EP1251093A2 - Device for delivering piles of folding boxes - Google Patents

Device for delivering piles of folding boxes Download PDF

Info

Publication number
EP1251093A2
EP1251093A2 EP02005689A EP02005689A EP1251093A2 EP 1251093 A2 EP1251093 A2 EP 1251093A2 EP 02005689 A EP02005689 A EP 02005689A EP 02005689 A EP02005689 A EP 02005689A EP 1251093 A2 EP1251093 A2 EP 1251093A2
Authority
EP
European Patent Office
Prior art keywords
stop
transport
stacking shaft
support means
hold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP02005689A
Other languages
German (de)
French (fr)
Other versions
EP1251093A3 (en
EP1251093B1 (en
Inventor
Stefan Furthmüller
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bahmueller Maschinenbau Prazisionswerkzeuge GmbH
Original Assignee
Bahmueller Maschinenbau Prazisionswerkzeuge GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bahmueller Maschinenbau Prazisionswerkzeuge GmbH filed Critical Bahmueller Maschinenbau Prazisionswerkzeuge GmbH
Publication of EP1251093A2 publication Critical patent/EP1251093A2/en
Publication of EP1251093A3 publication Critical patent/EP1251093A3/en
Application granted granted Critical
Publication of EP1251093B1 publication Critical patent/EP1251093B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H31/00Pile receivers
    • B65H31/32Auxiliary devices for receiving articles during removal of a completed pile
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/42Piling, depiling, handling piles
    • B65H2301/422Handling piles, sets or stacks of articles
    • B65H2301/4223Pressing piles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2301/00Handling processes for sheets or webs
    • B65H2301/40Type of handling process
    • B65H2301/42Piling, depiling, handling piles
    • B65H2301/422Handling piles, sets or stacks of articles
    • B65H2301/4226Delivering, advancing piles
    • B65H2301/42264Delivering, advancing piles by moving the surface supporting the lowermost article of the pile, e.g. conveyor, carriage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2404/00Parts for transporting or guiding the handled material
    • B65H2404/60Other elements in face contact with handled material
    • B65H2404/69Other means designated for special purpose
    • B65H2404/694Non driven means for pressing the handled material on forwarding or guiding elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/10Handled articles or webs
    • B65H2701/17Nature of material
    • B65H2701/176Cardboard
    • B65H2701/1764Cut-out, single-layer, e.g. flat blanks for boxes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/10Handled articles or webs
    • B65H2701/17Nature of material
    • B65H2701/176Cardboard
    • B65H2701/1766Cut-out, multi-layer, e.g. folded blanks or boxes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/10Handled articles or webs
    • B65H2701/19Specific article or web
    • B65H2701/191Bags, sachets and pouches or the like

Definitions

  • the mechanical parts of the stacking device must work at very high speeds. To the speeds reasonably within tolerable limits hold, two stacks are formed one above the other by temporary supports are separated. Thereby is gained time to get a finished stack out of the To be able to remove the stacking device.
  • the temporary support means to bring it into the stacking shaft quickly enough without the risk of colliding with those at high speed incoming products.
  • the probability of a collision to reduce is in the known machine Rake that forms the temporary support means.
  • the rake can move its teeth through the slots of the protrude downstream stop to in the To form a stacking shaft of temporary support means.
  • the rake must perform a vertical movement in the shaft and it becomes at the bottom of the stacking shaft pulled out, outside the stacking shaft into the upper one Position returned to above the margin of the Products to be fed into the stacking shaft. thereupon it is in the stacking shaft in direct current with the in Chute dropping products moving down. Also there is no danger when the lowering speed is low the collision with incoming products because of the rake happens very quickly in the area where the products are over the take-off rollers are shot.
  • the known machine has a type of cross slide with two linear axes running at right angles to each other.
  • This arrangement is driven by two endless ones Belts that are connected to the support beam on which the Prongs of the rake are attached.
  • the drive takes place via a toothed belt that runs around fixed rollers.
  • the belt space curve must be designed so that the stroke of the rake in the direction of transport is sufficient, thus the teeth of the rake even for the largest products can be withdrawn behind the relevant stop. This is the way for very small products an extremely long idle stroke that takes up unnecessary time and also at very high speeds for small products forces. In particular, therefore, the folding machine can with small products not at higher speed work, although smaller products allow this easily would.
  • the temporary supports in the form of arithmetic are also used in the known machine to to hold down the stack of folding box tubes and depressed it in an output conveyor convict.
  • the rake In this area, the rake must run parallel to the exit route be led and is therefore over a longer period Time period not available for recording trimmings. To bridge this time, in which the rake for Stacking is not available, on the other hand the lifting table but can also not be used, there will be more Support means used in the form of fingers that way long carry the stack of incoming products until the Lift table has become free from the previous stack and in the stack height can be raised.
  • the first edition means are fingers or similar elements that are in the Clearance profile of the stacking shaft in front of or out of this can be moved back without making a vertical movement perform.
  • the second temporary supports act as hold-downs, around the finished stack formed on the lift table hold together and into the exit conveyor threading. To accomplish this task, the Carry out two movements with the second temporary support means. You have to move vertically through the stacking chute and they have to leave the clearance profile on top of that of the stacking shaft.
  • the tines move the second temporary support means not parallel to the axis of the stacking shaft, but along an arc with a large radius.
  • a swivel axis is provided for this purpose, which are perpendicular to the direction of transport and horizontal runs so that the bow movement occurs, which makes another linear axis superfluous. It is sufficient, in the solution according to the invention, if the second temporary support means only during the retraction movement from the stacking shaft and the feed movement in the stacking shaft move along a linear axis. The movement from top to bottom through the stacking shaft and outside the stacking shaft from bottom to top is not straight Move.
  • the upstream stop is designed as a vibrator. This also enables one Subsequent adjustment of the folding box hoses when the Seam is glued and the adhesive has not yet cooled completely is.
  • the finished stacks can be reliably removed can be achieved if the output transport device several parallel conveyor belts includes. Moving the stack away from the lifting table is improved, if it is also fan-shaped, and at least one of the conveyor belts into a gap between the prongs of the lifting table.
  • Additional conveyor belts can be found next to the lifting table run and up to its upstream Edge.
  • the upper folding box hoses are also re-pressed achieved by placing the finished stack in a hold-down device is pinched.
  • This is also expedient equipped with endless conveyor belts on the Work on top of the stack. The working dream of this Conveyor belts run parallel to the area that contains the working strand of the conveyor belts are formed on which the stacks rest.
  • FIG. 1 shows a device 1 for forming stacks 2 from flat products 3 for example folding carton blanks or folding box hoses.
  • the representation is highly schematic, with only such parts illustrated are that are essential for understanding.
  • the products 3 run from the right in relation to FIG. 1 to the left and come from a folding machine, for example, in which the folding box blanks to folding box hoses be shaped, glued or along the seam to be stapled.
  • a folding machine for example, in which the folding box blanks to folding box hoses be shaped, glued or along the seam to be stapled.
  • the machine 1 includes a machine frame 4, which illustrates highly schematized and cut open is.
  • the machine frame 4 has side pillars 5, which are connected to one another via a transverse yoke 6.
  • the Pillars 5 stand on a base foundation 7, on which also rear pillars 8 are raised. Between the backward support stands 8 and the pillars 5 extends an upper machine yoke 9 on which an underframe 11 is attached.
  • a stacking shaft 12 formed laterally is open and downstream in the direction of transport from a stop 13 and upstream from a stop 14 is limited.
  • the stop 14 consists of an essentially planes Plate with vertical slits.
  • the Plate 14 is attached to an eccentric shaft 15 which between the two pillars 5 is rotatably mounted.
  • the upstream stop 14 serves as Jogger.
  • the stop 13, however, is essentially during the operation is fixed, but can be at a distance can be set to the stop 14.
  • a transport device 16 which comprises two transport rollers 17 and 18.
  • the two transport rollers 17 and 18 are axially parallel between horizontally the two pillars 5 stored and driven in rotation.
  • Their peripheral speed is greater than that Transport speed at which the products correspond 3 coming from the right.
  • the products 3 arrive in a continuous Stream to the transport device 16 and are in the stream spaced from each other. Be between the rollers 17 and 18 them into the stacking shaft 12 at high speed shot in and fall down in this, as will be explained in more detail below.
  • the lifting table 19 Located in the lower area of the stacking shaft 12 is a lifting table 19, which with the help of links 21 and 22nd back and forth between the two positions shown in Fig. 1 can be moved.
  • the lifting table 19 is in the manner of a rake formed, and has several parallel to the direction of transport extending tines on over a Stiffening element 24 are interconnected.
  • the movement of the lifting table 19 takes place essentially in parallel to the surfaces formed by the stops 13 and 14 are.
  • the stop 13 is also designed as a rake and consists of several essentially vertically downwards hanging tines, between which are vertical and slits open downward are included.
  • the support means 25 are two Longitudinally movable fingers, which with the help of a Working cylinder 27 in the clearance profile of the stacking shaft 12 can be withdrawn before and from this.
  • the two fingers 25 lead through corresponding openings through the upstream stop 14 and are located below the lower transport roller 16.
  • the two fingers 25 are at such a distance from one another, that they have the smallest folding box hose to be processed can support laterally. In the case, that two such fingers are not enough, if very wide blanks can also be stacked in addition to these two fingers to the outside Fingers 25 are arranged. All fingers 26 are driven synchronously and at the same time in the stacking shaft 12 advanced or withdrawn.
  • fingers 26 are located below the downstream stop 13 also fingers 26, which are also in the Clearance profile of the stacking shaft 12 in front of and out of this can be withdrawn.
  • the fingers 25, 26 define a plane that is rectangular runs to the stop 14 or the stop 13, and which is not inclined transversely to the transport direction.
  • the tines 28 sit on a crossbar, and each protrude after operating position through the slots in the downstream Stop 13 in the clearance profile of the stacking shaft 12th
  • the two guide rails 31 sit at the bottom of one Intermediate frame 32 and serve as guide rails for one Guide carriage 33 on which the beam 29 below the Rails is guided. With the help of a drive device, not shown can the carriage 33 by means of not shown Timing belt along the two guide rails 31 be moved.
  • the intermediate frame 32 is by means of an axis 35, which is attached to frame parts, not shown, pivotally mounted in the machine frame 4. The axis 35 runs below the guide rails 31.
  • the axis 35 runs horizontally and transversely to the transport path of products 3.
  • the opposite end of the intermediate frame 32 is fixed to the frame via a handlebar arrangement 37 Vertical guide rails 38 out. Also here is the drive device for the sake of clarity for the handlebar 37 and an associated one in the guide rails 38 running carriage 41 not shown.
  • the tines 28 of the second temporary support means can in this way behind the downstream Stop 13 are withdrawn, and they can also perform a pivoting movement with respect to the axis 35.
  • a transport device 42 begins at the pillars 5, the several endless ones running parallel to each other Conveyor belts in the form of flat belts 43 includes.
  • the Belts 23 are along the transport path by transport rollers 44 supports that are rotatable in the machine frame are stored.
  • the conveyor belts form 43 working dreams that extend along a plane, which runs perpendicular to planes through the two stops 13 and 14 are defined.
  • the level through which Working span of the conveyor belts 43 is defined increases starting from the pillar 5.
  • the distance between the Conveyor belts 43 and the storage is chosen so that they reach partially between the tines of the lifting table 19 or walk past it sideways so that one Collision is avoided.
  • a hold-down device 45 made of three parallel ones juxtaposed endless belts 46 is formed.
  • the distance between the endless belts is like this chosen that the tines have 28 place between them, with a conveyor belt 46 in the middle of the group of tines 28 runs.
  • the deflection roller necessary for this is next to the back of the stop 13 behind a corresponding Tine stored by this.
  • the hold-down device 45 begins just behind the downstream stop 13 and is sufficient as shown about to the end of the transport device 42 Bottom edge of the stop 13 is flush with the plane that is defined by the working dreams of the conveyor belts 46 Between the hold-down device 45 and the transport device 42 a channel is defined, which at the beginning and has the same clear height at the end.
  • the storage rollers for the conveyor belts 43 and 46 are indicated schematically in the figure, but otherwise not described further, since the manner of storage the Expert is familiar and, moreover, the way of Storage for further understanding of the invention is not is important.
  • the distance between the two stops 13 and 14 is set by adjusting the position of the stop 13. The distance is chosen so that the products 3 essentially fit in between if they are on one of the Support means or the lifting table 19 rest.
  • the lifting table 19 is in the top position raised.
  • the prongs 28 are in that Clearance profile of the stacking shaft 12 advanced because the guide rails 31 pivoted into the lowest position are.
  • the underside of the tines runs 28 in extension of the area caused by the working dream of the conveyor belts 46 of the hold-down device 45 is defined.
  • the tines 28 are aligned with the corresponding ones Gaps in the table 19.
  • the fingers 25 and 26 of the first support means are in the clearance profile is advanced so that it neither collide with the prongs 28 and the lifting table 19.
  • the first folding box hose 3 is shot, he comes on the Top of the tines 28 to lie. More folding box hoses lie on the one below from the stack already in the stack 12 from how this shows Fig. 3. The stack is initially from the Top of the prongs 28 worn.
  • the guide rails 31 pivoted upwards about the axis 35 into the upper end position. For this purpose, the guide rails 31 over the slide 41, which is guided in the guide rails 38 and accordingly is driven, on the stop 13 adjacent End raised.
  • the part-turn actuator is activated for the guide rails 31 stopped and instead whose drive for the slide 33 is in motion.
  • the tines 28 are through the gaps in the stop 13 in the stacking shaft 12 advanced. In the advanced position its underside is clearly above that level, lengthways those, the folding box hoses 3 in the stacking shaft 12 5, as can be seen in FIG.
  • the swivel drive for the guide rails 31 in the sense of lowering in motion set.
  • the tines 28 run in direct current with the Folding box hoses 3 falling down through the stacking shaft 12.
  • the lower layers of the blanks are cut through the upper layers kept closed. Only the top layers can do something due to the resilience of the corrugated cardboard jump.
  • the fingers 25 and 26 can be relatively weak dimensioned because the stack they have to carry until the lift table is in position again, relatively small and therefore light.
  • the main advantage of the arrangement according to the invention is that the tines are pivoting complete with respect to axis 35. This simplifies the storage essential.
  • the swivel drive and the horizontal drive is mechanically decoupled from one another. In this way, the longitudinal stroke that the tines 28th perform parallel to the surface of the lifting table 19 on the Be limited to the amount necessary to keep them straight behind withdraw the stop 13.
  • You need small ones Folding box hoses 3 do not have the same stroke go through as with large blanks. In this way the folding machine that cuts the folding box 3 generated, run much faster with small blanks than with large blanks, so even though the cycle time is determined by the structure of the folding straps higher throughput occurs.
  • the upper yoke 9 or the lower frame 11 are lowered somewhat, whereby a greater depth of the stacking shaft is reached becomes. Accordingly, there is another one on the pillars 5 Set of fingers 25 'provided below the Fingers 25 lie, namely by the amount of the additional Stacking shaft depth.
  • a device for stacking folding box hoses has a height-adjustable lift table.
  • the first temporary support means are located above the lifting table, which are pulled out of the stacking shaft or into these can be advanced.
  • Another set of temporary support means can be both from the stacking shaft be pulled out as down in the stacking shaft be moved.
  • the second support means serve simultaneously to do this, press a finished stack together around it between a transport device of a hold-down device to be able to thread. While the lift table is together with the second support device with the removal of the Stapels is busy, the first temporary support means for the fact that in the Stacking shaft can be stacked.

