EP1164331A1 - Waste incinerator flue gas recirculation - Google Patents

Waste incinerator flue gas recirculation Download PDF

Info

Publication number
EP1164331A1
EP1164331A1 EP01202285A EP01202285A EP1164331A1 EP 1164331 A1 EP1164331 A1 EP 1164331A1 EP 01202285 A EP01202285 A EP 01202285A EP 01202285 A EP01202285 A EP 01202285A EP 1164331 A1 EP1164331 A1 EP 1164331A1
Authority
EP
European Patent Office
Prior art keywords
gas
waste
incineration
zone
incinerator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP01202285A
Other languages
German (de)
French (fr)
Other versions
EP1164331B1 (en
Inventor
Marcellus Antonius Jozef Van Berlo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gemeente Amsterdam Gemeentelijke Dienst Afvalverwerking
Original Assignee
Gemeente Amsterdam Gemeentelijke Dienst Afvalverwerking
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gemeente Amsterdam Gemeentelijke Dienst Afvalverwerking filed Critical Gemeente Amsterdam Gemeentelijke Dienst Afvalverwerking
Publication of EP1164331A1 publication Critical patent/EP1164331A1/en
Application granted granted Critical
Publication of EP1164331B1 publication Critical patent/EP1164331B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G5/00Incineration of waste; Incinerator constructions; Details, accessories or control therefor
    • F23G5/08Incineration of waste; Incinerator constructions; Details, accessories or control therefor having supplementary heating
    • F23G5/14Incineration of waste; Incinerator constructions; Details, accessories or control therefor having supplementary heating including secondary combustion
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2202/00Combustion
    • F23G2202/10Combustion in two or more stages
    • F23G2202/101Combustion in two or more stages with controlled oxidant supply
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2202/00Combustion
    • F23G2202/10Combustion in two or more stages
    • F23G2202/106Combustion in two or more stages with recirculation of unburned solid or gaseous matter into combustion chamber
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G2206/00Waste heat recuperation
    • F23G2206/10Waste heat recuperation reintroducing the heat in the same process, e.g. for predrying

