EP0857824B1 - Method for covering a joining interface in a road surface, and also the joining interface thus obtained - Google Patents

Method for covering a joining interface in a road surface, and also the joining interface thus obtained Download PDF

Info

Publication number
EP0857824B1
EP0857824B1 EP98200341A EP98200341A EP0857824B1 EP 0857824 B1 EP0857824 B1 EP 0857824B1 EP 98200341 A EP98200341 A EP 98200341A EP 98200341 A EP98200341 A EP 98200341A EP 0857824 B1 EP0857824 B1 EP 0857824B1
Authority
EP
European Patent Office
Prior art keywords
interface
bridge
road
asphaltic mixture
plastics compound
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP98200341A
Other languages
German (de)
French (fr)
Other versions
EP0857824A1 (en
Inventor
Gerrit Gijsbertus Van Bochove
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heijmans Infrastructuur & Milieu Bv
Original Assignee
Heijmans Infrastructuur & Milieu Bv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heijmans Infrastructuur & Milieu Bv filed Critical Heijmans Infrastructuur & Milieu Bv
Publication of EP0857824A1 publication Critical patent/EP0857824A1/en
Application granted granted Critical
Publication of EP0857824B1 publication Critical patent/EP0857824B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/067Flat continuous joints cast in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/26Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre
    • E01C7/265Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders mixed with other materials, e.g. cement, rubber, leather, fibre with rubber or synthetic resin, e.g. with rubber aggregate, with synthetic resin binder
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/083Waterproofing of bridge decks; Other insulations for bridges, e.g. thermal ; Bridge deck surfacings

