EP1084005A1 - Method for bending a double pipe, in particular a bimetalic pipe - Google Patents

Method for bending a double pipe, in particular a bimetalic pipe

Info

Publication number
EP1084005A1
EP1084005A1 EP99924597A EP99924597A EP1084005A1 EP 1084005 A1 EP1084005 A1 EP 1084005A1 EP 99924597 A EP99924597 A EP 99924597A EP 99924597 A EP99924597 A EP 99924597A EP 1084005 A1 EP1084005 A1 EP 1084005A1
Authority
EP
European Patent Office
Prior art keywords
pipe
bending
double
inner pipe
bending tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
EP99924597A
Other languages
German (de)
French (fr)
Inventor
Emiel Cherrette
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fabricom SA
Original Assignee
Fabricom SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fabricom SA filed Critical Fabricom SA
Publication of EP1084005A1 publication Critical patent/EP1084005A1/en
Ceased legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D9/00Bending tubes using mandrels or the like
    • B21D9/16Auxiliary equipment, e.g. machines for filling tubes with sand
    • B21D9/18Auxiliary equipment, e.g. machines for filling tubes with sand for heating or cooling of bends
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/051Deforming double-walled bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D9/00Bending tubes using mandrels or the like
    • B21D9/15Bending tubes using mandrels or the like using filling material of indefinite shape, e.g. sand, plastic material

