EP1382750B1 - Procédé de compaction du sol - Google Patents
Procédé de compaction du sol Download PDFInfo
- Publication number
- EP1382750B1 EP1382750B1 EP03254512A EP03254512A EP1382750B1 EP 1382750 B1 EP1382750 B1 EP 1382750B1 EP 03254512 A EP03254512 A EP 03254512A EP 03254512 A EP03254512 A EP 03254512A EP 1382750 B1 EP1382750 B1 EP 1382750B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- ground
- additional material
- lance
- amelioration
- lance member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000006872 improvement Effects 0.000 title claims description 6
- 239000000463 material Substances 0.000 claims abstract description 74
- 238000000034 method Methods 0.000 claims abstract description 32
- 239000002689 soil Substances 0.000 claims abstract description 12
- 239000002344 surface layer Substances 0.000 claims description 9
- 230000015572 biosynthetic process Effects 0.000 claims description 8
- 238000005755 formation reaction Methods 0.000 claims description 8
- 239000004575 stone Substances 0.000 claims description 4
- 239000011230 binding agent Substances 0.000 abstract description 8
- 230000008569 process Effects 0.000 abstract description 4
- 238000002156 mixing Methods 0.000 abstract description 2
- ODINCKMPIJJUCX-UHFFFAOYSA-N Calcium oxide Chemical compound [Ca]=O ODINCKMPIJJUCX-UHFFFAOYSA-N 0.000 description 8
- 238000005056 compaction Methods 0.000 description 8
- 239000011148 porous material Substances 0.000 description 8
- 230000001668 ameliorated effect Effects 0.000 description 5
- 235000012255 calcium oxide Nutrition 0.000 description 4
- 239000000292 calcium oxide Substances 0.000 description 4
- 239000011236 particulate material Substances 0.000 description 4
- 239000010410 layer Substances 0.000 description 2
- 230000010355 oscillation Effects 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 239000011800 void material Substances 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 230000009172 bursting Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000010881 fly ash Substances 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000003415 peat Substances 0.000 description 1
- 238000001228 spectrum Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/36—Coherent pavings made in situ by subjecting soil to stabilisation
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/046—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
- E02D3/054—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil involving penetration of the soil, e.g. vibroflotation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
Definitions
- the present invention relates to ground improvement, particularly, but not exclusively, prior to building.
- Document GB-A-2286613 describes a method of ground improvement which comprises forcing one or more mandrels into the ground to be improved by applying vibratory force having at least a generally vertical component of movement to the mandrel 10 until it reaches predetermined depths thereafter removing the mandrel from the hole or holes which it has formed in the ground, filling the hole or holes with particulate material and, optionally, reintroducing the mandrel into the hole to compact and outwardly displace the particulate material prior to filling the hole again with further particulate material.
- Document GB-A-2366819 describes a pillar formed by creating a vertical hole in the ground, and filling this with particulate material such as stone.
- a void is created at the top of the pillar by dropping a device onto the pillar.
- the void is filled with concrete.
- a concrete raft can be formed over the pillar.
- the present invention provides a method of ground improvement, in which an array of locations is locally improved by forming elongate cavities, introducing additional material into the cavities, and providing a cap formation at each improved location by forming a depression at the surface and filling the depression with material, characterised in that the cavities are formed by vibrating a lance member into the ground repeatedly at each location, withdrawing the lance member, and reintroducing the lance member after the additional material is introduced, to compact the additional material and the surrounding ground, and in which the additional material includes ground amelioration material and a surface layer of the ground is disturbed to mix the ground with a ground amelioration material to form a pavement which interconnects the cap formations at the improved locations.
- ground amelioration material refers to a material which consists of, or includes, a binder capable of increasing cohesion in material such as soil.
- the binder may be a settable material such as a cementitious material.
- the binder is cement.
- bitumen may be used as a binder.
- Ground amelioration material may also incorporate additional granular material such as pulverised fuel ash, and hydrophilic material such as quick lime, to assist in controlling pore pressure of the material and of the surrounding ground.
- the term “ameliorated soil” is used to refer to soil, preferably derived locally, into which ground amelioration material has been mixed.
