EP0909621A1 - Method for forming and decorating unfired ceramic tiles ahead of the press and machine for carrying out the method - Google Patents
Method for forming and decorating unfired ceramic tiles ahead of the press and machine for carrying out the method Download PDFInfo
- Publication number
- EP0909621A1 EP0909621A1 EP98118752A EP98118752A EP0909621A1 EP 0909621 A1 EP0909621 A1 EP 0909621A1 EP 98118752 A EP98118752 A EP 98118752A EP 98118752 A EP98118752 A EP 98118752A EP 0909621 A1 EP0909621 A1 EP 0909621A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- press
- station
- carriage
- compartments
- decorating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 239000000919 ceramic Substances 0.000 title claims abstract description 11
- 238000005034 decoration Methods 0.000 claims abstract description 16
- 239000000463 material Substances 0.000 claims description 24
- 238000005056 compaction Methods 0.000 claims description 4
- 238000000151 deposition Methods 0.000 claims description 2
- 238000003825 pressing Methods 0.000 claims description 2
- 239000003086 colorant Substances 0.000 description 3
- 239000004927 clay Substances 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B13/00—Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
- B28B13/02—Feeding the unshaped material to moulds or apparatus for producing shaped articles
- B28B13/0215—Feeding the moulding material in measured quantities from a container or silo
- B28B13/023—Feeding the moulding material in measured quantities from a container or silo by using a feed box transferring the moulding material from a hopper to the moulding cavities
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B13/00—Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
- B28B13/02—Feeding the unshaped material to moulds or apparatus for producing shaped articles
- B28B13/0205—Feeding the unshaped material to moulds or apparatus for producing shaped articles supplied to the moulding device in form of a coherent mass of material, e.g. a lump or an already partially preshaped tablet, pastil or the like
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B13/00—Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
- B28B13/02—Feeding the unshaped material to moulds or apparatus for producing shaped articles
- B28B13/0215—Feeding the moulding material in measured quantities from a container or silo
- B28B13/022—Feeding several successive layers, optionally of different materials
Definitions
- the present invention relates to a method for forming and decorating unfired ceramic tiles ahead of the press and to a machine for carrying out the method.
- the aim of the present invention is to solve the above problems of the prior art by providing a method for forming and decorating unfired ceramic tiles ahead of the press and a machine for carrying out the method which allow to produce already-decorated unfired tiles quickly and with no risk of altering the distribution of the decorations.
- a method for forming and decorating unfired ceramic tiles ahead of the press characterized in that it comprises the steps of: cyclically vertically aligning at least a first compartment of a press feeder carriage with respect to a station for loading material that composes the tiles and aligning at least a second compartment of the carriage, arranged in front, with respect to a decorating station which is provided directly ahead of the press; moving said carriage towards the press with a stroke which arranges said at least a first compartment in vertical alignment with respect to said decorating station and simultaneously aligns said second compartment or set of second parallel compartments with respect to said press; depositing the material contained in said compartments in said decorating station and in said mold of the press; making said carriage return to an initial configuration; placing said material deposited in the decorating station in said empty second compartment; and pressing the material deposited on the mold of said press.
- the machine for performing the method for forming and decorating unfired ceramic tiles which comprises a press which is served in a linear fashion by a mold feeding carriage which can move so as to skim, in an upward region, a travel surface, is characterized in that said carriage has at least two compartments which are in-line or has parallel rows of mutually adjacent loading compartments which are mutually aligned at right angles to the advancement direction of the carriage and are adapted to arrange themselves alternately and simultaneously in alignment with at least one loading station and at least one decoration station which is arranged ahead of the press and with said decoration station and said press.
- the reference numeral 1 generally designates a machine for performing the method according to the invention.
- the machine 1 comprises a conventional press 2 which is served by a carriage 3 for feeding a mold 4, which can move in a conventional manner so as to skim a travel surface 5.
- the carriage 3, according to the requirements of the machine 1, can be configured in different embodiments: in one possible embodiment, shown in Figure 1, it has at least two loading compartments 3a and 3b which are mutually in-line along the longitudinal axis; there can be provided more than two of said compartments in order to produce small tiles 6, and in this case the compartments are adjacent and arranged in parallel rows which are transversely perpendicular to the direction of advancement of the carriage 3.