Definitions

  • the present invention relates to a method for forming at least one bend in a double pipe comprising an inner pipe located within an outer pipe.
  • US 4,377,894 discloses a method wherein a double pipe is bent using a suitable bending tool.
  • the outer surface of the outer pipe is heated and/or the inner surface of the inner pipe is cooled.
  • an expanding force in particular a hydraulic pressure, is applied to the interior of the inner tube.
  • the temperature of the outer pipe is caused to be lower than that of the inner pipe, in order to produce a tight fit between the outer pipe and the inner pipe.
  • This technique is known as thermo- hydraulic technique.
  • a problem with this known technique is that it is relatively cumbersome and expensive to implement.
  • a further problem is that upon bending the double pipe, the inner pipe loses contact from the outer pipe at the outer side of the bend (extrados). In addition, buckling occurs in the inner pipe at the inner side of the bend (intrados).
  • Buckling occurs at the inner side of the curve due to the fact that the inner pipe has a limited thickness, typically about 3 mm.
  • the problem of loosening occurs due to the fact that the materials used for manufacturing the inner and outer pipes have a different coefficient of expansion.
  • the outer pipe is made of carbon-steel and the inner pipe of stainless-steel
  • the coefficient of expansion of stainless steel is larger than the coefficient of expansion of carbon-steel
  • the average coefficient of linear expansion for carbon steel is approximately 14 * 10 "6 /°C and for stainless steel approximately 18*10 "6 /°C
  • the stainless-steel inner pipe will therefore shrink more than the carbon-steel outer pipe As a result, the inner pipe is loosened from the outer pipe
  • An object of the present invention is to provide an alternative method for forming a bend in a double pipe achieving satisfactory results, which is less cumbersome and less expensive to implement, and wherein the buckling problem is reduced
  • a method for forming at least one bend in a double pipe comprising an inner pipe located within an outer pipe, wherein the inner pipe has a coefficient of expansion higher than the coefficient of expansion of the outer pipe
  • the method is applied on an outer pipe having a yield point higher than the yield point of the inner pipe
  • the method essentially comprises the following steps In a first step, the inner pipe is filled with a compressible material The compressible material is compressed in the inner pipe This first step allows to reduce buckling and loosening of the inner pipe upon bending In a second step, the double pipe is bent using a pipe bending tool Then, the filling material is removed from the inner pipe In a further step, an expanding force is applied to the inner pipe until the outer pipe has undergone a predetermined expansion
  • the compressible material is in particular a granular material, such as sand Use of sand for reducing buckling upon bending single pipes is known, as indicated for example in EP-A-0 099 714.
  • filling sand has only been applied for bending single pipes.
  • the invention is related to a method for bending double pipes. It has been discovered that the use of the compressible material, in particular sand, reduces buckling of the inner pipe at the inner side of the bend, but also reduces loosening of the inner pipe from the outer pipe at the outer side of the bend. Furthermore, the subsequent steps of applying a heat source to the outer pipe and/or a cooling source to the inner pipe is no longer required. It is sufficient to apply an expanding force for achieving satisfactory results. Consequently, the method according to the invention is less expensive to apply than the known thermo-hydraulic method.
  • Figure 1 is a section view of a portion of a double pipe before bending.
  • Figure 2 is a section view of a portion of the double pipe of Figure 1 after bending using conventional techniques without filling with a compressible material.
  • Figure 3 illustrates the double pipe of Figure 1 after bending using the method according to the invention, but before the step of applying an expanding force.
  • Figure 4 is a diagram illustrating the direction of movement and the speed of the bending tool and the double pipe in function of the time during the bending operation.
  • Figure 5 is a section view of the pipe of Figure 3 showing the extension piece wherein an opening is provided.
  • Figure 6 is a section view of the double pipe of Figure 1 after the expanding force has been applied.
  • the method for forming at least one bend according to the invention is applicable on double pipes or so called bimetallic pipes.
  • a corrosion resisting inner pipe 10 is telescopically aligned inside a carbon outer pipe 12 and expanded by an expansion and calibrating process known as such.
  • An example of such a pipe is manufactured by Butting under the trade name BUBI pipe.
