EP1117899A1 - Recovery of submerged structures - Google Patents

Recovery of submerged structures

Info

Publication number
EP1117899A1
EP1117899A1 EP99947715A EP99947715A EP1117899A1 EP 1117899 A1 EP1117899 A1 EP 1117899A1 EP 99947715 A EP99947715 A EP 99947715A EP 99947715 A EP99947715 A EP 99947715A EP 1117899 A1 EP1117899 A1 EP 1117899A1
Authority
EP
European Patent Office
Prior art keywords
recovery apparatus
frame
submerged structure
submerged
frame means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP99947715A
Other languages
German (de)
English (en)
French (fr)
Inventor
Keith Dixon-Roche
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GBGB9821163.4A external-priority patent/GB9821163D0/en
Priority claimed from GBGB9821738.3A external-priority patent/GB9821738D0/en
Priority claimed from GBGB9825163.0A external-priority patent/GB9825163D0/en
Application filed by Individual filed Critical Individual
Publication of EP1117899A1 publication Critical patent/EP1117899A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/08Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
    • E21B19/09Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods specially adapted for drilling underwater formations from a floating support using heave compensators supporting the drill string

Definitions

  • This invention relates to recovery of submerged structures, and relates more particularly but not exclusively to methods and apparatus for the recovery of offshore platform jackets, i.e. seabed-mounted towers used for exploration and production of hydrocarbons from offshore locations.
  • offshore platform jackets i.e. seabed-mounted towers used for exploration and production of hydrocarbons from offshore locations.
  • Offshore platform jackets are very numerous, and eventually become redundant, at which time it is necessary or desirable that the jackets be removed from their operational site for reasons such as avoidance of navigational hazards, minimisation of environmental pollution, and recovery of recyclable materials.
  • Installation of an offshore platform jacket at a predetermined offshore location usually involves land- based prefabrication of the jacket, transport of the jacket on a barge from the fabrication site to the selected offshore location, and controlled sinking of the jacket to land upright at the location, followed by anchoring (e.g. by attaching the jacket base to the seabed using piles) .
  • Recovery of the jacket when redundant cannot readily be undertaken simply by reversing the installation procedure.
  • recovery apparatus for the recovery of a submerged structure comprising the combination of a frame means, controllable buoyancy means, and attachment means for attachment of the frame means to the submerged structure.
  • the frame means may be a generally planar construction dimensioned to conform to a generally planar facet of the submerged structure, e.g. one substantially vertical face of an offshore platform jacket.
  • the controllable buoyancy means may comprise airbag means which are controllably inflatable/deflatable for controllable variation of their displacement volume and hence of their buoyancy when submerged.
  • the controllable buoyancy means may either be permanently attached to the frame means, or selectively attachable to the submerged structure without being directly attached to the frame means.
  • the frame means is preferably provided with its own controllable buoyancy means sufficient at least to provide for controllable flotation/submersion of the frame means when the frame means is not attached to the submerged structure.
  • the attachment means for attachment of the frame means to the submerged structure may comprise a plurality of clamps, or may alternatively (or additionally) comprise a plurality of flexible straps capable of being secured around parts of the submerged structure such as the legs and/or struts of an offshore platform jacket.
  • the recovery apparatus may additionally comprise a base means to which the frame means is slidably and rotatably coupled, the base means preferably comprising mounting means by which the base means can be detachably mounted on a marine vessel such as a barge or self-propelled ship by which the recovery apparatus can be transported to the location of the submerged structure, and by which the recovery apparatus together with a recovered structure can be transported elsewhere.