- carriage 3 there are provided three or more compartments or rows of compartments, designated by the reference numeral 3c in the figures.
- the decoration station 8 has a first bed 10 which can move vertically in a seat 11 formed in the travel surface 5 of the carriage 3, so as to retract below the surface 5 and allow the return stroke of the carriage 3 without any interference therewith of the dose of material that is present on the bed 10.
- the precompaction station 9 is also provided with a second similar bed 12 which can move, for the same purpose, vertically in a corresponding adapted seat 13 formed in the travel surface 5, vertically above which a compaction presser 14 is operatively installed.
- the carriage 3 By means of a first stroke, the carriage 3 travels forwards, arranging the compartments 3b so that they are vertically aligned with the precompaction station 9: in this manner, the material is deposited onto the bed 12, which thus arranges itself in a lowered configuration ( Figure 3).
- the carriage 3 returns to the configuration for loading the compartments 3b and, directly thereafter, the compaction presser 14 compacts the material on the bed 12.
- the bed 12 has risen to an elevated configuration which is flush with the travel surface 5 and has introduced from below the dose of precompacted material into the intermediate compartments 3c (or the dose of loose material into the compartments 3a, in the simplified version of the carriage 3), moreover returning the empty compartments 3b below the station 7 again ( Figure 4).
- the carriage 3 performs a new stroke towards the press which is identical to the preceding one and arranges the compartments 3c, and therefore the precompacted material contained therein, at the bed 10 of the decoration station 8 on which it is deposited; simultaneously, the refilled compartments 3b are arranged at the precompaction station 9 ( Figures 5 and 6).
- the compartments 3b are again arranged at the station 7, while the compartments 3c and 3a receive from below, from the corresponding beds 12 and 10 which are aligned with them and rise again, the doses of materials to be precompacted or in which the first one is to be precompacted while the second one is being decorated.
- the carriage 3 performs another stroke towards the press 2 and the compartments arrange themselves as follows: the compartment 3a that contains the precompacted and decorated material aligns itself with the mold 4 of the press; simultaneously, the compartments 3c align themselves with the bed 10 of the decoration station 8 and the compartments 3b align themselves with the bed 12 of the precompaction station 9.
- the operating cycle intended for the stations and the press is performed simultaneously in said stations and press; at the end of these cycles, both the beds 10 and 12 and the mold 4 are in a raised configuration.
- the materials used may be any according to requirements without thereby abandoning the scope of the appended claims.
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Press-Shaping Or Shaping Using Conveyers (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
- Glass Compositions (AREA)
Abstract
Description
- The present invention relates to a method for forming and decorating unfired ceramic tiles ahead of the press and to a machine for carrying out the method.
- Various methods have long been known and used to produce dry-decorated ceramic tiles, which essentially entail preparing at a press, in a mold, a dose of clay which is adapted to form the so-called unfired foundation on which multiple layers of powdered colors are distributed by several means to produce the decoration.
- Although these methods achieve satisfactory end results, they are substantially time-consuming in their overall execution because the mold filling time and the time required to apply the decorations in one or more colors necessarily add up in operating sequences.
- Moreover, applying the decorations directly in the mold of the press does not allow to check the correct distribution of the powdered colors, which is also exposed to risk due to the movement of the filling carriage.
- The aim of the present invention is to solve the above problems of the prior art by providing a method for forming and decorating unfired ceramic tiles ahead of the press and a machine for carrying out the method which allow to produce already-decorated unfired tiles quickly and with no risk of altering the distribution of the decorations.
- The above aim and other objects which will become apparent hereinafter are achieved by a method for forming and decorating unfired ceramic tiles ahead of the press, characterized in that it comprises the steps of: cyclically vertically aligning at least a first compartment of a press feeder carriage with respect to a station for loading material that composes the tiles and aligning at least a second compartment of the carriage, arranged in front, with respect to a decorating station which is provided directly ahead of the press; moving said carriage towards the press with a stroke which arranges said at least a first compartment in vertical alignment with respect to said decorating station and simultaneously aligns said second compartment or set of second parallel compartments with respect to said press; depositing the material contained in said compartments in said decorating station and in said mold of the press; making said carriage return to an initial configuration; placing said material deposited in the decorating station in said empty second compartment; and pressing the material deposited on the mold of said press.