Definitions

  • the invention in question relates to a method for burning waste in a waste incinerator according to the preamble of claim 1, as well as a high efficiency waste incinerator.
  • Waste incinerators and the way in which they work, are known in practice.
  • the waste material to be incinerated is placed on a support with holes in it, generally known as the incinerator grid, wherein combustion air as primary gas is brought from below up through the incinerator grid and the waste material.
  • This combustion air supplies the necessary oxygen required for the incineration.
  • This air is often pre-heated in order to make the waste burn better, since the hot combustion air has a heating effect on the material to be incinerated, and also partly helps to dry the waste material so that it is easier to ignite.
  • the invention aims at providing an improved technique as mentioned in the opening words, wherein these drawbacks can be lessened.
  • the invention aims at providing a technique wherein the efficiency of the installation can be improved and wherein the emission of dangerous substances can be lessened.
  • the invention provides a method as described in the preamble, which is characterised in that the incineration zone comprises at least two zones, the waste material being supplied to a first zone, and wherein during the method the waste material is moved to a successive connected zone, and that a first partial primary gas supply is supplied to the first zone with an oxygen content of ⁇ 20% by volume and a temperature from 50°C to 450°C, preferably from 50°C to 300°C, and the temperature is controlled for each partial primary gas supply.
  • a method according to the invention can especially be advantageously carried out using the measures as described in the claims stated later in this document.
  • a primary gas is used in the first zone that has a low oxygen content. Because of the low oxygen content, an increase in temperature does not automatically result in the waste material actually combusting. Therefore, even a temperature higher than 300°C, for example 450°C or higher, can also be applied. Because the primary gas serves in the first instance to heat and dry the compact parts of the waste material, in principle this does not result in any problems. In the second instance the easily combustible parts of the waste material combust as a result of the primary part gas supply, which therefore takes place with a deficiency of oxygen. This means that the incineration on the waste bed only partly takes place.
  • the primary gas in the first zone serves in the first place to dry the waste material that has been placed in the incinerator.
  • the primary gas that is supplied to the first zone is fed in at a temperature from 50°C to 300°C, preferably from 150°C to 300°C.
  • the pre-heating of the primary gas for a waste incinerator requires a great deal of energy, and is especially necessary if the waste material is difficult to burn. The pre-heating of the primary gases is therefore dependent on the so-called thermal value of the waste material.
  • the primary gas is at a temperature of approximately 100°C in the case of a thermal value of 11,000 kilojoules per kilogram, while the temperature of the primary gases should be approximately 180°C in the case of waste material with a thermal value of around 7,000 kilojoules. These values are based on the use of air as the primary gas, both as pre-heating and as ignition gas.
  • the waste material that is placed in a waste incinerator for incineration varies enormously both in its content and its humidity.
  • the dampness that can exist in the waste material it is important how this dampness is spread through the waste material. If one part of the waste material is relatively dry and therefore easily combustible, this part will ensure that the damper waste material surrounding it will dry rapidly and thereby combust. In practice the dry and damp parts of the waste material are not homogeneously divided, so the combustion takes place in a very irregular way.
  • Waste material that is easily combustible and has a high thermal value demands a very low pre-heating of the primary gas. If air pre-heating is used, this results in a very fierce fire above the waste bed, wherein the firing in the waste bed is very strongly sub-stoichiometric, which results in very high temperatures locally in the incineration chamber. In this case air pre-heating is unnecessary.
  • Waste material that is easily combustible but that has a low thermal value also does not require air pre-heating. In addition, there is less chance of a strong sub-stoichiometric combustion.
  • Waste material that is not easily combustible and that has a high thermal value requires primary air at a high temperature in order to achieve enough combustion of the waste material on the one hand, and on the other hand because of this the actual burning of the waste material will easily result in a simple sub-stoichiometric combustion. A careful regulation of the temperature of the primary gases is therefore necessary to control the combustion.
  • the invention provides an improved technique as stated previously, wherein it is preferable to be able to regulate the temperature of the primary part gas supply.
  • This enables a regulation wherein the temperature of the primary gas is increased only in the zones where it is necessary, because of the composition of the waste material.
  • the primary gas that is supplied to the first zone is at a temperature of from 50°C to 450°C, preferably in the range 50°C to 300°C, with the strongest preference for the range 150°C to 300°C.
  • the aim is to choose a temperature in the first zone that is so high that in many cases pre-heating can be reduced to zero in the other zones.
  • a relatively low airflow for the first zone from 5% to 15% of the total primary airflow
  • relatively little energy is used for the pre-heating.
  • the figure shows a schematic outline of a waste incinerator according to the preferred design of the invention.
  • the incinerator shown has four different part gas supplies for primary gas (1, 2, 3, 4). These are introduced under the incinerator grid (5), on top of which is the waste bed (6).
  • the supply pipes for the first, second and third part supplies of the primary gas are equipped with an air pre-heater (7, 8).
  • Waste material is placed on the incinerator grid (5) above the first primary gas supply (1), wherein it is pervaded from below by waste gas that originates from the waste incinerator.
  • This flue gas has a low oxygen content.
  • the primary gas from the first part gas supply (1) will flow through the waste bed (6) by means of the available gas channels.
  • the waste material that comes into direct contact with such a channel is dried more than the rest of the waste material. If the partly dried waste material is moved on to a position where the second part of the primary gas (2) is supplied, because this secondary part of the supply contains oxygen, the flame front is practically immediately progressing downwards through these channels.
  • the flue gases that are created in the waste gas that are formed in the flame front above the waste bed are not made up of homogeneous parts. Because of the inhomogeneous composition of the waste material, some parts of it are well incinerated and therefore in those places the oxygen in the primary gas will have reacted. In other parts, where the incineration has not taken place to any large extent, part of the oxygen supplied by the primary gas supply will not have reacted and thereby will remain in the waste gas. By adding a secondary gas a good mix of these waste gas can be achieved.
  • the flue gases from the waste incinerator As secondary gases, a lot of mixing is created at the first height, the top of the flames where the hottest place in the flue is, but only a limited surplus of oxygen is created so that the forming of NO x is minimised.
  • an oxygen bearing gas Via the supply of the third gas (10) at a position downstream the supply of the secondary gas (9), an oxygen bearing gas is supplied with an adequate O 2 content (preferably a surplus) in order to burn off the remaining CO and any other possible combustible waste products in the flue gases. Because this occurs downstream, the flue gases are homogenous and already somewhat cooler and so the formation of nitrous oxides is less. Especially the fact that the flue gases are now already mixed, local peak temperatures that cause the most formation of nitrous oxides do not arise.
  • the subdivision of the supply of primary gas into several zones, as shown in the four zones in the illustration (1, 2, 3, 4), which successively pass through the waste material to be incinerated (6) achieves an optimum combustion. This can especially be achieved because the temperature can be independently regulated for each zone. Because in practice it is difficult to judge the thermal value of the waste material and its ignition behaviour in advance well enough to depend on it, the regulation of the temperature setting of the primary gas takes place by tracking the flame front for each zone. This can be done by hand or via an automatic measurement of the flame front with the help of video cameras for visible light and/or infrared light.
  • the primary gases that are supplied to the first zone (1) can be of a high temperature without any problem, because the oxygen content of these is very low.
  • the oxygen content can be 0% by volume or more.
  • the incineration above the first zone is therefore limited.
  • the maximum temperature of the flames in the first zone is thereby reduced in proportion to the available oxygen percentage, wherein no damage to the waste grid can arise. In particular damage by drops of melted metal that weld themselves to the surface of the grid is avoided. With current techniques wherein a water-cooled grid is usually used, it is not possible to obtain this advantage to such a high degree.
  • the reaction of waste gas in the first zone is also limited.
  • the waste material can therefore be fully pre-dried without all the material being incinerated in the first zone. This results in a good combustion situation in the second zone, where it is possible that no more air pre-heating is necessary, but where the incineration can still be well regulated.
  • a homogeneous incineration can especially be achieved in the second zone when the incinerator grid (5) is placed at a lower point, as described earlier.
  • the flue gas recirculation is supplied as the primary gas in the first zone.
  • the waste gas from the incinerator flue after passing through a dust filter (11) are recirculated to the first zone.
  • the oxygen percentage and the temperature are in this case reasonably firmly fixed (depending on the process design) and cannot be used for the actual control of the combustion process.
  • the amount (the flow) of primary gas in the first zone is very easy to vary across a wide range.
  • the flue gases arising from this can be mixed with air from the outside in order to achieve the required temperature combined with the required oxygen percentage, wherein a certain percentage of oxygen is still added to these gases.
  • the amount of air that is added to the flue gases from the outside depends on the temperature that is necessary for the primary gas in the first zone. In general this will be from 100°C to 270°C.
  • the oxygen percentage in this case will be from 0°C to 15°C.
  • the recovery of the heat from the burning of the gas in the gas boiler will result in a higher efficiency for the entire installation.
  • Waste gas from a gas turbine can also be used in a suitable way. Especially in the case of flue gases from a gas turbine or gas motor, these can have a temperature higher than 270°C, for example 450°C or higher. If the waste contains some humidity and the flow in the first primary zone is mot too high, even with these temperatures the pyrolisis may be limited so that sufficient calorific value remains in the waste, so as to get a good combustion in the subsequent (second) zone. Mixing with cool air or cooler recirculation flue gas is possible as well. The invention is therefore also adaptable for similar cases wherein the temperature of the primary gas supply is higher than 300°C.
  • the flue gases from the waste incinerator are at a temperature of from 100°C to 270°C.
  • a problem that can occur using similar flue gas recirculation is corrosion at 'cold spots' and the leaking of the recirculation gases to the outside in places where high pressure is present. Because of the temperature of the recirculation gases, similar corrosion is possible as the result of condensation of the recirculating gas in the pipes supplying gas to the incineration zone, for example underneath the incinerator grid (5).
  • any leakage of the recirculating gases in this housing (12) will not lead to direct problems in the surrounding area because the leaked gases will be taken up and diluted in the housing (12). These gases can then be passed on to the incineration zone.
  • the second part of the supply of the primary gas is used to maintain the surroundings of the supply of the first part of the gas supply (1) at the required, higher, temperature so that no condensation can take place.
  • the supply (1), and especially the funnel under the grid (5) for the first zone, as shown in Figure 2 are situated in this case in a casing (12) which is kept at a temperature that is regulated by the second part of the gas supply, and which can also be kept at a higher pressure according to a further recommended implementation.
  • this supply of the first part of the gas is insulated and surrounded by the air pre-heated by an air pre-heater, cold bridges can be prevented by this construction.
  • this air-preheater is the heater of the second part of the primary gas supply (7) this heater should work continuously at a sufficiently high temperature. If necessary, a bypass can be provided in this case wherein the primary gas that is supplied to the second zone does not pass through the air pre-heater (7). It is also possible, using a control valve, to provide a connection between the pre-heated air coming from the housing and the funnel for the first part of the gas supply in order to add oxygen-rich air to the first part of the supply.
  • the flue gas that is used for recirculation should preferably be withdrawn from the waste incinerator via a baghouse filter or electrostatic filter (11), so that the amount of dust in the recirculating gas is low and no problems arise with deposits occurring in the pipes.
  • the temperature of the recirculation gas is from 170°C to 270°C, preferably in the area of 190°C and 230°C. This temperature must be high enough to prevent problems with the condensation of the flue gases, but also low enough for it to be treated by common baghouse filter materials, for example a special catalytic layer on the baghouse filter material.
  • the primary air for the first zone is regulated in order to control the fire in the second and third zones.
  • the range of the gas supply via the first zone must be approximately 2.5% to 25% of the total amount of primary gas.
  • 10% of the total is enough to dry the waste material well, through the high temperature of the recirculation gases used.
  • the drying process is more than good and the amount of the gas supply can be reduced to 5%.
  • the amount can be increased to 20%.
  • the incinerator grid (5) in the first zone, on which the waste material to be burnt (6) is initially placed does not have to be equipped with water cooling.
  • condensation of water from the recirculated gas can especially occur on the cooled parts.
  • the recirculation gases have a very low oxygen content but a relatively high temperature, so that virtually no combustion takes place in the waste material above the first zone.
  • flame temperatures can exist of up to a maximum of 500°C if the oxygen content is lower than 10% by volume. Because of the low oxygen content and the low temperature, the flame front can however hardly creep downwards. This means that damage to the incinerator grid (5) in the first zone by overheating of the grid cannot occur.
  • the waste material from the first zone that reaches the second zone is, however, very well dried and easily combustible.
  • a primary air supply is added with a normal oxygen content. This causes the flame front to move downwards virtually instantaneously.
  • the incinerator grid in the second zone (5) is water-cooled. Because of the oxygen content as well as the good mix of the oxygen and the waste material to be burned, a very fierce fire will occur in the incinerator bed that burns right up to the grid (5).
  • the very easily combustible parts of the waste material (especially synthetic materials) already lose part of their thermal values and the peak temperatures in the second and third zones are lower than in the case where the waste material in the first zone is completely incinerated, as is the usual case when oxygen-rich air is used.
  • the heat that the grid (5) absorbs and gives off to the cooling water is re-used in a suitable way.
  • the primary gas for the second and third zones can be used without any further air pre-heating (7, 8), thereby lowering grid and flame temperature as well as reducing NO x formation.
  • the gas that is supplied to the second and third zones can therefore be fresh air that can be supplied directly from the outside.
  • the energy saving that is achieved by this it has the advantage that when the air is cold, the air speed will be lower for an equal supply of oxygen, wherein less flue dust will be created.
  • the amount of oxygen that is supplied via the second and third zones to the waste material that is to be burnt (6) must be approximately stoichiometric or somewhat less (from 0.8 to 1.0 times the amount of oxygen necessary for the combustion).
  • the amount of air that is supplied to the second and third zones is approximately from 25% to 30% of the total amount of gas that is used as the primary and third air supply. The result of this is that the highest heat develops in the waste bed itself.
  • the coal residue that is to say the percentage of unburned carbon
  • the quality of the resulting slag is therefore improved on account of the good drying in the first zone.
  • the gas that is used for the second and third zones should preferably not be pre-heated, and in the case of a good enough supply of waste material that can therefore be pre-dried in order to achieve a rapid combustion in the second zone, an air pre-heater (7, 8) can be omitted if required.
  • an air pre-heater (7, 8) can be omitted if required.
  • Contrary to the patent DE3915992A1 mentioned previously is it not advisable to use a tailored oxygen content in the main combustion zone as well, because the combustion there occurs in an sub-stoichiometric way in any case.
  • the last zone is a final incineration and cooling zone that only receives from 5% to 15% of the total amount of gas.
  • Recirculated gas can possibly be used here. This has the advantage that the CO 2 and H 2 O contained in the recirculated gas, if necessary supplemented with extra water, reacts with the calcium in the slag, wherein this goes through a rapid ageing process and there exists a lower pH value in any later leaching. In this way the quality of the slag is improved because there is less leaching.
  • the incineration in the main incineration zone is not going very well it can be useful to temporarily use an increased oxygen content directly after the main incineration zone in order to bring about a good combustion of the lower ash layer.
  • recirculated gas that is to say waste gas from the incinerator
  • the preference is the percentage is from 5% to 30% of the total amount of air supplied, preferably from 10% to 20%.
  • waste transport As the primary regulator for the capacity of the plant.
  • the supply of waste material to the grid must be adjusted in order to obtain a good layer thickness.
  • the individual regulating of the temperature in each zone proposed in Claim 2 it is possible to temporarily support a local lack of combustion in the main combustion zone without adapting the amount of the air supply.
  • the limiting of the formation of NO x and the negative influence on the waste throughput aim to keep the nominal air temperature in the main combustion zone as low as possible. This can be controlled by influencing the drying process in the first zone. For this a fixed, as low as possible, oxygen percentage is aimed for in principle, and a high temperature in the first primary gas supply. In this way the first primary gas supply becomes the primary regulating quantity for the drying of the waste material. This flow is regulated such that a good combustion takes place in the second zone, but not more than what is needed to prevent too fierce combustion.
  • the invention provides a much-improved technique for burning waste material in a waste incinerator.
  • the extra investments that are necessary for the recirculation of the waste gas and the more complex construction for the supply of the recirculation gases to the first zone are compensated for by the fact that the waste gas cleaning can be carried out on a smaller scale, and the fact that a lot less energy is needed for the preheating of the primary part of the gas supply.
  • the advantages are especially achieved because the incineration is better and because this results in an ash layer of a better quality.
  • waste material with a wide range of thermal values from 5,000 to 16,000 kilojoules per kilogram