  • the outer pipe is provided for ensuring strength, while the inner pipe is provided for ensuring protection against corrosion.
  • the inner pipe is made of stainless-steel and the outer pipe of carbon-steel.
  • the inner pipe 10 Before bending such a double pipe, the inner pipe 10 is filled with a compressible material 11 , which could for example be a granular material, in particular sand.
  • the compressible material should be a non metal and resisting to relatively high temperatures.
  • the compressible material is compressed in the inner tube using a technique known as such for single pipes.
  • the compressible material is removed.
  • the obtained pipe bend is shaped as illustrated in Figure 3.
  • an appropriate bending tool use is made of an appropriate bending tool.
  • a hot bending technique is applied using a heating mechanism, such as an inductor.
  • the temperature of the inner tube is essentially equal to the temperature of the outer pipe.
  • FIG. 4 is a diagram illustrating the direction of movement, the speed of the bending tool Vj and the speed of the double pipe v p in function of the time t upon bending the double pipe. The bending operation is performed from time span ti to t 6 .
  • a preheat phase (from ti to t 2 ), a start bending phase (from t 2 to t 3 ), a bending phase (from t 3 to t 4 ), an end bending phase (from t 4 to t 5 ) and a post heating phase (from t to t 6 ) are distinguished.
  • the inductor In the preheat phase, the inductor is moved in a first direction with a speed Vj, which is constant between time ti and t 2 . In the start bending phase, the inductor speed vi progressively decreases. Between time t 2 and t 3 , the double pipe is also moved in a second direction, opposite to the first direction, as illustrated in the lower part of Figure 4, with a progressively increasing speed v p .
  • the end phase comprising the end bending phase and the postheating phase
  • the inverse operation of the start phase is performed.
  • the double pipe speed v p is progressively decreasing between time t 4 and t 5
  • the inductor speed V ⁇ is progressively increasing.
  • the inductor is moved with a constant speed v* while the double pipe is not moved.
  • start and end phases allow to form a smooth transition between the straight part of the double pipe and the bend.
  • local buckling at these transitions is considerably reduced and the compression of the sand is improved, due to the effect of shrinking.
  • the relative speed between the inductor and the double pipe is kept essentially constant during the bending operation, as illustrated in Figure 4.
  • the sum of the speeds v ⁇ and v p is constant.
  • the duration of the initial phase, the intermediate phase and the end phase, as well as values for the speed will depend on a number of parameters, such as the material used for the inner and outer pipes, the diameter, the thickness.
  • the speed is approximately 50 mm/min, time span t 2 - ti approximately 30 seconds, time span t 3 - 1 2 approximately 45 seconds, time span t 4 - t 3 approximately 35 minutes, time span t 5 - t 4 approximately 45 seconds and time span t 6 - t 5 approximately 30 seconds.
  • the hydraulic pressure is in order of 47.5 MPa.
  • the expanding force is applied until the outer pipe has undergone a predetermined expansion.
  • the inner pipe will first be subjected to an elastic deformation and then a plastic deformation. After a determined degree of expansion, the inner pipe is in contact with the outer pipe. Keeping the expanding force will lead to a further plastic expansion of the inner pipe together with an elastic expansion and subsequently a plastic expansion of the outer pipe. Both pipes are thus plastically expanded.
  • This step of applying an expanding force is required, since a space is formed between the inner pipe and the outer pipe, as shown in Figures 3 and 5.
  • the space is present due to the heating applied upon bending the pipes and due to the different expansion coefficients of the inner and outer pipes. It should be noted that the space between the inner and outer pipes is considerably smaller than a corresponding space when applying the conventional techniques, wherein the bend is formed without using a compressible material.
  • An opening 15 is preferably provided for allowing air, present in the space, to escape when the expanding force is applied.
  • the opening is preferably provided in an extension part 16 of the double pipe, which extension part will be cut when the bending operation has been completed. The expanding force is released when a predetermined degree of expansion of one of the pipes, in particular the outer pipe, has been reached.
  • the expanding force has been released when the outer diameter of the outer pipe has expanded of 1 % of the outside diameter. If the yield point of the outer tube is larger than the yield point of the inner tube, the outer pipe will tend to shrink more than the inner pipe. This ensures a tight fitting between the inner and outer pipes.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)
  • Branch Pipes, Bends, And The Like (AREA)