- the additional material introduced into the cavities may be particulate and may comprise stone, gravel or another aggregate material.
- the additional material preferably includes ground amelioration material.
- the additional material may comprise soil mixed with ground amelioration material.
- the lance member may be repeatedly introduced at the same position, until heave is detected in the ground around that position.
- the surface depressions are preferably formed by impact from a dropped weight.
- the dropped weight may be a tapered member having a relatively narrow nose, forming a point of first contact with the ground, and widening from the nose.
- the dropped weight may widen to a width greater than the lance member, whereby to flare out the top of the material compacted by the lance member.
- the drawings illustrate a method of preparing ground in accordance with the present invention.
- the method is primarily intended for bad ground which has low natural load bearing capacity.
- Bad ground may, for example, include peat.
- peat It will be understood by the skilled reader that in many practical situations, no clear delineation can be made between good ground and bad ground, there being a continuous spectrum of ground quality. Indeed, the term "marginal ground” is sometimes used to refer to ground which is between good and bad ground. Consequently, the choice of technique to be used will be made in accordance with the quality of the ground in its natural state, the nature of the load imposed by the building to be constructed and other factors.
- Fig. 1 shows a lance member 14, for use in the method of the invention.
- the lance is used to provide local improvement of the ground at each location of an array of locations across the area being improved.
- the lance 14 is driven into the ground by vibration, to form an elongate cavity 16 ( Fig. 2 ) in the ground 17.
- the lance 14 is then withdrawn and the cavity 16 is filled with additional material 19.
- the additional material may be particulate in nature, such as stone, gravel or another aggregate.
- the additional material may be ground amelioration material, or ameliorated soil.
- quick lime is included in the additional material.
- the presence of quick lime which is highly hydrophilic, causes ground water to be drawn strongly from the surrounding ground 17, causing a significant reduction in local pore pressure. Consequently, the addition of quick lime is particularly preferred in locations at which excessive pore pressure is expected to be a problem. The reduction in pore pressure helps overcome any tendency of fine-grained soils to liquefy during the procedure.
- the lance 14 has an inverted frusto-conical shape.
- the lance 14 may have a diameter of about 300mm at its upper end and about 150mm at its lower end 14A, with a length of approximately 3m.
- the lance 14 is attached to extend down, substantially vertically, from a vibrator arrangement 18 which applies vertical oscillation to the lance 14 during use.
- the vertical oscillation may have an amplitude of about 25mm and a frequency of 1500 cycles per minute, with a rated impact per blow in excess of 40 tonnes.
- the cone angle of the lance 14 may be low, such as between 2° and 5°.
- the lance 14 will be driven into the ground substantially Without impact in a horizontal direction between the surface of the lance 14 and the sides of the cavity 16. That is, the main impact with the ground will be at the bottom of the cavity 16 as the lance 14 forces itself deeper into the ground.
- the lance 14 can be driven, by vibration, to any chosen depth without causing pore pressure problems, whereas the depth of compaction created by impact must be limited because of the force of impact and the resultant shock waves of pore pressure.
- the lance 14 is withdrawn. Additional material 19 is then introduced into the cavity.
- the additional material may be particulate, but preferably includes ground amelioration material or is ameliorated soil. This introduction of additional material results in the intermediate situation illustrated in Fig. 2 .
- the lance 14 is then reintroduced into the ground, at the same location, and vibrated down to cause compaction of the additional material. This may result in bulging of the cavity 16, as shown at 38 ( Fig. 3 ), arising from the inability of the surrounding ground 17 to contain the compaction forces created by the lance 14. The degree of bulging which occurs will depend on the size of downward compacting forces created by the vibration of the lance 14, and the natural capacity of the surrounding ground 34 to provide lateral containment of the additional material.
- the lance 14 is repeatedly vibrated in, removed and reintroduced after additional material has been introduced, until the cavity 16 is full of material which has been adequately compacted, with resultant bulging of the cavity.
- Compaction of the additional material in the cavity 16 is preferably continued until the ground 17 is seen to heave upwardly (indicated at 39) around the position of the cavity 16. This heave indicates that no further additional material can be accommodated, and no further compaction is possible.
