EP0924344A1 - Rail track constuction - Google Patents

Rail track constuction Download PDF

Info

Publication number
EP0924344A1
EP0924344A1 EP98204321A EP98204321A EP0924344A1 EP 0924344 A1 EP0924344 A1 EP 0924344A1 EP 98204321 A EP98204321 A EP 98204321A EP 98204321 A EP98204321 A EP 98204321A EP 0924344 A1 EP0924344 A1 EP 0924344A1
Authority
EP
European Patent Office
Prior art keywords
rails
grooves
fixing
course
reinforcing medium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP98204321A
Other languages
German (de)
French (fr)
Other versions
EP0924344B1 (en
Inventor
Cornelis Pieter Pronk
Josephus Cornelis Petrus Heerkens
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEIJMANS WEGEN- EN WATERBOUW BV
KONINKLIJKE WEGENBOUW STEVIN BV
Original Assignee
HEIJMANS WEGEN- EN WATERBOUW BV
KONINKLIJKE WEGENBOUW STEVIN BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEIJMANS WEGEN- EN WATERBOUW BV, KONINKLIJKE WEGENBOUW STEVIN BV filed Critical HEIJMANS WEGEN- EN WATERBOUW BV
Publication of EP0924344A1 publication Critical patent/EP0924344A1/en
Application granted granted Critical
Publication of EP0924344B1 publication Critical patent/EP0924344B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B19/00Protection of permanent way against development of dust or against the effect of wind, sun, frost, or corrosion; Means to reduce development of noise
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/06Pavings adjacent tramways rails ; Pavings comprising railway tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/11Embedded tracks, using prefab elements or injecting or pouring a curable material

