EP1108675B1 - Working method and protection system for passenger conveyer - Google Patents

Working method and protection system for passenger conveyer Download PDF

Info

Publication number
EP1108675B1
EP1108675B1 EP00107688A EP00107688A EP1108675B1 EP 1108675 B1 EP1108675 B1 EP 1108675B1 EP 00107688 A EP00107688 A EP 00107688A EP 00107688 A EP00107688 A EP 00107688A EP 1108675 B1 EP1108675 B1 EP 1108675B1
Authority
EP
European Patent Office
Prior art keywords
frame
conveyer
curing system
balustrade
escalator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP00107688A
Other languages
German (de)
French (fr)
Other versions
EP1108675A2 (en
EP1108675A3 (en
Inventor
Hirofumi Utsunomiya
Kazuhira Ojima
Chuichi Saitoh
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Ltd
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd, Hitachi Building Systems Co Ltd filed Critical Hitachi Ltd
Publication of EP1108675A2 publication Critical patent/EP1108675A2/en
Publication of EP1108675A3 publication Critical patent/EP1108675A3/en
Application granted granted Critical
Publication of EP1108675B1 publication Critical patent/EP1108675B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/222Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B31/00Accessories for escalators, or moving walkways, e.g. for sterilising or cleaning
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F13/00Arrangements for obstructing or restricting traffic, e.g. gates, barricades ; Preventing passage of vehicles of selected category or dimensions