Definitions

  • the invention relates to a method for applying a road-surface material composed of an asphaltic mixture of bitumen and small stone fragments which enclose cavities, in order to cover the interface between a bridge abutment and a bridge in a road.
  • a method for covering such a joining interface between a bridge abutment and a bridge in a road is disclosed in EP-A-506196.
  • an asphaltic mixture is used which has a high percentage of enclosed open cavities (drainage asphalt).
  • the asphaltic mixture having a relatively large quantity of enclosed cavities appears to be less resistant to such conditions.
  • the flexibility is fairly low, as a result of which the expansion differences may be inadequately absorbed.
  • the capacity to absorb impact stresses without permanent deformations occurring is too low.
  • EP-B-642 has attempted to offer a solution to this problem.
  • the joining interface is filled with a mixture of aggregate parts and a bituminous binder with a rubber base.
  • Such a mixture is less suitable for high traffic stresses in view of its viscoelastic behaviour resulting from of the high proportion of bitumen. It has been found that such improvements do not offer an adequate solution with the increase in traffic stresses.
  • the object of the invention is therefore to provide a method which is adequate in this connection. This is achieved by means of a method for covering the interface between a bridge abutment and a bridge in a road with a surface material, comprising the steps of:
  • the combination of a very open asphalt and the plastics compound present therein has various advantages.
  • First of all drainage asphalt has an improved bearing capacity compared with a conventional asphaltic mixture.
  • the essentially equally graded small stone fragments are encased in a bituminous mortar which provides for the cohesion of the mixture.
  • the small stone fragments are pressed against one another so that a supporting stone skeleton is produced, which provides for a good load transfer from the road surface to the underlying supporting structure. Because, however, the bituminous joint between the small stone fragments can undergo only limited deformation, the cohesion of the layer would be lost in the event of fairly large deformation and crack formation occurs (fatigue effect), as explained above.
  • the plastics compound thus appears to provide a predictable and stable behaviour of the combination, even in the case of the relatively large movements which occur in road interfaces.
  • a further improvement may be obtained by applying a curable plastics compound which, during the curing process, produces a small amount of foam (small gas bubbles).
  • the surface material is pre-eminently suitable for the interface between a bridge and the adjoining bridge abutment.
  • the asphaltic mixture can be applied on either side of and above the interface between the bridge abutment and the bridge.
  • the adjoining road-surface sections may have a different composition.
  • the asphaltic mixture can be applied over a bridge deck and the adjoining road sections and also over the interface between bridge deck and at least one road section, the plastics compound being introduced at least at the interface.
  • a boundary can be provided in the surface material on either side of the interface before the plastics compound is introduced.
  • the plastics compound can also be introduced into the asphaltic mixture covering the bridge.
  • the traffic surfaces thus obtained must be very resistant to the fatigue stresses which occur as a consequence of the passing traffic. Said fatigue stresses comprise local deflections which may ultimately give rise to crack formation.
  • the plastics compound introduced into the asphaltic mixture imparts a higher stability to the covering material thus manufactured, in combination with a certain degree of flexibility.
  • the invention also relates to a road-surface structure comprising an interface between a bridge and a bridge abutment, at which interface a surface material is situated which comprises an asphaltic mixture of small stone fragments having an encasing of bituminous mortar which is situated on the surface of the small stone fragments, by means of which encasing the small stone fragments are attached to one another with the inclusion of residual cavities filled with an elastic plastics compound.
  • the plastics compound can only be introduced into the asphaltic mixture at the interface.
  • the asphaltic mixture filled with plastics material can be enclosed between two boundaries extending through the surface material.
  • the surface material extends continuously over bridge, interface and bridge abutment.
  • FIG. 1 shows a surface material according to the invention.
  • Said surface material is composed of an asphaltic mixture known per se (drainage asphalt) composed of small stone fragments 1 and a bituminous mortar 2 which is situated on the surface of the small stone fragments.
  • bituminous mortar 2 By means of this layer of bituminous mortar 2 on the small stone fragments 1, the latter are attached to one another, as a result of which a rigid stone skeleton is produced which can transmit stresses in a suitable manner to a foundation via the contact faces between the various small stone fragments.
  • the bituminous mortar gives the skeleton a slight degree of flexibility, as a result of which said skeleton can yield to a limited degree under stress. If a certain degree of deformation is exceeded, as may occur, for example, on steel bridge decks or in joining interfaces between a bridge deck and a bridge abutment, the skeleton deforms plastically, as a result of which cracks may be produced and small stone fragments may ultimately break away under the influence of the vehicular traffic.
  • the cavities between the small stone fragments with their bituminous mortar layer are filled with an elastic plastics compound 3 which is capable of causing the skeleton to yield elastically even for fairly large deformations so that the skeleton can return to its original shape.
  • Said elastic plastics compound 3 may be composed, for example, of polyurethane or epoxy. A material which can be cured by means of UV light can also be used.
  • the plastics compound 3 can be introduced into the cavities between the small stone fragments 1 in the form of a two-component mixture. Said mixture can easily penetrate all the cavities, and can then cure as a result of the two components reacting with one another.
  • Figure 2 shows the joining interface between a bridge abutment 4 and a bridge deck span structure 5 which rests on bearing 6.
  • a sealing profile 7 has been provided in a known manner between bridge abutment 4 and bridge deck span structure 5, as well as a steel plate 8 which is coated on the top and bottom with a sliding layer of bituminous material 13.
  • the joining interface is provided with a continuous layer of surface material 9 composed of a very open asphaltic mixture composed of small stone fragments with a bituminous mortar (drainage asphalt).
  • a bituminous mortar drainage asphalt
  • the open cavities of the asphaltic mixture in the vicinity of the joining interface have been filled with a cured elastic plastics material.
  • the asphaltic mixture 10 according to the invention is therefore situated at the point of the joining interface.
  • Said asphaltic mixture is pre-eminently suitable, on the one hand, for absorbing stresses exerted by the road traffic and, on the other hand, for absorbing the relative movements resulting from expansion movements of the bridge deck span structure.
  • the asphaltic mixture 10 may be enclosed by boundaries 11, 12 which are intended to enclose the plastics material against leakage during introduction so that the mixture according to the invention is produced only at the point of the joining interface.
  • the asphaltic mixture could also be provided in a slot recessed or provided at the point of the joining interface and then filled with the plastics compound. It is also possible for bituminous topping layers to be present in addition between the concrete bearing structure and the mixture according to the invention.

