahrplan 53 aktualisiert und an die betroffenen Unterzentralen 30 bzw. Stellwerke 56 weiter gegeben. FIG. 8 substantially corresponds to FIG. 7 except that the update of the steering plan 31 and the daytime train schedule 53 is shown. If a delay is reported by a sub-central 30 or a simple interlocking 56, the forecast timetable 4 is updated. Then the affected tags station timetables 53 are brought up to date and transmitted to the affected simple interlockings 56. This can be done for example by an individual current timetable. If a dispatching decision 75 is made, this is included in the scheduling schedule 3. Subsequently, the affected steering plan 31 and the affected daily train station timetable 53 are updated and passed on to the affected sub-centers 30 and interlockings 56, respectively.

    Die Arbeit des Fahrdienstleiters wird erleichtert, wenn ihm eine interaktive Benutzeroberfläche 79, die aufgrund des Tages-Bahnhofsfahrplans erstellt wird, zur Verfügung gestellt wird. diese Benutzeroberfläche 79 ist in Fig. 9 gezeigt. Jede Zugmeldestelle (Bahnhof) des Stellwerks ist über einen Reiter 80, z.B. "Bahnhof_1" zugreifbar. Ein Reiter 80 einer Zugmeldestelle, bei der in Kürze eine Aktion ansteht, wird durch das System automatisch optisch hervorgehoben. Neue (zukünftige) Datensätze (=Zeilen), sowie in der Leitzentrale aktualisierte Datensätze (z.B. Prognose), werden vom System laufend automatisch von der Leitzentrale übertragen und gemäß zeitlicher Reihenfolge automatisch eingefügt. Nach jedem Eintrag durch den Bediener/Fahrdienstleiter (z.B. IST-Zeit) wird der Datensatz sofort zur Leitzentrale zur Auswertung (z.B. Prognose) gesendet. Endgültig durch Bediener/Fahrdienstleiter abgearbeitete, in die Leitzentrale übertragene und von dort quitierte Datensätze werden durch das System automatisch aus der Anzeige entfernt. Die Benutzeroberfläche 79 enthält die Kategorien Zugnummer 81, "Zug von" 82, "Zug nach" 83 und Gleis 84. Daraus erkennt der Fahrdienstleiter in Kenntniss der betrieblichen Verhältnisse, welche Fahrstraßen er stellen muß. Aus dem Feld "Halt ?" 85 erkennt er, ob ein Zug ankommt, abfährt oder durchfährt. Im Feld "SOLL ZEIT" 86 steht die im Fahrplan veröffentlichte Zeit. Das Feld "Prognose ZEIT" 87 enthält die zuletzt aus der Leitzentrale gemeldete Prognose. Daran erkennt der Fahrdienstleiter, wann er die Fahrstraßen stellen muß. Die Gegenwartslinie 88 repräsentiert die aktuelle Zeit auf der Y-Achse. Die Tabelle rollt mit fortschreitender Zeit automatisch darunter durch, beispielsweise sortiert nach der letzten Prognosezeit. Bei Betätigung der Funktionstaste "genau jetzt" 89 wird die aktuelle Systemzeit (Funkuhr) in ein gleichzeitig selektiertes Feld (IST-ZEIT) 90 eingetragen. Dies erfolgt z.B. über eine Touch Screen eines Fahrplanmonitors und Zwei-Finger-Bedienung. Weiterhin ist eine Funktionstaste "Verspätung" 91 zur Begründung der Verspätung für einen einzelnen Zug oder für eine Sammelbegründung für alle Züge, die innerhalb einer Zeitspanne einen gemeinsamen Weg haben, vorgesehen und die wegen deselben Grundes verspätet sind (z.B. "Bahndamm brennt"). Die Begründung wird in das Feld 92 eingetragen. Über die Funktionstaste 93 kann automatisch eine Sprechverbindung zum für dieses Stellwerk zuständigen Disponenten in der Leitzentrale aufgebaut werden. Es ist denkbar, verschiedene Hintergrundfarben für die Vergangenheit, Gegenwart (=in Kürze Aktion fällig) und Zukunft vorzusehen. Die interaktive Benutzeroberfläche 79 ist nur sensitiv für Einträge für die Gegenwart und die Vergangenheit.The work of the Dispatcher is facilitated when provided with an interactive user interface 79 created on the basis of the daytime train schedule. this user interface 79 is shown in FIG . Each Zugmeldestelle (station) of the signal box is accessible via a tab 80 , eg "Bahnhof_1". A rider 80 of a Zugmeldestelle, in the near future, an action is pending, automatically highlighted by the system. New (future) data records (= lines), as well as data records updated in the control center (eg forecasting), are continuously transmitted by the system automatically from the control center and inserted automatically according to chronological order. After each entry by the operator / dispatcher (eg actual time), the data record is immediately sent to the control center for evaluation (eg prognosis). Final data records processed by the operator / dispatcher, transferred to the control center and acknowledged from there, are automatically removed from the display by the system. The user interface 79 contains the categories train number 81, "train from" 82, "train to" 83 and track 84. From this recognizes the dispatcher in the knowledge of the operating conditions, which routes he must ask. From the field "Halt?" He recognizes whether a train arrives, departs or passes. The "TIME TIME" field 86 shows the time published in the timetable. The "Forecast TIME" field 87 contains the last forecast reported by the control center. At it the dispatcher recognizes, when he must put the driveways. The present line 88 represents the current time on the Y axis. The table scrolls automatically as time progresses, for example, sorted by the last forecast time. By pressing the function key "now" 89 , the current system time (radio clock) is entered in a simultaneously selected field (ACTUAL TIME) 90 . This is done, for example, via a touch screen of a timetable monitor and two-finger operation. Furthermore, a function key "Delay" 91 is provided to justify the delay for a single train or for a collective reasoning for all trains that have a common path within a period of time and that are late because of the same reason (eg "railway embankment burns"). The justification is entered in box 92 . By means of the function key 93, a speech connection to the dispatcher responsible for this interlocking can be set up automatically in the control center. It is conceivable to provide different background colors for the past, present (= action due soon) and future. The interactive user interface 79 is only sensitive to entries for the present and the past.