Abstract

Eine Vorrichtung zum Abstapeln von Faltschachtelschläuchen (3) weist einen höhenverstellbaren Hubtisch (19) auf. Oberhalb des Hubtisches befinden sich erste temporäre Auflagemittel (25,26), die aus dem Stapelschacht (12) herausgezogen oder in diesen vorgeschoben werden können. Ein weiterer Satz von temporären Auflagemitteln (28), kann sowohl aus dem Stapelschacht herausgezogen werden, als im Stapelschacht (12) abwärts bewegt werden. Die zweiten Auflagemittel (28) dienen gleichzeitig dazu einen fertigen Stapel zusammen zu drücken um ihn zwischen einer Transportvorrichtung (42) einer Niederhaltereinrichtung (45) einfädeln zu können. Während der Hubtisch (19) zusammen mit der zweiten Auflageeinrichtung (28) mit dem Wegführen des Stapels beschäftigt ist, sorgen die ersten temporären Auflagemittel (25,26) dafür, dass unterbrechungsfrei dennoch in dem Stapelschacht (12) abgestapelt werden kann.A device for stacking folding box hoses (3) has a height-adjustable lifting table (19). First temporary support means (25, 26) are located above the lifting table, which can be pulled out of the stacking shaft (12) or pushed into this. Another set of temporary support means (28) can be pulled out of the stacking shaft as well as moved downwards in the stacking shaft (12). The second support means (28) simultaneously serve to compress a finished stack in order to be able to thread it between a transport device (42) and a hold-down device (45). While the lifting table (19), together with the second support device (28), is busy removing the stack, the first temporary support means (25, 26) ensure that the stacking shaft (12) can still be stacked without interruption.

Description

Aus der DE 695 00 305 ist eine Vorrichtung bekannt, um aus einem Strom von ankommenden Faltschachtelschläuchen Kleinstapel zu erzeugen. Die Produkte kommen im festen zeitlichen Raster an. Der Abstand zwischen aufeinanderfolgenden Produkten definiert die maximale Pause innerhalb die Vorrichtung zum Abstapeln auf den nächsten Stapel umschalten muss. Die Vorrichtung muss mit sehr hoher Geschwindigkeit unterbrechungsfrei arbeiten, damit sie in der Lage ist, die Produkte entgegenzunehmen, ohne Rückwirkungen auf die vorausgehende Faltmaschine zu verursachen.From DE 695 00 305 a device is known to from a stream of incoming folding box hoses Generate small batches. The products come in solid time grid. The distance between successive Products defines the maximum break within that Switch device for stacking to the next stack got to. The device must be at very high speed work uninterruptedly so that they are able is to accept the products without any repercussions to create the previous folding machine.

Die mechanischen Teile der Stapelvorrichtung müssen dazu mit sehr hoher Geschwindigkeiten arbeiten. Um die Geschwindigkeiten einigermaßen in erträglichen Grenzen zu halten, werden übereinander zwei Stapel gebildet, die durch temporäre Auflagemittel voneinander getrennt werden. Dadurch wird Zeit gewonnen, um einen fertigen Stapel aus der Stapelvorrichtung herausschaffen zu können.The mechanical parts of the stacking device must work at very high speeds. To the speeds reasonably within tolerable limits hold, two stacks are formed one above the other by temporary supports are separated. Thereby is gained time to get a finished stack out of the To be able to remove the stacking device.

Die maximale Geschwindigkeit, mit der die Stapel bewegt werden können, ergibt aufgrund des Reibschlusses zwischen den aufeinander liegenden Produkten im Stapel. Würde der Stapel zu schnell beschleunigt und abgebremst werden, würden die Produkte im Stapel gegeneinander verrutschen. Die Haftreibung zwischen den Produkten begrenzt die maximale Beschleunigung und damit auch letztlich die erreichbare Geschwindigkeit. Aufgrund des Zwischenstapelns bzw. der zwei Stapel die temporär übereinander entstehen, wird Zeit gewonnen, um einen fertigen Stapel aus der Maschine herauszuschaffen, nämlich etwa so viel Zeit, wie der nächste Stapel zum Bilden braucht.The maximum speed at which the stack moves due to the frictional connection between the stacked products. Would the stack is accelerated and braked too quickly, the products would slide against each other in the stack. The static friction between the products limits the maximum Acceleration and ultimately the attainable Speed. Due to the intermediate stacking or two stacks that are created temporarily one above the other is time won to get a finished stack out of the machine, namely about as much time as the next stack for education.

Es entsteht jedoch das Problem, die temporären Auflagemittel schnell genug in den Stapelschacht zu bringen, ohne die Gefahr einer Kollision mit den mit hoher Geschwindigkeit ankommenden Produkten. Um die Kollisionwahrscheinlichkeit zu verringern, ist bei der bekannten Maschine ein Rechen vorhanden, der die temporären Auflagemittel bildet. Der Rechen kann mit seinem Zinken durch die Schlitze des stromabwärtsgelegenen Anschlags hindurchragen, um in dem Stapelschacht temporärer Auflagemittel zu bilden. Der Rechen muss in dem Schacht eine Vertikalbewegung vollführen und er wird am unteren Ende des Stapelschachtes aus diesem herausgezogen, außerhalb des Stapelschachtes in die obere Stellung zurückgeführt, um oberhalb des Einschusses der Produkte in den Stapelschacht vorgeschoben zu werden. Sodann wird er im Stapelschacht im Gleichstrom mit den im Schacht herunterfallenden Produkten nach unten bewegt. Auch bei niedriger Absenkegeschwindigkeit besteht keine Gefahr der Kollision mit ankommenden Produkten, weil der Rechen sehr schnell den Bereich passiert, in dem die Produkte über die Abzugswalzen eingeschossen werden.However, the problem arises, the temporary support means to bring it into the stacking shaft quickly enough without the risk of colliding with those at high speed incoming products. The probability of a collision to reduce is in the known machine Rake that forms the temporary support means. The rake can move its teeth through the slots of the protrude downstream stop to in the To form a stacking shaft of temporary support means. The rake must perform a vertical movement in the shaft and it becomes at the bottom of the stacking shaft pulled out, outside the stacking shaft into the upper one Position returned to above the margin of the Products to be fed into the stacking shaft. thereupon it is in the stacking shaft in direct current with the in Chute dropping products moving down. Also there is no danger when the lowering speed is low the collision with incoming products because of the rake happens very quickly in the area where the products are over the take-off rollers are shot.

Damit der Rechen die gewünschte Bewegung vollführt, weist die bekannte Maschine ein Art Kreuzschlitten auf mit zwei rechtwinklig zueinander verlaufenden linearen Achsen. Der Antrieb dieser Anordnung geschieht über zwei endlose Riemen, die mit dem Tragbalken verbunden sind, an dem die Zinken des Rechens befestigt sind. Der Antrieb erfolgt über einen Zahnriemen, der um ortsfest Rollen umläuft. Aufgrund dieser Anordnung vollführt der Rechen immer die gleiche Bewegung, gleichgültig, ob Produkte abgestapelt werden, die in Transportrichtung gesehen kurz oder lang sind.So that the rake performs the desired movement, the known machine has a type of cross slide with two linear axes running at right angles to each other. This arrangement is driven by two endless ones Belts that are connected to the support beam on which the Prongs of the rake are attached. The drive takes place via a toothed belt that runs around fixed rollers. by virtue of the rake always does the same in this arrangement Movement, regardless of whether products are stacked that seen short or long in the direction of transport.

Die Raumkurve des Riemens muss so gestaltet sein, dass der Hub des Rechens gesehen in Transportrichtung ausreicht, damit die Zinken des Rechens auch bei den größten Produkten hinter den betreffenden Anschlag zurückgezogen werden können. Bei sehr kleinen Produkten entsteht auf diese Weise ein extrem großer Leerhub, der unnötig Zeit kostet und auch bei kleinen Produkten zu sehr hohen Geschwindigkeiten zwingt. Insbesondere kann deswegen auch, die Faltmaschine mit kleinen Produkten nicht mit höherer Geschwindigkeit arbeiten, obwohl dies kleinere Produkte ohne weiteres zulassen würden.The belt space curve must be designed so that the stroke of the rake in the direction of transport is sufficient, thus the teeth of the rake even for the largest products can be withdrawn behind the relevant stop. This is the way for very small products an extremely long idle stroke that takes up unnecessary time and also at very high speeds for small products forces. In particular, therefore, the folding machine can with small products not at higher speed work, although smaller products allow this easily would.

Ferner ist die Kreuzschlittenführung mit den beiden rechtwinklig zueinander liegenden Linearachsen technisch sehr aufwendig und bedingt große zu bewegende Massen mit großen Kräften zweiter Ordnung. Furthermore, the cross slide with the two technically perpendicular linear axes very complex and requires large masses to be moved large second order forces.

Die temporären Auflagemittel in Gestalt des Rechens, werden bei der bekannten Maschine auch dazu verwendet, um den Stapel aus Faltschachtelschläuchen nieder zu halten und ihn niedergedrückt in eine Ausgabetransporteinrichtung zu überführen.The temporary supports in the form of arithmetic, are also used in the known machine to to hold down the stack of folding box tubes and depressed it in an output conveyor convict.