Abstract

The invention relates to a method for the incineration of waste material in an incinerator, comprising:
  • supplying waste material to an incineration zone which contains an incineration grid (5), wherein the waste material (6) is supplied to a first side of the incineration grid and is moved to a second side during the method,
  • supplying from below through the incineration grid (5) and the waste material (6) placed thereon a primary gas so as to at least partially incinerate said waste material in a combustion area that stretches from the incineration grid to a first level above the incineration grid. This method is improved because the incineration zone comprises at least two zones, the waste material being supplied to a first zone, and wherein during the method the waste material is moved to a successive connected zone, and that a first partial primary gas (1-4) supply is supplied to the first zone with an oxygen content of 20% by volume and a temperature from 50°C to 450°C, preferably from 50°C to 300°C.
  • Figure 00000001

    Description

    • The invention in question relates to a method for burning waste in a waste incinerator according to the preamble of claim 1, as well as a high efficiency waste incinerator.
    • Waste incinerators, and the way in which they work, are known in practice. In general the waste material to be incinerated is placed on a support with holes in it, generally known as the incinerator grid, wherein combustion air as primary gas is brought from below up through the incinerator grid and the waste material. This combustion air supplies the necessary oxygen required for the incineration. This air is often pre-heated in order to make the waste burn better, since the hot combustion air has a heating effect on the material to be incinerated, and also partly helps to dry the waste material so that it is easier to ignite. However, because of the inhomogeneous content of the waste material in fact a surplus of oxygen or a shortage of oxygen may arise locally in the waste bed, depending on the position of the waste bed and the amount of incineration that takes place. The gases resulting from the incineration (flue gases) therefore also have an uneven composition.
    • In order to further burn these flue gases, which can contain carbon monoxide and particles of other incombustible waste in places, and to mix these with the parts of the gas that still contain oxygen, use is made of a so-called secondary injection. This injection of secondary gas takes place at a particular height above the waste bed, wherein the flue gases mix together sufficiently to form a homogenised whole. The secondary gas consists generally of air, which contains oxygen that can be used by the incineration reaction. This means that there is always a surplus of oxygen available from the point of feeding in the secondary gas.
    • In the case of large-scale incinerators it is not always possible to achieve a sufficient mix of the inhomogeneous flue gases by means of the addition of the secondary gas. In this case the addition of a third gas takes place at a height above the input of the secondary gas. For the addition of the third gas there is a preference for using waste gas (flue gas) from the waste incinerator (recirculation of flue gas). This avoids the fact that the third gas should be pre-heated, as might be the case if cold air from outside were to be used.
    • While the technique described here is generally adopted, there are a number of drawbacks. The efficiency of the usual waste incinerators is relatively low, and furthermore the flue gases created contain a large proportion of unwanted substances such as a large quantity of nitrous oxides, and carbon monoxide. In the publication DE-A-3915992 a number of improvements are proposed, especially for the reduction of amounts of nitrous oxides.
    • The invention aims at providing an improved technique as mentioned in the opening words, wherein these drawbacks can be lessened. In particular the invention aims at providing a technique wherein the efficiency of the installation can be improved and wherein the emission of dangerous substances can be lessened.
    • For this the invention provides a method as described in the preamble, which is characterised in that the incineration zone comprises at least two zones, the waste material being supplied to a first zone, and wherein during the method the waste material is moved to a successive connected zone, and that a first partial primary gas supply is supplied to the first zone with an oxygen content of < 20% by volume and a temperature from 50°C to 450°C, preferably from 50°C to 300°C, and the temperature is controlled for each partial primary gas supply. By using these measures a technique is provided which results in an improved efficiency and wherein the amount of dangerous substances is minimised.
    • A method according to the invention can especially be advantageously carried out using the measures as described in the claims stated later in this document.
    • According to the invention a primary gas is used in the first zone that has a low oxygen content. Because of the low oxygen content, an increase in temperature does not automatically result in the waste material actually combusting. Therefore, even a temperature higher than 300°C, for example 450°C or higher, can also be applied. Because the primary gas serves in the first instance to heat and dry the compact parts of the waste material, in principle this does not result in any problems. In the second instance the easily combustible parts of the waste material combust as a result of the primary part gas supply, which therefore takes place with a deficiency of oxygen. This means that the incineration on the waste bed only partly takes place. Consequently, a relatively large amount of carbon monoxide, CH4, and other products arising from the reaction in the incineration can be released. Other parts of the first primary part gas supply will not result in any combustion and will therefore leave the waste bed with a low oxygen percentage. These parts of gas that are released in the first zone are mixed together with the secondary gas. The parts of the primary gas which contain a surplus of oxygen, as a result of the combustion not being good enough in parts of the waste bed, thereby ensure at least a part of the carbon monoxide being burnt, as described previously. Because of the limited combustion of the waste material in the first zone, the temperatures in the waste bed remain relatively low and the waste material will only be pyrolyzed to a limited extent. In a following zone where a greater amount of oxygen is added, this results in good combustion and a higher temperature in the waste bed than if combustion takes place in the first zone. Because of the waste material being inhomogeneous, and the inhomogeneous spread of the waste material on the incinerator grid, there will always be some parts of the waste material that receive too little oxygen.
    • As mentioned before, the primary gas in the first zone serves in the first place to dry the waste material that has been placed in the incinerator. To do this, the primary gas that is supplied to the first zone is fed in at a temperature from 50°C to 300°C, preferably from 150°C to 300°C. The pre-heating of the primary gas for a waste incinerator requires a great deal of energy, and is especially necessary if the waste material is difficult to burn. The pre-heating of the primary gases is therefore dependent on the so-called thermal value of the waste material. The preference is for the primary gas to be at a temperature of approximately 100°C in the case of a thermal value of 11,000 kilojoules per kilogram, while the temperature of the primary gases should be approximately 180°C in the case of waste material with a thermal value of around 7,000 kilojoules. These values are based on the use of air as the primary gas, both as pre-heating and as ignition gas.
    • As mentioned before, the waste material that is placed in a waste incinerator for incineration varies enormously both in its content and its humidity. As for the dampness that can exist in the waste material, it is important how this dampness is spread through the waste material. If one part of the waste material is relatively dry and therefore easily combustible, this part will ensure that the damper waste material surrounding it will dry rapidly and thereby combust. In practice the dry and damp parts of the waste material are not homogeneously divided, so the combustion takes place in a very irregular way. With the combinations of easily combustible waste, and waste that is difficult to burn, and waste material with a high thermal value and that with a low thermal value, one can see that there are, therefore, various different situations, which all pose specific demands on the temperature of the primary gas.
    • Waste material that is easily combustible and has a high thermal value demands a very low pre-heating of the primary gas. If air pre-heating is used, this results in a very fierce fire above the waste bed, wherein the firing in the waste bed is very strongly sub-stoichiometric, which results in very high temperatures locally in the incineration chamber. In this case air pre-heating is unnecessary.
    • Waste material that is easily combustible but that has a low thermal value also does not require air pre-heating. In addition, there is less chance of a strong sub-stoichiometric combustion.
    • Waste material that is not easily combustible and that has a high thermal value requires primary air at a high temperature in order to achieve enough combustion of the waste material on the one hand, and on the other hand because of this the actual burning of the waste material will easily result in a simple sub-stoichiometric combustion. A careful regulation of the temperature of the primary gases is therefore necessary to control the combustion.
    • Finally, it is essential to have pre-heated air for waste material that is not easily combustible and has a low thermal value.
    • In general current techniques can only provide a single temperature for the primary gases. This means that in general the primary gases are pre-heated, which in many cases will be done in sub-stoichiometric conditions.
    • From another viewpoint the invention provides an improved technique as stated previously, wherein it is preferable to be able to regulate the temperature of the primary part gas supply. This enables a regulation wherein the temperature of the primary gas is increased only in the zones where it is necessary, because of the composition of the waste material. For this the primary gas that is supplied to the first zone is at a temperature of from 50°C to 450°C, preferably in the range 50°C to 300°C, with the strongest preference for the range 150°C to 300°C. By choosing for a relatively high temperature in the first zone the heating of the following zones can be a lot lower. The aim is to choose a temperature in the first zone that is so high that in many cases pre-heating can be reduced to zero in the other zones. Besides, by choosing a relatively low airflow for the first zone (from 5% to 15% of the total primary airflow), relatively little energy is used for the pre-heating.