Definitions

  • the present invention relates to a working method for a passenger conveyer such as an escalator, a moving sidewalk and the like, and a curing system for a passenger conveyer used during installing or repairing the passenger conveyer.
  • a curing system including sheets and panels has been arranged so as to surround the escalator in order to protect pedestrians around there from danger.
  • the conventional curing system of this kind is composed of, for example, a plurality of leg bodies capable of being set up on a floor surface where the escalator is to be installed, and the sheets and the panels described above which are fixed to the leg bodies in order to perform curing of the escalator.
  • the conventional curing system has a problem in that a large amount of curing members is required, the whole curing structure is complex and large, and the handling at transporting and managing is complicated. Further, there is a problem in that an additional area is required around the installation area because the leg bodies are set up on the floor near the installation area of the escalator, and accordingly the area occupied by the escalator during installing or repairing becomes so large as to restrict the pedestrian zone.
  • JP 04-144900 A shows a passenger conveyer with the features included in the first part of each of claims 1 and 5. More specifically, the document describes an outdoor-use escalator having a plurality of small roofs provided on the balustrade of the escalator.
  • JP 07-179284 A describes a passage system of a construction where an inclined passenger conveyer or escalator is newly installed over an existing stairway having a roof.
  • An object of the present invention is to provide a working method for a passenger conveyer and a curing system for a passenger conveyer by which curing of the passenger conveyer can be performed without leg bodies specifically used for curing and to be set up on a floor surface where the escalator is to be installed.
  • the working position of the passenger conveyer can be covered to perform desired curing without the specifically used leg bodies to be set up on the floor surface. Further, since the specifically used leg bodies are unnecessary, number of the members and installation area for the curing part can be reduced, the structure can be simplified, and the area around the passenger conveyer can be kept relatively wider.
  • FIG. 1 to FIG. 3 An embodiment of a curing system for a passenger conveyer in accordance with the present invention will be described below, referring to FIG. 1 to FIG. 3 .
  • the curing system 6 composing the first embodiment is arranged so as to cover over the whole side area in one side of the passenger conveyer, for example, the escalator to be cured.
  • the escalator 1 comprises a frame 2 forming the main body rising up, for example, to a position of a balustrade 3, steps 4, hand rails 5 and so on.
  • the curing system 6 covering the whole side area in one side portion of the escalator comprises a frame body 7; a sheet-shaped body, for example, a net body 8 attached to the frame body 7; and projecting parts 9, 10 by which the frame body 7 is fixed to, the frame 2 of the escalator 1. Holes 11, 12 provided in the projecting parts 9, 10 are fit to holes 13, 14 provided in the frame 2, respectively, and the curing system 6 is supported by the escalator 1 by inserting a bolt 15 into the holes 11, 13 and a bolt 16 into the holes 12, 14 and fastening the bolts 15, 16.
  • a holding means for holding the curing system 6 to the passenger conveyer 1 itself that is, a fixing means for fixing the curing system 6 to the frame 2 composing the main body of the escalator 1 is composed of the projecting parts 9, 10; the holes 11, 12 in the projecting parts 9, 10; the holes 13, 14 formed in the frame 2; and the bolts 15, 16.
  • the first embodiment constructed as described above restricts equipment, machines, work tools to project from the outside of the escalator 1, and accordingly it is possible to protect the environment around the escalator 1. Therefore, during the installation work or the repairing work, it is possible to secure the safety and the protection to pedestrians walking, for example, on the staircase 22.
  • the curing system 6 can be formed in a simple structure with less number of members since the leg bodies need not to be set up on the floor surface of the upper floor 20, the floor surface of the lower floor 21 and the staircase 22. Further, it is possible to reduce the total volume of the curing system by the amount of the leg bodies, and it is easy to handle the curing system in transportation and management. Furthermore, the area around the escalator 1 can be kept relatively wider, and the restriction to the pedestrian zone can be moderated.
  • the first embodiment described above comprises the holes 11, 12 in the frame 2, the holes 13, 14 formed in the frame 2 and bolts 15, 16 as the fixing means for fixing the curing system 6 to the frame 2
  • the curing system 6 may be fixed to the frame 2 by welding the projecting parts 9, 10 to the frame 2 without providing the holes 11, 12, 13, 14 and the bolts 15, 16.
  • number of the projecting parts 9, 10 in the frame body 7 may be appropriately determined depending on necessity.
  • the first embodiment described above basically comprises only the curing system 6, a lighting fixture, a ventilation unit and so on may be added.
  • FIG. 4 and FIG. 5 A second embodiment in accordance with the present invention will be describe below, referring to FIG. 4 and FIG. 5 .
  • the passenger conveyer to be cured is also an escalator 1 installed on a staircase 22 arranged between an upper floor 20 and a lower floor 21 in a building, similarly to the first embodiment described above, and the second embodiment has a curing system 30 covering over the whole side area in one side of the escalator 1.
  • the curing system 30 comprises a frame body 31, plate-shaped bodies, that is, panels 32 having solidity to be attached to the frame body 31, and extension parts 39 extending the panels 32 up to near a ceiling part 23 of a building.
  • the curing system comprises projecting parts 33, 34 in the frame body 31, holes 35, 36 provided in the projecting parts 33, 34, holes formed in the frame 2 so as to fit to the holes 35, 36 and bolts 37, 38 to be inserted into the corresponding holes.