In diesem Bereich muss der Rechen parallel zum Ausgabeweg geführt werden und steht deswegen über eine längere Zeitspanne nicht zur Aufnahme von Zuschnitten zur Verfügung. Um diese Zeit zu überbrücken, in denen der Rechen zum Abstapeln nicht zur Verfügung steht, anderseits der Hubtisch aber auch nicht benutzt werden kann, werden noch weitere Auflagemittel verwendet in Gestalt von Fingern, die so lange den Stapel aus ankommenden Produkten tragen, bis der Hubtisch von dem vorherigen Stapel freigeworden ist und in die Stapelhöhe nach oben gefahren werden kann.In this area, the rake must run parallel to the exit route be led and is therefore over a longer period Time period not available for recording trimmings. To bridge this time, in which the rake for Stacking is not available, on the other hand the lifting table but can also not be used, there will be more Support means used in the form of fingers that way long carry the stack of incoming products until the Lift table has become free from the previous stack and in the stack height can be raised.

Ausgehend hiervon ist es Aufgabe der Erfindung eine Vorrichtung zum Abstapeln von flachen Produkten insbesondere von Faltschachtelschläuchen zu schaffen, die flexible an die Größe anpassbar ist, und die mechanisch weniger aufwendig ist.Based on this, it is an object of the invention Device for stacking flat products in particular of folding box hoses to create the flexible one the size is adjustable, and the mechanically less complex is.

Diese Aufgabe wird erfindungsgemäße durch die Vorrichtung mit den Merkmalen des Anspruches 1 gelöst.This object is achieved by the device solved with the features of claim 1.

Bei der erfindungsgemäßen Vorrichtung sind zwei Arten temporärer Auflagemittel vorgesehen. Die ersten Auflagemittel sind Finger oder vergleichbare Elemente, die in das Lichtraumprofil des Stapelschachtes vor oder aus diesem zurückbewegt werden können, ohne dass sie eine Vertikalbewegung vollführen. There are two types in the device according to the invention temporary support means provided. The first edition means are fingers or similar elements that are in the Clearance profile of the stacking shaft in front of or out of this can be moved back without making a vertical movement perform.

Sie befinden sich nicht allzu weit unterhalb jener Ebene, in der die Produkte über die Transporteinrichtung in den Stapelschacht eingeschossen werden. Sie sind jedoch tief genug angeordnet, um einen Stapel aufzunehmen, der während der Zeit entsteht, während der der Hubtisch nicht zur Aufnahme von Produkten bereit steht. Insoweit korreliert die Höhe dieses Stapels mit der Zeit, die benötigt wird, den Hubtisch frei zu bekommen und wieder in die Stapelposition zurückzuführen.You are not too far below that Level in which the products are transported in the stack shaft are shot. However, you are arranged deep enough to hold a stack of arises during the time that the lift table is not is ready to accept products. So far correlated the amount of this stack with the time it takes will get the lifting table free and back into the stacking position due.

Die zweiten temporären Auflagemittel wirken als Niederhalter, um den auf den Hubtisch gebildeten fertigen Stapel zusammen zu halten und in die Ausgangstransporteinrichtung einzufädeln. Um diese Aufgabe zu erfüllen, müssen die zweiten temporären Auflagemittel zwei Bewegungen vollführen. Sie müssen sich vertikal durch den Stapelschacht bewegen lassen und sie müssen sich obendrein aus dem Lichtraumprofil des Stapelschachtes herausbewegen lassen.The second temporary supports act as hold-downs, around the finished stack formed on the lift table hold together and into the exit conveyor threading. To accomplish this task, the Carry out two movements with the second temporary support means. You have to move vertically through the stacking chute and they have to leave the clearance profile on top of that of the stacking shaft.

Bei der erfindungsgemäßen Lösung bewegen sich die Zinken der zweiten temporären Auflagemittel nicht parallel zu der Achse des Stapelschachtes, sondern längs einem Kreisbogen mit großem Radius. Hierzu ist eine Schwenkachse vorgesehen, die rechtwinklig zu der Transportrichtung und horizontal verläuft, damit die Bogenbewegung zustande kommt, die eine weitere Linearachse überflüssig macht. Es genügt, bei der erfindungsgemäßen Lösung, wenn sich die zweiten temporären Auflagemittel nur während der Rückzugsbewegung aus dem Stapelschacht und der Vorschubbewegung in dem Stapelschacht längs einer linearen Achse bewegen. Die Bewegung von oben nach unten durch den Stapelschacht und außerhalb des Stapelschachtes von unten nach oben ist keine gerade Bewegung. In the solution according to the invention, the tines move the second temporary support means not parallel to the axis of the stacking shaft, but along an arc with a large radius. A swivel axis is provided for this purpose, which are perpendicular to the direction of transport and horizontal runs so that the bow movement occurs, which makes another linear axis superfluous. It is sufficient, in the solution according to the invention, if the second temporary support means only during the retraction movement from the stacking shaft and the feed movement in the stacking shaft move along a linear axis. The movement from top to bottom through the stacking shaft and outside the stacking shaft from bottom to top is not straight Move.

Durch entsprechende Lage der Schwenkachse wird dafür gesorgt, dass in der unteren Stellung eine Unterseite der zweiten temporären Auflagemittel parallel zu der Stapelfläche des Hubtisches liegt und dass die Rückzugsbewegung aus dem Stapelschacht parallel zur Auflagefläche des Hubtisches erfolgt.By appropriate position of the swivel axis is for this worried that in the lower position a bottom of the second temporary support means parallel to the stacking surface of the lifting table and that the retraction movement is off the stacking shaft parallel to the support surface of the lifting table he follows.

Es hat sich gezeigt, dass der Winkelfehler der Auflageseite der zweiten Auflagemittel beim Durchwandern des Stapelschachtes keinen negativen Einfluss auf die Qualität des Stapels hat. Dafür kann der mechanische Aufwand zum Führen der zweiten temporären Auflagemittel wesentlich verringert werden.It has been shown that the angular error of the support side the second support means when walking through the Stacking shaft has no negative impact on quality of the stack. The mechanical effort for Leading the second temporary support means significantly reduced become.

Die Verwendung von unabhängigen Antrieben, für die Schwenk- und die Vorschub- bzw. Rückzugsbewegung gestattet es, beide Bewegungshübe völlig unabhängig zu justieren. Dadurch wird auch der Leerweg, und somit die Totzeit verringert, um den die Zinken hinter den stromabwärtsgelegenen Anschlag zurückgezogen werden. Die Vorrichtung ist damit in der Lage, auch Faltmaschinen bedienen zu können, die bei kleineren Faltschachtelschläuchen mit höherer Geschwindigkeit arbeitet.The use of independent drives for which Swivel and the feed or retraction movement allowed it to adjust both movement strokes completely independently. This also reduces the free travel and thus the dead time, around which the tines behind the downstream ones Stop be withdrawn. The device is in able to operate folding machines that smaller folding box hoses with higher speed is working.

Besonders gutes Abstapeln wird erreicht, wenn der eine Anschlag, vorzugsweise der stromaufwärts gelegene Anschlag als Rüttler ausgebildet ist. Dies ermöglicht auch eine nachträgliche Justage der Faltschachtelschläuche, wenn die Naht geklebt ist und der Kleber noch nicht vollständig erkaltet ist.Particularly good stacking is achieved when one Stop, preferably the upstream stop is designed as a vibrator. This also enables one Subsequent adjustment of the folding box hoses when the Seam is glued and the adhesive has not yet cooled completely is.

Ein zuverlässiger Abtransport der fertigen Stapel kann erreicht werden, wenn die Ausgabetransporteinrichtung mehrere parallel nebeneinander verlaufende Transportbänder umfasst. Das Wegführen des Stapels vom Hubtisch wird verbessert, wenn dieser ebenfalls fächerartig gestaltet ist, und wenigstens eines der Transportbänder bis in eine Lücke zwischen den Zinken des Hubtisches reicht.The finished stacks can be reliably removed can be achieved if the output transport device several parallel conveyor belts includes. Moving the stack away from the lifting table is improved, if it is also fan-shaped, and at least one of the conveyor belts into a gap between the prongs of the lifting table.

Dadurch kann ein niedrig bauender Hubtisch erreicht werden, der keine Rollen aufweist und es wird auch kein Schieber benötigt, um den Stapel vom Hubtisch herunter zu schieben.This enables a low-build lift table to be reached who has no roles and will not Slider needed to get the stack down from the lift table slide.

Weitere Transportbänder können seitlich neben dem Hubtisch verlaufen und bis zu dessen stromaufwärts gelegener Kante reichen.Additional conveyor belts can be found next to the lifting table run and up to its upstream Edge.

Die Leichtgängigkeit der Transportbänder und die Wartungsfreiheit lässt sich verbessern, wenn die Transportbänder im Bereich des jeweiligen Arbeitstrumms durch Rollen unterstützt werden. Hierdurch werden gleitende Auflagen vermieden.The smooth movement of the conveyor belts and the absence of maintenance can be improved if the conveyor belts in the area of the respective work dream by roles get supported. This will make sliding pads avoided.

Das Zuhalten des Stapels und damit das notwendige Nachpressen auch der oberen Faltschachtelschläuche wird erreicht, indem der fertige Stapel in eine Niederhaltereinrichtung eingeklemmt wird. Diese ist zweckmäßigerweise auch mit endlosen Transportbändern ausgestattet, die auf der Oberseite des Stapels wirken. Die Arbeitstrumme dieser Transportbänder laufen parallel zu der Fläche, die die Arbeitstrumme der Transportbänder gebildet werden, auf denen die Stapel ruhen.Locking the stack and thus the necessary The upper folding box hoses are also re-pressed achieved by placing the finished stack in a hold-down device is pinched. This is also expedient equipped with endless conveyor belts on the Work on top of the stack. The working dream of this Conveyor belts run parallel to the area that contains the working strand of the conveyor belts are formed on which the stacks rest.

Im übrigen sind Weiterbildungen der Erfindung Gegenstand von Unteransprüchen. Dabei sollen auch solche Kombinationen als beansprucht angesehen werden, auf die kein ausdrückliches Ausführungsbeispiel gerichtet ist. In der Zeichnung ist ein Ausführungsbeispiel des Gegenstandes der Erfindung dargestellt. Es zeigen:

Fig. 1
eine Vorrichtung zum Abstapeln von Faltschachtelschläuchen in einer stark schematisierten Seitenansicht und
Fig. 2-10
die weiter vereinfachte Vorrichtung nach Fig. 1 in den einzelnen Funktionsstufen und
Fig. 11
die Vorrichtung nach Fig. 1 für besonders große Faltschachtelschläuche bzw. Faltschachtelschläuche mit großer Rücksprungkraft.
For the rest, further developments of the invention are the subject of dependent claims. Combinations to which no express exemplary embodiment is directed should also be regarded as claimed. In the drawing, an embodiment of the object of the invention is shown. Show it:
Fig. 1
a device for stacking folding box hoses in a highly schematic side view and
Fig. 2-10
the further simplified device of FIG. 1 in the individual functional levels and
Fig. 11
1 for particularly large folding box hoses or folding box hoses with a high return force.

Fig. 1 zeigt eine Vorrichtung 1 zum Bilden von Stapeln 2 aus flachen Produkten 3 beispielsweise Faltschachtelzuschnitten oder Faltschachtelschläuchen. Die Darstellung ist stark schematisiert, wobei nur solche Teile veranschaulicht sind, die für das Verständnis wesentlich sind.1 shows a device 1 for forming stacks 2 from flat products 3 for example folding carton blanks or folding box hoses. The representation is highly schematic, with only such parts illustrated are that are essential for understanding.

Die Produkte 3 laufen bezogen auf Fig. 1 von rechts nach links und kommen beispielsweise aus einer Faltmaschine, in der die Faltschachtelzuschnitte zu Faltschachtelschläuchen geformt werden, die längs der Naht geklebt oder geheftet werden. Somit ist in Fig. 1 eine Richtung nach rechts eine stromaufwärts gelegene Richtung bezogen auf den Strom der Produkte 3 und eine nach links verlaufende Bewegung eine stromabwärts gerichtete Bewegung.The products 3 run from the right in relation to FIG. 1 to the left and come from a folding machine, for example, in which the folding box blanks to folding box hoses be shaped, glued or along the seam to be stapled. Thus, there is a direction in FIG. 1 on the right an upstream direction in relation to the Product 3 stream and a leftward movement a downstream movement.