    • The following paragraphs describe the invention in more detail, based on the illustrations.
    • The figure shows a schematic outline of a waste incinerator according to the preferred design of the invention. The incinerator shown has four different part gas supplies for primary gas (1, 2, 3, 4). These are introduced under the incinerator grid (5), on top of which is the waste bed (6). In the design shown the supply pipes for the first, second and third part supplies of the primary gas are equipped with an air pre-heater (7, 8).
    • Waste material is placed on the incinerator grid (5) above the first primary gas supply (1), wherein it is pervaded from below by waste gas that originates from the waste incinerator. This flue gas has a low oxygen content. The primary gas from the first part gas supply (1) will flow through the waste bed (6) by means of the available gas channels. The waste material that comes into direct contact with such a channel is dried more than the rest of the waste material. If the partly dried waste material is moved on to a position where the second part of the primary gas (2) is supplied, because this secondary part of the supply contains oxygen, the flame front is practically immediately progressing downwards through these channels. For this reason it is useful to somewhat mix the waste material and to disturb the existing channels, by placing the grids (5) for the second and successive zones somewhat lower, and preferably at a height that is somewhat less than the average bed height. The result of this mixing is that the parts of the surface already burning in the first zone (1) arrive on the waste bed (6) and ignite or further dry the other waste material, wherein the waste material in the second zone (2) burns more homogeneously. In addition the possibility of being able to regulate the process is increased because in this case the grid in the first zone can be used to fine-tune the regulation of the supply for the remaining part of the process. The flame front above the waste material will reach to the first height. Near this height is a supply of secondary gas (9). It is preferable that a number of supplies (9) are placed around the circumference of the installation. The flue gases that are created in the waste gas that are formed in the flame front above the waste bed are not made up of homogeneous parts. Because of the inhomogeneous composition of the waste material, some parts of it are well incinerated and therefore in those places the oxygen in the primary gas will have reacted. In other parts, where the incineration has not taken place to any large extent, part of the oxygen supplied by the primary gas supply will not have reacted and thereby will remain in the waste gas. By adding a secondary gas a good mix of these waste gas can be achieved. By using use gases that are low in oxygen content, the flue gases from the waste incinerator, as secondary gases, a lot of mixing is created at the first height, the top of the flames where the hottest place in the flue is, but only a limited surplus of oxygen is created so that the forming of NOx is minimised. Via the supply of the third gas (10) at a position downstream the supply of the secondary gas (9), an oxygen bearing gas is supplied with an adequate O2 content (preferably a surplus) in order to burn off the remaining CO and any other possible combustible waste products in the flue gases. Because this occurs downstream, the flue gases are homogenous and already somewhat cooler and so the formation of nitrous oxides is less. Especially the fact that the flue gases are now already mixed, local peak temperatures that cause the most formation of nitrous oxides do not arise.
    • The subdivision of the supply of primary gas into several zones, as shown in the four zones in the illustration (1, 2, 3, 4), which successively pass through the waste material to be incinerated (6) achieves an optimum combustion. This can especially be achieved because the temperature can be independently regulated for each zone. Because in practice it is difficult to judge the thermal value of the waste material and its ignition behaviour in advance well enough to depend on it, the regulation of the temperature setting of the primary gas takes place by tracking the flame front for each zone. This can be done by hand or via an automatic measurement of the flame front with the help of video cameras for visible light and/or infrared light.
    • The primary gases that are supplied to the first zone (1) can be of a high temperature without any problem, because the oxygen content of these is very low. The oxygen content can be 0% by volume or more. The incineration above the first zone is therefore limited. The maximum temperature of the flames in the first zone is thereby reduced in proportion to the available oxygen percentage, wherein no damage to the waste grid can arise. In particular damage by drops of melted metal that weld themselves to the surface of the grid is avoided. With current techniques wherein a water-cooled grid is usually used, it is not possible to obtain this advantage to such a high degree.
    • Because the available energy that is released in the first zone is limited, because only a limited oxygen-based combustion takes place, the reaction of waste gas in the first zone is also limited. The waste material can therefore be fully pre-dried without all the material being incinerated in the first zone. This results in a good combustion situation in the second zone, where it is possible that no more air pre-heating is necessary, but where the incineration can still be well regulated. A homogeneous incineration can especially be achieved in the second zone when the incinerator grid (5) is placed at a lower point, as described earlier.
    • As mentioned previously, it is preferable that the flue gas recirculation is supplied as the primary gas in the first zone. In this way the waste gas from the incinerator flue after passing through a dust filter (11) are recirculated to the first zone. The oxygen percentage and the temperature are in this case reasonably firmly fixed (depending on the process design) and cannot be used for the actual control of the combustion process. The amount (the flow) of primary gas in the first zone is very easy to vary across a wide range.
    • Other possibilities for application as the first primary part of the gas supply are the use of flue gases from gas burners, gas-driven boilers, gas motors or gas turbines, for example. Especially important is the use of gas motors on the basis of available waste gas such as the biological gas that results from fermentation produced by purifying sewage water, for example. Because in this case the heat from the flue gases from the motor are also used efficiently, the efficiency increases significantly compared to the conventional separate set-up of the bio-gas motor wherein only the generated electricity and heat from the cooling water is used.
    • The flue gases arising from this can be mixed with air from the outside in order to achieve the required temperature combined with the required oxygen percentage, wherein a certain percentage of oxygen is still added to these gases. The amount of air that is added to the flue gases from the outside depends on the temperature that is necessary for the primary gas in the first zone. In general this will be from 100°C to 270°C. In the case of flue gases from a gas boiler, part of the heat of the flue gas will be recovered, wherein this gas will have a lowered temperature when it is supplied to the first zone. The oxygen percentage in this case will be from 0°C to 15°C. In addition the recovery of the heat from the burning of the gas in the gas boiler will result in a higher efficiency for the entire installation. Waste gas from a gas turbine can also be used in a suitable way. Especially in the case of flue gases from a gas turbine or gas motor, these can have a temperature higher than 270°C, for example 450°C or higher. If the waste contains some humidity and the flow in the first primary zone is mot too high, even with these temperatures the pyrolisis may be limited so that sufficient calorific value remains in the waste, so as to get a good combustion in the subsequent (second) zone. Mixing with cool air or cooler recirculation flue gas is possible as well. The invention is therefore also adaptable for similar cases wherein the temperature of the primary gas supply is higher than 300°C.
    • The flue gases from the waste incinerator, as shown in the figure, which are extracted after they have passed through the dust filter (11), are at a temperature of from 100°C to 270°C. A problem that can occur using similar flue gas recirculation is corrosion at 'cold spots' and the leaking of the recirculation gases to the outside in places where high pressure is present. Because of the temperature of the recirculation gases, similar corrosion is possible as the result of condensation of the recirculating gas in the pipes supplying gas to the incineration zone, for example underneath the incinerator grid (5). According to the preferred implementation it is best to enclose the supply of the first part of the primary gas (1) in a housing (12) which will be fed with gases, as shown in Figure 2. This makes good insulation possible. In addition, any leakage of the recirculating gases in this housing (12) will not lead to direct problems in the surrounding area because the leaked gases will be taken up and diluted in the housing (12). These gases can then be passed on to the incineration zone. As shown in Figure 2, the second part of the supply of the primary gas is used to maintain the surroundings of the supply of the first part of the gas supply (1) at the required, higher, temperature so that no condensation can take place. The supply (1), and especially the funnel under the grid (5) for the first zone, as shown in Figure 2, are situated in this case in a casing (12) which is kept at a temperature that is regulated by the second part of the gas supply, and which can also be kept at a higher pressure according to a further recommended implementation. Because this supply of the first part of the gas is insulated and surrounded by the air pre-heated by an air pre-heater, cold bridges can be prevented by this construction. If this air-preheater is the heater of the second part of the primary gas supply (7) this heater should work continuously at a sufficiently high temperature. If necessary, a bypass can be provided in this case wherein the primary gas that is supplied to the second zone does not pass through the air pre-heater (7). It is also possible, using a control valve, to provide a connection between the pre-heated air coming from the housing and the funnel for the first part of the gas supply in order to add oxygen-rich air to the first part of the supply.