  • a holding means for holding the curing system 30 to the passenger conveyer 1 itself that is, a fixing means for fixing the curing system 30 to the frame 2 composing the main body of the escalator 1 is composed of the projecting parts 33, 34 in the frame body 31; the holes 35, 36 and so on; and the bolts 37, 38.
  • the second embodiment constructed as described above can also perform curing of the escalator 1 without any leg bodies to be set up on the upper floor 20, the lower floor 21 and the staircase 22, and has the operation and the effects similar to those of the first embodiment described above.
  • the extension parts 39 of the curing system 30 cover the wider range extending up to near a ceiling part 23 of a building, it is possible to more certainly protect the environment around the escalator 1 during installation work or repairing work of the escalator 1. Therefore, it is possible to more certainly secure the safety and the protection to pedestrians walking on the staircase 22.
  • FIG. 6 shows a third embodiment in accordance with the present invention.
  • the frame body 31 comprises a hook-shaped hooking part 41 as well as the projecting part 33.
  • a hole 35 is formed in the projecting part 33, and a hole fit to the hole 35 is formed at the corresponding position in the frame 2.
  • a bolt 37 is inserted into the hole 35 and the hole.
  • a hook-shaped hooking part 40 for hooking the above-mentioned hooking part 41 is provided in the frame 2.
  • the other structures are similar to those in the second embodiment described above.
  • the above-mentioned hooking part 41 in the frame body 31 and the hooking part 40 in the frame 2 compose a holding means for holding the curing system 30 to the escalator 1 itself, that is, a hooking means for hooking the curing system 30 to the frame 2.
  • the hooking part 41 in the frame body 31 is initially hooked to the hooking part 40 in the frame 2, and the hole 35 of the projecting part 33 in the frame body 31 is fit to the hole formed in the frame 2, and then the bolt 37 is inserted the hole 35 and the hole and fastened.
  • the third embodiment constructed as described above can also perform curing of the escalator 1 without any leg bodies to be set up on the upper floor 20, the lower floor 21 and the staircase 22, and has the operation and the effects similar to those of the second embodiment described above.
  • the bolt 37 is fastened, for example, by hand work after hooking the hooking part 41 in the frame body 31 to the hooking part 40 in the frame 2, manpower of the fastening work using the bolts can be reduced. Therefore, the attaching work of the curing system 30 can be efficiently performed.
  • the third embodiment has the projecting part 33, and the projecting part 33 is fastened to the frame 2 through the bolt 37.
  • a hooking part similar to the hooking part 41 is provided instead of the projecting part 33, and a hooking part to be hooked with the hooking part is provided in the frame 2.
  • the curing system 6 or 30 is arranged so as to cover over the whole side area in one side of the escalator 1.
  • the present invention is not limited that the curing system 6 or 30 is arranged in such a manner.
  • the curing system may be arranged so as to cover a part, for example, a half of the a side area in one side of the escalator 1, or may be arranged so as to cover over the whole side area in both side of the escalator 1, or may be arranged so as to cover over the landings in the upper and the lower floors of the escalator 1, if necessary.
  • the escalator 1 is taken as an example of the passenger conveyer to be cured.
  • the escalator 1 may be a generally used escalator, or may be a recently developed thin escalator of which the total height is lower than that of the general escalator by 20 to 30 %.
  • the curing system may be employed for a moving sidewalk instead of the escalator 1.
  • the passenger conveyer is installed in a staircase in a railway station
  • civil work is performed to excavate an installation place such as part of the upper and the lower floors and the staircase where the passenger conveyer is to be installed.
  • a simple fence or cover is put up around the working zone so as to prevent the passengers in the railway station from entering in there.
  • the passenger conveyer is brought in to be temporarily installed in the excavated portion.
  • the curing system is held with the frame of the passenger conveyer to surround the working zone.
  • the fourth step assembling of the remaining parts of the passenger conveyer and accurate positioning of the passenger conveyer are performed. Further, after the fourth step, the fifth step is performed to remove the curing system and to attach the exterior features of the passenger conveyer. Thus, the installation of the passenger conveyer is completed.
  • the work from the first step to the fifth step described above is a procedure for newly installing a passenger conveyer.
  • the curing system described above is not always necessary to be supported with the frame of the passenger conveyer and the curing system may be supported using the balustrade or the like.
  • the total weight of the curing system described above is completely supported by the passenger conveyer side.
  • the curing system may be set up on the floors in the upper and the lower floors and on the staircase where the passenger conveyer is installed. Thereby, the weight of the curing system is sustained by the floors and the staircase, and the passenger conveyer side only prevents the set-up curing system from falling down.
  • curing of the passenger conveyer can be performed without the specifically used leg bodies to be set up on the floor surface, number of the members for the curing system can be reduced compared to the conventional curing system, and the structure of the curing system can be simplified. Thereby, the manufacturing cost can be reduced. Further, the total volume of the curing system can be reduced compared to that of the conventional curing system by the amount of eliminating the leg bodies, and the handling at transporting and managing can be easily performed. Furthermore, the area around the passenger conveyer can be kept wider compared to the conventional curing system, and accordingly the restrictions to the pedestrian zone and so on can be moderated.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Escalators And Moving Walkways (AREA)