Zu der Vorrichtung 1 gehört ein Maschinengestell 4, das stark schematisiert und aufgeschnitten veranschaulicht ist. Das Maschinengestell 4 weist seitliche Pfeiler 5 auf, die über ein Querjoch 6 miteinander verbunden sind. Die Pfeiler 5 stehen auf einem Bodenfundament 7, auf dem ebenfalls rückwärtige Tragpfeiler 8 aufgeständert sind. Zwischen den rückwertigen Tragständern 8 und den Pfeilern 5 erstreckt sich ein oberes Maschinenjoch 9, auf dem ein Untergestellrahmen 11 befestigt ist.The machine 1 includes a machine frame 4, which illustrates highly schematized and cut open is. The machine frame 4 has side pillars 5, which are connected to one another via a transverse yoke 6. The Pillars 5 stand on a base foundation 7, on which also rear pillars 8 are raised. Between the backward support stands 8 and the pillars 5 extends an upper machine yoke 9 on which an underframe 11 is attached.

In dem Maschinengestell 4 ist stromabwärts der beiden Pfeiler 5 ein Stapelschacht 12 ausgebildet, der seitlich offen ist und der in Transportrichtung also stromabwärts von einem Anschlag 13 und stromaufwärts von einem Anschlag 14 begrenzt ist.In the machine frame 4 is downstream of the two Pillar 5 a stacking shaft 12 formed laterally is open and downstream in the direction of transport from a stop 13 and upstream from a stop 14 is limited.

Der Anschlag 14 besteht aus einer im wesentlichen Ebenen Platte, die mit vertikalen Schlitzen versehen ist. Die Platte 14 ist an einer Exzenterwelle 15 befestigt, die zwischen den beiden Pfeilern 5 drehbar gelagert ist. Auf diese Weise dient der stromaufwärts gelegene Anschlag 14 als Rüttler. Der Anschlag 13 ist hingegen im Wesentlichen währen des Betriebs feststehend, kann jedoch in seinem Abstand zu dem Anschlag 14 eingestellt werden.The stop 14 consists of an essentially planes Plate with vertical slits. The Plate 14 is attached to an eccentric shaft 15 which between the two pillars 5 is rotatably mounted. To this Way, the upstream stop 14 serves as Jogger. The stop 13, however, is essentially during the operation is fixed, but can be at a distance can be set to the stop 14.

Sowohl der Anschlag 14 als auch der Anschlag 13 definieren Ebenen, die zueinander parallel sind.Define both the stop 14 and the stop 13 Levels that are parallel to each other.

Um die Produkte 3 in den Stapelschacht 12 zu transportieren, ist eine Transporteinrichtung 16 vorgesehen, die zwei Transportrollen 17 und 18 umfasst. Die beiden Transportrollen 17 und 18 sind achsparallel horizontal zwischen den beiden Pfeilern 5 gelagert und drehangetrieben. In order to transport the products 3 into the stacking shaft 12, a transport device 16 is provided which comprises two transport rollers 17 and 18. The two transport rollers 17 and 18 are axially parallel between horizontally the two pillars 5 stored and driven in rotation.

Ihre Umfangsgeschwindigkeit ist größer als es der Transportgeschwindigkeit entspricht, mit der die Produkte 3 von rechts kommend herangeführt werden.Their peripheral speed is greater than that Transport speed at which the products correspond 3 coming from the right.

Die Produkte 3 gelangen in einem kontinuierlichen Strom zu der Transporteinrichtung 16 und sind in dem Strom voneinander beabstandet. Zwischen den Rollen 17 und 18 werden sie mit hoher Geschwindigkeit in den Stapelschacht 12 eingeschossen, und fallen in diesem quer liegend nach unten, wie dies nachstehend noch im einzelnen erläutert ist.The products 3 arrive in a continuous Stream to the transport device 16 and are in the stream spaced from each other. Be between the rollers 17 and 18 them into the stacking shaft 12 at high speed shot in and fall down in this, as will be explained in more detail below.

Im unteren Bereich des Stapelschachtes 12 befindet sich ein Hubtisch 19, der mit Hilfe von Lenkern 21 und 22 zwischen den beiden in Fig. 1 erkennbaren Lagen hin und her bewegt werden kann. Der Hubtisch 19 ist nach Art eines Rechens ausgebildet, und weist mehrere parallel zur Transportrichtung sich erstreckende Zinken auf, die über ein Versteifungselement 24 miteinander verbunden sind. Die Bewegung des Hubtisches 19, erfolgt im wesentlichen parallel zu den Flächen, die durch die Anschläge 13 und 14 gebildet sind. Der Anschlag 13 ist ebenfalls als Rechen ausgebildet und besteht aus mehreren im wesentlichen vertikal nach unten hängenden Zinken, zwischen denen vertikal verlaufende und nach unten offene Schlitze enthalten sind.Located in the lower area of the stacking shaft 12 is a lifting table 19, which with the help of links 21 and 22nd back and forth between the two positions shown in Fig. 1 can be moved. The lifting table 19 is in the manner of a rake formed, and has several parallel to the direction of transport extending tines on over a Stiffening element 24 are interconnected. The movement of the lifting table 19 takes place essentially in parallel to the surfaces formed by the stops 13 and 14 are. The stop 13 is also designed as a rake and consists of several essentially vertically downwards hanging tines, between which are vertical and slits open downward are included.

Im Bereich der oberen Endlage des Hubtisches 19 sind am besten in Fig. 10 erkennbare erste temporäre Auflagemittel 25 und 26 vorgesehen. Die Auflagemittel 25 sind zwei in Längsrichtung bewegliche Finger, die mit Hilfe eines Arbeitszylinders 27 in das Lichtraumprofil des Stapelschachtes 12 vor und aus diesem zurückgezogen werden können. Die beiden Finger 25 führen durch entsprechende Öffnungen in dem stromaufwärts gelegenen Anschlag 14 hindurch und befinden sich unterhalb der unteren Transportrolle 16. Die beiden Finger 25 haben einen solchen Abstand voneinander, dass sie den kleinsten zu verarbeitenden Faltschachtelschlauch seitlich unterstützen können. Für den Fall, dass zwei derartige Finger nicht ausreichen, wenn sehr breite Zuschnitte gestapelt werden sollen, können zusätzlich zu diesen beiden Fingern nach außen hin noch weitere Finger 25 angeordnet werden. Sämtliche Finger 26 werden synchron angetrieben und gleichzeitig in den Stapelschacht 12 vorgeschoben oder zurückgezogen.In the area of the upper end position of the lifting table 19 are best first temporary support means recognizable in FIG 25 and 26 provided. The support means 25 are two Longitudinally movable fingers, which with the help of a Working cylinder 27 in the clearance profile of the stacking shaft 12 can be withdrawn before and from this. The two fingers 25 lead through corresponding openings through the upstream stop 14 and are located below the lower transport roller 16. The two fingers 25 are at such a distance from one another, that they have the smallest folding box hose to be processed can support laterally. In the case, that two such fingers are not enough, if very wide blanks can also be stacked in addition to these two fingers to the outside Fingers 25 are arranged. All fingers 26 are driven synchronously and at the same time in the stacking shaft 12 advanced or withdrawn.

Unterhalb des stromabwärtsgelegenen Anschlags 13 befinden sich ebenfalls Finger 26, die ebenfalls in das Lichtraumprofil des Stapelschachtes 12 vor und aus diesem zurückgezogen werden können.Are located below the downstream stop 13 also fingers 26, which are also in the Clearance profile of the stacking shaft 12 in front of and out of this can be withdrawn.

Der Übersichtlichkeit halber sind die Antriebseinrichtungen für die Finger 26 nicht gezeigt.For the sake of clarity, the drive devices are not shown for the fingers 26.

Die Finger 25, 26 definieren eine Ebene, die rechtwinklig zu dem Anschlag 14 bzw. dem Anschlag 13 verläuft, und die quer zur Transportrichtung nicht geneigt ist.The fingers 25, 26 define a plane that is rectangular runs to the stop 14 or the stop 13, and which is not inclined transversely to the transport direction.

In dem Stapelschacht ist ein zweites temporäres Auflagemittel wirksam, das ebenfalls als Rechen regelmäßig von einander beabstandeten Zinken 28 ausgebildet ist.There is a second temporary support in the stacking shaft effective, which also as a rake regularly from spaced prongs 28 is formed.

Die Zinken 28 sitzen an einem Querbalken, und ragen je nach Betriebsstellung durch die Schlitze in dem stromabwärtsgelegenen Anschlag 13 in das Lichtraumprofil des Stapelschachtes 12.The tines 28 sit on a crossbar, and each protrude after operating position through the slots in the downstream Stop 13 in the clearance profile of the stacking shaft 12th

Auf der Rückseite des stromabwärtsgelegenen Anschlags 13 befinden sich zwei zueinander parallel Führungsschienen 31, von denen aus Darstellungsgründen lediglich eine erkennbar ist.On the back of the downstream stop 13 there are two mutually parallel guide rails 31, of which only one is recognizable for reasons of illustration is.

Die beiden Führungsschienen 31 sitzen unten an einem Zwischenrahmen 32 und dienen als Führungsschienen für einen Führungsschlitten 33, an dem der Balken 29 unterhalb der Schienen geführt ist. Mit Hilfe einer nicht gezeigten Antriebseinrichtung kann der Schlitten 33 mittels nicht dargestellter Zahnriemen längs den beiden Führungsschienen 31 bewegt werden. Der Zwischenrahmen 32 ist mittels einer Achse 35, die an nicht gezeigten Gestellteilen befestigt ist, schwenkbar in dem Maschinegestell 4 gelagert. Die Achse 35 verläuft unterhalb der Führungsschienen 31.The two guide rails 31 sit at the bottom of one Intermediate frame 32 and serve as guide rails for one Guide carriage 33 on which the beam 29 below the Rails is guided. With the help of a drive device, not shown can the carriage 33 by means of not shown Timing belt along the two guide rails 31 be moved. The intermediate frame 32 is by means of an axis 35, which is attached to frame parts, not shown, pivotally mounted in the machine frame 4. The axis 35 runs below the guide rails 31.

Die Achse 35 verläuft horizontal und quer zum Transportweg der Produkte 3. Das gegenüberliegende Ende des Zwischenrahmens 32 ist über eine Lenkeranordnung 37 in gestellfesten Vertikalen Führungsschienen 38 geführt. Auch hier ist der Übersichtlichkeit halber die Antriebseinrichtung für die Lenker 37 und einen zugehörigen in den Führungsschienen 38 laufenden Schlitten 41 nicht gezeigt.The axis 35 runs horizontally and transversely to the transport path of products 3. The opposite end of the intermediate frame 32 is fixed to the frame via a handlebar arrangement 37 Vertical guide rails 38 out. Also here is the drive device for the sake of clarity for the handlebar 37 and an associated one in the guide rails 38 running carriage 41 not shown.

Zur Vertikalbewegung des Schlittens 41 kommen beispielsweise Schraubspindeltriebe in Fragen, während die Längsbewegung des Schlittens 33 über endlose Zahnriemen bewerkstelligt wird.Vertical movement of the slide 41 comes for example Screw drives in questions while the Longitudinal movement of the slide 33 over endless toothed belts is accomplished.

Die Zinken 28 des zweiten temporären Auflagemittels können auf diese Weise hinter den stromabwärtsgelegenen Anschlag 13 zurückgezogen werden, und sie können außerdem eine Schwenkbewegung bzgl. der Achse 35 vollführen. The tines 28 of the second temporary support means can in this way behind the downstream Stop 13 are withdrawn, and they can also perform a pivoting movement with respect to the axis 35.