- the next stage of the method is to provide a cap formation (to be described) at each of the locations which has been improved as described above.
- the cap formation is provided by forming a depression at the surface, and filling the depression with material which includes ground amelioration material or ameliorated soil.
- the depression is preferably formed by impact from a dropped weight.
- a preferred device for use as a drop weight is shown in Fig. 4 .
- the device 30 has a relatively narrow nose 32 which provides, in use, the point of first contact with the ground, when the device 10 is dropped. The device tapers down to the the nose 32, over a portion 34.
- a clevis arrangement 36 allows the device 30 to hang from a cable 37 to allow the device 30 to be raised by a crane, and then dropped to the ground.
- the weight of the device 30 is preferably at least 2,500 kg and preferably considerably more, such as 7,500 kg or 8,000 kg.
- the portion 34 preferably widens at an angle of 14° or greater, i.e. greater than the so called Morse angle of 14°. (The angle is measured between the central (vertical) axis of the device 30, and the tapering outer surface of the portion 34).
- the Morse angle of 14° is generally considered as the minimum angle required, to prevent the device 30 sticking in the ground, after being dropped.
- An angle between 14° and 20°, preferably about 17° may be chosen.
- Fig. 5 schematically shows the device 30, prior to it being dropped onto a location 40 which has already been improved by the first part of the method, in the manner described above. It is to be noted, and is preferred, that the device 30 is considerably wider than the lance 14, and is thus wider than the mouth 42 of the cavity 16.
- the device 30 is then dropped to embed itself in the material of the cavity 16 and is then removed. The result is shown in Fig. 6 .
- the compacted material previously introduced into the cavity 16 has been flared out at 44.
- the depression 46 is then filled with ground amelioration material to ground level, indicated at 48.
- the device 30 is dropped again and then removed, to form a further depression 30A. This results in additional outward and downward compaction of the surrounding ground 26.
- the additional material introduced prior to the drop is forced out into the surrounding ground forming a body of ameliorated soil around the depression 30A.
- the process is then repeated again, by filling the depression with additional material, dropping the device 30 to form a depression (not shown) and then filling the resulting depression again. It is preferred that additional material is introduced after each drop, but in some circumstances it may be appropriate to drop the device 30 more than once, before further additional material is introduced.
- Fig. 7 schematically shows three locations which have been treated in this manner, by means of the lance and subsequently by means of the device 30.
- the improved locations now form an array of pillars 49 of improved ground, separated by regions 50 which may still be in their original condition, but are likely to have been improved to some degree, as a result of the compaction, bursting etc. This completes the second part of the method.
- a surface layer 52 of the ground 17 (the depth of which is indicated by a broken line 54 in Fig. 7 ) is disturbed and mixed with ground amelioration material. This may be achieved by using a rotavator device, introducing the ground amelioration material either before or after rotavation. Alternatively, the material of the surface layer 52 may be removed for mixing and reintroduction. In a further alternative, the surface layer 52 may be disturbed to mix in ground amelioration material prior to the use of the lance 14. It is preferred that the surface layer 52 is formed without removing soil from the site, in order to speed up the process and minimise external environmental impact.
- the surface layer 52 is preferably formed before cementitious binder introduced into the depressions 46 (and in the cavities 16, if they were filled with ground amelioration material including a settable binder) has set, so that a unitary structure is formed as shown in Fig. 8.
- Fig. 8 shows a series of neighbouring locations 40, interconnected by the surface layer 52.
- the surface layer 52 has been formed prior to the cementitious binder setting at the locations 40 and consequently, once the material sets, a single unitary structure is formed, consisting of supporting pillars 56 and a surface pavement 52.
- the pillars 56 will be arrayed in two dimensions across the ground and thus, the pavement 52 will cover the entire area being treated, with support at each pillar 56.
- the result is a structure similar to a vaulted roof construction and with similar strength and load bearing characteristics arising from the unitary nature of the complete structure.
- the similarity with a vaulted roof is enhanced by the flaring achieved at the top of the pillars 56, by the use of the weight 30.