Definitions

  • the invention relates to a method for laying rails in a pavement having a road surface for traffic, wherein the rails are laid in the pavement such that they are sunken with respect to the road surface.
  • EP-A 0 737 778 in the name of the Applicant discloses a rail track construction with which two parallel rails are laid in grooves in a concrete or steel foundation.
  • a layer of sound-absorbent material such as, for example, very open asphalt concrete (VOAC) is applied between and alongside the rails. How the rails are fixed in the grooves is not shown in more detail. Fixing of the rails is problematical since, on the one hand, a high degree of fixation is desired and, on the other hand, a sound-damping effect must also be obtained and the transfer of vibration from the rails to the foundation, which for example is made of concrete, must be restricted.
  • EP-A 0 737 778 is not suitable for use in a road surface for traffic, such as, for example, in the case of tram rails laid in the road.
  • One aim of the present invention is therefore to provide a method for laying rails in a pavement with which stable positioning of the rails can take place in a simple and inexpensive manner.
  • a further aim of the present invention is to provide a method for forming a rail construction which is well integrated in the paving construction of the pavement with relatively few transitions so that a level road surface is retained.
  • a further aim of the present invention is to provide a rail construction wherein adequate vibration damping of the rails is obtained, wherein fixing of the position in the long term under static loads is guaranteed and wherein in the event of replacement the rails can be removed relatively easily.
  • the method according to the present invention is characterised in that the rails are laid in a fixing course that has been formed from a porous starting material having a relatively high voids content, which voids are filled with a hardening reinforcing medium.
  • the layer of starting material When applying the layer of starting material the latter can be rendered plastic and applied simply with the aid of, for example, known asphalt spreading techniques.
  • the voids in the starting material are then filled with a hardening reinforcing medium so that a fixing course is formed which has very high lateral dimensional stability.
  • the rails are accurately fixed and sleepers, tie bars or other fixing means to join the rails to one another can be dispensed with.
  • the method according to the present invention saves costs because the major part of the rail construction is formed by the road paving.
  • the space between the rails and the wall of the grooves is filled with a casting material, such as a casting material based on plastics, optionally with vibration-damping fillers, or a casting material composed of asphalt.
  • a casting material such as a casting material based on plastics, optionally with vibration-damping fillers, or a casting material composed of asphalt.
  • the staring material used for the fixing course is very open asphalt concrete (VOAC) having a voids content of at least 20 %, preferably between 25 % and 30 %. It has been found that such a course allows good penetration of the hardening reinforcing medium and that a highly advantageous lateral dimensional stability is obtained by this means.
  • the reinforcing medium comprises a cement-based slurry which has good penetration in very open asphalt concrete.
  • the thickness of the fixing course is preferably between 5 cm and 15 cm and in a preferred embodiment forms the road surface for the traffic.
  • a roadbase comprising asphalt granulate cement formed from recycled asphalt concrete with cement (CRAC) and/or asphalt concrete with minerals such as crushed aggregate or chippings (for example RAC) is preferably used.
  • CRAC recycled asphalt concrete with cement
  • a basecourse of asphalt concrete with minerals (RAC) can be used on top of this foundation and the fixing course applied on top of this.
  • transverse forces of various magnitude such as, for example, transverse forces which arise when taking bends, can be absorbed by varying the thickness of the fixing course.
  • the thickness of the roadbase is partly dependent on the sub-grade conditions and on the volume of traffic.
  • FIG. 1 shows a diagrammatic cross-section of a tram rail construction according to the present invention.
  • the figure shows a tram rail construction 1 having two rails 2, 2'. each of which has been laid in an individual groove 3.
  • the groove 3 has been made in a fixing course 4 according to the present invention which has been formed from very open asphalt concrete with a hardened cement-based reinforcing medium therein.
  • the fixing course 4 forms a road surface 5 for traffic, the rails 2, 2' being laid flush with the road surface 5.
  • the rails 2, 2' have been fixed in the grooves 3 by means of a plastic casting material 6, which, for example, is formed from a plastic, optionally with vibration-damping fillers.
  • a plastic casting material 6 which, for example, is formed from a plastic, optionally with vibration-damping fillers.
  • a roadbase 8 is used below the basecourse 7, which roadbase 8 can have a composition similar to that of the basecourse 7 or can be formed from crushed used asphalt concrete to which about 4 % by wt cement has been added (CRushed Asphalt Cement or CRAC) which has been made up in accordance with generally known guidelines.
  • rails can be laid in a pavement in a simple manner, without using sleepers, tie bars or other fixing means, such that a rail construction is obtained that is well integrated in the road surface with a minimum of transitions and minimum unevenness.
  • the rails 2, 2' can be anchored in a stable manner without the use of sleepers or other tie elements between the rails.

Abstract

The invention relates to a method for laying rails (2), such as, for example, tram rails, in a pavement having a road surface (5) for traffic. The rails are laid in a fixing course (4) that has been formed from a porous starting material having a relatively high voids content, which voids are filled with a hardening reinforcing medium. By this means the rails can be installed in a stable manner without the use of sleepers or tie bars. The starting material can be applied in a simple manner, for example by hot spreading. After the reinforcing medium has been applied, a construction which has high dimensional stability in the horizontal direction is formed in which the rails can be accurately positioned. The rails (2) can be sunk in grooves (3) and fixed in place by means of a casting material (6). The fixing course (4) preferably comprises very open asphalt concrete (VOAC) having a voids content of at least 20 %, preferably between 25 % and 30 %. The reinforcing medium used can be a cement-based slurry.