Auf der Höhe der unteren Stellung des Hubtisches 19 beginnt bei den Pfeilern 5 eine Transporteinrichtung 42, die mehrere parallel nebeneinander verlaufenden endlose Transportbänder in Gestalt von Flachriemen 43 umfasst. Die Riemen 23 sind längs des Transportweges durch Transportrollen 44 unterstützt, die drehbar in dem Maschinengestell gelagert sind. Auf diese Weise bilden die Transportbänder 43 Arbeitstrumme, die sich längs einer Ebene erstrecken, die senkrecht zu Ebenen verläuft, die durch die beiden Anschläge 13 und 14 definiert sind. Die Ebene die durch die Arbeitstrumme der Transportbänder 43 definiert ist, steigt ausgehend von dem Pfeiler 5 an. Der Abstand zwischen den Transportbändern 43 und die Lagerung ist so gewählt, dass sie zum Teil zwischen die Zinken des Hubtisches 19 hineingreifen oder an ihm seitlich vorbeilaufen, so dass eine Kollision vermieden wird.At the height of the lower position of the lifting table 19 a transport device 42 begins at the pillars 5, the several endless ones running parallel to each other Conveyor belts in the form of flat belts 43 includes. The Belts 23 are along the transport path by transport rollers 44 supports that are rotatable in the machine frame are stored. In this way, the conveyor belts form 43 working dreams that extend along a plane, which runs perpendicular to planes through the two stops 13 and 14 are defined. The level through which Working span of the conveyor belts 43 is defined increases starting from the pillar 5. The distance between the Conveyor belts 43 and the storage is chosen so that they reach partially between the tines of the lifting table 19 or walk past it sideways so that one Collision is avoided.

Oberhalb der Transporteinrichtung 42 befindet sich eine Niederhaltereinrichtung 45, die von drei parallelen nebeneinander verlaufenden Endlosbändern 46 gebildet ist. Den Abstand, den die Endlosbänder voneinander haben, ist so gewählt, dass zwischen ihnen die Zinken 28 Platz finden, wobei ein Transportband 46 in der Mitte der Gruppe von Zinken 28 verläuft. Die hierfür notwendige Umlenkrolle ist neben der Rückseite des Anschlags 13 hinter einer entsprechenden Zinke von diesem gelagert.Is located above the transport device 42 a hold-down device 45 made of three parallel ones juxtaposed endless belts 46 is formed. The distance between the endless belts is like this chosen that the tines have 28 place between them, with a conveyor belt 46 in the middle of the group of tines 28 runs. The deflection roller necessary for this is next to the back of the stop 13 behind a corresponding Tine stored by this.

Die Niederhaltereinrichtung 45 beginnt knapp hinter dem stromabwärts gelegenen Anschlag 13 und reicht wie gezeigt etwa bis zum Ende der Transporteinrichtung 42. Die Unterkante des Anschlags 13 fluchtet mit der Ebene, die durch die Arbeitstrume der Transportbänder 46 definiert ist Zwischen der Niederhaltereinrichtung 45 und der Transporteinrichtung 42 wird ein Kanal definiert, der am Anfang und am Ende dieselbe lichte Höhe aufweist.The hold-down device 45 begins just behind the downstream stop 13 and is sufficient as shown about to the end of the transport device 42 Bottom edge of the stop 13 is flush with the plane that is defined by the working dreams of the conveyor belts 46 Between the hold-down device 45 and the transport device 42 a channel is defined, which at the beginning and has the same clear height at the end.

Die Lagerungsrollen für die Transportbänder 43 und 46, sind in der Fig. schematisch angedeutet, im übrigen jedoch nicht weiter beschrieben, da Art und Weise der Lagerung dem Fachmann geläufig ist und im übrigen die Art und Weise der Lagerung für das weitere Verständnis der Erfindung nicht von Bedeutung ist.The storage rollers for the conveyor belts 43 and 46, are indicated schematically in the figure, but otherwise not described further, since the manner of storage the Expert is familiar and, moreover, the way of Storage for further understanding of the invention is not is important.

Die Funktionsweise der Stapelvorrichtung wird nunmehr anhand der Figuren 2 bis 10 erläutert.The operation of the stacking device is now explained with reference to Figures 2 to 10.

Der Abstand zwischen den beiden Anschlägen 13 und 14 ist durch Justage der Lage des Anschlags 13 eingestellt. Der Abstand ist so gewählt, dass die Produkte 3 im Wesentlichen spielfrei dazwischen passen, wenn sie auf einem der Auflagemittel bzw. dem Hubtisch 19 aufliegen.The distance between the two stops 13 and 14 is set by adjusting the position of the stop 13. The distance is chosen so that the products 3 essentially fit in between if they are on one of the Support means or the lifting table 19 rest.

In der Ausgangslage nach Fig. 2 ist der Hubtisch 19 in die oberste Stellung angehoben. Die Zinken 28 sind in das Lichtraumprofil des Stapelschachtes 12 vorgeschoben, weil die Führungsschienen 31 in die unterste Lage geschwenkt sind. In dieser Stellung verläuft die Unterseite der Zinken 28 in Verlängerung derjenigen Fläche, die durch die Arbeitstrumme der Förderbänder 46 der Niederhaltereinrichtung 45 definiert ist. Um Kollisionen weitgehend zu vermeiden, fluchten in dieser Stellung die Zinken 28 mit den entsprechenden Lücken in dem Tisch 19.2, the lifting table 19 is in the top position raised. The prongs 28 are in that Clearance profile of the stacking shaft 12 advanced because the guide rails 31 pivoted into the lowest position are. In this position the underside of the tines runs 28 in extension of the area caused by the working dream of the conveyor belts 46 of the hold-down device 45 is defined. To largely avoid collisions, in this position the tines 28 are aligned with the corresponding ones Gaps in the table 19.

Die Finger 25 und 26 der ersten Auflagemittel sind in das Lichtraumprofil vorgeschoben und zwar so, dass sie weder mit den Zinken 28 noch mit den Hubtisch 19 kollidieren. The fingers 25 and 26 of the first support means are in the clearance profile is advanced so that it neither collide with the prongs 28 and the lifting table 19.

Wenn in dieser Stellung gemäß Fig. 2 der erste Faltschachtelschlauch 3 eingeschossen wird, kommt er auf der Oberseite der Zinken 28 zu liegen. Weitere Faltschachtelschläuche lagern sich auf dem jeweils darunter befindlichen in dem Stapelschacht 12 bereits befindlichen Stapel ab, wie dies Fig. 3 zeigt. Der Stapel wird zunächst noch von der Oberseite der Zinken 28 getragen.If in this position according to FIG. 2, the first folding box hose 3 is shot, he comes on the Top of the tines 28 to lie. More folding box hoses lie on the one below from the stack already in the stack 12 from how this shows Fig. 3. The stack is initially from the Top of the prongs 28 worn.

Nachdem einige wenige Faltschachtelschläuche 3 eingetroffen sind, wird wie Fig. 4 zeigt, der Schlitten 33 längs der Führungsschienen 31 zurückgezogen, soweit bis die freien Enden der Zinken 28 vollständig aus dem Stapelschacht 12 herausgezogen sind und hinter dem Anschlag 13 verschwunden sind. Der bereits entstandene niedrige Stapel aus 3 oder 4 übereinander liegenden Faltschachtelschläuchen fällt während des Herausziehen der Zinken 28 aus dem Stapelschacht 12 auf die Finger 26 und 27. Diese werden ebenfalls zurückgezogen, so dass der Stapel, wie Fig. 5 zeigt, nunmehr auf der Oberseite des Hubtisches 19 zu liegen kommt.After a few folding box hoses 3 arrived 4, the carriage 33 is shown longitudinally the guide rails 31 withdrawn until the free Ends of the tines 28 completely out of the stacking shaft 12 are pulled out and disappeared behind the stop 13 are. The already created low stack of 3 or 4 Folding box hoses lying on top of each other fall during pulling the tines 28 out of the stacking shaft 12 on fingers 26 and 27. These are also withdrawn, so that the stack, as shown in FIG. 5, is now open the top of the lifting table 19 comes to rest.

In Fig. 4 hat das Anheben der Zinken 28 bereits begonnen. Sie sind ein wenig nach oben gestellt, d.h. sie verlaufen nicht mehr exakt parallel zu der Ebene, entsprechend der Arbeitstrumme der Endlosbänder 46.In Fig. 4 the lifting of the tines 28 has already started. They are raised a little, i.e. they run no longer exactly parallel to the plane, accordingly the working strand of the endless belts 46.

Während sich das Abstapeln der Faltschachtelschläuche auf dem Hubtisch 19 vollzieht, werden die Führungsschienen 31 um die Achse 35 nach oben geschwenkt in die obere Endlage. Hierzu werden die Führungsschienen 31 über den Schlitten 41, der in den Führungsschienen 38 geführt und entsprechend angetrieben ist, an ihrem den Anschlag 13 benachbarten Ende angehoben. During the stacking of the folding box hoses on the lifting table 19, the guide rails 31 pivoted upwards about the axis 35 into the upper end position. For this purpose, the guide rails 31 over the slide 41, which is guided in the guide rails 38 and accordingly is driven, on the stop 13 adjacent End raised.

Nach Erreichen der oberen Lage, wird der Schwenkantrieb für die Führungsschienen 31 stillgesetzt und statt dessen der Antrieb für den Schlitten 33 in Gang. Die Zinken 28 werden durch die Lücken in dem Anschlag 13 in den Stapelschacht 12 vorgeschoben. In der vorgeschobenen Stellung ist ihre Unterseite deutlich oberhalb jener Ebene, längs derer, die Faltschachtelschläuche 3 in den Stapelschacht 12 eingeschossen werden, wie dies Fig. 5 erkennen lässt.After reaching the upper position, the part-turn actuator is activated for the guide rails 31 stopped and instead whose drive for the slide 33 is in motion. The tines 28 are through the gaps in the stop 13 in the stacking shaft 12 advanced. In the advanced position its underside is clearly above that level, lengthways those, the folding box hoses 3 in the stacking shaft 12 5, as can be seen in FIG.

Sobald die gewünschte Anzahl von Faltschachtelschläuchen in dem Stapel 2 erreicht ist, wird der Schwenkantrieb für die Führungsschienen 31 im Sinne des Absenkens in Gang gesetzt. Dabei laufen die Zinken 28 im Gleichstrom mit den Herunterfallenden Faltschachtelschläuchen 3 nach unten durch den Stapelschacht 12 hindurch.As soon as the desired number of folding box hoses is reached in the stack 2, the swivel drive for the guide rails 31 in the sense of lowering in motion set. The tines 28 run in direct current with the Folding box hoses 3 falling down through the stacking shaft 12.

Während des Übergangs von Fig. 5 nach Fig. 6 wurde kontinuierlich der Hubtisch 19 abgesenkt, in dem Maße, in dem der Stapel 2 höher geworden ist, damit die Oberkante d.h. der Kopf des Stapels etwa immer im selben Abstand von der Einschussebene bliebt, so dass angenähert gleiche Fallverhältnisse für die in den Stapelschacht 12 gelangenden Faltschachtelschläuche vorliegen. Während des Abstapelns wird gleichzeitig über die Exzenterwelle 15 der Anschlag 14 periodisch gegen den Stapel bewegt, um den Stapel zusammen zu rütteln und Verzugsfehler im Falle von verklebten Nähten an den Faltschachtelzuschnitten noch ein wenig zu korrigieren.During the transition from FIG. 5 to FIG. 6 continuously lowered the lifting table 19, to the extent in which the stack 2 has become higher, so that the top edge i.e. the head of the stack is always about the same distance from the bullet level remains, so that approximately the same case conditions for those arriving in the stacking shaft 12 Folding box hoses are available. During stacking the stop 14 is simultaneously via the eccentric shaft 15 periodically moved against the stack to put the stack together to shake and warping errors in the case of taped seams to correct a little on the folding box blanks.

Die unteren Lagen der Zuschnitte werden jeweils durch die oberen Lagen geschlossen gehalten. Nur die oberen Lagen können aufgrund der Rücksprungkraft der Wellpappe etwas aufspringen. The lower layers of the blanks are cut through the upper layers kept closed. Only the top layers can do something due to the resilience of the corrugated cardboard jump.

Das Absenken der Zinken 28 in dem Stapelschacht 12, geschieht synchronisiert, so dass die Spitzen der Zinken 28, die Einschussebene an den Transportrollen in dem Augenblick passieren, in dem gerade kein Faltschachtelschlauch 3 eingeschlossen wird.The lowering of the tines 28 in the stacking shaft 12 happens synchronized, so the tips of the prongs 28, the bullet level at the transport rollers at the moment happen in which there is no folding box hose 3 is included.