- Advantageously, the machine for performing the method for forming and decorating unfired ceramic tiles, which comprises a press which is served in a linear fashion by a mold feeding carriage which can move so as to skim, in an upward region, a travel surface, is characterized in that said carriage has at least two compartments which are in-line or has parallel rows of mutually adjacent loading compartments which are mutually aligned at right angles to the advancement direction of the carriage and are adapted to arrange themselves alternately and simultaneously in alignment with at least one loading station and at least one decoration station which is arranged ahead of the press and with said decoration station and said press.
- Further characteristics and advantages of the present invention will become apparent from the following description of a preferred embodiment of a machine for performing a method for forming and decorating unfired ceramic tiles ahead of the press, illustrated only by way of non-limitative example in the accompanying drawings, wherein:
- Figure 1 is a view of a possible embodiment of a machine for performing a method for forming and decorating unfired ceramic tiles ahead of the press, according to the present invention;
- Figures 2 to 9 are sequential views of the operating steps for performing the method executed with a machine configured according to a possible and alternative embodiment of the press loading carriage of the present invention.
-
- With particular reference to the above figures, the
reference numeral 1 generally designates a machine for performing the method according to the invention. - The
machine 1 comprises aconventional press 2 which is served by acarriage 3 for feeding amold 4, which can move in a conventional manner so as to skim atravel surface 5. - The
carriage 3, according to the requirements of themachine 1, can be configured in different embodiments: in one possible embodiment, shown in Figure 1, it has at least twoloading compartments 3a and 3b which are mutually in-line along the longitudinal axis; there can be provided more than two of said compartments in order to producesmall tiles 6, and in this case the compartments are adjacent and arranged in parallel rows which are transversely perpendicular to the direction of advancement of thecarriage 3. - In another embodiment of the
carriage 3 there are provided three or more compartments or rows of compartments, designated by thereference numeral 3c in the figures. - In the
machine 1, along thetravel surface 5, there are also provided at least onestation 7 for loading material for producing thetiles 6 and at least onestation 8 for dry decorating said tiles, which is arranged between theloading station 7 and thepress 2. - Moreover, for particular applications it is possible to provide, between the
stations station 9 for precompacting the material, as shown in Figures 2 to 9. - The
decoration station 8 has afirst bed 10 which can move vertically in a seat 11 formed in thetravel surface 5 of thecarriage 3, so as to retract below thesurface 5 and allow the return stroke of thecarriage 3 without any interference therewith of the dose of material that is present on thebed 10. - The
precompaction station 9 is also provided with a secondsimilar bed 12 which can move, for the same purpose, vertically in a corresponding adaptedseat 13 formed in thetravel surface 5, vertically above which acompaction presser 14 is operatively installed. - The execution of the method for decorating unfired ceramic tiles ahead of the press and the operation of the corresponding machine for carrying out the method is as follows. Following the sequence of figures 2 to 9 for the sake of convenience in description, the method entails initially retracting the
carriage 3 from thepress 2, so that the compartment or set ofcompartments 3b arrange themselves below theloading station 7 to be filled (Figure 2). - By means of a first stroke, the
carriage 3 travels forwards, arranging thecompartments 3b so that they are vertically aligned with the precompaction station 9: in this manner, the material is deposited onto thebed 12, which thus arranges itself in a lowered configuration (Figure 3). - The
carriage 3 returns to the configuration for loading thecompartments 3b and, directly thereafter, the compaction presser 14 compacts the material on thebed 12. After compaction has been completed, thebed 12 has risen to an elevated configuration which is flush with thetravel surface 5 and has introduced from below the dose of precompacted material into theintermediate compartments 3c (or the dose of loose material into the compartments 3a, in the simplified version of the carriage 3), moreover returning theempty compartments 3b below thestation 7 again (Figure 4). - The
carriage 3 performs a new stroke towards the press which is identical to the preceding one and arranges thecompartments 3c, and therefore the precompacted material contained therein, at thebed 10 of thedecoration station 8 on which it is deposited; simultaneously, the refilledcompartments 3b are arranged at the precompaction station 9 (Figures 5 and 6). - The doses of the materials contained in the