Abstract

A method for covering the interface between a bridge abutment and a bridge in a road with a surface material, comprises the steps of: providing an asphaltic mixture having high porosity and composed of small stone fragments (1) and bitumen (2), applying the apshaltic mixture at least at the interface, filling the pores or open cavities in the asphaltic mixture with a curable elastic plastics compound (3), curing the plastics compound. <IMAGE>

Description

  • The invention relates to a method for applying a road-surface material composed of an asphaltic mixture of bitumen and small stone fragments which enclose cavities, in order to cover the interface between a bridge abutment and a bridge in a road.
  • A method for covering such a joining interface between a bridge abutment and a bridge in a road is disclosed in EP-A-506196. At the position of the interface, an asphaltic mixture is used which has a high percentage of enclosed open cavities (drainage asphalt).
  • The interface between a bridge abutment and a bridge is exposed to fairly large movements which are produced by differences in expansion as a consequence of temperature variations in the bridge deck span structure. The road interface is also heavily loaded by the impact stresses of the traffic.
  • The asphaltic mixture having a relatively large quantity of enclosed cavities (drainage asphalt) appears to be less resistant to such conditions. The flexibility is fairly low, as a result of which the expansion differences may be inadequately absorbed. In addition, the capacity to absorb impact stresses without permanent deformations occurring is too low.
  • EP-B-642 has attempted to offer a solution to this problem. For this purpose, the joining interface is filled with a mixture of aggregate parts and a bituminous binder with a rubber base. Such a mixture is less suitable for high traffic stresses in view of its viscoelastic behaviour resulting from of the high proportion of bitumen. It has been found that such improvements do not offer an adequate solution with the increase in traffic stresses.
  • The object of the invention is therefore to provide a method which is adequate in this connection. This is achieved by means of a method for covering the interface between a bridge abutment and a bridge in a road with a surface material, comprising the steps of:
    • providing an asphaltic mixture having high porosity and composed of small stone fragments (1) and bitumen (2),
    • applying the asphaltic mixture at least at the interface,
    • filling the pores or open cavities in the asphaltic mixture with a curable elastic plastics compound (3),
    • curing the plastics compound (3).
  • The combination of a very open asphalt and the plastics compound present therein has various advantages. First of all drainage asphalt has an improved bearing capacity compared with a conventional asphaltic mixture. The essentially equally graded small stone fragments are encased in a bituminous mortar which provides for the cohesion of the mixture.
  • During the application and compacting of the drainage asphalt layer, the small stone fragments are pressed against one another so that a supporting stone skeleton is produced, which provides for a good load transfer from the road surface to the underlying supporting structure. Because, however, the bituminous joint between the small stone fragments can undergo only limited deformation, the cohesion of the layer would be lost in the event of fairly large deformation and crack formation occurs (fatigue effect), as explained above.
  • This disadvantage is counteracted by the plastics filling in the accessible hollows of the drainage asphalt. Said plastics filling forms an elastic cohesion means which continues through the layer of surface material and is comparable with a network structure which counteracts the loss of cohesion in the asphaltic mixture in the event of large deformations. The positive consequence of this is that the supporting skeleton of the surface layer remains intact. Both crack formation and ruts can thereby largely be avoided.
  • Together with the viscoelastic behaviour of the bitumen layer around the small stone fragments, the plastics compound thus appears to provide a predictable and stable behaviour of the combination, even in the case of the relatively large movements which occur in road interfaces.
  • Crucial in the absorption of such large elongations or movements is that the points in the road-surface material where the largest percentage deformations occur (near the contact faces between the stones) are provided with bituminous, plastic deformable mortar and that the binding elastic plastics filler is situated at the points where the percentage movements have more or less been eliminated by damping and are thus smaller (in the hollows between the asphalt grains, at a certain distance from the contact faces).
  • A further improvement may be obtained by applying a curable plastics compound which, during the curing process, produces a small amount of foam (small gas bubbles). Thereby, the formation of large stress concentrations in the plastics filling, resulting from a three axial stress pattern, is avoided when great deformations occur of the system comprising drainage asphalt and plastics.
  • As a result of these properties, the surface material is pre-eminently suitable for the interface between a bridge and the adjoining bridge abutment.
  • According to a first possibility, the asphaltic mixture can be applied on either side of and above the interface between the bridge abutment and the bridge. The adjoining road-surface sections may have a different composition.
  • According to a second possibility, the asphaltic mixture can be applied over a bridge deck and the adjoining road sections and also over the interface between bridge deck and at least one road section, the plastics compound being introduced at least at the interface.
  • Such a method makes it possible to carry out the work efficiently since the road, the interface and the bridge can be covered in one continuous operation. Only later is it necessary to introduce the plastics compound at the point of the interface without affecting the finished road surface.