Description

    BACKGROUND OF THE INVENTION FIELD OF THE INVENTION
  • The present invention relates to a working method for a passenger conveyer such as an escalator, a moving sidewalk and the like, and a curing system for a passenger conveyer used during installing or repairing the passenger conveyer.
  • BACKGROUND OF THE INVENTION
  • When a passenger conveyer, for example, an escalator is installed or an installed escalator is repaired, a curing system including sheets and panels has been arranged so as to surround the escalator in order to protect pedestrians around there from danger.
  • The conventional curing system of this kind is composed of, for example, a plurality of leg bodies capable of being set up on a floor surface where the escalator is to be installed, and the sheets and the panels described above which are fixed to the leg bodies in order to perform curing of the escalator.
  • Therefore, the conventional curing system has a problem in that a large amount of curing members is required, the whole curing structure is complex and large, and the handling at transporting and managing is complicated. Further, there is a problem in that an additional area is required around the installation area because the leg bodies are set up on the floor near the installation area of the escalator, and accordingly the area occupied by the escalator during installing or repairing becomes so large as to restrict the pedestrian zone.
  • JP 04-144900 A shows a passenger conveyer with the features included in the first part of each of claims 1 and 5. More specifically, the document describes an outdoor-use escalator having a plurality of small roofs provided on the balustrade of the escalator.
  • JP 07-179284 A describes a passage system of a construction where an inclined passenger conveyer or escalator is newly installed over an existing stairway having a roof.
  • SUMMARY OF THE INVENTION
  • An object of the present invention is to provide a working method for a passenger conveyer and a curing system for a passenger conveyer by which curing of the passenger conveyer can be performed without leg bodies specifically used for curing and to be set up on a floor surface where the escalator is to be installed.
  • The above-mentioned object is met by the working method defined in claim 1, the passenger conveyor defined in claim 5, and the curing system defined in claim 6.
  • According to the invention, the working position of the passenger conveyer can be covered to perform desired curing without the specifically used leg bodies to be set up on the floor surface. Further, since the specifically used leg bodies are unnecessary, number of the members and installation area for the curing part can be reduced, the structure can be simplified, and the area around the passenger conveyer can be kept relatively wider.
  • BRIEF DESCRIPTION OF DRAWINGS
    • FIG. 1 is a side view showing a first embodiment of a curing system for a passenger conveyer in accordance with the present invention.
    • FIG. 2 is an enlarged cross-sectional view showing the I-portion of FIG. 1.
    • FIG. 3 is a view showing the state that the curing system shown in FIG. 2 is attached to a frame composing the main body of the passenger conveyer.
    • FIG. 4 is a side view showing a second embodiment in accordance with the present invention.
    • FIG. 5 is an enlarged cross-sectional view showing the II-portion of FIG. 4.
    • FIG. 6 is a cross-sectional view showing a main portion of a third embodiment in accordance with the present invention.
    DESCRIPTION OF THE PREFERRED EMBODIMENTS
  • An embodiment of a curing system for a passenger conveyer in accordance with the present invention will be described below, referring to FIG. 1 to FIG. 3.
  • In the first embodiment shown in FIG. 1 to FIG. 3, the curing system 6 composing the first embodiment is arranged so as to cover over the whole side area in one side of the passenger conveyer, for example, the escalator to be cured.
  • The escalator 1 comprises a frame 2 forming the main body rising up, for example, to a position of a balustrade 3, steps 4, hand rails 5 and so on. There are an upper floor 20 and a lower floor 21 in a building where the escalator 1 is to be installed, and there is a staircase 22 between the upper floor 20 and the lower floor 21. That is, the escalator 1 is an escalator which is installed on one side of the staircase 22, for example, an escalator installed in a railway station.
  • The curing system 6 covering the whole side area in one side portion of the escalator comprises a frame body 7; a sheet-shaped body, for example, a net body 8 attached to the frame body 7; and projecting parts 9, 10 by which the frame body 7 is fixed to, the frame 2 of the escalator 1. Holes 11, 12 provided in the projecting parts 9, 10 are fit to holes 13, 14 provided in the frame 2, respectively, and the curing system 6 is supported by the escalator 1 by inserting a bolt 15 into the holes 11, 13 and a bolt 16 into the holes 12, 14 and fastening the bolts 15, 16.