Description

  • The invention relates to a method for laying rails in a pavement having a road surface for traffic, wherein the rails are laid in the pavement such that they are sunken with respect to the road surface.
  • European Patent Application number EP-A 0 737 778 in the name of the Applicant discloses a rail track construction with which two parallel rails are laid in grooves in a concrete or steel foundation. A layer of sound-absorbent material such as, for example, very open asphalt concrete (VOAC) is applied between and alongside the rails. How the rails are fixed in the grooves is not shown in more detail. Fixing of the rails is problematical since, on the one hand, a high degree of fixation is desired and, on the other hand, a sound-damping effect must also be obtained and the transfer of vibration from the rails to the foundation, which for example is made of concrete, must be restricted. The construction disclosed in EP-A 0 737 778 is not suitable for use in a road surface for traffic, such as, for example, in the case of tram rails laid in the road. One aim of the present invention is therefore to provide a method for laying rails in a pavement with which stable positioning of the rails can take place in a simple and inexpensive manner. A further aim of the present invention is to provide a method for forming a rail construction which is well integrated in the paving construction of the pavement with relatively few transitions so that a level road surface is retained. A further aim of the present invention is to provide a rail construction wherein adequate vibration damping of the rails is obtained, wherein fixing of the position in the long term under static loads is guaranteed and wherein in the event of replacement the rails can be removed relatively easily.
  • To this end the method according to the present invention is characterised in that the rails are laid in a fixing course that has been formed from a porous starting material having a relatively high voids content, which voids are filled with a hardening reinforcing medium.
  • When applying the layer of starting material the latter can be rendered plastic and applied simply with the aid of, for example, known asphalt spreading techniques. The voids in the starting material are then filled with a hardening reinforcing medium so that a fixing course is formed which has very high lateral dimensional stability. As a result the rails are accurately fixed and sleepers, tie bars or other fixing means to join the rails to one another can be dispensed with. Furthermore the method according to the present invention saves costs because the major part of the rail construction is formed by the road paving.
  • It is possible first to lay the rails in the starting material, for cxample by cutting grooves in the latter when it is applied or by making said grooves subsequently by sawing or milling and then applying the reinforcing medium. However, it is also possible first to form the fixing course by applying a reinforcing medium and then to lay the rails in preformed and hardened grooves.
  • Preferably the space between the rails and the wall of the grooves is filled with a casting material, such as a casting material based on plastics, optionally with vibration-damping fillers, or a casting material composed of asphalt.
  • Preferably, the staring material used for the fixing course is very open asphalt concrete (VOAC) having a voids content of at least 20 %, preferably between 25 % and 30 %. It has been found that such a course allows good penetration of the hardening reinforcing medium and that a highly advantageous lateral dimensional stability is obtained by this means. Preferably, the reinforcing medium comprises a cement-based slurry which has good penetration in very open asphalt concrete.
  • The thickness of the fixing course is preferably between 5 cm and 15 cm and in a preferred embodiment forms the road surface for the traffic. For alignment in the vertical direction a roadbase comprising asphalt granulate cement formed from recycled asphalt concrete with cement (CRAC) and/or asphalt concrete with minerals such as crushed aggregate or chippings (for example RAC) is preferably used. A basecourse of asphalt concrete with minerals (RAC) can be used on top of this foundation and the fixing course applied on top of this. With a construction of this type some flexibility in the vertical direction is retained, as a result of which cracking in the event of slight settlement is counteracted.
  • With the method according to the present invention transverse forces of various magnitude, such as, for example, transverse forces which arise when taking bends, can be absorbed by varying the thickness of the fixing course. The thickness of the roadbase is partly dependent on the sub-grade conditions and on the volume of traffic.
  • The invention will be explained in more detail with reference to the single figure, which shows a diagrammatic cross-section of a tram rail construction according to the present invention. The figure shows a tram rail construction 1 having two rails 2, 2'. each of which has been laid in an individual groove 3. The groove 3 has been made in a fixing course 4 according to the present invention which has been formed from very open asphalt concrete with a hardened cement-based reinforcing medium therein. The fixing course 4 forms a road surface 5 for traffic, the rails 2, 2' being laid flush with the road surface 5.
  • The rails 2, 2' have been fixed in the grooves 3 by means of a plastic casting material 6, which, for example, is formed from a plastic, optionally with vibration-damping fillers. Below the fixing course there is a basecourse 7 formed from bitumen with crushed aggregate or chippings of a standard composition. A roadbase 8 is used below the basecourse 7, which roadbase 8 can have a composition similar to that of the basecourse 7 or can be formed from crushed used asphalt concrete to which about 4 % by wt cement has been added (CRushed Asphalt Cement or CRAC) which has been made up in accordance with generally known guidelines. Using the method according to the present invention rails can be laid in a pavement in a simple manner, without using sleepers, tie bars or other fixing means, such that a rail construction is obtained that is well integrated in the road surface with a minimum of transitions and minimum unevenness. By using the hardening reinforcing medium according to the present invention the rails 2, 2' can be anchored in a stable manner without the use of sleepers or other tie elements between the rails.