  • A boundary can be provided in the surface material on either side of the interface before the plastics compound is introduced.
  • According to a variant, the plastics compound can also be introduced into the asphaltic mixture covering the bridge.
  • Reference is made to the method for applying a surface material as disclosed in NL-A-7314861. Said known method is used for covering traffic surfaces such as runways for an airport, road surfaces, etc.
  • The traffic surfaces thus obtained must be very resistant to the fatigue stresses which occur as a consequence of the passing traffic. Said fatigue stresses comprise local deflections which may ultimately give rise to crack formation.
  • Such stresses are not primarily crucial for a joining interface. At the point of a joining interface, the road-surface material is exposed especially to stresses which are the consequence of expansion movements of the bridge, which essentially generate horizontally directed stresses.
  • The plastics compound introduced into the asphaltic mixture imparts a higher stability to the covering material thus manufactured, in combination with a certain degree of flexibility.
  • It is not known from said publication to use the method described therein in an interface between a bridge abutment and a bridge deck. Reason for this is that the flexibility of the product as known therefrom offers a too limited deformation capability.
  • The invention also relates to a road-surface structure comprising an interface between a bridge and a bridge abutment, at which interface a surface material is situated which comprises an asphaltic mixture of small stone fragments having an encasing of bituminous mortar which is situated on the surface of the small stone fragments, by means of which encasing the small stone fragments are attached to one another with the inclusion of residual cavities filled with an elastic plastics compound.
  • According to a first possibility the plastics compound can only be introduced into the asphaltic mixture at the interface. In that case, the asphaltic mixture filled with plastics material can be enclosed between two boundaries extending through the surface material.
  • According to a second possibility, the surface material extends continuously over bridge, interface and bridge abutment.
  • The invention will be explained in greater detail below with reference to the attached figures.
  • Figure 1 shows a section through the surface material.
  • Figure 2 shows a section through a joining interface.
  • Figure 1 shows a surface material according to the invention. Said surface material is composed of an asphaltic mixture known per se (drainage asphalt) composed of small stone fragments 1 and a bituminous mortar 2 which is situated on the surface of the small stone fragments. By means of this layer of bituminous mortar 2 on the small stone fragments 1, the latter are attached to one another, as a result of which a rigid stone skeleton is produced which can transmit stresses in a suitable manner to a foundation via the contact faces between the various small stone fragments.
  • The bituminous mortar gives the skeleton a slight degree of flexibility, as a result of which said skeleton can yield to a limited degree under stress. If a certain degree of deformation is exceeded, as may occur, for example, on steel bridge decks or in joining interfaces between a bridge deck and a bridge abutment, the skeleton deforms plastically, as a result of which cracks may be produced and small stone fragments may ultimately break away under the influence of the vehicular traffic.
  • According to the invention, the cavities between the small stone fragments with their bituminous mortar layer are filled with an elastic plastics compound 3 which is capable of causing the skeleton to yield elastically even for fairly large deformations so that the skeleton can return to its original shape.
  • Said elastic plastics compound 3 may be composed, for example, of polyurethane or epoxy. A material which can be cured by means of UV light can also be used.
  • The plastics compound 3 can be introduced into the cavities between the small stone fragments 1 in the form of a two-component mixture. Said mixture can easily penetrate all the cavities, and can then cure as a result of the two components reacting with one another.
  • Figure 2 shows the joining interface between a bridge abutment 4 and a bridge deck span structure 5 which rests on bearing 6. A sealing profile 7 has been provided in a known manner between bridge abutment 4 and bridge deck span structure 5, as well as a steel plate 8 which is coated on the top and bottom with a sliding layer of bituminous material 13.
  • Together with the adjacent surfaces of the bridge abutment 4 and bridge deck span structure 5, the joining interface is provided with a continuous layer of surface material 9 composed of a very open asphaltic mixture composed of small stone fragments with a bituminous mortar (drainage asphalt). According to the invention, the open cavities of the asphaltic mixture in the vicinity of the joining interface have been filled with a cured elastic plastics material.
  • The asphaltic mixture 10 according to the invention is therefore situated at the point of the joining interface. Said asphaltic mixture is pre-eminently suitable, on the one hand, for absorbing stresses exerted by the road traffic and, on the other hand, for absorbing the relative movements resulting from expansion movements of the bridge deck span structure.
  • The asphaltic mixture 10 may be enclosed by boundaries 11, 12 which are intended to enclose the plastics material against leakage during introduction so that the mixture according to the invention is produced only at the point of the joining interface.
  • As an alternative, the asphaltic mixture could also be provided in a slot recessed or provided at the point of the joining interface and then filled with the plastics compound. It is also possible for bituminous topping layers to be present in addition between the concrete bearing structure and the mixture according to the invention.