  • a marine vessel such as a barge or self-propelled ship by which the recovery apparatus can be transported to the location of the submerged structure, and by which the recovery apparatus together with a recovered structure can be transported elsewhere.
  • the recovery apparatus of the present invention is distinguished from known forms of salvage equipment for sunken ships by the frame means being particularly suited by size and shape for attachment to one vertical face of a vertically elongate lattice-form tower whose upper end will normally be just above or just below the surface of the sea. (By contrast, a sunken ship will be horizontally elongate and of vertically limited extent, not of open tubular lattice form, and extending along the seabed rather than being upstanding therefrom) .
  • a method of recovering a submerged structure comprising the steps of providing a recovery apparatus according to the first aspect of the invention, transporting the recovery apparatus to the location of the submerged structure, controllably submerging the frame means of the recovery apparatus to lie alongside the submerged structure, attaching the frame means to the submerged structure, attaching the controllable buoyancy means to the submerged structure if not already attached to the frame means, detaching the submerged structure from the seabed if not already detached therefrom, and controlling the buoyancy of the controllable buoyancy means to raise the submerged structure towards the surface of the sea.
  • the recovery apparatus comprises a base means mounted on a marine vessel
  • the structure and attached frame means are preferably tilted to a substantially horizontal alignment after being raised towards the surface of the sea, and then translated on board the marine vessel for subsequent transport to another location.
  • Fig 1 is a schematic representation of various components of a first embodiment of recovery apparatus in accordance with the present invention
  • Figs 2-16 are schematic representations of the deployment and utilisation of the recovery apparatus of Fig 1
  • Fig 17 is a schematic representation of a first form of pivot utilisable in the recovery apparatus of Fig 1
  • Fig 18 is a schematic representation of a second form of pivot utilisable in the recovery apparatus of Fig 1
  • Figs 19 and 20 schematically represent a second embodiment of recovery apparatus in accordance with the present invention
  • Figs 21 and 22 schematically represent side and end elevations, respectively, of a third embodiment of recovery apparatus in accordance with the present invention
  • Figs 23-26 schematically represent successive stages in the deployment of the third embodiment. Referring first to Fig.l, this figure is sub-divided as follows :-
  • Figs 1A and IB are respectively side elevation and plan views of an elongate ladder frame 100 carried in a base frame 102.
  • the ladder frame 100 is a substantially planer tubular lattice structure having a length and breadth similar to those of one vertical face of an offshore platform jacket (not shown in Fig.l) which is intended to be recovered by use of recovery equipment incorporating the ladder frame 100.
  • the rectangular base frame 102 has a socket 104 (Fig IB) at each corner for mounting on four locating pins 106 (Fig.lC) secured on the deck of a barge (not shown in Fig.l) which serves for maritime transport of the recovery equipment to and from the location of the offshore platform jacket.
  • Pivot means allow the ladder frame 100 to slide and pivot on the base frame 102.
  • the ladder frame 100 and the base frame 102 are each hollow with access to their respective interiors controlled by respective valves (not shown) . With the frame interiors drained of water, the frames 100 and 102 float as depicted in Fig.lA wherein the sea surface is represented by the line 108.
  • the recovery equipment also comprises a suitable plurality of airbags, of which one is depicted in Fig. ID in the form of a tubular closed-end envelope 110 with integral attachment straps 112.
  • Fig. IE shows a side view of four airbags 110 attached by their respective straps 112 to a lattice-form submerged structure 114.