Nachdem die Zinken 28 auf den Stapelkopf abgesenkt sind und diesen zusammendrücken, werden die Finger 26 und 27 vorgeschoben, wie dies Fig. 7 erkennen lässt. In Fig. 7 ist der Stapel zusammengedrückt, indem von oben mit Kraft die Zinken 28 aufgedrückt werden. Damit wird Platz geschaffen, um die Finger 26 und 27 in den Stapelschacht 12 vorzuschieben.After the tines 28 are lowered onto the stacking head are and squeeze them, the fingers 26 and 27 advanced, as can be seen in FIG. 7. In Fig. 7 the stack is compressed by force from above the tines 28 are pressed open. This creates space to advance the fingers 26 and 27 into the stacking shaft 12.

Sobald die Zinken 28 auf dem Stapel 2 ruhen, erfolgt zwangsläufig das weitere Abstapeln auf der Oberseite der Zinken 28, die den darunter befindlichen Stapel 2 zusammengedrückt halten. Nunmehr wird die Transporteinrichtung für den Schlitten 33 in Gang gesetzt, um die Zinken 28 in Stromrichtung zu bewegen. Gleichzeitig werden die Transportbänder 43 der Transporteinrichtung 42 mit eingeschaltet und auch die Transportbänder 46 der Niederhaltereinrichtung 45. Der mit Hilfe der Zinken 28 zusammengedrückte Stapel 2 wird so in den Kanal zwischen der Niederhaltereinrichtung 45 und der Transporteinrichtung 42 eingefädelt und in Transportrichtung befördert, wie dies Fig. 9 zeigt. Dabei laufen alle Teile, die mit dem Stapel 2 in Eingriff stehen, mit der selben Lineargeschwindigkeit.As soon as the tines 28 rest on the stack 2, this is done inevitably the further stacking on the top of the Prongs 28 that compress the stack 2 underneath hold. Now the transport device for the carriage 33 started to move the tines 28 in To move current direction. At the same time, the conveyor belts 43 of the transport device 42 also switched on and also the conveyor belts 46 of the hold-down device 45. The stack 2 compressed with the aid of the prongs 28 is in the channel between the hold-down device 45 and the transport device 42 threaded and in Transported direction, as shown in Fig. 9. there run all the parts that are engaged with the stack 2, with the same linear velocity.

Nachdem der Stapel 2 gemäß Fig. 10 vollständig eingefädelt ist, was spätestens dann erreicht wird, wenn der Schlitten 33 seine von dem Anschlag 13 am weitesten entfernt liegende Stellung erreicht hat, beginnt der Zyklus bei Fig. 4 erneut.After the stack 2 is fully threaded according to FIG. 10 is what is achieved at the latest when the Carriage 33 its farthest from stop 13 the cycle has started 4 again.

Während es Wegführens des vollständigen Stapels 2 erfolgt das Abstapeln auf den Fingern 26 und 27, so dass Zeit geschaffen wird, um den jetzt freien Hubtisch 19 wieder in die Aufnahmestellung nach oben zu bewegen. Damit steht im Zusammenwirken zwischen dem Abstapeln auf den Fingern 25 und 26 sowie auf dem Hubtisch 19 genügend Zeit zur Verfügung um die Zinken 28 über ihren verhältnismäßig langen Weg wieder in die Startposition gemäß Fig. 5 zu bringen.While it is taking away the whole stack 2 stacking on fingers 26 and 27 so that time is created to in the now free lifting table 19 again to move the recording position upwards. So it says in Interaction between stacking on fingers 25 and 26 as well as enough time on the lifting table 19 around the tines 28 over their relatively long path to bring it back to the starting position according to FIG. 5.

Die Finger 25 und 26 können verhältnismäßig schwach dimensioniert sein, da der Stapel, den sie tragen müssen, bis der Hubtisch wieder in Position steht, verhältnismäßig klein und damit leicht ist.The fingers 25 and 26 can be relatively weak dimensioned because the stack they have to carry until the lift table is in position again, relatively small and therefore light.

Der wesentliche Vorteil der erfindungsgemäßen Anordnung besteht darin, dass die Zinken eine Schwenkbewegung bezüglich der Achse 35 vollführen. Dadurch vereinfacht sich die Lagerung wesentlich. Außerdem sind der Schwenkantrieb und der horizontale Antrieb mechanisch voneinander entkoppelt. Auf diese Weise kann der Längshub, den die Zinken 28 parallel zur Fläche des Hubtisches 19 vollführen auf das Maß begrenzt werden, das notwendig ist, um sie gerade hinter den Anschlag 13 zurückzuziehen. Sie brauchen bei kleinen Faltschachtelschläuchen 3 nicht den selben Hub zu durchlaufen wie bei großen Zuschnitten. Auf diese Weise kann die Faltmaschine, die die Faltschachtelzuschnitten 3 erzeugt, bei kleinen Zuschnitten wesentlich schneller laufen als bei großen Zuschnitten, so dass, obwohl die Taktzeit durch die Struktur der Faltriemen vorgegeben ist, ein höherer Durchsatz zustande kommt. The main advantage of the arrangement according to the invention is that the tines are pivoting complete with respect to axis 35. This simplifies the storage essential. In addition, the swivel drive and the horizontal drive is mechanically decoupled from one another. In this way, the longitudinal stroke that the tines 28th perform parallel to the surface of the lifting table 19 on the Be limited to the amount necessary to keep them straight behind withdraw the stop 13. You need small ones Folding box hoses 3 do not have the same stroke go through as with large blanks. In this way the folding machine that cuts the folding box 3 generated, run much faster with small blanks than with large blanks, so even though the cycle time is determined by the structure of the folding straps higher throughput occurs.

Soweit keine Dimensionierungsangaben für Längen und Breiten gemacht wurden, ergeben sie sich aus der obigen Funktionsbeschreibung in selbstverständlicher Weise.So far no dimensioning information for lengths and Widths have been made, they result from the above Functional description in a natural way.

Bei Faltschachtelschläuchen, die in Transportrichtung gesehen sehr große Abmessungen haben, kann es nach dem Einschießen in den Stapelschacht 12 zu einer vorzeitigen Berührung der vorauseilenden Kante des eingeschossenen Faltschachtelschlauches mit der Oberseite des bereits gebildeten Stapels kommen. Die Vorderkante neigt dann dazu, unter Umständen sich zu verhaken, womit der Karton schräg in dem Schacht 12 liegen bleibt.For folding box hoses that are in the transport direction seen very large dimensions, it can after shooting in the stacking shaft 12 for premature contact the leading edge of the inserted carton tube with the top of the already formed Stacks come. The leading edge then tends to go under Under certain circumstances, getting caught, with which the cardboard slants in the Chute 12 remains.

Um diesen Effekt zu vermeiden kann, gemäß Fig. 11, das obere Joch 9 oder der Unterrahmen 11 etwas abgesenkt werden, wodurch eine größere Tiefe des Stapelschachtes erreicht wird. An den Pfeilern 5 ist dementsprechend ein weiterer Satz von Fingern 25' vorgesehen, die unterhalb der Finger 25 liegen, und zwar um die Höhe der zusätzlichen Stapelschachttiefe.In order to avoid this effect, according to FIG. 11, the upper yoke 9 or the lower frame 11 are lowered somewhat, whereby a greater depth of the stacking shaft is reached becomes. Accordingly, there is another one on the pillars 5 Set of fingers 25 'provided below the Fingers 25 lie, namely by the amount of the additional Stacking shaft depth.

Beim Absenken wird entsprechend der stromabwärtsgelegene Anschlag 13 und die Niederhaltereinrichtung 45 entsprechend mit abgesenkt. Da die Finger 26 an dem stromabwärtsgelegenen Rechen 13 befestigt sind, werden hier zusätzliche Elemente eingespart.When lowering the downstream one Stop 13 and the hold-down device 45 accordingly with lowered. Because the fingers 26 on the downstream Rakes 13 are attached, additional here Elements saved.

Eine Vorrichtung zum Abstapeln von Faltschachtelschläuchen weist einen höhenverstellbaren Hubtisch auf. Oberhalb des Hubtisches befinden sich erste temporäre Auflagemittel, die aus dem Stapelschacht herausgezogen oder in diesen vorgeschoben werden können. Ein weiterer Satz von temporären Auflagemitteln, kann sowohl aus dem Stapelschacht herausgezogen werden, als im Stapelschacht abwärts bewegt werden. Die zweiten Auflagemittel dienen gleichzeitig dazu einen fertigen Stapel zusammen zu drücken um ihn zwischen einer Transportvorrichtung einer Niederhaltereinrichtung einfädeln zu können. Währen der Hubtisch zusammen mit der zweiten Auflageinrichtung mit dem Wegführen des Stapels beschäftigt ist, sorgen die ersten temporären Auflagemittel dafür, dass unterbrechungsfrei dennoch in dem Stapelschacht abgestapelt werden kann.A device for stacking folding box hoses has a height-adjustable lift table. The first temporary support means are located above the lifting table, which are pulled out of the stacking shaft or into these can be advanced. Another set of temporary support means can be both from the stacking shaft be pulled out as down in the stacking shaft be moved. The second support means serve simultaneously to do this, press a finished stack together around it between a transport device of a hold-down device to be able to thread. While the lift table is together with the second support device with the removal of the Stapels is busy, the first temporary support means for the fact that in the Stacking shaft can be stacked.

Claims (39)