Abstract

A method for forming at least one bend in a double pipe is disclosed. The double pipe comprises an inner pipe located within an outer pipe. The method essentially comprises the following steps. In a first step, the inner pipe (10) is filled with a compressible material (11). The compressible material (11) is compressed in the inner pipe. In a second step, the double pipe is bent using a pipe bending tool. Then, the filling material (11) is removed from the inner pipe. In a further step, an expanding force is applied to the inner pipe (10) until the outer pipe (12) has undergone a predetermined expansion.

Description

"Method for bending a double pipe, in particular a bimetalic pipe"
BACKGROUND OF THE INVENTION
The present invention relates to a method for forming at least one bend in a double pipe comprising an inner pipe located within an outer pipe.
US 4,377,894 discloses a method wherein a double pipe is bent using a suitable bending tool. In a further step, the outer surface of the outer pipe is heated and/or the inner surface of the inner pipe is cooled. Consecutively, an expanding force, in particular a hydraulic pressure, is applied to the interior of the inner tube. After removing the hydraulic force, the temperature of the outer pipe is caused to be lower than that of the inner pipe, in order to produce a tight fit between the outer pipe and the inner pipe. This technique is known as thermo- hydraulic technique. A problem with this known technique is that it is relatively cumbersome and expensive to implement. A further problem is that upon bending the double pipe, the inner pipe loses contact from the outer pipe at the outer side of the bend (extrados). In addition, buckling occurs in the inner pipe at the inner side of the bend (intrados). These loosening and buckling problems are illustrated in Figure 2.
Buckling occurs at the inner side of the curve due to the fact that the inner pipe has a limited thickness, typically about 3 mm. The problem of loosening occurs due to the fact that the materials used for manufacturing the inner and outer pipes have a different coefficient of expansion. In particular, the outer pipe is made of carbon-steel and the inner pipe of stainless-steel The coefficient of expansion of stainless steel is larger than the coefficient of expansion of carbon-steel In particular, the average coefficient of linear expansion for carbon steel is approximately 14*10"6/°C and for stainless steel approximately 18*10"6/°C The stainless-steel inner pipe will therefore shrink more than the carbon-steel outer pipe As a result, the inner pipe is loosened from the outer pipe
SUMMARY OF THE INVENTION An object of the present invention is to provide an alternative method for forming a bend in a double pipe achieving satisfactory results, which is less cumbersome and less expensive to implement, and wherein the buckling problem is reduced
This object is achieved in a method according to the invention for forming at least one bend in a double pipe comprising an inner pipe located within an outer pipe, wherein the inner pipe has a coefficient of expansion higher than the coefficient of expansion of the outer pipe The method is applied on an outer pipe having a yield point higher than the yield point of the inner pipe The method essentially comprises the following steps In a first step, the inner pipe is filled with a compressible material The compressible material is compressed in the inner pipe This first step allows to reduce buckling and loosening of the inner pipe upon bending In a second step, the double pipe is bent using a pipe bending tool Then, the filling material is removed from the inner pipe In a further step, an expanding force is applied to the inner pipe until the outer pipe has undergone a predetermined expansion
The compressible material is in particular a granular material, such as sand Use of sand for reducing buckling upon bending single pipes is known, as indicated for example in EP-A-0 099 714. However, filling sand has only been applied for bending single pipes. The invention is related to a method for bending double pipes. It has been discovered that the use of the compressible material, in particular sand, reduces buckling of the inner pipe at the inner side of the bend, but also reduces loosening of the inner pipe from the outer pipe at the outer side of the bend. Furthermore, the subsequent steps of applying a heat source to the outer pipe and/or a cooling source to the inner pipe is no longer required. It is sufficient to apply an expanding force for achieving satisfactory results. Consequently, the method according to the invention is less expensive to apply than the known thermo-hydraulic method.
BRIEF DESCRIPTION OF THE DRAWINGS
Figure 1 is a section view of a portion of a double pipe before bending.
Figure 2 is a section view of a portion of the double pipe of Figure 1 after bending using conventional techniques without filling with a compressible material.
Figure 3 illustrates the double pipe of Figure 1 after bending using the method according to the invention, but before the step of applying an expanding force.
Figure 4 is a diagram illustrating the direction of movement and the speed of the bending tool and the double pipe in function of the time during the bending operation. Figure 5 is a section view of the pipe of Figure 3 showing the extension piece wherein an opening is provided.
Figure 6 is a section view of the double pipe of Figure 1 after the expanding force has been applied. DETAILED DESCRIPTION OF THE INVENTION
The method for forming at least one bend according to the invention is applicable on double pipes or so called bimetallic pipes. In particular, a corrosion resisting inner pipe 10 is telescopically aligned inside a carbon outer pipe 12 and expanded by an expansion and calibrating process known as such. An example of such a pipe is manufactured by Butting under the trade name BUBI pipe. The outer pipe is provided for ensuring strength, while the inner pipe is provided for ensuring protection against corrosion. Typically, the inner pipe is made of stainless-steel and the outer pipe of carbon-steel.
Experiments have been performed with the following pipes : a carbon steel outer tube (available at Butting, API 5L - X65) having a yield strength of minimum 450 MPa (Megapascal), a coefficient of expansion of approximately 14*10"6 /°C, a diameter of 219.1 mm and a thickness of 8 mm; a stainless steel inner pipe (available at Butting, ASTM A312 type 316L having a yield strength of minimum 170 MPa, a coefficient of expansion of approximately 18*10"6/°C, a diameter of 203 mm and a thickness of 3 mm.