compartments beds carriage 3 returns to the initial position for a subsequent cycle (Figures 5 and 6). - In this retracted configuration, the
compartments 3b are again arranged at thestation 7, while thecompartments 3c and 3a receive from below, from thecorresponding beds - The
carriage 3 performs another stroke towards thepress 2 and the compartments arrange themselves as follows: the compartment 3a that contains the precompacted and decorated material aligns itself with themold 4 of the press; simultaneously, thecompartments 3c align themselves with thebed 10 of thedecoration station 8 and thecompartments 3b align themselves with thebed 12 of theprecompaction station 9. - The
beds mold 4 move downwards (Figure 7), simultaneously unloading all the compartments of thecarriage 3, which performs a new return stroke (Figure 8). - Accordingly, the operating cycle intended for the stations and the press is performed simultaneously in said stations and press; at the end of these cycles, both the
beds mold 4 are in a raised configuration. - At each successive active stroke of the
carriage 3, the head of the carriage pushes away the formed and decorated tile ejected from themold 4, which accordingly arranges itself in standby to receive, from the compartments 3a of thecarriage 3 at each successive cycle thereof, the dose of precompacted and decorated material in order to produce other tiles or set of tiles (Figure 9). - For the sake of completeness it should be noted that in the embodiment of the carriage 3 (see Figure 1) that has only two
compartments 3c and 3a, in themachine 1 theprecompaction station 9 is not used and the dose of decorated material reaches themold 4 while it is still entirely in the so-called loose state. - It has thus been observed that the described invention achieves the intended aim.
- The invention thus conceived is susceptible of modifications and variations, all of which are within the scope of the invention.
- All the details may further be replaced with other technically equivalent elements.
- In the practical embodiment of the invention, the materials used, as well as the shapes and the dimensions, may be any according to requirements without thereby abandoning the scope of the appended claims.
- The disclosures in Italian Patent Application No. MO97A000183 from which this application claims priority are incorporated herein by reference.
- Where technical features mentioned in any claim are followed by reference signs, those reference signs have been included for the sole purpose of increasing the intelligibility of the claims and accordingly, such reference signs do not have any limiting effect on the interpretation of each element identified by way of example by such reference signs.
Claims (6)
- A method for forming and decorating unfired ceramic tiles ahead of a press, characterized in that it comprises the steps of: cyclically vertically aligning at least a first compartment of a press feeder carriage with respect to a station for loading material that composes the tiles and aligning at least a second compartment of the carriage, arranged in front, with respect to a decorating station which is provided directly ahead of the press; moving said carriage towards the press with a stroke which arranges said at least a first compartment in vertical alignment with respect to said decorating station and simultaneously aligns said at least a second compartment; depositing the material contained in said compartments in said decorating station and in said mold of the press; making said carriage return to an initial configuration; placing said material deposited in the decorating station in said empty second compartment; and pressing the material deposited on the mold of said press.
- The method according to claim 1, characterized in that it provides for the precompaction of the material in the compartments before applying the corresponding decorations.
- A machine for carrying out the method according to claim 1, comprising a press which is served in a linear manner by a mold feeding carriage which can move so as to skim over a travel surface, characterized in that said carriage has at least two in-line loading compartments or parallel rows of mutually adjacent loading compartments which are mutually aligned at right angles to the advancement direction of the carriage and are adapted to alternately arrange themselves simultaneously in alignment with at least one loading station and at least one decoration station which is arranged ahead of the press and with said decoration station and said press.
- The machine according to claim 3, characterized in that said decoration station is provided with a first bed which can move vertically in a seat formed in a travel surface of the carriage.
- The machine according to claim 3, characterized in that between said loading station and said decoration station there is provided a station for precompacting, with corresponding means, material contained in the compartment or set of compartments.