Vorrichtung zum Abstapeln von flachen Produkten zu Stapeln, insbesondere von Faltschachtelzuschnitten (3) oder Faltschachtelschläuchen, die in einem Strom nacheinander ankommen, mit einem Maschinengestell (4), mit einer Transporteinrichtung (16), die stromaufwärts in dem Maschinengestell (4) angeordnet ist, mit einem Stapelschacht (12), der stromabwärts der Transporteinrichtung (16) in dem Maschinengestell (4) angeordnet ist und der stromaufwärts und stromabwärts von jeweils einem Anschlag (13,14) begrenzt ist, mit einem Hubtisch (19), der in dem Lichtraumprofil des Stapelschachts (12) in dem Maschinengestell (4) auf und ab bewegbar gelagert ist, mit ersten temporären Auflagemitteln (25,26), die zwischen einer aktiven Stellung, in der sie in das Lichtraumprofil des Stapelschachtes (12) ragen und einer inaktiven Stellung, in der sie aus dem Lichtraumprofil zurückgezogen sind, hin und her beweglich in dem Maschinengestell (4) gelagert sind, mit einer Ausgangstransporteinrichtung (42), die in dem Lichtraumprofil des Stapelschachtes (12) beginnt und sich stromabwärts in dem Maschinengestell (4) erstreckt, mit einer Niederhalteeinrichtung (45), die außerhalb des Lichtraumprofils des Stapelschachts beginnt und sich zumindest ein Stück weit längs der Transporteinrichtung und oberhalb von dieser erstreckt, und mit zweiten temporären Auflagemitteln (28), die derart in dem Maschinengestell (4) gelagert sind, dass sie sowohl zwischen einer aktiven Stellung, in der sie in das Lichtraumprofil des Stapelschachtes (12) ragen und einer inaktiven Stellung, in der sie aus dem Lichtraumprofil zurückgezogen sind, hin und her beweglich sind und als auch um eine außerhalb des Stapelschachtes (12) liegende Schwenkachse (35) schwenkbar sind, damit sie im Gleichstrom mit den sich in dem Stapelschacht (12) vertikal nach unten bewegenden Produkten (3) von oberhalb der Tranporteinrichtung (16) bis auf die Höhe der Niederhalteeinrichtung (45) absenkbar sind. Device for stacking flat products into stacks, in particular folding box blanks (3) or folding box hoses, which arrive one after the other in a stream, with a machine frame (4), with a transport device (16) which is arranged upstream in the machine frame (4), with a stacking shaft (12) which is arranged downstream of the transport device (16) in the machine frame (4) and which is bounded by a stop (13, 14) upstream and downstream, with a lifting table (19), which is mounted in the clearance profile of the stacking shaft (12) in the machine frame (4) and can be moved, with first temporary support means (25, 26) which can move back and forth between an active position in which they protrude into the clearance profile of the stacking shaft (12) and an inactive position in which they are withdrawn from the clearance profile ( 4) are stored, with an output transport device (42) which begins in the clearance profile of the stacking shaft (12) and extends downstream in the machine frame (4), with a hold-down device (45) which begins outside the clearance profile of the stacking shaft and extends at least a little along the transport device and above it, and with second temporary support means (28) which are mounted in the machine frame (4) in such a way that they both between an active position in which they protrude into the clearance space of the stacking shaft (12) and an inactive position in which they emerge from the clearance space are withdrawn, can be moved back and forth and can also be pivoted about a pivot axis (35) lying outside the stacking shaft (12), so that they co-current with the products (3) moving vertically downwards in the stacking shaft (12) from above the transport device (16) can be lowered to the height of the hold-down device (45). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Transporteinrichtung (16) eine Transportgeschwindigkeit aufweist, die größer ist als die Geschwindigkeit mit der die Produkte (3) sonst im Strom laufen.Apparatus according to claim 1, characterized in that the transport device (16) has a transport speed which is greater than the speed at which the products (3) otherwise run in the stream. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Transporteinrichtung (16) von zwei achsparallelen gelagerten Transportrollen (17,18) gebildet ist, von denen zumindest eine vorzugsweise beide angetrieben ist.Device according to claim 1, characterized in that the transport device (16) is formed by two axially parallel transport rollers (17, 18), at least one of which is preferably both driven. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Stapelschacht (12) seitlich offen ist.Apparatus according to claim 1, characterized in that the stacking shaft (12) is open on the side. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der stromaufwärts gelegene Anschlag (14) unterhalb der Transporteinrichtung (16) beginnt und bis auf eine Höhe reicht, die tiefer liegt als die Oberseite des Hubtisches (19) in der vollständig abgesenkten Stellung.Device according to claim 1, characterized in that the upstream stop (14) begins below the transport device (16) and extends to a height which is lower than the top of the lifting table (19) in the fully lowered position. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der stromaufwärts gelegene Anschlag (14) als Rüttelanschlag ausgebildet ist. Device according to claim 1, characterized in that the upstream stop (14) is designed as a vibrating stop. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der stromaufwärts gelegene Anschlag (14) in Bewegungsrichtung der vertikal durch den Stapelschacht (12) fallenden Produkte (3) im wesentlichen glatt ist.Device according to claim 1, characterized in that the upstream stop (14) is essentially smooth in the direction of movement of the products (3) falling vertically through the stacking shaft (12). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der stromaufwärts gelegene Anschlag (13) eine untere Kante aufweist, die sich auf einer Höhe befindet, die tiefer liegt, als die Oberseite des Hubtisches (19) in der höchstens Stellung.Device according to claim 1, characterized in that the upstream stop (13) has a lower edge which is at a height which is lower than the upper side of the lifting table (19) in the maximum position. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der stromabwärtsgelegene Anschlag (13) die Gestalt eines Rechens() aufweist, mit einer Vielzahl parallel im Abstand zueinander angeordnete Zinken, die vertikal verlaufen und eine zu dem stromaufwärts gelegenen Anschlag (13) im Wesentlichen parallele Flächen definieren.Apparatus according to claim 1, characterized in that the downstream stop (13) has the shape of a rake (12), with a plurality of parallel, spaced-apart tines which run vertically and surfaces which are substantially parallel to the upstream stop (13) define. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Hubtisch (19) die Form eines Rechens auf-weist, mit einer Vielzahl parallel im Abstand zueinander angeordneter Zinken, deren freie Enden in Richtung stromabwärts zeigen.Apparatus according to claim 1, characterized in that the lifting table (19) has the shape of a rake, with a plurality of tines arranged in parallel at a distance from one another, the free ends of which point in the downstream direction. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Hubtisch (19) unterhalb und stromaufwärts des stromaufwärts gelegenen Anschlags (14) in dem Maschinengestell (4) gelagert ist.Apparatus according to claim 1, characterized in that the lifting table (19) is mounted below and upstream of the upstream stop (14) in the machine frame (4). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der stromaufwärts gelegene Anschlag (14) zum Durchtritt der Lagermittel (22,23) für den Hubtisch (19) Schlitze aufweist. Device according to claim 1, characterized in that the upstream stop (14) for the passage of the bearing means (22, 23) for the lifting table (19) has slots. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die ersten temporären Auflagen (25,26) insgesamt wenigstens vier Finger aufweisen, von denen zwei durch eine von dem stromaufwärts gelegene Anschlag (14) definierten Ebene in den Stapelschacht (12) vorschiebbar sind und die anderen beiden durch eine von dem stromabwärts gelegenen Anschlag (13) definierte Ebene in das Lichtraumprofil des Stapelschachtes (12) vorschiebbar sind, und dass die Finger (25,26) im vorgeschobenen Zustand eine Auflagefläche definieren, die im Wesentlichen rechtwinklig zu dem stromaufwärts gelegenen und dem stromaufwärts gelegenen Anschlag (13,14) verläuft.Device according to claim 1, characterized in that the first temporary supports (25, 26) have a total of at least four fingers, two of which can be pushed into the stacking shaft (12) through a plane defined by the upstream stop (14) and the others both can be pushed into the clearance profile of the stacking shaft (12) by a plane defined by the downstream stop (13), and that the fingers (25, 26) in the advanced state define a contact surface which is essentially perpendicular to the upstream and the upstream stop (13, 14). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Ausgangstransporteinrichtung (42) mehrere parallel nebeneinander verlaufende Transportbänder (43) aufweist.Apparatus according to claim 1, characterized in that the output transport device (42) has a plurality of conveyor belts (43) running parallel to one another. Vorrichtung nach Anspruch 14, dadurch gekennzeichnet, dass der Hubtisch (19) rechenförmig mit wenigstens zwei Zinken ausgebildet ist, und dass wenigstens eines der Transportbänder (43) bis zwischen die Zinken reicht.Device according to claim 14, characterized in that the lifting table (19) is constructed in a rake shape with at least two tines, and in that at least one of the conveyor belts (43) extends between the tines. Vorrichtung nach Anspruch 14, dadurch gekennzeichnet, dass die, bezogen auf die Breite des Transportweges, außenliegenden Transportbänder (43) um Umlenkrollen umlaufen, die seitlich neben dem Hubtisch (19) in der Nähe des stromaufwärts liegenden Anschlags (14) in dem Maschinengestell (4) gelagert sind.Device according to claim 14, characterized in that , based on the width of the transport path, the outer conveyor belts (43) run around deflection rollers, which are located laterally next to the lifting table (19) in the vicinity of the upstream stop (14) in the machine frame (4 ) are stored. Vorrichtung nach Anspruch 14, dadurch gekennzeichnet, dass sämtliche Transportbänder (43) mit der selben Transportgeschwindigkeit laufen und angetrieben sind.Device according to claim 14, characterized in that all the conveyor belts (43) run and are driven at the same transport speed. Vorrichtung nach Anspruch 14, dadurch gekennzeichnet, dass die Transportbänder (43) mit ihren Arbeitstrummen eine Transportebene definieren, die in Transportrichtung ansteigt.Device according to claim 14, characterized in that the conveyor belts (43) define with their working strands a transport plane which rises in the transport direction. Vorrichtung nach Anspruch 14, dadurch gekennzeichnet, dass die Transportbänder im Bereich ihrer Arbeitstrumme durch Rollen (44) unterstützt sind.Apparatus according to claim 14, characterized in that the conveyor belts are supported by rollers (44) in the area of their working dreams. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Niederhaltereinrichtung (45) von einer Vielzahl parallel nebeneinander angeordneter endloser Transportbänder (46) gebildet ist.Apparatus according to claim 1, characterized in that the hold-down device (45) is formed by a plurality of endless conveyor belts (46) arranged next to one another in parallel. Vorrichtung nach Anspruch 20, dadurch gekennzeichnet, dass die Tranportbänder (46) der Niederhaltereinrichtung (42) um Umlenkrollen umlaufen, die stromabwärts neben dem stromabwärts liegenden Anschlag (13) in dem Ma-schinengestellt (4) drehbar gelagert ist.Apparatus according to claim 20, characterized in that the conveyor belts (46) of the hold-down device (42) run around deflection rollers which are rotatably mounted downstream of the downstream stop (13) in the machine frame (4). Vorrichtung nach den Ansprüchen 14 und 20, dadurch gekennzeichnet, dass die Arbeitstrumme der Transportbänder (46) der Niederhaltereinrichtung (42) eine Ebene definieren, die zu der Ebene der Transportbänder (43) der Transporteinrichtung (42) parallel ist.Device according to claims 14 and 20, characterized in that the working volume of the conveyor belts (46) of the hold-down device (42) define a plane which is parallel to the plane of the conveyor belts (43) of the conveyor device (42). Vorrichtung nach den Ansprüchen 14 und 20, dadurch gekennzeichnet, dass die Transportbänder (43) der Transporteinrichtung (42) und die Transportbänder (46) der Niederhaltereinrichtung (45) mit der gleichen Geschwindigkeit laufen. Device according to claims 14 and 20, characterized in that the conveyor belts (43) of the transport device (42) and the conveyor belts (46) of the hold-down device (45) run at the same speed. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die zweiten temporären Auflagemittel (28) von einem Rechen gebildet sind, der parallel in Abstand zueinander angeordnete Zinken aufweist, die in den Lücken zwischen den Zinken des stromabwärtsliegenden Anschlags (13) hindurch bewegbar sind.Device according to claim 1, characterized in that the second temporary support means (28) are formed by a rake which has parallel, spaced-apart tines which are movable in the gaps between the tines of the downstream stop (13). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die zweiten temporären Auflagemittel (28) an einem Schlitten (33) befestigt sind, der stromabwärts des stromabwärts gelegenen Anschlags (13) geführt ist.Apparatus according to claim 1, characterized in that the second temporary support means (28) are attached to a carriage (33) which is guided downstream of the downstream stop (13). Vorrichtung nach Anspruch 25, dadurch gekennzeichnet, dass zur Führung des Schlittens (33) wenigstens eine Führungsschiene (31) vorgesehen ist, die um eine Schwenkachse (35) schwenkbar ist, die sich horizontal erstreckt und die rechtwinklig zu der Transportrichtung der Produkte (3) auf der Transporteinrichtung (42) ausgerichtet ist.Device according to Claim 25, characterized in that at least one guide rail (31) is provided for guiding the carriage (33), which can be pivoted about a pivot axis (35) which extends horizontally and which is perpendicular to the transport direction of the products (3) is aligned on the transport device (42). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der wenigstens einen Führungsschiene (31) Antriebsmittel (37,38,41) zugeordnet sind, um die Führungsschiene (31) um die Schwenkachse (35) auf und ab zu schwenken.Device according to claim 1, characterized in that the at least one guide rail (31) is assigned drive means (37, 38, 41) in order to pivot the guide rail (31) up and down about the pivot axis (35). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass Antriebsmittel vorgesehen sind, um den Schlitten (33) längs der Führungsschiene (31) zu führen.Device according to claim 1, characterized in that drive means are provided to guide the carriage (33) along the guide rail (31). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass Steuerungsmittel vorhanden sind, um die Bewegung der beweglichen Teile der Vorrichtung (1) miteinander zu koordinieren.Device according to claim 1, characterized in that control means are provided to coordinate the movement of the moving parts of the device (1) with each other. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Antriebseinrichtung (37,38,41) für die Führungsschienen (31) eine Vertikalführung (38) umfasst, in der ein weiterer Einstellschlitten (41) vertikal bewegbar ist, an dem die Führungsschiene (31) angebunden ist.Device according to claim 1, characterized in that the drive device (37, 38, 41) for the guide rails (31) comprises a vertical guide (38) in which a further adjustment slide (41) can be moved vertically, on which the guide rail (31) is connected. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der stromabwärts gelegene Anschlag (13) einstellbar in dem Maschinengestell (4) gehaltert ist, derart, dass sein Abstand zu dem stromaufwärts gelegenen Anschlag an die Abmessungen der Produkte (3), gesehen in Transportrichtung einstellbar ist, um die Tiefe des Lichtraumprofils des Stapelschachtes (12) einzustellen.Device according to claim 1, characterized in that the downstream stop (13) is adjustably held in the machine frame (4) in such a way that its distance from the upstream stop can be adjusted to the dimensions of the products (3), viewed in the direction of transport to adjust the depth of the clearance profile of the stacking shaft (12). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Hub der zweiten temporären Auflagemittel (28) in Richtung parallel zu den Führungsschienen (31) einstellbar ist, derart, dass der Leerhub, um den die Zinken der zweiten temporären Auflagemittel (28) aus dem Lichtprofil des Stapelschachtes (12) herausgezogen werden, minimierbar ist.Apparatus according to claim 1, characterized in that the stroke of the second temporary support means (28) in the direction parallel to the guide rails (31) is adjustable, such that the idle stroke by which the tines of the second temporary support means (28) from the light profile of the stacking shaft (12) can be pulled out, can be minimized. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass der Antrieb (37,38,41) zum Schwenken der Führungsschienen (31) um die Schwenkachse (35) und der Antrieb zum Längsverfahren des Schlittens (33) des zweiten temporären Auflagemittel (28) mechanisch voneinander entkoppelt ist, derart, dass die Bewegungen zeitlich und in ihrem Hub voneinander unabhängig sind. Device according to claim 1, characterized in that the drive (37, 38, 41) for pivoting the guide rails (31) about the pivot axis (35) and the drive for longitudinally moving the slide (33) of the second temporary support means (28) mechanically from one another is decoupled in such a way that the movements are independent of one another in terms of time and stroke. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die Niederhaltereinrichtung (45) in Richtung senkrecht zu der durch die Transporteinrichtung (42) definierten Transportebene veränderbar ist.Device according to claim 1, characterized in that the hold-down device (45) can be changed in the direction perpendicular to the transport plane defined by the transport device (42). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass dritte temporären Auflagemittel (25') vorgesehen sind, zu denen wenigstens zwei Finger gehören, die sich auf der Höhe der abgesenkten Niederhaltereinrichtung (45) im Bereich des stromaufwärts gelegenen Anschlags (14) befinden.Device according to claim 1, characterized in that third temporary support means (25 ') are provided, which include at least two fingers, which are located at the level of the lowered hold-down device (45) in the region of the upstream stop (14). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass die zweiten temporären Auflagemittel (28) in eine untere Stellung bringbar sind, in der ihre Unterseite sich auf der Höhe einer Ebene befindet, die durch die Arbeitstrumme der Niederhaltereinrichtung (45) definiert ist.Apparatus according to claim 1, characterized in that the second temporary support means (28) can be brought into a lower position, in which their underside is at the level of a plane which is defined by the working span of the hold-down device (45). Vorrichtung nach Anspruch 36, dadurch gekennzeichnet, dass in der unteren Stellung die Führungsschiene (31) für die zweiten temporären Auflagemittel (28) parallel zu der durch die Arbeitstrumme der Niederhaltereinrichtung (45) definierten Ebene verläuft.Apparatus according to claim 36, characterized in that in the lower position the guide rail (31) for the second temporary support means (28) runs parallel to the plane defined by the working strand of the hold-down device (45). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass zum Wegführen des Stapels (2) aus dem Stapelschacht (12) die zweiten temporären Auflagemittel (28) mit der selben linearen Geschwindigkeit aus dem Stapelschacht (12) herausgezogen werden, mit der sich die Arbeitstrumme der Transporteinrichtung (42) und die Arbeitstrumme der Niederhaltereinrichtung (45) bewegen.Apparatus according to claim 1, characterized in that, in order to lead the stack (2) away from the stacking shaft (12), the second temporary support means (28) are pulled out of the stacking shaft (12) at the same linear speed with which the working strand of the transport device is extended (42) and move the working strand of the hold-down device (45). Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, dass zumindest eines Endlosbänder (46) der Niederhaltereinrichtung (45) bis in die Nähe der Rückseite des stromabwärts gelegnen Anschlags (13) reicht und zwischen zwei Zinken des zurückgezogenen zweiten temporären Stapelmittels (28) verläuft.Device according to claim 1, characterized in that at least one endless belt (46) of the hold-down device (45) extends into the vicinity of the rear of the downstream stop (13) and runs between two prongs of the withdrawn second temporary stacking means (28).
EP02005689A 2001-04-17 2002-03-13 Device for delivering piles of folding boxes Expired - Lifetime EP1251093B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10118813 2001-04-17
DE10118813A DE10118813C2 (en) 2001-04-17 2001-04-17 Device for destacking carton tubes