    • The flue gas that is used for recirculation should preferably be withdrawn from the waste incinerator via a baghouse filter or electrostatic filter (11), so that the amount of dust in the recirculating gas is low and no problems arise with deposits occurring in the pipes. The temperature of the recirculation gas is from 170°C to 270°C, preferably in the area of 190°C and 230°C. This temperature must be high enough to prevent problems with the condensation of the flue gases, but also low enough for it to be treated by common baghouse filter materials, for example a special catalytic layer on the baghouse filter material. By means of an injection of a common and well-known ammonia in the first draught of the flue gas exhaust (SNCR) a catalytic conversion of NOx with NH3 is possible at this temperature, in combination with a breakdown of dioxin/furan.
    • The primary air for the first zone is regulated in order to control the fire in the second and third zones. The range of the gas supply via the first zone must be approximately 2.5% to 25% of the total amount of primary gas. For normal household waste with a thermal value of approximately 10,000 kilojoules per kilogram, 10% of the total is enough to dry the waste material well, through the high temperature of the recirculation gases used. In the case of good incineration (a short fierce fire in the second zone and a low percentage of remaining material) the drying process is more than good and the amount of the gas supply can be reduced to 5%. In the case where the waste does not combust enough the amount can be increased to 20%.
    • The incinerator grid (5) in the first zone, on which the waste material to be burnt (6) is initially placed does not have to be equipped with water cooling. When water cooling is used condensation of water from the recirculated gas can especially occur on the cooled parts. As mentioned previously, the recirculation gases have a very low oxygen content but a relatively high temperature, so that virtually no combustion takes place in the waste material above the first zone. In addition, because of the low oxygen content (at least lower than 20% by volume) flame temperatures can exist of up to a maximum of 500°C if the oxygen content is lower than 10% by volume. Because of the low oxygen content and the low temperature, the flame front can however hardly creep downwards. This means that damage to the incinerator grid (5) in the first zone by overheating of the grid cannot occur.
    • The waste material from the first zone that reaches the second zone is, however, very well dried and easily combustible. When this waste material reaches the second zone, a primary air supply is added with a normal oxygen content. This causes the flame front to move downwards virtually instantaneously. For this reason it is preferable that the incinerator grid in the second zone (5) is water-cooled. Because of the oxygen content as well as the good mix of the oxygen and the waste material to be burned, a very fierce fire will occur in the incinerator bed that burns right up to the grid (5). Because of the partial pyrolysis as a result of the high temperature of the primary gas, in the first zone the very easily combustible parts of the waste material (especially synthetic materials) already lose part of their thermal values and the peak temperatures in the second and third zones are lower than in the case where the waste material in the first zone is completely incinerated, as is the usual case when oxygen-rich air is used. The heat that the grid (5) absorbs and gives off to the cooling water is re-used in a suitable way.
    • If the combustion in the second and third zones goes very well, the primary gas for the second and third zones can be used without any further air pre-heating (7, 8), thereby lowering grid and flame temperature as well as reducing NOx formation. For normal household waste (9,000 to 11,000 kilojoules per kilogram) this will generally be the case when the waste material (6) is pre-dried in the first zone with the aid of recirculation gas. The gas that is supplied to the second and third zones can therefore be fresh air that can be supplied directly from the outside. As well as the energy saving that is achieved by this, it has the advantage that when the air is cold, the air speed will be lower for an equal supply of oxygen, wherein less flue dust will be created.
    • As described previously, the amount of oxygen that is supplied via the second and third zones to the waste material that is to be burnt (6) must be approximately stoichiometric or somewhat less (from 0.8 to 1.0 times the amount of oxygen necessary for the combustion). Depending on the type of waste material, for each zone approximately 15% to 40% of the total amount of the primary and third gas supply must be supplied to the second and third zones. The preference is that the amount of air that is supplied to the second and third zones is approximately from 25% to 30% of the total amount of gas that is used as the primary and third air supply. The result of this is that the highest heat develops in the waste bed itself. The coal residue, that is to say the percentage of unburned carbon, is therefore improved, and, because of the high temperatures, a maximum of heavy metals is driven out of the resulting slag. The quality of the resulting slag is therefore improved on account of the good drying in the first zone. As mentioned previously, the gas that is used for the second and third zones should preferably not be pre-heated, and in the case of a good enough supply of waste material that can therefore be pre-dried in order to achieve a rapid combustion in the second zone, an air pre-heater (7, 8) can be omitted if required. Contrary to the patent DE3915992A1 mentioned previously, is it not advisable to use a tailored oxygen content in the main combustion zone as well, because the combustion there occurs in an sub-stoichiometric way in any case.
    • The last zone, for example a fourth zone or even possibly a fifth zone or even a further zone if several similar zones are used, is a final incineration and cooling zone that only receives from 5% to 15% of the total amount of gas. Recirculated gas can possibly be used here. This has the advantage that the CO2 and H2O contained in the recirculated gas, if necessary supplemented with extra water, reacts with the calcium in the slag, wherein this goes through a rapid ageing process and there exists a lower pH value in any later leaching. In this way the quality of the slag is improved because there is less leaching. At times when the incineration in the main incineration zone is not going very well it can be useful to temporarily use an increased oxygen content directly after the main incineration zone in order to bring about a good combustion of the lower ash layer.
    • In order to obtain the stated low oxygen content in the secondary gas, it is preferable to supply recirculated gas, that is to say waste gas from the incinerator, as secondary gas.
    • For the third air supply the preference is the percentage is from 5% to 30% of the total amount of air supplied, preferably from 10% to 20%.
    • When the height of the flames above the waste bed (6) lessens due to inadequate combustion or insufficient ignition, it is preferable to reduce the amount of the third air supply, or possibly even shut if off completely, in order to correct the increasing oxygen percentage in the flue gases that is the result of inadequate combustion.
    • To regulate the capacity of the fire, the position of the main combustion zone and the extent to which the waste material is incinerated at the end of the grid, the following control quantities are available:
      • the quantity of waste material being fed to the grid
      • the transport of the waste material on the grid
      • the amount of air supplied to each zone
      • the air temperature in each zone
      • the oxygen content in the first zone.
    • This means that there are a large number of combinations possible. It is preferable to use the waste transport as the primary regulator for the capacity of the plant. The supply of waste material to the grid must be adjusted in order to obtain a good layer thickness. With respect to the creation of low emissions it is not recommended to regulate the amount of air in the main combustion zone, because this would upset the stoichiometry and therefore the balance of the combustion. Only adjustments smaller than approximately 10% of this flow or slow adjustments that are not faster than the supply of waste material to the combustion zone are possible here in order to manage the capacity and the position of the fire, respectively. With the individual regulating of the temperature in each zone proposed in Claim 2 it is possible to temporarily support a local lack of combustion in the main combustion zone without adapting the amount of the air supply. As regards the energy use, the limiting of the formation of NOx and the negative influence on the waste throughput, aim to keep the nominal air temperature in the main combustion zone as low as possible. This can be controlled by influencing the drying process in the first zone. For this a fixed, as low as possible, oxygen percentage is aimed for in principle, and a high temperature in the first primary gas supply. In this way the first primary gas supply becomes the primary regulating quantity for the drying of the waste material. This flow is regulated such that a good combustion takes place in the second zone, but not more than what is needed to prevent too fierce combustion.
    • From the above information it can be seen that the invention provides a much-improved technique for burning waste material in a waste incinerator. The extra investments that are necessary for the recirculation of the waste gas and the more complex construction for the supply of the recirculation gases to the first zone are compensated for by the fact that the waste gas cleaning can be carried out on a smaller scale, and the fact that a lot less energy is needed for the preheating of the primary part of the gas supply. The advantages are especially achieved because the incineration is better and because this results in an ash layer of a better quality. In addition there is an advantage in that waste material with a wide range of thermal values (from 5,000 to 16,000 kilojoules per kilogram) can be processed with incineration that is easily manageable. Because of the good pre-drying in the first zone, a more constant flame temperature and flame height can be achieved, wherein peaks and troughs in the steam production can be avoided. All these measures lead to improved energy efficiency. This makes it possible to achieve an efficiency of electricity production of at least 30% gross / 26% net, 33% gross / 29% net with improved performance, or 36% gross / 33% net with the best performance, when a method described in the present invention is combined with a method such as those described in the patent applications from the same inventors that are submitted together with this patent application. In addition the NOx content is reduced, first by the lower temperature in the incinerator, and secondly by the catalytic dust filter that can be effectively applied to this technique.
    • The invention is not limited to the implementation as shown in the figures and the description given above. These are only limited by the attached claims.