- the load bearing capacity will be further increased by the presence of the ground between the pillars 56, which will provide lateral stability for the pillars 56, and support for the pavement 52.
- the load bearing capacity of the pavement 52 is thus expected to be greater than that of an unsupported pavement, by virtue of the support provided by the ground beneath, and by the pillars 56.
- the method may be used to prepare ground for large commercial buildings such as retail sheds. Retail sheds may require relatively low loading on the ground over relatively large areas, with high loads around the edge of the building. Consequently, the unitary pillar and pavement structure described above can be used for providing adequate ground over the area of the building. It may be desirable to provide conventional piling systems at the edges of the building, to improve support for the building itself.
- Additional steps can be incorporated in the method, to further improve the performance of the ground.
- a large weight in the form of a plate, may be dropped to provide additional compaction of the ground, prior to the formation of the surface pavement layer.
- the weight may be a device of the type described in International patent application no. WO 99/09261 , particularly in relation to Figs. 9, 10 or 11 of that application.
- the weight is repeatedly dropped as it is moved across the ground, so that substantially the whole of the area has been subjected to impact from the weight, thus further consolidating the ground prior to the formation of the pavement layer.
- a final step of passing a roller over the site may be used, to further improve levelling and compacting.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Agronomy & Crop Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Superconductors And Manufacturing Methods Therefor (AREA)
- Soil Working Implements (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Road Paving Structures (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
- Road Repair (AREA)
Claims (9)
- Procédé d'amélioration du sol, dans lequel un réseau d'emplacements est amélioré localement en formant des cavités allongées (16), en introduisant un matériau supplémentaire (19) dans les cavités,
et en réalisant une formation de bouchon (48) à chaque emplacement amélioré (40) en formant une dépression (46) à la surface et en remplissant la dépression avec le matériau, caractérisé en ce que les cavités sont formées en faisant vibrer un élément formant lance (14) dans le sol de manière répétée à chaque emplacement, en retirant l'élément de lance formant lance, et en réintroduisant l'élément formant lance une fois que le matériau supplémentaire est introduit, pour compacter le matériau supplémentaire et le sol environnant (17),
et dans lequel le matériau supplémentaire comprend un matériau d'amélioration du sol et une couche de surface (52) du sol est perturbée pour mélanger le sol avec un matériau d'amélioration du sol pour former un pavement (52) qui relie les formations de bouchon aux emplacements améliorés. - Procédé selon la revendication 1, caractérisé en ce que le matériau supplémentaire (19) introduit dans les cavités est particulaire.
- Procédé selon la revendication 2, caractérisé en ce que le matériau supplémentaire (19) comprend de la pierre, du gravier ou un autre matériau granulaire.
- Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que le matériau supplémentaire (19) comprend un matériau d'amélioration du sol.
- Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que le matériau supplémentaire (19) comprend de la terre mélangée avec du matériau d'amélioration du sol.
- Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que l'élément formant lance (14) est introduit de manière répétée à la même position (40), jusqu'à ce qu'une boursouflure (39) soit détectée dans le sol autour de cette position.
- Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que les dépressions de surface (46) sont formées par un choc provenant d'un poids tombant (34).
- Procédé selon la revendication 7, caractérisé en ce que le poids tombant (34) est un élément effilé ayant un nez relativement étroit (32), formant un point de premier contact avec le sol, et s'élargissant à partir du nez.