Before bending such a double pipe, the inner pipe 10 is filled with a compressible material 11 , which could for example be a granular material, in particular sand. The compressible material should be a non metal and resisting to relatively high temperatures. The compressible material is compressed in the inner tube using a technique known as such for single pipes.
Providing the compressible material considerably reduces buckling, ovality and loosening of the inner pipe. Indeed, if the double pipe is bent without having been filled previously with sand or the like, the obtained bend will be shaped as illustrated in Figure 2.
After bending, the compressible material is removed. The obtained pipe bend is shaped as illustrated in Figure 3. For bending, use is made of an appropriate bending tool. In particular, a hot bending technique is applied using a heating mechanism, such as an inductor.
Using sand or another compressible material offers the further advantage that the temperature of the inner tube is essentially equal to the temperature of the outer pipe. As a result, when hot bending is applied, the deformation of the inner pipe 10 is performed at a warm temperature, since the heat from the inductor will conduct through the outer pipe and the inner pipe.
This method is in contrast with the state of the art, where the inner pipe is bent in a cold state, since a cooling source is applied to the cavity of the inner pipe. Cold bending of the inner pipe increases the yield point of the inner pipe. It is important however to keep the yield point of the inner pipe lower than the yield point of the outer pipe for reasons explained hereinafter. Hot bending has less influence on the yield point of the inner pipe. Figure 4 is a diagram illustrating the direction of movement, the speed of the bending tool Vj and the speed of the double pipe vp in function of the time t upon bending the double pipe. The bending operation is performed from time span ti to t6. Within this time period, a preheat phase (from ti to t2), a start bending phase (from t2 to t3), a bending phase (from t3 to t4), an end bending phase (from t4 to t5) and a post heating phase (from t to t6) are distinguished.
In the preheat phase, the inductor is moved in a first direction with a speed Vj, which is constant between time ti and t2. In the start bending phase, the inductor speed vi progressively decreases. Between time t2 and t3, the double pipe is also moved in a second direction, opposite to the first direction, as illustrated in the lower part of Figure 4, with a progressively increasing speed vp.
During the bending phase between time t3 and t4, the inductor is not moved, but the double pipe is moved with a constant speed vP.
During the end phase, comprising the end bending phase and the postheating phase, the inverse operation of the start phase is performed. In other words, the double pipe speed vp is progressively decreasing between time t4 and t5, while the inductor speed Vι is progressively increasing. Between t5 and t6, the inductor is moved with a constant speed v* while the double pipe is not moved.
The start and end phases allow to form a smooth transition between the straight part of the double pipe and the bend. In addition, local buckling at these transitions is considerably reduced and the compression of the sand is improved, due to the effect of shrinking.
Preferably, the relative speed between the inductor and the double pipe is kept essentially constant during the bending operation, as illustrated in Figure 4. In other words, the sum of the speeds vι and vp is constant.
The duration of the initial phase, the intermediate phase and the end phase, as well as values for the speed will depend on a number of parameters, such as the material used for the inner and outer pipes, the diameter, the thickness. In the example of a double pipe described hereinabove, the speed is approximately 50 mm/min, time span t2 - ti approximately 30 seconds, time span t3 - 12 approximately 45 seconds, time span t4 - t3 approximately 35 minutes, time span t5 - t4 approximately 45 seconds and time span t6 - t5 approximately 30 seconds. After bending, an expanding force is applied on the inner pipe, as indicated by the arrows in Figure 5. As expanding force, hydraulic pressure is in particular applied. In the given example the hydraulic pressure is in order of 47.5 MPa. The expanding force is applied until the outer pipe has undergone a predetermined expansion. The inner pipe will first be subjected to an elastic deformation and then a plastic deformation. After a determined degree of expansion, the inner pipe is in contact with the outer pipe. Keeping the expanding force will lead to a further plastic expansion of the inner pipe together with an elastic expansion and subsequently a plastic expansion of the outer pipe. Both pipes are thus plastically expanded.
This step of applying an expanding force is required, since a space is formed between the inner pipe and the outer pipe, as shown in Figures 3 and 5. The space is present due to the heating applied upon bending the pipes and due to the different expansion coefficients of the inner and outer pipes. It should be noted that the space between the inner and outer pipes is considerably smaller than a corresponding space when applying the conventional techniques, wherein the bend is formed without using a compressible material. An opening 15 is preferably provided for allowing air, present in the space, to escape when the expanding force is applied. The opening is preferably provided in an extension part 16 of the double pipe, which extension part will be cut when the bending operation has been completed. The expanding force is released when a predetermined degree of expansion of one of the pipes, in particular the outer pipe, has been reached. In the given example, the expanding force has been released when the outer diameter of the outer pipe has expanded of 1 % of the outside diameter. If the yield point of the outer tube is larger than the yield point of the inner tube, the outer pipe will tend to shrink more than the inner pipe. This ensures a tight fitting between the inner and outer pipes.
The obtained bend after release of the expanding force is illustrated in Figure 6. It has been found that the two pipes are tightly connected together with a clamping force which is larger than the clamping force of the pipes before bending. In the example given, a clamping stress, determined according to the API 5LD standard, in the order of 20 MPa has been found. In the described embodiment, only one bend has been formed in the double pipe. It is conceivable to apply consecutively a plurality of bends in a same double pipe.
PARTS LIST
10 inner pipe
11 compressible material
12 outer pipe
13 space
14 inner side bend (intrados) of inner pipe
15 opening
16 extension