  • A holding means for holding the curing system 6 to the passenger conveyer 1 itself, that is, a fixing means for fixing the curing system 6 to the frame 2 composing the main body of the escalator 1 is composed of the projecting parts 9, 10; the holes 11, 12 in the projecting parts 9, 10; the holes 13, 14 formed in the frame 2; and the bolts 15, 16.
  • During installation work or repairing work of the escalator 1, the first embodiment constructed as described above restricts equipment, machines, work tools to project from the outside of the escalator 1, and accordingly it is possible to protect the environment around the escalator 1. Therefore, during the installation work or the repairing work, it is possible to secure the safety and the protection to pedestrians walking, for example, on the staircase 22.
  • Particularly, the curing system 6 can be formed in a simple structure with less number of members since the leg bodies need not to be set up on the floor surface of the upper floor 20, the floor surface of the lower floor 21 and the staircase 22. Further, it is possible to reduce the total volume of the curing system by the amount of the leg bodies, and it is easy to handle the curing system in transportation and management. Furthermore, the area around the escalator 1 can be kept relatively wider, and the restriction to the pedestrian zone can be moderated.
  • Although the first embodiment described above comprises the holes 11, 12 in the frame 2, the holes 13, 14 formed in the frame 2 and bolts 15, 16 as the fixing means for fixing the curing system 6 to the frame 2, the curing system 6 may be fixed to the frame 2 by welding the projecting parts 9, 10 to the frame 2 without providing the holes 11, 12, 13, 14 and the bolts 15, 16.
  • Further, number of the projecting parts 9, 10 in the frame body 7 may be appropriately determined depending on necessity.
  • Furthermore, although the first embodiment described above basically comprises only the curing system 6, a lighting fixture, a ventilation unit and so on may be added.
  • A second embodiment in accordance with the present invention will be describe below, referring to FIG. 4 and FIG. 5.
  • In the second embodiment, the passenger conveyer to be cured is also an escalator 1 installed on a staircase 22 arranged between an upper floor 20 and a lower floor 21 in a building, similarly to the first embodiment described above, and the second embodiment has a curing system 30 covering over the whole side area in one side of the escalator 1.
  • The curing system 30 comprises a frame body 31, plate-shaped bodies, that is, panels 32 having solidity to be attached to the frame body 31, and extension parts 39 extending the panels 32 up to near a ceiling part 23 of a building.
  • As shown in FIG. 5, the curing system comprises projecting parts 33, 34 in the frame body 31, holes 35, 36 provided in the projecting parts 33, 34, holes formed in the frame 2 so as to fit to the holes 35, 36 and bolts 37, 38 to be inserted into the corresponding holes.
  • A holding means for holding the curing system 30 to the passenger conveyer 1 itself, that is, a fixing means for fixing the curing system 30 to the frame 2 composing the main body of the escalator 1 is composed of the projecting parts 33, 34 in the frame body 31; the holes 35, 36 and so on; and the bolts 37, 38.
  • The second embodiment constructed as described above can also perform curing of the escalator 1 without any leg bodies to be set up on the upper floor 20, the lower floor 21 and the staircase 22, and has the operation and the effects similar to those of the first embodiment described above. Particularly in the second embodiment, since the extension parts 39 of the curing system 30 cover the wider range extending up to near a ceiling part 23 of a building, it is possible to more certainly protect the environment around the escalator 1 during installation work or repairing work of the escalator 1. Therefore, it is possible to more certainly secure the safety and the protection to pedestrians walking on the staircase 22.
  • FIG. 6 shows a third embodiment in accordance with the present invention. In the third embodiment, the frame body 31 comprises a hook-shaped hooking part 41 as well as the projecting part 33. A hole 35 is formed in the projecting part 33, and a hole fit to the hole 35 is formed at the corresponding position in the frame 2. A bolt 37 is inserted into the hole 35 and the hole. Further, a hook-shaped hooking part 40 for hooking the above-mentioned hooking part 41 is provided in the frame 2. The other structures are similar to those in the second embodiment described above.
  • The above-mentioned hooking part 41 in the frame body 31 and the hooking part 40 in the frame 2 compose a holding means for holding the curing system 30 to the escalator 1 itself, that is, a hooking means for hooking the curing system 30 to the frame 2.
  • When the curing system 30 is attached to the escalator 1 in the third embodiment, the hooking part 41 in the frame body 31 is initially hooked to the hooking part 40 in the frame 2, and the hole 35 of the projecting part 33 in the frame body 31 is fit to the hole formed in the frame 2, and then the bolt 37 is inserted the hole 35 and the hole and fastened.