    Die vorgestellte Benutzeroberfläche 79 unterstützt den Fachmann vor Ort voll bei der Begründung von Verspätungen. Die Verspätungsminuten müssen nicht mehr manuell eingetippt werden, sondern werden vom System automatisch aus der Differenz von SOLL-Zeit und IST-Zeit errechnet. Ein durch die Funktionstaste "Verspätung" 91 zu öffnendes Menü erlaubt eine schnelle Zuordnung von Begründungen zu Datensätzen. Datensätze mit Verspätungen/Begründungen können in der Leitzentrale an ein Statstik-System weitergereicht werden. Datensätze mit nicht begründeten Verspätungen können von der Leitzentrale automatisch an den Fahrdienstleiter zur nachträglichen Begründung gesendet werden.The presented user interface 79 fully supports the local specialist in the reason of delays. The delay minutes do not have to can be typed in more manually, but are automatically turned off by the system the difference between the target time and the actual time. On through the function key "Delay" 91 menu allows quick assignment of Justifications for records. Records with delays / justifications can be forwarded to a statistic system in the control center. records With unreasonable delays can automatically from the control center sent to the dispatcher for subsequent substantiation become.

    Claims (12)

    Verfahren zur zeitnahen Information über Abweichungen von einem veröffentlichten Fahrplan, insbesondere Jahres- oder Periodenfahrplan, bei dem mindestens ein Fahrplan für den Tag erzeugt wird, die aktuelle Betriebslage eines fahr- oder flugplangebundenen Verkehrssystems, insbesondere Eisenbahnsystems, einschließlich momentaner Verspätungen und Dispositionsentscheidungen bestimmt wird und aus dem mindestens einen Fahrplan für den Tag und der aktuellen Betriebslage eine Prognose für die zukünftige Betriebslage ermittelt wird, dadurch gekennzeichnet, dass aus dem Fahrplan für den Tag, der aktuellen Betriebslage und der Prognose zumindest eine aktuelle Fahrplanunterlage (9) generiert wird.A method for timely information on deviations from a published timetable, in particular annual or periodic timetable, in which at least one schedule for the day is generated, the current operating position of a traffic or scheduled flight traffic system, in particular railway system, including current delays and disposition decisions is determined and off the at least one timetable for the day and the current operating position a prognosis for the future operating position is determined, characterized in that from the timetable for the day, the current operating position and the forecast at least a current timetable document (9) is generated. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass als Fahrplan für den Tag ein Beste-Prognose-Fahrplan (1), insbesondere aus einem Dispo-Fahrplan (3) und einem Prognose-Fahrplan (4), generiert wird und aus dem Beste-Prognose-Fahrplan (1) die mindestens eine Fahrplanunterlage (9) bestimmt wird.Method according to Claim 1, characterized in that a best-prognosis schedule (1), in particular from a scheduling schedule (3) and a forecast schedule (4), is generated as the schedule for the day and from the best prognosis Timetable (1) which determines at least one timetable document (9). Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Fahrplanunterlage (9) individuell konfiguriert wird.A method according to claim 1, characterized in that the timetable underlay (9) is configured individually. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Fahrplanunterlage (9) aktualisiert wird, wenn eine für die Fahrplanunterlage (9) relevante Änderung des Fahrplans für den Tag eingetreten ist.A method according to claim 1, characterized in that the timetable document (9) is updated when a relevant for the timetable document (9) change of the timetable for the day has occurred. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Fahrplanunterlage (9) abonnierbar ist. A method according to claim 1, characterized in that the timetable underlay (9) can be subscribed. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Fahrplanunterlage (9) elektronisch verteilt wird.A method according to claim 1, characterized in that the timetable underlay (9) is distributed electronically. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass eine Fahrplanunterlage (9) als Vorlage bereit gestellt wird und anschließend modifiziert wird.A method according to claim 1, characterized in that a timetable underlay (9) is provided as a template and is then modified. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass für mindestens einen, insbesondere für jeden, Bahnhof und/oder für mindestens ein Eisenbahnsignal erfasst wird, wann ein Zug ankommt, abfährt oder durch fährt und diese Informationen für die Aktualisierung des Fahrplans für den Tag, insbesondere des Beste-Prognose-Fahrplans (1), verwendet werden.A method according to claim 1, characterized in that for at least one, in particular for each station and / or for at least one railway signal is detected when a train arrives, departs or drives through and this information for updating the schedule for the day, in particular Best-Forecast-Timetable (1). Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass ein Tages-Bahnhofs-Fahrplan (53) für jeden Bahnhof erstellt wird, wobei bei einer Änderung des mindestens einen Fahrplans für den Tag, insbesondere des Prognose-Fahrplans (4) und Dispo-Fahrplans (3) oder des Beste-Prognose-Fahrplans (1), jeweils ein aktualisierter Tages-Bahnhofs-Fahrplan (53) oder eine aktuelle Fahrplanunterlage (9) an die von der Änderung betroffenen Stellwerke (56) übermittelt wirdA method according to claim 1, characterized in that a daily station timetable (53) is created for each station, wherein in a change of the at least one schedule for the day, in particular the forecast timetable (4) and scheduling (3 ) or the best-forecasting timetable (1), in each case an updated daily train station timetable (53) or a current timetable document (9) is transmitted to the interlockings (56) affected by the change Computerprogramm, in dem das Verfahren nach Anspruch 1 implementiert ist.Computer program in which the method according to claim 1 is implemented. Fahrplanunterlage (9) , insbesondere elektronische Fahrplanunterlage, die aus mindestens einem Fahrplan für den Tag, insbesondere einem Beste-Prognose-Fahrplan (1), generiert ist. Timetable document (9), in particular electronic timetable document, the at least one timetable for the day, especially one Best-Forecast-Timetable (1), generated. Fahrplanunterlage nach Anspruch 1, dadurch gekennzeichnet, dass sie ereignisgetrieben aktualisierbar und/oder konfigurierbar und/oder abonnierbar ist.Timetable underlay according to claim 1, characterized in that it is event-driven updatable and / or configurable and / or subscribable.
    EP03360138A 2003-12-08 2003-12-08 Method of actual information about deviations in a published schedule Revoked EP1541442B1 (en)

    Priority Applications (3)