Claims

1. A method for forming at least one bend in a double pipe comprising an inner pipe located within an outer pipe, the method comprising the steps of: bending the double pipe using a pipe bending tool; applying an expanding force to the inner pipe until the outer pipe has undergone a predetermined expansion; characterised in that the method is applied on an outer pipe having a yield point higher than the yield point of the inner pipe; and the method further comprises the steps of : filling the inner pipe with a compressible material and compressing the compressible material in the inner pipe prior to bending the double pipe; and removing the filling material after bending the double pipe and before applying the expanding force.
2. The method of claim 1 , wherein a heating mechanism is used as pipe bending tool.
3. The method of claim 2, wherein an inductor is used as heating mechanism.
4. The method of any one of the claims 1 to 3, wherein the step of bending the double pipe comprises an initial phase comprising the subsequent steps of : a) moving the pipe bending tool in a first direction during a first predetermined period of time; and b) simultaneously moving the pipe bending tool and the pipes during a second predetermined period of time, the pipe bending tool being moved in the first direction with a first progressively reducing speed and the pipes being moved in a second direction, opposite to the first direction, with a second progressively increasing speed.
5. The method of any one of the claims 1 to 4, wherein the step of bending the double pipe comprises an end phase comprising the subsequent steps of : a) simultaneously moving the pipe bending tool and the pipes during a third predetermined period of time, the pipe bending tool being moved in the first direction with a first progressively increasing speed and the pipes being moved in a second direction, opposite to the first direction, with a second progressively reducing speed; and b) moving the pipe bending tool in a first direction during a fourth predetermined period of time.
6. The method of claims 4 or 5, wherein the sum of said first and second speed are essentially constant during the bending step.
7. The method of any one of the preceding claims, wherein the expanding force is applied by applying a hydraulic pressure.
8. The method of any one of the preceding claims, wherein granular material, in particular sand, is used as compressible material.
9. The method of any one of the preceding claims, further comprising the step of forming an opening in the outer pipe.
10. The method of claim 9, wherein the opening is formed in an extension part of the outer pipe.
EP99924597A 1998-06-05 1999-06-04 Method for bending a double pipe, in particular a bimetalic pipe Ceased EP1084005A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
BE9800434 1998-06-05
BE9800434A BE1012024A3 (en) 1998-06-05 1998-06-05 Method for induction bending tube double.
PCT/BE1999/000070 WO1999064180A1 (en) 1998-06-05 1999-06-04 Method for bending a double pipe, in particular a bimetalic pipe

Publications (1)

Publication Number Publication Date
EP1084005A1 true EP1084005A1 (en) 2001-03-21

Family

ID=3891289

Family Applications (1)

Application Number Title Priority Date Filing Date
EP99924597A Ceased EP1084005A1 (en) 1998-06-05 1999-06-04 Method for bending a double pipe, in particular a bimetalic pipe

Country Status (4)