  • Similarly to the second embodiment, the third embodiment constructed as described above can also perform curing of the escalator 1 without any leg bodies to be set up on the upper floor 20, the lower floor 21 and the staircase 22, and has the operation and the effects similar to those of the second embodiment described above. Particularly in the third embodiment, since the bolt 37 is fastened, for example, by hand work after hooking the hooking part 41 in the frame body 31 to the hooking part 40 in the frame 2, manpower of the fastening work using the bolts can be reduced. Therefore, the attaching work of the curing system 30 can be efficiently performed.
  • The third embodiment has the projecting part 33, and the projecting part 33 is fastened to the frame 2 through the bolt 37. However, it is also possible to employ the structure that a hooking part similar to the hooking part 41 is provided instead of the projecting part 33, and a hooking part to be hooked with the hooking part is provided in the frame 2.
  • In each of the above-mentioned embodiments, the curing system 6 or 30 is arranged so as to cover over the whole side area in one side of the escalator 1. The present invention is not limited that the curing system 6 or 30 is arranged in such a manner. For example, the curing system may be arranged so as to cover a part, for example, a half of the a side area in one side of the escalator 1, or may be arranged so as to cover over the whole side area in both side of the escalator 1, or may be arranged so as to cover over the landings in the upper and the lower floors of the escalator 1, if necessary.
  • In each of the above-mentioned embodiments, the escalator 1 is taken as an example of the passenger conveyer to be cured. However, the escalator 1 may be a generally used escalator, or may be a recently developed thin escalator of which the total height is lower than that of the general escalator by 20 to 30 %. Further, the curing system may be employed for a moving sidewalk instead of the escalator 1.
  • Each of the above-mentioned embodiments has described on the curing system. The procedure of attaching the above-mentioned curing system will be described below.
  • For example, in a case where the passenger conveyer is installed in a staircase in a railway station, as the first step performed during a time slot when passengers are not in the railway station, civil work is performed to excavate an installation place such as part of the upper and the lower floors and the staircase where the passenger conveyer is to be installed. After completion of the excavation work, a simple fence or cover is put up around the working zone so as to prevent the passengers in the railway station from entering in there. As the second step during the time slot when passengers are not in the railway station, the passenger conveyer is brought in to be temporarily installed in the excavated portion. After the temporary installation work, as the third step the curing system is held with the frame of the passenger conveyer to surround the working zone. In this state, as the fourth step, assembling of the remaining parts of the passenger conveyer and accurate positioning of the passenger conveyer are performed. Further, after the fourth step, the fifth step is performed to remove the curing system and to attach the exterior features of the passenger conveyer. Thus, the installation of the passenger conveyer is completed.
  • The work from the first step to the fifth step described above is a procedure for newly installing a passenger conveyer. However, when a passenger conveyer already installed is repaired or modified, the curing system described above is not always necessary to be supported with the frame of the passenger conveyer and the curing system may be supported using the balustrade or the like.
  • Further, in each of the above-mentioned embodiments, the total weight of the curing system described above is completely supported by the passenger conveyer side. However, when the curing system is huge, the curing system may be set up on the floors in the upper and the lower floors and on the staircase where the passenger conveyer is installed. Thereby, the weight of the curing system is sustained by the floors and the staircase, and the passenger conveyer side only prevents the set-up curing system from falling down.
  • As having been described above, according to the present invention, curing of the passenger conveyer can be performed without the specifically used leg bodies to be set up on the floor surface, number of the members for the curing system can be reduced compared to the conventional curing system, and the structure of the curing system can be simplified. Thereby, the manufacturing cost can be reduced. Further, the total volume of the curing system can be reduced compared to that of the conventional curing system by the amount of eliminating the leg bodies, and the handling at transporting and managing can be easily performed. Furthermore, the area around the passenger conveyer can be kept wider compared to the conventional curing system, and accordingly the restrictions to the pedestrian zone and so on can be moderated.