Publications (3)

Publication Number Publication Date
EP1251093A2 true EP1251093A2 (en) 2002-10-23
EP1251093A3 EP1251093A3 (en) 2004-04-28
EP1251093B1 EP1251093B1 (en) 2007-04-11

Family

ID=7681729

Family Applications (1)

Application Number Title Priority Date Filing Date
EP02005689A Expired - Lifetime EP1251093B1 (en) 2001-04-17 2002-03-13 Device for delivering piles of folding boxes

Country Status (5)

Country Link
US (1) US20020150462A1 (en)
EP (1) EP1251093B1 (en)
AT (1) ATE359226T1 (en)
DE (2) DE10118813C2 (en)
ES (1) ES2283480T3 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7748702B2 (en) 2005-10-26 2010-07-06 Heidelberger Druckmaschinen Ag Method and device for combining auxiliary and main stacks in a delivery or feeder of a machine for processing printing materials and sheet-fed offset printing press having the device
EP3845475A1 (en) 2020-01-03 2021-07-07 Wilhelm B a h m ü l l e r Maschinenbau Präzisionswerkzeuge GmbH Device and method for stacking folding boxes and blanks in a stacking shaft

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3964182B2 (en) 2001-11-02 2007-08-22 株式会社ルネサステクノロジ Semiconductor device
DE10347166A1 (en) * 2003-10-06 2005-04-28 Wilhelm Bahmueller Maschb Prae Device for stacking flat products
EP2520526B1 (en) * 2010-05-12 2016-04-13 Macarbox, S.L.U. Piling machine for flat items
RU2674716C1 (en) * 2015-09-25 2018-12-12 Тотани Корпорейшн Device for laying and supply of sheet products
CN109051048A (en) * 2018-09-07 2018-12-21 浙江环龙机器有限公司 A kind of pack thread ejector sleeve device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69500305T2 (en) 1994-02-07 1997-10-16 Martin Sa Stacking, separation and removal station for sheet-like material that is released by a processing machine

Family Cites Families (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2414059A (en) * 1944-05-22 1947-01-07 Lewis J Powers Bunch forming and spacing apparatus
DE6950030U (en) * 1969-12-23 1970-04-23 Rau Swf Autozubehoer PLASTIC TRACK BEARINGS FOR THE DRIVE ROLLER OF AN MOTOR, IN PARTICULAR A MOTOR VEHICLE WIPER MOTOR
US3759402A (en) * 1972-04-10 1973-09-18 Harris Intertype Corp Counter ejector
CH602456A5 (en) * 1973-12-21 1978-07-31 Schelling & Co
US3892168A (en) * 1974-01-14 1975-07-01 Molins Machine Co Inc Counter ejector
BE841025A (en) * 1976-04-23 1976-08-16 DEVICE FOR INSERTING FROM A PROCESSING MACHINE AND DETACHING BAGS AND THE LIKE IN CONNECTED QUANTITIES
US4134330A (en) * 1977-10-26 1979-01-16 Koppers Company, Inc. Method and apparatus for stacking blanks
DE3043035C2 (en) * 1980-11-14 1983-11-10 Stiegler, Karl Heinz, 7000 Stuttgart Machine for the production of plastic bags with a stacking station
US4934687A (en) * 1988-01-11 1990-06-19 Galpin Research, Limited Partnership High speed stream fed stacker method and system for printed products
US5014974A (en) * 1990-01-16 1991-05-14 Numerical Concepts, Inc. In-line, continuous paper batching system
US5160129A (en) * 1991-08-27 1992-11-03 Ward Holding Company, Inc. Sheet stacking
US5494400A (en) * 1994-10-25 1996-02-27 Wirtz Manufacturing Co., Inc. Battery plate stacker
US5613673A (en) * 1995-08-15 1997-03-25 Marquip, Inc. Sheet stacking apparatus
US6129503A (en) * 1997-06-26 2000-10-10 Bobst Group, Inc. Combination counter-ejector shingle-output delivery system
US5980196A (en) * 1998-05-13 1999-11-09 Thermoguard Equipment, Inc. Counter-ejector and box feed machine
US6497549B2 (en) * 2000-12-27 2002-12-24 J & L Development, Inc. Counter-ejector

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69500305T2 (en) 1994-02-07 1997-10-16 Martin Sa Stacking, separation and removal station for sheet-like material that is released by a processing machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7748702B2 (en) 2005-10-26 2010-07-06 Heidelberger Druckmaschinen Ag Method and device for combining auxiliary and main stacks in a delivery or feeder of a machine for processing printing materials and sheet-fed offset printing press having the device
EP3845475A1 (en) 2020-01-03 2021-07-07 Wilhelm B a h m ü l l e r Maschinenbau Präzisionswerkzeuge GmbH Device and method for stacking folding boxes and blanks in a stacking shaft
DE102020100067A1 (en) 2020-01-03 2021-07-08 Wilhelm B a h m ü l l e r Maschinenbau Präzisionswerkzeuge GmbH Device and method for stacking folding boxes and blanks in a stacking shaft

Also Published As

Publication number Publication date
ES2283480T3 (en) 2007-11-01
EP1251093A3 (en) 2004-04-28
US20020150462A1 (en) 2002-10-17
ATE359226T1 (en) 2007-05-15
DE50209892D1 (en) 2007-05-24
EP1251093B1 (en) 2007-04-11
DE10118813C2 (en) 2003-07-03
DE10118813A1 (en) 2002-10-31

Similar Documents

Publication Publication Date Title
DE3122451C2 (en) Device for the continuous stacking of successively fed sheet material
DE10114263C1 (en) Feed off method, for sawn sections, uses clamp plates for movement of sawn section away from sawing plane and deposition on feed off surface
EP0553724B1 (en) Method and device for the production of defined piles of folded or unfolded sheets or sheet-like material
DE3049633A1 (en) Sheet stacking apparatus
DE2125991A1 (en) Method and apparatus for transporting stacked flat objects in succession to a collection
EP0288814B1 (en) Device for subdividing an endless zig-zag folded paper web
DE3018894A1 (en) DEVICE FOR THE ACCEPTANCE OF FOLDING BOX CUTTINGS PRODUCED IN A FOLDING AND GLUING MACHINE AND FOR PACKING THE SAME
EP0487837A1 (en) Palletizing machine
DE60112697T2 (en) Device for receiving and ejecting flat objects in a machine for their processing
DE19516953B4 (en) Device for cutting pages of paper
DE2158907C3 (en) Method and device for breaking out pre-cut pieces of material from sheet-like material webs
DE1277140B (en) Device for stacking and transporting flat objects, especially paper towels
EP1468948A1 (en) Cutting station with two mutually movable gripper beams
EP0856396B1 (en) Flexible device for forming carton blanks
DD140132A5 (en) DEVICE FOR FEEDING A PACK MACHINE WITH SUESSWAREN
EP0606113A2 (en) Device for placing reinforcing elements on indexing inserts
EP1251093A2 (en) Device for delivering piles of folding boxes
DE2634634A1 (en) STACKING AND FILLING DEVICE FOR RAIL PARTS MADE OF COMPRESSIBLE MATERIAL
DE102005002532A1 (en) Device and method for automated and simultaneous provision and change of at least two rolls of paper webs or the like for a downstream format cutter
DE2432738C3 (en) Device for aligning two-dimensional pieces lying on top of one another
DE2744061C2 (en)
DE1756760A1 (en) Device for stacking sheet material
DE19821918B4 (en) Method for conveying products and handling unit for carrying out the method
EP0019036A1 (en) Device for stacking square-shaped products, in particular so shaped printed matter, periodicals or the like
DE4015572C2 (en) Feeding device for a machine for assembling veneer strips into a veneer web

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

RIC1 Information provided on ipc code assigned before grant

Ipc: 7B 65H 31/32 A

17P Request for examination filed

Effective date: 20040806

AKX Designation fees paid

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070411

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20070411

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REF Corresponds to:

Ref document number: 50209892

Country of ref document: DE

Date of ref document: 20070524

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070711

ET Fr: translation filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070911

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2283480

Country of ref document: ES

Kind code of ref document: T3

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070411

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070411

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070411

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20080114

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070712

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20080328

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20080320

Year of fee payment: 7

BERE Be: lapsed

Owner name: BAHMULLER MASCHINENBAU PRAZISIONSWERKZEUGE G.M.B.

Effective date: 20080331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080331

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080331

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070411

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080313

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20090321

Year of fee payment: 8

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20090313

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090313

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20090314

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080313

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090314

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20070411

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100313

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20120403

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20120331

Year of fee payment: 11

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20131129

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 50209892

Country of ref document: DE

Effective date: 20131001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20131001

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130402