Country Link
EP (1) EP1084005A1 (en)
AU (1) AU4124799A (en)
BE (1) BE1012024A3 (en)
WO (1) WO1999064180A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2413976A (en) * 2004-05-14 2005-11-16 Fmc Technologies Manufacture of pipes
RS964U (en) * 2007-12-04 2008-08-07 Uroš Turanjanin Machine for bending aluminum and pvc profiles
EP2327486B1 (en) * 2009-11-26 2012-05-23 DALMINE S.p.A. Method for making lined pipe bends
GB2511773B (en) 2013-03-12 2015-09-09 Acergy France SAS Pipe bending for reel-lay operations
US9310023B2 (en) 2013-06-20 2016-04-12 The Boeing Company Methods and systems for distributing inert gas in an aircraft
GB2579417B (en) 2018-11-30 2021-06-02 Subsea 7 Do Brasil Servicos Ltda Pipe spooling for reel-lay operations
CN110181228B (en) * 2019-05-17 2021-02-02 东莞材料基因高等理工研究院 Manufacturing process of bimetal mechanical composite bent pipe
CN111633392B (en) * 2020-07-17 2023-12-29 常州今创风挡系统有限公司 Manufacturing process of connecting frame

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2220910A1 (en) * 1972-04-28 1973-12-20 Babcock & Wilcox Ag METHOD AND DEVICE FOR THE PRODUCTION OF ARCHES FROM PIPES OR HOLLOW BODIES IN THE HOT BENDING PROCESS
DE2329113A1 (en) * 1973-06-07 1975-01-02 Babcock & Wilcox Ag Tube bending using induction heating coils - with two yokes to control heat input at the inside and the outside of the bend
CA1139923A (en) * 1979-02-28 1983-01-25 Toshio Yoshida Method of producing multiple-wall composite pipes
JPS5645220A (en) * 1979-09-21 1981-04-24 Dai Ichi High Frequency Co Ltd Bending method for metallic pipe
US4377894A (en) * 1980-03-21 1983-03-29 Kawasaki Jukogyo Kabushiki Kaisha Method of lining inner wall surfaces of hollow articles
EP0099714B1 (en) * 1982-07-14 1986-09-10 The British Petroleum Company p.l.c. Method for bending pipes
JP2609205B2 (en) * 1992-10-12 1997-05-14 本田技研工業株式会社 Metal tube bending method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9964180A1 *

Also Published As

Publication number Publication date
WO1999064180A1 (en) 1999-12-16
AU4124799A (en) 1999-12-30
BE1012024A3 (en) 2000-04-04

Similar Documents

Publication Publication Date Title
CA1038796A (en) Method of producing high strength steel pipe
NL194968C (en) Method for forming a high-pressure hose connection.
JP2961134B2 (en) Method of making a mechanical connection to an object and an assembly for making a mechanical connection to an object
EP1635969A1 (en) Production of clad pipes
US7895875B2 (en) Methods and systems for reducing tensile residual stresses in compressed tubing and metal tubing products produced from same
JP4448791B2 (en) Method and apparatus for improving residual stress in piping
US20170113257A1 (en) Method for producing a large multilayer pipe
WO1999064180A1 (en) Method for bending a double pipe, in particular a bimetalic pipe
CA2262777C (en) Process for cold forming tube ends
AU589272B2 (en) Process and apparatus for manufacturing tube bends
EP0811444B1 (en) Method of wall-thickening metal pipes
KR100887450B1 (en) Method and apparatus for inserting synthetic resin-pipe in the outside-pipe and combined pipe manufactured thereby
US5875954A (en) Bonded pipe and method for bonding pipes
US6862910B2 (en) Method of manufacturing a hollow metal body
US6038902A (en) Intrados induction heating for tight radius rotary draw bend
JPS607591B2 (en) Clad pipe production method
JPS5973136A (en) Production of hollow torsion bar with arm
WO2005102555A1 (en) A method of producing thin walled metal tubes with thickened ends
JP4361985B2 (en) Manufacturing method of high-frequency ERW steel pipe with excellent workability
JPS62118919A (en) Method and device for manufacturing bend pipe
JPH08277994A (en) Hollow double pipe
JPH09126377A (en) Branching out pipe and its manufacture
JP2842225B2 (en) Upset processing method
JP2999698B2 (en) Metal tube thickening heat treatment method and apparatus
EP1379341B1 (en) Method of manufacturing a closed profile

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20001228

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE DE FR GB IT

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

17Q First examination report despatched

Effective date: 20010912

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN REFUSED

18R Application refused

Effective date: 20020310