Claims (12)

  1. Method for covering the interface between a bridge abutment and a bridge in a road with a surface material, comprising the steps of:
    providing an asphaltic mixture having high porosity and composed of small stone fragments (1) and bitumen (2),
    applying the asphaltic mixture at least at the interface.
    characterised by:
    filling the pores and open cavities in the asphaltic mixture with a curable elastic plastics compound (3), and
    curing the plastics compound (3).
  2. Method according to Claim 1, wherein the asphaltic mixture is applied on either side of and above the interface between the bridge abutment and the bridge.
  3. Method according to Claim 1 or 2, wherein the asphaltic mixture is applied over a bridge deck and the adjoining road sections and also over the interface between bridge deck and at least one road section, and the plastics compound is introduced at least at the interface.
  4. Method according to Claim 3, wherein a boundary (11, 12) is provided in the surface material on either side of the interface before the plastics compound (3) is introduced.
  5. Method according to Claim 3 or 4, wherein the plastics compound is introduced into the asphaltic mixture covering the bridge.
  6. Method according to one of the preceding claims, wherein a plastics compound is applied providing foam formation or formation of gas bubbles upon curing.
  7. Road-surface structure manufactured according to the method according to one of the preceding claims, comprising an interface between a bridge (5) and a bridge abutment (4), at which interface a surface material is situated which comprises an asphaltic mixture of small stone fragments (1) having an encasing of bituminous mortar (2) which is situated on the surface of the small stone fragments (1), by means of which encasing the small stone fragments (1) are attached to one another with the inclusion of residual cavities filled with an elastic plastics compound (3).
  8. Road-surface structure according to Claim 7, wherein the surface material extends continuously over bridge (5), interface and bridge abutment (4).
  9. Road-surface structure according to Claim 7 or 8, wherein the plastics compound is only introduced into the asphaltic mixture at the interface.
  10. Road-surface structure according to Claim 9, wherein the asphaltic mixture filled with plastics material is enclosed between two boundaries (11, 12) extending through the surface material.
  11. Road-surface structure according to Claim 9 or 10, wherein the bridge-covering asphaltic mixture is filled with the plastics compound.
  12. Road-surface structure according to one of Claims 7-11, wherein the interface is covered by a plate (8) which is coated on the top and bottom with a sliding layer (13) composed of bituminous material, above which plate the surface material is situated.
EP98200341A 1997-02-06 1998-02-05 Method for covering a joining interface in a road surface, and also the joining interface thus obtained Expired - Lifetime EP0857824B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1005198 1997-02-06
NL1005198A NL1005198C2 (en) 1997-02-06 1997-02-06 Method for coating a joint transition in a road surface, as well as the joint transition thus obtained.

Publications (2)

Publication Number Publication Date
EP0857824A1 EP0857824A1 (en) 1998-08-12
EP0857824B1 true EP0857824B1 (en) 2002-05-08

Family

ID=19764360

Family Applications (1)

Application Number Title Priority Date Filing Date
EP98200341A Expired - Lifetime EP0857824B1 (en) 1997-02-06 1998-02-05 Method for covering a joining interface in a road surface, and also the joining interface thus obtained

Country Status (4)

Country Link
EP (1) EP0857824B1 (en)
AT (1) ATE217374T1 (en)
DE (1) DE69805223T2 (en)
NL (1) NL1005198C2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1018173C2 (en) * 2001-05-30 2002-12-11 Heijmans Infrastructuur & Mili Bridging material for a joint construction, as well as pre-manufactured bridging unit.
NL1033956C2 (en) * 2007-06-08 2008-12-15 Ballast Nedam Infra B V Method for applying / removing a joint in a recess between parts of a road surface and a device for thereby covering.
NL2001419C2 (en) * 2008-03-28 2009-09-29 Rasenberg Wegenbouw B V Forming expansion joint cover for e.g. bridges or viaducts, by laying two elastic layers having different elasticity