    Application Number Priority Date Filing Date Title
    EP03360138A EP1541442B1 (en) 2003-12-08 2003-12-08 Method of actual information about deviations in a published schedule
    AT03360138T ATE318744T1 (en) 2003-12-08 2003-12-08 PROCEDURE FOR TIMELY INFORMATION ABOUT DEVIATIONS FROM A PUBLISHED TIMETABLE
    DE50302522T DE50302522D1 (en) 2003-12-08 2003-12-08 Procedure for timely information about deviations from a published timetable

    Applications Claiming Priority (1)

    Application Number Priority Date Filing Date Title
    EP03360138A EP1541442B1 (en) 2003-12-08 2003-12-08 Method of actual information about deviations in a published schedule

    Publications (2)

    Publication Number Publication Date
    EP1541442A1 true EP1541442A1 (en) 2005-06-15
    EP1541442B1 EP1541442B1 (en) 2006-03-01

    Family

    ID=34486514

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP03360138A Revoked EP1541442B1 (en) 2003-12-08 2003-12-08 Method of actual information about deviations in a published schedule

    Country Status (3)

    Country Link
    EP (1) EP1541442B1 (en)
    AT (1) ATE318744T1 (en)
    DE (1) DE50302522D1 (en)

    Cited By (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE102018214911A1 (en) * 2018-09-03 2020-03-05 Siemens Mobility GmbH Method and device for automatically triggering measures when a means of transport is delayed

    Families Citing this family (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE102016215767A1 (en) 2016-08-23 2018-03-01 Siemens Aktiengesellschaft Prediction of the train run

    Citations (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US4122523A (en) * 1976-12-17 1978-10-24 General Signal Corporation Route conflict analysis system for control of railroads
    US5794172A (en) * 1994-09-01 1998-08-11 Harris Corporation Scheduling system and method

    Patent Citations (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    US4122523A (en) * 1976-12-17 1978-10-24 General Signal Corporation Route conflict analysis system for control of railroads
    US5794172A (en) * 1994-09-01 1998-08-11 Harris Corporation Scheduling system and method

    Non-Patent Citations (2)

    * Cited by examiner, † Cited by third party
    Title
    KLAUS HUBER: "Elektronischer Buchfahrplan und La bei der Deutschen Bahn", ELEKTRISCHE BAHNEN, vol. 98, no. 4, April 2000 (2000-04-01), OLDENBOURG VERLAG, XP002279394 *
    STEPHAN TSCHORN: "Trassenmanagement und -marketing für freien Netzzugang", SIGNAL UND DRAHT, vol. 93, no. 5, May 2001 (2001-05-01), XP002279395 *

    Cited By (1)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE102018214911A1 (en) * 2018-09-03 2020-03-05 Siemens Mobility GmbH Method and device for automatically triggering measures when a means of transport is delayed

    Also Published As

    Publication number Publication date
    ATE318744T1 (en) 2006-03-15
    EP1541442B1 (en) 2006-03-01
    DE50302522D1 (en) 2006-04-27

    Similar Documents

    Publication Publication Date Title
    DE60121140T2 (en) ARRANGEMENT AND METHOD FOR OPTIMIZING THE ROAD TRACK OF A VEHICLE
    DE60020065T2 (en) PAPER-FREE OPERATING DATA ACQUISITION SYSTEM AND METHOD
    EP0567992B1 (en) Method for monitoring the transport of goods to predetermined removal stations
    DE2326859B2 (en) ARRANGEMENT FOR EVALUATING INFORMATION CONCERNING VEHICLES
    DE29615782U1 (en) Passenger information system for rail vehicles
    DE102008045050A1 (en) Method for automatic train control in European train control system track, involves using identical procedures for formation of telegrams to control balises for point-like automatic train control and wireless-based automatic train control
    EP1308366B1 (en) Warning device for work gangs
    EP0719224B1 (en) Traffic control system to control operations and traffic flow in rail transport
    DE19508731C2 (en) Device for location-independent mutual communication with a security device
    EP3768567B1 (en) Method for planning or controlling the movements of a plurality of vehicles over a network of routes
    DE602004012134T2 (en) METHOD AND SYSTEM FOR SUPPORTING THE OPERATION OF WORKS
    EP1541442B1 (en) Method of actual information about deviations in a published schedule
    DE102016215767A1 (en) Prediction of the train run
    DE102005038386B4 (en) Device for securing the train sequence in Zugleitbetrieb
    DE19825257B4 (en) Device for controlling the vehicles in a track system
    DE29708460U1 (en) Multimedia presentation system for public transportation
    DE102020133048A1 (en) System for securing maintenance tracks in rail traffic
    DE19643683C2 (en) Method for automatic control of a call collection taxi system
    DE102018212968A1 (en) Determine at least one timetable for at least one means of transportation from a plurality of means of transportation
    DE10240376A1 (en) Safe operation of rail systems uses travel and status data entered into protocol memory and continuously transmitted to central point to control alarm system
    DE10008147A1 (en) Rail vehicle control device for small-scale rail network uses central processor providing train control commands coupled to display monitor and 2 printers for print-out of train journey data set and event data set
    WO2021144699A1 (en) System for optimised route network utilisation in local public transport and method for same
    EP4091126A1 (en) System for optimised route network utilisation in local public transport and method for same
    DE102015217596A1 (en) Communication device and method for the automated exchange of messages in a railway installation
    DE10003192A1 (en) Public transport messaging service for alerting passenger to vehicle delays involves creating and transmitting information to users by transmitting warning message e.g. Short Message Service