Claims (8)

  1. A working method for a passenger conveyer (1), which comprises a balustrade (3), a frame (2) constituting a main body of said conveyer (1) and holding said balustrade (3), steps (4), and a hand rail (5) provided on said balustrade (3),
    characterized in that
    said frame (2) supports a curing system (6), the curring system (6) comprising a frame body (7), a sheet-shaped body, for example a net body (8), and projecting parts (9,10) provided with holes (11,12) by which the frame body (7) is fixed to the frame (2) of the conveyor (1), for covering a working area of said conveyer (1) when the conveyer is under installation or repair;
    said curing system (6) is removed on completion of said installation or repair work; and
    exterior equipment for said conveyer (1) is installed thereafter.
  2. The method of claim 1, wherein said frame body (7) is fixed at upper and lower portions of said frame (2) to prevent said curing system (6) from falling down.
  3. The method of any preceding claim wherein, for installing the passenger conveyer (1) in a staircase (22) of a railway station, the following steps are performed in this order:
    1. excavating an installation place for installing said frame (2),
    2. installing said frame (2) in the excavated site,
    3. using said frame (2) for supporting a curing system (6), which comprises a sheet, net (8), or panel,
    4. assembling said conveyer (1),
    5. removing said curing system (6), and
    6. attaching exterior equipment of said conveyer (1).
  4. A passenger conveyer (1) comprising a balustrade (3), a frame (2) constituting a main body of said conveyer (1) and holding said balustrade (3), steps (4), and a hand rail (5) provided on said balustrade (3),
    characterised in that said frame (2) has a supporting portion for supporting a curing system (6) via holding means (11 ... 14; 40, 41) provided on the curing system (6), the curring system (6) comprising a frame body (7), a sheet-shaped body, for example a net body (8), and projecting parts (9,10) provided with holes (11,12) by which the frame body (7) is fixed to the frame (2) of the conveyor (1), for covering a working area of said conveyer (1) when said conveyer (1) is under installation or repair.
  5. A curing system (6) for installation or repair work on a passenger conveyer (1), the conveyer (1) comprising a balustrade (3), a frame (2) constituting a main body of said conveyer (1) and holding said balustrade (3), steps (4), and a hand rail (5) provided on said balustrade (3),
    wherein said curing system (6) is secured to a frame body (7) comprising holding means for holding said frame body (7) on said frame (2), said curring system (6) comprising a frame body (7), a sheet-shaped body, for example a net body (8), and projecting parts (9,10) provided with holes (11,12) by which the frame body (7) is fixed to the frame (2) of the conveyor (1), for covering a working area of said installation or repair work.
  6. The system of claim 5, wherein said holding means comprises a hook-shaped attaching means (40, 41) for attaching said curing system(6) to said frame (2) to prevent the curing system (6) from falling off.
  7. The system of any one of claims 5 to 6, wherein said curing system (6) comprises an extension part (39) adapted to extend from a lower floor (21) in a building up to near a ceiling (23) thereof.
  8. The system of any one of claims 5 to 7, wherein said conveyer (1) is an escalator.
EP00107688A 1999-12-16 2000-04-10 Working method and protection system for passenger conveyer Expired - Lifetime EP1108675B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP35807599A JP3454766B2 (en) 1999-12-16 1999-12-16 Passenger conveyor construction method and passenger conveyor curing device
JP35807599 1999-12-16

Publications (3)

Publication Number Publication Date
EP1108675A2 EP1108675A2 (en) 2001-06-20
EP1108675A3 EP1108675A3 (en) 2004-02-04
EP1108675B1 true EP1108675B1 (en) 2012-12-12

Family

ID=18457415

Family Applications (1)

Application Number Title Priority Date Filing Date
EP00107688A Expired - Lifetime EP1108675B1 (en) 1999-12-16 2000-04-10 Working method and protection system for passenger conveyer

Country Status (6)

Country Link
EP (1) EP1108675B1 (en)
JP (1) JP3454766B2 (en)
KR (1) KR20010066772A (en)
CN (1) CN1167603C (en)
MY (1) MY133186A (en)
TW (1) TW522136B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11970365B2 (en) 2020-03-04 2024-04-30 Inventio Ag Protective device during assembly work on an escalator or a moving walkway