- The machine according to claim 5, characterized in that said precompaction means are constituted by a second bed which can move vertically in a respective corresponding seat formed in said travel surface of the carriage, vertically above which a corresponding compaction presser is installed.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT97MO000183A IT1295622B1 (en) | 1997-10-16 | 1997-10-16 | METHOD FOR THE FORMATION AND DECORATION OF RAW CERAMIC TILES UPLINE FROM THE PRESS AND PLANT FOR THE IMPLEMENTATION OF THE METHOD. |
ITMO970183 | 1997-10-16 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0909621A1 true EP0909621A1 (en) | 1999-04-21 |
EP0909621B1 EP0909621B1 (en) | 2003-04-23 |
Family
ID=11386436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP98118752A Expired - Lifetime EP0909621B1 (en) | 1997-10-16 | 1998-10-05 | Method for forming and decorating unfired ceramic tiles ahead of the press and machine for carrying out the method |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0909621B1 (en) |
DE (1) | DE69813721T2 (en) |
ES (1) | ES2192725T3 (en) |
IT (1) | IT1295622B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1256428A2 (en) * | 2001-04-27 | 2002-11-13 | Daniele Lamberti | Method for loading ceramic tile forming moulds, a plant for its implementation, and tiles obtained thereby |
ES2188391A1 (en) * | 2001-08-17 | 2003-06-16 | Esmalglass Sa | Method of producing ceramic tiles |
WO2010128953A1 (en) * | 2009-05-04 | 2010-11-11 | Scg Building Materials Co., Ltd. | Method and apparatus for forming and pressing powder materials |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1281915B (en) * | 1965-03-27 | 1968-10-31 | Thuringia Feinkeramikmaschinen | Filling device on presses for manufacturing two-layer panels |
NL6707021A (en) * | 1967-05-22 | 1968-11-25 | Mosa Porselein & Tegelfab | METHOD AND INSTALLATION FOR PRESSING MULTILAYER TILES |
DD126956A1 (en) * | 1975-11-20 | 1977-08-24 | ||
EP0444730A2 (en) * | 1990-02-26 | 1991-09-04 | L.B. Officine Meccaniche S.P.A. | Double-loading carriage for ceramic moulds in general, and typically for the manufacture of pressure-glazed tiles |
JPH08187709A (en) * | 1995-01-13 | 1996-07-23 | Inax Corp | Dry molding method for laminated tile |
EP0873832A1 (en) * | 1997-04-23 | 1998-10-28 | SACMI COOPERATIVA MECCANICI IMOLA S.c.r.l. | Apparatus for pressing two-layer ceramic tiles |
-
1997
- 1997-10-16 IT IT97MO000183A patent/IT1295622B1/en active IP Right Grant
-
1998
- 1998-10-05 EP EP98118752A patent/EP0909621B1/en not_active Expired - Lifetime
- 1998-10-05 DE DE69813721T patent/DE69813721T2/en not_active Expired - Fee Related
- 1998-10-05 ES ES98118752T patent/ES2192725T3/en not_active Expired - Lifetime
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1281915B (en) * | 1965-03-27 | 1968-10-31 | Thuringia Feinkeramikmaschinen | Filling device on presses for manufacturing two-layer panels |
NL6707021A (en) * | 1967-05-22 | 1968-11-25 | Mosa Porselein & Tegelfab | METHOD AND INSTALLATION FOR PRESSING MULTILAYER TILES |
DD126956A1 (en) * | 1975-11-20 | 1977-08-24 | ||
EP0444730A2 (en) * | 1990-02-26 | 1991-09-04 | L.B. Officine Meccaniche S.P.A. | Double-loading carriage for ceramic moulds in general, and typically for the manufacture of pressure-glazed tiles |
JPH08187709A (en) * | 1995-01-13 | 1996-07-23 | Inax Corp | Dry molding method for laminated tile |
EP0873832A1 (en) * | 1997-04-23 | 1998-10-28 | SACMI COOPERATIVA MECCANICI IMOLA S.c.r.l. | Apparatus for pressing two-layer ceramic tiles |
Non-Patent Citations (1)
Title |
---|
PATENT ABSTRACTS OF JAPAN vol. 096, no. 011 29 November 1996 (1996-11-29) * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1256428A2 (en) * | 2001-04-27 | 2002-11-13 | Daniele Lamberti | Method for loading ceramic tile forming moulds, a plant for its implementation, and tiles obtained thereby |
EP1256428A3 (en) * | 2001-04-27 | 2004-01-02 | Daniele Lamberti | Method for loading ceramic tile forming moulds, a plant for its implementation, and tiles obtained thereby |
ES2188391A1 (en) * | 2001-08-17 | 2003-06-16 | Esmalglass Sa | Method of producing ceramic tiles |