    Claims (19)

    1. A method for the incineration of waste material in an incinerator, comprising:
      supplying waste material to an incineration zone which contains an incineration grid, wherein the waste material is supplied to a first side of the incineration grid and is moved to a second side during the method,
      supplying from below through the incineration grid and the waste material placed thereon a primary gas so as to at least partially incinerate said waste material in a combustion area that stretches from the incineration grid to a first level above the incineration grid,
         characterized in that the incineration zone comprises at least two zones, the waste material being supplied to a first zone, and wherein during the method the waste material is moved to a successive connected zone, and that a first partial primary gas is supplied to the first zone with an oxygen content of less than 20% by volume and a temperature of from 50°C to 450°C, preferably from 50°C to 300°C.
    2. A method according to Claim 1, characterized in that the first partial primary gas supply comprises waste gas from an incinerator, preferably waste gas from a waste incinerator, a gas boiler, a gas motor or a gas turbine, waste gas from a waste incinerator being most preferred.
    3. A method according to Claim 2, characterized in that the waste gas from an incinerator is filtered, preferably through a dust filter.
    4. A method according to Claims 1, 2 or 3, characterized in that secondary gas is supplied near the first level above the incineration grid and a third gas is supplied at a second level above the first level, wherein the secondary gas has an oxygen content of < 20% by volume and the third gas has a higher oxygen content than the secondary gas.
    5. A method according to Claim 4, characterized in that the secondary gas contains waste gas from a waste incinerator.
    6. A method according to Claims 4 or 5, characterized in that the third gas comprises outside air.
    7. A method according to Claim 1 - 6, characterized in that the temperature is controlled for each partial primary gas supply.
    8. A method according to Claims 1 - 6, characterized in that the primary gas in the first zone has an oxygen content of from 0% to 15%, preferably from 0% to 10%.
    9. A method according to Claims 1 - 8, characterized in that the primary gas is supplied by at least three partial supplies, wherein at least:
      a first partial gas supply has an O2 content of from 0% to 15% and makes up from 2% to 25% of the total amount of primary gas;
      one or more successive partial gas supplies make up from 15% to 90% of the total amount of primary gas; and
      a last partial gas supply makes up from 5% to 25% of the total amount of primary gas.
    10. A method according to Claims 1 - 9, characterized in that the construction of the supply of the first partial primary gas supply, as far as these comprise waste gas from an incinerator, is enclosed by a housing, said housing being fed with gases at a temperature and/or pressure equal to or higher than the temperature or pressure, respectively, of the primary gas supply.
    11. A method according to Claim 10, characterized in that the housing is supplied with gases from a successive partial primary gas supply.
    12. A method according to Claims 10 - 11, characterized in that the gases from the housing are subsequently supplied to the incineration zone, for example by mixing them with the first partial primary gas supply.
    13. A method according to Claims 10 - 12, characterized in that the gases from the housing are subsequently supplied to a successive incineration zone, for example via a sidewall, or as secondary gas in the boiler as incineration gas.
    14. A method according to Claims 10 - 13, characterized in that the housing is supplied with gases at a temperature of at least 150°C.
    15. A method according to Claims 10 - 14, characterized in that the housing is supplied with gases at a higher pressure than that of the first partial primary gas supply.
    16. A method according to Claims 1 - 15, characterized in that the pipe for the supply of recirculation gases is enclosed in a pipe that is supplied with gases at a temperature and/or pressure equal to or higher than that of the first partial primary gas supply.
    17. A method according to Claims 1 - 16, characterized in that the first primary partial gas supply is controlled in order to influence the incineration in the connected main incineration zone by mainly varying the flow of the first primary partial gas supply and the oxygen content and/or temperature is subsequently or simultaneously varied.
    18. Waste incineration oven for a waste incinerator, consisting of an incinerator grid for the waste material to be incinerated, means for moving the waste to be incinerated from a first to a second side, primary gas supply means under the incinerator grid, secondary gas supply means at a first level above the incinerator grid and tertiary gas supply means at a second level above the incinerator grid and above the secondary gas supply means, characterized in that the secondary gas supply means is connected to an exhaust of off gas from the waste incinerator.
    19. Waste incineration oven according to claim 18, characterized in that the primary gas supply means consists of at least two separate supplies, the first primary gas supply means being located near the first side under the incinerator grid and the second primary gas supply means being located near the second side under the incinerator grid, and the first primary gas supply means being connected to an exhaust of off gas from a waste incinerator.
    EP01202285A 2000-06-14 2001-06-14 Waste incinerator flue gas recirculation Expired - Lifetime EP1164331B1 (en)