Claims (14)

  1. Method for laying rails in a pavement having a road surface for traffic, wherein the rails are laid in the pavement such that they are sunken with respect to the road surface, characterised in that the rails are laid in a fixing course that has been formed from a porous starting material having a relatively high voids content, which voids are filled with a hardening reinforcing medium.
  2. Method according to Claim 1, characterised in that grooves, in which the rails can be laid, are first made in the starting material of the fixing course, after which the reinforcing medium is applied.
  3. Method according to Claim 1, characterised in that the fixing course is first formed and in that the grooves are made after the reinforcing medium has hardened.
  4. Method according to Claim 2 or 3, characterised in that after laying the rails in the grooves the space between the rails and the wall of the grooves is filled with a casting material.
  5. Method according to Claim 1, 2, 3 or 4, characterised in that the reinforcing medium comprises a cement-based slurry.
  6. Method according to one of the preceding claims, characterised in that the fixing course comprises very open asphalt concrete (VOAC) having a voids content of at least 20 %, preferably between 25 % and 30 %.
  7. Method according to one of the preceding claims, characterised in that the casting material comprises a setting plastic or asphalt.
  8. Method according to one of the preceding claims, characterised in that two parallcl rails are laid without joining said rails to one another by sleepers.
  9. Method according to one of the preceding claims, characterised in that the thickness of the fixing course is between 5 cm and 15 cm.
  10. Method according to one of the preceding claims, characterised in that the fixing course forms the road surface.
  11. Method according to one of the preceding claims, characterised in that the fixing course is applied on top of a roadbase comprising recycled asphalt concrete with cement (CRAC) and/or asphalt concrete with minerals such as crushed aggregate or chippings (RAC).
  12. Method according to Claim 11, characterised in that paving of asphalt concrete with minerals such as crushed aggregate or chippings is applied on top of the roadbase.
  13. Method according to one of the preceding claims, characterised in that the grooves for laying the rails extend partially into the basecourse located beneath the fixing course.
  14. Method according to one of the preceding claims, characterised in that the rails (2, 2') are not joined to another by tie elements.
EP19980204321 1997-12-17 1998-12-17 Rail track construction Expired - Lifetime EP0924344B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1007815A NL1007815C2 (en) 1997-12-17 1997-12-17 Track construction.
NL1007815 1997-12-17

Publications (2)

Publication Number Publication Date
EP0924344A1 true EP0924344A1 (en) 1999-06-23
EP0924344B1 EP0924344B1 (en) 2004-02-25

Family

ID=19766199

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19980204321 Expired - Lifetime EP0924344B1 (en) 1997-12-17 1998-12-17 Rail track construction

Country Status (3)

Country Link
EP (1) EP0924344B1 (en)
DE (1) DE69821881T2 (en)
NL (1) NL1007815C2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19946317C1 (en) * 1999-09-28 2001-03-01 Sedra Asphalt Technik Biebrich Process for producing a soundproof track
EP1331311A1 (en) * 2002-01-24 2003-07-30 Alstom Method for building a track on a concrete slab
KR100918504B1 (en) * 2001-12-05 2009-09-24 알스톰 A method of construction a rail track in which a concrete track slab is produced and rail track anchor members are inserted into the track slab
DE102009044841B4 (en) * 2008-12-09 2012-02-23 Polyplan Gmbh Schienenfuge
CN113699839A (en) * 2021-09-06 2021-11-26 上海市城市建设设计研究总院(集团)有限公司 Urban tramcar rail side semi-flexible transition structure and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1026468C2 (en) 2003-06-30 2005-04-28 Heijmans Infrastructuur Bv Railway construction.