WO2003078120A1 (en) * | 2001-08-17 | 2003-09-25 | Esmalglass, S.A. | Method of producing ceramic tiles |
WO2010128953A1 (en) * | 2009-05-04 | 2010-11-11 | Scg Building Materials Co., Ltd. | Method and apparatus for forming and pressing powder materials |
Also Published As
Publication number | Publication date |
---|---|
DE69813721D1 (en) | 2003-05-28 |
ITMO970183A1 (en) | 1999-04-16 |
EP0909621B1 (en) | 2003-04-23 |
IT1295622B1 (en) | 1999-05-14 |
ITMO970183A0 (en) | 1997-10-16 |
DE69813721T2 (en) | 2004-02-05 |
ES2192725T3 (en) | 2003-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106187211B (en) | A kind of Imitation Rock Porcelain Tiles and preparation method thereof with entire body texture and quality | |
US1925050A (en) | Molding machine and method of | |
EP0909621B1 (en) | Method for forming and decorating unfired ceramic tiles ahead of the press and machine for carrying out the method | |
KR102234453B1 (en) | Method and system for producing sand moulds | |
CN1100651C (en) | Apparatus and method for pressing bricks and tiles or the like | |
CN101001727B (en) | Method and press for simultaneously forming and decorating ceramic articles | |
CN101823291A (en) | Method for distributing ceramic tiles | |
EP0873832A1 (en) | Apparatus for pressing two-layer ceramic tiles | |
CN102229190B (en) | Circulating feeding system for producing ceramic wall and flow tiles | |
CN101134342A (en) | Cloth device and method | |
EP2152484B1 (en) | Process for die filling supply, in forming of tiles or like products | |
EP1323510A1 (en) | Ceramic double-loading carriage | |
CN100589949C (en) | Plant for feeding a double layer of powder or granular material into the cavity of the mould for ceramic tile production | |
EP1097911A2 (en) | Decorated ceramic tiles, apparatus and method for decorating the same | |
CN202053348U (en) | Cloth circulating system for producing ceramic tiles | |
EP0858873A1 (en) | Machine for forming and pressing powders, particularly for producing ceramic tiles, and method for producing ceramic tiles | |
EP1256428A2 (en) | Method for loading ceramic tile forming moulds, a plant for its implementation, and tiles obtained thereby | |
EP1447190A2 (en) | Method for making tiles | |
ITRE20010114A1 (en) | PROCESS AND PRESSING DEVICE FOR CERAMIC TILES | |
CN100493876C (en) | Random distributing equipment and method for ceramic forming | |
CN102366965A (en) | Method for distributing material | |
ITMO20010253A1 (en) | FEEDING SYSTEM OF A PRESS FOR THE FORMING OF CERAMIC OBJECTS | |
WO2006117606A1 (en) | An apparatus and a process for die filling supply, in forming of tiles or like products | |
EP0985503A1 (en) | A plant for ceramic dry-state decoration and forming | |
JPS6217183Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE ES FR IT PT |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
17P | Request for examination filed |
Effective date: 19990715 |
|
AKX | Designation fees paid |
Free format text: DE ES FR IT PT |
|
17Q | First examination report despatched |
Effective date: 20020221 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: GHI.TECH. S.R.L. |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: CORTI, CATIA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Designated state(s): DE ES FR IT PT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20030423 |
|
REF | Corresponds to: |
Ref document number: 69813721 Country of ref document: DE Date of ref document: 20030528 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20030723 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2192725 Country of ref document: ES Kind code of ref document: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20040126 |
|
EN | Fr: translation not filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20051215 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070501 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20071008 Year of fee payment: 10 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20081031 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20081006 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20081006 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20091005 |