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    17P Request for examination filed

    Effective date: 20040921

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

    AX Request for extension of the european patent

    Extension state: AL LT LV MK

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

    AX Request for extension of the european patent

    Extension state: AL LT LV MK

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: FI

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    Ref country code: IE

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    Ref country code: SK

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    Ref country code: NL

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    Ref country code: SI

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    Ref country code: RO

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    Free format text: NOT ENGLISH

    AKX Designation fees paid

    Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

    Effective date: 20060301

    REG Reference to a national code

    Ref country code: IE

    Ref legal event code: FG4D

    Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

    REF Corresponds to:

    Ref document number: 50302522

    Country of ref document: DE

    Date of ref document: 20060427

    Kind code of ref document: P

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: SE

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060601

    Ref country code: BG

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060601

    Ref country code: DK

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060601

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060612

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: PT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060801

    ET Fr: translation filed
    NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
    REG Reference to a national code

    Ref country code: IE

    Ref legal event code: FD4D

    PLBI Opposition filed

    Free format text: ORIGINAL CODE: 0009260

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: MC

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20061231

    Ref country code: BE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20061231

    PLAX Notice of opposition and request to file observation + time limit sent

    Free format text: ORIGINAL CODE: EPIDOSNOBS2

    PLAF Information modified related to communication of a notice of opposition and request to file observations + time limit

    Free format text: ORIGINAL CODE: EPIDOSCOBS2

    26 Opposition filed

    Opponent name: DEUTSCHE BAHN AG

    Effective date: 20061201

    PLAB Opposition data, opponent's data or that of the opponent's representative modified

    Free format text: ORIGINAL CODE: 0009299OPPO

    R26 Opposition filed (corrected)

    Opponent name: DEUTSCHE BAHN AG PATENTABTEILUNG

    Effective date: 20061201

    RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

    Owner name: ALCATEL LUCENT

    PLBB Reply of patent proprietor to notice(s) of opposition received

    Free format text: ORIGINAL CODE: EPIDOSNOBS3

    BERE Be: lapsed

    Owner name: ALCATEL

    Effective date: 20061231

    RDAE Information deleted related to despatch of communication that patent is revoked

    Free format text: ORIGINAL CODE: EPIDOSDREV1

    RDAF Communication despatched that patent is revoked

    Free format text: ORIGINAL CODE: EPIDOSNREV1

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20061208

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: CZ

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    Ref country code: GR

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060602

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: FR

    Payment date: 20071210

    Year of fee payment: 5

    Ref country code: GB

    Payment date: 20071205

    Year of fee payment: 5

    RDAG Patent revoked

    Free format text: ORIGINAL CODE: 0009271

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: PATENT REVOKED

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20071206

    Year of fee payment: 5

    27W Patent revoked

    Effective date: 20071129

    GBPR Gb: patent revoked under art. 102 of the ep convention designating the uk as contracting state

    Effective date: 20071129

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: EE

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: LU

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20061208

    Ref country code: HU

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060902

    Ref country code: TR

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: CY

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

    Effective date: 20060301

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: IT

    Payment date: 20091217

    Year of fee payment: 7

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: CA

    Effective date: 20150521

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: CA

    Effective date: 20150521