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL36958C (en) * 1900-01-01
NL7314861A (en) * 1972-10-31 1974-05-02
DE4430967A1 (en) * 1994-08-31 1996-03-07 Xaver Riebel Bauunternehmung G Support bed for tram tracks
DE29611725U1 (en) * 1996-07-05 1996-09-05 Leonhardt & Sohn Kg Plaster edge element

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL36958C (en) * 1900-01-01
NL7314861A (en) * 1972-10-31 1974-05-02
DE4430967A1 (en) * 1994-08-31 1996-03-07 Xaver Riebel Bauunternehmung G Support bed for tram tracks
DE29611725U1 (en) * 1996-07-05 1996-09-05 Leonhardt & Sohn Kg Plaster edge element

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19946317C1 (en) * 1999-09-28 2001-03-01 Sedra Asphalt Technik Biebrich Process for producing a soundproof track
WO2001023669A1 (en) 1999-09-28 2001-04-05 Sedra Asphalt Technik Biebrich Gmbh Method for producing a soundproofed track
KR100918504B1 (en) * 2001-12-05 2009-09-24 알스톰 A method of construction a rail track in which a concrete track slab is produced and rail track anchor members are inserted into the track slab
EP1331311A1 (en) * 2002-01-24 2003-07-30 Alstom Method for building a track on a concrete slab
DE102009044841B4 (en) * 2008-12-09 2012-02-23 Polyplan Gmbh Schienenfuge
CN113699839A (en) * 2021-09-06 2021-11-26 上海市城市建设设计研究总院(集团)有限公司 Urban tramcar rail side semi-flexible transition structure and construction method thereof

Also Published As

Publication number Publication date
NL1007815C2 (en) 1999-06-24
DE69821881D1 (en) 2004-04-01
NL1007815A1 (en) 1999-06-21
EP0924344B1 (en) 2004-02-25
DE69821881T2 (en) 2004-12-16

Similar Documents

Publication Publication Date Title
Michas Slab track systems for high-speed railways.
US6962462B2 (en) Method of forming, installing and a system for attaching a pre-fabricated pavement slab to a subbase and the pre-fabricated pavement slab so formed
KR20040030113A (en) Method for the continuous laying of a rail on a rigid track, in addition to an alignment device and a rigid track
US8146834B2 (en) Concrete carriageway for rail vehicles
WO1997013923A1 (en) Method for constructing block paving
CA1336424C (en) Railroad roadway for high speed rail-mounted vehicles
KR20110089991A (en) Vibration-proof track for railroads and this construction technique
Bastin Development of German non-ballasted track forms
CA2420047A1 (en) Method of stabilizing particulates
EP0924344B1 (en) Rail track construction
US4576510A (en) Technique for the location of expansion joints when casting a concrete bed
JP2604476B2 (en) How to build a slab track
JPH09268501A (en) Labor-saving track and construction method therefor
CN114687263A (en) Prefabricated assembly type roadbed widening structure and construction method
Chang et al. Using precast concrete panels for pavement construction in Indiana
PL213301B1 (en) Method for constructing a rigid track and a communication track
EP1496156A2 (en) Railway construction
US20240084514A1 (en) Rail support arrangement
JP2896464B2 (en) Concrete body reinforcement laying method
JP2850163B2 (en) How to build a trajectory without ballast
JP2002309503A (en) Block pavement and construction method therefor
Van Dam et al. Jointed Concrete Pavement (JCP) Roundabouts [tech brief]
Walsh Pavement design (highways)
KR200373151Y1 (en) Supporting structure of car stopper
DK1229168T3 (en) Road surface and method for its construction

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE DE GB LU NL

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

RTI1 Title (correction)

Free format text: RAIL TRACK CONSTRUCTION

17P Request for examination filed

Effective date: 19991201

AKX Designation fees paid

Free format text: BE DE GB LU NL

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE DE GB LU NL

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 69821881

Country of ref document: DE

Date of ref document: 20040401

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20041217

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20041126

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 20050705

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20141230

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20141121

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20150227

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20141230

Year of fee payment: 17

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151231

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 69821881

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20151217

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20160101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160701

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160101

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20151217