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101966961A (en) * 2010-10-29 2011-02-09 江南嘉捷电梯股份有限公司 Guardrail structure on escalator or moving walk
CN102838036B (en) * 2012-09-19 2014-03-26 苏州富士电梯有限公司 Exit and entrance panel installing structure of escalator or moving pavement
CN104310184B (en) * 2014-08-21 2017-07-11 西尼机电(杭州)有限公司 Awning integral type escalator
ES2564908B1 (en) * 2015-10-05 2017-01-04 Thyssenkrupp Elevator Innovation Center, S. A. Corridor, ramp or escalator
WO2019185573A1 (en) 2018-03-28 2019-10-03 Inventio Ag Fixing device for fixing a temporary maintenance railing to a supporting structure of a people-transporting system
DE102018220899A1 (en) * 2018-12-04 2020-06-04 Thyssenkrupp Ag Balustrade for a passenger conveyor, passenger conveyor with such a balustrade and method for modernizing a passenger conveyor
TW202300431A (en) 2021-06-11 2023-01-01 瑞士商伊文修股份有限公司 Supporting structure of an escalator or a moving walkway

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04144900A (en) * 1990-10-05 1992-05-19 Toshiba Corp Escalator
JPH07179284A (en) * 1993-12-24 1995-07-18 Hitachi Ltd Passageway facility
JPH10182047A (en) * 1996-12-24 1998-07-07 Hitachi Ltd Transparent parapet fence for passenger conveyor
JP3122625B2 (en) * 1997-02-20 2001-01-09 株式会社日立ビルシステム Escalator curing method and curing panel
JPH10250965A (en) * 1997-03-14 1998-09-22 Hitachi Building Syst Co Ltd How to cure the escalator
JPH11322250A (en) * 1998-05-20 1999-11-24 Mitsubishi Electric Building Techno Service Co Ltd Working safety fence for outdoor escalator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11970365B2 (en) 2020-03-04 2024-04-30 Inventio Ag Protective device during assembly work on an escalator or a moving walkway

Also Published As

Publication number Publication date
CN1299773A (en) 2001-06-20
JP2001171964A (en) 2001-06-26
KR20010066772A (en) 2001-07-11
EP1108675A2 (en) 2001-06-20
MY133186A (en) 2007-10-31
CN1167603C (en) 2004-09-22
JP3454766B2 (en) 2003-10-06
TW522136B (en) 2003-03-01
EP1108675A3 (en) 2004-02-04

Similar Documents

Publication Publication Date Title
KR101794085B1 (en) Construction system and method for multi-floor buildings
EP1108675B1 (en) Working method and protection system for passenger conveyer
US7000733B2 (en) Work platform
KR102033453B1 (en) Method for Construction Threshold of Gate for Elevator Cabin
CN209891598U (en) Light prefabricated assembled stair
JP5417018B2 (en) How to install an elevator in an existing building
JP6239686B2 (en) Construction material of tunnel shaft internal structure, construction lift and material transport cart
KR102335856B1 (en) Safety railing for steel beam installation
EP0713942A1 (en) Temporary stairway with landing and method for arrangement thereof
JP6534938B2 (en) Lining plate installation and rain curing jig and lining plate installation method using the jig
JP3078805B1 (en) Construction method of nuclear power facilities
JP3212231B2 (en) Plant construction method and construction equipment
JP2022097091A (en) Manufacturing method of scaffold under elevated structure and delivering tool
JPH06305657A (en) Elevator and its elevator shaft
KR100579711B1 (en) Top plate support method for waterproofing the upper surface of the opening method
JPH09296407A (en) Lining board
JP3289216B2 (en) Work facility having pits and method of constructing the same
JPH08303006A (en) Building and scrapping construction method for building
KR101234263B1 (en) Support Unit for Mounting Banister and Banister Construction Method Using the Same
JP2936043B2 (en) Opening method, method of constructing an elevator hall using the same, and curing board suitable for these methods
JP2025130797A (en) Building construction method
LT5949B (en) Method for constructingrccv liner using rccv all-weather shield
JP2002349002A (en) ALC panel connection structure and connected ALC unit construction method
CN120844812A (en) A prefabricated prestressed outer beam embedded hole integral protection method
CN121251133A (en) Efficient construction method for large-size ALC wallboard in building

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Extension state: AL LT LV MK RO SI

17P Request for examination filed

Effective date: 20040729

AKX Designation fees paid

Designated state(s): DE FR GB

17Q First examination report despatched

Effective date: 20080328

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): DE FR GB

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 60047686

Country of ref document: DE

Effective date: 20130207

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20130913

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20130410

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 60047686

Country of ref document: DE

Effective date: 20130913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20131101

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130410

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20131231

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 60047686

Country of ref document: DE

Effective date: 20131101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130430