  • a barge 120 which is controllably ballastable (e.g. by controlled internal flooding) to selectively submerge at least one deck area 122 has the locating pins 106 secured to the deck area 122.
  • the barge 120 is ballasted to submerge the deck are 122 and the combination of the frames 100 and 102 is floated over the deck area 122 to align the sockets 104 with the pins 106.
  • the barge 120 is then deballasted to lift the pins 106 into the socket 104 which are then preferably locked together.
  • the barge 120 can then transport the recovery equipment to the location of jacket to be recovered.
  • a redundant offshore platform jacket 114 is prepared for recovery by the attachment of airbags 110 of a capacity adequate to lift the entire jacket 114 to the sea surface 108 (Fig. 3A) , partially (but not yet totally) severing the jacket legs at or near the seabed (Fig.3B), and partially inflating the airbags 110 to an extent that the combination of the jacket 114 and the airbags 110 have neutral buoyancy (Fig.3C).
  • the barge 120 carrying the frames 100 and 102 is brought up to a point near the prepared jacket 114, the barge 120 is submerged by ballasting until the ladder frame 100 floats on the sea surface 108, and the ladder frame 100 is slid horizontally off the base frame 102 by a means of an on-barge deck winch 124.
  • the frame 100 When the frame 100 has been moved nearly but not quite entirely off the base frame 102 (Fig.5) it is initially supported by self-flotation, and is then flooded at its outboard end (ie the end remote from the base frame 102; the right end as viewed in Fig.5) to sink the ladder frame 100 to a substantially vertical position (Fig.6) while still being pivotally coupled at its now upper end to the base frame 102.
  • the barge 120 with the vertically suspended ladder frame 100 is moved alongside the jacket 114 (Fig.7) and the frame 100 is then attached to a vertical side of the jacket 114 (Fig.8) by suitable attachment means (not shown in Fig.8) .
  • the barge 120 is deballasted to apply an upward force to the jacket 114 (Fig.9) which pre- tensions the jacket legs since they are not yet severed through and the jacket 114 thus remains anchored in the seabed.
  • the jacket legs are fully severed (Fig.10), for example by detonation of explosive cutting charges, while the barge 120 is manoeuvred by tugs such that local ocean current flows from the barge 120 towards the jacket 114.
  • the airbags 120 on the side of the jacket 114 opposite to the side to which the ladder frame 100 is attached are inflated (Fig.11) so as to begin to rotate the jacket 114 by lifting the lower end of the jacket towards the surface 108 at which the upper end of the jacket is suspended.
  • the barge 120 is ballasted to lower the pivot point of the coupling of the ladder frame 100 to the base frame 102 until the side of the jacket 114 to which the frame 100 is attached becomes substantially horizontal (Fig.14) whereafter the ladder frame 100 (with the still -attached jacket 114) is winched back onto the base frame 102 (Fig.15) .
  • the barge 120 is fully deballasted (Fig.16), and the deck load, including the recovered jacket 114 is lashed down for transit of the barge and jacket, with the recovery equipment, to a remote site where the jacket can be recycled, dumped, or otherwise disposed of.
  • a first form of sliding/pivoting connection 200 is shown in Fig.17 wherein Figs.l7A, 17B and 17C are respectively an elevation, a sectional side elevation, and a sectional plan view of the connection 200.
  • the connection 200 comprises a hollow housing 202 having a slot 204.
  • a bearing member 206 comprises a bearing shoe 208 having a flat face 210 which slidingly bears against a vertical barge wall 212 which extends fore and aft on either side of the stowed location of the ladder frame 100 (not shown in Fig.17) .
  • the bearing shoe face 210 and the barge wall contacted by the face 210 are each faced with replaceable polymer linings 214 and 216 to protect the steelwork.
  • a spigot 218 extends inward of the bearing shoe 208, and projects through the slot 204 for attachment to the ladder frame 100.
  • the vertical slot 204 allows limited vertical movement of the ladder frame 100.