    Applications Claiming Priority (2)

    Application Number Priority Date Filing Date Title
    NL1015519A NL1015519C2 (en) 2000-06-14 2000-06-14 Flue gas recirculation at a waste incineration plant.
    NL1015519 2000-06-14

    Publications (2)

    Publication Number Publication Date
    EP1164331A1 true EP1164331A1 (en) 2001-12-19
    EP1164331B1 EP1164331B1 (en) 2006-09-06

    Family

    ID=19771591

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP01202285A Expired - Lifetime EP1164331B1 (en) 2000-06-14 2001-06-14 Waste incinerator flue gas recirculation

    Country Status (8)

    Country Link
    EP (1) EP1164331B1 (en)
    AT (1) ATE338917T1 (en)
    CY (1) CY1105828T1 (en)
    DE (1) DE60122829T2 (en)
    DK (1) DK1164331T3 (en)
    ES (1) ES2272406T3 (en)
    NL (1) NL1015519C2 (en)
    PT (1) PT1164331E (en)

    Cited By (12)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    WO2002075214A1 (en) * 2001-03-16 2002-09-26 Gas Technology Institute Advanced nox reduction for boilers
    AT412500B (en) * 2002-10-29 2005-03-25 Wilde Andreas Ing PROCESS FOR BURNING SMALL FUEL
    EP1751468A2 (en) * 2004-05-14 2007-02-14 Eco Technologies, LLC Starved air inclined hearth combustor
    DE102006005464B3 (en) * 2006-02-07 2007-07-05 Forschungszentrum Karlsruhe Gmbh Primary reduction of the formation of nitric oxide, nitrous oxide and ammonia in exhaust fumes comprises combusting fuel in a furnace having a gas hot bed, supplying a secondary oxygen gas and axially mixing the exhaust components
    JP2013257063A (en) * 2012-06-12 2013-12-26 Jfe Engineering Corp Waste incinerator, and method of incinerating waste
    JP2014513786A (en) * 2011-03-29 2014-06-05 ヒタチ ゾウセン イノバ アーゲー How to optimize the complete combustion of incinerator exhaust gas
    CN107631301A (en) * 2016-08-01 2018-01-26 北京北控环保工程技术有限公司 Vertical incinerator and dangerous waste thing subregion CIU
    TWI644058B (en) * 2014-09-12 2018-12-11 三菱重工環境 化學工程股份有限公司 Stoker combustion furnace
    JP2019045130A (en) * 2017-08-30 2019-03-22 マルチン ゲーエムベーハー フュア ウムヴェルト ウント エネルギーテヒニーク Combustion plant and method for operating combustion plant
    CN112783236A (en) * 2019-11-11 2021-05-11 株式会社盖亚 Drying control method for automatic cooling switching of dryer
    JP2021096046A (en) * 2019-12-18 2021-06-24 三菱重工業株式会社 State determination device for combustion facility, state determination method and program
    CN113406282A (en) * 2021-06-18 2021-09-17 国网安徽省电力有限公司电力科学研究院 Power station boiler tail flue oxygen field calibration method

    Families Citing this family (2)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE102009014010B4 (en) * 2009-03-19 2012-02-23 Georg Fischer Gmbh & Co. Kg Burner for solid, lumpy fuel
    CN105351944B (en) * 2015-12-10 2017-12-08 重庆三峰卡万塔环境产业有限公司 A kind of improved grate furnace garbage combustion device

    Citations (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE3345867A1 (en) * 1983-12-19 1985-06-27 Wärmetechnik Dr. Pauli GmbH, 8035 Gauting Process and apparatus for the thermal utilisation of residues
    JPS61143615A (en) * 1984-12-17 1986-07-01 Hitachi Zosen Corp Method of preventing corrosion for boiler tube using combustion exhaust gas
    DE3915992A1 (en) * 1988-05-19 1989-11-23 Theodor Koch Process for the reduction of nitrogen oxides
    DE4402172A1 (en) * 1994-01-26 1995-07-27 Steinmueller Gmbh L & C Method of refuse incineration in furnace with grate firing
    US5762008A (en) * 1993-04-20 1998-06-09 Martin Gmbh Fuer Umwelt- Und Enetgietechnik Burning fuels, particularly for incinerating garbage

    Patent Citations (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE3345867A1 (en) * 1983-12-19 1985-06-27 Wärmetechnik Dr. Pauli GmbH, 8035 Gauting Process and apparatus for the thermal utilisation of residues
    JPS61143615A (en) * 1984-12-17 1986-07-01 Hitachi Zosen Corp Method of preventing corrosion for boiler tube using combustion exhaust gas
    DE3915992A1 (en) * 1988-05-19 1989-11-23 Theodor Koch Process for the reduction of nitrogen oxides
    US5762008A (en) * 1993-04-20 1998-06-09 Martin Gmbh Fuer Umwelt- Und Enetgietechnik Burning fuels, particularly for incinerating garbage
    DE4402172A1 (en) * 1994-01-26 1995-07-27 Steinmueller Gmbh L & C Method of refuse incineration in furnace with grate firing

    Non-Patent Citations (1)

    * Cited by examiner, † Cited by third party
    Title
    PATENT ABSTRACTS OF JAPAN vol. 010, no. 342 (M - 536) 19 November 1986 (1986-11-19) *

    Cited By (17)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    WO2002075214A1 (en) * 2001-03-16 2002-09-26 Gas Technology Institute Advanced nox reduction for boilers
    AT412500B (en) * 2002-10-29 2005-03-25 Wilde Andreas Ing PROCESS FOR BURNING SMALL FUEL
    EP1751468A2 (en) * 2004-05-14 2007-02-14 Eco Technologies, LLC Starved air inclined hearth combustor
    EP1751468A4 (en) * 2004-05-14 2009-02-25 Eco Technologies Llc Starved air inclined hearth combustor
    DE102006005464B3 (en) * 2006-02-07 2007-07-05 Forschungszentrum Karlsruhe Gmbh Primary reduction of the formation of nitric oxide, nitrous oxide and ammonia in exhaust fumes comprises combusting fuel in a furnace having a gas hot bed, supplying a secondary oxygen gas and axially mixing the exhaust components
    US8544394B2 (en) 2006-02-07 2013-10-01 Forschungszentrum Karlsruhe Gmbh Method for reducing nitrogen oxide on the primary side in a two-stage combustion process
    JP2014513786A (en) * 2011-03-29 2014-06-05 ヒタチ ゾウセン イノバ アーゲー How to optimize the complete combustion of incinerator exhaust gas
    JP2013257063A (en) * 2012-06-12 2013-12-26 Jfe Engineering Corp Waste incinerator, and method of incinerating waste
    TWI644058B (en) * 2014-09-12 2018-12-11 三菱重工環境 化學工程股份有限公司 Stoker combustion furnace
    CN107631301A (en) * 2016-08-01 2018-01-26 北京北控环保工程技术有限公司 Vertical incinerator and dangerous waste thing subregion CIU
    JP2019045130A (en) * 2017-08-30 2019-03-22 マルチン ゲーエムベーハー フュア ウムヴェルト ウント エネルギーテヒニーク Combustion plant and method for operating combustion plant
    CN112783236A (en) * 2019-11-11 2021-05-11 株式会社盖亚 Drying control method for automatic cooling switching of dryer
    JP2021096046A (en) * 2019-12-18 2021-06-24 三菱重工業株式会社 State determination device for combustion facility, state determination method and program
    WO2021124660A1 (en) * 2019-12-18 2021-06-24 三菱重工業株式会社 Combustion facility state identification device, state identification method, and program
    JP7051792B2 (en) 2019-12-18 2022-04-11 三菱重工業株式会社 Combustion equipment condition identification device, condition identification method and program
    CN113406282A (en) * 2021-06-18 2021-09-17 国网安徽省电力有限公司电力科学研究院 Power station boiler tail flue oxygen field calibration method
    CN113406282B (en) * 2021-06-18 2022-08-30 国网安徽省电力有限公司电力科学研究院 Power station boiler tail flue oxygen field calibration method