- Procédé selon la revendication 8, caractérisé en ce que le poids tombant (34) s'élargit à une largeur plus grande que l'élément formant lance, de manière à élargir (44) l'extrémité supérieure du matériau compacté par l'élément formant lance.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0216701 | 2002-07-18 | ||
GB0216701A GB0216701D0 (en) | 2002-07-18 | 2002-07-18 | Preparation of ground prior to building |
GB0225943 | 2002-11-07 | ||
GB0225943A GB0225943D0 (en) | 2002-07-18 | 2002-11-07 | Preparation of ground prior to building |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1382750A1 EP1382750A1 (fr) | 2004-01-21 |
EP1382750B1 true EP1382750B1 (fr) | 2009-08-19 |
Family
ID=27767110
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP03254513A Expired - Lifetime EP1382751B1 (fr) | 2002-07-18 | 2003-07-18 | Procédé de compaction du sol |
EP03254512A Expired - Lifetime EP1382750B1 (fr) | 2002-07-18 | 2003-07-18 | Procédé de compaction du sol |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP03254513A Expired - Lifetime EP1382751B1 (fr) | 2002-07-18 | 2003-07-18 | Procédé de compaction du sol |
Country Status (5)
Country | Link |
---|---|
EP (2) | EP1382751B1 (fr) |
AT (2) | ATE440182T1 (fr) |
DE (2) | DE60328854D1 (fr) |
ES (2) | ES2331239T3 (fr) |
GB (2) | GB2391035B (fr) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2403964B (en) * | 2003-07-18 | 2006-09-27 | Roxbury Ltd | Ground improvement |
CA2749198C (fr) * | 2009-01-09 | 2013-07-16 | Geopier Foundation Company, Inc. | Appareil et procede d'essais de module en batiment |
WO2011001297A1 (fr) * | 2009-06-30 | 2011-01-06 | Russet Trading & Investment 24 (Pty) Ltd | Procédé pour construire une colonne |
DE102010022661A1 (de) * | 2010-06-04 | 2011-12-08 | vgs Ingenieure Dr. Köhler & Kirschstein GmbH | Verfahren und Vorrichtung zur Bodenverdichtung |
CN102409588B (zh) * | 2011-11-25 | 2013-06-12 | 中铁十二局集团第三工程有限公司 | 移动式注浆车间 |
CN102535291A (zh) * | 2012-02-02 | 2012-07-04 | 石家庄铁道大学 | 一种高速公路工程软弱土地基处理方法 |
WO2017147424A1 (fr) * | 2016-02-24 | 2017-08-31 | Ingios Geotechnics, Inc. | Systèmes et procédés d'obtention de concavités comprimées et remplies d'agrégat en vue d'améliorer la rigidité et l'uniformité du sol |
CN105970995A (zh) * | 2016-05-25 | 2016-09-28 | 宁波市建设集团股份有限公司 | 承台胎模 |
CN109183542A (zh) * | 2018-07-26 | 2019-01-11 | 武汉大学 | 运营公路软土路基桥头跳车下隔板处理方法 |
CN109355990B (zh) * | 2018-11-29 | 2023-09-19 | 中国电建集团成都勘测设计研究院有限公司 | 低洼沼泽地区吹填特细砂路基结构 |
GB2595274B (en) * | 2020-05-20 | 2023-07-05 | Subsea 7 Norway As | Modifying seabed contours |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5249892A (en) * | 1991-03-20 | 1993-10-05 | Fox Nathaniel S | Short aggregate piers and method and apparatus for producing same |
GB2286613B (en) * | 1994-02-18 | 1998-05-13 | Roxbury Ltd | Improvements in or relating to methods and apparatus for improving the condition of ground |
GB2366819B (en) * | 1997-08-20 | 2002-06-05 | Roxbury Ltd | Monitoring the degree of compaction achieved during ground treatment |
ATE349576T1 (de) * | 1997-08-20 | 2007-01-15 | Roxbury Ltd | Baugrundbehandlung |
NL1007690C2 (nl) * | 1997-12-04 | 1999-06-09 | Ballast Nedam Funderingstechni | Werkwijze en inrichting voor het in een ondergrond aanbrengen van een paal. |
GB2365891B (en) * | 2000-07-07 | 2004-05-26 | Roxbury Ltd | Ground preparation |
-
2003
- 2003-07-18 DE DE60328854T patent/DE60328854D1/de not_active Expired - Fee Related
- 2003-07-18 GB GB0316860A patent/GB2391035B/en not_active Expired - Fee Related
- 2003-07-18 EP EP03254513A patent/EP1382751B1/fr not_active Expired - Lifetime
- 2003-07-18 DE DE60328853T patent/DE60328853D1/de not_active Expired - Fee Related
- 2003-07-18 GB GB0316861A patent/GB2391036B/en not_active Expired - Fee Related