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1554848A (en) * 1967-12-08 1969-01-24
GB1277524A (en) * 1970-04-16 1972-06-14 Shell Int Research Process for laying a modified asphalt pavement
DE2253495C3 (en) * 1972-10-31 1979-04-12 Alfred Kunz & Co, 8000 Muenchen Ceiling for traffic routes and the like
DE2322009A1 (en) * 1973-05-02 1974-11-21 Strabag Bau Ag PROCESS FOR CREATING OR REPAIRING TRAFFIC AREAS
DE2860972D1 (en) * 1977-07-22 1981-11-12 Thormack Limited A method of sealing bridge deck joints
NL9100524A (en) * 1991-03-25 1992-10-16 Hollandsche Betongroep Nv METHOD FOR CLOSING THE JOINT BETWEEN TWO MOVABLE PATHS ON AN ASPHALT ROAD SURFACE, IN PARTICULAR THE JOINT BETWEEN TWO BRIDGE PARTS OR BETWEEN A BRIDGE PART AND A MAIN PART.
NL9101645A (en) * 1991-09-27 1993-04-16 Bolidt Kunststoftoepassing B V Road surface

Also Published As

Publication number Publication date
DE69805223T2 (en) 2002-10-31
ATE217374T1 (en) 2002-05-15
NL1005198C2 (en) 1998-08-07
DE69805223D1 (en) 2002-06-13
EP0857824A1 (en) 1998-08-12

Similar Documents

Publication Publication Date Title
US3334555A (en) Paving utilizing epoxy resin
KR101323022B1 (en) Method of road repairing by using urethane sealant for repairing broken concrete near expansion joint
JPWO2005124026A1 (en) Paved road
US20090038511A1 (en) Carriageway and ground surfacing for carriageways
EP0857824B1 (en) Method for covering a joining interface in a road surface, and also the joining interface thus obtained
KR102199977B1 (en) Bridge waterproofing structure and waterproofing method with improved adhesion between pavement layer and waterproofing layer
EP0356066B1 (en) Improved material for bridge joints and for use in, and method of, repairing or surfacing roads and the like
RU2318947C2 (en) Road paving construction method
KR102044882B1 (en) Road paving method
CN110904851A (en) Bridge deck pavement method
Abe et al. Proposition of thin-layer repairing methods using low-elasticity polymer portland cement materials and glue and study on the fatigue resistance of reinforced concrete slab
JP5728048B2 (en) Bridge buried joint structure and construction method thereof
KR100621355B1 (en) Ultra-Thin Polymer Topping
RU2585769C1 (en) Method of forming layers of road pavement of roads and city streets
GB2200645A (en) Improved material for, and method of, repairing or surfacing roads and the like
KR100632397B1 (en) A pavement construction method
KR101370641B1 (en) Repair material for asphalt road and repairing method for road using thereof
US5964549A (en) Structural beam for crack repair
KR100187557B1 (en) Expansion joints apparatus and method for repairing crack
US6187428B1 (en) Wheel rut-resistant carriageway and process for obtaining such a carriageway
JP2000328503A (en) Pavement floor
KR102372024B1 (en) Underpass joint construction method
RU2187594C1 (en) Road member and method of laying and repair of road pavement using this member
GB2222168A (en) Bitumen-rubber-metal fibre or wire based compositions and their use in bridge joints and repairing or surfacing roads
JPS6214161Y2 (en)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FI FR GB IE IT LI LU NL SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 19981215

AKX Designation fees paid

Free format text: AT BE CH DE DK ES FI FR GB IE IT LI LU NL SE

RBV Designated contracting states (corrected)

Designated state(s): AT BE CH DE DK ES FI FR GB IE IT LI LU NL SE

17Q First examination report despatched

Effective date: 19990630

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FI FR GB IE IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020508

Ref country code: LI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020508

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20020508

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020508

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020508

Ref country code: CH

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020508

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020508

REF Corresponds to:

Ref document number: 217374

Country of ref document: AT

Date of ref document: 20020515

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 69805223

Country of ref document: DE

Date of ref document: 20020613

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020808

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20020808

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20021128

EN Fr: translation not filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030205

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030205

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030205

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20030211

GBPC Gb: european patent ceased through non-payment of renewal fee
REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20090302

Year of fee payment: 12

BERE Be: lapsed

Owner name: *HEIJMANS INFRASTRUCTUUR & MILIEU B.V.

Effective date: 20100228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100228

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20160502

Year of fee payment: 19

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 69805223

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20170901