    Also Published As

    Publication number Publication date
    DK1164331T3 (en) 2007-01-02
    DE60122829D1 (en) 2006-10-19
    ES2272406T3 (en) 2007-05-01
    CY1105828T1 (en) 2011-02-02
    ATE338917T1 (en) 2006-09-15
    DE60122829T2 (en) 2007-03-15
    EP1164331B1 (en) 2006-09-06
    NL1015519C2 (en) 2001-12-28
    PT1164331E (en) 2007-01-31

    Similar Documents

    Publication Publication Date Title
    EP1164331B1 (en) Waste incinerator flue gas recirculation
    JP3203255B2 (en) Method and apparatus for utilizing biofuel or waste material for energy production
    CA2121295C (en) Method for burning fuels, particularly for incinerating garbage
    CA2222819C (en) Method and device for producing and utilizing gas from waste materials
    US5762008A (en) Burning fuels, particularly for incinerating garbage
    US4679268A (en) Method and apparatus for burning solid waste products using a plurality of multiple hearth furnaces
    WO2006117579A1 (en) Method and apparatus for gasifying and burning pellets made from herbaceous plants
    CA2597159A1 (en) A method for reducing nitrogen oxide emissions of a bubbling fluidized bed boiler and an air distribution system of a bubbling fluidized bed boiler
    JP2004084981A (en) Waste incinerator
    CA1160456A (en) Process of heat-treating pellets
    JP2621895B2 (en) Method and apparatus for preheating waste metal for furnace
    JP2007127355A (en) Rubbish incinerating/melting method and device therefor
    GB2248488A (en) Introducing air into a rotary incinerator
    CN113405104A (en) Large-capacity high-load double-hearth waste incineration device
    CN209540898U (en) A kind of low latitude gas that bilayer is reverse compares waste incinerator
    CN111623345A (en) Multi-front-arch temperature-regulating biomass gasification hot blast stove
    CN217928780U (en) Circulating fluidized bed hot blast stove system
    CN2372565Y (en) Internal combustion life refuse incinerator
    CN216005774U (en) Marine solid waste plasma gasification melting system
    CN218972677U (en) Tail gas incinerator
    JPS61208420A (en) Method of combustion in dry retorting distillation gasification furnace
    EP1106918A1 (en) Boiler for fuel combustion and method for conducting gases therein
    CN2536955Y (en) Unpressurized energy-saving environmental protection boiler
    CN117570450A (en) Cold start process of internal circulating fluidized bed incinerator
    CZ33651U1 (en) Automatic boiler for agropellets combustion

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    17P Request for examination filed

    Effective date: 20020619

    AKX Designation fees paid

    Free format text: AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

    17Q First examination report despatched

    Effective date: 20041111

    GRAP Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOSNIGR1

    GRAS Grant fee paid

    Free format text: ORIGINAL CODE: EPIDOSNIGR3

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

    Effective date: 20060906

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    REG Reference to a national code

    Ref country code: IE

    Ref legal event code: FG4D

    REF Corresponds to:

    Ref document number: 60122829

    Country of ref document: DE

    Date of ref document: 20061019

    Kind code of ref document: P

    REG Reference to a national code

    Ref country code: GR

    Ref legal event code: EP

    Ref document number: 20060404140

    Country of ref document: GR

    REG Reference to a national code

    Ref country code: SE

    Ref legal event code: TRGR

    REG Reference to a national code

    Ref country code: DK

    Ref legal event code: T3

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: NV

    Representative=s name: ISLER & PEDRAZZINI AG

    REG Reference to a national code

    Ref country code: PT

    Ref legal event code: SC4A

    Free format text: AVAILABILITY OF NATIONAL TRANSLATION

    Effective date: 20061124

    ET Fr: translation filed
    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FG2A

    Ref document number: 2272406

    Country of ref document: ES

    Kind code of ref document: T3

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20070607

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PCAR

    Free format text: ISLER & PEDRAZZINI AG;POSTFACH 1772;8027 ZUERICH (CH)

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: CY

    Payment date: 20080623

    Year of fee payment: 8

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DK

    Payment date: 20090622

    Year of fee payment: 9

    Ref country code: ES

    Payment date: 20090629

    Year of fee payment: 9

    Ref country code: IE

    Payment date: 20090618

    Year of fee payment: 9

    Ref country code: MC

    Payment date: 20090619

    Year of fee payment: 9

    Ref country code: NL

    Payment date: 20090630

    Year of fee payment: 9

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: AT

    Payment date: 20090622

    Year of fee payment: 9

    Ref country code: FI

    Payment date: 20090624

    Year of fee payment: 9

    Ref country code: LU

    Payment date: 20090625

    Year of fee payment: 9

    Ref country code: PT

    Payment date: 20090605

    Year of fee payment: 9

    Ref country code: SE

    Payment date: 20090623

    Year of fee payment: 9

    Ref country code: TR

    Payment date: 20090605

    Year of fee payment: 9

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: BE

    Payment date: 20090623

    Year of fee payment: 9

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: CH

    Payment date: 20090624

    Year of fee payment: 9

    Ref country code: FR

    Payment date: 20090618

    Year of fee payment: 9

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: DE

    Payment date: 20090825

    Year of fee payment: 9

    Ref country code: GB

    Payment date: 20090623

    Year of fee payment: 9

    Ref country code: GR

    Payment date: 20090629

    Year of fee payment: 9

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: CY

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20090614

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: IT

    Payment date: 20090627

    Year of fee payment: 9

    REG Reference to a national code

    Ref country code: PT

    Ref legal event code: MM4A

    Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

    Effective date: 20101214

    BERE Be: lapsed

    Owner name: GEMEENTE AMSTERDAM, GEMEENTELIJKE DIENST AFVALVER

    Effective date: 20100630

    REG Reference to a national code

    Ref country code: NL

    Ref legal event code: V1

    Effective date: 20110101

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: MC

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100630

    Ref country code: FI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100614

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    Ref country code: DK

    Ref legal event code: EBP

    EUG Se: european patent has lapsed
    GBPC Gb: european patent ceased through non-payment of renewal fee

    Effective date: 20100614

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: PT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20101214

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: ST

    Effective date: 20110228

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100614

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100630

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110101

    Ref country code: IE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100614

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100630

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: NL

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110101

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100614

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100630

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: BE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100630

    Ref country code: GR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110104

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FD2A

    Effective date: 20110714

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100614

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110704

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DK

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100630

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100615

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: LU

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100614

    Ref country code: SE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100615

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: TR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20100614

    REG Reference to a national code

    Ref country code: GR

    Ref legal event code: ML

    Ref document number: 20060404140

    Country of ref document: GR

    Effective date: 20110104