- 2003-07-18 ES ES03254513T patent/ES2331239T3/es not_active Expired - Lifetime
- 2003-07-18 ES ES03254512T patent/ES2331238T3/es not_active Expired - Lifetime
- 2003-07-18 AT AT03254512T patent/ATE440182T1/de not_active IP Right Cessation
- 2003-07-18 EP EP03254512A patent/EP1382750B1/fr not_active Expired - Lifetime
- 2003-07-18 AT AT03254513T patent/ATE440183T1/de not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
DE60328854D1 (de) | 2009-10-01 |
EP1382751B1 (fr) | 2009-08-19 |
EP1382750A1 (fr) | 2004-01-21 |
GB2391035A (en) | 2004-01-28 |
GB0316861D0 (en) | 2003-08-20 |
ES2331238T3 (es) | 2009-12-28 |
GB2391036B (en) | 2005-05-04 |
GB0316860D0 (en) | 2003-08-20 |
ES2331239T3 (es) | 2009-12-28 |
GB2391036A (en) | 2004-01-28 |
ATE440183T1 (de) | 2009-09-15 |
DE60328853D1 (de) | 2009-10-01 |
EP1382751A1 (fr) | 2004-01-21 |
GB2391035B (en) | 2005-05-04 |
ATE440182T1 (de) | 2009-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1937900B1 (fr) | Tetes de damage pyramidales ou coniques, et procede d'utilisation pour la realisation de contreforts d'agregats dames | |
US9091036B2 (en) | Extensible shells and related methods for constructing a support pier | |
EP1382750B1 (fr) | Procédé de compaction du sol | |
US20170159257A1 (en) | Open-end extensible shells and related methods for constructing a support pier | |
CN109440778B (zh) | 主动式双向倾斜排桩基坑支护方法 | |
WO2006127571A2 (fr) | Mandrin a fentes pour pieux a refoulement lateral et procede d'utilisation | |
KR20180084101A (ko) | 안정된 기초지반 형성방법 | |
KR101973697B1 (ko) | 고밀도 급속 팽창성 우레탄의 다중 주입에 의한 철도 콘크리트 도상 침하의 복원 및 지반 보강을 위한 장치와 이를 이용한 시공방법 | |
CN110777569A (zh) | 膨胀土有限变形防上拱的地基结构和地基结构的施工方法 | |
GB2286613A (en) | Ground improvement | |
KR20160053945A (ko) | 토양 및 입자상 재료들을 압축하기 위한 방법들 및 장치들 | |
KR101683126B1 (ko) | 쇄석말뚝 다짐장치와 이를 이용한 쇄석말뚝 시공 방법 | |
JP2601702B2 (ja) | 軟弱地盤改良工法 | |
WO1994017252A1 (fr) | Ameliorations relatives a des fondations | |
CN211227880U (zh) | 一种膨胀土有限变形防上拱的地基结构 | |
CN1621623A (zh) | 复合地基的施工方法 | |
JPH0765315B2 (ja) | 盛土の構造 | |
CN109440780B (zh) | 主动式倾斜单排桩基坑支护方法 | |
JP3176530B2 (ja) | 液状化対策工法 | |
KR102535225B1 (ko) | 지지 피어 건설을 위한 개방 바닥 확장형 쉘들 및 관련 방법들 | |
JPS63315721A (ja) | 地盤締固め併用基礎杭打設工法 | |
RU1779706C (ru) | Способ возведени фундамента | |
JPH02266012A (ja) | 軟弱地盤の圧密方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK |
|
17P | Request for examination filed |
Effective date: 20040508 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 60328853 Country of ref document: DE Date of ref document: 20091001 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2331238 Country of ref document: ES Kind code of ref document: T3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20091119 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20091221 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 |
|
26N | No opposition filed |
Effective date: 20100520 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20091120 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100731 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20110331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110201 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100731 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 60328853 Country of ref document: DE Effective date: 20110201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100802 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100718 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20110720 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20100718 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20100220 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20090819 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20131018 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120719 |