  • connection 250 is the same, apart from a feature to be detailed, as the connection 200 and therefore has the same reference numerals applied.
  • the difference in the connection 250 with respect to the connection 200 lies in the slot 204 having a downwardly open end 252 to allow the bearing member 206 to be withdrawn from the housing 202 at choice.
  • the slot end 252 is closed against passage of the bearing member 206 by means of a removable transverse locking pin 254.
  • FIG. 19 A third form of sliding/pivoting connection, and its method of use, is depicted in Figs. 19 and 20.
  • the base frame 202 is provided with an elongated horizontal slot or slide 300 along either side of the stowed location of the ladder frame 100 (refer to Fig. IB) .
  • the ladder frame 100 is provided with a pair of spaced- apart spigots 302 on either side which run in the slots 300 and thereby support the ladder frame 100 on the base frame 102.
  • both of the locking pins 304 are withdrawn (Fig. 19B) to allow the previously retained spigot 302 to pass outboard of the slot 300 whereafter the outboard one of the pair of locking pins (but not the inboard locking pin) is re- inserted (Fig. 19C) .
  • the inboard locking pin 304 is re-inserted (Fig. 19D) to anchor what will become the upper end of the ladder frame 100 while allowing pivoting of the ladder frame 100 with respect to the base frame as shown in Fig. 20A (which corresponds to Fig. 6) .
  • the portion of the slide 300 adjacent the locking pins 304 is shown to an enlarged scale in Fig. 20B.
  • the slide 300 is vertically extended between the locking pins 304, which allows for heave of the ladder frame 100 due to oceanic turbulence during jacket recovery operations.
  • FIG. 21 and 22 are, respectively, an elevation and a side view of the third embodiment.
  • the third embodiment 400 comprises a ladder frame 402 in five sections 404 mutually linked by inter-section hinges 406.
  • Each section 404 is a cross-braced planar lattice having several transverse members 408 supporting controllably inflatable airbags 410.
  • Each section 404 also comprises a pair of clips 412 by which the ladder frame 402 can be secured to the transport barge.
  • Each section 404 can be secured to a jacket 114 by a pair of heavy-duty straps 414.
  • a similar frame with integral airbags can be attached to the opposite side of the jacket 114 to provide flotation functions in a manner analogous to that described with reference to the first embodiment.
  • the hinged multi-section ladder frame 402 allows its submersion and attachment to a jacket in several stages which will probably be easier than the handling of the single rigid ladder frame of the first embodiment .
  • By attaching initially only the top of the ladder frame 402 to the top of the jacket 114 (Fig. 23) and then progressively submerging the section 404, (Figs. 23, 24 and 25) until the entire frame 402 rests against the side of the jacket 114 (Fig. 26) greater control of deployment is possible than with a rigid frame of the same overall size.
  • the third embodiment 400 has advantages with respect to the first embodiment by comprising integrally mounted airbags which do not require separate deployment and attachment, an improved jacket-strengthening function and an improved distribution of dynamic stresses, and a skidding ability, i.e. the ability to act as a load- carrying sledge when being dragged across a deck or another solid surface (e.g land).
  • All embodiments of the recovery equipment have the advantages, compared to alternative jacket recovery equipment, of being economical and allowing recovery of jackets into shallow water.
  • the ladder frame has been described as lying fore and aft along the barge, but could alternatively lie athwart the barge, overhanging at each site.
  • the recovery equipment could be deployed between two barges or support vessels.
  • While the invention has particular applicability to the recovery of offshore platform jackets, the equipment and procedures of the invention can be applied to the recovery of other forms of submerged structure, whether or not such structures relate to exploration for and/or production of hydrocarbons.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
EP99947715A 1998-09-30 1999-09-30 Recovery of submerged structures Withdrawn EP1117899A1 (en)

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
GB9821163 1998-09-30
GBGB9821163.4A GB9821163D0 (en) 1998-09-30 1998-09-30 Offshore structure
GB9821738 1998-10-07
GBGB9821738.3A GB9821738D0 (en) 1998-10-07 1998-10-07 Offshore structure
GB9825163 1998-11-18
GBGB9825163.0A GB9825163D0 (en) 1998-11-18 1998-11-18 Offshore structure
PCT/GB1999/003250 WO2000019059A1 (en) 1998-09-30 1999-09-30 Recovery of submerged structures

Publications (1)

Publication Number Publication Date
EP1117899A1 true EP1117899A1 (en) 2001-07-25

Family

ID=27269495

Family Applications (1)

Application Number Title Priority Date Filing Date
EP99947715A Withdrawn EP1117899A1 (en) 1998-09-30 1999-09-30 Recovery of submerged structures

Country Status (5)

Country Link
EP (1) EP1117899A1 (no)
AU (1) AU6109099A (no)
MX (1) MXPA01003321A (no)
NO (1) NO20011595L (no)
WO (1) WO2000019059A1 (no)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202016100715U1 (de) * 2016-02-12 2017-05-15 OPHARDT R + D GmbH + Co. KG Vorrichtung für die maritime Anwendung

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3054267A (en) * 1957-05-29 1962-09-18 Petroleum Mortgage Company Method of and means for launching and erecting offshore structures
US3633369A (en) * 1970-04-20 1972-01-11 Brown & Root Method and apparatus for transporting and launching an offshore tower
US4683832A (en) * 1984-07-30 1987-08-04 Dysarz Edward D Device and method to set and salvage structures
US4690586A (en) * 1985-12-31 1987-09-01 Mobil Oil Corporation Method and apparatus for positioning an offshore platform jacket
US5097786A (en) * 1988-09-27 1992-03-24 Sheffield Woodrow W Method and apparatus for erecting and removing offshore structures
FR2657582A1 (fr) * 1990-01-31 1991-08-02 Bouygues Offshore Procede et dispositif pour recuperer la sous-structure d'une plate-forme en mer sans avoir a la demonter.
GB2315464A (en) * 1996-07-23 1998-02-04 John Gibson Agencies Ltd Transporting offshore structures
NO306289B1 (no) * 1996-12-18 1999-10-18 Offshore Shuttle As FremgangsmÕte og transportör til bruk ved installasjon eller fjerning av et understell for en offshoreplattform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO0019059A1 *

Also Published As

Publication number Publication date
NO20011595D0 (no) 2001-03-29
AU6109099A (en) 2000-04-17
MXPA01003321A (es) 2002-07-02
NO20011595L (no) 2001-05-25
WO2000019059A1 (en) 2000-04-06

Similar Documents

Publication Publication Date Title
AU701557B2 (en) Offshore apparatus and method for oil operations
US7033115B2 (en) Temporary floatation stabilization device and method
EP1766143B1 (en) Ballasting offshore platform with buoy assistance
KR101583494B1 (ko) 부유 빙해 선박용 계류 시스템
US6113314A (en) Disconnectable tension leg platform for offshore oil production facility
US6942427B1 (en) Column-stabilized floating structure with telescopic keel tank for offshore applications and method of installation
EP1189804B1 (en) Device for positioning and lifting a marine structure, particularly a platform deck
US5385427A (en) Method and apparatus for containment of oil and other pollutants
US6923598B2 (en) Method and apparatus for the lifting of offshore installation jackets
KR880002109B1 (ko) 해상 작업대
US4556341A (en) Work platform
WO2003066426A1 (en) Ballastable lifting vessel and method for lifting, transporting, positioning and installation of a marine structure, particularly one or several windmills
US3937027A (en) Method and apparatus for transporting and launching an offshore tower
NO783177L (no) Fremgangsmaate for bygging og transport av en marin konstruksjon samt et fartoey for bruk til dette
AU719838B2 (en) Transportation system and installation method
US3974657A (en) Modular offshore structure system
EP1117899A1 (en) Recovery of submerged structures
US6682265B1 (en) Method of establishing and/or operating a bore well in a seabed and a drilling vessel for use in connection therewith
CA2248578A1 (en) Disconnectable tension leg platform for offshore oil production facility
AU2002335802B2 (en) Achieving hydrostatic stability of a floating structure
US7104730B2 (en) Achieving hydrostatic stability of a floating structure
GB2269138A (en) Stabilising submersible barges.
EP0135393A2 (en) Sea-going self-propelled vessels for transport of prefabricated offshore structures
AU2002335802A1 (en) Achieving hydrostatic stability of a floating structure
Austin Offshore Rig Types

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20010417

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17Q First examination report despatched

Effective date: 20020913

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20040817